Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP3501103B2 - Method and apparatus for controlling suspension operation of shipboard crane device - Google Patents
[go: Go Back, main page]

JP3501103B2 - Method and apparatus for controlling suspension operation of shipboard crane device - Google Patents

Method and apparatus for controlling suspension operation of shipboard crane device

Info

Publication number
JP3501103B2
JP3501103B2 JP2000153213A JP2000153213A JP3501103B2 JP 3501103 B2 JP3501103 B2 JP 3501103B2 JP 2000153213 A JP2000153213 A JP 2000153213A JP 2000153213 A JP2000153213 A JP 2000153213A JP 3501103 B2 JP3501103 B2 JP 3501103B2
Authority
JP
Japan
Prior art keywords
hoisting
target
boom
speed
height
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2000153213A
Other languages
Japanese (ja)
Other versions
JP2001335284A (en
Inventor
衛 上島
昭 筒井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kobelco Construction Machinery Co Ltd
Original Assignee
Kobelco Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kobelco Construction Machinery Co Ltd filed Critical Kobelco Construction Machinery Co Ltd
Priority to JP2000153213A priority Critical patent/JP3501103B2/en
Publication of JP2001335284A publication Critical patent/JP2001335284A/en
Application granted granted Critical
Publication of JP3501103B2 publication Critical patent/JP3501103B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/36Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes mounted on road or rail vehicles; Manually-movable jib-cranes for use in workshops; Floating cranes
    • B66C23/52Floating cranes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/18Control systems or devices
    • B66C13/48Automatic control of crane drives for producing a single or repeated working cycle; Program control

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Automation & Control Theory (AREA)
  • Control And Safety Of Cranes (AREA)
  • Jib Cranes (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、台船上に設置され
たクレーン装置による地切り動作や水平引き込み動作等
の吊り動作を制御する方法及び装置に関するものであ
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method and a device for controlling a lifting operation such as a ground cutting operation and a horizontal pulling operation by a crane device installed on a ship.

【0002】[0002]

【従来の技術】従来、クレーン装置による吊り動作を制
御する方法として、例えば特開平8−188379号公
報には、陸上で作業が行われるクレーン装置の地切り動
作を制御するものが開示されている。この方法は、ブー
ムの撓みに起因する作業半径の変化分を検出し、その変
化分を相殺するようにブーム起伏角度を調節することに
より、ブーム先端をなるべく吊荷の真上にシフトして吊
荷を鉛直に地切りできるようにし、その地切りの際の吊
り荷の振れを防ぐようにしたものである。
2. Description of the Related Art Conventionally, as a method for controlling a lifting operation by a crane device, for example, Japanese Patent Application Laid-Open No. 8-188379 discloses a method for controlling a ground cutting operation of a crane device which is operated on land. . This method detects the amount of change in the working radius due to the flexure of the boom and adjusts the boom hoisting angle so as to cancel out the amount of change, thereby shifting the tip of the boom as much as possible just above the suspended load and suspending it. The load can be cut vertically and the swinging load is prevented from swinging during the cut.

【0003】[0003]

【発明が解決しようとする課題】前記陸上クレーン装置
と異なり、船上クレーン装置においては、着水状態にあ
る吊荷を引き上げる地切り動作に伴って吊荷重がクレー
ン装置だけでなく台船全体に徐々に作用していくので、
この吊荷重の変動に起因して当該台船の揺動(ピッチン
グやローリング)が生ずるおそれがある。従って、この
ような船上クレーン装置では、前記公報に示されるよう
なブーム起伏制御を行っても、地切り時の吊荷重の変化
による船体の揺れを有効に防ぐことは困難である。この
ことは、例えばブームを徐々に起こしながら吊荷を水平
方向手前側へ引き込む水平引き込み動作を行う場合につ
いても同様である。
Unlike the above-mentioned land-based crane device, in the on-board crane device, the lifting load gradually increases not only on the crane device but also on the entire pontoon along with the ground cutting operation for lifting the suspended load in the water landing state. As it acts on
Due to the fluctuation of the suspension load, there is a possibility that the ship is rocked (pitching or rolling). Therefore, in such an on-board crane device, it is difficult to effectively prevent the hull from swinging due to a change in the suspension load at the time of ground cutting, even if the boom hoisting control as disclosed in the above publication is performed. This also applies to a case where a horizontal pulling operation is performed in which the suspended load is pulled toward the front side in the horizontal direction while gradually raising the boom.

【0004】なお、特開平8−253193号公報に
は、液体を収納する収納パックを台船に搭載し、作業用
クレーンの挙動により発生する傾斜モーメントを前記収
納パックの重量によって相殺することにより船体の傾斜
を抑止する方法が開示されているが、かかる方法では装
備が大掛かりになり、大幅なコストアップは免れ得な
い。また、この方法によって高い制御応答性を得ること
は困難であり、前記のような地切り作業等に伴う船の揺
れを有効に抑止することは困難である。
In Japanese Patent Application Laid-Open No. 8-253193, a hull is constructed by mounting a storage pack for storing a liquid on a berth and offsetting a tilting moment generated by the behavior of a working crane by the weight of the storage pack. Although a method of suppressing the inclination of the above is disclosed, such a method requires a large amount of equipment, and a significant cost increase cannot be avoided. Further, it is difficult to obtain high control responsiveness by this method, and it is difficult to effectively suppress the sway of the ship due to the above ground cutting work and the like.

【0005】本発明は、このような事情に鑑み、大掛か
りな設備を付加することなく、吊荷の振れ及び船の揺れ
を抑えながら良好な船上クレーン作業を実現できる船上
クレーン装置の吊り動作制御方法及び装置を提供するこ
とを目的とする。
In view of the above circumstances, the present invention is a method for controlling a hoisting operation of a ship crane, which can realize good ship crane work while suppressing swinging of the suspended load and shaking of the ship without adding large-scale equipment. And to provide a device.

【0006】[0006]

【課題を解決するための手段】船上に設置されるクレー
ン装置には、ブームを起伏させる起伏動作と、吊荷の巻
上げ及び巻下げを行う動作(以下、総じて吊荷巻上動作
と称する。)という少なくとも2つの動作要素が存在す
る。従って、これら2つの動作を制御して縦メタセンタ
からブーム先端までの水平距離及びブーム先端高さを適
正な距離及び高さに保つようにすれば、船の揺れを有効
に抑止しながら地切り動作や水平引き込み動作等の吊り
動作を良好に行うことが可能になる。
Means for Solving the Problems In a crane device installed on a ship, a hoisting operation for hoisting a boom and an operation for hoisting and lowering a suspended load (hereinafter, referred to as a suspended load hoisting operation in general). There are at least two motion elements. Therefore, if these two operations are controlled so that the horizontal distance from the vertical metacenter to the boom tip and the boom tip height are maintained at appropriate distances and heights, the ground cutting operation can be effectively suppressed while suppressing the shaking of the ship. It is possible to favorably perform a suspending operation such as a horizontal drawing operation or a horizontal drawing operation.

【0007】本発明は、かかる点に着目してなされたも
のであり、起伏動作するブームとこのブームの先端から
吊り下げられた吊荷を巻き上げる巻上装置とが台船上に
搭載された船上クレーン装置による吊り動作を制御する
方法であって、前記台船の揺れを防ぐための縦メタセン
タからブーム先端までの目標水平距離及び目標ブーム先
端高さを求め、前記目標水平距離を維持するように前記
吊り動作時のブーム起伏角度を調節するとともに、前記
目標ブーム先端高さを維持するように吊荷の巻上速度を
調節するものである。
The present invention has been made by paying attention to such a point, and is a shipboard crane in which a boom that moves up and down and a hoisting device that hoists a suspended load suspended from the tip of the boom are mounted on a ship. A method of controlling a suspending operation by a device, wherein a target horizontal distance from a vertical metacenter for preventing swing of the pontoon and a boom tip end and a target boom tip height are obtained, and the target horizontal distance is maintained. The hoisting angle of the boom during the hoisting operation is adjusted, and the hoisting speed of the hoisted load is adjusted so as to maintain the target boom tip height.

【0008】また本発明は、前記船上クレーン装置によ
る吊り動作を制御する装置であって、前記ブームの先端
位置に相当する値を検出する位置検出手段と、前記台船
の揺れを防ぐための縦メタセンタからブーム先端までの
目標水平距離及び目標ブーム先端高さを演算する目標値
演算手段と、吊り動作時に実際の縦メタセンタからブー
ム先端までの水平距離を演算してその演算値と前記目標
水平距離との偏差を0に近づけるように前記ブーム駆動
手段の駆動を制御するブーム起伏制御手段と、吊り動作
時に実際のブーム先端高さを演算してその演算した高さ
と前記目標ブーム先端高さとの偏差を0に近づけるよう
に前記吊荷の巻上速度を制御する巻上速度制御手段とを
備えたものである。
Further, the present invention is a device for controlling a suspending operation by the above-mentioned ship crane device, which comprises position detecting means for detecting a value corresponding to a tip position of the boom, and a vertical direction for preventing the rocking of the barge. Target value calculating means for calculating the target horizontal distance from the metacenter to the boom tip and the target boom tip height, and the horizontal value from the actual vertical metacenter to the boom tip during the lifting operation to calculate the calculated value and the target horizontal distance. And a boom hoisting control means for controlling the drive of the boom driving means so as to bring the deviation of the boom closer to 0, and the actual height of the boom tip at the time of lifting operation, and the deviation between the calculated height and the target boom tip height. And a hoisting speed control means for controlling the hoisting speed of the suspended load so as to approach 0.

【0009】なお、演算される「水平距離」の値は、そ
の水平距離そのものであってもよいし、この水平距離に
相当するパラメータであってもよい。また、ブーム先端
高さは、縦メタセンタを基準とする座標系で設定される
高さであればよく、当該縦メタセンタからブーム先端高
さまでの垂直距離を用いるようにしてもよいし、その
他、前記縦メタセンタを基準とする座標系において動か
ない要素(例えば台船の浮かぶ水面)を基準とした高さ
であってもよい。
The value of the calculated "horizontal distance" may be the horizontal distance itself or a parameter corresponding to this horizontal distance. Further, the boom tip height may be a height set in a coordinate system with the vertical metacenter as a reference, and the vertical distance from the vertical metacenter to the boom tip height may be used. The height may be based on an element that does not move in the coordinate system that uses the vertical metacenter as a reference (for example, the water surface on which the barge floats).

【0010】前記方法及び装置によれば、ブーム起伏動
作によって縦メタセンタからブーム先端までの水平距離
を、吊荷巻上動作によってブーム先端高さを、それぞれ
適正な距離及び高さに維持する制御が行われ、この制御
によって、台船の揺れ及び吊荷の振れが有効に抑止され
る。すなわち、従来のように大掛かりな設備を付加する
ことなく、吊荷の振れおよび台船自体の揺れを抑止しな
がら安全にクレーンの地切り動作や水平引き込み動作を
行うことができる。
According to the method and apparatus described above, control for maintaining the horizontal distance from the vertical metacenter to the boom tip by the boom hoisting operation and maintaining the boom tip height at the hoisting operation at the proper distance and height, respectively. By this control, the shaking of the barge and the shaking of the suspended load are effectively suppressed. That is, it is possible to safely perform the ground cutting operation and the horizontal pulling operation of the crane while suppressing the swing of the suspended load and the swing of the barge itself without adding large-scale equipment as in the conventional case.

【0011】例えば前記吊り動作が着水状態にある吊荷
を引き上げて離水させる地切り動作である場合、原則と
してブーム先端を動かす必要はないので、その目標水平
距離としては、地切り動作開始直前(すなわち地切りの
ための巻上げ動作が始まる前)の水平距離を設定するよ
うにすればよく、目標ブーム先端高さとしては、前記地
切り動作に伴う船のピッチング角度やローリング角度の
変化にかかわらず実際の水平距離を前記目標水平距離に
近づけるために必要なブーム先端高さを時々刻々演算す
るようにしてやればよい。すなわち、前記目標値演算手
段は、位置検出手段の検出結果に基づいて巻上動作直前
における台船の縦メタセンタからブーム先端までの水平
距離を前記目標水平距離に設定し、かつ、地切り動作中
に縦メタセンタからブーム先端までの水平距離を前記目
標水平距離に近づけるために必要なブーム先端高さを前
記目標ブーム先端高さとして演算するように構成すれば
よい。
For example, in the case where the hoisting operation is a ground cutting operation for lifting a suspended load in the water landing state to separate the water, it is not necessary to move the boom tip in principle, so the target horizontal distance is just before starting the ground cutting operation. The horizontal distance (that is, before starting the hoisting operation for ground cutting) may be set, and the target boom tip height may be set regardless of changes in the pitching angle and rolling angle of the ship accompanying the ground cutting operation. Instead, the boom tip height required to bring the actual horizontal distance closer to the target horizontal distance may be calculated moment by moment. That is, the target value calculating means sets the horizontal distance from the longitudinal metacenter of the pontoon to the boom tip immediately before the hoisting operation to the target horizontal distance based on the detection result of the position detecting means, and during the ground cutting operation. The boom tip height required to bring the horizontal distance from the vertical metacenter to the boom tip closer to the target horizontal distance may be calculated as the target boom tip height.

