Guide wall construction method and deviceInfo
- Publication number
- JP3436715B2 JP3436715B2 JP32853699A JP32853699A JP3436715B2 JP 3436715 B2 JP3436715 B2 JP 3436715B2 JP 32853699 A JP32853699 A JP 32853699A JP 32853699 A JP32853699 A JP 32853699A JP 3436715 B2 JP3436715 B2 JP 3436715B2
- Authority
- JP
- Japan
- Prior art keywords
- guide wall
- pipe
- groove
- cutter
- injection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims description 35
- 238000002347 injection Methods 0.000 claims description 55
- 239000007924 injection Substances 0.000 claims description 55
- 239000000463 material Substances 0.000 claims description 29
- 238000005520 cutting process Methods 0.000 claims description 23
- 238000000034 method Methods 0.000 claims description 22
- 238000009933 burial Methods 0.000 claims description 16
- 239000003795 chemical substances by application Substances 0.000 claims description 2
- 239000010410 layer Substances 0.000 description 26
- 239000010426 asphalt Substances 0.000 description 8
- 239000004567 concrete Substances 0.000 description 8
- 238000009412 basement excavation Methods 0.000 description 7
- 230000002093 peripheral effect Effects 0.000 description 6
- 238000007711 solidification Methods 0.000 description 6
- 230000008023 solidification Effects 0.000 description 6
- 229910000831 Steel Inorganic materials 0.000 description 4
- 239000004568 cement Substances 0.000 description 4
- 239000000243 solution Substances 0.000 description 4
- 230000000087 stabilizing effect Effects 0.000 description 4
- 239000010959 steel Substances 0.000 description 4
- 239000000725 suspension Substances 0.000 description 4
- 239000011384 asphalt concrete Substances 0.000 description 3
- 239000011343 solid material Substances 0.000 description 3
- 238000005452 bending Methods 0.000 description 2
- 239000011230 binding agent Substances 0.000 description 2
- 238000005266 casting Methods 0.000 description 2
- 239000007788 liquid Substances 0.000 description 2
- 239000002344 surface layer Substances 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 101150096674 C20L gene Proteins 0.000 description 1
- 241000406668 Loxodonta cyclotis Species 0.000 description 1
- 102220543923 Protocadherin-10_F16L_mutation Human genes 0.000 description 1
- 101100445889 Vaccinia virus (strain Copenhagen) F16L gene Proteins 0.000 description 1
- 101100445891 Vaccinia virus (strain Western Reserve) VACWR055 gene Proteins 0.000 description 1
- 230000004888 barrier function Effects 0.000 description 1
- 239000000440 bentonite Substances 0.000 description 1
- 229910000278 bentonite Inorganic materials 0.000 description 1
- SVPXDRXYRYOSEX-UHFFFAOYSA-N bentoquatam Chemical compound O.O=[Si]=O.O=[Al]O[Al]=O SVPXDRXYRYOSEX-UHFFFAOYSA-N 0.000 description 1
- 230000000903 blocking effect Effects 0.000 description 1
- 238000007596 consolidation process Methods 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000000839 emulsion Substances 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 239000008267 milk Substances 0.000 description 1
- 210000004080 milk Anatomy 0.000 description 1
- 235000013336 milk Nutrition 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 235000019353 potassium silicate Nutrition 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 230000000717 retained effect Effects 0.000 description 1
- NTHWMYGWWRZVTN-UHFFFAOYSA-N sodium silicate Chemical compound [Na+].[Na+].[O-][Si]([O-])=O NTHWMYGWWRZVTN-UHFFFAOYSA-N 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 238000003756 stirring Methods 0.000 description 1
Landscapes
- Sewage (AREA)
Description
【0001】[0001]
【発明の属する技術分野】本発明は、管体の沈埋工法に
おけるガイドウォール構築方法およびその装置に関す
る。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a guide wall construction method and apparatus for a tube burial method.
【0002】[0002]
【従来の技術】近年、下水道管などの管体を溝孔内に沈
設して埋設するに際して、溝孔内に一本ごと管体を沈下
させて連結を行ういわゆる開削方法に代えて、複数本の
管体群を安定液で満たした沈埋溝内に沈下させ、相互
を、あるいは人孔(マンホール)と接続する方法が、特
に都市における交通の停止を最小限に抑えるために汎用
されている。2. Description of the Related Art In recent years, when a pipe body such as a sewer pipe is sunk and buried in a slot, a plurality of pipes are inserted instead of the so-called excavation method in which the pipes are sunk into the slot and connected. The method of submerging the group of pipes in a submerged ditch filled with a stabilizing solution and connecting them to each other or to a manhole is widely used to minimize the suspension of traffic particularly in a city.
【0003】かかる安定液掘削による沈埋工法の概要に
ついて説明すると、まず、図1に示すように、管体Pの
沈埋位置および人孔部M,Mの両側に、ガイドウォール
1,1を構築する。このガイドウォールは、後述のパワ
ーショベル等の掘削装置やクレーン等の吊り降ろし装
置、架設部材等の吊り支持部材の支持面となる。次い
で、図示しないが、ガイドウォール1,1間における始
端側人孔部Mから所定距離を、例えば次の人孔部Mまで
をパワーショベルなどにより、ベントナイト泥水などの
安定液Bを充填しながら沈埋溝Dを掘削するとともに、
この沈埋溝Dの少なくとも始端がわの人孔部Mに人孔2
を沈設する。The outline of the burial method by the stable liquid excavation will be explained. First, as shown in FIG. 1, guide walls 1, 1 are constructed at the burial position of the pipe P and both sides of the human hole M, M. . This guide wall serves as a support surface for an excavating device such as a power shovel, a hoisting device such as a crane, and a suspension supporting member such as an erection member, which will be described later. Next, although not shown in the drawings, a predetermined distance from the starting end side human hole M between the guide walls 1 and 1, for example, to the next human hole M is buried by filling a stabilizing solution B such as bentonite muddy water with a power shovel or the like. While excavating the groove D,
At least the starting point of this buried groove D is a human hole 2 in the human hole portion M.
To lay down.
【0004】他方、地上にて、図2および図3に示すよ
うに、複数本の管体P,P,…に、補強および重力増加
を目的として、溝形鋼等の上部支持材3、H形鋼等の下
部支持材4を当てがい、これをワイヤー5などにより管
体Pにも巻き掛けて一体化させる。また、この一体化連
結管体PUの上部支持材3上面には、カップラー6を長
手方向に間隔をおいて複数固着し、これらカップラー6
に位置監視用および吊り支持用のゲビン棒(ネジ鋼棒)
7を螺合させておく。On the other hand, on the ground, as shown in FIGS. 2 and 3, a plurality of pipes P, P, ... Are provided with upper support members 3 and H such as channel steel for the purpose of reinforcement and increase in gravity. A lower support member 4 such as a shaped steel is applied, and this is also wrapped around the pipe P with a wire 5 or the like to be integrated. A plurality of couplers 6 are fixed to the upper surface of the upper support member 3 of the integrated connecting pipe PU at intervals in the longitudinal direction.
