JP3500905B2 - Embankment compaction management method - Google Patents
[go: Go Back, main page]

JP3500905B2 - Embankment compaction management method - Google Patents

Embankment compaction management method

Info

Publication number
JP3500905B2
JP3500905B2 JP9988197A JP9988197A JP3500905B2 JP 3500905 B2 JP3500905 B2 JP 3500905B2 JP 9988197 A JP9988197 A JP 9988197A JP 9988197 A JP9988197 A JP 9988197A JP 3500905 B2 JP3500905 B2 JP 3500905B2
Authority
JP
Japan
Prior art keywords
compaction
density
data
work vehicle
receiving
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP9988197A
Other languages
Japanese (ja)
Other versions
JPH10293027A (en
Inventor
宗一 藤原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP9988197A priority Critical patent/JP3500905B2/en
Publication of JPH10293027A publication Critical patent/JPH10293027A/en
Application granted granted Critical
Publication of JP3500905B2 publication Critical patent/JP3500905B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Navigation (AREA)
  • Position Fixing By Use Of Radio Waves (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、例えばGPSシス
テムを用いた盛土の締固め管理方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for managing embankment compaction using, for example, a GPS system.

【0002】[0002]

【従来の技術】盛土工事において、掘削運搬によって緩
められた土砂を土構造物として必要な強度を得るために
盛土面を均一かつ十分に締固める必要がある。
2. Description of the Related Art In embankment work, it is necessary to uniformly and sufficiently compact the embankment surface in order to obtain the required strength of earth and sand loosened by excavation and transportation as an earth structure.

【0003】締固め度合の管理には、撒き出し厚さ、締
固め回数、締固め機種および締固め速度などの目視によ
る管理と、目視の補助手段として試験による管理方法が
ある。
Controlling the degree of compaction includes visual control of the thickness of sprinkling, the number of compactions, the type of compaction and the compaction speed, and a test method as a visual aid.

【0004】このうち、試験による管理方法としては、
施工面に穴を掘って砂などで置換して体積や重量(密
度)などを求める方法や、締固めた施工箇所の土を掘出
して土の重量を求める方法が通常行われている。
Of these, the management method by the test is as follows:
A method of digging a hole on the construction surface and replacing it with sand or the like to obtain the volume, weight (density), or the like, or a method of digging the soil at the compacted construction site to obtain the weight of the soil are commonly used.

【0005】しかしながら、この試験方法では、以下に
述べる技術的課題があった。
However, this test method has the following technical problems.

【0006】[0006]

【発明が解決しようとする課題】まず、飛行場、道路、
埋立て地およびダムなどの盛土工は平面積がきわめて大
きく、限られた予算内での計測データから全体の品質を
評価するのは難しかった。
[Problems to be Solved by the Invention] First,
The embankment works such as landfills and dams have very large flat areas, and it was difficult to evaluate the overall quality from the measurement data within the limited budget.

【0007】品質管理の評価を向上させるためには、計
測データ数を増す必要があるが、この場合には広大な面
積のために、多くの労力と時間を必要とし、コストアッ
プにつながるものとなっていた。
In order to improve the quality control evaluation, it is necessary to increase the number of measurement data. In this case, however, the large area requires a lot of labor and time, which leads to an increase in cost. Was becoming.

【0008】またこのように多数のサンプリング点で計
測を行ったとしても、一部において締固め不足部分が生
じたり、未転圧の部分があった場合には容易には確認す
ることができず、検査結果の大多数が基準を満たしてい
たとしても施工区域全域を完全に掌握しているとは言え
なかった。
Even if the measurement is carried out at a large number of sampling points in this way, it is not possible to easily confirm if there is a part of insufficient compaction or there is an unrolled pressure part. However, even if the majority of the inspection results meet the criteria, it cannot be said that they completely control the entire construction area.

【0009】ところで、GPSシステムを用いて基準局
に対する移動局の移動方向および移動高さを精密計測す
る方法や、これをモニタ画面上に表示したり、移動軌跡
を記録させるためのディフレンシャルGPS(以下DG
PSという)方式が確立されている。GPS衛星から得
られる信号のうち、民間で使用可能なC/Aコードは単
独では精度が低いものの、このようなDGPS方式を取
ることで、両者間の相対距離を極めて精度良く計測する
ことができる。
By the way, a method for precisely measuring the moving direction and moving height of a mobile station with respect to a reference station using a GPS system, and a differential GPS (for displaying this on a monitor screen or recording a moving track) Below DG
The method called PS) has been established. Of the signals obtained from GPS satellites, the C / A code that can be used by the private sector has low accuracy by itself, but by adopting such a DGPS system, the relative distance between the two can be measured with extremely high accuracy. .