【0012】前記巻上速度制御手段としては、目標巻上
速度を設定する目標巻上速度設定手段と、実際のブーム
先端高さを前記目標ブーム先端高さに近づけるための巻
上速度補正値を演算する巻上速度補正値演算手段と、こ
の巻上速度補正値演算手段で演算された補正値により前
記目標巻上速度が補正された最終目標巻上速度に基づい
て前記巻上装置による吊荷の巻上速度を調節する巻上速
度調節手段とを備えたものが、好適である。この構成に
よれば、前記巻上速度補正値演算手段で演算された補正
値により目標巻上速度が補正され、この補正後の最終目
標巻上速度に基づいて巻上装置による吊荷の巻上速度が
調節されることにより、実際のブーム先端高さをブーム
先端目標高さに近づけるための巻上速度制御が実現され
る。
As the hoisting speed control means, a target hoisting speed setting means for setting a target hoisting speed and a hoisting speed correction value for making the actual boom tip height close to the target boom tip height are provided. A hoisting speed correction value calculating means for calculating and a hoisting load by the hoisting device based on a final target hoisting speed in which the target hoisting speed is corrected by the correction value calculated by the hoisting speed correction value calculating means. It is preferable to have a hoisting speed adjusting means for adjusting the hoisting speed. According to this structure, the target hoisting speed is corrected by the correction value calculated by the hoisting speed correction value calculating means, and the hoisting device hoists the hoisting load based on the corrected final target hoisting speed. By adjusting the speed, hoisting speed control for bringing the actual boom tip height closer to the boom tip target height is realized.

【0013】ここで、前記目標巻上速度設定手段により
設定される目標値は一定でもよいが、操作者による操作
部材の操作量に応じた値を目標巻上速度に設定するよう
にすれば、操作者の意思を加味しながら、なおかつ、台
船の揺れを抑止する巻上速度制御を行うことができる。
The target value set by the target hoisting speed setting means may be constant, but if the target hoisting speed is set to a value corresponding to the operation amount of the operating member by the operator, It is possible to perform hoisting speed control that suppresses swaying of the pier while taking into consideration the operator's intention.

【0014】前記補正値演算手段としては、実際のブー
ム先端高さが前記目標ブーム先端高さよりも高い場合に
は巻上方向の補正値を演算し、実際のブーム先端高さが
前記目標ブーム先端高さよりも低い場合には巻下方向の
補正値を演算するものが、好適である。
The correction value calculating means calculates a correction value in the hoisting direction when the actual boom tip height is higher than the target boom tip height, and the actual boom tip height is calculated as the target boom tip height. If it is lower than the height, it is preferable to calculate a correction value in the unwinding direction.

【0015】すなわち、実際のブーム先端高さが高すぎ
る場合には、吊荷の巻上速度を巻上方向に補正してブー
ム先端に作用する荷重を増やすことによりブーム先端高
さを低く抑えることができ、実際のブーム先端高さが低
すぎる場合には、吊荷の巻上速度を巻下方向に補正して
ブーム先端に作用する下向き荷重を減らすことによりブ
ーム先端高さを上げることができる。
That is, when the actual boom tip height is too high, the hoisting height of the boom is kept low by correcting the hoisting speed of the suspended load in the hoisting direction to increase the load acting on the boom tip. If the actual height of the boom tip is too low, the boom tip height can be increased by correcting the hoisting speed of the suspended load in the hoisting direction to reduce the downward load that acts on the boom tip. .

【0016】一方、前記吊り動作が吊荷を水平方向に引
き込む水平引き込み動作である場合、その動作は適宜ブ
ームを起伏させることにより行われるので、前記目標値
演算手段としては、前記台船の揺れを防ぎながら水平引
き込み動作を行うための目標ブーム起伏角度を時々刻々
演算する目標起伏角度演算手段と、その目標起伏角度に
基づいてブーム先端位置の目標値を演算する目標位置演
算手段とを備え、その演算された目標位置に基づいて前
記目標水平距離及び目標ブーム先端高さを演算するよう
に構成されたものとすればよい。
On the other hand, when the suspending operation is a horizontal retracting operation for retracting the suspended load in the horizontal direction, the operation is performed by raising and lowering the boom as appropriate, so that the target value calculating means is the swing of the barge. A target hoisting angle calculation means for momentarily calculating a target boom hoisting angle for performing a horizontal retracting operation while preventing the above, and a target position calculation means for calculating a target value of the boom tip position based on the target hoisting angle, The target horizontal distance and the target boom tip height may be calculated based on the calculated target position.

【0017】例えば、ブームの起伏動作を指令するため
の操作部材を備える場合、船の揺れがなければブーム先
端位置は前記操作部材の操作内容に対応した軌跡を描く
はずである。換言すれば、当該軌跡にブーム先端位置が
追従するようにブーム起伏速度を制御すれば、船の揺れ
を避けながら安定した水平引き込み動作を行うことが可
能になる。従って、水平引き込み動作の場合、前記目標
起伏角度演算手段は、ブームの起伏動作を指令するため
の操作部材が操作される前のブーム起伏角度と操作開始
後の当該操作部材の操作内容とに基づいて前記目標ブー
ム起伏角度を演算するものとすればよい。
For example, when the operating member for instructing the hoisting operation of the boom is provided, the boom tip position should draw a locus corresponding to the operation contents of the operating member unless the ship is shaken. In other words, if the boom hoisting speed is controlled so that the boom tip position follows the trajectory, it is possible to perform a stable horizontal pulling operation while avoiding sway of the ship. Therefore, in the case of the horizontal retraction operation, the target hoisting angle calculation means is based on the boom hoisting angle before the operation member for instructing the boom hoisting operation is operated and the operation content of the operation member after the operation is started. The target boom hoisting angle may be calculated.

【0018】また、前記ブーム起伏制御手段としては、
目標ブーム起伏速度を設定する目標起伏速度設定手段
と、縦メタセンタからブーム先端位置までの水平距離を
前記目標水平距離に近づけるためのブーム起伏速度補正
値を演算する起伏速度補正値演算手段と、この起伏速度
補正値演算手段で演算された補正値により前記目標起伏
速度が補正された最終目標起伏速度に基づいて前記ブー
ム駆動手段の駆動によるブーム起伏速度を調節する起伏
速度調節手段とを備えたものが好適である。この構成に
よれば、前記起伏速度補正値演算手段で演算された補正
値により目標起伏速度が補正され、この補正後の最終目
標起伏速度に基づいて巻上装置によるブームの起伏速度
が調節されることにより、実際の縦メタセンタからブー
ム先端までの水平距離を目標水平距離に近づけるための
ブーム起伏制御が実現される。
As the boom up / down control means,
A target hoisting speed setting means for setting a target boom hoisting speed, a hoisting speed correction value calculating means for calculating a boom hoisting speed correction value for bringing the horizontal distance from the vertical metacenter to the boom tip position close to the target horizontal distance, And a hoisting speed adjusting means for adjusting the boom hoisting speed by driving the boom driving means based on the final target hoisting speed in which the target hoisting speed is corrected by the correction value calculated by the hoisting speed correction value calculating means. Is preferred. With this configuration, the target hoisting speed is corrected by the correction value calculated by the hoisting speed correction value calculating means, and the hoisting speed of the boom by the hoisting device is adjusted based on the corrected final target hoisting speed. As a result, boom hoisting control is realized to bring the horizontal distance from the actual vertical metacenter to the boom tip closer to the target horizontal distance.

【0019】一方、前記巻上速度制御手段は、実際の吊
荷高さを演算する吊荷高さ演算手段と、その演算された
吊荷高さの目標吊荷高さに対する偏差を0にするための
巻上速度補正値を演算する水平引き込み用補正値演算手
段とを備え、この水平引き込み用補正値演算手段で演算
された補正値により巻上速度を補正するように構成され
ているものが、より好ましい。この構成によれば、ブー
ム先端高さを目標ブーム先端高さに近づける機能に加え
て、吊られた荷の高さを一定に保ちながらの引き込みを
可能にする機能が加えられる。
On the other hand, the hoisting speed control means sets the suspended load height calculating means for calculating the actual suspended load height and the deviation of the calculated suspended load height from the target suspended load height to zero. And a horizontal pull-in correction value calculating means for calculating a hoisting speed correction value for correcting the hoisting speed by the correction value calculated by the horizontal pull-in correction value calculating means. , And more preferable. According to this configuration, in addition to the function of bringing the height of the boom tip end closer to the target boom tip height, the function of allowing the suspended load to be pulled in while keeping the height constant is added.

【0020】また、前記地切り動作と同様、前記巻上速
度制御手段は、実際のブーム先端高さが前記目標ブーム
先端目標高さよりも高い場合には巻上方向の補正値を演
算し、実際のブーム先端高さが前記目標ブーム先端高さ
よりも低い場合には巻下方向の補正値を演算する巻上速
度補正値演算手段を備え、この巻上速度補正値演算手段
で演算された補正値により巻上速度を補正するように構
成されているものが、好ましい。
Further, similar to the ground cutting operation, the hoisting speed control means calculates a hoisting direction correction value when the actual boom tip height is higher than the target boom tip target height, and actually When the boom tip height is lower than the target boom tip height, hoisting speed correction value calculating means for calculating a correction value in the hoisting direction is provided, and the correction value calculated by the hoisting speed correction value calculating means. The one configured to correct the hoisting speed according to is preferable.

【0021】[0021]

【発明の実施の形態】本発明の好ましい実施の形態を図
面に基づいて説明する。なお、この実施の形態では、船
上クレーン装置の地切り動作と水平引き込み動作の双方
を自動制御できる装置について開示するが、本発明は、
いずれか一方の動作専用に構成されたものであってもよ
い。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENT A preferred embodiment of the present invention will be described with reference to the drawings. In this embodiment, a device capable of automatically controlling both the ground cutting operation and the horizontal pulling operation of the ship crane is disclosed, but the present invention is
It may be configured only for one of the operations.

【0022】図1は、本発明が適用されるクレーン船の
一例を示したものである。図において、台船10の甲板
11上に垂直軸12を中心として旋回可能にクレーン旋
回体14が設置され、このクレーン旋回体14の前部に
水平軸16を中心として回動可能にブーム18が枢支さ
れている。ブーム18の先端にはブーム起伏用ロープ2
0の一端が固定され、他端が前記クレーン旋回体14に
設置されたブーム起伏ドラム22に巻き付けられてい
る。
FIG. 1 shows an example of a crane ship to which the present invention is applied. In the figure, a crane revolving structure 14 is installed on a deck 11 of a barge 10 so as to be pivotable about a vertical shaft 12, and a boom 18 is pivotally mounted at a front part of the crane revolving structure 14 about a horizontal shaft 16. It is pivotally supported. At the tip of the boom 18, the boom roping rope 2
One end of 0 is fixed, and the other end is wound around a boom hoisting drum 22 installed on the crane revolving structure 14.

【0023】このブーム起伏ドラム22には、図2に示
すようなブーム起伏ドラム駆動装置23が連結され、こ
のブーム起伏ドラム駆動装置23によってブーム起伏ド
ラム22が正逆方向に回転駆動されることにより、ブー
ム18が垂直軸16回りに回動する(起伏動作をする)
ようになっている。すなわち、前記ブーム起伏用ロープ
20、ブーム起伏ドラム22、及びブーム起伏ドラム駆
動装置23により、ブーム18を起伏させるブーム駆動
手段が構成されている。
A boom hoisting drum driving device 23 as shown in FIG. 2 is connected to the boom hoisting drum 22, and the boom hoisting drum driving device 23 drives the boom hoisting drum 22 to rotate in the forward and reverse directions. , The boom 18 rotates about the vertical axis 16 (performs an undulating motion)
It is like this. That is, the boom hoisting rope 20, the boom hoisting drum 22, and the boom hoisting drum drive device 23 constitute a boom drive means for hoisting the boom 18.

