JP3448282B2 - How to fill the void at the pipe installation location - Google Patents
How to fill the void at the pipe installation locationInfo
- Publication number
- JP3448282B2 JP3448282B2 JP2001035688A JP2001035688A JP3448282B2 JP 3448282 B2 JP3448282 B2 JP 3448282B2 JP 2001035688 A JP2001035688 A JP 2001035688A JP 2001035688 A JP2001035688 A JP 2001035688A JP 3448282 B2 JP3448282 B2 JP 3448282B2
- Authority
- JP
- Japan
- Prior art keywords
- grout material
- gap
- pipe
- filled
- resin
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Working Measures On Existing Buildindgs (AREA)
- Building Environments (AREA)
Description
【発明の詳細な説明】
【0001】
【発明の属する技術分野】本発明は、電気配線、ガス
管、電話線、光ファイバなどの引き込み線を建物に引き
込むための配管と配管を設置した貫通孔との空隙を埋め
るための配管設置箇所の空隙充填方法に関するものであ
る。
【0002】
【従来の技術】従来より、ビルなどの建物の屋外から屋
内に電気配線等の引き込み線を建物に引き込むにあたっ
ては、建物の壁に屋外と屋内に開口する貫通孔(コア抜
き孔部)を形成し、この貫通孔に配管を設置し、配管の
屋外側の開口から引き込み線を配管内に導入すると共に
配管の屋内側の開口から引き込み線を導出することによ
って、引き込み線を建物の屋内に導入するようにしてい
る。上記のようにして引き込み用の配管を地下に埋設し
て設置した場合、貫通孔の内面と配管との間に空隙が形
成され、この空隙を通じて屋外から屋内に雨水等の水が
侵入する。そこで、貫通孔の内面と配管の外面との間に
空隙に防水層を形成して充填するようにしている。
【0003】従来、このような防水層を形成するにあた
っては、セメントと防水用樹脂を混合して樹脂混和型の
グラウト材を調製し、空隙の屋外側の開口と屋内側の開
口をコンクリート等で閉塞した後、グラウト材を空隙に
注入して充填し、充填したグラウト材を空隙で硬化させ
ることによって防水層を形成するようにしていた。
【0004】
【発明が解決しようとする課題】しかし、上記の防水層
ではグラウト材が硬化する際に収縮してクラックが生じ
たり、地下変動や振動によりグラウト材にクラックが生
じたりするため、防水性能が低いという問題があった。
【0005】本発明は上記の点に鑑みてなされたもので
あり、防水性能を高くすることができる配管設置箇所の
空隙充填方法を提供することを目的とするものである。
【0006】
【課題を解決するための手段】本発明の請求項1に係る
配管設置箇所の空隙充填方法は、建物の壁1に貫通孔2
を形成すると共に貫通孔2に配管3を設置し、貫通孔2
の内面と配管3の外面の間の空隙4を充填する方法であ
って、セメントと防水用樹脂を混合してグラウト材5を
調製し、空隙4の屋外側の開口を閉塞した後、屋内側か
ら空隙4の奥にグラウト材5を注入して充填し、次に、
防水用樹脂6を屋内側から空隙4の奥に注入し、この注
入圧で空隙4に充填したグラウト材5を屋内側に移動さ
せながら防水用樹脂6を空隙4の奥に充填し、次に、グ
ラウト材5を屋内側から空隙4の奥に注入し、この注入
圧で空隙4に充填したグラウト材5及び防水用樹脂6を
屋内側に移動させながらグラウト材5を空隙4の奥に充
填することを特徴とするものである。
【0007】
【発明の実施の形態】以下、本発明の実施の形態を説明
する。
【0008】本発明で用いるグラウト材5はセメントと
防水用樹脂の混合物である。セメントとしてはポルトラ
ンドセメントなどの任意のセメント材料を用いることが
できる。防水用樹脂は熱可塑性樹脂のエマルジョンを主
成分とするものであって、具体的には、成瀬化学(株)
製造の「ナルファルト−C」(粘度500cps(20
℃)、pH7±1)や「ナルライト」(粘度30000
cps(20℃)、pH7±1、濃度50±2wt%、
比重1.03)などを用いることができるが、本発明で
は「ナルファルト−C」を用いるのが好ましい。そし
て、セメント、防水用樹脂、水を混合することによっ
て、粘稠物のグラウト材5を調製することができる。防
水用樹脂の配合量はセメントの配合量に対して5質量%
程度にするのが好ましく、具体的には、セメント10k
gに対して5質量%の防水用樹脂と20質量%の水を混
合してグラウト材5を調製することができる。そして、
グラウト材5は貫通孔2に注入して充填した際に自重に
より流れ落ちない程度の粘度に調製されるものである。
また、グラウト材5は餅状であって、その粘度・密度が
非常に高く水に希釈されにくいので、止水効果を大きく
することができる。また、本発明のグラウト材5は防水
用樹脂により硬化収縮によるクラックの発生がほとんど
無くなるものである。
【0009】図1(a)に示すように、電気配線等の引
き込み用の配管3は建物の壁1に形成した貫通孔2内に
配置されて地下に埋設されている。貫通孔2は壁1を厚
み方向に貫通して形成されており、建物の屋内側と屋外
側の両方に開口されている。図1には建物の壁1が建物
躯体の地下側壁1aと地下側壁1aの屋外側に隣接して
形成された連壁1bとで構成されているが、これに限ら
ず、建物躯体の地下側壁1aのみで建物の壁1が構成さ
れていても良い。また、図1に示すように、電気配線等
の主配線が配設された地下道の壁10が建物の壁1の屋
外側にある場合は、貫通孔2を地下道の壁10にまで貫
通させて地下道内に開口させるようにする。
【0010】配管3としては塩化ビニル樹脂管あるいは
鋼管などを用いることができる。また、配管3はその一
