JP3449236B2 - Joint structure and joint method of steel segment - Google Patents
[go: Go Back, main page]

JP3449236B2 - Joint structure and joint method of steel segment - Google Patents

Joint structure and joint method of steel segment

Info

Publication number
JP3449236B2
JP3449236B2 JP25380098A JP25380098A JP3449236B2 JP 3449236 B2 JP3449236 B2 JP 3449236B2 JP 25380098 A JP25380098 A JP 25380098A JP 25380098 A JP25380098 A JP 25380098A JP 3449236 B2 JP3449236 B2 JP 3449236B2
Authority
JP
Japan
Prior art keywords
tunnel
steel
steel segments
joint
segment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP25380098A
Other languages
Japanese (ja)
Other versions
JP2000080892A (en
Inventor
宏之 山中
一郎 大澤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP25380098A priority Critical patent/JP3449236B2/en
Publication of JP2000080892A publication Critical patent/JP2000080892A/en
Application granted granted Critical
Publication of JP3449236B2 publication Critical patent/JP3449236B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】この発明は鋼製セグメント
手方法に関し、特にトンネルの地山を複数の鋼製セグ
メントのみで構築される鋼構造の覆工体(ライニング)
で、または一次覆工として設置された鋼製セグメントの
内側に二次覆工としてコンクリートを打設することによ
り構築される鋼・コンクリート合成構造の覆工体で、さ
らには二次覆工として打設されたコンクリート内に複数
の補強鉄筋を配筋することにより構築される鋼・鉄筋コ
ンクリート合成構造の覆工体で覆工する際に適用され
る。
TECHNICAL FIELD The present invention relates to a steel segment .
Relates joint hand method, lining of steel structures especially built the natural ground of the tunnel only a plurality of steel segments (lining)
Or a steel-concrete composite structure constructed by placing concrete as a secondary lining on the inside of a steel segment installed as a primary lining, and as a secondary lining. It is applied when lining with a lining body of steel / reinforced concrete composite structure constructed by arranging multiple reinforcing reinforcing bars in the installed concrete.

【0002】[0002]

【従来の技術】掘進直後のトンネルの地山を覆工する方
法として、当出願人はこれまで、トンネルの地山に複数
の鋼製セグメントを設置して鋼構造の覆工体を構築する
方法、トンネルの地山に複数の鋼製セグメントを一次覆
工として設置し、その内側に二次覆工としてコンクリー
トを打設して鋼・コンクリート合成構造の覆工体を構築
する方法、さらに鋼製セグメントの内側に二次覆工とし
て打設されたコンクリート内に補強鉄筋を配筋すること
により鋼・鉄筋コンクリート合成構造の覆工体を構築す
る覆工法を開発した。
2. Description of the Related Art As a method for lining the ground of a tunnel immediately after excavation, the applicant has so far constructed a method of constructing a steel-structured lining body by installing a plurality of steel segments in the ground of the tunnel. , A method of constructing a lining body of steel-concrete composite structure by installing multiple steel segments as the primary lining on the ground of the tunnel and placing concrete as the secondary lining inside it, We have developed a lining method for constructing a lining body of steel / reinforced concrete composite structure by arranging reinforcing bars in the concrete placed as the secondary lining on the inside of the segment.

【0003】また、当出願人は、大断面のトンネルを効
率的かつ経済的に構築する方法として、例えば図7に図
示するように最初に矩形筒状の外殻部30を構築し、そ
の後に外殻部30内の土砂を掘削して大断面のトンネル
Aを構築する大断面トンネルの構築工法(MMST工
法)も開発した。
As a method for efficiently and economically constructing a tunnel having a large cross section, the applicant of the present invention first constructs a rectangular tubular outer shell portion 30 as shown in FIG. A construction method for a large-section tunnel (MMST method) in which earth and sand in the outer shell 30 is excavated to construct a large-section tunnel A has also been developed.

【0004】その際、外殻部30は複数の単体シールド
トンネルa(以下「単体トンネルa」という)を近接し
て掘進した後、この単体トンネルaを一つの空間に連続
するように接合し、その中にコンクリート31を連続し
て打設することにより構築している。
At this time, the outer shell portion 30 excavates a plurality of single shield tunnels a (hereinafter referred to as "single tunnel a") in close proximity, and then joins the single tunnels a so as to be continuous in one space. It is constructed by continuously placing concrete 31 in it.

【0005】図8は、これらのトンネルの構築工法で使
用される鋼製セグメントの一例を示し、鋼製セグメント
32は、図示するようにトンネルの周方向に複数の主桁
33を平行に設置し、この主桁33の両端部に継手板3
4を設置し、かつ隣接する主桁33,33間に複数の縦
リブ35を主桁33の軸方向に所定間隔に設置して長方
形状をなす格子枠体を形成し、この格子枠体の地山側に
スキンプレート36を取り付けて形成されている。
FIG. 8 shows an example of a steel segment used in the construction method of these tunnels. As shown in the figure, the steel segment 32 has a plurality of main girders 33 arranged in parallel in the circumferential direction of the tunnel. , Joint plates 3 at both ends of the main girder 33
4 are installed, and a plurality of vertical ribs 35 are installed between the adjacent main girders 33, 33 at predetermined intervals in the axial direction of the main girder 33 to form a rectangular grid frame body. It is formed by attaching a skin plate 36 to the natural side.

【0006】また、特にトンネルの周方向に隣接する鋼
製セグメント32を接合する方法としては、例えば図9
(a)に図示するように継手板34をトンネルの周方向
に貫通する複数の短ボルト37でボルト止めして接合す
る方法が知られている。
Further, as a method for joining the steel segments 32 which are adjacent to each other in the circumferential direction of the tunnel, for example, FIG.
As shown in (a), a method is known in which the joint plate 34 is bolted and joined by a plurality of short bolts 37 penetrating in the circumferential direction of the tunnel.

【0007】[0007]

【発明が解決しようとする課題】しかし、このように継
手板34を短ボルト37でボルト止めする方法では、継
手部における曲げ応力や引張り応力の伝達が継手板34
を介して行われるため、継手板34に応力が集中するこ
とにより図9(b)に図示するように継手板34が簡単
に変形しやすく、このため短ボルト37の軸力にばらつ
きが生じて所定の引張力を伝達できない等の課題があっ
た。
However, in the method of bolting the joint plate 34 with the short bolts 37 as described above, transmission of bending stress and tensile stress in the joint portion is performed by the joint plate 34.
Since the stress is concentrated on the joint plate 34, the joint plate 34 is easily deformed as shown in FIG. 9 (b), so that the axial force of the short bolt 37 varies. There was a problem that a predetermined tensile force could not be transmitted.

【0008】また、このように継手板34が変形してし
まうと、シールドトンネルの止水性と形状維持という覆
工体としての役割を充分に果たせなくなってしまう等の
課題もあった。
Further, if the joint plate 34 is deformed in this way, there is a problem that it cannot fully fulfill its role as a lining body for waterproofing and maintaining the shape of the shield tunnel.

