Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP3440109B2 - How to replenish components to a running electronic component mounter - Google Patents
[go: Go Back, main page]

JP3440109B2 - How to replenish components to a running electronic component mounter - Google Patents

How to replenish components to a running electronic component mounter

Info

Publication number
JP3440109B2
JP3440109B2 JP03039593A JP3039593A JP3440109B2 JP 3440109 B2 JP3440109 B2 JP 3440109B2 JP 03039593 A JP03039593 A JP 03039593A JP 3039593 A JP3039593 A JP 3039593A JP 3440109 B2 JP3440109 B2 JP 3440109B2
Authority
JP
Japan
Prior art keywords
mounting
component
parts
program
electronic component
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP03039593A
Other languages
Japanese (ja)
Other versions
JPH06244586A (en
Inventor
裕樹 山本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Panasonic Corp
Panasonic Holdings Corp
Original Assignee
Panasonic Corp
Matsushita Electric Industrial Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Panasonic Corp, Matsushita Electric Industrial Co Ltd filed Critical Panasonic Corp
Priority to JP03039593A priority Critical patent/JP3440109B2/en
Publication of JPH06244586A publication Critical patent/JPH06244586A/en
Application granted granted Critical
Publication of JP3440109B2 publication Critical patent/JP3440109B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Automatic Assembly (AREA)
  • Supply And Installment Of Electrical Components (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、電子部品実装機の稼動
率を高めるために、稼動中の電子部品実装機に部品を補
給する方法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of replenishing an operating electronic component mounter with components in order to increase the operating rate of the electronic component mounter.

【0002】[0002]

【従来の技術】近年、電子部品実装機を用いた生産現場
では、生産性向上のため、24時間無人稼動など稼動率向
上への取組みがなされている。稼動率に影響を及ぼすも
のの一つに、実装機の稼動中に、実装機にセットしてい
る部品のうち残量が少なくなった部品が出たとき、その
部品を補給するために実装機の稼動を停止させるかどう
かという問題がある。
2. Description of the Related Art In recent years, efforts have been made to improve the operating rate such as unmanned operation for 24 hours at a production site using an electronic component mounting machine in order to improve productivity. One of the things that affects the operating rate is that when the mounter is running, when the remaining amount of the part set in the mounter becomes low, the mounter's There is a problem of whether to stop the operation.

【0003】従来の電子部品実装機への部品補給方法の
一例について説明する。図2は、部品供給部が移動する
型の電子部品実装機の例を示した図であり、図3は、そ
の部品補給のフローチャートである。図2において、1
は基板への部品実装部であり、その背部に部品取込部が
ある。部品はカセット2にセットされ、実装する部品の
種類の数だけカセット装着部3にカセット2が並ぶ。実
装時は、指定された部品のカセット2が部品取込部へ移
動し、取り込まれる。4は部品供給部の移動の可否を設
定するスイッチである。
An example of a conventional component replenishment method for an electronic component mounter will be described. FIG. 2 is a diagram showing an example of an electronic component mounter in which the component supply unit moves, and FIG. 3 is a flowchart of component replenishment. In FIG. 2, 1
Is a component mounting portion on a board, and a component receiving portion is on the back thereof. The components are set in the cassette 2, and the cassettes 2 are lined up in the cassette mounting unit 3 by the number of types of components to be mounted. At the time of mounting, the cassette 2 of the designated component is moved to and taken in by the component taking-in section. A switch 4 sets whether or not the component supply unit can be moved.

【0004】部品供給部が一組で構成されている場合の
部品切れに対する部品補給は、まずステップ201の生産
中にステップ202で部品切れが発生したかどうかを判断
する。これは予めセットした部品の数を記憶させ、実装
した部品の数を減算していけば残りがいくつになったか
が判る。これを基に、ステップ203で生産動作を停止
し、ステップ204で部品供給部を部品補給可能な位置へ
移動させる。そこで、ステップ205で部品補給を行い、
ステップ206で部品補給が終了したことを確認し、ステ
ップ207で継続生産を再開する。
In the case of component replenishment for a component shortage in the case where the component supply section is composed of one set, first, it is judged whether or not a component shortage has occurred in step 202 during the production of step 201. This stores the number of parts set in advance and subtracts the number of mounted parts to find out how many are left. Based on this, the production operation is stopped in step 203, and the component supply unit is moved to a component replenishable position in step 204. Therefore, in step 205, parts are replenished,
In step 206, it is confirmed that the parts supply has been completed, and in step 207, continuous production is restarted.