端が建物の壁1の屋内側壁面と面一になるように配置さ
れていると共に、配管3の他端は貫通孔2の屋外側の開
口から地下道内に突出させており、マンホールに至るも
のである。そして、貫通孔2の屋外側端部において、貫
通孔2の内面と配管3の外面との間の全周に亘って防水
コンクリート11を打ち込んで硬化させることによっ
て、貫通孔2の略中心を貫くように配管3を配置して固
定すると共に貫通孔2の屋外側の開口を防水コンクリー
ト11にて閉塞するが、このようにして配管3を貫通孔
2内に設置することにより、貫通孔2の内面と配管3の
外面との間に空隙4が形成され、また、空隙4の屋外側
の開口は防水コンクリート11にて閉塞された状態とな
っている。
【0011】上記のような配管3の設置個所に形成され
た空隙4を防水層7で充填するにあたって次のようにし
て行う。まず、貫通孔2の内面と配管3の外面にプライ
マ12を全面に亘って十分に塗布する。プライマ12は
図1(a)に示すように、空隙4の屋内側の開口(貫通
孔2の屋内側の開口)からヘラ13を差し込んで塗布す
ることができる。プライマ12としては例えばアスファ
ルト系のものを使用することができ、具体的には成瀬化
学(株)製造のナルファルト−Kなどを用いることがで
きる。
【0012】次に、一次注入として空隙4の奥(防水コ
ンクリート11の屋内側の近傍)に上記グラウト材5を
注入して充填する。グラウト材5の注入は、図1(b)
及び図3(a)に示すように、ノズル14を空隙4に屋
内側の開口から差し込み、ホース20を介してノズル1
4に接続された低圧注入機15のタンク22からグラウ
ト材5を圧送してノズル14に供給し、空隙4の奥に位
置するノズル14の先端からグラウト材5を吐出させる
ようにして行うことができる。ノズル14を空隙4の奥
に位置させるには、奥の防水コンクリート11の屋内側
面にノズル14の先端を一度突き当てた後、ノズル14
を1cm程度引き抜いて後退させるようにするのが好ま
しい。低圧注入機15としては例えば手押し式モルタル
ポンプや電動式低圧モルタルポンプなどを用いることが
できる。また、グラウト材5は例えば127Pa(13
kgf/m2)程度の圧力で加圧注入することができる
が、この圧力はグラウト材5の粘度等に応じて適宜設定
可能である。また、グラウト材5は空隙4の奥において
配管3の外周を囲むように充填すると共に空隙4の奥の
約1/3にグラフト材5を充填する。
【0013】配管3を配設するための貫通孔2は地下2
m以上の所がほとんどであり、屋外のウォーターレベル
が高い場合は当然地下道の壁10や地下側壁1aと連壁
1bとの空隙から出水・漏水があり、従来ではグラウト
材が流されて注入が不可能であった。しかし、本発明で
はグラウト材5は防水用樹脂により餅状に調製されてい
るので、出水・漏水があっても流されないで確実に注入
することができるものである。
【0014】上記のようにして建物の屋内側からグラウ
ト材5を空隙4の奥に注入して充填した後、二次注入と
して防水用樹脂6を屋内側から空隙4の奥に注入して充
填する。この防水用樹脂6は上記グラウト材5を調製す
る際に用いたものと同じものを使用することができる。
また、防水用樹脂6の注入は一次注入で使用した低圧注
入機15とノズル14を用いる。すなわち、一次注入で
低圧注入機15のタンク22が空になるまでグラウト材
5を注入した後、空になったタンク22に防水用樹脂6
を入れ、この後、図1(c)及び図3(b)に示すよう
に、ホース20を通じてタンク22内の防水用樹脂6を
低圧注入機15により圧送してノズル14に供給し、空
隙4の奥に位置するノズル14の先端から防水用樹脂6
を吐出させるようにして行うことができる。そして、こ
のようにして防水用樹脂6を空隙4の奥に注入すること
によって、一次注入した上記グラウト材5を防水用樹脂
6の注入圧で屋外側から屋内側に押圧して移動させなが
ら防水用樹脂6を空隙4の奥に充填する。従って、防水
用樹脂6は、一次注入により空隙4に充填した上記グラ
ウト材5と防水コンクリート11との間で配管3の外周
を囲むように充填される。また、空隙4に充填した防水
用樹脂6の長さ(壁1の厚み方向における長さ)が10
0mm程度になるように防水用樹脂6を注入することが
できるが、この長さは壁1の厚みによって適宜変更可能
である。また、一次注入したグラウト材5は防水用樹脂
6の注入により空隙4の略中央部に移動して地下側壁1
aと連壁1bの境界付近に位置することになるが、これ
により、一次注入したグラウト材5の一部が地下側壁1
aと連壁1bの間の間隙16に流入されることになり、
空隙4の近傍において間隙16がグラウト材5で充填さ
れる。この時、出水・漏水の場合もグラウト材5の粘度
と水密性の高さにてカバーすることができる。
【0015】上記のようにして建物の屋内側から防水用
樹脂6を空隙4の奥に注入して充填した後、防水用樹脂
6は、壁1やグラウト材5のコンクリートやセメントに
含まれているカルシウムイオンなどのアルカリ土類金属
イオンと、防水用樹脂6の乳化剤であるポリビニルアル
コールとが化学反応することにより硬化する。すなわ
ち、アルカリ土類金属イオンと乳化剤が反応すると、乳
化剤の作用つまり保護コロイド形成能が失われ、防水用
樹脂6のポリマーから乳化剤が欠落する。この結果、ポ
リマー粒子相互に密着融合が始まってポリマーブロック
等が形成されて防水用樹脂6が硬化するのである。
【0016】上記のように防水用樹脂6を注入した後で
防水樹脂6が硬化する前に、三次注入としてグラウト材
5を屋内側から空隙4の奥に注入して充填する。このグ
ラウト材5は上記一次注入の際に用いたものと同じもの
を使用することができる。また、このグラウト材5の注
入は上記一次注入及び二次注入で使用した低圧注入機1
5とノズル14を用いる。すなわち、二次注入で低圧注
入機15のタンク22が空になるまで防水用樹脂6を注
入した後、空になったタンク22にグラウト材5を入
れ、この後、図2(a)及び図3(c)に示すように、
ホース20を通じてタンク22内のグラウト材5を低圧
注入機15により圧送してノズル14に供給し、空隙4
の奥に位置するノズル14の先端からグラウト材5を吐
出させるようにして行うことができる。そして、このよ
うにしてグラウト材5を空隙4の奥に注入することによ
