Casting termination method in continuous casting

Info

Publication number
JP3508339B2
JP3508339B2 JP28862695A JP28862695A JP3508339B2 JP 3508339 B2 JP3508339 B2 JP 3508339B2 JP 28862695 A JP28862695 A JP 28862695A JP 28862695 A JP28862695 A JP 28862695A JP 3508339 B2 JP3508339 B2 JP 3508339B2
Authority
JP
Japan
Prior art keywords
slab
casting
mold
molten steel
reduction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP28862695A
Other languages
Japanese (ja)
Other versions
JPH09122845A (en
Inventor
優和 小出
一治 花崎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Corp
Original Assignee
Sumitomo Metal Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo Metal Industries Ltd filed Critical Sumitomo Metal Industries Ltd
Priority to JP28862695A priority Critical patent/JP3508339B2/en
Publication of JPH09122845A publication Critical patent/JPH09122845A/en
Application granted granted Critical
Publication of JP3508339B2 publication Critical patent/JP3508339B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Continuous Casting (AREA)

Description

【発明の詳細な説明】 【0001】 【発明の属する技術分野】本発明は、連続鋳造における
鋳造終了方法、特に鋳片最トップからの洩鋼がなく鋳片
最トップを鋳型から引抜くことを可能とする連続鋳造の
鋳造終了方法に関する。 【0002】 【従来の技術】連続鋳造において鋳造を終了する場合に
は、タンディッシュ内残溶鋼が所定の量に達すると鋳造
速度を下げるとともに浸漬ノズルから鋳型内への給湯を
停止し、次いで鋳型内の溶鋼に冷却材を投入して、また
は冷却水をかけることによりトップ部を凝固させてから
鋳片を引き抜く方法が一般的である。しかしながら、特
開平6−226414号公報および特開平6−262323号公報に
も示されているように、このような方法には、以下のよ
うな問題がある。 【0003】(1) 鋳込終了前に鋳造速度を大きく減速す
るかまたは停止するため、生産性が落ちる。 (2) 鋳造速度の大幅な減速または停止による支持ロール
間で鋳片バルジングが発生し鋳片欠陥となる。 (3) 冷却材を投入しても、鋳片バルジングにより引抜く
ことでトップ部から未凝固溶鋼が絞り出されて洩鋼がみ
られ、支持ロール等に地金付着が生じ、次回の鋳造の障
害となる。 (4) 冷却材投入等に手間と時間を要する。 【0004】さらに、近年盛んに開発されている凝固末
期軽圧下法の場合、あるいは、鋳造鋳片の未凝固部を積
極的に圧潰してより薄い鋳片を製造する場合は、鋳造終
了時もそのまま圧下を続けていると、終了時の引抜によ
り、圧下位置から鋳型までの長さ相当分の未凝固溶鋼
が、鋳型側へ絞り出され鋳型、支持ロール間に洩鋼が生
じてしまい、上述の場合と同様に次回の鋳造に障害を起
こすことになる。 【0005】特開平6−226414号公報および特開平6−
262323号公報で提案されている方法は圧下を伴わない鋳
造の終了方法であるが、これらの方法を適用しようとす
ると以下の問題がある。 【0006】例えば、特開平6−226424号公報の方法を
用いる場合、 (1) 鋳造終了時鋳造速度を0.2m/分以下にしなければな
らないため生産性の減少となる。 【0007】(2) 軽圧下する場合において、鋳造速度を
下げることにより凝固完了域が鋳型側へ移動し所期の目
的を達しないのみならず、強制的に圧潰しようとすると
支持ロール群の構造を強固なものにしなければならな
い。 【0008】また、特開平6−262323号公報の方法は鋳
片最トップの凝固を二次冷却水で行う方法であるため、
圧下を伴う鋳造鋳片の引抜きを行う場合、未凝固溶鋼が
絞り出されてしまう。設備的にも問題がある。 【0009】そこで、軽圧下、未凝固部の積極圧下を行
う方法として、例えば特開平6−7909号公報、特開昭60
−250864号公報に開示されている方法が提案されてい
る。それによれば、圧下により排出される未凝固溶鋼を
収容する金枠を装着し、鋳片最トップからの漏鋼を防ぐ
のである。 【0010】しかしこれらの方法は前述した如く、 (1) 金枠の事前製作準備 (2) 金枠を鋳造終了時に手早く、かつ短時間に鋳型内に
装着するための手間 (3) 鋳型断面が大きい程金枠も大きくなり、装着も難し
くなる (4) 鋳造終了と同時にタンディッシュを上昇させ、移動
した後でないと、金枠が装着できないため (浸漬ノズル
が障害となるため) 、その時間約30〜60秒間要し、その
ため鋳造速度を極端に下げなければならない 等の欠点がある。 【0011】 【発明が解決しようとする課題】ここに、本発明の目的
は、軽圧下法を含む鋳片凝固部分の積極的圧下法 (大圧
下法) において不可避であった溶鋼の洩鋼を金枠等を装
着しなくても、効果的に回避しながら鋳片最トップを引
抜くことのできる鋳造終了方法を提供することである。 【0012】 【課題を解決するための手段】そこで、本発明者らは、
かかる目的を達成すべく種々検討を重ね、むしろ鋳型内
において積極的に凝固殻を鋳型壁に沿って形成すること
で、特に鋳型から鋳片を最終的に引き抜く際に見られる
鋳片外への洩鋼を効果的に防止できることを見出し、本
発明を完成した。 【0013】よって、本発明は、溶鋼を鋳型内で凝固さ
せながら得られた鋳片を連続して引抜きつつ、鋳造を終
了する方法であって、タンディッシュから鋳型内への溶
鋼の給湯を完了するに際して、まず鋳造速度を下げるこ
と、次いで、鋳型直下または下方に配設した圧下セグメ
ントで厚み方向に鋳片を強制的に圧潰することにより、
鋳片最トップから上方へ向けて溢れでる溶鋼を鋳型壁に
接触させることによって、鋳片が鋳型内にある間に、内
部に未凝固の溶鋼を有する凝固壁を生成させること、そ
して鋳片最トップに該凝固壁を生成した鋳片が鋳型から
抜けないうちに、鋳片を圧潰した前記圧下セグメントを
復帰させることにより、該圧下セグメントに接した鋳片
をバルジングさせることによって、前記凝固壁の内部の
溶鋼のレベルを低下させて少なくとも該凝固壁の内部に
空間を形成することから成る、鋳片最トップからの漏鋼
がなく鋳片最トップを鋳型から引抜くことを可能とする
連続鋳造における鋳造終了方法である。 【0014】 【発明の実施の形態】次に、本発明の作用について添付
図面を参照しながらさらに具体的に説明する。図1は、
本発明にかかる方法によって鋳造を終了できる未凝固圧
下用連続鋳造設備の構成図であり、図2は、鋳造終了前
の圧下状態を示す説明図であり、そして図3は、圧下セ
グメントを開放したときの状態を示す説明図である。 【0015】本発明を、図1ないし図3によって説明す
ると、凝固末期における鋳片を含む鋳片未凝固部分を圧
下しながら連続鋳造方法を終了しようとする場合、ま
ず、図1に示すように、定常鋳造速度 (Vc)の状態から
タンディッシュ1内の溶鋼4が所定の残鋼量になったこ
とを溶鋼4の重量測定を行っているロードセル23で検出
し、所定の残鋼量に達すると上位コントローラより、鋳
造速度コントローラに指令を与え、鋳造速度を下げる。
このとき鋳造速度は例えば3〜5m/分の定常速度から1
〜2m/分まで減速させる。なお、従来はこのときの減速
は0〜0.5 m/分と殆ど停止状態であった。 【0016】これによって、鋳型1内へ溶鋼の給湯を完
了する前に、完全凝固位置 (クレータエンド部) をそれ
までの圧下ガイドロール領域 (13-1〜13-5) から鋳型側
に移動させると共にこの圧下ガイドロール領域における
圧下ゾーンを鋳型側へ移動させることができる。なお、
鋳造速度によりクレータエンド部の位置は次式の如く変
化する。 【0017】 【数1】 【0018】未凝固圧下による鋳片の鋳造方法において
も鋳片のクレータエンド部を圧下することで中心偏析や
ポロシティを改善するためには、クレータエンド部近傍
も圧下する必要があり、そのためには鋼種や、溶鋼の過
熱度により鋳造速度を変化させる必要がある。そのため
には図1に示すごとく圧下ゾーン13において複数の圧下
セグメントを設けているのが一般的である。 【0019】次に、定常鋳造速度Vc の状態で鋳造中か
ら、鋳造終了に入る場合の圧下ガイドロール (圧下セグ
メント) の油圧圧下シリンダの圧力コントロールについ
て説明する。 【0020】図1において、今、定常鋳造速度 (Vc)の
状態で鋳造されているときの圧下セグメント13 (13-1〜