【0009】そこで、継手部の剛性を高め、確実な引張
力を伝達させるようにするために、例えば図10に図示
するように主桁33どうしを継手プレート38と複数の
高力ボルト39で接合する高力ボルト摩擦接合なども検
討されているが、鋼製セグメント32が設置された後
に、ジャッキ推力などの施工時荷重の影響を受けること
によりボルトの軸力にばらつきが生じてボルトの軸力管
理がしにくい等の課題があった。
Therefore, in order to increase the rigidity of the joint portion and to transmit a reliable tensile force, for example, as shown in FIG. 10, the main girders 33 are joined to the joint plate 38 and a plurality of high-strength bolts 39. Although high-strength bolt friction joining, etc., has also been studied, the axial force of the bolt varies due to the influence of construction load such as jack thrust after the steel segment 32 is installed, and the axial force of the bolt varies. There were issues such as difficulty in management.

【0010】さらに、図7に図示する大断面トンネルの
場合、短ボルト37は単体トンネルaにおいては曲げモ
ーメントによる引張力を、大断面トンネルAにおいては
引っ張り鋼材としての引張力をそれぞれ受けるものと
し、この二つの応力の和を設計応力として設計されてい
る。
Further, in the case of the large section tunnel shown in FIG. 7, the short bolt 37 receives the tensile force by the bending moment in the simple tunnel a and the tensile force as the tensile steel material in the large section tunnel A, respectively. The sum of these two stresses is designed as the design stress.

【0011】また、これらの短ボルト37には一般に、
鋼製セグメント32の組み立て時に許容引張力応力の8
0%程度の初期導入軸力が導入されている。また、大断
面トンネルの場合、短ボルト37が大断面トンネルの断
面力に対して所定の安全率を確保しているためには、以
下の条件を満足していることが必要とされている。
Further, these short bolts 37 are generally
When assembling the steel segment 32, the allowable tensile stress is 8
An initial introduction axial force of about 0% is introduced. Further, in the case of a large-section tunnel, in order for the short bolt 37 to secure a predetermined safety factor against the sectional force of the large-section tunnel, it is necessary to satisfy the following conditions.

【0012】 短ボルト37の引張力は、単体トンネ
ルaの施工時に設計値以内に納まっていること。これ
は、単体トンネルaの構築時に、短ボルト37に設計値
以上の引張力が生じていると、大断面トンネルAの構築
時にボルトの引張力に余裕がなくなってしまうためであ
る。 短ボルト37の初期導入軸力は、コンクリート
31の打設時において全てのボルトでほぼ一定であるこ
これは、短ボルト37の初期導入軸力にばらつきが
あると、短ボルト37ごとに剛性が違うことにより、大
断面トンネルAの構築時に生じる引張力の分担率にばら
つきが生じるためである。
The tensile force of the short bolt 37 must be within the design value when the single tunnel a is constructed. This is because when the short bolt 37 has a tensile force equal to or greater than the design value when the single tunnel a is constructed, the bolt tensile force becomes insufficient when the large cross section tunnel A is constructed. The initial axial force of the short bolt 37 should be almost constant for all bolts when the concrete 31 is placed . This is because if the initial introduction axial force of the short bolts 37 varies, the rigidity of each of the short bolts 37 varies, so that the proportion of the tensile force generated when the large-section tunnel A is constructed varies.

【0013】しかし、実際の大断面トンネルAの構築に
際しては、以下に述べるような様々な課題がある。単体
トンネルaの施工に際して、鋼製セグメント32の組み
立て時に導入された短ボルト37の初期導入軸力が、当
初一定でも大断面トンネルAの施工に際して、コンクリ
ート31の打設時に大きなばらつきが生じる。
However, in the actual construction of the large-section tunnel A, there are various problems as described below. When the single tunnel a is constructed, even if the initial introduction axial force of the short bolt 37 introduced during the assembly of the steel segment 32 is initially constant, when the large-section tunnel A is constructed, a large variation occurs when the concrete 31 is placed.

【0014】これは、鋼製セグメント32を設置してか
らコンクリート31を打設するまでの間、鋼製セグメン
ト32が様々な施工時荷重(ジャッキ推力、接続部施工
時荷重など)を受けて変形し、また鋼製セグメント32
が徐々に変形しながら地山面になじんでいくことに起因
するためである。
This is because the steel segment 32 is deformed under various construction loads (jack thrust, connection construction load, etc.) between the installation of the steel segment 32 and the placing of the concrete 31. And steel segment 32
This is due to the fact that while gradually deforming, it adapts to the ground surface.

【0015】この軸力のばらつきは、コンクリート31
を打設する前に再度、軸力を導入して調整できれば特に
問題はないが、さびや水滴の影響によりトルク値に大き
なばらつきが生じることから、鋼製セグメント32を設
置して時間が経過した後にボルトに再び一定の軸力を導
入するのは不可能である。
This variation in axial force is caused by the concrete 31
There is no particular problem if the axial force can be introduced and adjusted again before placing the steel, but since there is a large variation in the torque value due to the influence of rust and water droplets, it took time to install the steel segment 32. It is not possible to reintroduce a constant axial force on the bolt later.

【0016】また、大断面トンネルAの断面力による引
張力に対して、確実な引張耐力を有することを確認する
ためには、一つの連続する空間となるように接合された
単体トンネルa内にコンクリート31を打設する前に短
ボルト37に作用している引張力を把握する必要がある
が、鋼製セグメント32の組み立て時に許容引張力応力
の80%程度の初期導入軸力が導入されているため、短
ボルト37に作用している引張力は把握できない。
Further, in order to confirm that the tensile strength due to the cross-sectional force of the large cross-section tunnel A is ensured, the single tunnel a joined to form one continuous space is confirmed. It is necessary to grasp the tensile force acting on the short bolt 37 before placing the concrete 31, but when the steel segment 32 is assembled, an initial introduction axial force of about 80% of the allowable tensile force stress is introduced. Therefore, the tensile force acting on the short bolt 37 cannot be grasped.

【0017】このため、何らかの施工時荷重によって一
部の短ボルト37に設計値以上の引張力が作用していた
としても対処できない。このように、単体トンネルの端
面力と大断面トンネルの断面力の両方の断面力に対して
一種類の短ボルトで対処しようとすると、上記するよう
な様々な問題が生じるため、大断面トンネルAにおける
ボルト耐力に対して定量的な品質保証ができない。
Therefore, even if some short bolts 37 are subjected to a tensile force above the design value due to some load during construction, it cannot be dealt with. In this way, if one type of short bolt is used to deal with both the sectional force of the end tunnel of the simple tunnel and the sectional force of the large section tunnel, various problems as described above will occur. Quantitative quality assurance is not possible for bolt proof strength.