って、一次注入した上記グラウト材5と二次注入した上
記防水用樹脂6を三次注入のグラウト材5の注入圧で屋
外側から屋内側に押圧して移動させながら三次注入のグ
ラウト材5を空隙4の奥に充填する。従って、三次注入
のグラウト材5は、防水用樹脂6と防水コンクリート1
1との間で配管3の外周を囲むように充填される。ま
た、三次注入のグラウト材5も空隙4の奥の約1/3に
充填する。また、図2(b)に示すように、防水用樹脂
6は三次注入のグラウト材5により空隙4の略中央部に
移動して地下側壁1aと連壁1bの境界付近に位置する
ことになるが、これにより、防水用樹脂6の一部が地下
側壁1aと連壁1bの間の間隙16に流入されることに
なり、空隙4の近傍において間隙16が防止用樹脂6に
より充填される。
【0017】このように一次注入から三次注入まで行っ
た後、振動や埃等を与えないようにして空隙4内のグラ
ウト材5の硬化養生を行うことによって、グラウト材5
の硬化物と防水用樹脂6の硬化物の層とが隣接して構成
される防水層7を形成する。この後、図2(c)に示す
ように、一次注入したグラウト材5の手前(屋内側)に
おいて空隙4の屋内側端部にポリマーセメントモルタル
19を充填して硬化させ、空隙4の屋内側の開口(貫通
孔2の屋内側の開口)を閉塞する。尚、21は鏝であ
る。このようにして配管設置箇所に形成される空隙4を
防水層7で充填することができる。
【0018】そして、本発明では空隙4にグラウト材
5、防水用樹脂6、グラウト材5の順で充填し、グラウ
ト材5の層の間に防水用樹脂6の層を設けて防水層7を
形成したので、地下変動や振動による収縮などでグラウ
ト材5にクラックが発生した場合であっても、屋外から
クラックに侵入した雨水等の水を防水用樹脂6の硬化物
で屋内に侵入しないように遮断することができ、防水層
7の防止性能を高くすることができるものである。ま
た、地下側壁1aと連壁1bとの間の間隙16にグラウ
ト材5と防水用樹脂6を充填したので、屋外から間隙1
6や防水コンクリート11を通じて屋内に雨水の侵入や
出水や漏水も防止することができ、防水性をさらに高め
ることができるものである。
【0019】また、従来ではグラウト材を貫通孔に充填
した際に、レベリングやブリージング等により貫通孔の
上部に空隙が形成されていたが、本発明ではグラウト材
5は防水用樹脂により自重により流れ落ちない程度の粘
度で餅状に調製されているので、レベリングやブリージ
ング等が発生せず、貫通孔の上部に空隙が形成されない
ように確実に充填することができるものである。
【0020】また、本発明のグラウト材5は従来よりも
貫通孔2の内面と配管3の外面との密着度を高くするこ
とができるものである。しかも、従来では止水材として
主に発泡ウレタン系のものが使用される場合があるが、
配管3の中には弱体な塩化ビニル樹脂管もあり、止水材
の膨張力や注入力で配管3に亀裂や変形などの支障が出
ることがあったが、本発明では発泡ウレタン系のものを
用いないので、配管3に亀裂や変形などの支障が生じな
いようにすることができるものである。
【0021】このように本発明は、防水性、水密性、壁
1と配管3との密着性、ブリージング、レベリング、ク
ラック防止、止水性等を高くすることができるものであ
る。
【0022】
【発明の効果】上記のように本発明の請求項1の発明
は、建物の壁に貫通孔を形成すると共に貫通孔に配管を
設置し、貫通孔の内面と配管の外面の間の空隙を充填す
る方法であって、セメントと防水用樹脂を混合してグラ
ウト材を調製し、空隙の屋外側の開口を閉塞した後、屋
内側から空隙の奥にグラウト材を注入して充填し、次
に、防水用樹脂を屋内側から空隙の奥に注入し、この注
入圧で空隙に充填したグラウト材を屋内側に移動させな
がら防水用樹脂を空隙の奥に充填し、次に、グラウト材
を屋内側から空隙の奥に注入し、この注入圧で空隙に充
填したグラウト材及び防水用樹脂を屋内側に移動させな
がらグラウト材を空隙の奥に充填するので、グラウト材
の間に防水用樹脂を設けることによって、地下変動や振
動によりグラウト材に発生したクラックに屋外から雨水
や出水や漏水等の水が侵入しても、防水用樹脂でこの水
が屋内に侵入しないように遮断することができ、防止性
能を高くすることができるものである。Description: BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a pipe for drawing a lead wire such as an electric wiring, a gas pipe, a telephone line, or an optical fiber into a building, and a through hole provided with the pipe. The present invention relates to a method of filling a gap at a pipe installation location for filling a gap with the above. 2. Description of the Related Art Conventionally, when a service line such as an electric wiring is drawn into a building from the outside of a building such as a building to the inside of the building, a through hole (a core opening hole portion) that opens to the outside and the inside of a wall of the building. ) Is formed, a pipe is installed in this through-hole, and the lead-in wire is introduced into the pipe from the outdoor opening of the pipe, and the lead-in wire is led out from the indoor opening of the pipe, thereby forming