【0024】ブーム18の先端にはシーブ19が回転可
能に取付けられ、このシーブ19に吊荷巻上ロープ24
が掛けられている。そして、この吊荷巻上ロープ24の
一方の端部(垂下側端部)に荷吊り用のフック26が固
定され、他方の端部が前記クレーン旋回体14に設置さ
れた吊荷巻上ドラム28に巻き付けられている。
A sheave 19 is rotatably attached to the tip of the boom 18, and the hoisting rope 24 is attached to the sheave 19.
Is hung. Then, a hook 26 for hanging a load is fixed to one end portion (end portion on the hanging side) of the suspended load hoist rope 24, and the other end portion thereof is a suspended load hoist drum installed on the crane revolving structure 14. It is wrapped around 28.

【0025】この吊荷巻上ドラム28には、図2に示す
ような吊荷巻上ドラム駆動装置29が連結され、この吊
荷巻上ドラム駆動装置29によって吊荷巻上ドラム28
が正逆方向に回転駆動されることにより、前記フック2
6に吊られた吊荷の巻上げ及び巻下げが行われるように
なっている。すなわち、前記吊荷巻上用ロープ24、吊
荷巻上ドラム28、吊荷巻上ドラム駆動装置29等によ
り、本発明における巻上装置が構成されている。
A suspended load hoisting drum driving device 29 as shown in FIG. 2 is connected to the suspended load hoisting drum 28.
Is rotated in the forward and reverse directions, so that the hook 2
The hanging load hung on 6 is hoisted and unwound. That is, the hoisting rope 24, the hoisting hoisting drum 28, the hoisting hoisting drum driving device 29, and the like constitute the hoisting device of the present invention.

【0026】なお、図1においてGはクレーン装置も含
めた船体の重心、θPは縦メタセンタML回りの台船1
0のピッチング角度、θRは横メタセンタMB回りの台
船10のローリング角度、LMCPは水面から縦メタセン
タMLまでの高さ距離、LMCRは水面から横メタセンタ
MBまでの高さ距離、LSCは重心Gからクレーン旋回中
心までの水平距離、LCBはクレーン旋回中心からブーム
フット(水平軸16の中心)までの水平距離、LBFは水
面からブームフットまでの高さ距離、LBはブーム長
さ、θBは実際のブーム起伏角度である。
In FIG. 1, G is the center of gravity of the hull including the crane device, and θ P is the pontoon 1 around the vertical metacenter ML.
Pitching angle of 0, θ R is the rolling angle of the ship 10 around the horizontal metacenter MB, L MCP is the height distance from the water surface to the vertical metacenter ML, L MCR is the height distance from the water surface to the horizontal metacenter MB, L SC Is the horizontal distance from the center of gravity G to the center of swing of the crane, L CB is the horizontal distance from the center of swing of the crane to the boom foot (center of horizontal axis 16), L BF is the height distance from the water surface to the boom foot, and L B is the boom The length, θ B, is the actual boom undulation angle.

【0027】さらに、この装置では、図2に示すような
操作・検出システム30と、コントローラ40とが搭載
されている。
Further, in this apparatus, an operation / detection system 30 as shown in FIG. 2 and a controller 40 are mounted.

【0028】操作・検出システム30は、吊荷巻上操作
手段31A及びその操作量検出手段31Bと、ブーム起
伏操作手段32A及びその操作量検出手段32Bと、ロ
ーリング角度検出手段32と、ピッチング角度検出手段
33と、ブーム起伏角度検出手段34と、クレーン旋回
角度検出手段35と、ブーム起伏ドラム回転速度検出手
段36Bと、吊荷巻上ドラム回転速度検出手段36Rと
を備えている。
The operation / detection system 30 comprises a hoisting and hoisting operation means 31A and its operation amount detection means 31B, a boom hoisting operation means 32A and its operation amount detection means 32B, a rolling angle detection means 32, and a pitching angle detection. Means 33, boom hoisting angle detection means 34, crane turning angle detection means 35, boom hoisting drum rotation speed detection means 36B, and suspended load hoisting drum rotation speed detection means 36R are provided.

【0029】吊荷巻上操作手段31Aは、操作者により
操作される吊荷巻上操作レバーを備え、操作量検出手段
31Bは当該吊荷巻上操作レバーの操作量を検出してそ
の検出信号をコントローラ40に出力する。また、ブー
ム起伏操作手段32Aは、操作者により操作されるブー
ム起伏操作レバーを備え、操作量検出手段32Bは当該
ブーム起伏操作レバーの操作量を検出してその検出信号
をコントローラ40に出力する。
The suspended load hoisting operation means 31A is provided with a suspended load hoisting operation lever operated by an operator, and the operation amount detection means 31B detects an operation amount of the suspended load hoisting operation lever and outputs a detection signal thereof. Is output to the controller 40. The boom hoisting operation means 32A includes a boom hoisting operation lever operated by an operator, and the operation amount detection means 32B detects an operation amount of the boom hoisting operation lever and outputs a detection signal to the controller 40.

【0030】ローリング角度検出手段32、ピッチング
角度検出手段33、ブーム起伏角度検出手段34、クレ
ーン旋回角度検出手段35は、それぞれ実際のローリン
グ角度θR、ピッチング角度θP、ブーム起伏角度θB
クレーン旋回角度θCを検出するもので、コントローラ
40における後述のブーム先端位置演算部とともに位置
検出手段を構成する。ブーム起伏ドラム回転速度検出手
段36Bはブーム起伏ドラム22の回転速度VBを検出
し、吊荷巻上ドラム回転速度検出手段36Rは吊荷巻上
ドラム28の回転速度VRを検出する。
The rolling angle detecting means 32, the pitching angle detecting means 33, the boom hoisting angle detecting means 34, and the crane turning angle detecting means 35 are respectively an actual rolling angle θ R , pitching angle θ P , boom hoisting angle θ B ,
The crane turning angle θ C is detected, and constitutes a position detecting unit together with a boom tip position calculating unit (described later) in the controller 40. Boom hoisting drum rotation speed detecting means 36B detects the rotational speed V B of the boom hoisting drum 22, the suspended load hoist drum rotation speed detecting means 36R detects the rotational speed V R of the suspended load hoist drum 28.

【0031】一方、コントローラ40は、地切り動作
(着水状態にある吊荷を水上から上方へ離水させる動
作)及び水平引き込み動作(吊り上げた荷を水平方向手
前側へ引き込む動作)に共通の機能として、ブーム先端
位置演算部41、実水平距離演算部41a、目標ブーム
先端位置演算部(目標値演算手段)42、目標水平距離
演算部(目標値演算手段)42a、ブーム起伏ドラム目
標回転速度設定部(目標起伏速度設定手段)43、吊荷
巻上ドラム目標回転速度設定部(目標巻上速度設定手
段)44、ブーム起伏ドラム速度補正値演算部(起伏速
度補正値演算手段)45、吊荷巻上ドラム速度補正値演
算部(巻上速度補正値演算手段)46A、ブーム起伏ド
ラム駆動指令値設定部(起伏速度調節手段)48B、及
び吊荷巻上ドラム駆動指令値設定部(巻上速度調節手
段)48Rを備えている。さらに、水平引き込み動作用
の機能として、ブーム起伏角度記憶部(目標起伏角度演
算手段)50、目標ブーム起伏角度演算部(目標起伏角
度演算手段)51、吊荷高さ位置演算部(吊荷高さ演算
手段)52、目標吊荷高さ位置記憶部53、及び水平引
き込み用吊荷巻上ドラム速度補正値演算部(水平引き込
み用補正値演算手段)46Bを備えている。そして、具
体的に次のような演算制御動作を実行する。
On the other hand, the controller 40 has a function common to the ground cutting operation (an operation of separating a suspended load in the water landing state from above the water) and a horizontal retracting operation (an operation of retracting the suspended load to the front side in the horizontal direction). As a boom tip position calculation unit 41, an actual horizontal distance calculation unit 41a, a target boom tip position calculation unit (target value calculation means) 42, a target horizontal distance calculation unit (target value calculation means) 42a, a boom hoisting drum target rotation speed setting Section (target hoisting speed setting means) 43, hoisting hoist drum target rotation speed setting section (target hoisting speed setting means) 44, boom hoisting drum speed correction value calculation section (hoisting speed correction value calculation means) 45, hoisting load Hoisting drum speed correction value calculation unit (hoisting speed correction value calculation unit) 46A, boom hoisting drum drive command value setting unit (hoisting speed adjustment unit) 48B, and hoisting load hoisting drum drive finger It has value setting portion (winding speed adjusting unit) 48R. Further, as a function for horizontal retracting operation, a boom hoisting angle storage unit (target hoisting angle calculation means) 50, a target boom hoisting angle calculation unit (target hoisting angle calculation means) 51, a suspended load height position calculation unit (suspended load height). (A calculation means) 52, a target suspended load height position storage section 53, and a horizontal draw-in hoisting drum hoisting drum speed correction value calculation section (horizontal draw-in correction value calculation means) 46B. Then, specifically, the following arithmetic control operation is executed.

【0032】A)地切り動作 この地切り動作では、基本的にブームの起伏操作は行わ
れず、吊荷巻上操作が行われるのみである。従って、ブ
ーム起伏操作手段32A及びその操作量検出手段32B
は事実上用いられず、ブーム起伏ドラム目標回転速度設
定部43で設定される目標回転速度は0となる。
A) Ground-cutting operation In this ground-cutting operation, basically, the boom hoisting operation is not performed, but only the suspended load hoisting operation is performed. Therefore, the boom up / down operation means 32A and the operation amount detection means 32B thereof.
Is not actually used, and the target rotation speed set by the boom hoisting drum target rotation speed setting unit 43 is zero.

【0033】ブーム先端位置及び目標ブーム先端位置
の演算 まず、ブーム先端位置演算部41は、地切り動作の開始
前後にわたり、前記ローリング角度検出手段32、ブー
ム先端位置ピッチング角度検出手段33、ブーム起伏角
度検出手段34、及びクレーン旋回角度検出手段35か
ら出力される検出信号に基づいて、三次元直角座標系
X,Y,Zでのブーム先端位置座標(XBT,YBT
BT)を時々刻々演算する。ここで、X軸は船体長手方
向に沿う水平軸、Y軸はX軸に直交する水平軸、Z軸は
垂直軸であり、座標XBTは縦メタセンタMLからブーム
先端位置(正確にはブーム先端のシーブ19による吊荷
巻上ロープ24の支点の位置)までのX軸方向の距離
(水平距離)、座標YBTは縦メタセンタMLからブーム
先端位置までのY軸方向の距離(水平距離)、座標ZBT
は水面からブーム先端位置までのZ軸方向の距離(高さ
距離)であって、これらの座標XBT,YBT,ZBTは次式
(1a)(1b)(1c)により算出される。
Calculation of Boom Tip Position and Target Boom Tip Position First, the boom tip position calculating section 41, before and after the start of the ground cutting operation, the rolling angle detecting means 32, the boom tip position pitching angle detecting means 33, and the boom hoisting angle. Based on the detection signals output from the detection means 34 and the crane turning angle detection means 35, the boom tip position coordinates (X BT , Y BT , in the three-dimensional rectangular coordinate system X, Y, Z).
Z BT ) is calculated every moment. Here, the X-axis is a horizontal axis along the longitudinal direction of the hull, the Y-axis is a horizontal axis orthogonal to the X-axis, the Z-axis is a vertical axis, and the coordinate X BT is from the vertical metacenter ML to the boom tip position (to be exact, the boom tip). The position in the X axis direction (horizontal distance) from the sheave 19 to the position of the fulcrum of the hoisting rope 24, the coordinate Y BT is the distance in the Y axis direction from the vertical metacenter ML to the boom tip position (horizontal distance) Coordinates Z BT
Is the distance (height distance) in the Z-axis direction from the water surface to the boom tip position, and these coordinates X BT , Y BT , and Z BT are calculated by the following equation.
It is calculated by (1a) (1b) (1c).