【0018】この発明は以上の課題を解決するためにな
されたもので、継手ボルトの引張耐力を品質・保証し
て、鋼製セグメント同士を確実・強固に接合でき、かつ
高い止水性を保持できるようにした鋼製セグメントの継
手構造およびその継手方法を提供することを目的とす
る。
The present invention has been made to solve the above problems. The tensile strength of the joint bolts is quality and guaranteed, the steel segments can be securely and firmly joined to each other, and a high waterproofness can be maintained. An object of the present invention is to provide a joint structure for a steel segment and a joint method therefor.

【0019】[0019]

【課題を解決するための手段】以上の課題を解決するた
めに、この発明に係る鋼製セグメントの継手方法は、
造的な前提としてトンネルの周方向と軸方向にそれぞれ
延びる主桁と継手板を有する鋼製セグメントの継手構造
において、継手板をトンネルの周方向に貫通する複数の
短ボルトで、主桁を継手プレートとトンネルの軸方向に
貫通する複数の高力ボルトでそれぞれ接合する。
In order to solve the above problems BRIEF SUMMARY OF THE INVENTION joint method of a steel segment engaging Ru to the present invention, structure
In a joint structure of steel segments having a main girder and a joint plate extending in the tunnel circumferential direction and axial direction respectively as a constructional premise, the main girder is joined by a plurality of short bolts penetrating the joint plate in the tunnel circumferential direction. A plurality of high-strength bolts that penetrate the plate and the tunnel in the axial direction are used to join them.

【0020】請求項1記載の鋼製セグメントの継手方法
は、トンネルの周方向と軸方向にそれぞれ延びる主桁と
継手板を有する鋼製セグメントの継手方法において、最
初に継手板をトンネルの周方向に貫通する複数の短ボル
トで接合して鋼製セグメントを組み立て、その後、施工
時荷重を受けることにより徐々に変形し、ボルト軸力の
変動への影響がなくなり、セグメントが地山面に充分に
なじんでから、主桁どうしを継手プレートとトンネルの
軸方向に貫通する複数の高力ボルトで高力ボルト摩擦
合する。
According to the first aspect of the present invention, there is provided a steel segment joint method , comprising a main girder and a joint plate extending in a circumferential direction and an axial direction of a tunnel, respectively. Assemble steel segments by joining with multiple short bolts that pass through the circumference of the tunnel , and then construct
When it receives a load, it gradually deforms and the bolt axial force
There is no influence on fluctuations, and the segment is sufficiently on the ground surface.
After fitting in , the main girders are frictionally joined to each other by a plurality of high-strength bolts penetrating in the axial direction of the joint plate and the tunnel.

【0021】請求項記載の鋼製セグメントの継手方法
は、単体シールドトンネルを鋼製セグメントで覆工しつ
つ掘進した後に、単体シールドトンネル内に所定の厚さ
にコンクリートを打設してトンネルを構築する際に、鋼
製セグメント同士を接合する鋼製セグメントの継手方法
において、単体シールドトンネルの掘進時に鋼製セグメ
ント同士をトンネルの周方向に貫通する複数の短ボルト
で接合して鋼製セグメントを組み立て、その後、施工時
荷重を受けることにより徐々に変形し、ボルト軸力の変
動への影響がなくなり、セグメントが地山面に充分にな
じんでから、コンクリートを打設する前に鋼製セグメン
ト同士を継手プレートとトンネルの軸方向に貫通する複
数の高力ボルトで高力ボルト摩擦接合する。
According to a second aspect of the present invention, there is provided a steel segment joint method, wherein a single shield tunnel is lined with a steel segment and is dug, and then concrete is cast in the single shield tunnel to a predetermined thickness to form the tunnel. At the time of construction, in the method of joining steel segments that join steel segments together, when digging a single shield tunnel, steel segments are joined by a plurality of short bolts that penetrate the steel segments in the circumferential direction of the tunnel to form a steel segment. Assembled and then constructed
When the load is applied, it gradually deforms and the bolt axial force changes.
Motion is not affected and the segment is
Then, before the concrete is placed, the steel segments are friction- bonded to each other with a plurality of high-strength bolts penetrating in the axial direction of the joint plate and the tunnel.

【0022】請求項記載の鋼製セグメントの継手方法
は、複数の単体シールドトンネルを、鋼製セグメントで
覆工しつつ掘進した後に、単体シールドトンネル内にコ
ンクリートを打設して外殻部を構築し、次にこの外殻部
内の土砂を掘削して大断面のトンネルを構築する際に、
鋼製セグメント同士を接合する鋼製セグメントの継手方
法において、単体シールドトンネルの掘進時に鋼製セグ
メント同士をトンネルの周方向に貫通する複数の短ボル
トで接合して鋼製セグメントを組み立て、その後、施工
時荷重を受けることにより徐々に変形し、ボルト軸力の
変動への影響がなくなり、セグメントが地山面に充分に
なじんでから、コンクリートを打設する前(またはコン
クリートを打設する直前)に鋼製セグメント同士を継手
プレートとトンネルの軸方向に貫通する複数の高力ボル
トで接合する。
According to a third aspect of the present invention, there is provided a steel segment joint method, wherein after digging a plurality of single shield tunnels while lining them with steel segments, concrete is placed in the single shield tunnel to form an outer shell portion. When constructing, and then excavating the earth and sand in this outer shell to construct a tunnel of large cross section,
In a steel segment joint method for joining steel segments to each other, at the time of excavation of a single shield tunnel, steel segments are joined by a plurality of short bolts penetrating in the circumferential direction of the tunnel to assemble a steel segment, and then construction
When it receives a load, it gradually deforms and the bolt axial force
There is no influence on fluctuations, and the segment is sufficiently on the ground surface.
After fitting in, before placing concrete (or just before placing concrete), steel segments are joined with a plurality of high-strength bolts that penetrate the joint plate and the tunnel in the axial direction.

【0023】請求項記載の鋼製セグメントの継手方法
は、請求項2または3において、主桁と継手プレートと
の当接面を粗面または凹凸状に形成する。請求項記載
の鋼製セグメントの継手方法は、請求項2、3または4
において、高力ボルトを締結するボルト孔の一部を鋼製
セグメントの製作時に形成し、残りを高力ボルトを締結
する際に形成する。
According to a fourth aspect of the present invention, there is provided a steel segment joint method according to the second or third aspect, wherein the contact surface between the main girder and the joint plate is formed into a rough surface or an uneven shape. The method for joining steel segments according to claim 5 is the method according to claim 2, 3 or 4.
In, a part of the bolt hole for fastening the high-strength bolt is formed when the steel segment is manufactured, and the rest is formed when the high-strength bolt is fastened.

