Operating method and apparatus for cooling system during reactor isolation

Info

Publication number
JP3457465B2
JP3457465B2 JP11805096A JP11805096A JP3457465B2 JP 3457465 B2 JP3457465 B2 JP 3457465B2 JP 11805096 A JP11805096 A JP 11805096A JP 11805096 A JP11805096 A JP 11805096A JP 3457465 B2 JP3457465 B2 JP 3457465B2
Authority
JP
Japan
Prior art keywords
rcic
water
reactor
cooling system
pump
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP11805096A
Other languages
Japanese (ja)
Other versions
JPH09304574A (en
Inventor
浩一 木村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Toshiba Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp filed Critical Toshiba Corp
Priority to JP11805096A priority Critical patent/JP3457465B2/en
Publication of JPH09304574A publication Critical patent/JPH09304574A/en
Application granted granted Critical
Publication of JP3457465B2 publication Critical patent/JP3457465B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • Y02E30/30Nuclear fission reactors

Landscapes

  • Monitoring And Testing Of Nuclear Reactors (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、沸騰水型軽水炉原
子力発電所の原子炉隔離時冷却系の運転方法およびその
装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method and an apparatus for operating a reactor isolation cooling system of a boiling water type light water reactor nuclear power plant.

【0002】[0002]

【従来の技術】図12〜図14は現在起動試験中の改良
型沸騰水型軽水炉(以下ABWRという)原子力発電所
の原子炉隔離時冷却系(以下RCIC系という)等の系
統概要図である。
2. Description of the Related Art FIGS. 12 to 14 are schematic diagrams of a system such as a reactor isolation cooling system (hereinafter referred to as RCIC system) of an improved boiling water type light water reactor (hereinafter referred to as ABWR) nuclear power plant under start-up test. .

【0003】このRCIC系の目的は給水系からの冷却
水の喪失による原子炉隔離時に、原子炉に冷却水を供給
し、炉心の冷却並びに炉水位の維持を図ることにある。
またABWRにおいては配管等が破断し、原子炉圧力容
器(以下RPVという)1内の冷却材が喪失した場合の
非常用炉心冷却系としての目的を持つように改善設計さ
れている。RPV1は原子炉格納容器2内に格納され、
原子炉格納容器2内にはドライウェル3が形成される一
方、サプレッションプール(以下S/Pという)4が内
蔵されている。RPV1は給水配管5と主蒸気管6とに
接続されている。
The purpose of this RCIC system is to supply cooling water to the reactor at the time of reactor isolation due to the loss of cooling water from the water supply system to cool the core and maintain the reactor water level.
Further, the ABWR is designed to be improved so as to serve as an emergency core cooling system in the case where the piping etc. is broken and the coolant in the reactor pressure vessel (hereinafter referred to as RPV) 1 is lost. The RPV 1 is stored in the reactor containment vessel 2,
A dry well 3 is formed in the reactor containment vessel 2, while a suppression pool (hereinafter referred to as S / P) 4 is built therein. The RPV 1 is connected to the water supply pipe 5 and the main steam pipe 6.

【0004】RCIC系は、RCICポンプ7と、これ
を駆動するRCICタービン8の各1台、タービン付属
機器一式および系統構成に必要な配管,弁類,計装制御
機器を具備している。
The RCIC system includes an RCIC pump 7, an RCIC turbine 8 for driving the RCIC pump 7, a set of turbine accessories, and piping, valves, and instrumentation control equipment required for system configuration.

【0005】ABWRのRCIC系には以下のように原
子炉隔離時モード,事故時モードおよび系統試験モード
の各運転モードがある。
The ABWR RCIC system has the following operating modes: reactor isolation mode, accident mode, and system test mode.

【0006】(1)原子炉隔離時モード(図12参照) RPV1が隔離されると、原子炉圧力が上昇し、逃がし
安全弁が作動して炉圧を設定値以下に保つ。一方、この
とき給水が喪失しているので、燃料の崩壊熱による蒸気
発生が続き炉水位が低下し続ける。
(1) Reactor isolation mode (see FIG. 12) When RPV1 is isolated, the reactor pressure rises and the relief safety valve operates to keep the reactor pressure below the set value. On the other hand, since the water supply is lost at this time, steam generation due to the decay heat of the fuel continues and the reactor water level continues to drop.

【0007】原子炉水位が低下し、水位低(L−2)に
達すると、通常閉弁しているRCICタービン止め弁9
が全開し、RPV1から蒸気がRCICタービン8に送
り込まれ、RCICタービン8を駆動する。
When the reactor water level drops and reaches a low water level (L-2), the RCIC turbine stop valve 9 normally closed.
Is fully opened and steam is sent from the RPV 1 to the RCIC turbine 8 to drive the RCIC turbine 8.

【0008】このために、RCICタービン8に直結さ
れたRCICポンプ7およびRCIC軸受油ポンプ10
が駆動され、同時にRCIC注入弁11が開弁する。こ
れにより、開弁中のCSP側吸込弁12を通って、図1
2中太線で示す経路で復水貯蔵槽(以下CSPという)
13の冷却水がRPV1に補給される(炉心注入)。
For this reason, the RCIC pump 7 and the RCIC bearing oil pump 10 directly connected to the RCIC turbine 8 are provided.
Is driven, and at the same time, the RCIC injection valve 11 opens. As a result, through the CSP side suction valve 12 which is being opened,
2 Condensate storage tank (hereinafter referred to as CSP) along the route indicated by the thick line
The cooling water of 13 is supplied to the RPV 1 (core injection).

【0009】その結果、炉水位が上昇し、水位高(L−
8)になると、RCICタービン止め弁9が全閉し、R
CIC手タービン駆動蒸気が遮断されてRCICポンプ
7が停止し、原子炉への冷却水の注入が停止する。その
後、再び原子炉水位が低下し、水位低(L−2)に至っ
た場合は自動再起動する。
As a result, the reactor water level rises and the water level rises (L-
8), the RCIC turbine stop valve 9 is fully closed and R
The CIC hand turbine drive steam is shut off, the RCIC pump 7 is stopped, and the injection of cooling water into the reactor is stopped. After that, when the reactor water level decreases again and the water level becomes low (L-2), the reactor is automatically restarted.

【0010】このようにRCIC径の初期水源はCSP
13であるが、このCSP13の水位が低くなった場合
等では図13に示すようにサプレッションプール4(以
下S/Pという)へ自動的に切り換えられる。但し、実
際には原子炉1はスクラムしており、何らかの復旧作業
が実施されているため、CSP13の貯蔵水(以下CS
P水という)を使い切り、S/P4に水源を切り換える
可能性は低い。
In this way, the initial water source of RCIC diameter is CSP
However, when the water level of the CSP 13 becomes low, the suppression pool 4 (hereinafter referred to as S / P) is automatically switched as shown in FIG. However, since the reactor 1 is actually scramming and some restoration work is being carried out, the stored water of the CSP 13 (hereinafter referred to as CS
It is unlikely that the water source will be used up and the water source will be switched to S / P4.

【0011】なお、図12中、4aはS/P側吸込弁、
14,15は第1,第2試験用調節弁、16は最小流量
バイパス弁、17はRCICタービン止め弁、18はR
CIC主蒸気止め弁、19はRCIC加減弁、20はR
CIC系統流量発信器、21はRCIC流量制御器、2
2はRCIC流量確立検出器、23はRCIC吐出圧力
発信器、24はRCIC吐出圧力確立検出器、25はR
CIC吐出圧力計、26はRCICタービン回転数ピッ
クアップ、27はRCICタービン回転数指示計、28
はRCIC軸受油ポンプ、29はEHCである。
In FIG. 12, 4a is an S / P side suction valve,
Reference numerals 14 and 15 are first and second test control valves, 16 is a minimum flow bypass valve, 17 is an RCIC turbine stop valve, and 18 is R.
CIC main steam stop valve, 19 is RCIC control valve, 20 is R
CIC system flow transmitter, 21 is RCIC flow controller, 2
2 is an RCIC flow rate establishment detector, 23 is an RCIC discharge pressure transmitter, 24 is an RCIC discharge pressure establishment detector, and 25 is R
CIC discharge pressure gauge, 26 RCIC turbine speed pickup, 27 RCIC turbine speed indicator, 28
Is an RCIC bearing oil pump, and 29 is an EHC.

【0012】(2)事故時モード(図13参照) 原子炉配管破断等の原子炉冷却材喪失事故時に、原子炉
水位低(L1.5)またはドライウェル圧力高(例えば
0.14kg/cm2)の信号を受けて、RCICタービン
8およびRCICポンプ7が、上記(1)の原子炉隔離
時モードと同様に自動起動し、初期水源としてCSP水
(図12参照)を、最終水源としてS/P(図13参
照)水を、給水ライン5から原子炉へ注入する。但し、
水位低(L1.5)に到達する前に水位低L−2信号が
発生した時点で、既に本RCIC系は起動している。ま
た、CSP13からS/P4への水源切換は自動的に行
なわれる。
(2) Accident mode (see FIG. 13) In the event of loss of reactor coolant such as breakage of reactor piping, the reactor water level is low (L1.5) or the dry well pressure is high (eg 0.14 kg / cm 2). ) Signal, the RCIC turbine 8 and the RCIC pump 7 are automatically started as in the reactor isolation mode of (1) above, and CSP water (see FIG. 12) is used as an initial water source and S / is used as a final water source. P (see FIG. 13) water is injected into the reactor through the water supply line 5. However,
When the low water level L-2 signal is generated before reaching the low water level (L1.5), the RCIC system is already activated. Further, the water source switching from the CSP 13 to the S / P 4 is automatically performed.

【0013】(3)系統試験モード(図14参照) プラント通常運転時に原子炉蒸気を用いてRCICター
ビン8、RCICポンプ7を手動起動し、S/P4から
RCICポンプ7、そして第1試験用調節弁14および
第2試験用調節弁15を経由し、再びS/P4に戻る試
験配管A(図14中太線で表示)を用いて循環運転さ
せ、系統試験,起動試験,RCIC系の健全性確認のた
めの1回/月の割合で実施される定例運転に使用する。
(3) System test mode (see FIG. 14) During normal plant operation, the RCIC turbine 8 and RCIC pump 7 are manually started using the reactor steam, and the S / P 4 to the RCIC pump 7 and the first test adjustment are performed. Circulation operation is performed using the test pipe A (indicated by the bold line in FIG. 14) that returns to S / P4 via the valve 14 and the second control valve 15 for system test, start test, and soundness confirmation of RCIC system. It is used for regular operation, which is carried out once a month for

【0014】なお、従来のプラントではCSP13→R
CICポンプ7→CSP13の系統試験用のラインがあ
り、これを用いていた。しかし、RCICポンプ7がS
/P4の直ぐ近くに配置されることから、S/P4→R
CICポンプ7→S/P4の配管の方が短くでき経済的
であること、また、ABWRではS/P水浄化系が新た
に設けられ、S/P4のプール水(以下S/P水とい
う)を清浄に保てるため、初期水源をS/P水で炉心注
入を行なっても不純な塵芥等を炉内に持ち込まないた
め、上記CSP13の系統試験用ラインを省略する設計
変更が行なわれた。
In the conventional plant, CSP13 → R
There was a line for a system test of the IC pump 7 → CSP 13, and this line was used. However, RCIC pump 7
S / P4 → R because it is located in the immediate vicinity of / P4
The CIC pump 7 → S / P4 piping is shorter and more economical, and the ABWR has a new S / P water purification system, and S / P4 pool water (hereinafter referred to as S / P water) In order to maintain the cleanliness, even if the initial water source is S / P water, even if core injection is performed, impure dusts and the like are not brought into the reactor. Therefore, a design change was made in which the system test line of the CSP 13 was omitted.

