JP3511210B2 - Heat storage method for air conditioning - Google Patents
Heat storage method for air conditioningInfo
- Publication number
- JP3511210B2 JP3511210B2 JP32901092A JP32901092A JP3511210B2 JP 3511210 B2 JP3511210 B2 JP 3511210B2 JP 32901092 A JP32901092 A JP 32901092A JP 32901092 A JP32901092 A JP 32901092A JP 3511210 B2 JP3511210 B2 JP 3511210B2
- Authority
- JP
- Japan
- Prior art keywords
- water
- storage tank
- heat storage
- refrigerator
- heat
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Other Air-Conditioning Systems (AREA)
Description
【発明の詳細な説明】
【0001】
【産業上の利用分野】本発明は、空調用蓄熱方法に関す
るものである。
【0002】
【従来の技術】従来、大規模蓄熱設備にみられるヒーテ
ィングタワーを使用した空調用のヒートポンプシステム
は、冬期にヒーティングタワーで外気から熱を採取して
温水を生成し、一方夏期には冷却塔から外気に熱を放出
して冷水を生成するようになっている。
【0003】ところが現在のヒートポンプシステムによ
れば、冷凍機におけるフロン等の冷媒サイクル中の圧縮
機は、夏期と冬期では異なった条件で運転されている。
これらの運転状態を説明するため、図4、図5に夫々の
冷媒サイクルの工程と温度との関係を、また図6、図7
に夫々のP−h線図を示した。ヒートポンプシステムに
おける温度ヘッドは、ちょうど水力ポンプにおける揚水
ヘッドに相当すると考えられるが、図4、図5に示した
ように、冬期の温水生成時は夏期の冷水生成時に比べて
大きな温度ヘッドを必要としている。また図6、図7に
示したように、夫々のP−h線図をみれば、夏期に比べ
て冬期の運転の方が圧縮比が大きくなっている。
【0004】
【発明が解決しようとする課題】しかしながら、圧縮機
の設計についてはその圧縮比からシリンダーや回転羽根
のクリアランス等が決定されるため、当然のことなが
ら、通常大きな温度ヘッドを必要とする冬期の温水生成
時の圧縮比を基に設計された圧縮機搭載の冷媒システム
は、夏期の冷水運転時では圧縮機の効率(圧縮効率)が
目減りした運転とならざるを得ない。そのため従来のヒ
ーティングタワー方式のヒートポンプシステムでは、効
率改善のために冷凍機の圧縮機を2機搭載して、冬期の
温水生成時には2段圧縮サイクルで運転し、夏期の冷水
生成時には1段圧縮サイクルで運転するようにして圧縮
効率を改善した冷媒サイクルを採用しているものもあ
る。
【0005】そのためシステムの設計、構築時には、圧
縮機を2機搭載しなければならないという問題が生じ、
工費、スペース、施工量の点で必ずしも満足できるもの
ではなかった。また従来のヒーティングタワー方式のヒ
ートポンプシステムでは、熱を蓄える媒体としては蓄熱
槽内に溜める水が主流であったが、水を蓄熱媒体として
いる以上、高密度の蓄熱は期待できず、そのため増大す
る夏期の熱負荷に対応するには設備機器が大規模となら
ざるを得ず、ビル空調などを実施する場合には、スペー
ス上の問題があった。
【0006】
【課題を解決するための手段】この点、例えば本出願人
が先に開示した特開平2−166330号公報には、本
出願人が開発した新しい氷蓄熱システムを利用して夏期
の大きな熱負荷に対しても充分対処できる、「蓄熱式冷
暖房方法」が提案されている。本発明では、従来のヒー
ティングタワー方式のヒートポンプシステムにみられる
既述の問題点に鑑み、そのような本出願人が開発した氷
蓄熱システムを採り入れつつ、さらにヒーティングタワ
ー方式を併用した新しい空調用蓄熱方法を提供して問題
の解決を図るものである。
【0007】 そのため本発明では、空調用熱源水を蓄
える蓄熱槽、ブラインを冷熱源として0゜C以下の過冷
却水を生成する過冷却器、この過冷却水の過冷却状態を
解除する過冷却解除手段、凝縮器と蒸発器を有する冷凍
機、及び冷却塔を使用し、冷房時にはブラインを冷凍機
の蒸発器と過冷却器との間を循環させ、また冷却塔から
の冷却水は冷凍機の凝縮器と冷却塔との間で循環させ、
蓄熱槽から取水した熱源水を過冷却器に供給し、当該過
冷却器から吐出される過冷却水を過冷却解除手段によっ
て氷・水スラリーに変換し、生成された前記氷・水スラ
リーを蓄熱槽内に供給してこの蓄熱槽内に氷・水を共存
させ、また暖房時には、前記ブラインを前記冷凍機の蒸
発器と冷却塔との間で循環させ、また蓄熱槽から取水し
た熱源水は前記冷凍機の凝縮器に供給して加熱し、生成
される温水を蓄熱槽内に供給することによって、夫々夏
期、冬期の空調用の熱源水を得るようにした。
【0008】
【作用】ブラインを冷熱源とする過冷却器は、その効率
面で直膨方式の過冷却器よりも多少劣っているが、反面
そのときの冷凍機の圧縮機の圧縮比は冬期の温水生成時
のものと比較して差が小さくなる。従って夏期の冷房
時、冬期の暖房時とも1機の圧縮機によって冷凍機を運
転しても、両時期の圧縮効率にさほど開きはない。また
一方、過冷却水の過冷却状態を解除して生成される氷
は、シャーベット状のものであり、IPF(氷の充填
率)を高くでき、高密度の蓄熱が可能である。従って1
機の圧縮機による冷凍機の運転、及び夏期の高密度蓄熱
を鑑みれば、夏期、冬期の通期を通してみると、機器の
稼働率も高く、結果的に極めて効率のよい空調用熱源と
なり、しかも圧縮機が1機で済み蓄熱密度が高いという
ことは、それだけシステム構築上、必要とするスペース
を小さくできる。
【0009】そのうえブラインを冷熱源とする過冷却器
は、冷媒配管がなく、施工上簡便である。従って、冷房
運転、暖房運転を水路の切り替えによって行う際も配管
施工量が必要最小限で済み、システムの構築が容易であ
る。
【0010】さらにまた、冷却塔は冬期においてヒーテ
ィングタワーとして使用され、ブラインに対して外気か
ら容易に採熱することが可能となっている。
【0011】
【実施例】以下、本発明の実施例を図面に基づき説明す
れば、図1は本実施例を実施するために必要な主要設備
機器の配置、並びに配管の系統を示しており、本実施例
で使用した冷凍機1は、圧縮機2、凝縮器3、膨張弁
4、蒸発器5を有している。一方空調用熱源水を蓄える
蓄熱槽6の上部には過冷却器7が配置され、蓄熱槽6内