【0024】[0024]

【発明の実施の形態】図1〜図5は、この発明の実施の
一形態を示し、大断面トンネルAの地山面に複数の鋼製
セグメント1が単体トンネルaの周方向と軸方向に互い
に隣接し、かつ互いに接合して設置されている。
1 to 5 show an embodiment of the present invention in which a plurality of steel segments 1 are provided on the ground surface of a large-section tunnel A in the circumferential direction and the axial direction of a single tunnel a. They are installed adjacent to each other and joined to each other.

【0025】その際、特に単体トンネルaの周方向に隣
接する鋼製セグメント1同士は、例えば図2に図示する
ように継手プレート2と複数の高力ボルト3による高力
ボルト摩擦接合と複数の短ボルト4によるボルト接合に
よって接合されるただし、これらの接合は同時はな
く、後述するように、最初に継手板7をトンネルの周方
向に貫通する複数の短ボルト4で接合して鋼製セグメン
ト1を組み立て、その後、施工時荷重を受けることによ
り徐々に変形し、ボルト軸力の変動への影響がなくな
り、セグメント1が地山面に充分になじんでから、主桁
5どうしを継手プレート2とトンネルの軸方向に貫通す
る複数の高力ボルト3で高力ボルト摩擦接合する。
At this time, in particular, the steel segments 1 adjacent to each other in the circumferential direction of the unitary tunnel a are joined to each other by high-strength bolt friction joining with a joint plate 2 and a plurality of high-strength bolts 3 as shown in FIG. It is joined by bolt joining with the short bolt 4. However, these joints are not simultaneous.
As will be described later, first connect the joint plate 7 to the circumference of the tunnel.
Steel segment by connecting with a plurality of short bolts 4 that penetrate in the direction
Assembling the grate 1 and then receiving the load during construction
It gradually deforms and has no effect on the fluctuation of bolt axial force.
The main girder after the segment 1 has fully adjusted to the ground surface.
5 through the joint plate 2 and the tunnel axial direction
The high-strength bolts 3 are friction-bonded with each other.

【0026】図2(a)は、ここで使用されている鋼製
セグメントの一例を示し、図示するように単体トンネル
aの周方向に複数の主桁5が平行に延在され、この隣接
する主桁5,5間に複数の縦リブ6が主桁5の軸方向に
所定間隔に取り付けられ、さらに主桁5,5の端部間に
継手板7と補強板8がそれぞれ取り付けられている。
FIG. 2 (a) shows an example of a steel segment used here, and as shown in the drawing, a plurality of main girders 5 extend in parallel in the circumferential direction of the unitary tunnel a and are adjacent to each other. A plurality of vertical ribs 6 are attached between the main girders 5 and 5 at predetermined intervals in the axial direction of the main girder 5, and a joint plate 7 and a reinforcing plate 8 are attached between the ends of the main girders 5 and 5, respectively. .

【0027】また、これらの部材から長方形状に形成さ
れた格子状枠体9の地山側にスキンプレート10が取り
付けられている。なお、これらの部材は溶接またはボル
ト接合などによって互いに接合されている。
Further, a skin plate 10 is attached to the ground side of the lattice-shaped frame body 9 formed in a rectangular shape from these members. Note that these members are joined to each other by welding or bolt joining.

【0028】主桁5、縦リブ6および継手板7はいずれ
も、所定の梁成(高さ)を有して帯板状に形成されてい
る。また、主桁5の端部に高力ボルト3を締結する複数
のボルト孔11が所定間隔に形成され、継手板7には短
ボルト4を締結するボルト孔12と継手プレート2を通
す縦孔13がそれぞれ形成されている。
Each of the main girder 5, the vertical ribs 6 and the joint plate 7 is formed into a strip plate having a predetermined beam formation (height). Further, a plurality of bolt holes 11 for fastening the high-strength bolts 3 are formed at predetermined intervals at the end of the main girder 5, and a bolt hole 12 for fastening the short bolt 4 and a vertical hole for passing the joint plate 2 are formed in the joint plate 7. 13 are formed respectively.

【0029】ボルト孔11と12はそれぞれ、主桁5と
継手板6の軸方向に所定間隔にかつ並列に形成されてい
る。また、縦孔13は主桁5の両側に位置し、かつ継手
プレート2を主桁5の軸方向に自由にスライドできるよ
うに、継手プレート2の断面形よりやや大きめの矩形状
に形成されている。
The bolt holes 11 and 12 are formed at predetermined intervals in parallel in the axial direction of the main girder 5 and the joint plate 6, respectively. The vertical holes 13 are located on both sides of the main girder 5, and are formed in a rectangular shape slightly larger than the cross-sectional shape of the joint plate 2 so that the joint plate 2 can freely slide in the axial direction of the main girder 5. There is.

【0030】なお、縦孔13は継手プレート2が特に長
いときは、継手板7と隣接する縦リブ6Aにも形成され
ている。縦リブ6は単体トンネルaを掘進するシールド
機の推進反力を得る反力受けとして充分な強度を有する
ように、必要に応じて補強リブ6aで補強され、かつ主
桁5,5間に最適な間隔で取り付けられている。
The vertical hole 13 is also formed in the vertical rib 6A adjacent to the joint plate 7 when the joint plate 2 is particularly long. The vertical ribs 6 are reinforced by the reinforcing ribs 6a as necessary so as to have sufficient strength as a reaction force receiving the propulsion reaction force of the shield machine for excavating the single tunnel a, and are optimal between the main girders 5 and 5. It is installed at regular intervals.

【0031】また、縦リブ6Aは、縦孔13を設けたこ
とによる断面不足を補うために縦リブ6より大きめに形
成されている。こうして形成された鋼製セグメント1
は、単体トンネルaの周方向と軸方向に互いに隣接して
設置され、特に単体トンネルaの周方向に隣接する鋼製
セグメント1の継手板7は互いに突き合わせられてい
る。
The vertical ribs 6A are formed to be larger than the vertical ribs 6 in order to compensate for the lack of cross section due to the provision of the vertical holes 13. Steel segment 1 thus formed
Are installed adjacent to each other in the circumferential direction and the axial direction of the simple tunnel a, and in particular, the joint plates 7 of the steel segments 1 adjacent to each other in the circumferential direction of the simple tunnel a are butted against each other.

【0032】そして、継手板7のボルト孔11に短ボル
ト4が締結されている。また、主桁5の側部間に継手プ
レート2が縦孔12を通して架け渡され、かつ継手プレ
ート2のボルト孔2aと主桁5のボルト孔11に高力ボ
ルト3が締結されている。
Then, the short bolt 4 is fastened to the bolt hole 11 of the joint plate 7. Further, the joint plate 2 is bridged between the side portions of the main girder 5 through the vertical holes 12, and the high-strength bolts 3 are fastened to the bolt holes 2 a of the joint plate 2 and the bolt holes 11 of the main girder 5.