【0015】また、CSP13とS/P4ではCSP1
3の方が水位が高いため、CSP13が水源の時に第
1,第2試験用調節弁14,15が誤開してヘッド差で
CSP水がS/P4に流れ込むことと、CSP13→R
CICポンプ7→S/P4の流れによりRCICポンプ
7とこれに直結されているRCICタービン8が空回り
しないように、水源をS/P4にした場合のみ第1,第
2試験用調節弁14,15が開弁操作され、それ以外で
は開弁操作を阻止するようにインターロックが組み込ま
れている。
Also, in CSP13 and S / P4, CSP1
No. 3 has a higher water level, so when the CSP 13 is the water source, the control valves 14, 15 for the first and second tests erroneously open and the CSP water flows into the S / P 4 due to the head difference.
Only when the water source is set to S / P4 so that the RCIC pump 7 and the RCIC turbine 8 directly connected thereto do not idle due to the flow of the CIC pump 7 → S / P4, the first and second test control valves 14, 15 Is operated to open the valve, and otherwise an interlock is incorporated to prevent the valve from being opened.

【0016】[0016]

【発明が解決しようとする課題】RCIC系は、原子炉
圧力を、例えば10.6kg/cm2〜82.8kg/cm2の間
の範囲であり、かつ定格流量を、例えば135万kWe
級ABWRの場合は182m3/hrに制御し、かつ保つ
ように設計されている。その制御系の調整確認を実施す
るために起動試験時にはRCIC系の制御回路調整のた
めの試験を実施する必要があり、最初はテストループで
の調整を実施し、最終的には原子炉注水を実施して、そ
の際の試験データの採取および調整を行なうことが必要
となる。
RCIC system [0005] is, the reactor pressure is in the range of, for example, between 10.6kg / cm 2 ~82.8kg / cm 2 , and the rated flow, for example, 1.35 million kWe
In the case of class ABWR, it is designed to control and maintain 182 m 3 / hr. In order to confirm the adjustment of the control system, it is necessary to carry out a test for RCIC system control circuit adjustment at the start-up test. First, the test loop is adjusted, and finally the reactor water injection is performed. It is necessary to carry out, and to collect and adjust the test data at that time.

【0017】それを実現するためには、まず系統試験モ
ードでの調整を実施し、その後に炉心注入を実施する
が、そのためにはS/P4の水質浄化を実施するように
計画されていた。
In order to realize it, first, adjustment in the system test mode is carried out, and then core injection is carried out. For that purpose, it was planned to carry out water purification of S / P4.

【0018】また、制御系の調整がなされていない状態
で急に原子炉1に冷却水を注入すると、炉注流量がハン
チングを起こす可能性があるため最初の炉注(炉心注
入)についてはある程度流量と圧力をS/P循環のテス
トループ運転で確保した上で炉心注入に切り換える必要
がある。
If the cooling water is suddenly injected into the reactor 1 without adjusting the control system, hunting may occur in the reactor injection flow rate. Therefore, the first reactor injection (core injection) is performed to some extent. It is necessary to switch to core injection after securing the flow rate and pressure by the test loop operation of S / P circulation.

【0019】さらに、炉心注入時にRCICポンプ7を
停止させると、原子炉の給水制御系に外乱を与えること
になるため、給水制御系に外乱を与えないようにゆっく
りとテストループ運転に切り換え、その後停止させる必
要がある。
Further, if the RCIC pump 7 is stopped at the time of core injection, disturbance will be given to the feedwater control system of the nuclear reactor. Therefore, the test loop operation should be slowly switched so as not to give disturbance to the feedwater control system. Need to stop.

【0020】しかしながら、起動試験中および営業運転
時においてもS/P水浄化系の運用によりS/P水の浄
化が行なわれるのは定期検査に入る直前だけで、通常の
原子炉運転時にはS/P水の浄化が行なわれない場合が
出てきた。
However, even during the start-up test and during the commercial operation, the S / P water purification system is operated to purify the S / P water only immediately before the periodic inspection is started, and the S / P water is purified during the normal reactor operation. There are cases where P water is not purified.

【0021】ところで、CSP13は図示しない発電機
駆動用タービンの復水を一時貯蔵する水槽であり、その
CSP水は通常時においても図示しない制御棒駆動系や
原子炉再循環ポンプおよび原子炉浄化系ポンプのパージ
水として使用され、その分、清浄な復水の補給を受ける
ため、水質はかなり良い。
By the way, the CSP 13 is a water tank for temporarily storing the condensate water of the generator driving turbine (not shown), and the CSP water is also used for the control rod drive system, the reactor recirculation pump and the reactor cleaning system (not shown) even in the normal time. It is used as the purge water for the pump, and the clean water is replenished for that amount, so the water quality is quite good.

【0022】一方、S/P4の水はCSP水と異なり、
普段は約4000t/hrの水を貯めておき、その貯蔵水
を使用して図示しない他のECCS(非常用炉心冷却)
系の月1回の定例試験用の水源に使用されるだけであ
る。また、ECCSポンプの運転によりECCS系の配
管内の錆や塵芥等が還流水によりS/P4に持ち込まれ
るため、浄化が行なわれない場合は、水質状態は極めて
悪い。
On the other hand, S / P4 water is different from CSP water.
Normally, about 4000 t / hr of water is stored, and the stored water is used for other ECCS (emergency core cooling) not shown.
It is only used as a water source for the system's monthly regular test. Further, since the rust, dust and the like in the ECCS system piping are brought into the S / P 4 by the reflux water by the operation of the ECCS pump, the water quality is extremely bad if the purification is not performed.

【0023】このため、起動試験の最初の炉心注入時に
使う予定のS/P4を水源としたテストループ運転を実
施した場合は炉内に水質の悪い水と錆や塵芥等が持ち込
まれる。一般に原子炉の水質は被曝低減や、炉内の燃料
棒,炉内構造物等の腐食を防ぐために、各種浄化系で浄
化し、極めて純度を高く保持している。そこに水質が悪
く、錆や塵芥等を多量に含んだS/P水を持ち込むこと
は許されない。このため、今までのテストループを使用
した試験が不可能になり、他の試験方法が必要となっ
た。
For this reason, when the test loop operation is carried out using S / P4, which is to be used at the time of the first core injection in the start-up test, as the water source, poor quality water and rust, dust, etc. are brought into the reactor. In general, the water quality of a nuclear reactor is purified by various purification systems in order to reduce radiation exposure and prevent corrosion of fuel rods, internal structures, etc. in the reactor, and maintains extremely high purity. It is unacceptable to bring in S / P water containing a large amount of rust, dust, etc. Therefore, the test using the test loop up to now becomes impossible, and another test method is required.

【0024】また、起動試験時のテストループでの運転
後や運転中の定例試験後には、そのままでは、たとえ水
源をCSP13に切り換えて直接炉内注入を実施するに
しても、配管内にS/P4の比較的汚い水および塵芥等
が残溜しており、炉心注入時にそれらが炉内に持ち込ま
れる虞がある。
Further, after the operation in the test loop during the start-up test and after the regular test during the operation, if the water source is switched to the CSP 13 and the direct injection into the furnace is carried out, the S / The relatively dirty water and dust of P4 remain, and there is a risk that they will be brought into the reactor during core injection.

【0025】しかし、事故時等の場合は発生確率が極め
て小さいこと、数日の長期に亘って炉内に冷却水を送り
込む必要があることから、最終水源がS/P4に切り換
えられて炉内に注入することも、やむを得ないことでは
あるが、通常運転での範疇においては被曝低減の観点か
らも可能な限り汚れた水や錆,塵芥等の不純物は炉内に
持ち込まない方が望ましい。
However, in the case of an accident or the like, the probability of occurrence is extremely small, and since it is necessary to send cooling water into the furnace for a long period of several days, the final water source is switched to S / P4 and the inside of the furnace is switched. It is unavoidable to inject it into the furnace, but in the category of normal operation, it is desirable not to bring dirty water, impurities such as rust, and dust into the furnace from the viewpoint of reducing exposure.

【0026】したがって、これらを炉内に持ち込まない
ようにするには、本来は設計上は必要のなかった配管内
のフラッシングにより配管内を洗浄する必要がある。し
かし、この配管のフラッシングは時間がかかるため、R
CIC起動試験では試験工程が延び、営業運転時には余
分な労力がかかり、できれば何らかの方法でフラッシン
グが必要のないようにする方法が望まれていた。
Therefore, in order to prevent these from being brought into the furnace, it is necessary to clean the inside of the pipe by flushing the inside of the pipe, which was originally unnecessary in the design. However, since flushing of this pipe takes time, R
In the CIC start-up test, the test process is extended, extra labor is required during the commercial operation, and if possible, there is a demand for a method that eliminates the need for flushing.

【0027】そこで、本発明では、S/P水浄化系が運
用されていない場合においても、支障なく起動試験を実
施することができる原子炉隔離時冷却系の運転方法およ
びその装置を提供することを目的とする。
Therefore, the present invention provides a method for operating a reactor isolation cooling system and an apparatus therefor capable of carrying out a start-up test without trouble even when the S / P water purification system is not in operation. With the goal.

【0028】また、他の目的は、RCIC系統試験モー
ドでの定例試験後においてフラッシングの必要のないR
CIC配管保有水をCSP水で置換し、炉心注入時にS
/P水および塵芥等が炉内に持ち込まれないような運転
方法および装置を提供することにある。
Another object is to eliminate the need for flushing after the regular test in the RCIC system test mode.
The water held in the IC pipe is replaced with CSP water, and S is added at the time of core injection.
/ P An object of the present invention is to provide an operation method and apparatus that prevent water, dust, etc. from being brought into the furnace.

【0029】[0029]

【課題を解決するための手段】請求項1の発明は、炉心
注入時には復水貯蔵槽を水源とした水を原子炉圧力容器
に注入する一方、起動試験時にはサプレッションプール
の水をRCICポンプから再びサプレッションプールに
戻す循環運転をする原子炉隔離時冷却系の運転方法にお
いて、上記サプレッションプールを水源とする原子炉隔
離時冷却系の起 動試験終了後に、上記RCICポンプを
運転して、上記復水貯蔵槽の水をサプレッションプール
に吐出させて配管を浄化し、その後復水貯蔵槽を水源と
した水を原子炉圧力容器に注入することを特徴とする。
According to the invention of claim 1, at the time of core injection, water from a condensate storage tank as a water source is used as a reactor pressure vessel.
Injection into the suppression pool during the start-up test
Water from the RCIC pump back to the suppression pool
In the operating method of the cooling system for reactor isolation during recirculation operation, the reactor partition using the suppression pool as a water source is used.
After completion of startup tests away cooling system, the RCIC pump
Operate the water in the above condensate storage tank to the suppression pool
To clean the piping and then use the condensate storage tank as a water source.
The water is injected into the reactor pressure vessel .