Position monitoring and hanging support gebin rod (screw steel rod)
Screw 7 together.
【0005】かかる段取りが完了した後、例えば、構造
体として組み立てた門型クレーン足場8を支持体とし
て、チェーンブロック9Aにより連結管体PUに巻きつ
けられているワイヤー5を介して連結管体PUを吊り支
持し、チェーン9Bによる支持を順次落とし下げ、人孔
2の接続すべき位置まで吊り降ろし沈下させる。この沈
下完了状態が図3に示されている。しかる後、図4に示
すように、ガイドウォール1,1間に架設された架設部
材20と吊り支持用ゲビン棒7とをナット21により連
結し、連結管体PUを吊り支持する。After such setup is completed, for example, the portal crane scaffold 8 assembled as a structure is used as a support, and the connecting pipe PU is connected via the wire 5 wound around the connecting pipe PU by the chain block 9A. Is suspended and supported, and the support by the chain 9B is sequentially lowered, and is suspended and lowered to the position where the human hole 2 should be connected. This sinking completion state is shown in FIG. Thereafter, as shown in FIG. 4, the erection member 20 erected between the guide walls 1 and 1 and the suspension supporting gebin rod 7 are connected by the nut 21 to suspend and support the connection pipe body PU.
【0006】次いで、連結管体PUが設計位置(深さ方
向位置、および溝幅方向位置)に吊り支持されているか
否かを、安定液面から突出するゲビン棒7、および管体
の所定部位に対して連結糸を介して繋いだウキF(図示
せず)の位置によって確認する。管体の沈設位置がズレ
ている場合には、沈設管体の側方にH形鋼を建込み、こ
れを管体の側面に押し当て溝幅方向に移動させる等して
沈設位置を調整する。Next, it is determined whether or not the connecting pipe body PU is suspended and supported at the design position (position in the depth direction and position in the groove width direction), and the gebin rod 7 protruding from the stable liquid surface and a predetermined portion of the pipe body. It is confirmed by the position of Uuki F (not shown) connected via a connecting thread. If the sunk position of the pipe is misaligned, H-shaped steel is built on the side of the sunk pipe and pressed against the side of the pipe to move it in the groove width direction to adjust the sunk position. .
【0007】しかる後、沈埋溝D内の安定液B中にセメ
ントミルク等の固化材を注入するとともにエア攪拌を行
い、安定液Bの固化を図る。この固化の完了および1週
間程度の養生期間を待って、人孔2内に作業員が潜入
し、図5に示すように固化泥水部分を狸掘して人孔2と
管体Pとの間を貫通させ、この貫通路に、人孔2内から
接続用の短管P’を挿入し、さらに短管P’の周囲の空
隙にモルタルを充填して、止水を図る。After that, a solidifying material such as cement milk is injected into the stabilizing solution B in the submerged groove D, and air stirring is performed to solidify the stabilizing solution B. After the completion of the solidification and the curing period of about one week, the worker infiltrates into the manhole 2, and the solidified mud portion is dug into the manhole 2 and the pipe P as shown in FIG. The short pipe P ′ for connection is inserted from the inside of the human hole 2 into this through passage, and the space around the short pipe P ′ is filled with mortar to stop water.
【0008】かかる管体沈埋工法において、従来、ガイ
ドウォールを構築するには、沈埋溝の掘削に先立ってそ
の両側のガイドウォール構築部分を掘削し、所望の断面
形状例えば図19(A)に示すように断面鉤形をなす打
設溝100,100を形成し、しかる後同図(B)に示
すようにこの打設溝100,100内にコンクリート1
01,101を打設してガイドウォールを構築してい
た。In the conventional tube burial method, in order to construct a guide wall, prior to excavation of the burial groove, the guide wall structuring portions on both sides thereof are excavated, and a desired cross-sectional shape, for example, shown in FIG. 19 (A). As shown in FIG. 2B, concrete 1 is formed in the casting grooves 100, 100 having a hook-shaped cross section.
A guide wall was constructed by placing 01 and 101.
【0009】[0009]
【発明が解決しようとする課題】しかしながら、かかる
従来方法は要するにコンクリートの現場打設を基本とす
るものであり、打設時のコンクリート撒き出し作業や撒
き出しコンクリートの表面の均し等の作業に、非常に手
間がかかるという問題点を有していた。However, such a conventional method is basically based on the in-place pouring of concrete, and is suitable for sprinkling concrete at the time of pouring or leveling the surface of sprinkled concrete. However, there was a problem that it was very troublesome.
【0010】したがって、本発明の主たる課題は、ガイ
ドウォール構築にかかる手間数を減らして、構築作業の
迅速化および容易化を図ることにある。Therefore, a main object of the present invention is to reduce the labor required for constructing the guide wall and to speed up and facilitate the construction work.
【0011】[0011]
【課題を解決するための手段】上記課題を解決した本発
明のうち、請求項1に記載の発明は、少なくともガイド
ウォールの構築対象部位の管体沈埋位置がわ側面に沿う
溝を形成するとともに、この溝のガイドウォール構築対
象部位がわ側面から固結材を注入し固結させ、この固結
部分をガイドウォールとなすことを特徴とする、管体沈
埋工法におけるガイドウォール構築方法である。In the present invention which has solved the above-mentioned problems, the invention according to claim 1 is such that at least the tubular body burying position of the portion to be constructed of the guide wall is along the side surface.
A groove is formed and a guide wall construction pair for this groove is formed.
The solidification material is injected from the side surface of the elephant part to solidify it, and this solidification
This is a guide wall construction method in a pipe burial method, characterized in that a portion is formed as a guide wall.
【0012】請求項2記載の発明は、舗装道路において
管体の沈埋敷設作業に利用するガイドウォールを管体沈
埋位置の両側にそれぞれ構築する方法であって、少なく
ともガイドウォールの構築対象部位の管体沈埋位置がわ
側面に沿う溝を形成するとともに、この溝のガイドウォ
ール構築対象部位がわ側面に露出する少なくとも路盤層
内にその露出面から固結材を注入して固結させ、この固
結した路盤層およびその上層をガイドウォールとなすこ
とを特徴とする、管体沈埋工法におけるガイドウォール
構築方法である。According to the second aspect of the present invention, there is provided a method of constructing guide walls used for laying and laying a pipe body on a paved road on both sides of a pipe burial position. A groove is formed along the side surface of the body where the body is sunk, and a portion of the groove is exposed on the side surface of the guide wall. A method of constructing a guide wall in a pipe burial method, characterized in that a roadbed layer and a layer above it are used as a guide wall.