【0034】[0034]

【数1】 [Equation 1]

【0035】すなわち、ブーム先端位置演算部41は、
各検出手段とともに位置検出手段を構成する。
That is, the boom tip position calculation unit 41
A position detecting means is configured with each detecting means.

【0036】さらに、実水平距離演算部41aは、前記
ブーム先端位置演算部41で求められたX,Y座標に基
づき、実際の縦メタセンタMLからブーム先端位置まで
の水平距離RBTを演算する。この水平距離RBTは、RBT
=√(XBT 2+YBT 2)により与えられる。
Further, the actual horizontal distance calculating section 41a calculates the horizontal distance R BT from the actual vertical metacenter ML to the boom tip position based on the X and Y coordinates obtained by the boom tip position calculating section 41. This horizontal distance R BT is R BT
= √ (X BT 2 + Y BT 2 ).

【0037】一方、吊荷巻上操作量検出手段31Bにお
いては、吊荷巻上操作手段31Aにおける操作レバーの
操作量が時々刻々検出され、コントローラ40に入力さ
れる。そして、吊荷が着水している状態で操作レバーが
巻上方向に操作された時点、すなわち、地切り作業が開
始された時点で、目標ブーム先端位置演算部42は、そ
の直前(すなわち操作レバーが操作される前)に前記ブ
ーム先端位置演算部41で演算されていたXY座標(X
BT,YBT)を目標座標(XBTO,YBTO)に設定し、か
つ、次式により与えられる目標Z座標、すなわち目標ブ
ーム先端高さZBT Oを演算する。
On the other hand, the suspended load hoisting operation amount detecting means 31B
The operating lever of the hanging load hoisting operation means 31A
The operation amount is detected moment by moment and input to the controller 40.
Be done. And the operating lever is
When it is operated in the winding direction, that is, the ground cutting work is started.
At the time of starting, the target boom tip position calculation unit 42
Immediately before (that is, before the operating lever is operated)
XY coordinates (X
BT, YBT) Is the target coordinate (XBTO, YBTO), Or
The target Z coordinate given by
Dome tip height ZBT OIs calculated.

【0038】[0038]

【数2】 [Equation 2]

【0039】ここで、θBAは、地切り動作による吊り荷
重の変動に伴うピッチング角度θPやローリング角度θR
の変化にかかわらず前記実水平距離RBTを目標水平距離
B TOに近づけるのに必要なブーム起伏角度(目標起伏
角度)である。換言すれば、次式で表される水平距離R
BTZOを前記目標水平距離RBTOと等しい値にするブーム
起伏角度である。
Where θBAIs a suspended load due to ground cutting operation
Pitching angle θ due to change in weightPAnd rolling angle θR
The actual horizontal distance RBTThe target horizontal distance
RB TOBoom undulation angle required to get close to
Angle). In other words, the horizontal distance R expressed by the following equation
BTZOIs the target horizontal distance RBTOBoom to equal value
The undulation angle.

【0040】[0040]

【数3】 [Equation 3]

【0041】この目標起伏角度θBAは、前記(数3)及
びRBTZO=RBTOという条件式に基づき、適当な数値計
算法(収束計算法)により算出することができる。そし
て、この算出した目標起伏角度θBAを前記(数2)に代
入することによって、目標ブーム先端高さZBTOを得る
ことができる。
This target undulation angle θ BA can be calculated by an appropriate numerical calculation method (convergence calculation method) based on the conditional expression (Formula 3) and R BTZO = R BTO . Then, the target boom tip height Z BTO can be obtained by substituting the calculated target hoisting angle θ BA into the above (Formula 2).

【0042】その一方で、目標水平距離演算部42a
は、前記目標座標(XBTO,YBTO)に基づき、目標水平
距離RBTOを演算する。この目標水平距離RBTOは、R
BTO=√(XBTO 2+YBTO 2)により与えられる。
On the other hand, the target horizontal distance calculating section 42a
Calculates the target horizontal distance R BTO based on the target coordinates (X BTO , Y BTO ). This target horizontal distance R BTO is R
BTO = √ (X BTO 2 + Y BTO 2 )

【0043】そして、この目標水平距離RBTO及び前記
目標ブーム先端高さZBTOに基づき、次のブーム起伏制
御と吊荷巻上速度制御とが並行して行われる。
Then, based on the target horizontal distance R BTO and the target boom tip height Z BTO , the next boom hoisting control and suspended load hoisting speed control are performed in parallel.

【0044】ブーム起伏制御 前記ブーム起伏ドラム目標回転速度設定部43は、ブー
ム起伏操作手段32Aにおけるブーム起伏操作レバーの
操作量に応じた目標回転速度を設定するものであるが、
この地切り動作ではブーム起伏操作は行われないのでブ
ーム起伏ドラム目標回転速度VBOは0に固定される。従
って、最終的に指令されるブーム起伏ドラム回転速度は
次の速度補正値δVBのみによって決定される。
Boom hoisting control The boom hoisting drum target rotation speed setting unit 43 sets a target rotation speed according to the operation amount of the boom hoisting operation lever in the boom hoisting operation means 32A.
Since the boom hoisting operation is not performed in this ground cutting operation, the boom hoisting drum target rotation speed V BO is fixed at zero. Therefore, the finally commanded boom hoisting drum rotation speed is determined only by the next speed correction value δ VB .

【0045】すなわち、ブーム起伏ドラム速度補正値演
算部45は、前記目標水平距離演算部42aで演算され
た目標水平距離RBTOと、前記実水平距離演算部41a
で演算された実際の水平距離RBTとの偏差ΔRBT(=R
BTO−RBT)を演算し、この偏差ΔRBTを0に近づける
ための起伏ドラム速度補正値δVBを演算する。
That is, the boom hoisting drum speed correction value calculation unit 45 calculates the target horizontal distance R BTO calculated by the target horizontal distance calculation unit 42a and the actual horizontal distance calculation unit 41a.
Deviation ΔR BT (= R from the actual horizontal distance R BT calculated by
BTO- R BT ) is calculated, and the undulating drum speed correction value δ VB for making the deviation ΔR BT closer to 0 is calculated.

【0046】より具体的には、比例微分演算によって前
記偏差ΔRBTに対応する制御量Frを演算し、この制御
量Frに対応する起伏ドラム速度補正値δVBを予め用意
された図3(b)に示すグラフから算出する。このグラ
フに示されるように、制御量Frが正の場合(すなわち
目標水平距離RBTOよりも実際の水平距離RBTの方が小
さい場合)には、ブーム倒伏方向の(すなわち負の)ブ
ーム起伏ドラム速度補正値δVBが設定され、逆に制御量
Frが負の場合(すなわち目標水平距離RBTOよりも実
際の水平距離RBTの方が大きい場合)には、ブーム起立
方向の(すなわち正の)起伏ドラム速度補正値δVBが設
定される。
More specifically, the control amount Fr corresponding to the deviation ΔR BT is calculated by the proportional differential calculation, and the undulating drum speed correction value δ VB corresponding to this control amount Fr is prepared in advance in FIG. ) Calculated from the graph shown in. As shown in this graph, when the control amount Fr is positive (that is, when the actual horizontal distance R BT is smaller than the target horizontal distance R BTO ), the boom undulation in the boom fall direction (that is, negative) is performed. When the drum speed correction value δ VB is set and conversely the control amount Fr is negative (that is, when the actual horizontal distance R BT is larger than the target horizontal distance R BTO ), the boom rising direction (that is, the positive value) is positive. The undulating drum speed correction value δ VB is set.

【0047】そして、ブーム起伏ドラム駆動指令値設定
部48Bは、このブーム起伏ドラム速度補正値δVBをそ
のまま最終のブーム起伏ドラム目標回転速度VBO′に設
定するとともに、この最終目標回転速度VBO′とブーム
起伏ドラム回転速度検出手段36Bによって検出される
実際のブーム起伏ドラム回転速度VBとの偏差ΔVB(=
BO′−VB)を演算し、この偏差ΔVBを0に近づける
ための起伏ドラム駆動指令値SBを演算する。
Then, the boom hoisting drum drive command value setting unit 48B sets this boom hoisting drum speed correction value δ VB as it is to the final boom hoisting drum target rotation speed V BO ′, and this final target rotation speed V BO. ′ ′ And the actual boom hoisting drum rotation speed V B detected by the boom hoisting drum rotation speed detection means 36B, ΔV B (=
V BO ′ −V B ), and the undulating drum drive command value S B for making the deviation ΔV B closer to 0 is calculated.

【0048】より具体的には、比例積分演算によって前
記速度偏差ΔVBに対応する制御量Fsを演算し、この
制御量Fsに対応する起伏ドラム駆動指令値SBを予め
用意された図3(c)に示すグラフから算出する。この
グラフに示されるように、制御量Fsが正の場合(すな
わち目標回転速度VBOよりも実際の回転速度VBの方が
小さい場合)には、ブーム倒伏方向の(すなわち負の)
駆動指令値SBが設定され、制御量Fsが負の場合(すな
わち目標回転速度VBOよりも実際の回転速度VBの方が
大きい場合)には、ブーム起立方向の(すなわち正の)
駆動指令値SBが設定される。
More specifically, the control amount Fs corresponding to the speed deviation ΔV B is calculated by proportional-plus-integral calculation, and the undulating drum drive command value S B corresponding to this control amount Fs is prepared in advance in FIG. It is calculated from the graph shown in c). As shown in this graph, when the control amount Fs is positive (that is, when the actual rotation speed V B is smaller than the target rotation speed V BO ), the boom falls in the boom falling direction (that is, negative).
When the drive command value S B is set and the control amount Fs is negative (that is, when the actual rotation speed V B is higher than the target rotation speed V BO ), the boom is in the upright direction (that is, positive).
The drive command value S B is set.

【0049】このような駆動指令値SBがブーム起伏ド
ラム駆動装置23に入力されることにより、前記水平距
離RBTを前記目標水平距離RBTOに近づけるようなブー
ム起伏制御が実行される。
By inputting such a drive command value S B to the boom hoisting drum driving device 23, boom hoisting control is performed so that the horizontal distance R BT approaches the target horizontal distance R BTO .

【0050】吊荷巻上速度制御 一方、吊荷巻上ドラム目標回転速度設定部44は、操作
量検出手段31Bにより検出される吊荷巻上操作レバー
の操作量に見合った吊荷巻上ドラム目標回転速度VRO
設定する。この設定は、予め用意された図4(a)に示
すグラフに基づいて設定される。
On the other hand, the lifting load hoisting drum target rotation speed setting unit 44 controls the lifting load hoisting drum target rotation speed setting unit 44 to match the operation amount of the lifting load hoisting operation lever detected by the operation amount detecting means 31B. The target rotation speed V RO is set. This setting is set based on the graph shown in FIG.

【0051】一方、吊荷巻上ドラム速度補正値演算部4
6Aは、目標ブーム先端位置演算部42によって演算さ
れるブーム先端目標高さZBTOとブーム先端位置演算部
41によって演算される実際のブーム先端高さZBTとの
偏差ΔZBT(=ZBTO−ZBT)を演算し、この偏差ΔZ
BTを0に近づけるための巻上ドラム速度補正値δVRを演
算する。
On the other hand, the suspended load hoist drum speed correction value calculation unit 4
6A is a deviation ΔZ BT (= Z BTO −) between the boom tip target height Z BTO calculated by the target boom tip position calculation section 42 and the actual boom tip height Z BT calculated by the boom tip position calculation section 41. Z BT ) is calculated and this deviation ΔZ
A hoisting drum speed correction value δ VR for making BT close to 0 is calculated.