【0030】本請求項1によれば、RCIC起動試験の
原子炉注入時に、清浄なCSP水をS/Pへ排水する配
管経路でRCICポンプを起動し、系統流量および圧力
を確立した後、吐出ラインをS/P側から炉注側に切り
換えることにより、S/P排水配管内に残溜している比
較的清浄でないS/P水を、清浄なCSP水により押し
出してS/P側へ排水し、清浄なCSP水に置換してか
ら炉心注入に切り換えることができる。したがって、比
較的清浄でないS/P水を炉内に持ち込むことなく最初
の炉心注入をゆっくりと切り換えることができる。
According to the first aspect of the present invention, at the time of injection into the RCIC start-up test reactor, the RCIC pump is started through a pipe path for draining clean CSP water to the S / P, and after establishing the system flow rate and pressure, the discharge is performed. By switching the line from the S / P side to the furnace injection side, the relatively unclean S / P water remaining in the S / P drainage pipe is pushed out by clean CSP water and drained to the S / P side. However, it is possible to switch to the core injection after replacing with clean CSP water. Therefore, the first core injection can be slowly switched without introducing relatively unclean S / P water into the reactor.

【0031】請求項2の発明は、請求項1記載の原子炉
隔離時冷却系の運転方法において、RCICポンプの起
動後に、復水貯蔵槽の貯水をサプレッションプールに排
水する排水流路の途中に直列に介在された複数の調節弁
を開弁するときは、その下流側の調節弁を開弁した後、
上記上流側の調節弁をこの下流側調節弁の開度よりも小
さい開度で開弁し、これらの弁開度差を10%以下に設
定することを特徴とする。
According to a second aspect of the present invention, in the method for operating the reactor isolation cooling system according to the first aspect, after the RCIC pump is activated, the stored water in the condensate storage tank is drained to the suppression pool midway. When opening a plurality of control valves interposed in series, after opening the control valve on the downstream side,
The upstream control valve is opened with an opening smaller than the opening of the downstream control valve, and the valve opening difference between these is set to 10% or less.

【0032】本請求項2によれば、RCICポンプの起
動後、下流側の調節弁を開弁してから、上流側の調節弁
を下流側調節弁よりも小さい開度で開弁し、その弁開度
差を10%以下に設定しているので、上流側弁にキャビ
テーションが発生するのを防止ないし低減して健全性を
向上させることができる。
According to the present invention, after the RCIC pump is activated, the downstream control valve is opened, and then the upstream control valve is opened with a smaller opening than the downstream control valve. Since the valve opening difference is set to 10% or less, it is possible to prevent or reduce the occurrence of cavitation in the upstream side valve and improve the soundness.

【0033】請求項3の発明は、請求項1または2記載
の原子炉隔離時冷却系の運転方法により原子炉隔離時冷
却系を自動運転する手段を設けたことを特徴する。
The invention of claim 3 is characterized in that means for automatically operating the reactor isolation cooling system is provided by the method for operating the reactor isolation cooling system according to claim 1 or 2.

【0034】本請求項3によれば、請求項1または2記
載の運転方法を自動的に行なうことができる。したがっ
て、手動操作による誤操作を未然に防止することができ
る。
According to the third aspect, the operating method according to the first or second aspect can be automatically performed. Therefore, an erroneous operation due to a manual operation can be prevented in advance.

【0035】請求項4の発明は、炉心注入時には復水貯
蔵槽を水源とする一方、その試験時にはサプレッション
プールを水源としてRCICポンプを運転する原子炉隔
離時冷却系の運転方法の起動試験において、RCICポ
ンプの運転を停止させるときは、そのポンプの吐出先を
原子炉内からサプレッションプールに切り換えてから行
なうことを特徴とする。
According to a fourth aspect of the present invention, the condensate storage tank is used as a water source at the time of core injection, and at the time of the test, in the start-up test of the operating method of the reactor isolation cooling system in which the RCIC pump is operated with the suppression pool as the water source, When the operation of the RCIC pump is stopped, it is characterized in that the discharge destination of the pump is switched from inside the reactor to the suppression pool.

【0036】本請求項4によれば、RCIC起動試験時
のRCIC炉心注入運転後のRCICポンプの停止を、
CSPを水源にした炉心注入から吐出側をS/P側にゆ
っくり切り換えて停止させることにより、RCIC系の
炉心注入流量の急減による給水制御系への外乱を防止す
ることができる。
According to the present invention, the stop of the RCIC pump after the RCIC core injection operation during the RCIC start test is performed.
By slowly switching the discharge side from the core injection using the CSP as the water source to the S / P side and stopping the flow, it is possible to prevent disturbance to the feedwater control system due to a rapid decrease in the RCIC system core injection flow rate.

【0037】請求項5の発明は、請求項4記載の原子炉
隔離時冷却系の運転方法により原子炉隔離時冷却系を自
動運転する手段を設けたことを特徴とする。
The invention of claim 5 is characterized in that means for automatically operating the reactor isolation cooling system is provided by the method of operating the reactor isolation cooling system according to claim 4.

【0038】本請求項5によれば、請求項3記載の運転
方法を自動的に行なうことができる。したがって、手動
操作による誤操作を未然に防止することができる。
According to the fifth aspect, the operating method according to the third aspect can be automatically performed. Therefore, an erroneous operation due to a manual operation can be prevented in advance.

【0039】請求項6の発明は、炉心注入時には復水貯
蔵槽を水源とした水を原子炉圧力容器に注入する一方、
起動試験時にはサプレッションプールの水をRCICポ
ンプから再びサプレッションプールに戻す循環運転をす
原子炉隔離時冷却系の運転装置であって、上記原子炉
隔離時冷却系の系統流量を定格よりも少ない所定流量に
絞り、この系統配管内の保有水を復水貯蔵槽からの貯水
に置換するために必要な時間が経過したときに、サプレ
ッションプールに排水を吐出する側の弁を自動的に閉
じ、その後RCICポンプの運転を停止させるインター
ロック手段を設けたことを特徴とする。
According to the sixth aspect of the invention, at the time of core injection, water from the condensate storage tank as the water source is injected into the reactor pressure vessel,
During the start-up test, the water in the suppression pool is circulated from the RCIC pump back to the suppression pool.
It is an operating device of the reactor isolation cooling system, in which the system flow of the reactor isolation cooling system is reduced to a predetermined flow rate that is less than the rated value, and the water held in this system piping is stored in the condensate storage tank. When the time required for replacement has elapsed, the suppression pool is provided with an interlock means for automatically closing the valve on the discharge side of the wastewater and thereafter stopping the operation of the RCIC pump.

【0040】本請求項6によれば、インターロック手段
により、置換運転によるS/P排水量を自動的に必要最
小限に抑えることができる。
According to the sixth aspect, the S / P drainage amount due to the replacement operation can be automatically suppressed to the necessary minimum by the interlock means.

【0041】[0041]

【発明の実施の形態】以下、図1〜図11を参照して本
発明の実施の形態を説明する。なお、図1〜図11中、
図12〜図14で示す部分と同一または相当部分には同
一符号を付している。
BEST MODE FOR CARRYING OUT THE INVENTION Embodiments of the present invention will be described below with reference to FIGS. In addition, in FIGS.
The same or corresponding parts as those shown in FIGS. 12 to 14 are designated by the same reference numerals.

【0042】(第1の実施形態) 図1〜図4は本発明の第1の請求項に対応する第1の実
施形態であるRCIC運転方法の各ステップを示してい
る。
(First Embodiment) FIGS. 1 to 4 show steps of an RCIC operation method according to a first embodiment of the present invention, which corresponds to the first claim.

【0043】まず、本実施形態では冷却水の炉心注入時
に、CSP13の貯水よりも清浄でないS/P4の比較
的汚い水をRPV1内に持ち込まないためと、ある程度
系統流量および圧力が確立した後に、CSP13を水源
とする一方、S/P4を排水先として運転するために、
CSP側吸込弁12を開弁する必要がある。
First, in the present embodiment, at the time of injecting cooling water into the core, relatively dirty water of S / P4, which is not cleaner than the stored water of CSP13, is not brought into RPV1, and after the system flow rate and pressure are established to some extent, In order to operate S / P4 as a drainage destination while using CSP13 as a water source,
It is necessary to open the CSP side suction valve 12.

【0044】しかし、CSP側吸込弁12が開弁してい
ると、前述したCSP水がS/P4に流出しないように
するインターロックの動作によりRCIC系のS/P排
水ラインにある第1,第2試験用調節弁14,15の開
弁を阻止している。
However, when the CSP-side suction valve 12 is open, the first and second lines in the RCIC system S / P drain line are operated by the interlock operation that prevents the CSP water from flowing out to the S / P 4. The opening of the second test control valves 14 and 15 is prevented.

【0045】そこで、まず、CSP側吸込弁12の開弁
信号をアイソレでクリアし、上,下流側調節弁である第
1,第2試験用調節弁14,15が開弁できるようにす
る。
Therefore, first, the valve opening signal of the CSP side suction valve 12 is cleared by the isolation so that the first and second test control valves 14 and 15 which are the upstream and downstream control valves can be opened.

【0046】次にRCICポンプ7の起動前に第1,第
2試験用調節便14,15を開弁すると、CSP13の
水がCSP13とS/P4とのヘッド差によりS/P4
に流れ込み、その流動によりRCICポンプ7が回転す
る。このために、RCICポンプ7に直結されたRCI
Cタービン8が空回りしてしまう。RCICタービン8
が空回りすると、その回転速度がRCIC軸受ポンプ1
0が油圧を確立するために必要な速度よりも低速である
ため、軸受の潤滑油無しで回転することとなり、RCI
Cタービン8の軸受部に対して悪い影響を与える虞があ
る。そこで、第1,第2試験用調節弁14,15を開弁
するよりも前にRCICポンプ7を起動する。
Next, when the first and second controlled flights 14 and 15 are opened before the RCIC pump 7 is started, the water in the CSP 13 is S / P4 due to the head difference between the CSP 13 and S / P4.
The RCIC pump 7 rotates due to the flow. For this purpose, the RCI directly connected to the RCIC pump 7
The C turbine 8 runs idle. RCIC turbine 8
When idling, the rotation speed of RCIC bearing pump 1
Since 0 is lower than the speed required to establish hydraulic pressure, the bearing will rotate without lubricating oil, and the RCI
The bearing of the C turbine 8 may be adversely affected. Therefore, the RCIC pump 7 is started before opening the first and second test control valves 14 and 15.

【0047】図1に示すように、RCICポンプ7の起
動時は吐出圧力高および系統流量低信号により最小流量
バイパス弁16を開弁してRCICポンプ7の健全性を
保つための最低限の流量を確保する。
As shown in FIG. 1, when the RCIC pump 7 is started, the minimum flow rate bypass valve 16 is opened by the high discharge pressure signal and the low system flow rate signal to maintain the minimum flow rate for maintaining the soundness of the RCIC pump 7. Secure.