the lead wire of the building. They are being introduced indoors. When the drawing pipe is buried underground and installed as described above, a gap is formed between the inner surface of the through hole and the pipe, and water such as rainwater enters the room from outside to inside through the gap. Therefore, a gap between the inner surface of the through hole and the outer surface of the pipe is filled with a waterproof layer. Conventionally, when forming such a waterproof layer, cement and a waterproof resin are mixed to prepare a resin-mixed grout material, and the outdoor opening and the indoor opening of the void are made of concrete or the like. After the blockage, the grout material is injected into the gap to fill the gap, and the filled grout material is cured in the gap to form a waterproof layer. [0004] However, in the above waterproof layer, the grout material contracts when it hardens, causing cracks, and cracks occur in the grout material due to underground fluctuations and vibrations. There was a problem that performance was low. [0005] The present invention has been made in view of the above points, and it is an object of the present invention to provide a method of filling a gap in a pipe installation location, which can enhance waterproof performance. According to a first aspect of the present invention, there is provided a method of filling a gap in a pipe installation location, comprising the steps of:
Is formed, and a pipe 3 is installed in the through hole 2.
Is a method of filling a void 4 between the inner surface of the pipe and the outer surface of the pipe 3 by mixing a cement and a waterproofing resin to prepare a grout material 5, closing an outdoor opening of the void 4, and then indoors. The grout material 5 is injected and filled into the space 4 at the back, and then
The waterproofing resin 6 is injected into the interior of the gap 4 from the indoor side, and the grouting material 5 filled in the void 4 is moved to the interior side by this injection pressure, and the waterproofing resin 6 is filled into the interior of the gap 4. The grout material 5 is injected into the interior of the gap 4 from the indoor side, and the grout material 5 and the waterproof resin 6 filled in the gap 4 are moved to the interior side by this injection pressure, and the grout material 5 is filled into the interior of the gap 4. It is characterized by doing. An embodiment of the present invention will be described below. The grout material 5 used in the present invention is a mixture of cement and a waterproof resin. Any cement material such as Portland cement can be used as the cement. The waterproofing resin is mainly composed of a thermoplastic resin emulsion. Specifically, Naruse Chemical Co., Ltd.