【0052】具体的には、比例微分演算によって前記偏
差ΔZBTに対応する制御量Grを演算し、この制御量G
rに対応する吊荷巻上ドラム速度補正値δVRを予め用意
された図4(b)に示すグラフから算出する。このグラ
フに示されるように、制御量Grが正の場合(すなわち
目標高さZBTOよりも実際のブーム先端高さZBTの方が
低い場合)には、吊荷の巻上げに伴うブーム吊荷重の増
大を抑えてブーム高さを確保するために吊荷巻上速度を
減速する方向の(すなわち負の)吊荷巻上ドラム速度補
正値δVRが設定され、逆に制御量Grが負の場合(すな
わち目標高さZ BTOよりも実際のブーム先端高さZBT
方が高い場合)には、前記巻上げに伴うブーム吊荷重の
増大を促進してブーム高さを下げるために吊荷巻上速度
を増速する方向の(すなわち正の)吊荷巻上ドラム速度
補正値δVRが設定される。
Specifically, the deviation is calculated by the proportional derivative calculation.
Difference ΔZBTThe control amount Gr corresponding to is calculated, and this control amount G
Suspended load hoist drum speed correction value δ corresponding to rVRPrepared in advance
It is calculated from the graph shown in FIG. This gra
As shown in FIG. 4, when the control amount Gr is positive (that is,
Target height ZBTOActual boom tip height ZBTIs better
(If low), increase the boom hoisting load due to hoisting of the hoisting load.
In order to suppress the size and secure the boom height, increase the hoisting load hoisting speed.
Suspended load hoist drum speed compensation in the direction of deceleration (ie negative)
Positive value δVRIs set, and conversely, when the control amount Gr is negative (
The target height Z BTOActual boom tip height ZBTof
If it is higher, the boom hoisting load due to the hoisting
Suspended load hoisting speed to promote increase and lower boom height
(Ie positive) hoist hoist drum speed in the direction of increasing
Correction value δVRIs set.

【0053】そして、吊荷巻上ドラム駆動指令値設定部
48Rは、前記吊荷巻上ドラム目標回転速度設定部44
で設定された目標速度VROに前記速度補正値δVRを加え
て補正した値(VRO+δVR)を最終目標回転速度VRO
として演算するとともに、この最終目標回転速度VRO
と、吊荷巻上ドラム回転速度検出手段36Rによって検
出される吊荷巻上ドラム回転速度VRとの偏差ΔVR(=
RO′−VR)を演算し、この偏差ΔVRを0に近づける
ための吊荷巻上ドラム駆動指令値SRを演算する。
The suspended load hoisting drum drive command value setting unit 48R is used to set the suspended load hoisting drum target rotation speed setting unit 44.
A value (V RO + δ VR ) corrected by adding the speed correction value δ VR to the target speed V RO set in step 4 is the final target rotation speed V RO ′.
And the final target rotation speed V RO
When, the deviation [Delta] V R of the suspended load hoist drum rotation speed V R detected by the suspended load hoist drum rotation speed detecting means 36R (=
V RO ′ −V R ) is calculated, and the hanging load hoist drum drive command value S R for making this deviation ΔV R close to 0 is calculated.

【0054】より具体的には、比例積分演算によって前
記速度偏差ΔVRに対応する制御量Gsを演算し、この
制御量Gsに対応する起伏ドラム駆動指令値SRを予め
用意された図4(c)に示すグラフから算出する。この
グラフに示されるように、制御量Fsが正の場合(すな
わち目標回転速度VRO′よりも実際の回転速度VRの方
が小さい場合)には、巻下方向の(すなわち負の)駆動
指令値SRが設定され、制御量Gsが負の場合(すなわ
ち目標回転速度VRO′よりも実際の回転速度VRの方が
大きい場合)には、巻上方向の(すなわち正の)駆動指
令値SBが設定される。
More specifically, the control amount Gs corresponding to the speed deviation ΔV R is calculated by the proportional-plus-integral calculation, and the undulating drum drive command value S R corresponding to the control amount Gs is prepared in advance in FIG. It is calculated from the graph shown in c). As shown in this graph, when the controlled variable Fs is positive (that is, when the actual rotation speed V R is smaller than the target rotation speed V RO ′), the driving in the unwinding direction (that is, negative) is performed. When the command value S R is set and the control amount Gs is negative (that is, when the actual rotation speed V R is larger than the target rotation speed V RO ′), the hoisting direction (that is, positive) drive is performed. The command value S B is set.

【0055】このような駆動指令値SRが吊荷巻上ドラ
ム駆動装置29に入力されることにより、実際のブーム
先端高さZBTを前記ブーム先端目標高さZBTOに近づけ
るような巻上速度制御が実行される。
By inputting such a drive command value S R to the hoisting and hoisting drum driving device 29, hoisting so that the actual boom tip height Z BT approaches the boom tip target height Z BTO . Speed control is executed.

【0056】以上のようにして、ブーム起伏制御と
巻上速度制御とが並行して行われることにより、縦メタ
センタMLからブーム先端位置までの水平距離RBTを当
初の目標水平距離RBTOに近づけながらの地切り動作を
行うことができ、その結果、当該水平距離の変化に起因
する吊荷の振れ、さらには、メタセンタ回りの船体の揺
れを有効に抑止しながら、吊荷を安全に水上から巻き上
げることが可能になる。
As described above, the boom hoisting control and the hoisting speed control are performed in parallel to bring the horizontal distance R BT from the vertical metacenter ML to the boom tip position closer to the initial target horizontal distance R BTO . It is possible to perform the ground cutting operation while keeping the suspended load safely above the water while effectively suppressing the swing of the suspended load due to the change in the horizontal distance and the hull swing around the metacenter. It is possible to wind up.

【0057】B)水平引き込み動作 この水平引き込み動作では、前記地切り動作とは逆に、
ブームの起伏操作が行われるのみで、基本的に吊荷巻上
操作は行われない。従って、吊荷巻上操作手段31A及
びその操作量検出手段31Bは事実上用いられず、吊荷
巻上ドラム目標回転速度設定部44で設定される目標回
転速度VROは0となる。
B) Horizontal pulling operation In this horizontal pulling operation, contrary to the ground cutting operation,
Only the boom hoisting operation is performed, and basically the suspended load hoisting operation is not performed. Therefore, the suspended load hoisting operation means 31A and the operation amount detection means 31B are not used practically, and the target rotation speed V RO set by the suspended load hoisting drum target rotational speed setting unit 44 becomes zero.

【0058】ブーム先端位置及び目標ブーム先端位置
の演算 前記地切り動作と同様、ブーム先端位置演算部41は、
三次元直角座標系X,Y,Zでのブーム先端位置座標
(XBT,YBT,ZBT)を時々刻々演算し、さらに、実水
平距離演算部41aは、前記ブーム先端位置演算部41
で求められたX,Y座標に基づき、実際の縦メタセンタ
MLからブーム先端位置までの水平距離R BTを演算す
る。その演算原理は前述の通りである。
Boom tip position and target boom tip position
Arithmetic Similar to the ground cutting operation, the boom tip position calculation unit 41
Boom tip position coordinates in three-dimensional Cartesian coordinate system X, Y, Z
(XBT, YBT, ZBT) Is calculated from time to time, and
The flat distance calculation unit 41a includes the boom tip position calculation unit 41.
Actual vertical metacenter based on the X and Y coordinates obtained in
Horizontal distance R from ML to boom tip position BTCalculate
It The calculation principle is as described above.

【0059】一方、ブーム起伏操作量検出手段32Bに
おいては、ブーム起伏操作手段32Aにおけるブーム起
伏操作レバーの操作量が時々刻々検出され、コントロー
ラ40に入力される。ここで、水平引き込み作業を目的
として実際にブーム起伏操作が開始された時点で、ブー
ム起伏角度記憶部50は、その時点での実際のブーム起
伏角度θBを基準ブーム起伏角度θBOとして記憶すると
ともに、目標ブーム起伏角度演算部51は、前記基準ブ
ーム起伏角度θBOからのブーム起伏操作レバーの操作内
容に見合ったブーム起伏角度変化量ΔθBを演算し、こ
のブーム起伏角度変化量ΔθBを前記基準ブーム起伏角
度θBOに加算した角度を目標ブーム起伏角度θBAとして
時々刻々演算する。すなわち、オペレータによるブーム
起伏操作レバーの操作に対応したブーム起伏角度を目標
ブーム起伏角度θBAとして設定する。
On the other hand, in the boom hoisting operation amount detecting means 32B, the operation amount of the boom hoisting operating lever in the boom hoisting operating means 32A is detected moment by moment and input to the controller 40. Here, at the time when the boom hoisting operation is actually started for the purpose of horizontal retraction work, the boom hoisting angle storage unit 50 stores the actual boom hoisting angle θ B at that time as the reference boom hoisting angle θ BO . At the same time, the target boom hoisting angle calculation unit 51 calculates a boom hoisting angle change amount Δθ B corresponding to the operation content of the boom hoisting operation lever from the reference boom hoisting angle θ BO, and calculates the boom hoisting angle change amount Δθ B. The angle added to the reference boom hoisting angle θ BO is calculated every moment as the target boom hoisting angle θ BA . That is, the boom hoisting angle corresponding to the operation of the boom hoisting operation lever by the operator is set as the target boom hoisting angle θ BA .

【0060】なお、前記ブーム起伏操作レバーの操作に
より出力される信号は図3(a)に示すように回転速度
指令信号であるため、そのレバー操作量を時間積分する
ことによって前記ブーム起伏角度変化量ΔθBを算出す
ることが可能である。
Since the signal output by the operation of the boom hoisting operation lever is a rotation speed command signal as shown in FIG. 3A, the boom hoisting angle change is obtained by integrating the lever operation amount over time. It is possible to calculate the quantity Δθ B.

【0061】そして、目標ブーム先端位置演算部42
は、前記目標ブーム起伏角度θBAに対応するブーム先端
位置を目標ブーム先端位置(XBTO,YBTO,ZBTO)と
して演算する。この目標ブーム先端位置は次式により求
めることができる。
The target boom tip position calculation unit 42
Calculates the boom tip position corresponding to the target boom hoisting angle θ BA as the target boom tip position (X BTO , Y BTO , Z BTO ). This target boom tip position can be obtained by the following equation.

【0062】[0062]

【数4】 [Equation 4]

【0063】さらに、目標水平距離演算部42aは、前
記目標座標(XBTO,YBTO)に基づき、目標水平距離R
BTOを演算する。この目標水平距離RBTOは、前記地切り
動作と同様、RBTO=√(XBTO 2+YBTO 2)により与えら
れる。
Further, the target horizontal distance calculating section 42a, based on the target coordinates (X BTO , Y BTO ), sets the target horizontal distance R.
Calculate BTO . This target horizontal distance R BTO is given by R BTO = √ (X BTO 2 + Y BTO 2 ) as in the ground cutting operation.

【0064】このようにして求められた目標水平距離R
BTO及び目標ブーム先端高さ(すなわち目標ブーム先端
位置のZ座標値)ZBTOに基づき、次のブーム起伏制御
と吊荷巻上速度制御とが並行して行われる。
The target horizontal distance R thus obtained
Based on the BTO and the target boom tip height (that is, the Z coordinate value of the target boom tip position) Z BTO , the next boom hoisting control and suspended load hoisting speed control are performed in parallel.

【0065】ブーム起伏制御 まず、ブーム起伏ドラム目標回転速度設定部43は、ブ
ーム起伏操作手段32Aにおけるブーム起伏操作レバー
の操作量に応じた目標回転速度VBOを設定する。この設
定は、予め用意された図3(a)に示すグラフに基づい
て設定される。
Boom hoisting control First, the boom hoisting drum target rotation speed setting unit 43 sets the target rotation speed V BO according to the operation amount of the boom hoisting operation lever in the boom hoisting operation means 32A. This setting is set based on the graph shown in FIG. 3A prepared in advance.

【0066】一方、ブーム起伏ドラム速度補正値演算部
45は、前記地切り動作のときと同様にして、目標水平
距離RBTOと実際の水平距離RBTとの偏差ΔRBT(=R
BTO−RBT)を演算し、この偏差ΔRBTを0に近づける
ための起伏ドラム速度補正値δ VBを当該偏差ΔRBTの比
例微分演算及び予め用意された図3(b)に示すグラフ
から算出する。
On the other hand, the boom undulation drum speed correction value calculation unit
45 is the target horizontal level in the same manner as in the ground cutting operation.
Distance RBTOAnd the actual horizontal distance RBTDeviation fromBT(= R
BTO-RBT) Is calculated and this deviation ΔRBTClose to 0
Relief drum speed correction value for VBIs the deviation ΔRBTRatio of
Example Differentiation and graph prepared in advance as shown in FIG. 3 (b)
Calculate from

【0067】そして、ブーム起伏ドラム駆動指令値設定
部48Bは、このブーム起伏ドラム速度補正値δVBを前
記ブーム起伏ドラム目標回転速度設定部43で設定され
たブーム起伏ドラム目標回転速度VBOに加算した値を最
終のブーム起伏ドラム目標回転速度VBO′に設定すると
ともに、前記地切り動作のときと同様にして、この最終
目標回転速度VBO′とブーム起伏ドラム回転速度検出手
段36Bによって検出される実際のブーム起伏ドラム回
転速度VBとの偏差ΔVB(=VBO′−VB)を演算し、
この偏差ΔVBを0に近づけるための起伏ドラム駆動指
令値SBを当該偏差ΔVBの比例微分演算及び予め用意さ
れた図3(c)に示すグラフから算出する。このような
駆動指令値SBがブーム起伏ドラム駆動装置23に入力
されることにより、実際の水平距離RBTを時々刻々演算
される目標水平距離RBTOに追従させるようなブーム起
伏制御が実行される。
The boom hoisting drum drive command value setting unit 48B adds the boom hoisting drum speed correction value δ VB to the boom hoisting drum target rotation speed V BO set by the boom hoisting drum target rotation speed setting unit 43. This value is set as the final boom hoisting drum target rotation speed V BO ′, and the final target rotation speed V BO ′ and the boom hoisting drum rotation speed detecting means 36B are detected in the same manner as in the ground cutting operation. The deviation ΔV B (= V BO ′ −V B ) from the actual boom undulation drum rotation speed V B is calculated,
The deviation [Delta] V B calculates the undulating drum drive command value S B for close to 0 from the graph shown in FIG. 3 that is provided proportional differential operation and advance of the deviation ΔV B (c). By inputting such a drive command value S B to the boom hoisting drum drive device 23, boom hoisting control is performed so that the actual horizontal distance R BT follows the target horizontal distance R BTO calculated momentarily. It

【0068】吊荷巻上速度制御 前述のように、水平引き込み動作では原則として吊荷巻
上操作レバーは操作されないため、吊荷巻上ドラム目標
回転速度VROは0であり、基本的に最終の吊荷巻上ドラ
ム目標回転速度は次の2つの補正値δVR,δVRhによっ
て決定される。
Suspended load hoisting speed control As described above, in principle, the hoisted load hoisting operation lever is not operated in the horizontal retracting operation, so the hoisted load hoisting drum target rotation speed V RO is basically 0, which is basically the final value. The target rotational speed of the hoisted load hoisting drum is determined by the following two correction values δ VR and δ VRh .

【0069】まず、吊荷巻上ドラム速度補正値演算部4
6Aは、前記地切り動作のときと同様にして、目標ブー
ム先端位置演算部42によって演算されるブーム先端目
標高さZBTOとブーム先端位置演算部41によって演算
される実際のブーム先端高さZBTとの偏差ΔZBT(=Z
BTO−ZBT)を演算し、この偏差ΔZBTを0に近づける
ための巻上ドラム速度補正値δVRを前記地切り動作のと
きと同様にして当該偏差ΔZBTの比例微分演算及び予め
用意された図4(b)に示すグラフから算出する。
First, the suspended load hoist drum speed correction value calculation unit 4
6A is a boom tip target height Z BTO calculated by the target boom tip position calculation section 42 and an actual boom tip height Z calculated by the boom tip position calculation section 41, as in the ground cutting operation. the deviation between the BT ΔZ BT (= Z
BTO- Z BT ) is calculated, and the winding drum speed correction value δ VR for making the deviation ΔZ BT closer to 0 is calculated in the same manner as in the ground cutting operation and the proportional differential calculation of the deviation ΔZ BT is prepared in advance. It is calculated from the graph shown in FIG.

【0070】一方、水平引き込み用吊荷巻上ドラム速度
補正値演算部46Bは、水平引き込み動作中に吊荷高さ
を一定に保つための速度補正値δVRhを演算する。その
演算は次のようにして行われる。
On the other hand, the horizontal pull-in hanging load hoisting drum speed correction value calculation section 46B calculates a speed correction value δ VRh for keeping the height of the hanging load constant during the horizontal pulling operation. The calculation is performed as follows.

【0071】吊荷高さ位置演算部52は、水平引き込み
動作時における吊荷高さ位置hrを時々刻々演算する。
この吊荷高さhrは、吊荷のロープ長をL、ロープ掛数
をmとすると、hr=ZBT−L/mによって与えられ、
ロープ長Lは、(総ロープ長)から(ドラムに巻き取ら
れているロープ長)及び(ブームに沿って配されている
ロープ長)を差し引くことによって求められる。そし
て、目標吊荷高さ記憶部50は、水平引き込み動作開始
時の吊荷高さhrを目標吊荷高さhroとして記憶する。
The suspended load height position calculation unit 52 constantly calculates the suspended load height position hr during the horizontal pulling operation.
This suspended load height hr is given by hr = Z BT −L / m, where L is the suspended rope length and m is the number of rope suspensions.
The rope length L is obtained by subtracting (the rope length wound on the drum) and (the rope length arranged along the boom) from the (total rope length). Then, the target hanging load height storage unit 50 stores the hanging load height h r at the start of the horizontal pulling operation as the target hanging load height h ro .

【0072】次に、水平引き込み用吊荷巻上ドラム速度
補正値演算部46Bは、目標吊荷高さhroと実際の吊荷
高さhrとの偏差Δhr(=hro−hr)を演算し、この
偏差Δhrを0に近づけるための水平引き込み用巻上ド
ラム速度補正値δVRhを演算する。
Next, a horizontal pull-in for the suspended load hoist drum speed correction value calculation unit 46B is the target suspended load height h ro the actual suspended load height h r deviation between Δh r (= h ro -h r ) Is calculated, and a horizontal drawing hoisting drum speed correction value δ VRh for approximating this deviation Δh r to 0 is calculated.

【0073】具体的には、比例微分演算によって前記偏
差ΔZBTに対応する制御量Grhを演算し、この制御量G
rhに対応する吊荷巻上ドラム速度補正値δVRhを図5に
示すグラフから算出する。このグラフに示されるよう
に、制御量Grhが正の場合(すなわち目標吊荷高さhro
よりも実際の吊荷高さhrの方が低い場合)には、吊荷
高さを上げるべく吊荷巻上速度を増速する方向の(すな
わち正の)吊荷巻上ドラム速度補正値δVRが設定され、
逆に制御量Grhが負の場合(すなわち目標吊荷高さhro
よりも実際の吊荷高さhrの方が高い場合)には、吊荷
高さを下げるべく巻下げ方向の(すなわち負の)吊荷巻
上ドラム速度補正値δVRhが設定される。
Specifically, the control amount Grh corresponding to the deviation ΔZ BT is calculated by the proportional derivative calculation, and the control amount Grh is calculated.
The suspended load hoist drum speed correction value δ VRh corresponding to rh is calculated from the graph shown in FIG. As shown in this graph, when the controlled variable Grh is positive (that is, the target suspended load height h ro
When the actual suspended load height h r is lower than that), the suspended load hoisting drum speed correction value in the direction of increasing the suspended load hoisting speed to increase the suspended load height (that is, a positive value) δ VR is set,
Conversely, when the control amount Grh is negative (that is, the target suspended load height h ro
When the actual suspended load height h r is higher than the actual suspended load height h r ), the suspended load hoist drum speed correction value δ VRh in the unwinding direction (that is, the negative direction) is set in order to lower the suspended load height.

【0074】そして、吊荷巻上ドラム駆動指令値設定部
48Rは、前記目標巻上速度VRO=0)に前記ブーム高
さ調節用の速度補正値δVR及び吊荷高さ調節用の水平引
き込み用速度補正値δVRhを加えて補正した値(0+δ
VR+δVRh)を最終目標回転速度VRO′として演算する
とともに、この最終目標回転速度VRO′と、吊荷巻上ド
ラム回転速度検出手段36Rによって検出される吊荷巻
上ドラム回転速度VRとの偏差ΔVR(=VRO′−VR
を演算し、この偏差ΔVRを0に近づけるための吊荷巻
上ドラム駆動指令値SRを前記地切り動作のときと同様
にして当該偏差ΔVRの比例微分演算及び図4(c)の
グラフを用いて演算する。このような駆動指令値SR
吊荷巻上ドラム駆動装置29に入力されることにより、
実際のブーム先端高さZBTを前記ブーム先端目標高さZ
BTOに近づけながら、なおかつ、吊荷高さhrを一定に保
つための巻上速度制御が実行される。
Then, the hanging load hoist drum drive command value setting unit 48R sets the target hoisting speed V RO = 0) to the speed correction value δ VR for adjusting the boom height and the horizontal value for adjusting the height of the hanging load. Value corrected by adding the velocity correction value δ VRh for pull-in (0 + δ
VR + δ VRh) a 'as well as operation as, the final target speed V RO' final target speed V RO and, suspended load hoist drum is detected by the suspended load hoist drum rotation speed detecting means 36R rotational speed V R deviation ΔV R of the (= V RO '-V R)
Is calculated, and the hanging load hoisting drum drive command value S R for bringing the deviation ΔV R close to 0 is calculated in the same manner as in the ground cutting operation and the proportional differential calculation of the deviation ΔV R and the operation shown in FIG. Calculate using a graph. By inputting such a drive command value S R into the lifting load hoist drum driving device 29,
The actual boom tip height Z BT is the boom tip target height Z
While close to the BTO, yet, hoist speed control for maintaining the suspended load height h r constant is performed.

【0075】以上のようにして、ブーム起伏制御と
巻上速度制御とが並行して行われることにより、縦メタ
センタMLからブーム先端位置までの水平距離RBTを、
ブーム起伏操作レバーの操作に対応した水平距離(目標
水平距離)RBTOに追従させることができる。換言すれ
ば、船が静止した状態でブーム先端位置が描くべき軌跡
に実際のブーム先端位置を沿わせるような制御を行いな
がらの水平引き込み動作を行うことができ、その結果、
前記水平距離変化の乱れに起因する吊荷の振れ、さらに
は、メタセンタ回りの船体の揺れを有効に抑止しなが
ら、吊荷を安全に手前側へ引き込むことが可能になる。
As described above, since the boom hoisting control and the hoisting speed control are performed in parallel, the horizontal distance R BT from the vertical metacenter ML to the boom tip position is
It is possible to follow the horizontal distance (target horizontal distance) R BTO corresponding to the operation of the boom hoisting operation lever. In other words, the horizontal retraction operation can be performed while controlling the actual boom tip position to follow the trajectory of the boom tip position while the ship is stationary.
It is possible to safely pull in the suspended load toward the front side while effectively suppressing the swing of the suspended load caused by the disturbance of the change in the horizontal distance, and further the swing of the hull around the metacenter.

【0076】なお、この水平引き込み動作において吊荷
を正確に水平移動させる必要がない場合(すなわち吊荷
高さを正確に一定に保つ必要がない場合)には、水平引
き込み用吊荷巻上ドラム速度補正値δVRhの演算を省略
することが可能である。
When it is not necessary to accurately move the suspended load horizontally in this horizontal retracting operation (that is, when it is not necessary to keep the suspended load height exactly constant), the suspended load hoisting drum for horizontal retracting is performed. It is possible to omit the calculation of the velocity correction value δ VRh .

【0077】その他、本発明は例として次のような実施
形態をとることも可能である。
In addition, the present invention can take the following embodiments as examples.

【0078】(1) 前記実施形態では、水面を基準にブ
ーム先端高さZBTを設定した例を示したが、ブーム先端
高さZBTの基準位置は自由に設定可能であり、基本的に
縦メタセンタMLとの相対的な高さ位置を特定できる値
であればよい。例えば縦メタセンタMLからの垂直距離
をブーム先端高さとして用いるようにしてもよい。
(1) In the above embodiment, an example in which the boom tip height Z BT is set on the basis of the water surface is shown, but the reference position of the boom tip height Z BT can be set freely, and basically, Any value may be used as long as it is possible to specify the height position relative to the vertical metacenter ML. For example, the vertical distance from the vertical metacenter ML may be used as the boom tip height.