【0048】この後、直ぐに系統流量を確保するために
第1,第2試験用調節弁14,15を速かに調整開弁操
作をする必要があることと、第1,第2試験用調節弁1
4,15間の開度差が大きく開くと片側の弁14または
15に負荷がかかり、キャビテーションにより弁14ま
たは15の健全性が損われるので、図2に示すように、
まず、第2試験用調節弁15のみ微開にして、RCIC
ポンプ7を起動し、直ぐに第1,第2試験用調節弁1
4,15を調整開し最小流量バイパス弁16が閉弁する
まで系統流量を確保する。
After that, in order to immediately secure the system flow rate, it is necessary to quickly open the first and second test control valves 14 and 15 for adjusting and opening, and the first and second test control. Valve 1
When the difference in opening between 4 and 15 is greatly opened, a load is applied to the valve 14 or 15 on one side, and the soundness of the valve 14 or 15 is impaired by cavitation. Therefore, as shown in FIG.
First, only the control valve 15 for the second test is opened slightly, and the RCIC is opened.
The pump 7 is started and immediately the first and second test control valves 1
The system flow rate is secured until the valves 4 and 15 are adjusted and opened and the minimum flow rate bypass valve 16 is closed.

【0049】系統流量が確立したら、RCIC流量制御
器21の出力を手動で上げてRCICタービン8の回転
数を上げていく。
When the system flow rate is established, the output of the RCIC flow controller 21 is manually increased to increase the rotation speed of the RCIC turbine 8.

【0050】ここで、テストループから炉心注入に切り
換える時に系統流量が多過ぎると、給水制御系に対して
外乱が大きくなることから、その系統流量を、例えば定
格流量が182m3/hrの場合、これよりも少ない10
0m3/hr程度まで上昇したところでRCIC流量制御
器21を100m3/hrの流量で自動に投入する。
Here, if the system flow rate is too high when switching from the test loop to the core injection, the disturbance to the feed water control system becomes large. Therefore, when the system flow rate is, for example, the rated flow rate is 182 m 3 / hr, Less than 10
When the temperature has risen to about 0 m 3 / hr, the RCIC flow controller 21 is automatically turned on at a flow rate of 100 m 3 / hr.

【0051】系統流量が自動で100m3/hrで制御さ
れるので、ここから第1,第2試験用調節弁14,15
の開度を調整してRCICポンプ7の吐出圧力を原子炉
注入に可能な圧力まで上げて行くが、ここで、第1,第
2試験用調節弁14,15間の開度差が開くと片側の弁
14または15に負荷がかかり、キャビテーションによ
り弁14または15の健全性が損われることと、第2試
験用調節弁15の先は直ぐS/P4への吐出になってい
るため背圧がたちにくく、第1試験用調節弁14に対し
てキャビテーションが発生し易いことから開度差は10
%以下とし、必ず第1試験用調節弁14の開度を小さく
なるようにし、開弁操作は第2試験用調節弁15を先に
する一方、閉弁操作は第1試験用調節弁14を先に実施
することとする。
Since the system flow rate is automatically controlled at 100 m 3 / hr, the control valves 14 and 15 for the first and second tests are started from here.
Is adjusted to raise the discharge pressure of the RCIC pump 7 to a pressure at which the reactor can be injected. If the difference in opening between the first and second test control valves 14 and 15 opens, A load is applied to the valve 14 or 15 on one side, the soundness of the valve 14 or 15 is impaired by cavitation, and the tip of the second test control valve 15 is immediately discharged to the S / P 4, so that the back pressure is reduced. The opening difference is 10 because the cavitation easily occurs in the first test control valve 14.
% Or less, the opening degree of the first test control valve 14 is made small, and the second test control valve 15 is opened first while the first test control valve 14 is closed. It will be implemented first.

【0052】RCICポンプ7で炉心注入を実施するに
は、少なくとも、その吐出圧力は炉圧+水頭差が必要に
なる。そこで、RCICポンプ7の吐出圧力を上げてい
き、炉圧+水頭差になったところで図3に示すように初
めてRCIC注入弁11を全開とし、第1,第2試験用
調節弁14,15を徐々に閉弁し、ゆっくりと炉心注入
に切り換えていく。このときも第1,第2試験用調節弁
14,15間の開度を上述と同様に制御する。最後に、
図4に示すように、第1,第2試験用調節弁14,15
が全開になったところで切換は完了し、定格流量までR
CIC系統流量を上げてゆく。
In order to carry out core injection with the RCIC pump 7, at least the discharge pressure thereof needs to be the reactor pressure + head difference. Therefore, the discharge pressure of the RCIC pump 7 is increased, and when the reactor pressure + head difference is reached, the RCIC injection valve 11 is fully opened for the first time as shown in FIG. 3, and the first and second test control valves 14 and 15 are opened. Close the valve gradually and slowly switch to core injection. Also at this time, the opening degree between the first and second control valves 14 and 15 is controlled in the same manner as described above. Finally,
As shown in FIG. 4, first and second test control valves 14, 15
Switching is completed when the valve is fully opened and R
Increase the flow rate of the CIC system.

【0053】本実施形態の方法により、炉内(RPV
1)にS/P4の比較的汚い水を持ち込むことなく、し
かも、給水制御系に外乱を与えることなく、流量制御系
の調整を実施する前の状態で、安定して冷却材を炉内注
入することができる。
By the method of this embodiment, the inside of the furnace (RPV
Stable injection of coolant into the reactor without bringing in relatively dirty water of S / P4 to 1) and without disturbing the water supply control system before adjusting the flow control system. can do.

【0054】(第2の実施形態) 次に、同じく図1〜図4を参照して本発明の請求項4に
対応する第2の実施形態であるRCICの運転方法につ
いて説明する。
(Second Embodiment) Next, a method of operating an RCIC which is a second embodiment corresponding to claim 4 of the present invention will be described with reference to FIGS.

【0055】まず、上記手順により冷却材を炉内注入し
ているRCIC系の吐出先をS/P4へ急激に切り換え
ると、原子炉水位を制御している給水制御系に対して大
きな外乱になるため、RCIC流量制御器21を自動モ
ードのまま、例えば系統流量を、例えば定格流量が18
2m3/hrの場合、これよりも少ない100m3/hr程度
まで下降させる。
First, if the discharge destination of the RCIC system injecting the coolant into the reactor is suddenly switched to S / P4 by the above procedure, a large disturbance will occur to the feedwater control system controlling the reactor water level. Therefore, for example, the system flow rate, for example, the rated flow rate is 18 when the RCIC flow rate controller 21 remains in the automatic mode.
In case of 2 m 3 / hr, it is lowered to about 100 m 3 / hr, which is smaller than this.

【0056】ここで、図4で示す炉心注入運転で、水源
が先ほど述べた理由でCSP13のままである場合で
は、CSP吸込弁12が開弁していることにより、イン
ターロックによってRCIC系のS/P排水ラインの第
1,第2試験用調節弁14,15が開弁できなくなる。
このため、同吸込弁12の開弁信号をアイソレでクリア
し、第1,第2試験用調節弁14,15が開弁できるよ
うにする。なお、炉心注入が上記第1の実施形態の手順
で実施する場合は既にその時点で実施されているためこ
こで新たに実施する必要は無い。
Here, in the core injection operation shown in FIG. 4, when the water source is still CSP 13 for the reason described above, the CSP suction valve 12 is open, so that the RCIC system S The first and second control valves 14, 15 of the / P drain line cannot be opened.
Therefore, the valve opening signal of the suction valve 12 is cleared by isolation so that the first and second test control valves 14 and 15 can be opened. When the core injection is performed according to the procedure of the first embodiment, it is already performed at that time, and it is not necessary to newly perform it here.

【0057】次に第1,第2試験用調節弁14,15を
所定順に徐々にゆっくりと開弁し、炉心注入からS/P
排水に切り換えて行くが、ここでも、第1,第2試験用
調節弁14,15間の開度差が大きく開くと、片側の弁
14または15に負荷がかかり、キャビテーションによ
り弁14または15の健全性が損なわれることと、第2
試験用調節弁15の先(下流)はすぐS/P4への吐出
になっているため背圧がたちにくく第1試験用調節弁1
4に対してキャビテーションが発生し易いことから、開
度差は10%以下とし、図3に示すように必ず第1試験
用調節弁14の開度を小さくなるようにし、閉弁操作は
第1試験用調節弁14を先に実施することとする。
Next, the first and second test control valves 14 and 15 are gradually and slowly opened in a predetermined order, and the S / P from the core injection is started.
Although the drainage is switched to drainage, if the opening difference between the first and second test control valves 14 and 15 is large, the load is applied to the valve 14 or 15 on one side, and the cavitation causes the valve 14 or 15 to move. The loss of soundness and the second
Since the tip (downstream) of the test control valve 15 is immediately discharged to the S / P 4, back pressure is difficult to reach and the first test control valve 1
Since cavitation is likely to occur with respect to No. 4, the opening difference is set to 10% or less, and the opening of the first test control valve 14 is always made small as shown in FIG. The test control valve 14 will be implemented first.

【0058】この後、第1,第2試験用調節弁14,1
5を徐々に開弁することにより、吐出先がS/P4に切
り換わっていくが、そのうちRCICポンプ7の吐出圧
力が炉圧+水頭差以下になったところで、前述した理由
により、炉心注入はもうされなくなったと判断し、図2
に示すようにRCIC注入弁11を全閉する。最後にR
CICポンプ7の運転停止後も第1,第2試験用調節弁
14,15が開弁していると、CSP13の水がS/P
4に流れ込み、その流動により、RCICポンプ7が空
転し、このポンプ7に直結されているとRCICタービ
ン8が空回りして上記した不都合が発生してしまう。
After that, the first and second test control valves 14, 1
By gradually opening valve 5, the discharge destination is switched to S / P4, but when the discharge pressure of the RCIC pump 7 becomes less than the reactor pressure + water head difference, the core injection It is judged that it is no longer done, and Figure 2
The RCIC injection valve 11 is fully closed as shown in FIG. Finally R
If the first and second test control valves 14 and 15 are still open even after the operation of the IC pump 7 is stopped, the water of the CSP 13 is S / P.
4, the RCIC pump 7 idles due to the flow, and if the RCIC pump 7 is directly connected to this pump 7, the RCIC turbine 8 idles and the above-mentioned inconvenience occurs.

【0059】このために、RCICポンプ7の運転を停
止させる前に、第1,第2試験用調節弁14,15を全
閉にし、吐出圧力高及び系統流量低信号により図1に示
すように最小流量バイパス弁16が開弁してRCICポ
ンプ7の健全性を保つ。その後すぐにRCICポンプ7
の運転停止操作を実施する。
For this reason, before stopping the operation of the RCIC pump 7, the first and second test control valves 14 and 15 are fully closed, and as shown in FIG. The minimum flow bypass valve 16 is opened to maintain the soundness of the RCIC pump 7. RCIC pump 7 immediately afterwards
Perform the operation stop operation of.