"Nalphalt-C" (viscosity 500 cps (20
℃), pH 7 ± 1) and “Nallite” (viscosity 30000)
cps (20 ° C.), pH 7 ± 1, concentration 50 ± 2 wt%,
Specific gravity 1.03) can be used, but in the present invention, it is preferable to use “Nalphalt-C”. Then, a viscous grout material 5 can be prepared by mixing cement, a waterproofing resin, and water. 5% by weight of resin for waterproofing based on the amount of cement
It is preferable that the cement concrete 10k
The grout material 5 can be prepared by mixing 5% by mass of the waterproofing resin and 20% by mass of water with respect to g. And
The grout material 5 is adjusted to a viscosity such that it does not flow down by its own weight when it is filled into the through hole 2 by filling.
Further, the grout material 5 is in the shape of a rice cake and has a very high viscosity and density and is hardly diluted with water, so that the water stopping effect can be enhanced. The grout material 5 of the present invention has almost no cracks due to shrinkage on curing due to the waterproof resin. As shown in FIG. 1 (a), a pipe 3 for drawing in electrical wiring and the like is disposed in a through hole 2 formed in a wall 1 of a building and is buried underground. The through hole 2 is formed so as to penetrate the wall 1 in the thickness direction, and is opened on both the indoor side and the outdoor side of the building. In FIG. 1, the building wall 1 is composed of an underground side wall 1a of the building skeleton and a continuous wall 1b formed adjacent to the outdoor side of the underground side wall 1a. The wall 1 of the building may be constituted only by 1a. In addition, as shown in FIG. 1, when the underpass wall 10 on which the main wiring such as the electric wiring is disposed is on the outdoor side of the building wall 1, the through hole 2 is penetrated to the underpass wall 10. Make it open in the underpass. As the pipe 3, a vinyl chloride resin pipe or a steel pipe can be used. Further, the pipe 3 is arranged such that one end thereof is flush with the indoor side wall surface of the building wall 1, and the other end of the pipe 3 is protruded from the outdoor opening of the through hole 2 into the underground passage. And leads to manholes. Then, at the outdoor side end of the through hole 2, the waterproof concrete 11 is driven and hardened over the entire circumference between the inner surface of the through hole 2 and the outer surface of the pipe 3, thereby penetrating substantially the center of the through hole 2. The pipe 3 is disposed and fixed as described above, and the opening on the outdoor side of the through hole 2 is closed with the waterproof concrete 11. By thus installing the pipe 3 in the through hole 2, the A space 4 is formed between the inner surface and the outer surface of the pipe 3, and the opening of the space 4 on the outdoor side is closed by waterproof concrete 11. The filling of the gap 4 formed at the place where the pipe 3 is installed with the waterproof layer 7 is performed as follows. First, the primer 12 is sufficiently applied to the inner surface of the through hole 2 and the outer surface of the pipe 3 over the entire surface. As shown in FIG. 1A, the primer 12 can be applied by inserting a spatula 13 from an opening on the indoor side of the gap 4 (an opening on the indoor side of the through hole 2). As the primer 12, for example, an asphalt-based primer can be used, and specifically, Nalphalt-K manufactured by Naruse Chemical Co., Ltd. can be used. Next, as a primary injection, the grout material 5 is injected and filled into the interior of the gap 4 (near the indoor side of the waterproof concrete 11). The grout material 5 is injected as shown in FIG.
As shown in FIG. 3A, the nozzle 14 is inserted into the gap 4 from the opening on the indoor side, and the nozzle 1 is inserted through the hose 20.
The grout material 5 is fed from the tank 22 of the low-pressure injector 15 connected to the nozzle 4 and supplied to the nozzle 14, and the grout material 5 is discharged from the tip of the nozzle 14 located at the back of the gap 4. it can. In order to position the nozzle 14 at the back of the gap 4, the tip of the nozzle 14 is once abutted against the indoor side of the waterproof concrete 11 at the back, and
Is preferably pulled out by about 1 cm to retract. As the low-pressure injector 15, for example, a hand-operated mortar pump or an electric low-pressure mortar pump can be used. The grout material 5 is, for example, 127 Pa (13
The pressure can be injected under a pressure of about kgf / m 2 ), and this pressure can be appropriately set according to the viscosity of the grout material 5 and the like. Further, the grout material 5 is filled so as to surround the outer periphery of the pipe 3 at the back of the gap 4, and the graft material 5 is filled at about 3 of the back of the gap 4. The through hole 2 for arranging the pipe 3 is located underground 2
m or more in most places, and when the outdoor water level is high, there is naturally water leakage / leakage from the gap between the underground passage wall 10 and the underground side wall 1a and the continuous wall 1b. It was impossible. However, in the present invention, since the grout material 5 is prepared in the form of a rice cake with a waterproofing resin, even if there is water discharge or water leakage, the grout material 5 can be injected without fail. After the grout material 5 is injected from the indoor side of the building into the interior of the cavity 4 and filled as described above, the waterproofing resin 6 is injected from the indoor side into the interior of the cavity 4 and filled as a secondary injection. I do. As the waterproofing resin 6, the same resin used when preparing the grout material 5 can be used.