に取水口を有する取水管8からポンプ9で汲み上げられ
た蓄熱槽6内の熱源水が水路a、bを通じてこの過冷却
器7に供給されるようになっている。
【0012】上記過冷却器7は冷凍機1の蒸発器5で冷
却されたブラインを冷熱源とするものであり、このブラ
インはポンプ10によって水路c、dを通じて過冷却器
7に供給され、水路e、fを通じて蒸発器5に戻され、
過冷却器7と蒸発器5との間に冷媒回路が形成されてい
る。そしてこの過冷却器7に通水される水は0゜C以下
の過冷却水となって、過冷却解除パイプ11に吐出さ
れ、その時の衝撃で過冷却状態が解除されてシャーベッ
ト状の氷が水とのスラリー状態となって生成されて搬送
管12を通じて蓄熱槽6内に供給されるようになってい
る。
【0013】一方、取水管8からポンプ9で汲み上げら
れた蓄熱槽6内の熱源水は、水路a、gを経て冷凍機1
の凝縮器3にも供給される配管構成となっており、この
凝縮器3には、水路h、iを経て蓄熱槽6内に戻される
管路系と、水路h、j、kを経てヒーティングタワー兼
用冷却塔13の散水部14へと供給される管路系が設け
られている。上記ヒーティングタワー兼用冷却塔13の
下部水槽15には、水路l、mを経て水路fに通ずる管
路系と、水路l、nを経て水路gに通ずる管路系が夫々
設けられている。なお図中、21、22、23、24、
25、26、27、28、29は各水路に設けられた
弁、30はヒーティングタワー兼用冷却塔13へ供給す
るためのポンプである。
【0014】本実施例を実施するための主要設備機器、
配管系統は以上のように構成されており、いま夏期の冷
房運転を実施する場合を図2に基づき説明すると、まず
各水路に設けられた弁の中で、弁24、25、27、2
8は閉鎖される。そして氷フィルタなどの氷核分離装置
(図示せず)を通して取水管8によって取水された蓄熱
槽6内の水は、ポンプ9によって水路a、bを通じて過
冷却器7に供給される。 また冷凍機1の蒸発器5で−
6゜C程度まで冷却されるブラインは、水路c、dを通
じてポンプ10によって過冷却器7に供給され、水路
e、fを通じて蒸発器5に戻されて循環している(図2
における白抜き矢印)。
【0015】このとき凝縮器3に供給される冷却水は、
ヒーティングタワー兼用冷却塔13の下部水槽15から
水路l、nを通じて蒸発器3に供給され、水路h、j、
kを通じて、ポンプ30によってヒーティングタワー兼
用冷却塔13へ戻されて循環している。そして過冷却器
7から吐出された過冷却水から、過冷却解除手段11に
よって氷・水スラリーが生成されて、搬送管12を通じ
て蓄熱槽6に供給され、蓄熱槽6内に氷を水と共に蓄え
る蓄氷運転がなされる。このような状態から、例えばフ
ァンコイルユニット等の負荷側熱交換器(図示せず)に
蓄熱槽6から冷水を供給し、それによって昇温した水は
再び蓄熱槽6内に戻すようにして蓄熱槽6内の冷水は冷
房時の空調用に供されるのである。
【0016】次に冬期に実施される暖房運転を図3に基
づいて説明すると、まず各水路に設けられた弁の中で、
弁21、22、23、26、29は閉鎖される。そして
冷凍機1を運転すると、冷房運転時に蒸発器5と過冷却
器7との間を循環していたブラインが、今度は水路c、
kを通じてポンプ30によってヒーティングタワー兼用
冷却塔13へと供給され、−10゜C程度となっている
ブラインはそこで外気から採熱されて、下部水槽15か
ら水路l、m、fを通じて蒸発器5へと戻され、ヒーテ
ィングタワー兼用冷却塔13と蒸発器5との間を循環す
るようになる(図3における白抜き矢印)。
【0017】一方、蓄熱槽6内の熱源水は、取水管8か
ら取水されてポンプ9によって水路a、gを通じて凝縮
器3に供給されてそこで加熱され、水路h、iを通じて
蓄熱槽6内に温水が供給されるのである(図3における
黒矢印)。
【0018】以上のように、本発明によれば夏期の冷房
運転の際は、高効率かつ高密度の蓄熱が実施でき、また
冬期ではシステムそのものを代えずに水路の切換によっ
て暖房運転を可能としている。またそのような冷暖房運
転の際に使用するブライン、ポンプは全てを兼用してお
り、通年を通して使用できるので、設備面での稼働効率
もよい。さらに冷暖房時では、圧縮比の差がさほど大き
くないので、従来のように敢えて圧縮機を2機搭載する
必要がない。
【0019】なお上記実施例では、単一の蓄熱槽6を使
用したが、これを2つの蓄熱槽として、さらに凝縮器を
追加したダブルバンドル冷凍機とすれば、冷温水の同時
取り出しが可能になる。また蓄熱槽の分割等によって、
氷を蓄えながら同時に温水を生成したり若しくは温水を
蓄えることも可能である。
【0020】
【発明の効果】本発明によれば、冷房運転時、暖房運転
時によって圧縮比の切り替えを行う必要がなく、従って
従来のように効率改善のために敢えて冷凍機に圧縮機を
2機搭載する必要がない。それゆえシステム構築時に要
する冷凍機関係のスペースが従来よりも小さくて済み、
その分システム構築の設計が容易であり、またイニシャ
ルコストも低廉に抑えることができる。また夏期の冷房
運転の際には氷蓄熱によって蓄熱しているから、通期を
通してみれば結果的に極めて効率のよいシステムとな
り、小規模設備であっても夏期の大きな熱負荷に対処す
ることができる。さらに過冷却器にはブラインを冷熱源
とする過冷却器を用いているから、それに必要な冷媒配
管は少なくて済み、冷房運転、暖房運転を水路の切り替
えによって行う際も、必要な配管施工量は少なくて済
む。その他、冬期の温水生成時にブラインに対して行う
採熱は、冷却塔をヒーティングタワーとして使用してこ
れを実施しているから、設備面でも極めて効率のよい蓄
熱方法となっている。Description: BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a heat storage method for air conditioning. 2. Description of the Related Art Conventionally, a heat pump system for air conditioning using a heating tower, which is found in large-scale heat storage equipment, generates heat by collecting heat from outside air in a heating tower in winter, while generating heat in summer. The heat is released from the cooling tower to the outside air to generate cold water. However, according to the current heat pump system, a compressor in a refrigerant cycle such as Freon in a refrigerator is operated under different conditions in summer and winter.