【0005】[0005]

【発明が解決しようとする課題】上記従来例のように、
部品供給部を一組持っているものは、部品切れが発生し
た場合、その都度生産を中断して部品供給部を止め、部
品の補給を行わなければならなかった。
As in the above-mentioned conventional example,
In the case of a product having one set of parts supply parts, when the parts were out of stock, the production had to be interrupted, the parts supply part stopped, and the parts replenished each time.

【0006】これに対し、部品供給部を二組備え、その
二組が交替で、一方が供給動作中に他方が休止し、その
休止の間に部品を補給するという構成のものもあるが、
そのような構成では、部品供給部が大きいスペースを必
要とし、又、重量も重くなるという問題があった。
On the other hand, there is also a structure in which two sets of parts supply units are provided, and the two sets are alternately arranged so that one of them is stopped during the supply operation and the parts are replenished during the stop.
In such a configuration, there is a problem that the component supply section requires a large space and the weight becomes heavy.

【0007】本発明は、このような従来技術の問題点を
解決しようとするもので、部品供給部は一組で、しか
も、電子部品実装機が生産を中断することなく、部品の
補給が可能な部品補給方法を提供することを目的とす
る。
The present invention is intended to solve the above-mentioned problems of the prior art, and it is possible to replenish the components with a single component supply unit and without the electronic component mounting machine interrupting the production. The purpose of the present invention is to provide a method for supplying various parts.

【0008】[0008]

【課題を解決するための手段】上記目的を達成するため
に、本発明は、電子部品実装機が第1の実装プログラム
で稼動中に、部品供給部にセットしている部品のうち残
量が少なくなった部品が出たとき、その部品名と部品供
給部におけるセット位置とを報知するステップと、他の
部品のうち1枚の基板中に同一種類で多数個実装する部
品を選択し、その選択された部品を優先的に連続して実
装する第2の実装プログラムを作成するステップと、現
時点で実装中の基板が実装を終了し次の基板の実装が始
まる時点で、前記第1の実装プログラムから第2の実装
プログラムに自動的に切り換えるステップと、前記選択
された部品を実装動作中に前記残量が少なくなった部品
を補給するステップとから構成される。
To achieve the above object, according to the present invention, when the electronic component mounting machine is operating with the first mounting program, the remaining amount of the components set in the component supply section is reduced. When a reduced number of parts appear, a step of informing the name of the part and the setting position in the part supply unit, and selecting a large number of parts of the same type to be mounted on one board from other parts, The step of creating a second mounting program for preferentially and continuously mounting the selected components, and the first mounting at the time when the board currently being mounted finishes mounting and the next board starts mounting. It is composed of a step of automatically switching from a program to a second mounting program and a step of replenishing the component whose remaining amount is low during the mounting operation of the selected component.

【0009】[0009]

【作用】この構成によれば、まず、基板1枚当たりの生
産時間が最も短く、効率的な第1の実装プログラムで実
装動作が行われる。そこで、残量が少なくなった部品が
出たとき、実装機がその部品名、部品供給部における設
置位置等をオペレータに報知すると共に、第2の実装プ
ログラムを自動的に作成する。
According to this configuration, first, the mounting operation is performed by the first mounting program which is the most efficient and has the shortest production time per substrate. Therefore, when a component with a low remaining amount comes out, the mounter notifies the operator of the component name, the installation position in the component supply unit, and the like, and automatically creates a second mounting program.