The injection of the waterproofing resin 6 uses the low-pressure injector 15 and the nozzle 14 used in the primary injection. That is, the grout material 5 is injected by the primary injection until the tank 22 of the low-pressure injection machine 15 becomes empty, and then the waterproofing resin 6 is added to the empty tank 22.
Then, as shown in FIGS. 1 (c) and 3 (b), the waterproof resin 6 in the tank 22 is pressure-fed by the low-pressure injector 15 through the hose 20 and supplied to the nozzle 14, and the gap 4 From the tip of the nozzle 14 located at the back of the
Is ejected. Then, by injecting the waterproofing resin 6 into the interior of the gap 4 in this manner, the primary injected grout material 5 is pressed and moved from the outdoor side to the indoor side by the injection pressure of the waterproofing resin 6 while being waterproofed. The filling resin 6 is filled in the space 4. Therefore, the waterproofing resin 6 is filled so as to surround the outer circumference of the pipe 3 between the grout material 5 and the waterproof concrete 11 filled in the gaps 4 by the primary injection. In addition, the length of the waterproof resin 6 filled in the gap 4 (the length in the thickness direction of the wall 1) is 10
The waterproofing resin 6 can be injected so as to have a thickness of about 0 mm, but the length can be appropriately changed depending on the thickness of the wall 1. Further, the grout material 5 which has been primarily injected is moved to a substantially central portion of the gap 4 by the injection of the waterproofing resin 6 and the underground side wall 1 is formed.
a and a portion of the grout material 5 that has been primarily injected is located near the boundary between the continuous wall 1a and the continuous wall 1b.
a to the gap 16 between the continuous wall 1b,
The gap 16 is filled with the grout material 5 in the vicinity of the gap 4. At this time, even when water flows out or leaks, the grout material 5 can be covered with the high viscosity and high watertightness. After the waterproof resin 6 is injected into the interior of the gap 4 and filled from the indoor side of the building as described above, the waterproof resin 6 is contained in the concrete or cement of the wall 1 or the grout material 5. It hardens due to a chemical reaction between the alkaline earth metal ions such as calcium ions and polyvinyl alcohol which is an emulsifier of the waterproofing resin 6. That is, when the alkaline earth metal ion reacts with the emulsifier, the function of the emulsifier, that is, the ability to form a protective colloid is lost, and the emulsifier is lost from the polymer of the waterproof resin 6. As a result, the adhesion and fusion of the polymer particles begin to form a polymer block or the like, and the waterproofing resin 6 is cured. As described above, after the waterproofing resin 6 is injected and before the waterproofing resin 6 is cured, the grout material 5 is injected from the indoor side into the interior of the gap 4 and filled therein as a tertiary injection. The same grout material 5 as that used at the time of the primary injection can be used. The grout material 5 was injected by the low-pressure injection machine 1 used in the primary injection and the secondary injection.
5 and the nozzle 14 are used. That is, after the waterproofing resin 6 is injected by the secondary injection until the tank 22 of the low-pressure injection machine 15 becomes empty, the grout material 5 is put into the empty tank 22, and thereafter, FIG. 2 (a) and FIG. As shown in FIG.
The grout material 5 in the tank 22 is pumped through the hose 20 by the low-pressure injector 15 and supplied to the nozzle 14, and the gap 4
The grout material 5 can be discharged from the tip of the nozzle 14 located at the back of the nozzle. By injecting the grout material 5 into the interior of the gap 4 in this manner, the primary injected grout material 5 and the secondary injected waterproof resin 6 are exposed to the outdoor pressure by the tertiary injected grout material 5 injection pressure. The grout material 5 of the tertiary injection is filled into the inside of the gap 4 while being pressed and moved from the inside to the indoor side. Therefore, the grout material 5 of the tertiary injection is made of the waterproof resin 6 and the waterproof concrete 1.