【0060】本実施形態の方法により、炉心注入中のR
CIC系を、給水制御系に外乱を与えることなく、流量
制御系の調整を実施する前の状態で、安定してテストル
ープに切り換えることができ、又、RCICポンプ7の
停止後のCSP13とS/P4のヘッド差によるRCI
Cタービン8の空回りを防止することができる。
By the method of the present embodiment, R during core injection
The CIC system can be stably switched to the test loop in the state before the adjustment of the flow rate control system is performed without giving any disturbance to the water supply control system, and the CSP 13 and the S after the RCIC pump 7 is stopped. / P4 head difference RCI
The idle rotation of the C turbine 8 can be prevented.

【0061】次に、以上のRCIC起動試験時のS/P
排水運転の起動から炉心注入への切換えまでの試験方法
と、その炉心注入からS/P排水運転に切換えてRCI
Cポンプ7の運転を停止するまでの試験方法の手順を記
載した手順書を示す。
Next, the S / P at the time of the RCIC start test described above
Test method from start of drainage operation to switching to core injection, and switching from core injection to S / P drainage operation
The procedure manual which describes the procedure of the test method until the operation of the C pump 7 is stopped is shown.

【0062】なお、この手順書では各機器の名称及び番
号に付いては、ABWR135万kWe級プラントでの名
称を記載している。
In this procedure manual, the names and numbers of the respective equipments are the names at the ABWR 1.35 million kWe class plant.

【0063】この手順書に従って操作することにより、
実際の試験において運転操作員が特殊な操作の実施時で
も、間違いなく確実に運転操作を実施することができ
る。
By operating according to this procedure manual,
Even when a driving operator performs a special operation in an actual test, the driving operation can be surely performed with certainty.

【0064】RCIC起動試験時の炉心注入切換手順書 1.試験目的・概要 1.1 試験目的 原子炉隔離時冷却系(RCIC)が、所定の性能を満足
していることを確認する。
Procedure for switching core injection during RCIC start-up test 1. Test Purpose / Outline 1.1 Test Purpose Confirm that the reactor isolation cooling system (RCIC) satisfies the specified performance.

【0065】1.2 試験概要 RCIC系の制御要素の調整および性能確認を行なうた
め、試験を実施する。
1.2 Outline of Test A test is conducted to adjust the control elements of the RCIC system and confirm the performance.

【0066】[0066]

【表1】 [Table 1]

【0067】[0067]

【表2】 [Table 2]

【0068】[0068]

【表3】 [Table 3]

【0069】[0069]

【表4】 [Table 4]

【0070】[0070]

【表5】 [Table 5]

【0071】[0071]

【表6】 [Table 6]

【0072】[0072]

【表7】 [Table 7]

【0073】[0073]

【表8】 [Table 8]

【0074】(第3の実施形態) 次に図5〜図7を参照して本発明の請求項6に対応する
第3の実施形態であるRCIC運転方法について説明す
る。
(Third Embodiment) Next, an RCIC operation method according to a third embodiment of the invention will be described with reference to FIGS.

【0075】この実施形態はRCIC配管内に残溜した
保有水を、清浄なCSP水に置換するための運転方法の
一例であり、その置換水の水源としては、CSP13の
貯水を利用するために、図5に示すようにCSP側吸入
弁12を開弁して水源をCSP13に切り換える。
This embodiment is an example of an operation method for replacing the retained water remaining in the RCIC pipe with clean CSP water, and the stored water of CSP 13 is used as the water source of the replacement water. As shown in FIG. 5, the CSP side intake valve 12 is opened to switch the water source to the CSP 13.

【0076】次にCSP13側を水源にしたことにより
第1,第2試験用調節弁14,15がインターロックに
より開弁操作不可能となるため、CSP側吸込弁12開
信号をアイソレでクリアする。
Next, since the CSP 13 side is used as the water source, the first and second test control valves 14 and 15 cannot be opened due to the interlock, so the CSP side suction valve 12 open signal is cleared by isolation. .

【0077】この後、RCICポンプ7の起動前に第
1,第2試験用調節弁14,15が開弁すると、CSP
13の貯水がS/P4とのヘッド差によりS/P4に流
れ込む。このために、そのCSP水の流れによりRCI
Cポンプ7と、これに直結されたRCICタービン8が
空回りしてしまう。このRCICタービン8の軸受周り
の給油はその軸に直結されたRCIC軸受油ポンプ10
により行っているが、RCIC系統の流れによるRCI
Cタービン8の空回りの場合はその回転数が低いために
RCIC軸受油ポンプ10の油圧が確立せず、軸受の潤
滑油なしで回ることとなり、軸受部に対して焼付け等悪
い影響を与える虞れがある。
After that, if the first and second test control valves 14 and 15 are opened before the RCIC pump 7 is started, the CSP is opened.
The stored water of 13 flows into S / P4 due to the head difference from S / P4. Because of this, the CSP water flow causes RCI
The C pump 7 and the RCIC turbine 8 directly connected to the C pump run idle. The oil around the bearing of the RCIC turbine 8 is supplied to the RCIC bearing oil pump 10 directly connected to the shaft.
RCI by the flow of RCIC system
When the C turbine 8 is idle, the RCIC bearing oil pump 10 does not establish a hydraulic pressure because of its low rotational speed, and the bearing rotates without lubricating oil of the bearing, which may adversely affect the bearing such as seizure. There is.

【0078】そこで、先にRCICポンプ7を起動して
から第1,第2試験用調節弁14,15を開弁すること
とする。なお、第1,第2試験用調節弁14,15が全
閉状態においても最小流量バイパス弁16が開弁してR
CICポンプ7の健全性を保つための最低限の流量が確
保されるため、RCICポンプ7の起動後に第1,第2
試験用調節弁14,15を開弁すればよい。但し、その
後すぐに第1,第2試験用調節弁14,15を開弁する
ため、図6に示すように先に第2試験用調整弁15を微
開しておく方が望ましい。
Therefore, the RCIC pump 7 is first activated and then the first and second test control valves 14 and 15 are opened. Even when the first and second test control valves 14 and 15 are fully closed, the minimum flow bypass valve 16 opens and R
Since the minimum flow rate for maintaining the soundness of the CIC pump 7 is secured, the first and second after the RCIC pump 7 is started.
The test control valves 14 and 15 may be opened. However, since the first and second test control valves 14 and 15 are opened immediately after that, it is desirable to slightly open the second test control valve 15 first as shown in FIG.

【0079】RCICポンプ7の起動後に第1,第2試
験用調節弁14,15の開度を徐々に開けて系統流量を
確保し、図7に示すようにCSP13を水源とし、S/
P4を排水先とした運転を実施する。
After the RCIC pump 7 is started, the openings of the first and second control valves 14 and 15 are gradually opened to secure the system flow rate, and as shown in FIG.
Conduct operation with P4 as the drainage destination.

【0080】すると、RCIC配管を含む系統内の保有
水が清浄なCSP水で置換され、さらに配管に付着した
塵芥や錆等がS/P4へ流し出される。
Then, the water held in the system including the RCIC pipe is replaced with clean CSP water, and dust, rust, etc. adhering to the pipe are washed out to the S / P 4.

【0081】この置換終了後にRCICポンプ7の運転
を停止するが、このときにおいても先にRCICポンプ
7を停止すると、CSP13とS/P4のヘッド差でS
/P4側にCSP13の保有水が流入し、RCICポン
プ7とRCICタービン8が空回りするため、図6に示
すように先に第1,第2試験用調節弁14,15を全閉
し、最小流量バイパス弁16を通したラインで運転中に
速やかにRCICポンプ7を停止する。
After the replacement, the operation of the RCIC pump 7 is stopped. Even at this time, if the RCIC pump 7 is stopped first, the head difference between the CSP 13 and the S / P 4 causes S to be S.
Since the water held in the CSP 13 flows into the / P4 side and the RCIC pump 7 and the RCIC turbine 8 run idle, the first and second test control valves 14 and 15 are fully closed first as shown in FIG. The RCIC pump 7 is immediately stopped during operation on the line passing through the flow rate bypass valve 16.

【0082】本運転操作を実施することによって、従来
のフラッシングよりも短い時間で、RCIC配管内保有
水をCSP13の清浄水に置換することができ、また、
RCIC系統内を清浄水の流れにより清浄効果も期待で
きることから、RCIC系の炉心注入に当たっても不純
物の炉内持ち込みを抑制ないし防止することができる。
By carrying out this operation, the water held in the RCIC pipe can be replaced with the clean water of the CSP 13 in a shorter time than the conventional flushing.
Since the cleaning effect can be expected by the flow of clean water in the RCIC system, it is possible to suppress or prevent impurities from being brought into the reactor even when the RCIC system is injected into the core.

【0083】(第4の実施形態) 次に同じく、図6,図7を参照して本発明の請求項7に
対応する第4の実施形態である運転方法について説明す
る。
(Fourth Embodiment) Next, a driving method according to a fourth embodiment of the present invention will be described with reference to FIGS. 6 and 7.

【0084】上記第3の実施形態でCSP水をS/P4
に排水することで、RCIC配管内保有水を清浄なCS
P水に置換し、S/P4に排水した水は最終的には廃棄
物処理系で一度処理してから再利用することになる。
In the third embodiment, CSP water is added to S / P4.
By draining the water to the RCIC pipe
The water replaced with P water and drained to S / P4 is finally treated once in the waste treatment system and then reused.

【0085】しかし、廃棄物処理系で処理する水の量に
ついては、少ない方が処理負荷を軽減するために望まし
いことと、S/P4にあまり多量の排水を流すと、S/
P4の水位の上昇により水位高警報(例えばABWR1
35万kWe級では水位低〜水位高間が45m3/hr)が発
生することのため、上昇した水をすぐに廃棄物処理系に
送る必要が発生してくる。
However, regarding the amount of water to be treated in the waste treatment system, it is preferable that the amount of water is smaller in order to reduce the treatment load.
High water level warning (for example, ABWR1
In the 350,000 kWe class, a low water level to a high water level of 45 m 3 / hr) occurs, so it becomes necessary to immediately send the raised water to the waste treatment system.

【0086】このために、RCIC配管内保有水の置換
操作を実施しつつ、S/P4への排水量を減らす為の方
法が必要となる。
For this reason, a method for reducing the amount of wastewater discharged to the S / P 4 while performing the operation of replacing the retained water in the RCIC pipe is required.

【0087】そこで、図6に示すようにまず、RCIC
ポンプ7の起動後に、最小流量バイパス弁16を通す運
転からS/P4へ排水するために図7に示すように第
1,第2試験用調節弁14,15を開弁操作して、系統
流量を確保するわけであるが、このときにある程度の流
速で数分間押し込めば上記置換効果が充分に期待できる
ので、RCIC系統流量を最小流量バイパス弁16が確
実に閉じ、RCIC系統にある程度の流れが期待できる
流量として、定格流量(例えばABWR135万kWe級
プラントで、約182m3/hr)の半分程度の80〜9
0m3/hrに調整し、これを5〜10分間運転してRC
ICポンプ7の運転を停止することとする。
Therefore, first, as shown in FIG.
After the pump 7 is started, in order to drain the S / P 4 from the operation of passing the minimum flow bypass valve 16, as shown in FIG. However, at this time, the above replacement effect can be fully expected if the flow rate is pushed for a few minutes at a certain flow rate, and therefore the RCIC system flow rate is surely closed by the minimum flow rate bypass valve 16 and a certain amount of flow occurs in the RCIC system. The expected flow rate is 80 to 9 which is about half of the rated flow rate (for example, ABWR 1.35 million kWe class plant, about 182 m 3 / hr).
Adjust to 0 m 3 / hr, run this for 5-10 minutes and RC
The operation of the IC pump 7 is stopped.