【0013】請求項3記載の発明は、カッター刃を有す
るカッター装置と、前記カッター装置のカッター刃によ
り切削形成された溝内に挿入されるとともに切削溝側壁
に対して固結材を注入する注入管と、この注入管を介し
て固結材を供給する固結剤供給手段とを備えたことを特
徴とする、管体沈埋工法におけるガイドウォール構築装
置である。According to a third aspect of the present invention, there is provided a cutter device having a cutter blade, and an injection for inserting a consolidating material into a groove formed by the cutter blade of the cutter device and at the same time to the side wall of the cutting groove. An apparatus for constructing a guide wall in a pipe body burying method, comprising a pipe and a solidifying agent supply means for supplying a solidifying material through the injection pipe.
【0014】[0014]
【発明の実施の形態】以下、本発明の実施の形態につい
て、舗装道路におけるガイドウォール構築の例を引いて
詳説する。
<第1の形態>
図6は、舗装道路に好適なガイドウォール構築装置例1
0を示している。本装置例10は、円盤状カッター刃1
1Cを有する公知のアスファルトカッター11に対し
て、カッター刃11Cの進行方向後方において切削溝3
0内に挿入される注入管12を取付けたものである。BEST MODE FOR CARRYING OUT THE INVENTION Hereinafter, embodiments of the present invention will be described in detail with reference to an example of construction of a guide wall on a paved road. <First Embodiment> FIG. 6 shows a guide wall construction device example 1 suitable for paved roads.
0 is shown. This device example 10 has a disk-shaped cutter blade 1
For the known asphalt cutter 11 having 1C, the cutting groove 3 is provided behind the cutter blade 11C in the traveling direction.
The injection pipe 12 to be inserted into 0 is attached.
【0015】さらに詳しく説明すると図示例の注入管1
2は、図8にも示すように、先端側部分12Tが水平方
向に沿う基端側部分12Pに対して直角をなして屈曲し
た形状をなし、その先端側部分12Tの溝30内挿入部
分におけるガイドウォール構築対象部位40がわの側面
に、長手方向に間隔をおいて複数の注入口12a,12
a…(一つでも良い)が形成されたものであり、基端側
部分12Pにおいてアスファルトカッター11の底面に
回動自在に取付けられている。また、注入管12の基端
は、たとえば図7に示すように、スイベル13、供給管
14および固結材供給ポンプ15をこの順に介して固結
材タンク16に接続される。なお図示しないが、これら
供給管14、固結材供給ポンプ15およびタンク16は
アスファルトカッター11に取付けて一体化することも
できるし、別体とすることもできる。More specifically, the injection pipe 1 shown in the figure is used.
As shown in FIG. 8, 2 has a shape in which the front end side portion 12T is bent at a right angle to the base end side portion 12P along the horizontal direction. A plurality of injection ports 12a, 12 are formed on the side surface of the guide wall construction target site 40 at intervals in the longitudinal direction.
a (or even one) is formed and is rotatably attached to the bottom surface of the asphalt cutter 11 at the base end side portion 12P. Further, the base end of the injection pipe 12 is connected to a solidifying material tank 16 via a swivel 13, a supply pipe 14 and a solidifying material supply pump 15 in this order, as shown in FIG. 7, for example. Although not shown, the supply pipe 14, the solidifying material supply pump 15, and the tank 16 can be attached to the asphalt cutter 11 to be integrated, or can be provided separately.
【0016】特徴的には、注入管12は基端側部分12
Pにおいてアスファルトカッター11の底面に回動自在
に取付けられているとともに、基端がスイベル13を介
して供給管14に接続されているので、スイベル13の
回転軸芯周りに注入管12を回動させることで、先端側
部分12Tを溝30外から溝30内に挿入する或いはそ
の逆に溝30内から溝30外へ退避させることができる
ようになっている。Characteristically, the injection tube 12 has a proximal portion 12
At P, it is rotatably attached to the bottom surface of the asphalt cutter 11, and since the base end is connected to the supply pipe 14 via the swivel 13, the injection pipe 12 is rotated around the rotation axis of the swivel 13. By doing so, the front end side portion 12T can be inserted into the groove 30 from the outside of the groove 30 or, conversely, can be retracted from the inside of the groove 30 to the outside of the groove 30.
【0017】他方、ガイドウォールの構築に際しては、
構築装置10の円盤状カッター刃11Cを回転させると
ともに、その円盤状カッター刃11Cをガイドウォール
の構築対象部位40の管体沈埋位置がわ側面42に沿っ
て少なくとも路盤層R内(好適には図示のように路盤層
Rの下端)に達する深度まで切削挿入し、この状態でガ
イドウォールの構築対象部位40の長手方向に構築装置
10を前進させて、ガイドウォールの構築対象部位40
の管体沈埋位置がわ側面42に沿って長手方向に延在す
る溝を形成する一方で、カッター刃11Cよりも後方位
置においては図8にも示すように、切削溝30内に挿入
した注入管12およびその注入口12a,12a…を介
して、切削溝30のガイドウォール構築対象部位がわ側
面42に露出する路盤層R内にその露出面42aから固
結材を注入する。この際、路盤層Rは上層Sと路床Gの
遮断層rとに挟まれており且つそれ自体砕石や砂利等を
含み透液性に富むので、注入した固結材の殆どが路盤層
R内に浸透し保持される。かくして、図9にも示すよう
に、注入した固結材により少なくとも路盤層Rが固結す
るとともにその上層と一体化し、これら固結体Zおよび
その上層Sがガイドウォール1,1となる。なお、図9
は固結後に、ガイドウォール1,1間の管体沈埋位置4
1を舗装の除去を含めて掘削し、沈埋溝Dを形成した状
態を示している。On the other hand, when constructing the guide wall,
While rotating the disk-shaped cutter blade 11C of the building device 10, the disk-shaped cutter blade 11C is moved at least in the roadbed layer R along the side surface 42 where the tubular body sunk position of the construction target site 40 of the guide wall is located. As described above, the cutting device is cut and inserted to a depth reaching the lower end of the roadbed layer R, and in this state, the building device 10 is advanced in the longitudinal direction of the guide wall construction target site 40, and the guide wall construction target site 40
While the tube body sunk position forms a groove extending in the longitudinal direction along the side surface 42, at a position rearward of the cutter blade 11C, as shown in FIG. Through the pipe 12 and the injection ports 12a, 12a, ..., A solid material is injected from the exposed surface 42a into the roadbed layer R where the guide wall construction target portion of the cutting groove 30 is exposed on the side surface 42. At this time, the roadbed layer R is sandwiched between the upper layer S and the blocking layer r of the roadbed G, and since it itself contains crushed stones, gravel, etc. and is highly liquid-permeable, most of the injected solidification material is the roadbed layer R. Penetrates inside and is retained. Thus, as shown in FIG. 9, at least the roadbed layer R is solidified and integrated with the upper layer by the injected solidifying material, and the solidified body Z and the upper layer S thereof become the guide walls 1, 1. Note that FIG.