1 to fill the outer periphery of the pipe 3. Further, the grout material 5 of the tertiary injection is also filled in about 1/3 of the depth of the gap 4. Further, as shown in FIG. 2B, the waterproofing resin 6 is moved to a substantially central portion of the gap 4 by the grout material 5 of the tertiary injection and is located near the boundary between the underground side wall 1a and the continuous wall 1b. However, as a result, a part of the waterproofing resin 6 flows into the gap 16 between the underground side wall 1a and the continuous wall 1b, and the gap 16 is filled with the preventing resin 6 near the gap 4. After the primary injection to the tertiary injection as described above, the grout material 5 in the gap 4 is cured and cured without giving vibration and dust, so that the grout material 5 is formed.
And a layer of a cured product of the waterproofing resin 6 form a waterproof layer 7 which is formed adjacently. Thereafter, as shown in FIG. 2 (c), a polymer cement mortar 19 is filled in the interior side end of the cavity 4 before the primary grout material 5 (indoor side) and hardened, and the interior side of the cavity 4 is (The opening on the indoor side of the through hole 2) is closed. In addition, 21 is a trowel. In this way, the gap 4 formed at the pipe installation location can be filled with the waterproof layer 7. In the present invention, the gap 4 is filled with the grout material 5, the waterproof resin 6, and the grout material 5 in this order, and a waterproof resin layer 6 is provided between the grout material 5 layers to form the waterproof layer 7. Even if cracks occur in the grout material 5 due to shrinkage due to underground fluctuations or vibrations, water such as rainwater that has entered the cracks from the outside is prevented from entering the indoors with the cured product of the waterproofing resin 6 even if cracks occur due to underground fluctuations or vibrations. , And the waterproof layer 7 can be improved in the prevention performance. Further, since the grout material 5 and the waterproof resin 6 were filled in the gap 16 between the underground side wall 1a and the continuous wall 1b, the gap 1 was
6 and waterproof concrete 11, rainwater can be prevented from entering, leaking and leaking into the room, and the waterproofness can be further improved. In the prior art, when the grout material was filled in the through-hole, a void was formed in the upper portion of the through-hole by leveling, breathing, etc., but in the present invention, the grout material 5 flows down by its own weight by the waterproof resin. Since it is prepared in the shape of a rice cake with a viscosity that is not so high, leveling or breathing does not occur, and the filling can be surely performed so that no void is formed above the through hole. Further, the grout material 5 of the present invention can increase the degree of adhesion between the inner surface of the through hole 2 and the outer surface of the pipe 3 as compared with the prior art. In addition, in the past, urethane foam is mainly used as a water-stopping material,
In the pipe 3, there is also a weak vinyl chloride resin pipe, which may cause cracks or deformations in the pipe 3 due to the expansion force of the water-stopping material or injection force. Since the pipe 3 is not used, it is possible to prevent a trouble such as a crack or deformation from occurring in the pipe 3. As described above, the present invention can enhance the waterproofness, watertightness, adhesion between the wall 1 and the pipe 3, breathing, leveling, crack prevention, water stoppage, and the like. As described above, according to the first aspect of the present invention, a through-hole is formed in a wall of a building and a pipe is installed in the through-hole, and a space between an inner surface of the through-hole and an outer surface of the pipe is provided. Is a method of filling a void, in which a grout material is prepared by mixing cement and a waterproofing resin, and after closing an outdoor opening of the void, the grout material is injected from the indoor side into the back of the void and filled. Then, the waterproofing resin is injected into the interior of the void from the indoor side, and the waterproofing resin is filled into the interior of the void while moving the grout material filled in the void by the injection pressure to the indoor side. The grout material is injected into the interior of the gap from the indoor side, and the grout material and the waterproofing resin filled in the gap are moved to the interior side by this injection pressure, and the grout material is filled into the interior of the gap, so between the grout materials. By providing waterproofing resin, Even if water such as rainwater, water seepage, or water leaks from the outside into cracks generated in the grout material, the waterproof resin can block this water from entering the room, thereby increasing the prevention performance. Things.