13-5) の圧下シリンダ14に加える油圧圧力P(kg/cm2)は
近似的に下式で表わせる。 【0021】 【数2】【0022】(1) 式から分かるように、鋳造速度を下げ
ることによりクレータエンド部が鋳型側に近づくことに
より、鋳型側の圧下セグメントによる凝固スラブ17の圧
下量(D−Dt)が増大するため、(2) 式で示す短辺面の
圧下反力増加分に相当する油圧圧力を油圧のコントロー
ラを介して増加させていく。他方、クレータエンド部か
ら後の圧下セグメントの油圧シリンダに加える圧力は、
Vc を下げる前の圧力から(2) 式で示す短辺面の圧下反
力分に対する油圧圧力相当分だけを下げて (減圧) いく
ことにより、クレータエンド部の圧下を保持すると共
に、それ以降の圧下セグメントでの鋳片のバルジングを
防ぐことにある。 【0023】このように圧下セグメントに静鉄力+圧下
反力相当分の油圧圧力を各シリンダに加えることによ
り、鋳片は圧下され、その圧下セグメントの後にある圧
下セグメントにはそれぞれの圧下セグメントに加わる溶
鋼静鉄圧力に相当する静鉄力相当+αの油圧圧力を油圧
シリンダに加えることにより圧下セグメントで圧下され
た鋳片は圧下勾配 (圧下量/圧下セグメントのロールピ
ッチ×本数) に沿った厚み方向テーパ付スラブとなり、
その圧下セグメントの後に配設された圧下セグメントは
静鉄圧相当分+αの油圧圧力では圧下できないため浮上
がることになる。なお、図中の符号27は鋳型下部のフッ
トロール、19〜22はピンチロール、20は下部ロール固定
フレーム、15は圧下セグメントの固定フレーム、16は同
じく可動フレームである。 【0024】このようにして、鋳造速度を下げた時の圧
下状態を図2に示す。圧下セグメント13-1〜13-5は単一
ロールないし複数ロールのいずれを含むセグメントであ
っても差し支えない。鋳造終了前に減速することにて所
定の鋳造速度Vi にしたとき、クレータエンド部までの
長さLi は、次式で表わされる。 【0025】 【数3】【0026】次いで、タンディッシュ1からの溶鋼4を
ノズル2を閉じることによって鋳型への給湯を終了させ
るが、そのとき、鋳型内から未凝固鋳片5が抜け出ない
間までに鋳型直下の圧下ゾーン13で未凝固鋳片5を圧下
すると、図2に示すように、鋳型3内の鋳片最トップか
らは未凝固溶鋼が溢れ出て、この未凝固溶鋼は鋳型壁と
接して凝固殻26を作ることになる。 【0027】すなわち、この状態に達してから、鋳型3
への給湯を停止すると、湯面24は低鋳造速度にて引抜か
れることにより、圧下セグメント13-1の圧下により未凝
固溶鋼5が鋳片最トップから鋳型内に吐き出されつつ鋳
型壁と接して、凝固殻26を形成しながら引抜かれる。給
湯の停止時点は圧下セグメント13-1の圧下に先立って
も、あるいは同時であっても、あるいは遅れても特に問
題はない。これらの場合を包含して本発明では「給湯を
終了するとともに」という。次いで図3に示す如く鋳型
下方に鋳片が存在する間に、圧下セグメント13-1を開放
すると鋳型内に吐き出されていた溶鋼は吸引されて凝固
殻26で囲まれた空間25ができる。この空間を作ることに
より、鋳片最トップからの溢鋼を防ぐことができ、同時
に圧下セグメント13-2、13-3、・・・は未凝固長Lf に
相当する静鉄圧力による張出力相当〜若干のプラス力に
なるよう各圧下セグメントの油圧シリンダー14の圧力を
調整することにより、そのまま鋳片を引抜くことが可能
となり、洩鋼を防ぐことができる。 【0028】圧下量が小さい時は、圧下セグメント13-1
のみならず13-2、さらには13-3を開放して空間25を確保
することもできる。この空間25と圧下量との間には凝固
殻の熱収縮を考慮する必要はあるが、ここでは無視して
近似的に下式の関係が成立すればよい。 【0029】 【数4】 【0030】このときの様子は図3に示されているが、
それ以降においては、圧下セグメント13-2〜13-5は、圧
下セグメントの圧下を行う油圧シリンダーの圧力をLf
に相当する静鉄圧力+α (0〜10%) にコントロールす
ることにより、鋳片最トップからの洩鋼を起こさせるこ
となく安定して鋳造を終了させることができる。図中、
foはクレータエンドまでの長さを、そのときの角度θ
はメニスカスからクレータエンドまでの角度をそれぞれ
示す。次に、本発明をその実施例によってさらに具体的
に詳述する。 【0031】 【実施例】本例においては、図1ないし図3に示す連続
鋳造設備と同様の設備によって、未凝固部分軽圧下連続
鋳造法の鋳造終了操作に本発明を適用した。 【0032】本例における鋳造条件は表1に示す如く、
圧下セグメントは1〜4セグメント(図1では13-1〜13-
5で5セグメント) から構成されていた。このとき鋳造
速度4m/分のクレータエンド部までの長さLは、前述の
(3) 式より下記のように求められる。 【0033】 【数5】 【0034】このときの4.6 mは4セグメント13-4の出
側ロール側に存在する圧下セグメント13-2〜13-4の3セ
グメント合計で30mmだけ圧下させた。図4は、本例にお
ける圧下中のクレータエンド部と開放時のクレータエン
ド部の位置をしめすグラフである。 【0035】図5は、本例における同じく鋳造終了前に
おける減速の様子を示すグラフである。以上のような条
件を前提に本例では次のような実施例によって本発明の
効果を確認した。 【0036】実施例1 本例では、4m/分の定常鋳込速度 (Vc)から鋳造終了す
る例を示す。予め組込まれた上位コントローラのプログ
ラムのタンディッシュ内残溶鋼が所定の量に達すると、
鋳造速度が減速 (減速度α=4m/min2) されると同時
に、圧下セグメント13-1〜13-4に所定の加圧指令を与え
ることにより、圧下セグメントのそれぞれのシリンダー
14に組み込まれた位置検出センサーの時間当たりの圧下
量を検出し、これをフィードバックさせながら減速量を
考慮した量だけの圧下を行いつつ、鋳造速度がVc =1.
5m/分になった後に、圧下セグメント13-1のみで30mm圧
下の状態にした。 【0037】この状態から約1.2 分以後 (凝固スラブ17
のクレータエンド部が圧下セグメント13-1内に安定して
存在するまでの必要な時間は1.2 分以上である) 鋳型内
への給湯を停止し、約10秒後に圧下セグメント13-1を1.
5 mm/秒の開放速度で開放させると同時に圧下セグメン
ト13-2以降の各圧下セグメントを静鉄圧力 (p=ρH≒
ρ・Lfo sinθ、図3参照) により張出す力相当分の油
圧圧力×1.1 の油圧圧力に減じることにより、本発明の
鋳型内での凝固殻に囲まれた空間25を作ることができ
た。 【0038】そのまま(1.5m/分) の速度で約2〜2.6 分
引抜く間に未凝固溶鋼は二次冷却水からの冷却により完
全凝固させた後、加速度α=4m/min2で 加速させVc
=4m/分で引抜き、一滴の漏鋼も引き起こすことなく鋳
片を引抜くことができた。 【0039】実施例2 本例では実施例1の鋳造速度を1.5m/からさらに1m/分
まで減速させた例を示す。本例においても実施例1と同
様にこの時の非定常部鋳片長さ、つまり圧下セグメント
13-1の開放によってバルジングのみられる領域の鋳片か
ら最終端までの長さの部分はVc =1.5m/分の時、Max
4.0m、Vc:1m/分の時、Max 2.8 m以内で、従来方法に
比較して大差なく、鋳造終了が速く確実に実施できた。 【0040】 【表1】 【0041】 【発明の効果】本発明の鋳造終了方法により、未凝固部
の圧下を行う鋳造方法にて鋳造終了時に従来の方法 (特
開平6−226414号公報参照) のように鋳造速度を0.2 m/
分以下に落とすこともなく、また金枠等の冷却箱も装着
することなく、比較的高速で引抜きながら鋳造を完了す
ることができ、生産性の向上をさらに図ることができ
た。
Description: BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of ending casting in continuous casting, and more particularly to a method of extracting the top of a slab from a mold without leaking steel from the top of the slab. The present invention relates to a method for terminating continuous casting that can be performed. [0002] In the case of ending the casting in continuous casting, when the residual molten steel in the tundish reaches a predetermined amount, the casting speed is reduced and hot water supply from the immersion nozzle into the mold is stopped. Generally, a method of putting a coolant into the molten steel in the inside or applying cooling water to solidify a top portion and then pulling out a slab is generally used. However, as shown in JP-A-6-226414 and