【0088】この運転方法により、RCIC配管内を清
浄なCSP水により洗浄することができると共に、S/
P4への排水量を10m3/hr以下に減少させることが
でき、S/P4の水位上昇を押さえることができる。
By this operation method, the inside of the RCIC pipe can be washed with clean CSP water, and the S /
The amount of drainage water to P4 can be reduced to 10 m 3 / hr or less, and the water level rise of S / P4 can be suppressed.

【0089】次の置換運転手順書は上記第3の実施の形
態であるRCIC系配管内保有水の置換方法の実際の操
作手順を示す。なお、この手順書では各機器の名称及び
番号に付いては、ABWR135万kWe級プラントの名
称を記載している。
The following replacement operation procedure manual shows an actual operation procedure of the method for replacing the water held in the RCIC system pipe according to the third embodiment. In addition, in this procedure manual, the name and number of each device are described as the name of the ABWR 1.35 million kWe class plant.

【0090】この手順書に従って操作することにより、
実際の置換操作において運転操作員が、間違いなく確実
に運転操作を実施することができる。
By operating according to this procedure manual,
In the actual replacement operation, the driving operator can definitely carry out the driving operation without fail.

【0091】置換運転手順書 この手順書は135万kWe級ABRW標準モデル及びシ
ミュレーターを参考として作成している。
Replacement Operation Procedure This procedure is prepared with reference to the 1.35 million kWe class ABRW standard model and simulator.

【0092】1.目的・概要 1.1 目的 原子炉隔離時冷却系(RCIC)が、炉心注入される場
合に備えて、RCIC系のサーベランス試験後にRCI
C系配管内の保有水をCSP水に置換しておく。
1. Purpose / Outline 1.1 Purpose RCI after the surveillance test of RCIC system in preparation for core injection of RCIC
The retained water in the C system pipe is replaced with CSP water.

【0093】1.2 概要 RCIC系をCSP水源・S/P吐出ラインで運転し、
配管内の保有水を清浄なCSP水に置換する。
1.2 Overview The RCIC system is operated by the CSP water source / S / P discharge line,
Replace the retained water in the pipe with clean CSP water.

【0094】[0094]

【表9】 [Table 9]

【0095】[0095]

【表10】 [Table 10]

【0096】[0096]

【表11】 [Table 11]

【0097】[0097]

【表12】 [Table 12]

【0098】[0098]

【表13】 [Table 13]

【0099】[0099]

【表14】 [Table 14]

【0100】(第5の実施形態) 図8は本発明の請求項9に対応する第5の実施形態であ
る置換運転操作を容易にするインターロック回路を示
す。
(Fifth Embodiment) FIG. 8 shows an interlock circuit for facilitating a replacement operation according to a fifth embodiment of the present invention.

【0101】上記各実施形態では、いずれも、CSP水
源時に第1,第2試験用調節弁14,15を開弁操作す
るために、CSP側吸込隔離弁12開の信号をアイソレ
でクリアしていたが、それをインターロックで自動的に
実施できる様にする。
In each of the above-described embodiments, the signal for opening the CSP side suction isolation valve 12 is cleared by the isolation in order to open the first and second test control valves 14, 15 when the CSP water source is used. However, it will be possible to automatically implement it with an interlock.

【0102】まず、上記置換運転モードを実施するとき
にはモード選択スイッチ30で置換運転モードを選択す
る。この後RCICポンプ7が起動すると、RCICタ
ービン速度ピックアップ26からRCICタービン回転
数信号31をRCICポンプ運転条件判定回路32で受
け取り、そのタービン回転数が一定値以上になると、の
判定回路32からポンプ起動信号33が出力される。
First, when the replacement operation mode is carried out, the replacement operation mode is selected by the mode selection switch 30. After this, when the RCIC pump 7 is started, the RCIC turbine speed signal 31 is received from the RCIC turbine speed pickup 26 by the RCIC pump operating condition judgment circuit 32, and when the turbine speed becomes a certain value or more, the pump is started from the judgment circuit 32. The signal 33 is output.

【0103】アンド回路andはこの置換運転モード選
択信号34とポンプ起動信号33のアンド条件成立によ
りCSP側吸込弁12開による第1,第2試験用調節弁
14,15の開阻止信号35をワイプアウトし、RCI
Cポンプ7の起動後の第1,第2試験用調節弁14,1
5の開弁操作を可能とする。
The AND circuit and wipes the opening prevention signal 35 of the first and second test control valves 14 and 15 by opening the CSP side suction valve 12 when the AND condition of the replacement operation mode selection signal 34 and the pump start signal 33 is satisfied. Out, RCI
First and second test control valves 14, 1 after the C pump 7 is started
The valve opening operation of 5 is possible.

【0104】このときのポンプ起動検出の手段として
は、RCICタービン速度の他に、RCICポンプ吐出
圧力を検出し圧力高でポンプ起動を検出する手段等が考
えられる。
As means for detecting the pump start at this time, in addition to the RCIC turbine speed, means for detecting the RCIC pump discharge pressure and detecting the pump start at a high pressure can be considered.

【0105】なお、図8中、各orはOR回路、36は
第1,第2試験用調節弁開阻止信号の阻止信号、37は
RCIC自動起動信号、38は第1試験用調節弁操作ス
イッチ、39は第2試験用調節弁操作スイッチ、40は
第1試験用調節弁開指令信号、41は第1試験用調節弁
閉信号指令、42は第2試験用調節弁開指令信号、43
は第2試験用調節弁閉指令信号である。
In FIG. 8, each or is an OR circuit, 36 is a blocking signal for the first and second test control valve open blocking signals, 37 is an RCIC automatic start signal, and 38 is a first test control valve operating switch. , 39 is a second test control valve operating switch, 40 is a first test control valve open command signal, 41 is a first test control valve close signal command, 42 is a second test control valve open command signal, 43
Is a control valve closing command signal for the second test.

【0106】(第6の実施形態) 図9は本発明の請求項8に対応する第6の実施形態であ
る置換運転操作を容易にする自動運転のフローチャー
ト、図10はそのロジック回路の1例を示している。な
お、図9中、S1〜S15はフローチャートの各ステッ
プを示す。
(Sixth Embodiment) FIG. 9 is a flowchart of the automatic operation for facilitating the replacement operation according to the sixth embodiment of the present invention, and FIG. 10 shows an example of its logic circuit. Is shown. In addition, in FIG. 9, S1 to S15 indicate each step of the flowchart.

【0107】つまり、置換運転モードを実施するときに
は、まずS1で、モードSW(スイッチ)30により置
換運転モードを選択する。これにより、S2でRCIC
系統流量制御器21はRCIC「手動」モード設定0%
に切り換える。
That is, when carrying out the replacement operation mode, first in S1, the replacement operation mode is selected by the mode SW (switch) 30. This allows RCIC in S2
System flow controller 21 is RCIC "manual" mode setting 0%
Switch to.

【0108】この後、S3でRCICポンプ7を起動す
ると、RCICタービン8はRCIC流量制御器21か
らの速度信号が0%であるので、最低速度で運転され
る。このときにRCICタービン回転数ピックアップ2
6からRCICタービン回転数信号31をRCICポン
プ運転条件判定回路32で受け取り、一定値以上になる
とポンプ起動信号33が出力される。
Thereafter, when the RCIC pump 7 is started in S3, the RCIC turbine 8 is operated at the minimum speed because the speed signal from the RCIC flow controller 21 is 0%. At this time, the RCIC turbine speed pickup 2
The RCIC turbine speed signal 31 from 6 is received by the RCIC pump operating condition determination circuit 32, and when the RCIC pump operating condition determination circuit 32 exceeds a certain value, a pump start signal 33 is output.

【0109】置換運転モード選択信号34とポンプの起
動信号33のアンドによりCSP側吸込弁11開による
第1,第2試験用調節弁14,15の開阻止信号35を
ワイプアウトし、RCICポンプ7の起動後の第1,第
2試験用調節弁14,15の開弁操作を可能とすると同
時に、S4で第1,第2試験用調節弁14,15に開信
号44を出力し開弁操作をする。
The AND of the replacement operation mode selection signal 34 and the pump start signal 33 wipes out the opening blocking signal 35 of the first and second test control valves 14 and 15 due to the opening of the CSP side suction valve 11, and the RCIC pump 7 is operated. It is possible to open the first and second test control valves 14 and 15 after the start of the valve, and at the same time, in S4, an open signal 44 is output to the first and second test control valves 14 and 15 to open the valve. do.

【0110】次に、第1,第2試験用調節弁14,15
の開によりRCICの系統流量が上昇するが、この時に
RCICの系統流量発信器20より系統流量信号45を
RCIC系統流量確立検出器22が受け、流量が一定値
以上になると、S5で流量が確立したと判断して、系統
流量確立信号46を出力する。
Next, the first and second test control valves 14, 15
When the RCIC system flow rate rises due to the opening of, the RCIC system flow rate establishment detector 22 receives the system flow rate signal 45 from the RCIC system flow rate transmitter 20 at this time, and when the flow rate exceeds a certain value, the flow rate is established in S5. When it is determined that it has been done, the system flow rate establishment signal 46 is output.

【0111】この流量確立信号46を受けると、第1,
第2試験用調節弁開信号44の条件が非成立となり、S
6で開弁操作を終了すると同時にS7でRCIC流量制
御器21の制御モード「自動」で定格流量の約50%の
流量程度に流量設定を切換え、系統流量設定した流量に
なる様にEHC29に信号を送りRCICタービン速度
を制御する。
When the flow rate establishment signal 46 is received,
The condition of the second test control valve open signal 44 is not satisfied, and S
Simultaneously with the completion of the valve opening operation in 6, the flow rate setting is switched to a flow rate of about 50% of the rated flow rate in the control mode “automatic” of the RCIC flow rate controller 21 in S7, and the EHC 29 is signaled to reach the set flow rate. To control the RCIC turbine speed.

【0112】系統流量確立信号46は時限UPタイマー
47にも送られる。S8で時限タイマー47で一定時間
(約5〜10分)が経過したときに置換運転完了タイム
アップと判断して、S9で第1,第2試験用調節弁1
4,15に閉弁信号49を送って閉じる。
The system flow rate establishment signal 46 is also sent to the timed UP timer 47. In S8, when the fixed time (about 5 to 10 minutes) has elapsed with the time limit timer 47, it is determined that the replacement operation completion time has expired, and in S9, the first and second test control valves 1
A valve closing signal 49 is sent to 4 and 15 to close.