【0010】第2の実装プログラムは、残量が少なくな
った部品以外の部品で、1枚の基板中に同一種類で多数
個実装する部品を優先的に連続して実装するプログラム
となっている。そして、部品切れ警告があっても、その
とき実装動作中の基板に対しては十分充当できる数が残
っているので、その基板が実装終了した後、次の基板の
実装動作が始まる時点で、第1の実装プログラムから第
2の実装プログラムに自動的に切り換わる。
The second mounting program is a component other than the component whose remaining amount is low, and is a program for preferentially and consecutively mounting a large number of components of the same type mounted on one board. . And, even if there is a component out warning, there is still a sufficient number available for the board being mounted at that time, so after the board is mounted, when the mounting operation of the next board starts, The first mounting program automatically switches to the second mounting program.

【0011】そこで、多数個実装する部品が優先的に連
続して実装されるが、例えば、その部品1点当たりの装
着時間を1秒とし、その基板に60点装着するものとすれ
ば、部品供給部は60秒間移動せずに実装動作が継続され
ることになる。従って、部品切れ報知のときからその部
品の補給準備をしていたオペレータは、その間に部品切
れ部品の補給を行えばよい。なおそのとき、補給する部
品の位置(カセット位置)は補給可能な位置にあることが
前提である。
Therefore, a large number of parts to be mounted are preferentially and continuously mounted. For example, if the mounting time per part of the part is 1 second and 60 parts are mounted on the board, the parts are mounted. The supply unit will not move for 60 seconds and the mounting operation will continue. Therefore, the operator who has been preparing to replenish the parts since the notification of out-of-parts may replenish the out-of-component parts in the meantime. At that time, it is premised that the position of the component to be replenished (the cassette position) is a position at which replenishment is possible.

【0012】[0012]

【実施例】以下、図1のフローチャートを用いて、本発
明の一実施例における部品補給方法を詳細に説明する。
まず、プログラムは、電子部品実装機の生産で基板1
枚当たりの生産時間が最も短くなるような動作データに
従ったものとなっており、ステップ101ではこのプログ
ラムで生産されている。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The component replenishing method in one embodiment of the present invention will be described in detail below with reference to the flowchart of FIG.
First of all, the program is for the production of electronic component mounter board 1
The operation data is such that the production time per sheet is the shortest, and in step 101, the program is produced by this program.

【0013】ステップ102では、部品の残量が部品毎に
設定された警告値に達したものがあれば、部品切れ予告
機能により自動的にその部品名、及び部品供給部上の設
置位置をCRT上に表示し、オペレータに報知する。こ
こで警告値は、ステップ103の処理時間が十分考慮され
たものでなければならない。オペレータは、その報知に
従って、補給部品の準備をする。
In step 102, if the remaining amount of the part reaches the warning value set for each part, the part name advance notice function automatically indicates the part name and the installation position on the part supply unit by CRT. Display on top and inform the operator. Here, the warning value must take into consideration the processing time of step 103. The operator prepares the spare parts according to the notification.

【0014】ステップ103では、部品供給部ができるだ
け長い時間移動を停止する状態が続くためのプログラム
が自動的に作成される。プログラムは、部品を補給
する際、その部品のセット位置が補給可能な位置にくる
ように考慮されていなければならない。例えば部品取込
部近傍に位置していては補給が困難である。
In step 103, a program for automatically continuing the state in which the component supply unit stops moving for as long as possible is automatically created. When replenishing a part, the program must be designed so that the set position of the part is at a replenishable position. For example, it is difficult to replenish when it is located in the vicinity of the component intake portion.

【0015】ステップ104では、現在実行中のプログラ
ムからプログラムへの切り換えを行うためのタイミ
ングとして、現在生産中の基板の実装が終了したかどう
かを判断し、ステップ105でプログラムからプログラ
ムへの切り換えを自動的に行う。
In step 104, it is judged whether or not the mounting of the board currently in production is completed, as the timing for switching from the program currently being executed to the program. In step 105, the program is switched to the program. Do it automatically.