After consolidation, the tube body burial position 4 between the guide walls 1 and 1
1 shows a state in which a buried trench D is formed by excavating No. 1 including removal of pavement.
【0018】<第2の形態>
また第2の形態として、ガイドウォール構築がわ側面に
複数の注入口を設けた円盤状カッター刃を前述のアスフ
ァルトカッターに装着して、注入溝の形成および注入を
略同時的に行うものも提案する。かかる注入口付円盤状
カッター刃の具体例としては、図10に示す第1例50
および図11に示す第2例60を提案する。第1例50
は、支持軸53の先端部に同軸的に固定した円盤状支持
部51の外周面に、支持部幅以上の幅のリング状切削刃
52を固設してなる基本構造のもと、支持軸53内を通
って円盤状支持部51の中心部内に至り、且つこの中心
部内から放射方向に分岐延在して支持部51の外がわ側
面の周縁部においてそれぞれ外側を向いて開口する注入
管路54を形成したものである。従って注入口54aは
カッター刃50の回転に伴って同軸的に回転し、その高
さ位置を連続的に変化させながらの注入が可能となって
いる。かくして、カッター刃50による切削溝30の形
成直後に略同時的に注入面42に対する注入口54aか
らの固結材注入を行うことができる。なお、確実な注入
を行うためには常に少なくとも1つの注入口54aが切
削溝30内に入っているように、注入口数およびそれら
の間隔を定める。<Second Embodiment> As a second embodiment, a disc-shaped cutter blade having a guide wall construction and a plurality of injection ports provided on the side surface is attached to the above-mentioned asphalt cutter to form an injection groove and perform injection. It is also proposed that the steps are performed almost simultaneously. As a specific example of such a disc-shaped cutter blade with an injection port, a first example 50 shown in FIG.
And a second example 60 shown in FIG. 11 is proposed. First example 50
Is based on a basic structure in which a ring-shaped cutting blade 52 having a width equal to or larger than the width of the supporting portion is fixedly provided on the outer peripheral surface of a disk-shaped supporting portion 51 that is coaxially fixed to the tip of the supporting shaft 53. An injection pipe that passes through 53 to reach the center of the disk-shaped support portion 51, and radially extends from the center of the support portion 51 to open outward at the peripheral edge of the outer side surface of the support portion 51. The path 54 is formed. Therefore, the injection port 54a rotates coaxially with the rotation of the cutter blade 50, and injection can be performed while continuously changing its height position. Thus, immediately after the cutting groove 30 is formed by the cutter blade 50, the solidifying material can be injected into the injection surface 42 from the injection port 54a almost at the same time. In order to perform reliable injection, the number of injection ports and their intervals are determined so that at least one injection port 54a is always in the cutting groove 30.
【0019】第2例60は、支持軸63の先端部に同軸
的に固定した円盤状支持部61の外周面に、支持部幅よ
りも幅の広いリング状切削刃62を固設してなる基本構
造のもと、支持軸63および円盤状支持部61の中心部
にその回転軸心と同軸的な貫通孔65を設けるととも
に、この貫通孔65内に、先端側部分64aに長手方向
に間隔をあけて複数の注入口64c,64c…を形成し
た屈曲管64の基端がわ部分64bを遊びをもって挿し
通し、屈曲管64の支持部外側部分64aを円盤状支持
部の外がわ側面61aと刃部外側内周面62aとからな
る凹部60U内に収容するとともに、その少なくとも注
入口64c,64c…形成部分が溝切削形成時において
溝内の路盤層Rに臨むように、屈曲管64を図示しない
台車に対して固定したものである。かくして本第2例に
おいても、カッター刃60による切削溝30の形成並び
に注入面42に対する注入口64cからの固結材注入を
行うことができ、しかも本第2例では注入管64を回転
させずに所定の注入姿勢に保持した状態で切削刃部62
のみを回転させることができる。これに対して、前述第
1の例においては、各注入口54a,54aはカッター
刃50の回転に伴って同軸的に回転し、切削溝30への
入出を交互に繰り返すことになるため、各注入口54
a,54aから常時固結材注入を行うと、溝30外にも
固結材が撒き出されてしまう。In the second example 60, a ring-shaped cutting blade 62 having a width wider than the width of the support portion is fixedly provided on the outer peripheral surface of a disk-shaped support portion 61 coaxially fixed to the tip end portion of the support shaft 63. Based on the basic structure, a through hole 65 coaxial with the rotation axis of the support shaft 63 and the disk-shaped support portion 61 is provided in the center portion of the support shaft 63, and the distal end side portion 64a is longitudinally spaced within the through hole 65. , The base end ring portion 64b of the bending tube 64 having a plurality of injection ports 64c, 64c ... Is inserted with play, and the supporting portion outer side portion 64a of the bending tube 64 is inserted into the outer side surface 61a of the disc-shaped supporting portion. The bent pipe 64 is housed in the recess 60U composed of the inner peripheral surface 62a of the blade and the outer peripheral surface 62a of the blade portion, and at least the portion where the injection ports 64c, 64c ... Fixed to a dolly not shown It is intended. Thus, also in the second example, the cutting groove 30 can be formed by the cutter blade 60 and the solidifying material can be injected into the injection surface 42 from the injection port 64c. Further, in the second example, the injection pipe 64 is not rotated. The cutting blade 62 is held in a predetermined injection posture while
Only can be rotated. On the other hand, in the above-mentioned first example, the respective inlets 54a, 54a rotate coaxially with the rotation of the cutter blade 50, and thus the inlets and outlets to and from the cutting groove 30 are alternately repeated. Inlet 54
If the solidifying material is constantly injected from a and 54a, the solidifying material will be scattered out of the groove 30.
【0020】なお、これらの例において前述第1の形態
と同様な点については、敢えて同一の符号を付して説明
を省略する。In these examples, the same points as those of the first embodiment are designated by the same reference numerals and the description thereof will be omitted.