【図面の簡単な説明】
【図1】本発明の実施の形態の一例を示し、(a)乃至
(c)は一部が破断した斜視図である。
【図2】同上の(a)乃至(c)は一部が破断した斜視
図である。
【図3】同上の(a)乃至(c)は断面図である。
【符号の説明】
1 壁
2 貫通孔
3 配管
4 空隙
5 グラウト材
6 防水用樹脂BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 shows an example of an embodiment of the present invention, and (a) to (c) are partially broken perspective views. FIGS. 2A to 2C are perspective views with a part cut away. FIGS. 3A to 3C are cross-sectional views. [Description of Signs] 1 wall 2 through hole 3 pipe 4 air gap 5 grout material 6 waterproof resin
フロントページの続き (58)調査した分野(Int.Cl.7,DB名) F16L 5/02 Continuation of front page (58) Field surveyed (Int.Cl. 7 , DB name) F16L 5/02
Claims (1)
孔に配管を設置し、貫通孔の内面と配管の外面の間の空
隙を充填する方法であって、セメントと防水用樹脂を混
合してグラウト材を調製し、空隙の屋外側の開口を閉塞
した後、屋内側から空隙の奥にグラウト材を注入して充
填し、次に、防水用樹脂を屋内側から空隙の奥に注入
し、この注入圧で空隙に充填したグラウト材を屋内側に
移動させながら防水用樹脂を空隙の奥に充填し、次に、
グラウト材を屋内側から空隙の奥に注入し、この注入圧
で空隙に充填したグラウト材及び防水用樹脂を屋内側に
移動させながらグラウト材を空隙の奥に充填することを
特徴とする配管設置箇所の空隙充填方法。(57) [Claim 1] A method for forming a through hole in a wall of a building, installing a pipe in the through hole, and filling a gap between an inner surface of the through hole and an outer surface of the pipe. Then, a grout material is prepared by mixing cement and a waterproofing resin, and after closing the outdoor opening of the void, the grout material is injected from the indoor side into the interior of the void and filled, and then the waterproofing resin is filled. Is injected from the indoor side into the back of the gap, and the waterproofing resin is filled into the back of the gap while moving the grout material filled into the gap with the injection pressure to the indoor side,
A pipe installation characterized by injecting a grout material from the indoor side into the interior of the gap, and filling the grout material into the interior of the gap while moving the grout material and the waterproofing resin filled in the gap by the injection pressure to the interior side. How to fill the gaps in the location.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2001035688A JP3448282B2 (en) | 2001-02-13 | 2001-02-13 | How to fill the void at the pipe installation location |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2001035688A JP3448282B2 (en) | 2001-02-13 | 2001-02-13 | How to fill the void at the pipe installation location |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2002235873A JP2002235873A (en) | 2002-08-23 |
| JP3448282B2 true JP3448282B2 (en) | 2003-09-22 |
Family
ID=18899103
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2001035688A Expired - Fee Related JP3448282B2 (en) | 2001-02-13 | 2001-02-13 | How to fill the void at the pipe installation location |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3448282B2 (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP6128088B2 (en) * | 2014-09-24 | 2017-05-17 | Jfeスチール株式会社 | Pipe penetration construction method and pipe penetration construction member |
| CN109235391A (en) * | 2018-11-01 | 2019-01-18 | 中国电建集团成都勘测设计研究院有限公司 | The surface grouting structure of diversion outlet closuring concrete |
| CN113236870B (en) * | 2021-04-25 | 2023-07-14 | 华南蓝天航空油料有限公司 | Valve well seepage-proofing construction process |
-
2001
- 2001-02-13 JP JP2001035688A patent/JP3448282B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JP2002235873A (en) | 2002-08-23 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP2866015B2 (en) | Water stopping method for concrete underground structures | |
| CA2032217C (en) | Method of rehabilitating manholes by custom lining/relining | |
| US5063967A (en) | Pumpable cement grout | |
| AU2004288174B2 (en) | Method for preparing in-ground tunnel structures | |
| KR101415106B1 (en) | The back feel grouting apparatus for upper part of tunnel | |
| KR102598805B1 (en) | Construction method of tunnel lining back grouting of grouting tube recovery | |
| JP3448282B2 (en) | How to fill the void at the pipe installation location | |
| KR100818212B1 (en) | Repair method of injection leak on the back of concrete structure using organic and inorganic fillers | |
| JP2010101090A (en) | Water-stop structure, construction method therefor, and method of performing water stop of anchor penetration part of seepage control member | |
| KR102356751B1 (en) | Waterproof system of trench | |
| US7828496B1 (en) | Watertight joint seal for concrete structures | |
| CN213539105U (en) | A leaking stoppage structure for deep basal pit basement outer wall crack | |
| JP2014208970A (en) | Rear face injection water cut-off method | |
| CN107143701A (en) | A kind of waterproof wall bushing | |
| KR102620161B1 (en) | Steel pipe reinforcing grouting method in tunnel | |
| CN112431989B (en) | Method for quickly repairing leakage of pipe orifice of PE (polyethylene) solid-wall drain pipe | |
| JP5567728B2 (en) | Back side injection water stop method | |
| JP5457215B2 (en) | Back side injection water stop method | |
| JP3482413B2 (en) | Lightweight cement mortar for bolt box filling method and bolt box filling method using lightweight cement mortar | |
| KR100309316B1 (en) | The method for double flood control of a culvert with box construction formular | |
| JPH10231575A (en) | Method of spraying concrete wall and composition for the spraying | |
| CN206545284U (en) | A kind of subsided rest room | |
| CN220870264U (en) | A basement wall-penetrating pipe leakage blocking structure | |
| KR100396852B1 (en) | Method for repairing crevis on concrete structures | |
| CN222558196U (en) | Waterproof plugging structure for cracks |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20030603 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| LAPS | Cancellation because of no payment of annual fees |