【0079】(2) 前記実施形態では、地切り動作時に
吊荷巻上操作手段31Aにおける操作レバーの操作量に
応じて吊荷巻上ドラム目標回転速度(すなわち目標巻上
速度)が設定されるものを示したが、この目標巻上速度
は一定にしてもよい。例えば、運転室内に地切り作業指
令ボタンを設けてこのボタンが操作されたときに前記一
定の目標巻上速度に基づいて自動的に地切り制御が行わ
れるようにし、吊荷がある程度水上から離れた時点から
操作レバーによって巻上及び巻下操作が可能となるよう
に構成してもよい。
(2) In the above-described embodiment, the hoisting load hoisting drum target rotation speed (that is, the target hoisting speed) is set in accordance with the operation amount of the operation lever in the hoisting load hoisting operation means 31A during the ground cutting operation. Although the target hoisting speed is shown, the target hoisting speed may be constant. For example, a ground cutting work command button is provided in the driver's cab, and when this button is operated, ground cutting control is automatically performed based on the constant target hoisting speed, and the suspended load is separated from the water to some extent. It may be configured such that the winding operation and the winding operation can be performed by the operation lever from the point of time.

【0080】また逆に、水平引き込み動作時における目
標ブーム起立速度を一定にすることも可能である。例え
ば、運転室内に水平引き込み作業指令ボタンを設けてこ
のボタンが操作されたときに前記一定のブーム起立速度
に基づいて水平引き込み制御が行われるようにしてもよ
い。
On the contrary, it is possible to make the target boom rising speed constant during the horizontal pulling operation. For example, a horizontal retraction operation command button may be provided in the driver's cab, and when the button is operated, the horizontal retraction control may be performed based on the constant boom rising speed.

【0081】(3) 本発明では、ブーム駆動手段の具体
的な構成を問わず、前記のようなブーム起伏ドラム22
及びブーム起伏用ロープ20の組み合わせの他、例えば
油圧シリンダを使用してもよい。
(3) In the present invention, the boom hoisting drum 22 as described above is used regardless of the specific structure of the boom driving means.
In addition to the combination of the boom hoisting rope 20, a hydraulic cylinder, for example, may be used.

【0082】[0082]

【発明の効果】以上のように本発明は、台船の揺れを防
ぐための縦メタセンタからブーム先端までの目標水平距
離及び目標ブーム先端高さを求め、前記目標水平距離を
維持するように前記吊り動作時のブーム起伏角度を調節
するとともに、前記目標ブーム先端高さを維持するよう
に吊荷の巻上速度を調節するものであるので、大掛かり
な設備を付加することなく、吊荷の振れ及び船の揺れを
抑えながら良好な船上クレーン作業ができる効果があ
る。
As described above, according to the present invention, the target horizontal distance from the vertical metacenter to the boom tip and the target boom tip height for preventing the sway of the pontoon are obtained, and the target horizontal distance is maintained so as to maintain the target horizontal distance. Since the hoisting angle of the boom is adjusted during the hoisting operation and the hoisting speed of the hoisting load is adjusted so as to maintain the target boom tip height, swinging of the hoisting load is possible without adding large-scale equipment. Also, there is an effect that good ship crane work can be performed while suppressing the sway of the ship.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の実施の形態にかかる台船及びこれに搭
載されたクレーン装置の全体正面図及び側面図である。
FIG. 1 is an overall front view and side view of a barge and a crane device mounted thereon according to an embodiment of the present invention.

【図2】前記クレーン装置の吊り動作制御装置を示すブ
ロック図である。
FIG. 2 is a block diagram showing a suspension operation control device of the crane device.

【図3】(a)は前記吊り動作制御装置においてブーム
起伏ドラム目標回転速度を演算するために用いられるグ
ラフ、(b)は同装置において起伏ドラム回転速度補正
値を演算するために用いられるグラフ、(c)は同装置
において起伏ドラム駆動指令値を設定するために用いら
れるグラフである。
3A is a graph used for calculating a boom hoisting drum target rotation speed in the suspension operation control device, and FIG. 3B is a graph used for calculating a hoisting drum rotation speed correction value in the device. , (C) are graphs used to set the undulating drum drive command value in the same apparatus.

【図4】(a)は前記吊り動作制御装置において吊荷巻
上ドラム目標回転速度を演算するために用いられるグラ
フ、(b)は同装置において吊荷巻上ドラム速度補正値
を演算するために用いられるグラフ、(c)は同装置に
おいて吊荷巻上ドラム駆動指令値を設定するために用い
られるグラフである。
FIG. 4A is a graph used for calculating a hoisting load hoisting drum target rotation speed in the hoisting operation control device, and FIG. 4B is for calculating a hoisting load hoisting drum speed correction value in the device. And (c) is a graph used to set a suspended load hoisting drum drive command value in the same device.

【図5】前記吊り動作制御装置において水平引き込み用
吊荷巻上ドラム速度補正を演算するための用いられるグ
ラフである。
FIG. 5 is a graph used for calculating a horizontal hoisting load hoisting drum speed correction in the hoisting operation control device.

【符号の説明】[Explanation of symbols]

10 台船 14 クレーン旋回体 18 ブーム 20 ブーム起伏用ロープ(ブーム駆動手段を構成) 22 ブーム起伏ドラム(ブーム駆動手段を構成) 23 ブーム起伏ドラム駆動装置(ブーム駆動手段を構
成) 24 吊荷巻上用ロープ(巻上装置を構成) 28 吊荷巻上ドラム(巻上装置を構成) 29 吊荷巻上ドラム駆動装置(巻上装置を構成) 32 ローリング角度検出手段(位置検出手段を構成) 33 ピッチング角度検出手段(位置検出手段を構成) 34 ブーム起伏角度検出手段(位置検出手段を構成) 35 クレーン旋回角度検出手段(位置検出手段を構
成) 40 コントローラ 41 ブーム先端位置演算部(位置検出手段を構成) 41a 実水平距離演算部(ブーム起伏制御手段を構
成) 42 目標ブーム先端位置演算部(目標値演算手段) 42a 目標水平距離演算部(目標値演算手段) 43 ブーム起伏ドラム目標回転速度設定部(目標起伏
速度設定手段) 44 吊荷巻上ドラム目標回転速度設定部(目標巻上速
度設定手段) 45 ブーム起伏ドラム速度補正値演算部(起伏速度補
正値演算手段) 46A 吊荷巻上ドラム速度補正値演算部(巻上速度補
正値演算手段) 46B 水平引き込み用吊荷巻上ドラム速度補正値演算
部(水平引き込み用補正値演算手段) 48B ブーム起伏ドラム駆動指令値設定部(起伏速度
調節手段) 48R 吊荷巻上ドラム駆動指令値設定部(巻上速度調
節手段)
10 Ship 14 Crane revolving structure 18 Boom 20 Boom hoisting rope (composing boom driving means) 22 Boom hoisting drum (composing boom driving means) 23 Boom hoisting drum driving device (composing boom driving means) 24 Hoisting load Rope (constituting a hoisting device) 28 Suspended load hoisting drum (constituting a hoisting device) 29 Lifting load hoisting drum driving device (constituting a hoisting device) 32 Rolling angle detecting means (constituting a position detecting means) 33 Pitching angle detecting means (constituting position detecting means) 34 Boom hoisting angle detecting means (constituting position detecting means) 35 Crane turning angle detecting means (constituting position detecting means) 40 Controller 41 Boom tip position calculating section (representing position detecting means) Configuration) 41a Actual horizontal distance calculation unit (configures boom up / down control means) 42 Target boom tip position calculation unit (target value calculation means) 42a Target horizontal distance calculation unit (target value calculation means) 43 Boom hoisting drum target rotation speed setting unit (target hoisting speed setting means) 44 Suspended load hoisting drum target rotation speed setting unit (target hoisting speed setting means) 45 Boom hoisting Drum speed correction value calculation unit (raising / lowering speed correction value calculation unit) 46A Suspended load hoisting drum speed correction value calculation unit (Hoisting speed correction value calculation unit) 46B Horizontal retraction suspended load hoisting drum speed correction value calculation unit (horizontal) Retracting correction value computing means) 48B Boom hoisting drum drive command value setting section (hoisting speed adjusting means) 48R Suspended load hoisting drum drive command value setting section (hoisting speed adjusting means)

───────────────────────────────────────────────────── フロントページの続き (56)参考文献 特開 平8−188379(JP,A) 特開 昭62−8992(JP,A) 特開 平10−227042(JP,A) 特開 昭63−37095(JP,A) 特開 平8−295488(JP,A) 実開 昭62−26383(JP,U) (58)調査した分野(Int.Cl.7,DB名) B66C 23/00 B66C 13/22 B66C 13/52 ─────────────────────────────────────────────────── --Continued from the front page (56) Reference JP-A-8-188379 (JP, A) JP-A-62-8992 (JP, A) JP-A-10-227042 (JP, A) JP-A-63- 37095 (JP, A) JP-A-8-295488 (JP, A) Actually developed 62-26383 (JP, U) (58) Fields investigated (Int.Cl. 7 , DB name) B66C 23/00 B66C 13 / 22 B66C 13/52