【0010】また、締固め管理の自動化のために、振動
ローラ、タンピングローラなどの転圧作業車に締固め密
度を間接的に計測できるセンサを取付ける方法も最近で
は採用されている。
Further, in order to automate compaction management, a method of attaching a sensor such as a vibrating roller or a tamping roller, which can indirectly measure compaction density to a compaction working vehicle, has been recently adopted.

【0011】この発明は、以上の着眼点に基づきなされ
たものであって、その目的は、移動局としての転圧作業
車の移動軌跡をGPSシステムによりモニタするととも
に、その移動軌跡に応じた締固め度合も管理できるよう
にした盛土の締固め管理方法を提供するものである。
The present invention has been made based on the above-mentioned points of view, and an object thereof is to monitor a movement locus of a compaction work vehicle as a mobile station by means of a GPS system and to make a tightening according to the movement locus. It provides a compaction management method for embankments that can also control the degree of compaction.

【0012】[0012]

【課題を解決するための手段】以上の目的を達成するた
め、本発明のうち請求項1に記載の発明は、ディフレン
シャルGPS方式のGPS受信器を備えた基準局と、基
準局にデータリンクするGPS受信器を備えた移動局と
しての転圧作業車と、転圧作業車の情報を受ける受信局
とからなり、前記転圧作業車には、前記GPS受信器に
加え、締固め密度センサと、センサによって計測された
計測結果を現在位置情報とともに記録する記録手段と、
この記録内容を送信するデータ送信手段を設け、前記受
信局には、記録内容を受信するデータ受信手段と、デー
タ受信手段に接続されて受信データを処理するデータ処
理手段を設け、このデータ処理手段に前記転圧作業車の
移動軌跡とともに、締固めデータを記録、表示させ、前
記GPS受信器による高度計測結果と組み合わせて締固
め度合いを管理することを特徴とするものである。
In order to achieve the above object, the invention according to claim 1 of the present invention is a reference station provided with a GPS receiver of a differential GPS system, and data link to the reference station. It comprises a compaction work vehicle as a mobile station equipped with a GPS receiver, and a reception station for receiving information on the compaction work vehicle. The compaction work vehicle includes a compaction density sensor in addition to the GPS receiver. Recording means for recording the measurement result measured by the sensor together with the current position information,
The data transmitting means for transmitting the recorded content is provided, and the receiving station is provided with the data receiving means for receiving the recorded content and the data processing means connected to the data receiving means for processing the received data. wherein the movement locus of the rolling compaction work vehicle, recorded compaction data, to be displayed on the front
Compact by combining with the altitude measurement result by GPS receiver
It is an feature that you manage the order degree.

【0013】 なお、この発明で言うDGPS方式と
は、予め正確な位置が計測されている基準局において、
受信した各衛星からの疑似距離、時刻情報および軌道デ
ータから誤差成分を検出し、それを補正値として移動局
に送信し、移動局はその値により、移動局の受信器で受
信したGPS信号の補正を行うものである。
Note that the DGPS method referred to in the present invention refers to a reference station whose accurate position is measured in advance,
An error component is detected from the received pseudo range from each satellite, time information, and orbital data, and the error component is transmitted to the mobile station as a correction value. The mobile station uses the value to detect the GPS signal received by the receiver of the mobile station. It is to make a correction.

【0014】したがって、この請求項1記載の発明で
は、受信局側で転圧作業車の移動軌跡、およびその移動
軌跡に沿った全ての締固めデータを把握することができ
る。
Therefore, according to the first aspect of the present invention, the receiving station can grasp the movement locus of the compaction work vehicle and all the compaction data along the movement locus.