FIGS. 4 and 5 show the relationship between the process of each refrigerant cycle and the temperature, and FIGS.
The respective Ph diagrams are shown in FIG. The temperature head in the heat pump system is considered to be equivalent to the pumping head in a hydraulic pump. However, as shown in FIGS. 4 and 5, a large temperature head is required when generating hot water in winter compared to when generating cold water in summer. I have. Also, as shown in FIGS. 6 and 7, from the respective Ph diagrams, the compression ratio is larger in winter operation than in summer. However, in the design of a compressor, since the clearance of a cylinder or a rotating blade is determined from the compression ratio, a large temperature head is naturally required. A refrigerant system equipped with a compressor designed based on the compression ratio at the time of generating hot water in winter has to be operated with reduced efficiency (compression efficiency) of the compressor during cold water operation in summer. For this reason, the conventional heating tower type heat pump system is equipped with two refrigerator compressors to improve the efficiency.
There is a refrigerant cycle in which the compression efficiency is improved by operating the compressor in a two-stage compression cycle when generating hot water and operating in a one-stage compression cycle when generating cold water in summer. Therefore, when designing and constructing a system, there arises a problem that two compressors must be mounted.
They were not always satisfactory in terms of construction cost, space, and construction volume. In the conventional heating tower type heat pump system, water stored in the heat storage tank was the mainstream medium for storing heat.However, since water is used as the heat storage medium, high density heat storage cannot be expected In order to cope with the heat load in the summer season, the equipment must be large-scale, and there is a space problem when air-conditioning the building. [0006] In this respect, for example, Japanese Patent Application Laid-Open No. Hei 2-166330 previously disclosed by the present applicant discloses that a new ice heat storage system developed by the present applicant is utilized in summer. A "heat storage type cooling and heating method" which can sufficiently cope with a large heat load has been proposed. In the present invention, in consideration of the above-mentioned problems observed in the conventional heating tower type heat pump system, a new air conditioning system using the ice storage system developed by the present applicant and further using the heating tower type together is adopted. It is intended to solve the problem by providing a heat storage method. Therefore, in the present invention, a heat storage tank for storing a heat source water for air conditioning, a supercooler for generating