【0033】こうして、単体トンネルaの周方向に隣接
する鋼製セグメント1と1が複数の短ボルト4によるボ
ルト接合と継手プレート2と複数の高力ボルト3による
高力ボルト摩擦接合によって接合されている。
Thus, the steel segments 1 and 1 which are adjacent to each other in the circumferential direction of the unitary tunnel a are joined by bolt joining with a plurality of short bolts 4 and high strength bolt friction joining with a joint plate 2 and a plurality of high strength bolts 3. There is.

【0034】なおその際、主桁5の端部と継手プレート
2との当接面を粗面に形成したり、あるいは図2(c)
に図示するように当接面に極小さな凹凸部14を多数形
成したりすることにより当接面の摩擦係数を著しく高め
ることができる。
At this time, the contact surface between the end portion of the main girder 5 and the joint plate 2 may be formed into a rough surface, or as shown in FIG.
As shown in the drawing, the friction coefficient of the contact surface can be remarkably increased by forming a large number of extremely small uneven portions 14 on the contact surface.

【0035】また、図3(a),(b)に図示するよう
に、細めに形成された2枚の継手プレート2で主桁5の
端部をそれれ接合することにより、施工性の向上が図
れるとともにセグメント接合部の施工状の誤差を容易に
吸収できる。
Further, as illustrated in FIG. 3 (a), (b) , by two joint plates 2 formed thinner by the end of the main girder 5 to their respective joint, the workability It is possible to improve and it is possible to easily absorb the error in the construction condition of the segment joint.

【0036】また、トンネルaの覆工体(ライニング)
が鋼構造の場合、図1に図示するように鋼製セグメント
1のみが本体構造(躯体)として設置され、覆工体が鋼
コンクリート合成構造の場合は、図4(a)〜(c)に
図示するように一次覆工として設置された鋼製セグメン
ト1の内側に二次覆工としてコンクリート15が所定の
厚さに打設され、さらに鋼・鉄筋コンクリート合成構造
の覆工体の場合には、鋼製セグメント1の内側に二次覆
工として補強鉄筋16を配筋した後にコンクリート15
が所定の厚さに打設されている。
The lining body of the tunnel a (lining)
4 is a steel structure, as shown in FIG. 1, only the steel segment 1 is installed as a main body structure (frame body), and when the lining body is a steel-concrete composite structure, as shown in FIGS. As shown in the figure, inside the steel segment 1 installed as a primary lining, concrete 15 is cast as a secondary lining to a predetermined thickness, and in the case of a lining body of steel / reinforced concrete composite structure, After reinforcing steel bars 16 are reinforced as secondary linings inside the steel segment 1, concrete 15
Is cast to a predetermined thickness.

【0037】また特に、図5に図示するような大断面ト
ンネルの場合、鋼・鉄筋コンクリート合成構造の外郭部
17を構築するために、複数の鋼製セグメント1で覆工
しながら掘進され、かつ一つの空間に連続するように接
合された単体トンネルa内に補強鉄筋16が配筋され、
その後にコンクリート15が打設されている。そして、
こうして形成された外郭部17の内側土砂が掘削されて
いる。
Further, in particular, in the case of a large cross-section tunnel as shown in FIG. 5, in order to construct the outer portion 17 of the steel / reinforced concrete composite structure, a plurality of steel segments 1 are dug while lining, and Reinforcing bars 16 are arranged in a single tunnel a that is continuously joined to one space,
After that, concrete 15 is placed. And
The inner sediment of the outer shell 17 thus formed is excavated.

【0038】なお、図5に図示するように大断面トンネ
ルAを構築する場合において、特に補強鉄筋を配筋しな
いで鋼・コンクリート合成構造とする場合もある。この
ような構成において、次にこの発明に係る鋼製セグメン
トの継手方法を説明する(図6(a) 〜(e) 参照)。
In the case of constructing the large cross-section tunnel A as shown in FIG. 5, there is also a case where a steel / concrete composite structure is used without particularly reinforcing bars. Next, a method for joining steel segments according to the present invention having such a configuration will be described (see FIGS. 6 (a) to 6 (e)).

【0039】 シールド機(図省略)のテール部にお
いて、トンネルの地山面に複数の鋼製セグメント1をト
ンネルの周方向と軸方向に互いに隣接させて設置する。
その際、トンネルの周方向に隣接する鋼製セグメント1
の継手板7は、図6(b)に図示するように隙間が生じ
ないように密着させ、かつ双方のボルト孔12を一致さ
せる。 次に、継手板7のボルト孔12に短ボルト4を締結
して、トンネルの周方向に隣接する鋼製セグメント1同
士を接合する。 次に、図1に図示するように、トンネルの地山を鋼
製セグメントのみで覆工するときは、鋼製セグメント1
が組み立て後に様々な施工時荷重を受けることにより徐
々に変形し、ボルト軸力が変動するのでこれらの影響が
なくなり、セグメントが地山面に充分になじんでから、
主桁5どうしを継手プレート2と複数の高力ボルト3に
よってそれぞれ高力ボルト摩擦接合する。
In the tail portion of the shield machine (not shown), a plurality of steel segments 1 are installed on the ground surface of the tunnel so as to be adjacent to each other in the circumferential direction and the axial direction of the tunnel.
At that time, the steel segments 1 adjacent to each other in the circumferential direction of the tunnel
As shown in FIG. 6 (b), the joint plate 7 is closely attached so that no gap is generated, and both bolt holes 12 are aligned. Next, the short bolts 4 are fastened to the bolt holes 12 of the joint plate 7 to join the steel segments 1 adjacent to each other in the circumferential direction of the tunnel. Next, as shown in FIG. 1, when lining the ground of the tunnel with only the steel segment, the steel segment 1
Is gradually deformed by being subjected to various loads during construction after assembly, and the bolt axial force fluctuates, so these effects are eliminated, and after the segment has fully fitted to the ground surface,
The main girders 5 are friction-bonded to each other by the joint plate 2 and the plurality of high-strength bolts 3, respectively.

【0040】継手プレート2は一方の継手板7の縦孔1
3から他方の継手板7の縦孔13に挿通して双方の主桁
5の端部間に架け渡す。そして、主桁5のボルト孔11
とボルト孔11に対応して形成された継手プレート2の
ボルト孔2aに高力ボルト3を締結する。
The joint plate 2 is a vertical hole 1 of one joint plate 7.
3 through the vertical hole 13 of the other joint plate 7 and bridge between the ends of both main girders 5. Then, the bolt hole 11 of the main girder 5
The high-strength bolt 3 is fastened to the bolt hole 2a of the joint plate 2 formed corresponding to the bolt hole 11.

【0041】なお、高力ボルト3はコンクリート15を
打設する前に締結すればよいが、特にコンクリート15
を打設する直前に締結するほうが、施工時荷重の影響を
受けないこと、また鋼製セグメント1が地山に充分にな
じむことから、その後の変形がほぼ停止するため望まし
い。
The high-strength bolt 3 may be fastened before the concrete 15 is placed.
It is desirable to fasten just before placing the steel because it is not affected by the load during construction and the steel segment 1 fits well into the ground, and the subsequent deformation is almost stopped.