【0015】本発明のうち請求項2に記載の発明は、前
記転圧作業車には、予め定められた基準締固め密度に対
する、前記センサの計測結果に応じた実締固め密度を比
較する手段と、実締固め密度が前記基準締固め密度に到
達していない場合、および/または基準密度を越えてい
る場合に、警報出力を発生させる警報発生手段とを備え
たことを特徴とするものである。
According to a second aspect of the present invention, in the compaction work vehicle, means for comparing an actual compaction density according to a measurement result of the sensor with a predetermined standard compaction density. And an alarm generating means for generating an alarm output when the actual compaction density does not reach the reference compaction density and / or exceeds the reference compaction density. is there.

【0016】したがって、この請求項2に記載の発明に
あっては、警報出力に応じて締固めの圧密度合が基準値
に到達しているか否かが転圧作業車を操作運行している
オペレータに直ちに判別でき、規定回数往復による締固
め作業を必ずしもすることなく、次の締固め位置に移動
して作業を継続できる。
Therefore, according to the second aspect of the present invention, whether the compaction compaction density has reached the reference value according to the alarm output or not is the operator operating the compaction work vehicle. Therefore, the work can be continued by moving to the next compaction position without necessarily performing the compaction work by reciprocating the specified number of times.

【0017】[0017]

【発明の実施の形態】以下、本発明の好ましい実施の形
態につき、添付図面を参照して詳細に説明する。
Preferred embodiments of the present invention will now be described in detail with reference to the accompanying drawings.

【0018】図1は本発明方法を実施するためのシステ
ム構成図を示すものである。図において、1は作業敷地
内の適宜位置に配置された基準局、2は作業敷地内の作
業エリアAを走行する移動局としての転圧作業車、3は
作業敷地内にあって、転圧作業車2からのデータを受け
てこのデータを処理する仮設工事事務所の一部に設けた
コントロールルームである。
FIG. 1 shows a system configuration diagram for carrying out the method of the present invention. In the figure, 1 is a reference station arranged at an appropriate position in the work site, 2 is a compaction work vehicle as a mobile station traveling in a work area A in the work site, and 3 is a compaction work in the work site. It is a control room provided in a part of the temporary construction office that receives data from the car 2 and processes this data.

【0019】基準局1は複数のGPS衛星からのGPS
信号を受けるアンテナを含むGPS受信器4と、GPS
受信器4に接続されたデータプロセッサ5、アンテナを
含むデータリンク送信器6およびインターフェイス装置
などからなっており、この基準局1は特に電波ブロッキ
ングなどのないような見晴しの良い位置に配置される。
The reference station 1 is a GPS from a plurality of GPS satellites.
GPS receiver 4 including an antenna for receiving signals, and GPS
The reference station 1 includes a data processor 5 connected to the receiver 4, a data link transmitter 6 including an antenna, an interface device, and the like, and the reference station 1 is arranged at a position with a good view such as no radio wave blocking.

【0020】なお、空港などでは管制塔にDGPS基準
局などを設置している場合あり、このような場所での工
事の場合には、これを基準局1として利用することもで
きる。
In some cases, such as airports, a DGPS reference station or the like is installed in a control tower, and in the case of construction at such a place, this can be used as the reference station 1.

【0021】転圧作業車2には、同図1および図2に示
すように、前記GPS衛星からの信号を受けるアンテナ
を含むGPS受信器7、データプロセッサ8、アンテナ
を含むデータリンク受信器9、およびインターフェイス
装置などからなるDGPS受信装置を備えている。
As shown in FIGS. 1 and 2, the compaction work vehicle 2 includes a GPS receiver 7 including an antenna for receiving signals from the GPS satellites, a data processor 8, and a data link receiver 9 including an antenna. , And a DGPS receiver including an interface device and the like.

【0022】さらに、転圧作業車2には、以上のDGP
S受信装置とともに、締固め密度検出用センサ11を含
む密度測定装置12と、センサ11の検出結果から実締
固め密度に換算するほか、DGPSによりディフレンシ
ャル補正された現在位置座標の取込み、その他の演算処
理を実行するノート型などの小型パソコン13、および
パソコン13に接続されて、これに取入れられた現在位
置座標、締固め密度データを送信するアンテナを含むデ
ータ送信器14とを備えている。
Further, the compaction work vehicle 2 has the above DGP.
Along with the S receiving device, the density measuring device 12 including the compaction density detecting sensor 11 and the detection result of the sensor 11 are converted into the actual compaction density, and the current position coordinates differentially corrected by the DGPS are also taken in, etc. And a data transmitter 14 including an antenna for transmitting the compaction density data and the present position coordinates which are connected to the personal computer 13 and are connected to the personal computer 13. .