supercooled water of 0 ° C. or less using brine as a cold heat source, and a supercooler for releasing the supercooled state of the supercooled water. A cooling unit having a releasing means, a condenser having a condenser and an evaporator, and a cooling tower are used. During cooling, brine is circulated between an evaporator and a supercooler of the refrigerator, and cooling water from the cooling tower is cooled by the refrigerator. Circulating between the condenser and the cooling tower,
The heat source water taken from the heat storage tank is supplied to the supercooler, and the supercooled water discharged from the supercooler is converted into ice / water slurry by the supercool release means, and the generated ice / water slurry is stored in the heat storage tank. Ice and water coexist in the heat storage tank by supplying it into the tank, and at the time of heating, the brine is circulated between the evaporator of the refrigerator and the cooling tower. intake heat source water heat is supplied to the condenser of the refrigerator, by supplying the hot water storage tank to be produced, respectively in summer, and to obtain a heat source water for winter air-conditioning. The supercooler using brine as a cold heat source is somewhat inferior to the direct expansion type supercooler in terms of efficiency, but the compression ratio of the compressor of the refrigerator at that time is in winter. The difference is smaller than that at the time of hot water generation. Therefore, even if the refrigerator is operated by one compressor during both cooling in summer and heating in winter, the compression efficiencies in both periods are not so large. On the other hand, the ice generated by releasing the supercooled water from the supercooled state is a sherbet-shaped ice, and can have a high IPF (ice filling rate) and can store heat at a high density. Therefore 1
Considering the operation of the refrigerator by the compressor of the compressor and the high-density heat storage in the summer, the operation rate of the equipment is high when viewed throughout the summer and winter seasons, resulting in an extremely efficient heat source for air conditioning. The high heat storage density with only one machine can reduce the space required for system construction. In addition, a supercooler using brine as a cold heat source has no refrigerant piping and is simple to construct. Therefore, even when the cooling operation and the heating operation are performed by switching the water channel, the required amount of piping is minimal, and the system can be easily constructed. [0010] Furthermore, the cooling tower is used as a heating tower in winter, and it is possible to easily take heat from the outside air to the brine. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below with reference to the drawings. FIG. 1 shows an arrangement of main equipment necessary for carrying out the embodiment and a piping system. The refrigerator 1 used in this embodiment has a compressor 2, a condenser 3, an expansion valve 4, and an evaporator 5. On the other hand, a supercooler 7 is disposed above a heat storage tank 6 for storing heat source water for air conditioning, and heat source water in the heat storage tank 6 pumped by a pump 9 from an intake pipe 8 having an intake port in the heat storage tank 6 is connected to a water channel. The supercooler 7 is supplied through a and b. [0012] The subcooler 7 are intended to brine that has been cooled by the evaporator 5 of the refrigerating machine 1 and the cold heat source, the brine waterway c, through the d is supplied to the subcooler 7 by pump 10 , Returned to the evaporator 5 through water channels e and f,
A refrigerant circuit is formed between the subcooler 7 and the evaporator 5. Then, the water passed through the supercooler 7 becomes supercooled water of 0 ° C. or less, is discharged to the supercooling release pipe 11, and the supercooled state is released by the impact at that time, so that the sherbet-like ice is removed. It is formed in a slurry state with water and supplied to the heat storage tank 6 through the transfer pipe 12. On the other hand, the heat source water in the heat storage tank 6 pumped up by the pump 9 from the water intake pipe 8 passes through the water channels a and g and is supplied to the refrigerator 1.
The pipes are also supplied to the condenser 3 of this type. The condenser 3 has a pipe system which is returned to the heat storage tank 6 through the water paths h and i, and a heat pipe through the water paths h, j and k. There is provided a pipeline system that is supplied to the sprinkling section 14 of the cooling tower 13 also serving as a cooling tower. The lower water tank 15 of the cooling tower / cooling tower 13 is provided with a pipeline system communicating with the water channel f via the water channels l and m and a pipeline system communicating with the water channel g via the water channels l and n. In the figure, 21, 22, 23, 24,
Reference numerals 25, 26, 27, 28, and 29 denote valves provided in each water channel, and reference numeral 30 denotes a pump for supplying the cooling tower and cooling tower 13 together. The main equipment for carrying out the present embodiment,
The piping system is configured as described above, and the case where the cooling operation is performed in the summer season will be described with reference to FIG. 2. First, among the valves provided in each water channel, valves 24, 25, 27, and 2 are used.
8 is closed. The water in the heat storage tank 6 that has been taken in by the water intake pipe 8 through an ice nucleus separation device (not shown) such as an ice filter is supplied to the subcooler 7 by the pump 9 through the water paths a and b. In the evaporator 5 of the refrigerator 1,
The brine cooled to about 6 ° C. is supplied to the subcooler 7 by the pump 10 through the channels c and d, and is returned to the evaporator 5 through the channels e and f to circulate (FIG. 2).
In white arrow). At this time, the cooling water supplied to the condenser 3 is
The water is supplied from the lower water tank 15 of the cooling tower / cooling tower 13 to the evaporator 3 through the channels l and n, and the channels h, j,
Through k, it is returned to the heating tower / cooling tower 13 by the pump 30 and circulated. Then, from the supercooled water discharged from the supercooler 7, ice / water slurry is generated by the supercool release means 11, supplied to the heat storage tank 6 through the transport pipe 12, and stores the ice with the water in the heat storage tank 6. Ice storage operation is performed. From such a state, for example, cold water is supplied from the heat storage tank 6 to a load-side heat exchanger (not shown) such as a fan coil unit, and the water whose temperature has been raised thereby is returned to the heat storage tank 6 again. The cold water in the tank 6 is used for air conditioning during cooling. Next, the heating operation performed in winter will be described with reference to FIG. 3. First, among valves provided in each water channel,
Valves 21, 22, 23, 26, 29 are closed. When the refrigerator 1 is operated, the brine circulating between the evaporator 5 and the subcooler 7 during the cooling operation is changed to the water channel c, this time.
The brine, which is supplied to the heating tower / cooling tower 13 by the pump 30 through k and is at about −10 ° C., is collected from the outside air there and is supplied from the lower water tank 15 to the evaporator 5 through water paths 1, m, and f. To circulate between the heating tower / cooling tower 13 and the evaporator 5 (open arrows in FIG. 3). On the other hand, the heat source water in the heat storage tank 6 is withdrawn from the water intake pipe 8 and supplied to the condenser 3 through the water channels a and g by the pump 9 and is heated there. Hot water is supplied (black arrow in FIG. 3). As described above, according to the present invention, during cooling operation in summer, high-efficiency and high-density heat storage can be performed, and in winter, heating operation can be performed by switching water channels without changing the system itself. I have. In addition, since the brine and the pump used for such a cooling and heating operation are shared, and can be used throughout the year, the operation efficiency in terms of equipment is good. Furthermore, since the difference in compression ratio is not so large during cooling and heating, it is not necessary to mount two compressors as in the related art. In the above embodiment, a single heat storage tank 6 is used. However, if this single heat storage tank 6 is used as a double heat storage tank and a condenser is added, a double bundle refrigerator can be used to simultaneously extract cold and hot water. Become. Also, by dividing the heat storage tank, etc.
It is also possible to generate hot water or store hot water at the same time as storing ice. According to the present invention, there is no need to switch the compression ratio between the cooling operation and the heating operation. There is no need to carry it. Therefore, the space related to the refrigerator required when constructing the system can be smaller than before,
The design of the system construction is easy, and the initial cost can be reduced. In addition, during the cooling operation in summer, heat is stored by ice heat storage, and as a result throughout the year, the system becomes extremely efficient, and even small-scale equipment can cope with a large heat load in summer. . Furthermore, since the supercooler uses a supercooler that uses brine as a cold heat source, it requires only a few refrigerant pipes. Need less. In addition, since the heat collection performed on the brine during the generation of hot water in winter is performed using a cooling tower as a heating tower, it is an extremely efficient heat storage method in terms of facilities.
【図面の簡単な説明】
【図1】実施例における主要な設備機器と配管系統の概
略図である。
【図2】冷房運転時の実施例における系統の概略図であ
る。
【図3】暖房運転時の実施例における系統の概略図であ
る。
【図4】従来のヒーティングタワー方式ヒートポンプシ
ステムの冷水生成時の冷媒サイクルの工程説明図であ
る。
【図5】従来のヒーティングタワー方式ヒートポンプシ
ステムの温水生成時の冷媒サイクルの工程説明図であ
る。
【図6】従来のヒーティングタワー方式ヒートポンプシ
ステムの冷水生成時のP−h線図である。
【図7】従来のヒーティングタワー方式ヒートポンプシ
ステムの温水生成時のP−h線図である。
【符号の説明】
1 冷凍機
2 圧縮器
3 凝縮器
5 蒸発器
6 蓄熱槽
7 過冷却器
11 過冷却解除手段
13 ヒーティングタワー兼用冷却塔BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a schematic diagram of main equipment and a piping system in an embodiment. FIG. 2 is a schematic diagram of a system in an embodiment during a cooling operation. FIG. 3 is a schematic diagram of a system in an embodiment during a heating operation. FIG. 4 is an explanatory diagram of a process of a refrigerant cycle when generating cold water in a conventional heating tower type heat pump system. FIG. 5 is an explanatory diagram of a process of a refrigerant cycle when generating hot water in a conventional heating tower type heat pump system. FIG. 6 is a Ph diagram of the conventional heating tower type heat pump system when cold water is generated. FIG. 7 is a Ph diagram of the conventional heating tower type heat pump system when hot water is generated. [Description of Signs] 1 Refrigerator 2 Compressor 3 Condenser 5 Evaporator 6 Heat storage tank 7 Subcooler 11 Subcooling release means 13 Heating tower / cooling tower
───────────────────────────────────────────────────── フロントページの続き (72)発明者 谷野 正幸 神奈川県相模原市共和2−8−21 ホワ イトビレッヂ101 (72)発明者 菊地 栄 神奈川県厚木市下津古久1−3−17 (72)発明者 入部 真武 神奈川県厚木市愛甲710−1 コートア ムールII203 (72)発明者 守屋 充 神奈川県座間市相模ヶ丘3−7−25 サ ンライトヒルズ203 (72)発明者 衛藤 一典 東京都町田市森野4−15−12 寺田ビル 森野B−311 (72)発明者 松本 正 神奈川県厚木市妻田北3−14−50 コー ポ本厚木A−103 (56)参考文献 特開 平2−44134(JP,A) 特開 平4−143535(JP,A) 特開 平2−166330(JP,A) (58)調査した分野(Int.Cl.7,DB名) F24F 5/00 102 ──────────────────────────────────────────────────続 き Continued on the front page (72) Inventor Masayuki Tanino 2-8-21 Kyowa, Sagamihara City, Kanagawa Prefecture White Village 101 (72) Inventor Sakae Kikuchi 1-3-17 Koku Shimotsu, Atsugi-shi, Kanagawa Prefecture (72) Inventor Ibe Shintake 710-1 Court Amour II 203, Aiko, Atsugi-shi, Kanagawa Prefecture (72) Inventor Mitsuru Moriya 3-7-25, Sagamigaoka, Zama-shi, Kanagawa Prefecture Sunlight Hills 203 (72) Inventor Kazunori Eto 4-, Morino, Machida, Tokyo, Japan 15-12 Terada Building Morino B-311 (72) Inventor Tadashi Matsumoto 3-14-50 Tsumadakita, Atsugi-shi, Kanagawa Prefecture A-103 Honatsutsugi A-103 (56) References JP-A-2-44134 (JP, A) JP-A-4-143535 (JP, A) JP-A-2-166330 (JP, A) (58) Fields investigated (Int. Cl. 7 , DB name) F24F 5/00 102
Claims (1)
を冷熱源として0゜C以下の過冷却水を生成する過冷却
器、当該過冷却水の過冷却状態を解除する過冷却解除手
段、凝縮器と蒸発器を有する冷凍機、及び冷却塔を使用
し、 冷房時にはブラインを冷凍機の蒸発器と過冷却器
との間で循環させ、また冷却塔からの冷却水は冷凍機の
凝縮器と冷却塔との間を循環させ、蓄熱槽から取水した
熱源水を過冷却器に供給し、当該過冷却器から吐出され
る過冷却水を過冷却解除手段によって氷・水スラリーに
変換し、生成された前記氷・水スラリーを蓄熱槽内に供
給してこの蓄熱槽内に氷・水を共存させ、 暖房時には、前記ブラインを前記冷凍機の蒸発器と冷却
塔との間で循環させ、また蓄熱槽から取水した熱源水は
前記冷凍機の凝縮器に供給して加熱し、生成される温水
を蓄熱槽内に供給することを特徴とする、空調用蓄熱方
法。(57) [Claims 1] A heat storage tank for storing heat source water for air conditioning, a supercooler for generating supercooled water of 0 ° C or less using brine as a cold heat source, and supercooling of the supercooled water. Using a supercooling release means for releasing the state, a refrigerator having a condenser and an evaporator, and a cooling tower, and circulating brine between the evaporator and the supercooler of the refrigerator during cooling, and from the cooling tower. Cooling water was circulated between the condenser of the refrigerator and the cooling tower, and was taken from the heat storage tank.