JP-A-6-262323, such a method has the following problems. (1) Since the casting speed is greatly reduced or stopped before the end of casting, productivity decreases. (2) Slab bulging occurs between the supporting rolls due to a large reduction or stoppage of the casting speed, resulting in a slab defect. (3) Even if the coolant is supplied, unsolidified molten steel is squeezed out from the top part by pulling out by slab bulging, leaking steel is seen, and base metal adheres to support rolls, etc., and the next casting It is an obstacle. (4) It takes time and effort to supply coolant. Further, in the case of the late solidification light reduction method which has been actively developed in recent years, or when a thin cast piece is manufactured by actively crushing an unsolidified portion of a cast cast piece, the casting is also performed at the end of casting. If the reduction is continued as it is, the unsolidified molten steel equivalent to the length from the reduction position to the mold is squeezed out to the mold side by the drawing at the end, and the leaked steel occurs between the mold and the support roll, as described above. As in the case of the above, the next casting is disturbed. JP-A-6-226414 and JP-A-6-226414
The method proposed in Japanese Patent No. 262323 is a method for terminating casting without reduction, but there are the following problems when applying these methods. For example, when the method disclosed in Japanese Patent Application Laid-Open No. 6-226424 is used, (1) the productivity is decreased because the casting speed at the end of casting must be 0.2 m / min or less. (2) In the case of light reduction, the solidification completed area is moved to the mold side by lowering the casting speed, so that the intended purpose is not achieved. Must be strong. The method disclosed in Japanese Patent Application Laid-Open No. 6-262323 is a method in which the top of the slab is solidified with secondary cooling water.
When a cast slab is drawn with a reduction, unsolidified molten steel is squeezed out. There is a problem in equipment. [0009] Therefore, as a method of lightly reducing the pressure of the unsolidified portion, for example, JP-A-6-7909 and JP-A-60-60
A method disclosed in -250864 has been proposed. According to this, a metal frame for accommodating unsolidified molten steel discharged by rolling is mounted to prevent steel leakage from the top of the slab. However, as described above, these methods are as follows: (1) Preparing for the preparation of the metal frame (2) Time and effort for mounting the metal frame into the mold quickly and quickly at the end of casting (3) The cross section of the mold is The larger the size, the larger the metal frame, and the more difficult it is to mount. (4) Since the tundish must be raised at the same time as casting and moved, the metal frame cannot be mounted (because the immersion nozzle is an obstacle), It takes 30 to 60 seconds, and thus has the disadvantage that the casting speed must be extremely reduced. [0011] The object of the present invention is to solve the problem of molten steel leaked steel which was inevitable in the active reduction method (large reduction method) of the solidified portion of the slab including the light reduction method. An object of the present invention is to provide a method for terminating a casting in which the top of a slab can be pulled out while effectively avoiding the need for mounting a metal frame or the like. Means for Solving the Problems Accordingly, the present inventors have
In order to achieve such an object, various studies are repeated, and rather, a solidified shell is positively formed along the mold wall in the mold, so that the slab, especially when the slab is finally extracted from the mold, is removed from the slab. The present inventors have found that leaked steel can be effectively prevented, and have completed the present invention. Therefore, the present invention is a method for terminating casting while continuously drawing a slab obtained while solidifying molten steel in a mold, and completing the supply of molten steel from the tundish into the mold. In doing so, first lower the casting speed, then by forcibly crushing the slab in the thickness direction with a reduction segment disposed directly below or below the mold,
Molten steel slab is at overflowing toward the outermost top upward by Rukoto into contact with the mold walls, while the slab is within the mold, the inner
By generating a solidified wall having unsolidified molten steel in the portion , and by returning the rolling-down segment that crushed the slab before the slab that generated the solidified wall at the top of the slab falls out of the mold. By bulging the slab in contact with the reduction segment, the inside of the solidified wall is
Reduce the level of molten steel to at least the inside of the solidification wall
This is a method of terminating casting in continuous casting, which comprises forming a space and allows the top of the slab to be pulled out of the mold without leakage of steel from the top of the slab. Next, the operation of the present invention will be described more specifically with reference to the accompanying drawings. FIG.
It is a block diagram of the continuous casting equipment for unsolidified rolling which can complete | finish casting by the method concerning this invention, FIG. 2: is explanatory drawing which shows the rolling state before completion | finish of casting, and FIG. 3 opened the rolling segment. FIG. 9 is an explanatory diagram showing a state at the time. The present invention will be described with reference to FIGS. 1 to 3. In the case where the continuous casting method is to be ended while reducing the unsolidified portion of the slab including the slab in the final stage of solidification, first, as shown in FIG. From the state of the steady casting speed (Vc), it is detected by the load cell 23 that measures the weight of the molten steel 4 that the molten steel 4 in the tundish 1 has reached a predetermined residual steel amount. Then, a command is sent from the host controller to the casting speed controller to reduce the casting speed.
At this time, the casting speed is, for example, from a steady speed of 3 to 5 m / min to 1
Decelerate to ~ 2m / min. Conventionally, the deceleration at this time was almost stopped at 0 to 0.5 m / min. Thus, before the molten steel is supplied into the mold 1, the completely solidified position (crater end portion) is moved from the pressing guide roll region (13-1 to 13-5) to the mold side. At the same time, the reduction zone in the reduction guide roll region can be moved to the mold side. In addition,
The position of the crater end changes according to the casting speed according to the following equation. [Equation 1] In order to improve center segregation and porosity by lowering the crater end portion of the slab even in the method of casting a slab by unsolidification reduction, it is necessary to reduce the vicinity of the crater end portion as well. It is necessary to change the casting speed depending on the type of steel and the degree of superheat of the molten steel. For this purpose, a plurality of rolling-down segments are generally provided in the rolling-down zone 13 as shown in FIG. Next, a description will be given of the pressure control of the hydraulic pressure reduction cylinder of the pressure reduction guide roll (reduction segment) when the casting is completed from the time of casting at the steady casting speed Vc. In FIG. 1, when the casting is performed at a steady casting speed (Vc), the rolling-down segments 13 (13-1 to 13-1) are used.
13-5) The hydraulic pressure P (kg / cm 2 ) applied to the reduction cylinder 14 can be approximately expressed by the following equation. [Equation 2] As can be seen from the equation (1), since the crater end portion approaches the mold side by lowering the casting speed, the reduction amount (D-Dt) of the solidified slab 17 by the reduction segment on the mold side increases. The hydraulic pressure corresponding to the increase in the reduction reaction force on the short side surface shown by the equation (2) is increased via the hydraulic controller. On the other hand, the pressure applied from the crater end to the hydraulic cylinder of the later rolling down segment is
By lowering (reducing) the pressure equivalent to the hydraulic pressure corresponding to the reduction reaction force on the short side surface shown in equation (2) from the pressure before lowering Vc, the reduction of the crater end is maintained, and An object of the present invention is to prevent slab bulging in a reduction segment. By applying a hydraulic pressure equivalent to the static iron force + the rolling reaction force to each of the rolling segments to the respective cylinders, the slab is reduced, and the rolling segments subsequent to the rolling segment are applied to the respective rolling segments. The slab reduced in the reduction segment by applying a hydraulic pressure equivalent to the static iron force + α equivalent to the applied molten steel static pressure to the hydraulic cylinder is the thickness along the reduction gradient (reduction amount / roll pitch of the reduction segment × number of rolls). It becomes a slab with a direction taper,
The rolling segment arranged after the rolling segment cannot be reduced by the hydraulic pressure of the amount corresponding to the static iron pressure + α, and therefore floats. In the drawing, reference numeral 27 denotes a foot roll at the lower part of the mold, 19 to 22 denote pinch rolls, 20 denotes a lower roll fixing frame, 15 denotes a fixed frame of a pressing segment, and 16 denotes a movable frame. FIG. 2 shows a rolling state when the casting speed is reduced in this way. The rolling-down segments 13-1 to 13-5 may be segments including any of a single roll or a plurality of rolls. When the casting speed is reduced to a predetermined casting speed Vi before the end of the casting, the length Li to the crater end portion is expressed by the following equation. [Equation 3] Next, the molten steel 4 from the tundish 1 is supplied to the mold by closing the nozzle 2 by closing the nozzle 2. At this time, a rolling zone immediately below the mold is formed until the unsolidified slab 5 does not come out of the mold. When the unsolidified slab 5 is reduced in step 13, as shown in FIG. 2, unsolidified molten steel overflows from the top of the slab in the mold 3, and the unsolidified molten steel comes into contact with the mold wall to form the solidified shell 26. Will make it. That is, after reaching this state, the mold 3
When the hot water supply to the mold is stopped, the molten metal surface 24 is drawn out at a low casting speed, so that the unsolidified molten steel 5 is discharged from the top of the slab into the mold by the reduction of the reduction segment 13-1, and contacts the mold wall. The solidified shell 26 is drawn out. There is no particular problem if the hot water supply is stopped before, at the same time as, or after the reduction of the reduction segment 13-1. In the present invention, including these cases, it is referred to as "ending hot water supply". Next, as shown in FIG. 3, when the squeezing segment 13-1 is opened while the slab exists under the mold, the molten steel discharged into the mold is sucked to form a space 25 surrounded by the solidified shell 26. By creating this space, overflow from the top of the slab can be prevented, and at the same time, the reduction segments 13-2, 13-3, ... are equivalent to tension output by static iron pressure corresponding to the unsolidified length Lf. By adjusting the pressure of the hydraulic cylinders 14 of the respective pressure-reducing segments so as to have a slight positive force, the cast slab can be pulled out as it is, and steel leakage can be prevented. When the reduction amount is small, the reduction segment 13-1
In addition, the space 25 can be secured by opening 13-2 and further 13-3. It is necessary to consider the heat shrinkage of the solidified shell between the space 25 and the amount of reduction, but it is sufficient that the relationship expressed by the following expression be established approximately, ignoring it. [Equation 4] The situation at this time is shown in FIG.
After that, the rolling segments 13-2 to 13-5 determine the pressure of the hydraulic cylinder that reduces the rolling segment as L f
By controlling the static iron pressure + α (0 to 10%) corresponding to the above, it is possible to stably end the casting without causing a steel leak from the top of the slab. In the figure,
L fo is the length to the crater end, the angle θ at that time
Indicates the angle from the meniscus to the crater end, respectively. Next, the present invention will be described in more detail with reference to examples. EXAMPLE In this example, the present invention was applied to an operation for ending the casting of the unsolidified partial light pressure continuous casting method using equipment similar to the continuous casting equipment shown in FIGS. The casting conditions in this example are as shown in Table 1.
The rolling segment is 1 to 4 segments (13-1 to 13-
5 and 5 segments). At this time, the length L up to the crater end portion at a casting speed of 4 m / min is as described above.
From equation (3), it is obtained as follows. [Equation 5] At this time, 4.6 m was reduced by 30 mm in total of the three reduction segments 13-2 to 13-4 existing on the exit roll side of the four segments 13-4. FIG. 4 is a graph showing the position of the crater end portion during rolling down and the position of the crater end portion during opening in the present example. FIG. 5 is a graph showing the state of deceleration before the end of casting in this example. In this example, based on the above conditions, the effects of the present invention were confirmed by the following examples. Embodiment 1 In this embodiment, an example in which the casting is finished at a steady casting speed (Vc) of 4 m / min. When the residual molten steel in the tundish of the pre-installed upper controller program reaches a predetermined amount,
At the same time as the casting speed is reduced (deceleration α = 4 m / min 2 ), a predetermined pressure command is given to the pressure reduction segments 13-1 to 13-4, so that each cylinder of the pressure reduction segment
The position reduction sensor incorporated in 14 detects the amount of reduction per time and feeds it back to reduce the amount by considering the deceleration amount, while the casting speed is Vc = 1.
After the speed reached 5 m / min, the state was reduced by 30 mm only with the reduction segment 13-1 alone. After about 1.2 minutes from this state (solidified slab 17
(The time required for the crater end portion to stably exist in the reduction segment 13-1 is 1.2 minutes or more.) Hot water supply into the mold and after about 10 seconds, remove the reduction segment 13-1.
At the same time as releasing at a release speed of 5 mm / sec, each rolling segment after the rolling segment 13-2 is subjected to the static iron pressure (p = ρHρ
ρ · L fo sin θ (see FIG. 3), the hydraulic pressure was reduced to 1.1 times the hydraulic pressure equivalent to the overhanging force, whereby a space 25 surrounded by a solidified shell in the mold of the present invention could be created. . The unsolidified molten steel is completely solidified by cooling from the secondary cooling water during the drawing at a speed of (1.5 m / min) for about 2 to 2.6 minutes and then accelerated at an acceleration α = 4 m / min 2. Vc
= 4 m / min, and the slab could be drawn without causing a single drop of steel leakage. Embodiment 2 This embodiment shows an example in which the casting speed of Embodiment 1 is further reduced from 1.5 m / min to 1 m / min. Also in this example, as in the first embodiment, the length of the unsteady portion slab at this time, that is, the reduction segment
The length from the slab to the final end of the area where bulging is only performed by opening 13-1 is Vc = 1.5 m / min.
At 4.0 m and Vc: 1 m / min, the casting was completed quickly and reliably within less than Max 2.8 m without much difference from the conventional method. [Table 1] According to the casting termination method of the present invention, the casting speed is set to 0.2 at the time of the termination of the casting by the casting method in which the unsolidified portion is reduced, as in the conventional method (see JP-A-6-226414). m /
The casting could be completed while drawing at a relatively high speed without dropping to less than a minute and without installing a cooling box such as a metal frame, thereby further improving productivity.

【図面の簡単な説明】 【図1】本発明を適用できる未凝固圧下用連続鋳造設備
の構成図である。 【図2】図1の設備において鋳造終了前の圧下状態を示
す説明図である。 【図3】鋳造終了後に圧下セグメント13-1を開放するこ
とにより、短辺面が圧下しきれずに圧下反力で開いた状
態を示す説明図である。 【図4】未凝固圧下鋳造時と開放時のクレータエンドの
位置を示したグラフである。 【図5】本発明の鋳造末期の終了時の鋳造速度の変化と
時間の関係を示すグラフである。 【符号の説明】 10:ピンチロール 13-1〜13-5:圧
下セグメント 15:圧下セグメント固定フレーム 16:圧下セグメ
ント可動フレーム 18:鋳片 (凝固後の) 20:下部ロール
固定フレーム 19, 22:ピンチロール圧下シリンダー 27:鋳型下部の
フットロール
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a configuration diagram of an unsolidified rolling continuous casting facility to which the present invention can be applied. FIG. 2 is an explanatory view showing a rolling-down state before completion of casting in the equipment of FIG. FIG. 3 is an explanatory view showing a state in which a short side surface is not fully pressed down and is opened by a pressing reaction force by opening a pressing segment 13-1 after completion of casting. FIG. 4 is a graph showing the position of a crater end during unsolidified rolling casting and opening. FIG. 5 is a graph showing a relationship between a change in casting speed and time at the end of the last stage of casting according to the present invention. [Description of Signs] 10: Pinch rolls 13-1 to 13-5: Roll-down segment 15: Roll-down segment fixed frame 16: Roll-down segment movable frame 18: Cast piece (after solidification) 20: Lower roll fixed frame 19, 22: Pinch roll pressing cylinder 27: Foot roll at the bottom of the mold

───────────────────────────────────────────────────── フロントページの続き (56)参考文献 特開 平7−223053(JP,A) 特開 平4−33757(JP,A) 特開 平6−226414(JP,A) 特開 平6−335759(JP,A) (58)調査した分野(Int.Cl.7,DB名) B22D 11/10 B22D 11/128 350 B22D 11/16 B22D 11/20 ──────────────────────────────────────────────────続 き Continuation of front page (56) References JP-A-7-223053 (JP, A) JP-A-4-33757 (JP, A) JP-A-6-226414 (JP, A) JP-A-6-226414 335759 (JP, A) (58) Field surveyed (Int. Cl. 7 , DB name) B22D 11/10 B22D 11/128 350 B22D 11/16 B22D 11/20

Claims (1)

(57)【特許請求の範囲】 【請求項1】 溶鋼を鋳型内で凝固させながら得られた
鋳片を連続して引抜きつつ、鋳造を終了する方法であっ
て、タンディッシュから鋳型内への溶鋼の給湯を完了す
るに際して、まず鋳造速度を下げること、次いで、鋳型
直下または下方に配設した圧下セグメントで厚み方向に
鋳片を強制的に圧潰することにより、鋳片最トップから
上方へ向けて溢れでる溶鋼を鋳型壁に接触させることに
よって、鋳片が鋳型内にある間に、内部に未凝固の溶鋼
を有する凝固壁を生成させること、そして鋳片最トップ
に該凝固壁を生成した鋳片が鋳型から抜けないうちに、
鋳片を圧潰した前記圧下セグメントを復帰させることに
より、該圧下セグメントに接した鋳片をバルジングさせ
ることによって、前記凝固壁の内部の溶鋼のレベルを低
下させて少なくとも該凝固壁の内部に空間を形成する
とから成る、鋳片最トップからの漏鋼がなく鋳片最トッ
プを鋳型から引抜くことを可能とする連続鋳造における
鋳造終了方法。
(1) A method for terminating casting while continuously drawing a slab obtained while solidifying molten steel in a mold, comprising: To complete the hot water supply of molten steel, first reduce the casting speed, and then forcibly crush the slab in the thickness direction with a reduction segment arranged directly below or below the mold, from the top of the slab.
The Rukoto molten steel that is overflowing upward into contact with the mold walls
Thus, while the slab is within the mold, molten steel unsolidified within
Producing a solidified wall having a top and a slab top
Before the slab that produced the solidified wall did not fall out of the mold,
The level of the molten steel inside the solidified wall is reduced by returning the rolled-down segment obtained by crushing the cast slab and bulging the cast slab in contact with the rolled-down segment.
In the continuous casting please allowed to consist this <br/> and forming a space in the interior of at least the coagulation wall, makes it possible to pull out the cast slab uppermost top without leakage steel from slab outermost top from the mold Casting termination method.
JP28862695A 1995-11-07 1995-11-07 Casting termination method in continuous casting Expired - Fee Related JP3508339B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP28862695A JP3508339B2 (en) 1995-11-07 1995-11-07 Casting termination method in continuous casting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP28862695A JP3508339B2 (en) 1995-11-07 1995-11-07 Casting termination method in continuous casting

Publications (2)

Publication Number Publication Date
JPH09122845A JPH09122845A (en) 1997-05-13
JP3508339B2 true JP3508339B2 (en) 2004-03-22

Family

ID=17732623

Family Applications (1)

Application Number Title Priority Date Filing Date
JP28862695A Expired - Fee Related JP3508339B2 (en) 1995-11-07 1995-11-07 Casting termination method in continuous casting

Country Status (1)

Country Link
JP (1) JP3508339B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101252647B1 (en) * 2010-11-26 2013-04-09 주식회사 포스코 Continuous casting apparatus and continuous casting method using the same
CN105945253B (en) * 2016-07-15 2017-11-10 中冶赛迪工程技术股份有限公司 Gap preset method after bleed-out occurs for a kind of slab caster
JP7234785B2 (en) * 2019-05-08 2023-03-08 日本製鉄株式会社 Casting end control method
JP7679800B2 (en) * 2022-06-28 2025-05-20 Jfeスチール株式会社 Continuous casting method for steel

Also Published As

Publication number Publication date
JPH09122845A (en) 1997-05-13

Similar Documents

Publication Publication Date Title
CN105014036B (en) Method for preventing molten steel from being leaked out during continuous casting final pouring
JP3508339B2 (en) Casting termination method in continuous casting
JP3045052B2 (en) Roll segment device for continuous casting machine
JP3186631B2 (en) Termination method of constant speed drawing casting in continuous casting
JP3111954B2 (en) Continuous casting method
JP3305675B2 (en) Finishing method of thin slab continuous casting
JP3508389B2 (en) Casting termination method in continuous casting
JP5018441B2 (en) Method of drawing slab after completion of casting in continuous casting
JP3452799B2 (en) Continuous casting guide roll device and continuous casting method
JPH10193067A (en) Continuous casting of steel
JP3108558B2 (en) Late casting method in continuous casting
JP2009291814A (en) Method for casting slab
JPH07303951A (en) Secondary cooling method for continuous casting and the device thereof
JPS60162560A (en) Continuous casting method of steel
JPH06292959A (en) Slab support device
JPH07112255A (en) How to finish pouring in continuous casting
JPH0692022B2 (en) Light reduction method for continuous cast slab
JP2720692B2 (en) High-speed casting end method in continuous casting
JP2903844B2 (en) Method of finishing casting in continuous casting
JPH0215858A (en) Method and device for continuously casting cast strip
JPH0947852A (en) Continuous casting method and immersion nozzle
JPS60250864A (en) Top treatment of slab when casting in continuous casting ends
JP4706507B2 (en) Continuous casting method
JPS62197250A (en) Semi-continuous casting method
JP3237725B2 (en) Continuous casting method

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20031202

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20031215

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080109

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090109

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100109

Year of fee payment: 6

LAPS Cancellation because of no payment of annual fees