【0023】なお、アンテナ類は転圧作業車2の天蓋上
に突出配置され、パソコン13のディスプレイはオペレ
ータの見やすい位置に設置され、センサ11は車体下部
に配置され、その他の機器類は運転席背面に落下防止処
置、防振処置を施した状態で一括配置される。
The antennas are arranged so as to project on the canopy of the compaction work vehicle 2, the display of the personal computer 13 is installed at a position where the operator can easily see, the sensor 11 is arranged at the lower part of the vehicle body, and other devices are in the driver's seat. It is placed all together with the back surface having fall prevention measures and anti-vibration measures.

【0024】コントロールルーム3には、前記データ送
信器14から送られたデータを受信するアンテナを含む
受信器15と、受信器の出力端に接続され、送られたデ
ータを各種ユーザインターフェイスにより加工処理し、
表示、記録するためのデータ処理手段としての大型パソ
コン16、その他プリンタ、あるいはプロッタ、通信モ
デムなどのパソコン付属周辺機器、補助機器一式を備え
ている。
The control room 3 is connected to a receiver 15 including an antenna for receiving the data sent from the data transmitter 14 and an output end of the receiver, and processes the sent data by various user interfaces. Then
A large-sized personal computer 16 as a data processing means for displaying and recording, a printer, a plotter, a peripheral device attached to a personal computer such as a communication modem, and a set of auxiliary devices are provided.

【0025】なお、パソコン13、16同士を双方向通
信可能とするために、転圧作業車2とコントロールルー
ムの双方に送受信器を備えることも可能であり、大型パ
ソコン16側の管理者から、転圧作業車を操作するオペ
レータ側に指示を送ることもできるし、双方に別途無線
通話器を設け、これによって互いに連絡を取合う構成と
しても良い。
It should be noted that it is possible to equip both the compacting work vehicle 2 and the control room with transceivers so that the personal computers 13 and 16 can communicate with each other bidirectionally. It is also possible to send an instruction to the operator who operates the compaction work vehicle, or to separately provide wireless communication devices on both sides and thereby to communicate with each other.

【0026】転圧作業車2としては、振動ローラ、コン
パクションローラなどがある。また、密度測定装置12
は、締固め度合を間接的に計測するもので、以下の測定
装置を用いることができる。
As the compaction work vehicle 2, there are a vibration roller, a compaction roller and the like. Further, the density measuring device 12
Measures indirectly the degree of compaction, and the following measuring device can be used.

【0027】a)RI式水分・密度測定装置 放射性同位元素により密度と水分量を間接的に測定す
る。 b)電磁波式締固め度測定装置 電磁波の速度が、土の含水比と乾燥密度に影響されるこ
とから、その相関関係を予め把握し、間接的に密度の測
定を行う。 c)振動ローラにより振動を加えたときの反力が締固め
状態とともに変化する現象から間接的に密度を測定す
る。この場合加速度計と組合わせて波形(振幅)も計測
することにより精度が上がる。
A) RI-type water / density measuring device The density and water content are indirectly measured by radioisotopes. b) Electromagnetic wave type compaction degree measuring device Since the speed of electromagnetic waves is affected by the water content ratio and dry density of soil, the correlation is grasped in advance and the density is indirectly measured. c) The density is indirectly measured from the phenomenon that the reaction force when vibration is applied by the vibrating roller changes with the compacted state. In this case, the accuracy is improved by measuring the waveform (amplitude) in combination with the accelerometer.

【0028】さらに、以上の各種測定装置とGPS受信
器による高度計測結果を組合わせて用いることもでき
る。GPS受信器では4つ以上のGPS衛星を捕捉する
ことにより、方位に加えて高度もcm単位で検出可能で
あり、以上の測定装置のデータに加え、作業位置での沈
下量などのデータをパソコン16に取込んで解析するこ
とで、前回の高度に対する今回の高度を比較するように
すれば、作業位置における締固め度合をさらに精度良く
管理できる。
Further, the above various measuring devices and the altitude measurement results obtained by the GPS receiver can be used in combination. By capturing four or more GPS satellites, the GPS receiver can detect not only azimuth but also altitude in cm units. In addition to the data from the above measuring devices, data such as the amount of subsidence at the working position can be obtained from a personal computer. If the present altitude is compared with the previous altitude by taking in 16 and analyzing it, the compaction degree at the working position can be managed more accurately.

【0029】以上の構成において、転圧作業車2は所定
長さ往復して転圧しつつ、次の作業場所に移動する作業
を繰返す。
In the above construction, the compaction work vehicle 2 reciprocates for a predetermined length and compacts, and repeats the work of moving to the next work place.

【0030】図3は、その移動軌跡を示すもので、作業
エリアAの出発地点から順次往復動作を繰返し、作業エ
リアAの端まで走行したら次のレーンに移動し、同一動
作を繰返すことで、最終地点までを締固める作業が行わ
れる。この移動軌跡はコントロールセンター3側のパソ
コン16に取入れられ、図の斜線で示すごとく転圧作業
車1の移動軌跡がディスプレイに表示される。
FIG. 3 shows the locus of movement. By repeating the reciprocating operation from the starting point of the work area A, moving to the next lane after traveling to the end of the work area A, the same operation is repeated. Work to compact up to the final point is performed. This movement locus is taken into the personal computer 16 on the control center 3 side, and the movement locus of the compaction work vehicle 1 is displayed on the display as shown by the slanted lines in the figure.

【0031】そして、転圧作業車2の往復回数は、予め
規定回数に定めておくとともに、パソコン13ではその
往復毎に密度測定装置12により計測されたデータを取
込み、予め定められた基準締固め密度に対する前記セン
サ11の計測結果に応じた実締固め密度を比較し、実締
固め密度が基準密度を越えている場合に、警報出力を発
生させる。
The number of reciprocations of the compaction work vehicle 2 is set to a prescribed number in advance, and the personal computer 13 takes in the data measured by the density measuring device 12 for each reciprocation and compacts a predetermined standard. The actual compaction density corresponding to the measurement result of the sensor 11 is compared with the density, and when the actual compaction density exceeds the reference density, an alarm output is generated.

【0032】例えば、パソコン13のディスプレイにこ
の状態を表示させても良いし、音声により例えば「締固
め密度になりました、次にお進みください」などの音声
を出力することもできる。
For example, this state may be displayed on the display of the personal computer 13 or a voice such as "Compact density reached, please proceed next" can be output by voice.

【0033】また、規定往復回数となった場合には、基
準密度に到達していなくても、警報出力が発生され、例
えば音声の場合には「規定回数になりました、次にお進
みください」などの音声が出力される。
When the specified number of round trips is reached, an alarm output is generated even if the reference density has not been reached. For example, in the case of voice, "The specified number of times has been reached, please proceed to the next. Is output.

【0034】以上の作業状況はコントロールセンター3
側のパソコン16に順次取入れられ、その画面上に、図
示省略するが、前記移動軌跡の往復部位毎にその転圧回
数、締固め度合の合否が記録される。
The above-mentioned working conditions are the control center 3
Although not shown, the number of rolling compactions and the pass / fail of the compaction degree are recorded on each screen of the personal computer 16 on one side, although not shown.

【0035】したがって、締固めが良好に行われれば、
規定往復回数に到達しなくとも、次に進んで転圧作業が
できるため、余分な時間を取ることがない。
Therefore, if compaction is performed well,
Even if the specified number of reciprocations is not reached, it is possible to proceed to the next rolling operation, so that no extra time is taken.

【0036】また基準締固め密度に到達していない部位
は直ちにその位置が特定されるため、その位置の土砂の
除去と入替え施工などを直ちに行うことができる。
Further, since the position of the portion that has not reached the standard compaction density is immediately specified, it is possible to immediately perform the removal and replacement work of the earth and sand at that position.

【0037】例えばパソコン16のディスプレイ画面上
において不合格箇所の色表示を変えるなどのユーザイン
ターフェイスを取ることで、簡単にその不合格区域を特
定できる。
For example, by taking a user interface such as changing the color display of the failed portion on the display screen of the personal computer 16, the failed area can be easily specified.

【0038】なお、転圧作業車2は、コントロールセン
ターからのコントロールにより無人で操縦することもで
きることは勿論である。
Of course, the compaction work vehicle 2 can be operated unmanned under the control of the control center.