【0042】また、高力ボルト3を締結する際、ジャッ
キ推力などの施工時荷重によって鋼製セグメント1の接
合部間に目違いやずれが生じて高力ボルト3を締結でき
ない場合も考えられる。
Further, when the high-strength bolt 3 is fastened, it is possible that the high-strength bolt 3 cannot be fastened due to misalignment or misalignment between the joints of the steel segments 1 due to a load during construction such as jack thrust.

【0043】このような場合の対策としては、鋼製セグ
メント1の設置(組み立て)時に、継手プレート2のボ
ルト孔2aと主桁5のボルト孔11貫通する仮接合ボル
ト(図省略)で主桁5どうしを仮接合しておき、コンク
リート15を打設する際に仮接合ボルトを引き抜き、そ
の後に高力ボルト3を締結する。
As a countermeasure against such a case, when the steel segment 1 is installed (assembled), the main girders are temporarily joined with bolts 2a of the joint plate 2 and the bolt holes 11 of the main girder 5 (not shown). The five are temporarily joined together, the temporary joining bolt is pulled out when the concrete 15 is placed, and then the high-strength bolt 3 is fastened.

【0044】なお、主桁5どうしを仮接合する他の方法
としては、主桁5の端部間に仮の継手プレート(図省
略)を添え付け、この仮の継手プレートと主桁5を仮接
合ボルト(図省略)で仮接合しておく方法もある。
As another method of temporarily joining the main girders 5 to each other, a temporary joint plate (not shown) is attached between the ends of the main girders 5, and the temporary joint plate and the main girder 5 are temporarily joined. There is also a method of temporarily joining with a joining bolt (not shown).

【0045】また、ボルト孔11と2aのうち、一部の
ボルト孔を当初に形成しておき、残りのボルト孔を高力
ボルト3を締結する際に形成する方法もある。そうする
方が、鋼製セグメント1の製作誤差、組み立て誤差など
の施工上の誤差も簡単に吸収できるし、また高力ボルト
摩擦接合の場合、品質上大きなボルト孔をあけることが
できないことから高度の組立精度が要求されるため、高
力ボルトの締結時にボルト孔を形成することにより、施
工精度の著しい向上が図れる。また、継手部の高いの止
水性も確保できる。
There is also a method in which some of the bolt holes 11 and 2a are initially formed and the remaining bolt holes are formed when the high-strength bolt 3 is fastened. By doing so, it is possible to easily absorb construction errors such as manufacturing errors and assembly errors of the steel segment 1, and in the case of high-strength bolt friction welding, it is not possible to make large bolt holes in terms of quality. Since assembly accuracy is required, forming a bolt hole at the time of fastening a high-strength bolt can significantly improve the installation accuracy. In addition, high waterproofness of the joint can be secured.

【0046】さらに、図3に図示するように、細めに形
成された2枚の継手プレート2で主桁5の端部を接合す
ることにより、継手部の誤差に対しより容易に対処しや
すくなる。
Further, as shown in FIG. 3, by joining the ends of the main girders 5 with the two thinly formed joint plates 2, it becomes easier to deal with the error of the joint portion. .

【0047】なお、覆工体を鋼製セグメント1のみで構
築するときは、これで施工は終了するが、覆工体を鋼・
コンクリート合成構造とするときは、図4(a)〜
(c)に図示するように鋼製セグメント1の内側にコン
クリート15を所定の厚さに打設し、さらに鋼・鉄筋コ
ンクリート合成構造とするときは、コンクリート15内
に補強鉄筋16を配筋する。
When the lining body is constructed with only the steel segment 1, the construction is completed, but the lining body is made of steel.
When using a concrete composite structure, the structure shown in FIG.
As shown in (c), concrete 15 is cast inside the steel segment 1 to a predetermined thickness, and when a steel / reinforced concrete composite structure is to be formed, reinforcing steel bars 16 are arranged in the concrete 15.

【0048】さらに、図5に図示するような大断面トン
ネルの場合は、複数の鋼製セグメント1で覆工し、かつ
一つの空間に連続するように接合された単体トンネルa
内に補強鉄筋16を配筋し、その後にコンクリート15
を打設して外殻部躯体17を構築する。そして、外郭部
17内の土砂を汎用重機などで掘削して大断面トンネル
Aを構築する。
Further, in the case of a large cross section tunnel as shown in FIG. 5, a single tunnel a which is lined with a plurality of steel segments 1 and joined so as to be continuous in one space a
Reinforcing bars 16 are laid inside, and then concrete 15
And the outer shell body 17 is constructed. Then, the large-section tunnel A is constructed by excavating the earth and sand in the outer shell portion 17 with a general-purpose heavy machine or the like.

【0049】このようにして、特に大断面トンネルで発
生する応力に対して確実な引張耐力を有する継手構造を
形成できる。
In this way, it is possible to form a joint structure having a reliable tensile strength against the stress particularly generated in the large-section tunnel.

【0050】[0050]

【発明の効果】この発明は以上説明した構成からなり、
特に大断面トンネルを構築する場合、大断面トンネルで
その断面力によって引張力を受けるボルトを、単体トン
ネルでその断面力によって引張力を受ける短ボルトと完
全に分離することにより、ボルトが大断面トンネルの断
面力による引張力に対して確実な引張耐力を有すること
を確認できるため、大断面トンネルにおけるボルト耐力
に対して定量的な品質保証が可能になり、これにより大
断面トンネルで発生する応力に対して確実な引張耐力を
有する継手構造とすることができる。
The present invention has the configuration described above,
Especially when constructing a large-section tunnel, the bolt that receives tensile force due to its sectional force in the large-section tunnel is completely separated from the short bolt that receives tensile force due to its sectional force in the single-section tunnel, so that the bolt has a large-section tunnel. Since it can be confirmed that the tensile strength due to the cross-sectional force of the large cross-section force is confirmed, it is possible to quantitatively guarantee the quality of the bolt strength in the large-section tunnel, which can reduce the stress generated in the large-section tunnel. On the other hand, a joint structure having a reliable tensile strength can be obtained.

【0051】また、大断面トンネルの断面力に対して、
鋼製セグメントの継手部を継手剛性の高い高力ボルト摩
擦接合の継手とすることにより、ひび割れ防止とじん性
に優れ、特に地震時の繰り返し荷重に強い鋼・コンクリ
ート合成構造、または鋼・鉄筋コンクリート合成構造の
大断面トンネルを構築できる。
Further, with respect to the sectional force of the large section tunnel,
By making the joint part of the steel segment a joint of high strength bolt friction joint with high joint rigidity, it has excellent crack prevention and toughness, especially steel / concrete composite structure or steel / reinforced concrete composite structure that is strong against repeated load during earthquakes. A large-section tunnel with a structure can be constructed.