The heat source water is supplied to the subcooler, and the supercooled water discharged from the subcooler is converted into ice / water slurry by the subcooling releasing means, and the generated ice / water slurry is supplied into the heat storage tank. Ice and water coexist in the lever storage tank. During heating, the brine is circulated between the evaporator and the cooling tower of the refrigerator, and the heat source water withdrawn from the storage tank is
The heating is supplied to the refrigerator of the condenser, and supplying hot water produced in the thermal storage tank, the air-conditioning heat storage method.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP32901092A JP3511210B2 (en) | 1992-11-16 | 1992-11-16 | Heat storage method for air conditioning |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP32901092A JP3511210B2 (en) | 1992-11-16 | 1992-11-16 | Heat storage method for air conditioning |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH06147562A JPH06147562A (en) | 1994-05-27 |
| JP3511210B2 true JP3511210B2 (en) | 2004-03-29 |
Family
ID=18216598
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP32901092A Expired - Fee Related JP3511210B2 (en) | 1992-11-16 | 1992-11-16 | Heat storage method for air conditioning |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3511210B2 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| ES2277780B1 (en) * | 2005-12-01 | 2008-06-16 | Andres Medrano Alijas | COOLING ASSEMBLY OF AN AIR CONDITIONING SYSTEM AND COOLING PROCEDURE. |
-
1992
- 1992-11-16 JP JP32901092A patent/JP3511210B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH06147562A (en) | 1994-05-27 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR101864636B1 (en) | Waste heat recovery type hybrid heat pump system | |
| JP2005257127A (en) | Natural refrigerant heat pump system | |
| JP2991337B1 (en) | Unused heat source ice heat storage heat pump device | |
| JP2007010288A (en) | Method for enhancing cooling / heating capacity of existing heat pump air conditioner, heat storage unit device, and heat pump air conditioner using the device | |
| JP2003185287A (en) | Supercooled water and hot water production system | |
| JP3511210B2 (en) | Heat storage method for air conditioning | |
| JP5240040B2 (en) | Refrigeration equipment | |
| JP2000205774A (en) | Capsule type heat storage device | |
| JP4241662B2 (en) | Heat pump system | |
| JP2004251557A (en) | Refrigeration system using carbon dioxide as refrigerant | |
| JP4270803B2 (en) | Cold generation system | |
| JP3821286B2 (en) | Refrigeration system combining absorption type and compression type and its operating method | |
| JP2924460B2 (en) | Air conditioner | |
| JPH05133635A (en) | Cold storage type air conditioner | |
| CN201037714Y (en) | High-efficiency multifunctional air energy unit | |
| KR100345579B1 (en) | The combined Compact Refrigerative / Regenerative Heat-Pump System | |
| KR100187774B1 (en) | A regenerative cooling system | |
| KR20030082822A (en) | The Combined Cooling and Heating Ice Regenerative System | |
| JP3260418B2 (en) | Thermal storage type air conditioner | |
| JPH0275842A (en) | Regenerative heat pump device | |
| JP3502155B2 (en) | Thermal storage type air conditioner | |
| JP3063969U (en) | Circuit type heat pipe thermal battery | |
| JP2851696B2 (en) | Thermal storage type air conditioner | |
| KR101493783B1 (en) | Refrigerant supercooling type air conditioner | |
| JPH06101934A (en) | Air conditioning system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20020115 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20031218 |
|
| LAPS | Cancellation because of no payment of annual fees |