Claims (11)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 起伏動作するブームとこのブームの先端
から吊り下げられた吊荷を巻き上げる巻上装置とが台船
上に搭載された船上クレーン装置による吊り動作を制御
する方法であって、前記台船の揺れを防ぐための縦メタ
センタからブーム先端までの目標水平距離及び目標ブー
ム先端高さを求め、前記目標水平距離を維持するように
前記吊り動作時のブーム起伏角度を調節するとともに、
前記目標ブーム先端高さを維持するように吊荷の巻上速
度を調節することを特徴とする船上クレーン装置の吊り
動作制御方法。
1. A method of controlling a hoisting operation by an on-board crane device mounted on a ship, comprising: a hoisting boom and a hoisting device for hoisting a suspended load suspended from a tip of the boom. Obtaining the target horizontal distance from the vertical metacenter to prevent the ship from swinging to the boom tip and the target boom tip height, and adjusting the boom undulation angle during the lifting operation to maintain the target horizontal distance,
A hoisting operation control method for an on-board crane device, wherein hoisting speed of a hoisting load is adjusted so as to maintain the target boom tip height.
【請求項2】 起伏動作するブームと、このブームを起
伏方向に駆動するブーム駆動手段と、このブームの先端
から吊り下げられた吊荷を巻き上げる巻上装置とが台船
上に搭載された船上クレーン装置による吊り動作を制御
する装置であって、前記ブームの先端位置に相当する値
を検出する位置検出手段と、前記台船の揺れを防ぐため
の縦メタセンタからブーム先端までの目標水平距離及び
目標ブーム先端高さを演算する目標値演算手段と、吊り
動作時に実際の縦メタセンタからブーム先端までの水平
距離を演算してその演算値と前記目標水平距離との偏差
を0に近づけるように前記ブーム駆動手段の駆動を制御
するブーム起伏制御手段と、吊り動作時に実際のブーム
先端高さを演算してその演算した高さと前記目標ブーム
先端高さとの偏差を0に近づけるように前記吊荷の巻上
速度を制御する巻上速度制御手段とを備えたことを特徴
とする船上クレーン装置の吊り動作制御装置。
2. An on-board crane in which a boom that hoists and lowers, a boom driving means that drives the boom in the hoisting direction, and a hoisting device that hoists a suspended load suspended from the tip of the boom are mounted on a carrier. A device for controlling a suspending operation by a device, the position detecting means detecting a value corresponding to a tip position of the boom, and a target horizontal distance from a vertical metacenter to a boom tip for preventing the rocking of the barge and a target. The target value calculating means for calculating the boom tip height and the boom so that the horizontal distance from the actual vertical metacenter to the boom tip during the lifting operation is calculated and the deviation between the calculated value and the target horizontal distance approaches zero. The boom up-and-down control means for controlling the drive of the drive means and the actual boom tip height during the lifting operation are calculated, and the deviation between the calculated height and the target boom tip height is calculated. A hoisting speed control device for controlling a hoisting speed of the hoisted load so as to approach 0, and a hoisting operation control device for an on-board crane device.
【請求項3】 請求項2記載の船上クレーン装置の吊り
動作制御装置において、前記吊り動作は着水状態にある
吊荷を引き上げて離水させる地切り動作であり、前記目
標値演算手段は、位置検出手段の検出結果に基づいて巻
上動作直前における台船の縦メタセンタからブーム先端
までの水平距離を前記目標水平距離に設定し、かつ、地
切り動作中に縦メタセンタからブーム先端までの水平距
離を前記目標水平距離に近づけるために必要なブーム先
端高さを前記目標ブーム先端高さとして演算することを
特徴とする船上クレーン装置の吊り動作制御装置。
3. The hoisting operation control device for an on-board crane apparatus according to claim 2, wherein the hoisting operation is a ground cutting operation for pulling up a suspended load in a watering state to separate the water, and the target value computing means is configured to position the position. Based on the detection result of the detection means, the horizontal distance from the vertical metacenter of the ship to the boom tip immediately before the hoisting operation is set to the target horizontal distance, and the horizontal distance from the vertical metacenter to the boom tip during the ground cutting operation. A boom operation height control device for a ship crane, wherein a boom tip height required to bring the target boom distance closer to the target horizontal distance is calculated as the target boom tip height.
【請求項4】 請求項3記載の船上クレーン装置の吊り
動作制御装置において、前記巻上速度制御手段は、目標
巻上速度を設定する目標巻上速度設定手段と、実際のブ
ーム先端高さを前記目標ブーム先端高さに近づけるため
の巻上速度補正値を演算する巻上速度補正値演算手段
と、この巻上速度補正値演算手段で演算された補正値に
より前記目標巻上速度が補正された最終目標巻上速度に
基づいて前記巻上装置による吊荷の巻上速度を調節する
巻上速度調節手段とを備えたことを特徴とする船上クレ
ーン装置の吊り動作制御装置。
4. The hoisting operation control device for an on-board crane device according to claim 3, wherein the hoisting speed control means sets a target hoisting speed setting means for setting a target hoisting speed and an actual boom tip height. A hoisting speed correction value calculating means for calculating a hoisting speed correction value for approaching the target boom tip height, and the target hoisting speed is corrected by the correction value calculated by the hoisting speed correction value calculating means. And a hoisting speed adjusting means for adjusting the hoisting speed of the hoisting load by the hoisting device based on the final target hoisting speed.
【請求項5】 請求項4記載の船上クレーン装置の吊り
動作制御装置において、前記目標巻上速度設定手段は操
作者による操作部材の操作量に応じた値を目標巻上速度
に設定することを特徴とする船上クレーン装置の吊り動
作制御装置。
5. The hoisting operation control device for an on-board crane apparatus according to claim 4, wherein the target hoisting speed setting means sets the target hoisting speed to a value corresponding to an operation amount of an operating member by an operator. A characteristic control device for hoisting cranes on board.
【請求項6】 請求項4または5記載の船上クレーン装
置の吊り動作制御装置において、前記巻上速度補正値演
算手段は、実際のブーム先端高さが前記目標ブーム先端
目標高さよりも高い場合には巻上方向の補正値を演算
し、実際のブーム先端高さが前記目標ブーム先端高さよ
りも低い場合には巻下方向の補正値を演算することを特
徴とする船上クレーン装置の吊り動作制御装置。
6. The hoisting motion control device for an on-board crane device according to claim 4 or 5, wherein the hoisting speed correction value calculation means is configured to operate when the actual boom tip end height is higher than the target boom tip end target height. Calculates a correction value in the hoisting direction, and calculates a correction value in the hoisting direction when the actual boom tip height is lower than the target boom tip height. apparatus.
【請求項7】 請求項2記載の船上クレーン装置の吊り
動作制御装置において、前記吊り動作は吊荷を水平方向
に引き込む水平引き込み動作であり、前記目標値演算手
段は、前記台船の揺れを防ぎながら水平引き込み動作を
行うための目標ブーム起伏角度を時々刻々演算する目標
起伏角度演算手段と、その目標起伏角度に基づいてブー
ム先端位置の目標値を演算する目標位置演算手段とを備
え、その演算された目標位置に基づいて前記目標水平距
離及び目標ブーム先端高さを演算するように構成されて
いることを特徴とする船上クレーン装置の吊り動作制御
装置。
7. The hoisting operation control device for an on-board crane apparatus according to claim 2, wherein the hoisting operation is a horizontal pulling-in operation for pulling a suspended load in a horizontal direction, and the target value calculation means causes the rocking of the pontoon. A target hoisting angle calculation means for momentarily calculating a target boom hoisting angle for performing a horizontal retracting operation while preventing, and a target position calculation means for calculating a target value of the boom tip position based on the target hoisting angle are provided. A hoisting operation control device for an on-board crane device, which is configured to calculate the target horizontal distance and the target boom tip height based on the calculated target position.
【請求項8】 請求項7記載の船上クレーン装置の吊り
動作制御装置において、前記目標起伏角度演算手段は、
ブームの起伏動作を指令するための操作部材が操作され
る前のブーム起伏角度と操作開始後の当該操作部材の操
作内容とに基づいて前記目標ブーム起伏角度を演算する
ことを特徴とする船上クレーン装置の吊り動作制御装
置。
8. The hoisting operation control device for an on-board crane device according to claim 7, wherein the target hoisting angle calculation means is:
A shipboard crane, wherein the target boom hoisting angle is calculated based on the boom hoisting angle before the operation member for instructing the boom hoisting operation and the operation content of the operation member after the operation is started. Equipment suspension control device.
【請求項9】 請求項7または8記載の船上クレーン装
置の吊り動作制御装置において、前記ブーム起伏制御手
段は、目標ブーム起伏速度を設定する目標起伏速度設定
手段と、縦メタセンタからブーム先端位置までの水平距
離を前記目標水平距離に近づけるためのブーム起伏速度
補正値を演算する起伏速度補正値演算手段と、この起伏
速度補正値演算手段で演算された補正値により前記目標
起伏速度が補正された最終目標起伏速度に基づいて前記
ブーム駆動手段の駆動によるブーム起伏速度を調節する
起伏速度調節手段とを備えたことを特徴とする船上クレ
ーン装置の吊り動作制御装置。
9. The hoisting motion control device for an on-board crane apparatus according to claim 7 or 8, wherein the boom hoisting control means includes a target hoisting speed setting means for setting a target boom hoisting speed, and a vertical metacenter to a boom tip position. The hoisting speed correction value calculating means for calculating a boom hoisting speed correction value for making the horizontal distance of the hoisting speed closer to the target horizontal distance, and the target hoisting speed is corrected by the correction value calculated by the hoisting speed correction value calculating means. And a hoisting speed adjusting means for adjusting the boom hoisting speed by the drive of the boom driving means based on the final target hoisting speed.
【請求項10】 請求項7〜9のいずれかに記載の船上
クレーン装置の吊り動作制御装置において、前記巻上速
度制御手段は、実際の吊荷高さを演算する吊荷高さ演算
手段と、その演算された吊荷高さの目標吊荷高さに対す
る偏差を0にするための巻上速度補正値を演算する水平
引き込み用補正値演算手段とを備え、この水平引き込み
用補正値演算手段で演算された補正値により巻上速度を
補正するように構成されていることを特徴とする船上ク
レーン装置の吊り動作制御装置。
10. The hoisting operation control device for an on-board crane device according to claim 7, wherein the hoisting speed control means is a hoisting load height calculating means for calculating an actual hoisting load height. And a horizontal pull-in correction value calculating means for calculating a hoisting speed correction value for making the deviation of the calculated hanging load height from the target hanging load height zero, and this horizontal pull-in correction value calculating means A hoisting motion control device for an on-board crane device, which is configured to correct the hoisting speed based on the correction value calculated in.
【請求項11】 請求項7〜10のいずれかに記載の船
上クレーン装置の吊り動作制御装置において、前記巻上
速度制御手段は、実際のブーム先端高さが前記目標ブー
ム先端目標高さよりも高い場合には巻上方向の補正値を
演算し、実際のブーム先端高さが前記目標ブーム先端高
さよりも低い場合には巻下方向の補正値を演算する巻上
速度補正値演算手段を備え、この巻上速度補正値演算手
段で演算された補正値により巻上速度を補正するように
構成されていることを特徴とする船上クレーン装置の吊
り動作制御装置。
11. The hoisting speed control device for a ship crane according to any one of claims 7 to 10, wherein the hoisting speed control means has an actual boom tip height higher than the target boom tip target height. A hoisting speed correction value calculating means for calculating a hoisting direction correction value, and a hoisting speed correction value when the actual boom tip height is lower than the target boom tip height. A hoisting motion control device for a ship crane, wherein the hoisting speed is corrected by the correction value calculated by the hoisting speed correction value calculating means.
JP2000153213A 2000-05-24 2000-05-24 Method and apparatus for controlling suspension operation of shipboard crane device Expired - Fee Related JP3501103B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000153213A JP3501103B2 (en) 2000-05-24 2000-05-24 Method and apparatus for controlling suspension operation of shipboard crane device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000153213A JP3501103B2 (en) 2000-05-24 2000-05-24 Method and apparatus for controlling suspension operation of shipboard crane device

Publications (2)

Publication Number Publication Date
JP2001335284A JP2001335284A (en) 2001-12-04
JP3501103B2 true JP3501103B2 (en) 2004-03-02

Family

ID=18658525

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000153213A Expired - Fee Related JP3501103B2 (en) 2000-05-24 2000-05-24 Method and apparatus for controlling suspension operation of shipboard crane device

Country Status (1)

Country Link
JP (1) JP3501103B2 (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1071117A (en) * 1997-07-28 1998-03-17 Clean Tex Japan Kk Dust control mat
DE102009032267A1 (en) * 2009-07-08 2011-01-13 Liebherr-Werk Nenzing Gmbh, Nenzing Crane for handling a load suspended on a load rope
KR100978467B1 (en) * 2010-05-24 2010-08-26 주식회사 오리엔탈정공 Deck crane controlling height of hook interworking with luffing angle of boom
DE102012004802A1 (en) * 2012-03-09 2013-09-12 Liebherr-Werk Nenzing Gmbh Crane control with distribution of a kinematically limited size of the hoist
JP6166940B2 (en) * 2013-04-25 2017-07-19 東亜建設工業株式会社 Lifting method and lifting assist device using crane
EP3925919B1 (en) * 2019-02-14 2024-01-24 Tadano Ltd. Lifting control device and mobile crane
EP3925918A4 (en) * 2019-02-14 2022-11-23 Tadano Ltd. DYNAMIC TAKE-OFF CONTROL DEVICE AND CRANE
CN113682978B (en) * 2021-08-18 2024-03-12 天津赛挪林柯国际贸易有限责任公司 Offshore platform crane lifting method and lifting device
CN114237048B (en) * 2021-12-10 2024-07-09 大连海事大学 Intelligent operation track planning system of unmanned crane of polar region ship and working method thereof

Also Published As

Publication number Publication date
JP2001335284A (en) 2001-12-04

Similar Documents

Publication Publication Date Title
US11919749B2 (en) Crane, and method for controlling such a crane
CN110719886A (en) Motion compensated cranes for use on offshore vessels
CN108675165B (en) Anti-rolling control method for anti-rolling crane for ship
JP3501103B2 (en) Method and apparatus for controlling suspension operation of shipboard crane device
JP3140953B2 (en) Method and device for preventing steadying of suspended load of container crane
WO2019177021A1 (en) Crane and crane control method
JP2019064796A (en) crane
CN115196521B (en) Control system for adjusting marine hoisting equipment by using ship stability
WO2020166721A1 (en) Dynamic lift-off control device, and crane
CN113165855A (en) Crane and method for monitoring operation of such crane
JP2022190556A (en) crane
CN114212704A (en) Auxiliary arm for anti-sway and anti-sway of marine crane
CN111836774B (en) Crane and control method thereof
EP3925919B1 (en) Lifting control device and mobile crane
JP4277024B2 (en) Control method of spreader in crane
JP2744110B2 (en) Vertical cutoff control device for suspended load in crane
JP5817153B2 (en) Offshore cargo handling system and offshore floating body equipped with the same
JPH04235895A (en) Control device for lifting long cargo by crane vertically from ground
JP2026503624A (en) Method and device for operating a slewing jib crane, slewing jib crane, and program
JPH0769276A (en) Vibration absorbing device during cargo handling work at sea
JPH05330786A (en) Controller for stopping boom hoisting of crane
JPH0735830Y2 (en) Tug
KR20200020481A (en) A floating crane
WO2023054534A1 (en) Crane, and dynamic lift-off control device
JP2023130563A (en) crane

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20031111

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20031124

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20071212

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081212

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081212

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091212

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101212

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101212

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111212

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111212

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121212

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121212

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131212

Year of fee payment: 10

LAPS Cancellation because of no payment of annual fees