【0021】<第3の形態>
さらに第3の形態として、図12および図13に示すよ
うに、固結材注入口付チェーンカッタ76を備えたチェ
ーンカッタアタッチメント72を台車71に架装した装
置も提案する。<Third Embodiment> As a third embodiment, as shown in FIGS. 12 and 13, a device in which a chain cutter attachment 72 having a chain cutter 76 with a binder injection port is mounted on a carriage 71. Also suggest.
【0022】さらに詳説すると、図示例のチェーンカッ
タアタッチメント72は、クローラ式台車71の前部に
上下方向に沿う姿勢で取付けられたリーダ74と、この
リーダ74によって上下方向に移動自在の支持ベース7
5と、この支持ベース75に起伏自在に取付けられた固
結材注入口付チェーンカッタ76とからなる。In more detail, the chain cutter attachment 72 of the illustrated example has a leader 74 attached to the front part of the crawler type carriage 71 in a posture along the vertical direction, and a support base 7 movable in the vertical direction by the leader 74.
5 and a chain cutter 76 with a solid material injection port, which is attached to the support base 75 so as to be up and down.
【0023】リーダ74は、上下方向に間隔をあけて並
設された一対のスプロケット74A,74Bと、これら
スプロケット74A,74B間に巻きかけられた無端チ
ェーン74Cと、一方の(図示例では上方の)スプロケ
ット74Aを回転駆動するリーダ駆動源74Dとからな
り、この無端チェーン74Cの前方側部分に支持ベース
75が連結されている。支持ベース75は、台車前部に
設けられた上下方向に沿う左右一対のガイドレール71
A,71B間に係合されており、これらガイドレール7
1A,71Bに沿う上下方向にのみ移動可能となってい
る。また、支持ベース75の前面上部にはチェーンカッ
タ連結のための軸受け部75Aが突出形成されている。The leader 74 includes a pair of sprockets 74A and 74B arranged side by side in the vertical direction and an endless chain 74C wound between the sprockets 74A and 74B. ) A leader drive source 74D that rotationally drives the sprocket 74A, and a support base 75 is connected to the front side portion of this endless chain 74C. The support base 75 includes a pair of left and right guide rails 71 provided in the front portion of the carriage and extending in the vertical direction.
The guide rail 7 is engaged between A and 71B.
It is movable only in the vertical direction along 1A and 71B. A bearing portion 75A for connecting the chain cutter is formed on the upper front surface of the support base 75 so as to project therefrom.
【0024】一方、チェーンカッタ76は、図14にも
示すように縦長支持体76Aの上端および下端にスプロ
ケット76B,76Cをそれぞれ取付け、これらスプロ
ケット76B,76C間に、外周面に切削刃76d,7
6d…を有する切削刃付無端チェーン76Dを巻き掛
け、縦長支持体76Aをその上部を取り囲むケースカバ
ー76Eにより支持するようになし、ケースカバー76
Eの外側には、一方の(図示例では上方の)スプロケッ
ト76Bを回転駆動するカッタ駆動源76Kを取付けて
これらを一体化する一方で、縦長支持体76Aの下端側
部分には上下方向に間隔をおいて複数の注入口76F,
76Fを形成し、これら注入口76F,76Fを支持体
76A内を通る供給路76Gを介して図示しない固結材
供給手段に接続したものである。On the other hand, in the chain cutter 76, as shown in FIG. 14, sprockets 76B and 76C are attached to the upper and lower ends of the vertically long support 76A, respectively, and the cutting blades 76d and 7D are provided on the outer peripheral surface between these sprockets 76B and 76C.
An endless chain 76D with a cutting blade having 6d is wound around, and a vertically long support body 76A is supported by a case cover 76E surrounding the upper portion thereof.
On the outer side of E, a cutter drive source 76K that rotationally drives one (upper in the illustrated example) sprocket 76B is attached to integrate them, while the lower end portion of the vertically long support 76A is vertically spaced. A plurality of inlets 76F,
76F is formed, and these inlets 76F and 76F are connected to a solid material supply means (not shown) via a supply path 76G passing through the inside of the support 76A.
【0025】かかる固結材注入口付チェーンカッタ76
が、そのケースカバー76Eの上部背面に設けた第1の
軸受け部76Hにおいて、リーダ74に連結した支持ベ
ース75前面に設けた第2の軸受け部75Aに第1の回
転軸77Aを介して連結され、当該第1の回転軸77A
周りに起伏可能となっている。また、ケースカバー76
Eの上部背面における第1の軸受け部76Hよりも下方
に設けた第3の軸受け部76Jに起伏ジャッキ78の先
端部78Aが、支持ベース75前面における第2の軸受
け部75Aよりも下方の部位に起伏ジャッキ78の基端
部78Bがそれぞれ第2の回転軸77Bおよび第3の回
転軸77Cを介して回転自在に連結されている。[0025] The chain cutter 76 with such a binder injection port
In the first bearing portion 76H provided on the upper rear surface of the case cover 76E, the first bearing portion 76H is coupled to the second bearing portion 75A provided on the front surface of the support base 75 coupled to the reader 74 via the first rotating shaft 77A. , The first rotating shaft 77A
It is possible to undulate around. Also, the case cover 76
A tip 78A of the undulating jack 78 is provided on a third bearing portion 76J provided below the first bearing portion 76H on the upper back surface of E, at a portion of the front surface of the support base 75 below the second bearing portion 75A. A base end portion 78B of the undulating jack 78 is rotatably connected to each other via a second rotating shaft 77B and a third rotating shaft 77C.
【0026】かくして、リーダ駆動源74Dを作動させ
て無端チェーン74Cを駆動させれば、これに伴って支
持ベース75を介してチェーンカッタ76を上昇または
下降させることができ、また起伏ジャッキ78の伸縮動
作によってによってチェーンカッタ76の角度(第1の
回転軸77Aを中心とする)を調整できる。なお、台車
71の移動、チェーンカッタ76の駆動・起伏動・上下
動のほか、注入口76F,76Fからの固結材注入制御
は、台車71から離れた位置の作業員が無線または有線
による遠隔操作によって行うことができるようになし、
台車71の運転席71Cからは台車の移動運転のみを行
えるようにするのが好ましい。Thus, when the leader driving source 74D is operated to drive the endless chain 74C, the chain cutter 76 can be raised or lowered via the support base 75 accordingly, and the hoisting jack 78 can be expanded and contracted. The angle of the chain cutter 76 (centering on the first rotation shaft 77A) can be adjusted by the operation. In addition to the movement of the dolly 71, the driving / raising / lowering / up / down movement of the chain cutter 76, the solidifying material injection control from the injection ports 76F and 76F is performed remotely by a worker at a position remote from the dolly 71 by wireless or wire. Do what you can do by operation,
From the driver's seat 71C of the truck 71, it is preferable that only the traveling operation of the truck can be performed.