【0016】ステップ106において、部品補給が可能な
状態かどうかをオペレータが判断し、可能な状態であれ
ばスイッチ4(図2参照)をオフにして部品供給部の移動
ができないように固定する。しかし、固定した状態で
も、多数個実装する部品が連続して装着されているの
で、生産は継続されている。
In step 106, the operator determines whether or not the parts can be replenished, and if so, the switch 4 (see FIG. 2) is turned off to fix the parts supply unit so that it cannot be moved. However, even in a fixed state, since many parts to be mounted are continuously mounted, production is continued.

【0017】ステップ107では、オペレータにより、部
品の補給が行われる。オペレータが部品を補給している
間、安全のために部品供給部は移動できないように制御
されている。ステップ108では、この安全面の制御にお
いて、1種類の部品の補給が終了したかどうかをオペレ
ータが判断する。終了していれば、オペレータはスイッ
チ4をオンにして部品供給部の移動が可能なようにす
る。
In step 107, the parts are replenished by the operator. For the sake of safety, the component supply unit is controlled so as not to move while the operator replenishes the components. In step 108, in this safety control, the operator determines whether or not the replenishment of one type of component has been completed. If the operation is completed, the operator turns on the switch 4 so that the component supply unit can be moved.

【0018】ステップ109で部品補給が全て終了したこ
とを判断し、ステップ110で現在生産中の基板の実装が
終了したことを判断する。ここで、ステップ111でプロ
グラムからプログラムへの切り換えを自動的に行
い、その後、ステップ112にあるようにプログラムで
の生産を継続していく。
In step 109, it is determined that all the parts have been replenished, and in step 110, it is determined that the mounting of the board currently in production is completed. Here, in step 111, switching from program to program is automatically performed, and thereafter, production in the program is continued as in step 112.

【0019】ただし、ステップ108あるいはステップ109
で部品供給が終了していないのに、生産を継続するため
に部品供給部の移動が必要な場合、生産動作の停止を行
うかどうかの判断はステップ113で行う。ステップ114で
生産動作を停止させ、ステップ115でオペレータにより
生産動作を再開してよいかどうかの判断を行い、ステッ
プ116でプログラムでの継続生産を再開する。
However, step 108 or step 109
If it is necessary to move the component supply unit in order to continue the production even though the component supply has not been completed, the determination as to whether to stop the production operation is performed in step 113. In step 114, the production operation is stopped, in step 115, it is judged by the operator whether or not the production operation may be resumed, and in step 116, the continuous production by the program is resumed.

【0020】[0020]

【発明の効果】以上説明したように、本発明によれば、
電子部品実装機が稼動中に部品切れが生じても、実装機
の生産動作を継続したまま、部品の補給が可能になり、
電子部品実装機の稼動率の向上、生産性の向上を図るこ
とができる効果がある。
As described above, according to the present invention,
Even if the electronic component mounter runs out of parts during operation, parts can be replenished while the production operation of the mounter continues.
There is an effect that the operation rate of the electronic component mounter can be improved and the productivity can be improved.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の一実施例のフローチャートである。FIG. 1 is a flowchart of an embodiment of the present invention.

【図2】一組の部品供給部を持つ電子部品実装機の斜視
図である。
FIG. 2 is a perspective view of an electronic component mounter having a set of component supply units.

【図3】従来例のフローチャートである。FIG. 3 is a flowchart of a conventional example.

【符号の説明】[Explanation of symbols]

1 … 部品実装部、 2 … カセット、 3 … カセッ
ト装着部、 4 … スイッチ。
1 ... Component mounting part, 2 ... Cassette, 3 ... Cassette mounting part, 4 ... Switch.