【0113】S10で第1,第2試験用調節弁14,1
5が全閉したと判断すると、S11でRCICタービン
止め弁9を全閉させる全閉指令信号50を出力し、S1
2でその止め弁9が全閉したと判断したときに、S13
でRCICタービン7の運転を停止させる。これとほぼ
同時に、S14で流量制御器21の制御モード「自動」
で定格流量に設定し、S15で置換運転が完了する。
At S10, the first and second test control valves 14,1
If it is determined that SRC 5 is fully closed, a full-close command signal 50 for fully closing the RCIC turbine stop valve 9 is output in S11, and S1
When it is determined in 2 that the stop valve 9 is fully closed, S13
Then, the operation of the RCIC turbine 7 is stopped. Almost at the same time, in S14, the control mode of the flow rate controller 21 is "automatic".
The rated flow rate is set with and the replacement operation is completed in S15.

【0114】本実施形態により、RCIC配管内保有水
の置換運転のうち、モード選択及びポンプ起動のみを運
転員が操作することにより、全て自動で実施することが
可能となる。又、モード選択によりポンプ起動信号を出
力し全て自動で実施することも可能となる。更に、S/
P4の水位を監視しておき、RCIC水位高でポンプ7
の停止のインターロックを加えることも可能である。
According to the present embodiment, it is possible to carry out all of the operations for replacing the water retained in the RCIC pipes automatically by the operator operating only the mode selection and pump startup. It is also possible to output the pump start signal by selecting the mode and carry out all the operations automatically. Furthermore, S /
The water level of P4 is monitored, and the pump 7
It is also possible to add an interlock for stopping.

【0115】尚、図10のロジック図は図9のフローチ
ャートを実現するための一例であり、信号の組み方につ
いては、図9のフローチャートを実現するロジック回路
であればよく、特に図10の回路構成に拘束されない。
Note that the logic diagram of FIG. 10 is an example for realizing the flowchart of FIG. 9, and how to assemble signals may be any logic circuit that realizes the flowchart of FIG. 9, and particularly the circuit configuration of FIG. Not be bound by.

【0116】(第7の実施形態) 図11は本発明の請求項10に対応する第7の実施形態
であるRCIC配管置換運転モードの運転図である。
(Seventh Embodiment) FIG. 11 is an operation diagram of an RCIC pipe replacement operation mode according to a seventh embodiment of the present invention.

【0117】この実施形態はまず、置換運転に対しては
誤操作防止の為、運転操作員のモード選択により運転可
能とし、CSP13水源時に第1,第2試験用調節弁1
4,15の誤開により、CSP水がS/P4に流出する
ことと、その流れによりRCICポンプ7とRCICタ
ービン8が空回りしないようにRCICポンプ7の起動
前には第1,第2試験用調節弁14,15を開弁しない
ようにインターロックを設ける点に特徴がある。
In this embodiment, first, in order to prevent an erroneous operation in the replacement operation, the operation can be performed by the operator's mode selection. When the CSP 13 water source is used, the first and second test control valves 1 are provided.
Before opening the RCIC pump 7, the first and second tests are performed so that the CSP water flows out to the S / P 4 due to the accidental opening of 4, 15 and the RCIC pump 7 and the RCIC turbine 8 do not idle due to the flow. The feature is that an interlock is provided to prevent the control valves 14 and 15 from opening.

【0118】また、配管洗浄運転には特に定格流量が必
要ないことと、S/P水位の上昇を少なくするために、
RCICポンプ7の運転時の系統流量は、定格流量の半
分程度とする。
In addition, in order that the rated flow rate is not particularly required for the pipe cleaning operation and that the S / P water level rise is reduced,
The system flow rate during operation of the RCIC pump 7 is about half of the rated flow rate.

【0119】さらに、運転時間については、置換運転に
十分な時間だけ運転することとし、例えば約5〜10分
間の運転とする。
Further, regarding the operation time, the operation is performed for a time sufficient for the replacement operation, for example, about 5 to 10 minutes.

【0120】これらの運転条件を定めた配管内置換運転
モードを技術的に定義することにより、通常運用におい
ても特殊な運転操作を実施すること無く使用することが
できる。
By technically defining the in-pipe replacement operation mode that defines these operation conditions, it can be used in normal operation without performing a special operation.

【0121】[0121]

【発明の効果】以上説明したように、本願の請求項1の
発明は、RCIC起動試験の原子炉注入時に、清浄なC
SP水をS/Pへ排水する配管経路でRCICポンプを
起動し、系統流量および圧力を確立した後、吐出ライン
をS/P側から炉注側に切り換えることにより、比較的
清浄でないS/P水を炉内に持ち込むことなく最初の炉
心注入をゆっくりと切り換えることができる。
As described above, according to the invention of claim 1 of the present application, a clean C is introduced at the time of injection into the reactor in the RCIC start-up test.
After starting the RCIC pump in the piping route that drains the SP water to the S / P and establishing the system flow rate and pressure, the discharge line is switched from the S / P side to the reactor injection side, resulting in a relatively unclean S / P The initial core injection can be slowly switched without bringing water into the reactor.

【0122】請求項2の発明は、RCICポンプの起動
後、下流側調節弁を開弁してから、上流側調節弁を下流
側調節弁よりも小さい開度で開弁し、これらの弁開度差
を10%以下に設定しているので、上流側調節弁にキャ
ビテーションが発生するのを防止ないし低減して健全性
を向上させることができる。
According to the second aspect of the present invention, after the RCIC pump is activated, the downstream side control valve is opened, and then the upstream side control valve is opened with a smaller opening than the downstream side control valve. Since the degree difference is set to 10% or less, it is possible to prevent or reduce the occurrence of cavitation in the upstream side control valve and improve the soundness.

【0123】請求項3の発明は、請求項1または2記載
の運転方法を自動的に行なうことができる。したがっ
て、手動操作による誤操作を未然に防止することができ
る。
According to the invention of claim 3, the operating method according to claim 1 or 2 can be automatically performed. Therefore, an erroneous operation due to a manual operation can be prevented in advance.

【0124】請求項4の発明は、RCIC起動試験時の
RCIC炉心注入運転後のRCICポンプの停止を、C
SPを水源にした炉心注入から吐出側をS/Pにゆっく
り切り換えて停止することによりRCIC系の炉心注入
流量の急減による給水制御系への外乱を防止することが
できる。
According to the fourth aspect of the present invention, when the RCIC pump is stopped after the RCIC core injection operation at the RCIC start test,
By slowly switching the discharge side from the core injection using SP as a water source to S / P and stopping it, it is possible to prevent disturbance to the feed water control system due to a rapid decrease in the RCIC system core injection flow rate.

【0125】請求項5の発明は、請求項3記載の運転方
法を自動的に行なうことができる。したがって、手動操
作による誤操作を未然に防止することができる。
According to the invention of claim 5, the operating method of claim 3 can be automatically performed. Therefore, an erroneous operation due to a manual operation can be prevented in advance.

【0126】請求項6の発明は、インターロック手段に
より、置換運転によるS/P排水量を自動的に必要最小
限に抑えることができる。
According to the sixth aspect of the invention , the S / P drainage amount due to the replacement operation can be automatically suppressed to the necessary minimum by the interlock means.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の第1,第2の実施形態に係るRCIC
起動試験時におけるポンプ起動時及び停止前の最小流量
バイパスライン運転のステップを示す運転流路図。
FIG. 1 is an RCIC according to first and second embodiments of the present invention.
FIG. 6 is an operation flow chart showing steps of the minimum flow rate bypass line operation at the time of starting the pump and before stopping the pump during the start-up test.

【図2】本発明の第1,第2の実施形態に係るRCIC
起動試験時におけるS/P排水ライン運転のステップを
示す運転流路図。
FIG. 2 is an RCIC according to first and second embodiments of the present invention.
FIG. 5 is an operation flow chart showing the steps of S / P drainage line operation during a startup test.

【図3】本発明の第1,第2の実施形態に係るRCIC
起動試験時における炉注切換時のステップを示す運転流
路図。
FIG. 3 is an RCIC according to first and second embodiments of the present invention.
FIG. 6 is an operation flow chart showing steps at the time of switching the reactor injection during the start-up test.

【図4】本発明の第1,第2の実施形態に係るRCIC
起動試験時における炉心注入ステップを示す運転流路
図。
FIG. 4 is an RCIC according to first and second embodiments of the present invention.
FIG. 5 is an operation flow chart showing a core injection step during a start-up test.

【図5】本発明の第3,第4の実施形態に係る置換運転
時におけるポンプ起動前のステップを示す運転流路図。
FIG. 5 is an operation flow chart showing steps before pump startup during the replacement operation according to the third and fourth embodiments of the present invention.

【図6】本発明の第3,第4の実施形態に係る置換運転
時におけるRCICポンプ起動直後と停止直前のステッ
プを示す運転流路図。
FIG. 6 is an operation flow chart showing steps immediately after starting and immediately before stopping the RCIC pump during the replacement operation according to the third and fourth embodiments of the present invention.

【図7】本発明の第3,第4の実施形態に係る置換運転
時の置換運転ステップを示す運転流路図。
FIG. 7 is an operation flow chart showing replacement operation steps during replacement operation according to the third and fourth embodiments of the present invention.

【図8】本発明の第5の実施形態のロジック回路図。FIG. 8 is a logic circuit diagram of a fifth embodiment of the present invention.

【図9】本発明の第6の実施形態に係る置換自動運転装
置のフローチャート図。
FIG. 9 is a flow chart diagram of a replacement automatic driving device according to a sixth embodiment of the present invention.

【図10】本発明の第6の実施形態に係る置換自動運転
装置のロジック回路図。
FIG. 10 is a logic circuit diagram of a replacement automatic driving device according to a sixth embodiment of the present invention.

【図11】本発明の第7の実施形態に係る置換運転モー
ドの運転流路図。
FIG. 11 is an operation flow chart of the replacement operation mode according to the seventh embodiment of the present invention.

【図12】従来のRCIC運転方法における原子炉隔離
時モード及び事故時モードにおいて、CSPを水源とす
るステップを示す運転流路図。
FIG. 12 is an operation flow chart showing steps of using the CSP as a water source in the reactor isolation mode and the accident mode in the conventional RCIC operation method.

【図13】従来のRCIC運転方法における原子炉隔離
時モード及び事故時モードにおいて、S/Pを水源とす
るステップを示す運転流路図。
FIG. 13 is an operation flow chart showing steps of using S / P as a water source in the reactor isolation mode and the accident mode in the conventional RCIC operation method.

【図14】従来のRCIC運転方法における系統試験モ
ードの運転流路図。
FIG. 14 is an operation flow chart in the system test mode in the conventional RCIC operation method.