【0039】[0039]

【発明の効果】以上の説明により明らかなように、本発
明による盛土の締固め管理方法にあっては、転圧作業車
の移動軌跡をGPSシステムによりモニタするととも
に、その移動軌跡に応じた締固め度合も管理できるた
め、従来の測定方法に比べて作業と同時にリアルタイム
でその作業域の検査を行うことができる。また規定往復
によらず、基準を満たしていれば次の締固め箇所に移動
できるため、作業の無駄を省くことができる。さらには
不良個所の早期発見にも極めて有効である。
As is clear from the above description, in the embankment compaction management method according to the present invention, the movement locus of the compaction work vehicle is monitored by the GPS system and the compaction according to the movement locus is performed. Since the degree of compaction can also be controlled, the work area can be inspected in real time at the same time as the work, as compared to the conventional measurement method. Further, regardless of the prescribed round trip, if the standard is satisfied, it is possible to move to the next compaction point, so that waste of work can be eliminated. Furthermore, it is extremely effective for early detection of defective parts.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明方法を実施するためのシステム構成の全
体の概略を示す説明図である。
FIG. 1 is an explanatory diagram showing an overall outline of a system configuration for carrying out a method of the present invention.

【図2】転圧作業車に設けたシステム構成図である。FIG. 2 is a system configuration diagram provided in a compaction work vehicle.

【図3】転圧作業車の移動軌跡を示す模式図である。FIG. 3 is a schematic diagram showing a movement trajectory of a compaction work vehicle.

【符号の説明】[Explanation of symbols]

1 基準局 2 転圧作業車 3 コントロールセンター 4 GPS受信器 6 データリンク用送信器 7 GPS受信器 9 データリンク用受信器 11 締固め密度検出用センサ 13、16 パソコン 14 データ送信器 15 データ受信器 1 reference station 2 compaction work vehicle 3 control center 4 GPS receiver 6 Data link transmitter 7 GPS receiver 9 Data link receiver 11 Compaction density detection sensor 13, 16 PC 14 Data transmitter 15 Data receiver

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 ディフレンシャルGPS方式のGPS
信器を備えた基準局と、基準局にデータリンクするGP
受信器を備えた移動局としての転圧作業車と、転圧作
業車からの情報を受信する受信局とからなり、 前記転圧作業車には、前記GPS受信器に加え、締固め
密度センサと、センサによって計測された計測結果を現
在位置情報とともに記録する記録手段と、この記録内容
を送信するデータ送信手段を設け、 前記受信局には、記録内容を受信するデータ受信手段
と、データ受信手段に接続されて受信されたデータを処
理するデータ処理手段を設け、このデータ処理手段に前
記転圧作業車の移動軌跡とともに、締固めデータを記
録、表示させ、前記GPS受信器による高度計測結果と
組み合わせて締固め度合いを管理することを特徴とする
盛土の締固め管理方法。
1. A GPS receiver of a differential GPS system
A base station equipped with a signal receiver and a GP for data linking to the base station
A compaction work vehicle as a mobile station equipped with an S receiver, and a receiving station for receiving information from the compaction work vehicle, wherein the compaction work vehicle includes compaction density in addition to the GPS receiver. A sensor, a recording unit that records the measurement result measured by the sensor together with the current position information, and a data transmitting unit that transmits the recorded content are provided, and the receiving station includes a data receiving unit that receives the recorded content, and a data receiving unit. A data processing means is provided which is connected to the receiving means and processes the received data. The data processing means records and displays the compaction data together with the movement track of the compaction work vehicle, and the altitude measurement by the GPS receiver. The result and
Compaction management method embankment characterized that you manage compaction degree in combination.
【請求項2】 前記転圧作業車には、予め定められた基
準締固め密度に対する、前記センサの計測結果に応じた
実締固め密度を比較する手段と、実締固め密度が前記基
準締固め密度に到達していない場合、および/または基
準密度を越えている場合に、警報出力を発生させる警報
発生手段とを備えたことを特徴とする請求項1に記載の
盛土の締固め管理方法。
2. A means for comparing an actual compaction density according to a measurement result of the sensor with respect to a predetermined standard compaction density, and the actual compaction density having the actual compaction density of the compaction work vehicle. The embankment compaction management method according to claim 1, further comprising: an alarm generation unit that generates an alarm output when the density has not reached and / or when the density exceeds the reference density.
JP9988197A 1997-04-17 1997-04-17 Embankment compaction management method Expired - Lifetime JP3500905B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP9988197A JP3500905B2 (en) 1997-04-17 1997-04-17 Embankment compaction management method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP9988197A JP3500905B2 (en) 1997-04-17 1997-04-17 Embankment compaction management method