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 電子部品実装機が第1の実装プログラム
で稼動中に、部品供給部にセットしている部品のうち残
量が少なくなった部品が出たとき、その部品名と部品供
給部におけるセット位置とを報知するステップと、他の
部品のうち1枚の基板中に同一種類で多数個実装する部
品を選択し、その選択された部品を優先的に連続して実
装する第2の実装プログラムを作成するステップと、現
時点で実装中の基板が実装を終了し次の基板の実装が始
まる時点で、前記第1の実装プログラムから第2の実装
プログラムに自動的に切り換えるステップと、前記選択
された部品を実装動作中に前記残量が少なくなった部品
を補給するステップとからなることを特徴とする稼動中
の電子部品実装機への部品補給方法。
1. When the electronic component mounting machine is operating with the first mounting program and a component set in the component supply unit has a low remaining amount, the component name and the component supply unit are output. And a step of notifying the set position in the step of selecting a plurality of parts of the same type to be mounted on one board from other parts, and mounting the selected parts in succession with priority. A step of creating a mounting program; a step of automatically switching from the first mounting program to a second mounting program when the board currently being mounted finishes mounting and the mounting of the next board starts; And a step of replenishing the component whose remaining amount is low during the mounting operation of the selected component.
【請求項2】 残量が少なくなった部品の補給が終了し
た後、さらに次の基板の実装が始まる時点で、第2の実
装プログラムから第1の実装プログラムに戻すステップ
を有することを特徴とする請求項1記載の稼動中の電子
部品実装機への部品補給方法。
2. A step of returning from the second mounting program to the first mounting program at the time when mounting of the next board is started after the supply of the parts whose remaining amount is low is completed. The method of replenishing components to an operating electronic component mounter according to claim 1.
JP03039593A 1993-02-19 1993-02-19 How to replenish components to a running electronic component mounter Expired - Fee Related JP3440109B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP03039593A JP3440109B2 (en) 1993-02-19 1993-02-19 How to replenish components to a running electronic component mounter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP03039593A JP3440109B2 (en) 1993-02-19 1993-02-19 How to replenish components to a running electronic component mounter

Publications (2)

Publication Number Publication Date
JPH06244586A JPH06244586A (en) 1994-09-02
JP3440109B2 true JP3440109B2 (en) 2003-08-25

Family

ID=12302744

Family Applications (1)

Application Number Title Priority Date Filing Date
JP03039593A Expired - Fee Related JP3440109B2 (en) 1993-02-19 1993-02-19 How to replenish components to a running electronic component mounter

Country Status (1)

Country Link
JP (1) JP3440109B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011077096A (en) * 2009-09-29 2011-04-14 Hitachi High-Tech Instruments Co Ltd Electronic component mounting apparatus, component feeder, and method of mounting electronic component

Also Published As

Publication number Publication date
JPH06244586A (en) 1994-09-02

Similar Documents

Publication Publication Date Title
JP5323137B2 (en) Setup method, component mounting method and component mounting system
JP3440109B2 (en) How to replenish components to a running electronic component mounter
EP1024420B1 (en) Apparatus and method for notifying lack of component in advance, component mounting apparatus, and article of manufacture comprising computer usable medium
US6189207B1 (en) Method of mounting parts
EP0894422A1 (en) Component feeding method and apparatus therefor
JP3335675B2 (en) Component mounting method and component mounting machine
JPH04299897A (en) Parts supply method
JPH07162194A (en) Component mounting method
WO2000016602A1 (en) A method of supplying components to an electronic component mounting or insertion machine
JP4931654B2 (en) Component mounting method
JP3821526B2 (en) Component mounting equipment
JP3028636B2 (en) Component mounting method and component mounting machine
JP4408501B2 (en) Component mounting method and apparatus
JPH10233594A (en) Electronic component supply method and device
JP2851139B2 (en) Parts supply method
JP3163889B2 (en) Parts supply method
JPH04219000A (en) Component mounting method
JPH0581080B2 (en)
JPH0557533A (en) Tray parts feeder
JPH03221326A (en) Part feeding device and part feeding method using thereof
JPH05218681A (en) Electronic component mounting method
JP3773303B2 (en) Component supply unit positioning method
JP2023184014A (en) component mounting machine
JPH10335894A (en) Component mounting method
JP2839035B2 (en) Parts supply method

Legal Events

Date Code Title Description
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080613

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090613

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100613

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100613

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110613

Year of fee payment: 8

LAPS Cancellation because of no payment of annual fees