【0027】また図示例では、切削注入時の切削物や注
入固結材が切削口元から飛散するのを防止するべく、チ
ェーンカッタ76の切削口元を囲むカバー80が台車7
1前部に設けられている。このカバー80は、基本的に
カッタの上下動に伴って上下動するが、カッタ76の下
降時においては切削面(この場合舗装面)に当接したと
ころで下降が止まり、カッタ76のみが更に下降するよ
うに構成されている。他方、ガイドウォールの構築に際
しては、例えば次のように行うことができる。先ず図1
5に示すように、チェーンカッタ76の外側カット面が
ガイドウォールの構築対象部位の管体沈埋位置がわ側面
に沿うように台車71を配置する。このような台車大移
動時には、チェーンカッタ76は舗装面からある程度離
間する退避状態とされる。図示例では、起伏シリンダ7
8により第1の回転軸77Aを中心として4時方向を向
いた姿勢とされるとともに、リーダ74によって上方限
界まで上昇されている。Further, in the illustrated example, the cover 80 surrounding the cutting mouth of the chain cutter 76 is provided with the carriage 7 in order to prevent the cutting material or the injected solidified material from being scattered from the cutting mouth during cutting and pouring.
1 It is provided in the front part. This cover 80 basically moves up and down as the cutter moves up and down, but when the cutter 76 descends, it stops descending when it comes into contact with the cutting surface (in this case, the paved surface), and only the cutter 76 descends further. Is configured to. On the other hand, the construction of the guide wall can be performed as follows, for example. First of all,
As shown in FIG. 5, the carriage 71 is arranged so that the outer cut surface of the chain cutter 76 is along the side surface of the tubular body sunk position of the construction target site of the guide wall. During such a large movement of the truck, the chain cutter 76 is in a retracted state in which it is separated from the pavement surface to some extent. In the illustrated example, the undulating cylinder 7
The position of 8 is oriented around the first rotation shaft 77A in the 4 o'clock direction, and is raised to the upper limit by the reader 74.
【0028】かかる段取りが終了したならば、図16に
も示すように、台車71から離れた位置の作業員90が
遠隔操作によって、チェーンカッタ76を切削作動させ
るとともに下降させ、所定深度まで切削挿入する。しか
る後、この姿勢および高さ位置を保持したままで、同じ
く台車71から離れた位置の作業員90が遠隔操作によ
って、図17に示すように、切削溝30のガイドウォー
ル構築対象部位がわ側面に露出する路盤層Rに臨む注入
口76F,76Fからその露出面を介して固結材を注入
するとともに、この注入を継続しながら台車71を徐々
に後退させる。かくして、チェーンカッター76による
注入溝30の形成直後に略同時的に注入口76F,76
Fからの注入が行われ、前述例と同様ガイドウォールが
構築される。After the completion of such setup, as shown in FIG. 16, a worker 90 at a position distant from the carriage 71 operates the chain cutter 76 for cutting operation and lowers it by remote control, and inserts it to a predetermined depth. To do. Thereafter, while maintaining this posture and height position, the worker 90 at a position also separated from the dolly 71 is remotely operated, and as shown in FIG. The solidifying material is injected from the injection ports 76F, 76F facing the roadbed layer R exposed to the outside through the exposed surface, and the carriage 71 is gradually retracted while continuing the injection. Thus, immediately after the injection groove 30 is formed by the chain cutter 76, the injection ports 76F, 76 are almost simultaneously formed.
Injection from F is performed, and a guide wall is constructed in the same manner as the above example.
【0029】なお、本第3の形態におけるチェーンカッ
タとしては、上記図示例のようなチェーン取り回し形態
のもののほか、楕円もしくは真円軌道や、四角形等の各
種多角形軌道で無端チェーンを駆動する形態も採用でき
る。また、上記例のチェーンカッタアタッチメント72
を第1の形態のような手押し台車に架装した形態とする
こともできる。さらに、注入口76Fをチェーンカッタ
72に設けずに、前述第1の形態と同様にカッタの進行
方向後方において溝内に注入管を臨ませる注入形態とす
ることもできる。As the chain cutter in the third embodiment, in addition to the chain manipulating form as shown in the above-described example, a form in which an endless chain is driven by an elliptical or perfect circle or various polygonal orbits such as quadrangle. Can also be adopted. In addition, the chain cutter attachment 72 of the above example
Can be mounted on a hand truck as in the first embodiment. Further, instead of providing the injection port 76F in the chain cutter 72, it is also possible to adopt an injection form in which the injection pipe is exposed in the groove behind the cutter in the advancing direction as in the first embodiment.
【0030】<利点>
これらの実施形態からも容易に理解できるように、本発
明では従来のコンクリートの現場打設と比べて次の利点
がある。
(A)本発明では固結材を路盤層等のガイドウォール構
築対象部位に注入するだけなので、表面均しをする必要
がない。したがって、従来例と比べると、本発明のほう
が労力を要せずしかも迅速かつ容易に行うことができ
る。<Advantages> As can be easily understood from these embodiments, the present invention has the following advantages as compared with conventional in-situ casting of concrete. (A) In the present invention, since the solidifying material is simply injected into the guide wall construction target site such as the roadbed layer, it is not necessary to level the surface. Therefore, compared with the conventional example, the present invention requires less labor and can be performed quickly and easily.
【0031】(B)打設溝の構築およびコンクリート撒
き出しによる打設作業と、本発明の注入溝の構築作業お
よび注入作業とを比べると、本発明のほうが労力を要せ
ずしかも迅速かつ容易に行うことができる。(B) Comparing the construction work of the construction groove and the construction work by sprinkling concrete with the construction work and the construction work of the injection groove of the present invention, the present invention requires less labor and is quick and easy. Can be done.
【0032】(C)特に上記例のように本発明装置を用
いると注入溝の構築作業(沈埋位置集縁に沿う舗装面の
カット作業)および注入作業を同時的に行うことができ
るので、労力を著しく軽減できるとともに、作業の著し
い迅速化・容易化を図ることができる。(C) In particular, when the apparatus of the present invention is used as in the above example, the work of constructing the injection groove (the work of cutting the pavement surface along the edge of the submerged position) and the work of injection can be performed at the same time. Can be significantly reduced, and the work can be significantly speeded up and facilitated.