Publications (2)

Publication Number Publication Date
JPH10293027A JPH10293027A (en) 1998-11-04
JP3500905B2 true JP3500905B2 (en) 2004-02-23

Family

ID=14259152

Family Applications (1)

Application Number Title Priority Date Filing Date
JP9988197A Expired - Lifetime JP3500905B2 (en) 1997-04-17 1997-04-17 Embankment compaction management method

Country Status (1)

Country Link
JP (1) JP3500905B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108152840A (en) * 2017-12-27 2018-06-12 江苏徐工信息技术股份有限公司 High Precision Automatic pressure path control system and method based on Big Dipper RN Differential positionings

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090214300A1 (en) * 2005-05-25 2009-08-27 Bjorn Birgisson Devices, systems, and methods for measuring and controlling compactive effort delivered to a soil by a compaction unit
JP5371732B2 (en) * 2009-12-25 2013-12-18 前田建設工業株式会社 Concrete compaction management method
JP5276211B1 (en) * 2012-11-15 2013-08-28 株式会社シーティーエス GNSS receiver mounting device
JP6161475B2 (en) * 2013-09-05 2017-07-12 鹿島建設株式会社 Compaction management method and compaction management system
CN107102344A (en) * 2017-06-15 2017-08-29 国家电网公司 A kind of roller compaction construction auxiliary and operation guidance method and device
JP7246039B2 (en) * 2018-10-22 2023-03-27 大成建設株式会社 MOBILE OBJECT AND GROUND MEASUREMENT METHOD HAVING MEASUREMENT FUNCTION OF GROUND DENSITY OR MOISTURE
JP7086904B2 (en) * 2019-09-05 2022-06-20 日立建機株式会社 Rolling vehicle
JP7529540B2 (en) * 2020-11-02 2024-08-06 株式会社安藤・間 Moisture content measuring device, moisture content estimation formula setting program, and moisture content measuring method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108152840A (en) * 2017-12-27 2018-06-12 江苏徐工信息技术股份有限公司 High Precision Automatic pressure path control system and method based on Big Dipper RN Differential positionings

Also Published As

Publication number Publication date
JPH10293027A (en) 1998-11-04

Similar Documents

Publication Publication Date Title
US6477795B1 (en) Excavator data acquisition and control system and process
JP3908031B2 (en) Embankment rolling pressure management method and apparatus
JP3460224B2 (en) Embankment compaction management system
US8280634B2 (en) Utility mapping and data distribution system and method
JP3500905B2 (en) Embankment compaction management method
JP5371732B2 (en) Concrete compaction management method
JP2772551B2 (en) Comprehensive construction management method
JP2000110111A (en) Vibration roller compaction management device
JP4048799B2 (en) Construction data management system for earthwork
KR101267016B1 (en) Singnal apparatus for the survey of buriedstructures by used gpr unit
White et al. Power-based compaction monitoring using vibratory padfoot roller
JP2002327429A (en) Compaction management method
KR100428692B1 (en) Real-Time Monitoring System for settlement on surface operating Amfirol & GPS & Remote Modem at Wide Large Area
US20250052024A1 (en) A system and method to measure a deformation of a geomaterial portion due to compaction of the geomaterial portion
JP3118173B2 (en) Geodetic system
KR200194862Y1 (en) Uniformity detection apparatus for the survey of buried structures by used gpr system
JP2922832B2 (en) Geodetic system
JP2000136928A (en) Traveling topographic surveying device using GPS
JP2009276254A (en) Buried object locating system
Nazarian et al. New Wave Propagation Devices for Nondestructive Testing of Pavements and Bridge Decks
CN120947472A (en) A portable intelligent optical cable burial depth detector
JPH11337333A (en) Damage position detection device for water-blocking members
JP2002189073A (en) GPS satellite capture status determination system

Legal Events

Date Code Title Description
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20071212

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081212

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091212

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091212

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101212

Year of fee payment: 7

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101212

Year of fee payment: 7

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111212

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121212

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121212

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131212

Year of fee payment: 10

EXPY Cancellation because of completion of term