【符号の説明】[Explanation of symbols]

1 原子炉圧力容器(RPV) 2 原子炉格納容器(PCV) 3 ドライウェル(D/W) 4 サプレッションプール(S/P) 4a S/P側吸込弁 6 主蒸気配管 7 RCICポンプ 8 RCICタービン 9 RCICタービン止め弁 10 RCIC軸受油ポンプ 11 RCIC注入弁 12 CSP側吸込弁 13 復水貯蔵槽(CSP) 14 第1試験用調節弁 15 第2試験用調節弁 16 最小流量バイパス弁 18 RCIC主蒸気止め弁 19 RCIC加減弁 20 RCIC系統流量発信器 21 RCIC流量制御器 22 RCIC流量確立検出器 23 RCIC吐出圧力発信器 24 RCIC吐出圧力検出器 25 RCIC吐出圧力計 26 RCICタービン回転数ピックアップ 27 RCICタービン回転数指示計 29 EHC 30 運転モード選択スイッチ 31 RCICタービン回転数信号 32 運転条件判定回路(RCIC回転数低以外検出
器) 33 ポンプ起動信号 34 モードSW置換モード選択信号 35 CSP側吸込弁開条件による第1,第2試験用調
節弁開阻止信号 36 第1,第2試験用調節弁開阻止信号の阻止信号 37 RCIC自動起動信号 38 第1試験用調節弁操作スイッチ 39 第2試験用調節弁操作スイッチ 40 第1試験用調節弁開指令信号 41 第1試験用調節弁閉指令信号 42 第2試験用調節弁開指令信号 43 第2試験用調節弁閉指令信号 44 第1,第2試験用調節弁開指令信号 45 系統流量信号 46 系統流量確立信号 47 時限UPタイマー 48 時限DOUNタイマー 49 第1,第2試験用調節弁閉指令信号 50 RCICタービン止め弁全閉指令信号
1 Reactor Pressure Vessel (RPV) 2 Reactor Containment Vessel (PCV) 3 Drywell (D / W) 4 Suppression Pool (S / P) 4a S / P Side Suction Valve 6 Main Steam Pipe 7 RCIC Pump 8 RCIC Turbine 9 RCIC turbine stop valve 10 RCIC bearing oil pump 11 RCIC injection valve 12 CSP side suction valve 13 condensate storage tank (CSP) 14 first test control valve 15 second test control valve 16 minimum flow bypass valve 18 RCIC main steam stop Valve 19 RCIC control valve 20 RCIC system flow rate transmitter 21 RCIC flow rate controller 22 RCIC flow rate establishment detector 23 RCIC discharge pressure transmitter 24 RCIC discharge pressure detector 25 RCIC discharge pressure gauge 26 RCIC turbine speed pickup 27 RCIC turbine speed Indicator 29 EHC 30 Operation mode selection switch 31 CIC turbine rotation speed signal 32 Operating condition determination circuit (detector other than RCIC rotation speed low) 33 Pump start signal 34 Mode SW replacement mode selection signal 35 Control valve opening prevention signal for first and second test depending on CSP side suction valve opening condition 36 Blocking signal of control valve opening blocking signal for first and second tests 37 RCIC automatic start signal 38 Control valve operating switch for first test 39 Control valve operating switch for second test 40 Control valve opening command signal for first test 41 Control valve closing command signal for first test 42 Control valve opening command signal for second test 43 Control valve closing command signal for second test 44 Control valve opening command signal for first and second test 45 System flow rate signal 46 System flow rate establishment Signal 47 Timed UP timer 48 Timed down timer 49 Control valve closing command signal for first and second tests 50 RCIC turbine stop valve fully closed command signal

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) G21C 15/18 GDC ─────────────────────────────────────────────────── ─── Continuation of front page (58) Fields surveyed (Int.Cl. 7 , DB name) G21C 15/18 GDC

Claims (6)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 炉心注入時には復水貯蔵槽を水源とした
水を原子炉圧力容器に注入する一方、起動試験時にはサ
プレッションプールの水をRCICポンプから再びサプ
レッションプールに戻す循環運転をする原子炉隔離時冷
却系の運転方法において、上記サプレッションプールを
水源とする原子炉隔離時冷却系の起動試験終了後に、上
記RCICポンプを運転して、上記復水貯蔵槽の水をサ
プレッションプールに吐出させて配管を浄化し、その後
復水貯蔵槽を水源とした水を原子炉圧力容器に注入する
ことを特徴とする原子炉隔離時冷却系の運転方法。
1. A condensate storage tank was used as a water source during core injection .
While injecting water into the reactor pressure vessel, the water in the suppression pool was resupplied from the RCIC pump during the start-up test.
In the operation method of the reactor isolation cooling system that performs circulation operation to return to the suppression pool,
After the start-up test of the reactor isolation cooling system that is the water source,
Run the RCIC pump to support the water in the condensate storage tank.
Discharge into the pressure pool to purify the piping, then
A method of operating a cooling system during reactor isolation , comprising injecting water from a condensate storage tank into a reactor pressure vessel .
【請求項2】 請求項1記載の原子炉隔離時冷却系の運
転方法において、RCICポンプの起動後に、復水貯蔵
槽の貯水をサプレッションプールに排水する排水流路の
途中に直列に介在された複数の調節弁を開弁するとき
は、その下流側の調節弁を開弁した後、上記上流側の調
節弁をこの下流側調節弁の開度よりも小さい開度で開弁
し、これらの弁開度差を10%以下に設定することを特
徴とする原子炉隔離時冷却系の運転方法。
2. The method for operating a reactor isolation cooling system according to claim 1, wherein after the RCIC pump is started, a condensate storage tank is connected in series in the middle of a drainage channel for draining the stored water into a suppression pool. When opening a plurality of control valves, after opening the downstream control valve, open the upstream control valve with an opening smaller than the opening of the downstream control valve, A method for operating a reactor isolation cooling system, characterized in that the valve opening difference is set to 10% or less.
【請求項3】 請求項1または2記載の原子炉隔離時冷
却系の運転方法により原子炉隔離時冷却系を自動運転す
る手段を設けたことを特徴する原子炉隔離時冷却系の運
転装置。
3. An operating device for a reactor isolation cooling system, comprising means for automatically operating the reactor isolation cooling system according to the method for operating a reactor isolation cooling system according to claim 1 or 2.
【請求項4】 炉心注入時には復水貯蔵槽を水源とする
一方、その試験時にはサプレッションプールを水源とし
て、RCICポンプを運転する原子炉隔離時冷却系の運
転方法の起動試験において、RCICポンプの運転を停
止させるときは、そのポンプの吐出先を原子炉内からサ
プレッションプールに切り換えてから行なうことを特徴
とする原子炉隔離時冷却系の運転方法。
4. The operation of the RCIC pump in the start-up test of the operating method of the RCIC cooling system in which the RCIC pump is operated while the condensate storage tank is used as the water source during core injection and the suppression pool is used as the water source during the test. The method of operating the reactor isolation cooling system is characterized by switching the discharge destination of the pump from inside the reactor to the suppression pool before shutting down.
【請求項5】 請求項4記載の原子炉隔離時冷却系の運
転方法により原子炉隔離時冷却系を自動運転する手段を
設けたことを特徴とする原子炉隔離時冷却系の運転装
置。
5. An apparatus for operating a reactor isolation cooling system, comprising means for automatically operating the reactor isolation cooling system according to the method for operating a reactor isolation cooling system according to claim 4.
【請求項6】 炉心注入時には復水貯蔵槽を水源とした
水を原子炉圧力容器に注入する一方、起動試験時にはサ
プレッションプールの水をRCICポンプ ら再びサプ
レッションプールに戻す循環運転をする原子炉隔離時冷
却系の運転装置であって、上記原子炉隔離時冷却系の系
統流量を定格よりも少ない所定流量に絞り、この系統配
管内の保有水を復水貯蔵槽からの貯水に置換するために
必要な時間が経過したときに、サプレッションプールに
排水を吐出する側の弁を自動的に閉じ、その後RCIC
ポンプの運転を停止させるインターロック手段を設けた
ことを特徴とする原子炉隔離時冷却系の運転装置。
6. A condensate storage tank was used as a water source during core injection .
While injecting water into the reactor pressure vessel, the water of the suppression pool at startup test RCIC pump or al again substatement
An operation device for a reactor isolation cooling system that performs a circulating operation to return to the recession pool. When the time required to replace the stored water from the water storage tank has elapsed, the valve that discharges wastewater to the suppression pool is automatically closed, and then RCIC
An operating device for a reactor isolation cooling system, characterized by comprising an interlock means for stopping the operation of a pump.
JP11805096A 1996-05-13 1996-05-13 Operating method and apparatus for cooling system during reactor isolation Expired - Fee Related JP3457465B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11805096A JP3457465B2 (en) 1996-05-13 1996-05-13 Operating method and apparatus for cooling system during reactor isolation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11805096A JP3457465B2 (en) 1996-05-13 1996-05-13 Operating method and apparatus for cooling system during reactor isolation

Publications (2)

Publication Number Publication Date
JPH09304574A JPH09304574A (en) 1997-11-28
JP3457465B2 true JP3457465B2 (en) 2003-10-20

Family

ID=14726789

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11805096A Expired - Fee Related JP3457465B2 (en) 1996-05-13 1996-05-13 Operating method and apparatus for cooling system during reactor isolation

Country Status (1)

Country Link
JP (1) JP3457465B2 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9460818B2 (en) 2012-03-21 2016-10-04 Ge-Hitachi Nuclear Energy Americas Llc Low pressure reactor safety systems and methods
CN109555712B (en) * 2018-11-21 2020-08-11 深圳中广核工程设计有限公司 A nuclear power plant main pump integrated verification test device
CN111370151B (en) * 2020-04-14 2024-11-22 上海核工程研究设计院股份有限公司 A passive core cooling system flow resistance test emergency system and its use method
CN112033673B (en) * 2020-09-24 2025-02-14 哈尔滨电气动力装备有限公司 Multifunctional high temperature and high pressure comprehensive testing device
CN116525165A (en) * 2023-04-19 2023-08-01 岭东核电有限公司 Nuclear power plant water supply system isolation valve on-load test control system and method

Also Published As

Publication number Publication date
JPH09304574A (en) 1997-11-28

Similar Documents

Publication Publication Date Title
JP3457465B2 (en) Operating method and apparatus for cooling system during reactor isolation
JP5642091B2 (en) Reactor transient mitigation system
JPS6323519B2 (en)
JP2859990B2 (en) Boiling water reactor equipment
JP2009180526A (en) Fuel pool water supply system
JP2977892B2 (en) System cleaning equipment for boiling water nuclear power plants
KR0121554B1 (en) Nuclear Power Plant Partial Filling Device and Its Operation Method
JP3909973B2 (en) Condensate storage facility and its operation control method
JP2933334B2 (en) Emergency core cooling system of boiling water nuclear power plant and its operation method.
JP2546568B2 (en) Reactor water level control method
JP2001091684A (en) Fuel pool cooling system
JP7062568B2 (en) Water treatment method and water treatment preparation method for nuclear power plants
CN120228075B (en) A method for flushing drum filter level gauge in nuclear power plant
Jiang et al. The Safety Function Design Improvement
JPH0943381A (en) Operation method of residual heat removal system of nuclear reactor
JP3130095B2 (en) Method and apparatus for removing decay heat of boiling water reactor
JP5779117B2 (en) Reactor water pipe cleaning method
JPH1194985A (en) Reactor purification equipment
JP2025171534A (en) Crud reduction device and crud reduction method
JPH10123289A (en) Water supply final piping cleaning method
JP2007187543A (en) Residual heat removal system and operation method thereof
JPH0511097A (en) Method of suppressing deterioration of reactor water quality at reactor startup
JPS6010597B2 (en) Reactor coolant purification system
JPS5933871B2 (en) Site bunker - automatic operation control device
JPS6137593B2 (en)

Legal Events

Date Code Title Description
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20070801

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080801

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090801

Year of fee payment: 6

LAPS Cancellation because of no payment of annual fees