【0033】<その他>
(イ)本発明の方法および装置は舗装路の種類を問わず
適用できる。図示しないが、例えば遮断層を上面層とし
て含む路床(盛土または地山)の上に、下層路盤および
上層路盤からなる路盤層が積層され、その上に上層とし
て、下から順にプライムコート層、基層、タックコート
層、表層が積層された構造のアスファルトコンクリート
舗装のほか、このアスファルトコンクリート舗装におけ
る上層に代えて、アスファルト乳剤または路盤紙および
セメントコンクリート表層を有するセメントコンクリー
ト舗装、アスファルトコンクリート舗装において、基層
およびタックコート層を省略した簡易舗装に適用するこ
とができる。<Others> (a) The method and apparatus of the present invention can be applied regardless of the type of paved road. Although not shown, for example, on a roadbed (embankment or ground) including a barrier layer as an upper layer, a roadbed layer consisting of a lower roadbed and an upper roadbed is laminated, and as an upper layer thereon, a prime coat layer in order from the bottom, In addition to asphalt concrete pavement with a structure in which a base layer, tack coat layer and surface layer are laminated, in place of the upper layer in this asphalt concrete pavement, cement concrete pavement with asphalt emulsion or roadbed paper and cement concrete surface layer, asphalt concrete pavement, base layer Also, it can be applied to simple pavement without the tuck coat layer.
【0034】また本発明は、舗装されていない道路にお
いてガイドウォールを構築する場合にも適用できる。The present invention can also be applied when constructing a guide wall on an unpaved road.
【0035】(ロ)本発明の方法は、本発明の構築装置
を用いずに行うことができる。例えば図18に示すよう
にバックホー等の掘削装置BHにより沈埋溝Dの掘削を
行うとともに、バックホーBHの掘削進行方向後方位置
において沈埋溝Dの両側のウォール構築対象部位40
に、例えば図示のように当該部位の側面43に沿って注
入管12を移動させながら固結材を注入して固結させ
(Zは固結体を示している)ガイドウォールとしたり、
図示しないが、沈埋溝の掘削に先立って沈埋溝の両側の
ガイドウォール構築対象部分に切削溝等を形成しないで
注入管を貫入し、この注入管を介して構築対象部分内に
固結材を注入し固化させたりすることも本発明に含まれ
る。(B) The method of the present invention can be carried out without using the construction apparatus of the present invention. For example, as shown in FIG. 18, while the excavation device BH such as a backhoe excavates the submerged groove D, the wall construction target site 40 on both sides of the submerged groove D is located at a position behind the backhoe BH in the excavation proceeding direction.
In addition, for example, as shown in the figure, while the injection pipe 12 is moved along the side surface 43 of the site, a solidifying material is injected and solidified (Z represents a solidified body) to form a guide wall,
Although not shown, prior to excavation of the submerged groove, the injection pipe is penetrated without forming cutting grooves in the guide wall construction target parts on both sides of the submerged groove, and the solidification material is inserted into the construction target part through this injection pipe. Injection and solidification are also included in the present invention.
【0036】(ハ)上記第1の形態のガイドウォール構
築装置は、円盤状カッター刃を有するアスファルトカッ
ターをベースとしているが、他の種類の舗装路カッター
をベースとすることもできる。また図示しないが、カッ
ター装置と注入管とを別体とし、例えば注入管を専用の
台車に搭載してカッター装置に続いて注入管台車を移動
させながら注入作業を行うように構成することもでき
る。(C) The guide wall construction device of the first embodiment is based on an asphalt cutter having a disc-shaped cutter blade, but may be based on another type of paved road cutter. Although not shown, the cutter device and the injection pipe may be separately provided, for example, the injection pipe may be mounted on a dedicated carriage and the injection pipe carriage may be moved subsequently to the cutter device to perform the injection work. .
【0037】(ニ)固結材としては、セメント系硬化材
や水ガラス系硬化材等、公知のものを用いることができ
る。(D) As the solidifying material, known materials such as cement-based hardening material and water glass-based hardening material can be used.
【0038】[0038]
【発明の効果】以上のとおり、本発明によれば、ガイド
ウォール構築にかかる手間数が減り、構築作業の迅速化
および容易化が図られるようになる。As described above, according to the present invention, the labor required for constructing the guide wall is reduced, and the construction work can be speeded up and facilitated.
【図1】従来のガイドウォールの構築ならびに掘削溝の
掘削形態を示す、平面図である。FIG. 1 is a plan view showing the construction of a conventional guide wall and the excavation form of a trench.
【図2】従来の管体の吊り降ろし工程を示す、縦断面図
である。FIG. 2 is a vertical cross-sectional view showing a conventional tube body hanging process.
【図3】従来の管体の吊り降ろし工程を他の方向から示
した、縦断面図である。FIG. 3 is a vertical cross-sectional view showing a conventional tube body hanging process from another direction.
【図4】固化材の添加・混合工程における吊り支持状態
を示す、縦断面図である。FIG. 4 is a vertical cross-sectional view showing a suspension support state in a solidifying material adding / mixing step.
【図5】従来の人孔および管体の接続工程を示す、縦断
面図である。FIG. 5 is a vertical cross-sectional view showing a conventional process for connecting a human hole and a tubular body.
【図6】本発明の第1の実施形態を示す斜視図である。FIG. 6 is a perspective view showing the first embodiment of the present invention.
【図7】本発明装置の系統図である。FIG. 7 is a system diagram of the device of the present invention.
【図8】図6の要部を示す縦断面図である。8 is a vertical cross-sectional view showing a main part of FIG.
【図9】施工完了後の要部を示す縦断面図である。FIG. 9 is a vertical cross-sectional view showing a main part after completion of construction.
【図10】第2の実施形態の第1例を示す要部縦断面図
である。FIG. 10 is a longitudinal sectional view of a main part showing a first example of the second embodiment.
【図11】第2の実施形態の第2例を示す要部縦断面図
である。FIG. 11 is a longitudinal sectional view of an essential part showing a second example of the second embodiment.
【図12】第3の実施形態の装置を示す側面図である。FIG. 12 is a side view showing the device of the third embodiment.
【図13】第3の実施形態の装置を示す上面図である。FIG. 13 is a top view showing the device of the third embodiment.
【図14】図12の要部拡大図である。FIG. 14 is an enlarged view of a main part of FIG.
【図15】台車配置工程を示す側面図である。FIG. 15 is a side view showing a bogie arrangement step.
【図16】カッタ下降工程を示す側面図である。FIG. 16 is a side view showing a cutter lowering step.
【図17】注入溝の切削および固結材注入工程を示す側
面図である。FIG. 17 is a side view showing the steps of cutting the injection groove and injecting the solidifying material.
【図18】他の例を示す縦断面図である。FIG. 18 is a vertical sectional view showing another example.
【図19】従来例を示す縦断面図である。FIG. 19 is a vertical sectional view showing a conventional example.
1…ガイドウォール、10…ガイドウォール構築装置、
11…アスファルトカッター、11a…カッター刃、1
2…注入管、40…ガイドウォール構築対象部位、41
…沈埋位置、Z…固結体、D…沈埋溝、R…路盤層、S
…上層。1 ... Guide wall, 10 ... Guide wall construction device,
11 ... Asphalt cutter, 11a ... Cutter blade, 1
2 ... Injection pipe, 40 ... Guide wall construction target site, 41
... Burial position, Z ... Solid body, D ... Burial groove, R ... Roadbed layer, S
… Upper layer.
───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) E03F 3/06 F16L 1/00 ─────────────────────────────────────────────────── ─── Continuation of the front page (58) Fields surveyed (Int.Cl. 7 , DB name) E03F 3/06 F16L 1/00
Claims (3)
ールを管体沈埋位置の両側にそれぞれ構築する方法であ
って、 少なくともガイドウォールの構築対象部位の管体沈埋位
置がわ側面に沿う溝を形成するとともに、この溝のガイ
ドウォール構築対象部位がわ側面から固結材を注入し固
結させ、この固結部分をガイドウォールとなすことを特
徴とする、管体沈埋工法におけるガイドウォール構築方
法。1. A method of constructing guide walls used for laying and laying a pipe body on both sides of a pipe body burying position , wherein at least the pipe body burying position of the guide wall construction target site.
Form a groove along the side surface of the table, and
Dowel construction target site
A method of constructing a guide wall in a pipe burial method, which comprises tying the sections together to form a guide wall.
用するガイドウォールを管体沈埋位置の両側にそれぞれ
構築する方法であって、 少なくともガイドウォールの構築対象部位の管体沈埋位
置がわ側面に沿う溝を形成するとともに、この溝のガイ
ドウォール構築対象部位がわ側面に露出する少なくとも
路盤層内にその露出面から固結材を注入して固結させ、
この固結した路盤層およびその上層をガイドウォールと
なすことを特徴とする、管体沈埋工法におけるガイドウ
ォール構築方法。2. A method for constructing guide walls used for laying a pipe body on a paved road on both sides of the pipe burial position, wherein at least the side face of the guide wall where the pipe burial position is located is a side surface. Along with forming a groove along with, the guide wall construction target part of this groove is injected and solidified by injecting a solidifying material from the exposed surface into at least the roadbed layer exposed on the side surface of the groove,
A method of constructing a guide wall in a pipe burial method, characterized in that the solidified roadbed layer and its upper layer serve as a guide wall.
内に挿入されるとともに切削溝側壁に対して固結材を注
入する注入管と、 この注入管を介して固結材を供給する固結剤供給手段と
を備えたことを特徴とする、管体沈埋工法におけるガイ
ドウォール構築装置。3. A cutter device having a cutter blade, an injection pipe which is inserted into a groove formed by the cutter blade of the cutter device and which injects a solidifying material into a side wall of the cutting groove, and the injection pipe. A guide wall construction device in a pipe burial method, comprising a solidifying agent supply means for supplying a solidifying material through the pipe.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP32853699A JP3436715B2 (en) | 1999-11-18 | 1999-11-18 | Guide wall construction method and device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP32853699A JP3436715B2 (en) | 1999-11-18 | 1999-11-18 | Guide wall construction method and device |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2001140330A JP2001140330A (en) | 2001-05-22 |
| JP3436715B2 true JP3436715B2 (en) | 2003-08-18 |
Family
ID=18211395
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP32853699A Expired - Fee Related JP3436715B2 (en) | 1999-11-18 | 1999-11-18 | Guide wall construction method and device |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3436715B2 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP6999483B2 (en) * | 2018-04-19 | 2022-01-18 | 鹿島建設株式会社 | Guide wall and how to build a guide wall |
-
1999
- 1999-11-18 JP JP32853699A patent/JP3436715B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JP2001140330A (en) | 2001-05-22 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US8061065B2 (en) | Apparatus and a method for constructing an underground continuous filling wall and stratum | |
| JPH07113214B2 (en) | Excavation device for underground wall and construction method using the device | |
| CN1073654C (en) | Excavator for constructing underground continuous wall and underground continuous wall construction method | |
| JPH03100223A (en) | Method for building seamless, continuous, and linear or circular structural wall and machine for realizing said method | |
| CN115387328B (en) | Beach cast-in-place pile construction method based on ultra-long spiral drilling machine | |
| JP2000303467A (en) | Self-sustaining earth retaining wall and self-sustaining earth retaining wall construction method | |
| US5403125A (en) | Method and apparatus for providing underground barrier | |
| JP3436715B2 (en) | Guide wall construction method and device | |
| JPH09317373A (en) | Method of shaft construction | |
| JP3760343B2 (en) | Drilling bottom stabilization method and construction method of underground building | |
| KR102610909B1 (en) | Method and structure of steel pipe propulsion using anchor installation inside steel pipe to prevent sinking | |
| JP3931123B2 (en) | Non-open-cutting construction method for underground structures | |
| JP3426556B2 (en) | Ground improvement device and ground improvement method | |
| KR102627320B1 (en) | Inclined grouting equipment for reinforcement of soft ground | |
| JP2004285563A (en) | Enlarged drilling method, pile burial method and bit | |
| JP2874906B2 (en) | Shaft construction method | |
| FI96793C (en) | Procedures and means for reinforcing soil | |
| JP7566235B1 (en) | Ground improvement methods | |
| KR102721639B1 (en) | Construction method using appatatus for improving soft ground | |
| JP2689370B2 (en) | Underground continuous wall excavator and underground continuous wall construction method | |
| JPH01310011A (en) | Underground continuous wall construction | |
| JP3545723B2 (en) | Shaft construction machine, shaft construction method and deep foundation method | |
| CN121138330A (en) | TRD Cement-Soil Mixing Wall Curtain Waterstop Construction Method for Deep Foundation Pit in Water-Rich Sandy Layers | |
| JP2005264452A (en) | Construction method of pile foundation, and construction device for pile foundation | |
| JP2006169828A (en) | Pile hole excavation method and foundation pile structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080606 Year of fee payment: 5 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090606 Year of fee payment: 6 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100606 Year of fee payment: 7 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110606 Year of fee payment: 8 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110606 Year of fee payment: 8 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120606 Year of fee payment: 9 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120606 Year of fee payment: 9 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130606 Year of fee payment: 10 |
|