【0052】さらに、鋼製セグメントの組み立ての際
は、短ボルトだけを締結すればよいので、鋼製セグメン
トの製作誤差、組み立て誤差などの施工上の誤差を確認
してから高力ボルトを締結するためのボルト孔を形成す
ることにより施工精度の向上が図れる。
Further, when assembling the steel segment, only the short bolts need to be fastened. Therefore, after confirming construction errors such as manufacturing error and assembly error of the steel segment, the high strength bolt is fastened. By forming a bolt hole for this, the construction accuracy can be improved.

【0053】特に高力ボルト摩擦接合の場合、品質上大
きなボルト孔をあけることができないことから高度の組
立精度が要求されるため、高力ボルトの締結時にボルト
孔を形成することにより、施工精度の著しい向上が図れ
る。また、継手部の高いの止水性も確保できる。
In particular, in the case of high-strength bolt friction welding, since a large bolt hole cannot be formed in terms of quality, a high degree of assembly precision is required. Can be significantly improved. In addition, high waterproofness of the joint can be secured.

【図面の簡単な説明】[Brief description of drawings]

【図1】鋼製セグメントのみで構築されたシールドトン
ネルの一部斜視図である。
FIG. 1 is a partial perspective view of a shield tunnel constructed of steel segments only.

【図2】トンネルの周方向に隣接する鋼製セグメント同
士の接合部を示し、(a)は接合前の状態を示す斜視
図、(b)は接合後の状態を示す斜視図、(c)は主桁
どうしの継手部を示すトンネル周方向の平面図である。
2A and 2B show a joint between steel segments adjacent to each other in the circumferential direction of the tunnel, FIG. 2A is a perspective view showing a state before joining, FIG. 2B is a perspective view showing a state after joining, and FIG. FIG. 4 is a plan view in the circumferential direction of the tunnel showing a joint portion between main girders.

【図3】トンネルの周方向に隣接する鋼製セグメント同
士の接合部を示し、(a)は接合前の状態を示す斜視
図、(b)は接合後の状態を示す斜視図である。
FIG. 3 is a perspective view showing a joint between steel segments adjacent to each other in the circumferential direction of the tunnel, FIG. 3A is a perspective view showing a state before joining, and FIG. 3B is a perspective view showing a state after joining.

【図4】鋼・鉄筋コンクリート合成構造のシールドトン
ネルを示し、(a)はその一部斜視図、(b)は覆工体
の一部斜視図、(c)はトンネル軸方向の断面図であ
る。
4A and 4B show a shield tunnel of a composite structure of steel and reinforced concrete, in which FIG. 4A is a partial perspective view thereof, FIG. 4B is a partial perspective view of a lining body, and FIG. .

【図5】鋼・鉄筋コンクリート合成構造で構築された大
断面トンネルを示し、(a)はその断面図、(b)は覆
工体の一部斜視図、(c)はトンネル軸方向の断面図で
ある。
[Fig. 5] Fig. 5 shows a large-section tunnel constructed with a composite structure of steel and reinforced concrete, (a) is its sectional view, (b) is a partial perspective view of the lining body, and (c) is a sectional view in the axial direction of the tunnel. Is.

【図6】(a)〜(e)はトンネルの周方向に隣接する
鋼製セグメントの継手方法を示す工程図である。
6 (a) to 6 (e) are process drawings showing a method for joining steel segments adjacent to each other in the circumferential direction of the tunnel.

【図7】鋼・鉄筋コンクリート合成構造で構築された大
断面トンネルの断面図である。
FIG. 7 is a cross-sectional view of a large-section tunnel constructed of a steel / reinforced concrete composite structure.

【図8】従来の鋼製セグメントの一例を示す斜視図であ
る。
FIG. 8 is a perspective view showing an example of a conventional steel segment.

【図9】トンネルの周方向に隣接する鋼製セグメント同
士の短ボルトによる継手を示し、(a)はその断面図、
(b)は変形後の状態を示す断面図である。
FIG. 9 shows a joint by short bolts between steel segments adjacent to each other in the circumferential direction of the tunnel, (a) is a cross-sectional view thereof,
(B) is sectional drawing which shows the state after a deformation | transformation.

【図10】トンネルの周方向に隣接する鋼製セグメント
の高力ボルトによる継手を示す断面図である。
FIG. 10 is a cross-sectional view showing a joint made of high-strength bolts of steel segments adjacent to each other in the circumferential direction of the tunnel.

【符号の説明】[Explanation of symbols]

1 鋼製セグメント 2 継手プレート 3 高力ボルト 4 短ボルト 5 主桁 6 縦リブ 7 継手板 8 補強板 9 格子状枠体 10 スキンプレート 11 ボルト孔 12 ボルト孔 13 縦孔 14 凹凸部 15 コンクリート 16 補強鉄筋 17 外郭部 1 Steel segment 2 Joint plate 3 high strength bolts 4 short bolts 5 main girders 6 vertical ribs 7 Joint plate 8 Reinforcement plate 9 Lattice frame 10 skin plate 11 bolt holes 12 bolt holes 13 vertical holes 14 uneven parts 15 concrete 16 Reinforcing rebar 17 Outer part

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) E21D 11/04 E21D 11/15 ─────────────────────────────────────────────────── ─── Continued Front Page (58) Fields surveyed (Int.Cl. 7 , DB name) E21D 11/04 E21D 11/15

Claims (5)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 トンネルの周方向と軸方向にそれぞれ延
びる主桁と継手板を有する鋼製セグメントの継手方法に
おいて、最初に継手板をトンネルの周方向に貫通する複
数の短ボルトで接合して鋼製セグメントを組み立て、そ
の後、施工時荷重を受けることにより徐々に変形し、ボ
ルト軸力の変動への影響がなくなり、セグメントが地山
面に充分になじんでから、主桁どうしを継手プレートと
トンネルの軸方向に貫通する複数の高力ボルトで高力ボ
ルト摩擦接合することを特徴とする鋼製セグメントの継
手方法。
1. A joint method of a steel segment having a circumferential and axial directions extending respectively the main girder and the joint plate of the tunnel, first by joining a plurality of short bolts passing through the fitting plate in the circumferential direction of the tunnel Assemble the steel segments and
After that, the load during construction will gradually deform and
The influence on the fluctuation of axial force is eliminated, and the segment is solid.
From at sufficiently familiar to the surface, high strength ball in a plurality of high strength bolts passing through the main beam each other in the axial direction of the joint plate and the tunnel
A method for joining steel segments, characterized in that it is made by friction welding.
【請求項2】 単体シールドトンネルを鋼製セグメント
で覆工しつつ掘進した後に、単体シールドトンネル内に
所定の厚さにコンクリートを打設してトンネルを構築す
る際に、鋼製セグメント同士を接合する鋼製セグメント
の継手方法において、単体シールドトンネルの掘進時に
鋼製セグメント同士をトンネルの周方向に貫通する複数
の短ボルトで接合して鋼製セグメントを組み立て、その
後、施工時荷重を受けることにより徐々に変形し、ボル
ト軸力の変動への影響がなくなり、セグメントが地山面
に充分になじんでから、コンクリートを打設する前に鋼
製セグメント同士を継手プレートとトンネルの軸方向に
貫通する複数の高力ボルトで高力ボルト摩擦接合するこ
とを特徴とする鋼製セグメントの継手方法。
2. The steel segments are joined to each other when the single shield tunnel is lined with the steel segments and is dug, and then concrete is cast in the single shield tunnel to a predetermined thickness to construct the tunnel. In the method of joining steel segments to assemble, the steel segments are assembled by joining the steel segments with a plurality of short bolts penetrating in the circumferential direction of the tunnel during the excavation of the single shield tunnel ,
After that, it gradually deforms due to the load during construction,
The influence on the axial force fluctuation is eliminated, and the segment is
The steel segment is characterized by performing high-strength bolt friction welding between the steel segments with a plurality of high-strength bolts penetrating in the axial direction of the joint plate and tunnel before pouring concrete. Joint method.
【請求項3】 複数の単体シールドトンネルを、鋼製セ
グメントで覆工しつつ掘進した後に、単体シールドトン
ネル内にコンクリートを打設して外殻部を構築し、次に
この外殻部内の土砂を掘削して大断面のトンネルを構築
する際に、鋼製セグメント同士を接合する鋼製セグメン
トの継手方法において、単体シールドトンネルの掘進時
に鋼製セグメント同士をトンネルの周方向に貫通する複
数の短ボルトで接合して鋼製セグメントを組み立て、そ
の後、施工時荷重を受けることにより徐々に変形し、ボ
ルト軸力の変動への影響がなくなり、セグメントが地山
面に充分になじんでから、コンクリートを打設する前に
鋼製セグメント同士を継手プレートとトンネルの軸方向
に貫通する複数の高力ボルトで接合することを特徴とす
る鋼製セグメントの継手方法。
3. A plurality of single shield tunnels are lined with steel segments to be excavated, then concrete is placed in the single shield tunnel to construct an outer shell portion, and then earth and sand in the outer shell portion. When constructing a large-section tunnel by excavating a steel segment, in the joint method of steel segments that join steel segments together, when a single shield tunnel is dug, a plurality of short segments that penetrate the steel segments in the circumferential direction of the tunnel are pierced. Assemble the steel segments by bolting them together and
After that, the load during construction will gradually deform and
The influence on the fluctuation of axial force is eliminated, and the segment is solid.
A method for joining steel segments, wherein the steel segments are joined to each other with a plurality of high-strength bolts penetrating in the axial direction of the joint plate and the tunnel before the concrete is poured, after the steel segments are sufficiently fitted.
【請求項4】 主桁と継手プレートとの当接面を粗面ま
たは凹凸状に形成することを特徴とする請求項2または
記載の鋼製セグメントの継手方法。
4. The method of claim 2 or the contact surface between the main beam and the fitting plate and forming a rough or uneven
3. The method for joining steel segments according to item 3 .
【請求項5】 高力ボルトを締結するボルト孔の一部を
鋼製セグメントの製作時に形成し、残りを高力ボルトを
締結する際に形成することを特徴とする請求項2、3ま
たは4記載の鋼製セグメントの継手方法。
5. A portion of the bolt holes for fastening the high strength bolt is formed during manufacture of the steel segment, claim 2, characterized in that formed at the time of fastening the high-strength bolts the rest or
Or the method of joining steel segments according to item 4 .
JP25380098A 1998-09-08 1998-09-08 Joint structure and joint method of steel segment Expired - Fee Related JP3449236B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP25380098A JP3449236B2 (en) 1998-09-08 1998-09-08 Joint structure and joint method of steel segment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP25380098A JP3449236B2 (en) 1998-09-08 1998-09-08 Joint structure and joint method of steel segment

Publications (2)

Publication Number Publication Date
JP2000080892A JP2000080892A (en) 2000-03-21
JP3449236B2 true JP3449236B2 (en) 2003-09-22

Family

ID=17256337

Family Applications (1)

Application Number Title Priority Date Filing Date
JP25380098A Expired - Fee Related JP3449236B2 (en) 1998-09-08 1998-09-08 Joint structure and joint method of steel segment

Country Status (1)

Country Link
JP (1) JP3449236B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2451449A (en) * 2007-07-30 2009-02-04 Lameek Ltd Waterproof tunnel lining
JP5138823B1 (en) * 2012-03-16 2013-02-06 朝日エンヂニヤリング株式会社 Steel joint structure
CN108571328B (en) * 2018-06-29 2023-08-04 西南交通大学 Segment lining structure and design method of shield tunnel at strata interface
CN108979677B (en) * 2018-09-29 2023-05-23 中铁二院昆明勘察设计研究院有限责任公司 Spout-steel frame integral yielding primary support structure based on friction energy dissipation longitudinal beam and construction method

Also Published As

Publication number Publication date
JP2000080892A (en) 2000-03-21

Similar Documents

Publication Publication Date Title
CN1330850C (en) Composite segment
JP2009154400A (en) Synthetic segment
JP3449236B2 (en) Joint structure and joint method of steel segment
JP3011169B2 (en) Shield tunnel and lining method
JP5160521B2 (en) Synthetic segment
JP3698564B2 (en) Shield tunnel connection structure
KR20050073776A (en) Assembly pile for method of ground improvement
JP3914640B2 (en) Connection structure of steel underground continuous wall and reinforced concrete slab
GB2131849A (en) Structural framework
JP4945294B2 (en) segment
JP4740029B2 (en) Manufacturing method of floor slab or lining board
JP4920626B2 (en) Synthetic segment
JP4287542B2 (en) Segment structure
JP3930149B2 (en) Segment piece and underground structure construction method
JPH07103785B2 (en) Segment that does not require joint bolts
JP3257501B2 (en) Tunnel lining
JP3958153B2 (en) Support structure and method for widening tunnel
JP6997671B2 (en) Pile, how to join piles and how to remove upper piles
JP4494585B2 (en) Shield tunnel segment and its manufacturing method
JP3011170B2 (en) Segment joint structure
JP3543140B2 (en) Composite wall using steel reinforced concrete continuous basement wall and its construction method
JP3021407B2 (en) Shield tunnel lining
JP4066279B2 (en) Steel segment connection structure reinforcement structure
JP2000087453A (en) Joint structure of column or wall and beam or slab and its construction method
JP3235494B2 (en) Construction method of large section tunnel using short bolt and long bolt combined type segment

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20030610

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120711

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150711

Year of fee payment: 12

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees