Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP3525481B2 - Train control device - Google Patents
[go: Go Back, main page]

JP3525481B2 - Train control device - Google Patents

Train control device

Info

Publication number
JP3525481B2
JP3525481B2 JP04540994A JP4540994A JP3525481B2 JP 3525481 B2 JP3525481 B2 JP 3525481B2 JP 04540994 A JP04540994 A JP 04540994A JP 4540994 A JP4540994 A JP 4540994A JP 3525481 B2 JP3525481 B2 JP 3525481B2
Authority
JP
Japan
Prior art keywords
train
target
speed
maximum
time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP04540994A
Other languages
Japanese (ja)
Other versions
JPH06321115A (en
Inventor
悟 村田
敦 川端
修一 三浦
維史 田代
泰男 諸岡
正和 八尋
正樹 片平
和郎 解良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Priority to JP04540994A priority Critical patent/JP3525481B2/en
Publication of JPH06321115A publication Critical patent/JPH06321115A/en
Application granted granted Critical
Publication of JP3525481B2 publication Critical patent/JP3525481B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Electric Propulsion And Braking For Vehicles (AREA)
  • Train Traffic Observation, Control, And Security (AREA)
  • Traffic Control Systems (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、計画ダイヤに基づいて
走行する列車を制御する列車制御装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a train control device for controlling a train running on a schedule.

【0002】[0002]

【従来の技術】従来、列車の運転は、運転士の経験に頼
っていた。駅を出発した運転士に与えられる情報は、次
の駅における到着予定時刻と発車時刻のみであった。運
転士は、乗車率,区間内の勾配,信号やカーブによる速
度制限,省エネ,乗り心地等を考慮しながら経験に従っ
て運転を行っており、駅間の走行時間と次の駅の発車時
刻までの余裕時間の使い方は、運転士任せであった。
2. Description of the Related Art Conventionally, train operation has been dependent on the experience of a driver. The only information given to the driver leaving the station was the estimated arrival time and departure time at the next station. The driver is driving according to his experience, taking into consideration the boarding rate, the gradient within the section, the speed limitation by signals and curves, energy saving, the riding comfort, etc., and the driving time between stations and the departure time of the next station How to use the spare time was left to the driver.

【0003】もし、天候状態や事故等により列車ダイヤ
に乱れが生じた場合は、中央指令所の運行管理装置が修
正ダイヤを決定し、その修正ダイヤに基づいた駅間走行
時間を列車へ伝達していた。このとき運転士は、修正さ
れた駅間走行時間内に運転する。
If the train schedule is disturbed due to weather conditions, accidents, etc., the operation management device of the central command station determines a revised schedule, and the train running time based on the revised schedule is transmitted to the train. Was there. At this time, the driver drives within the corrected traveling time between stations.

【0004】一方、保安として自動列車制御装置(以
下、ATCと記す)が用いられている。このATCは、
特開昭48−64604 号に記載されている様に、駅間を複数
の区間に分割し、先行列車との位置関係に応じて区間単
位で速度制限する仕組みになっており、先行列車との間
の区間数が減ってくるほど制限速度が抑えられる機構が
用いられていた。
On the other hand, an automatic train controller (hereinafter referred to as ATC) is used for security. This ATC is
As described in JP-A-48-64604, the station is divided into a plurality of sections, and the speed is limited in each section according to the positional relationship with the preceding train. A mechanism was used in which the speed limit was suppressed as the number of sections in between decreased.

【0005】[0005]

【発明が解決しようとする課題】従来は、駅間における
余裕時間の使い方は運転士に一任しているため、先行列
車の位置や速度が運転士に分からない。そのため悪天候
や事故により先行列車が減速していても通常どおり走行
するので、ATCにより速度制限を受け、与えられた駅
間走行時間を守ることができなくなる場合があった。ま
た速度制限を受けると、その影響で後続列車が速度制限
を受けるようになり、遅れがつぎつぎに波及していく、
いわゆるアコーディオン現象が生じ、運行ダイヤの乱れ
が拡大してしまう。
Conventionally, the driver does not know the position or speed of the preceding train because the driver is left to use the spare time between stations. For this reason, even if the preceding train slows down due to bad weather or an accident, the train runs normally, so there are cases where the ATC limits the speed and it becomes impossible to keep the running time between stations. Also, if the speed limit is imposed, the subsequent trains will be subject to the speed limit due to the influence, and the delay will spread one after another.
The so-called accordion phenomenon occurs, and the disorder of the train schedule will be magnified.

【0006】また修正ダイヤによりダイヤの乱れを回復
する場合でも、その修正ダイヤに含まれている余裕時間
の使い方が個々の運転士に任せられているから、運転士
はできるだけ速く列車ダイヤを回復しようとして制限速
度一杯で走ろうとする。そのため先行列車との距離がつ
まっていくことになり、再びアコーディオン現象が生じ
てしまい、ダイヤの回復が遅れる場合があった。
[0006] Further, even when the disorder of the timetable is recovered by the modified timetable, the driver tries to recover the train timetable as quickly as possible because the individual driver is allowed to use the spare time included in the modified timetable. Tries to run at full speed limit. As a result, the distance from the preceding train became shorter, and the accordion phenomenon occurred again, which sometimes delayed the recovery of the diamond.

【0007】このように従来の制御方法では、一度、列
車の運行に乱れが生じると、その乱れが後続の移動体に
波及しやすいため、運行計画の変更を余儀なくされる場
合が多かった。また運行ダイヤを変更し、早急に元の運
行計画への回復を図る際に、なかなか回復しない場合が
あった。
As described above, in the conventional control method, once the train operation is disturbed, the disturbance is likely to spread to the succeeding moving bodies, so that the operation plan is often forced to be changed. In addition, when the operation schedule was changed and an attempt was made to quickly restore the original operation plan, there were cases where it did not recover easily.

【0008】本発明の目的は、列車運行の遅延を極力防
止する列車制御装置を提供することにある。
An object of the present invention is to provide a train control device which prevents the delay of train operation as much as possible.

【0009】また、本発明の他の目的は、遅延が発生し
ても、回復を早めることのできる列車制御装置を提供す
ることにある。
Another object of the present invention is to provide a train control device which can speed up recovery even if a delay occurs.

【0010】[0010]

【課題を解決するための手段】本発明は、列車ダイヤに
基づいて、制御対象列車に対して、その列車の到達目標
として到達位置,到達時刻,到達時における目標速度を
指令し、この到達目標を入力して到達目標までの走行可
能範囲を運転台に表示する列車制御装置であって、前記
走行可能範囲は、距離−時刻平面上において、現在位置
から最大減速度で減速し、停止したら当該停止を維持
し、その後最大加速度で加速し、最高速度に至ったら当
該速度を維持し、その後最大減速度で減速して前記到達
目標に前記目標速度で到達する軌跡と、現在位置から最
大加速度で加速し、最高速度に至ったら当該速度を維持
し、その後最大減速度で減速し、停止したら当該停止を
維持し、その後最大加速度で加速して前記到達目標に前
記目標速度で到達する軌跡とに囲まれた領域である列車
制御装置である。
According to the present invention, an arrival position, an arrival time, and a target speed at arrival are instructed to a controlled train as an arrival target of the train based on a train schedule, and the arrival target is reached. Is a train control device that displays the travelable range up to the arrival target on the driver's cab, wherein the travelable range is decelerated at the maximum deceleration from the current position on the distance-time plane, and when stopped Maintain a stop, then accelerate at maximum acceleration, maintain that speed when the maximum speed is reached, then decelerate at maximum deceleration and reach the target at the target speed and the maximum acceleration from the current position. Accelerate and maintain the speed when reaching the maximum speed, then decelerate at maximum deceleration, maintain the stop when stopped, then accelerate at maximum acceleration to reach the target at the target speed A train control device which is a region surrounded by the trajectory.

【0011】また本発明は、列車ダイヤに基づいて、制
御対象である先行列車と後続列車に対して、それら列車
の到達目標として到達位置,到達時刻,到達時における
目標速度を指令し、これら列車が目標に到達するための
走行可能範囲を演算して、当該走行可能範囲から前記後
続列車に対して走行支障の発生を検出したとき、前記い
ずれかの列車に対してその列車の走行可能範囲内に新た
に到達目標を設定する列車制御装置であって、前記走行
可能範囲は、距離−時刻平面上において、現在位置から
最大減速度で減速し、停止したら当該停止を維持し、そ
の後最大加速度で加速し、最高速度に至ったら当該速度
を維持し、その後最大減速度で減速して前記到達目標に
前記目標速度で到達する軌跡と、現在位置から最大加速
度で加速し、最高速度に至ったら当該速度を維持し、そ
の後最大減速度で減速し、停止したら当該停止を維持
し、その後最大加速度で加速して前記到達目標に前記目
標速度で到達する軌跡とに囲まれた領域である列車制御
装置である。
Further, according to the present invention, based on the train schedule, the arrival position, the arrival time, and the target speed at the arrival are commanded to the preceding train and the succeeding train which are control targets as the arrival targets of these trains, and these trains Calculates the travelable range for reaching the target and detects the occurrence of a travel obstacle for the following train from the travelable range, within the travelable range of the train for any of the trains. In the train control device that newly sets the reaching target, the travelable range is decelerated at the maximum deceleration from the current position on the distance-time plane, and when stopped, the stop is maintained, and then at the maximum acceleration. Accelerate, maintain the speed when reaching the maximum speed, then decelerate at maximum deceleration and reach the target at the target speed, and accelerate from the current position to maximum acceleration, When the speed reaches a certain level, the speed is maintained, then the speed is decelerated with the maximum deceleration, the stop is maintained when the speed is stopped, and then the area is surrounded by the locus of accelerating with the maximum acceleration and reaching the reaching target at the target speed. Is a train control device.

【0012】列車に対して、到達目標として到達位置,
到達時刻,到達時における速度を指令することによっ
て、この列車の時刻−距離平面上の走行可能範囲が一義
的に決まる。この範囲にこの列車の運行を妨げる支障、
例えば、ATCの制限速度信号がなければ、若しくは、
支障のないような到達目標(前述したように駅の着時刻
のみ決められているので先行列車の走行の仕方によって
後続列車に支障が生じる)を設定すれば、遅延の原因と
なる支障を極力回避することができる。
For the train, the arrival position as the arrival target,
The travelable range of this train on the time-distance plane is uniquely determined by instructing the arrival time and the speed at the arrival time. Obstacles that hinder the operation of this train within this range,
For example, if there is no ATC speed limit signal, or
By setting a goal that does not cause any obstacles (only the arrival time at the station is determined as described above, which causes obstacles to the following trains depending on how the preceding train runs), avoid the obstacles that cause delays as much as possible. can do.

【0013】また、到達目標から走行可能範囲を演算し
た結果、支障があると判断されたとき、その走行可能範
囲内に新たに中間到達目標を設定することにより、走行
可能範囲がさらに限定され、支障となる要因が取り除か
れ、最も速く遅延を回復することができる。
When it is determined that there is a problem as a result of calculating the travelable range from the reachable target, the travelable range is further limited by newly setting an intermediate reachable target within the runnable range, Obstacles are removed and delays are most quickly recovered.

【0014】[0014]

【発明の実施の形態】図2乃至図7を用いて、本発明に
より運転時隔が小さくなることを説明する。
DESCRIPTION OF THE PREFERRED EMBODIMENTS It will be described with reference to FIG. 2 to FIG. 7 that the driving interval is reduced by the present invention.

【0015】図2は、ある列車に目標として(位置,時
刻,速度)を与えることによって時刻−距離平面上にお
ける走行可能範囲が決定されることを示す図である。
FIG. 2 is a diagram showing that the travelable range on the time-distance plane is determined by giving a target (position, time, speed) to a train.

【0016】列車に目標として(位置,時刻,速度)の
組(s1,t1,v1),(s2,t2,v2)を図示
のように与えると、列車の最大加速度,最大減速度,最
高速度は列車固有の値として、路線の状態(勾配,曲線
等)も路線毎に決まっているので、時刻−距離平面上に
おける走行可能範囲は、一義的に図示の曲線によって囲
まれる領域となる。すなわち、領域の上部は、曲線31
1の地点s1において速度v1から速度0まで最大減速
度で減速し、直線312で停止し、曲線315で速度0
から最高速度まで最大加速度で加速し、直線314で最
高速度を維持し、曲線313で速度v2になるように減
速する軌跡であり、下部は、曲線316で速度v1から
最高速度まで最大加速度で加速し、直線317で最高速
度を維持し、曲線320で最大減速度で速度0まで減速
し、直線319で停止した後、曲線318で最大加速度
で速度v2になるように加速する軌跡であり、走行可能
範囲はこの範囲内に制限される。
When the train is given a set of (position, time, speed) (s1, t1, v1), (s2, t2, v2) as shown in the figure, the maximum acceleration, maximum deceleration and maximum speed of the train are given. Is a value peculiar to the train, and the state of the route (gradient, curve, etc.) is also determined for each route, so the travelable range on the time-distance plane is uniquely the region surrounded by the curve shown. That is, the upper part of the area is curved 31
At the point s1 of 1, the vehicle decelerates from the speed v1 to the speed 0 with the maximum deceleration, stops at the straight line 312, and the speed 0 at the curve 315.
From the maximum speed to the maximum speed, the maximum speed is maintained on the straight line 314, and the curve 313 decelerates to the speed v2. The lower part is the maximum acceleration from the speed v1 to the maximum speed on the curve 316. Then, the straight line 317 maintains the maximum speed, the curve 320 decelerates to the speed 0 with the maximum deceleration, the straight line 319 stops, and the curve 318 accelerates to the maximum speed v2. The possible range is limited to this range.

【0017】現在の(位置,時刻,速度)を(s1,t
1,v1)とすると、将来の(s2,t2,v2)を指
定することにより、時刻−距離平面上における走行可能
範囲を限定することができる。またさらに、地点s1,
s2における列車の加速度(減速度)を指定するとさら
に走行可能範囲は限定される。
The current (position, time, speed) is calculated as (s1, t
1, v1), the travelable range on the time-distance plane can be limited by specifying future (s2, t2, v2). Furthermore, point s1,
When the acceleration (deceleration) of the train in s2 is designated, the travelable range is further limited.

【0018】次に図3を用いて走行可能範囲を狭める原
理を説明する。
Next, the principle of narrowing the travelable range will be described with reference to FIG.

【0019】図2における2目標から得られる走行可能
範囲内に、新たに中間目標321を指定することによ
り、図示するように走行可能範囲は図2に示す領域より
狭めることができる。
By newly designating the intermediate target 321 within the travelable range obtained from the two targets in FIG. 2, the travelable range can be made narrower than the area shown in FIG. 2 as shown in the figure.

【0020】図4は同一路線上に2列車が存在する場合
を示したもので、この場合の列車の最適走行パターンに
ついて説明する。駅1を出発した列車(曲線400)を
後続の列車が駅2において追い越す(曲線402,40
3)場合を示す。
FIG. 4 shows a case where two trains exist on the same route. The optimum traveling pattern of the trains in this case will be described. Subsequent trains overtake the train that left station 1 (curve 400) at station 2 (curves 402, 40).
3) Show the case.

【0021】先行列車の走行に伴い、保安用の自動列車
制御装置(以下、ATC)による制限速度信号が出力さ
れ、後続列車がこの制限速度信号以上速度で走行すると
後続列車は常用最大ブレーキ(ATCブレーキ)が掛か
り制限速度以下になるまで減速される。この制限速度信
号の変化の様子を示す軌跡が折線401である。後続列
車が駅1を通過後、高速を維持したまま走行すると曲線
402に示されるように先行列車に近づき過ぎるため制
限速度信号に抵触するためATCブレーキが作動し減速
を余儀なくされてしまう。
As the preceding train travels, a speed limit signal is output by an automatic train control device for security (hereinafter referred to as ATC). When the succeeding train travels at a speed higher than the speed limit signal, the succeeding train operates at the maximum service brake (ATC). The brake will be applied and the speed will be reduced until the speed falls below the speed limit. A broken line 401 is a locus showing how the speed limit signal changes. If the succeeding train passes the station 1 and runs at a high speed, it approaches the preceding train too much as shown by the curve 402, and the ATC brake is activated due to the conflict with the speed limit signal, forcing deceleration.

【0022】もし、後続列車が曲線403のように走行
されるのであれば、ATCブレーキが作動することな
く、滑らかに駅2に進入し先行列車を追い越すことがで
きる。曲線402と曲線403を比較すると、曲線40
2はATCブレーキが作動するため駅2を通過する時刻
が曲線403に比べ遅れてしまっているため列車遅延の
原因となったり、列車遅延が生じている場合遅延解消の
阻害要因となったりする。さらに、曲線402において
はATCブレーキ作動後再加速(再力行)を行うため、
消費電力が増大したり、乗客の乗り心地が悪化したりす
る。従って、列車の走行にとって、極力ATCブレーキ
が作動しないようにすることが必要条件である。
If the succeeding train travels along a curve 403, it is possible to smoothly enter the station 2 and pass the preceding train without operating the ATC brake. Comparing the curves 402 and 403, the curve 40
In No. 2, since the ATC brake operates, the time passing through the station 2 is delayed as compared with the curve 403, which causes a train delay, or an obstacle to the delay cancellation when a train delay occurs. Further, in the curve 402, since re-acceleration (re-powering) is performed after the ATC brake is activated,
The power consumption increases, and the riding comfort of passengers deteriorates. Therefore, it is a necessary condition for running the train to prevent the ATC brake from operating as much as possible.

【0023】このような理想的走行パターン403を生
成するための本発明の原理を図5乃至図7により説明す
る。
The principle of the present invention for generating such an ideal traveling pattern 403 will be described with reference to FIGS.

【0024】図5において、目標((位置,時刻,速
度)の組を指す、以下同様)404は先行列車の駅1発
時刻、目標405は先行列車の駅2到着時刻、目標40
6は後続列車の駅1通過時刻、目標407は後続列車の
駅2通過時刻を示す目標である。本実施形態では、例え
ば、この目標404,405と目標406,407を夫
々先行列車と後続列車の目標として、図2において説明
した領域を算出する。領域408は先行列車の走行可能
範囲で、領域409は後続列車の走行可能範囲である。
折線410は、領域408内を列車が走行した場合に生
じる制限速度信号の最悪の状態、すなわち、先行列車が
領域408の上部に沿って走行した場合に発生する制限
速度信号である。
In FIG. 5, a target (indicates a set of (position, time, speed), the same applies hereinafter) 404 is the departure time of the preceding train at station 1 and a target 405 is the arrival time of the preceding train at station 2 and the target 40.
6 is a target indicating the passage time of the succeeding train at station 1, and target 407 is a target indicating the passage time of the succeeding train at station 2. In the present embodiment, for example, the areas described in FIG. 2 are calculated with the targets 404 and 405 and the targets 406 and 407 as the targets of the preceding train and the succeeding train, respectively. A region 408 is a traveling range of the preceding train, and a region 409 is a traveling range of the following train.
The polygonal line 410 is the worst condition of the speed limit signal generated when the train travels in the area 408, that is, the speed limit signal generated when the preceding train travels along the upper portion of the area 408.

【0025】図5からもわかるように、先行列車及び後
続列車が夫々勝手に走行すると、後続列車にATCブレ
ーキが掛かってしまう状況が存在し、後続列車の最適な
運行を妨げる要因となる。本実施形態では、このように
各列車について走行可能な範囲を算出することによりA
TCによるブレーキが作動(列車同士の支障)する可能
性のある領域を求める。
As can be seen from FIG. 5, when the preceding train and the succeeding train run independently, there is a situation in which the succeeding train is subject to ATC brakes, which is a factor that hinders the optimum operation of the succeeding train. In this embodiment, by calculating the travelable range for each train in this way, A
Find the area where the braking by TC may operate (obstruction between trains).

【0026】次に、列車同士の支障を解消する原理を説
明する。図6に図3に示す基本原理を用いて列車同士の
支障を解消する場合を説明する。図5に示された目標に
加えて新たに目標411及び目標412を先行列車及び
後続列車に指定する。領域413,414と領域41
5,416が新たな目標によって分割された領域であ
る。
Next, the principle of eliminating obstacles between trains will be described. FIG. 6 illustrates a case in which obstacles between trains are eliminated by using the basic principle shown in FIG. In addition to the targets shown in FIG. 5, targets 411 and 412 are newly designated as the preceding train and the following train. Areas 413, 414 and Area 41
5, 416 are areas divided by a new target.

【0027】このように中間目標を設定することにより
先行列車の走行可能範囲が狭められ制限速度信号が先行
列車側に寄り後続列車に走行余裕ができるので、後続列
車にATCブレーキが掛かる可能性が減少する。これに
加え、後続列車に対して最も制限速度信号に抵触し易い
点を目標412とすることで、さらに後続列車にATCブ
レーキが掛かる可能性を小さくしている。
By setting the intermediate target in this manner, the travelable range of the preceding train is narrowed, the speed limit signal is closer to the preceding train, and the following train has a traveling margin, so that there is a possibility that the ATC brake will be applied to the following train. Decrease. In addition to this, the target 412 is set to a point where the following train is most likely to interfere with the speed limit signal, thereby further reducing the possibility that the ATC brake is applied to the following train.

【0028】図4において説明した最適走行パターンを
図6の距離−時刻平面に当てはめたものを図7に示す。
図4に示した最適走行パターン400は新たに分割され
た領域413及び領域414に、最適走行パターン40
3は領域415及び領域416に含まれることがわかる。
そして、先行列車及び後続列車は、これら領域を走行す
る限り列車同士の支障は発生しない。
FIG. 7 shows the optimum running pattern described in FIG. 4 applied to the distance-time plane of FIG.
The optimum driving pattern 400 shown in FIG. 4 is displayed in the newly divided areas 413 and 414.
It can be seen that 3 is included in the areas 415 and 416.
Then, the preceding train and the following train do not interfere with each other as long as they run in these areas.

【0029】以上説明したように、本実施形態では、列
車に対して目標(位置,時刻,速度)を指定することによ
り、列車同士の支障を回避でき、さらに中間目標を設定
することにより支障となる要因を極力取り除くことがで
きる。
As described above, in this embodiment, by designating targets (position, time, speed) for trains, obstacles between trains can be avoided, and further obstacles can be set by setting intermediate targets. Can be removed as much as possible.

【0030】ところで、上記のように目標を設定したと
しても、現実に列車がその目標に到達可能な目標でなけ
ればならない。そこで、目標に列車が到達可能であるか
を判断する処理を設ける。
By the way, even if the target is set as described above, the train must be a target that can actually reach the target. Therefore, a process for determining whether the train can reach the target is provided.

【0031】列車位置情報が更新される度に、予め記憶
されている列車の最速パターンが読み出され、最速パタ
ーンで走行した際に対象の列車が目標へ到達可能かどう
か計算することで、列車が目標へ到達可能であるかが判
断できる。これを図8,図9を用いて説明する。
Each time the train position information is updated, the fastest train pattern stored in advance is read out, and when the train runs in the fastest pattern, it is calculated whether or not the target train can reach the target. Can determine if the target can be reached. This will be described with reference to FIGS.

【0032】現在、列車が(s1,t1,v1)に存在
するとし、目標を(s2,t2,v2)とする。図8
は、距離−速度平面において、最速パターンの距離−速
度曲線501,現在の列車情報の位置・速度(s1,v
1)を表す点502,目標の位置・速度(s2,v2)
を表す点505を示したものである。点502(s1,
v1)から最大加速度で最速パターンへ到達する曲線5
04を計算する。この計算には、路線データ,列車性能
データを用いる。同様に曲線505も最大減速度を用い
ることにより計算される。この曲線504及び505の
計算結果と最速パターンの距離−時刻曲線501および
現在の列車位置速度情報とから、目標の位置・速度(s
2,v2)に最も速く到達する場合の時刻tを計算する
ことができる。この時刻tと目標(s2,t2,v2)
の時刻t2を比較し、t≦t2であれば到達可能,t>
t2であれば到達不可能であると判断できる。
It is assumed that the train currently exists at (s1, t1, v1), and the target is (s2, t2, v2). Figure 8
Is the distance-speed curve 501 of the fastest pattern on the distance-speed plane, the position / speed of the current train information (s1, v
Point 502 representing 1), target position / speed (s2, v2)
Is a point 505 that represents Point 502 (s1,
Curve 5 that reaches the fastest pattern from v1) with maximum acceleration
Calculate 04. Route data and train performance data are used for this calculation. Similarly, curve 505 is calculated by using maximum deceleration. From the calculated results of the curves 504 and 505, the distance-time curve 501 of the fastest pattern, and the current train position / speed information, the target position / speed (s
2, v2) can be calculated when the time t is reached fastest. This time t and target (s2, t2, v2)
Of time t2 are compared, reachable if t ≦ t2, t>
If t2, it can be determined that it is unreachable.

【0033】以上を距離−時刻平面で表すと、図9のよ
うになる。列車情報(s1,t1,v1)は点602,
距離−速度曲線504に対応する距離−時刻曲線は60
4,距離−速度曲線501に対応する距離−時刻曲線は
601,目標の位置・速度(s2,v2)に最も速く到
達した状態(s2,t,v2)は603である。図9に
おける矢印の傾きは602,603における速度を表し
ている。ここで、目標(s2,t2,v2)が607
(t>t2)である場合は到達不可能であり、606
(t≦t2)である場合は到達可能である。
The above is expressed in the distance-time plane as shown in FIG. Train information (s1, t1, v1) is point 602
The distance-time curve corresponding to the distance-speed curve 504 is 60.
4, the distance-time curve corresponding to the distance-speed curve 501 is 601, and the state (s2, t, v2) that reaches the target position / speed (s2, v2) fastest is 603. The inclination of the arrow in FIG. 9 indicates the speed at 602 and 603. Here, the target (s2, t2, v2) is 607
If (t> t2), it is unreachable, and 606
If (t ≦ t2), it is reachable.

【0034】tを求める計算において、最速パターンの
距離−速度曲線および距離−時刻曲線は予め計算し記憶
されているため、実際に計算を行うのは曲線504,5
05のみであり、計算量は少ない。
In the calculation of t, since the distance-speed curve and the distance-time curve of the fastest pattern are calculated and stored in advance, the actual calculation is performed by the curves 504, 5
Only 05, the calculation amount is small.

【0035】目標が到達可能であればこの目標を指令
し、もし不可能とされれば再度目標を設定し直す。
If the target can be reached, this target is commanded, and if it is impossible, the target is set again.

【0036】次にこの原理を実現するための一実施形態
を図1を用いて説明する。
Next, an embodiment for realizing this principle will be described with reference to FIG.

【0037】地上には、中央運行管理装置10000と
駅装置11000が設置される。中央運行管理装置10
000は、全線に渡る列車群の監視を行い、列車ダイヤ
の作成及び変更を行う。そして、運行管理計算機101
00は、中央ローカルネットワーク10300,ゲート
ウェイ10400,広域ネットワーク12000を介し
て駅装置11000と接続される。
A central operation management system 10000 and a station system 11000 are installed on the ground. Central operation management device 10
000 monitors the train group across all lines and creates and changes the train schedule. And the operation management computer 101
00 is connected to the station device 11000 via the central local network 10300, the gateway 10400, and the wide area network 12000.

【0038】駅装置11000は、列車ダイヤに基づく
駅ダイヤを持ち、前駅を出発して自駅へ向かう列車を監
視し、駅ダイヤに基づいて目標状態を設定し列車20へ
送信する。以下、前駅から自駅構内までの範囲を自駅区
域と呼ぶ。駅計算機11100 は駅ローカルネットワーク1
1200に接続されている。また、駅装置11000と
車上装置200は、無線通信装置101及び無線通信装
置201を介し情報交換できる。
The station device 11000 has a station timetable based on the train timetable, monitors a train departing from the previous station and heading to the own station, sets a target state based on the station timetable, and transmits it to the train 20. Hereinafter, the range from the front station to the premises of the own station is called the own station area. Station computer 11100 is station local network 1
It is connected to 1200. Further, the station device 11000 and the on-board device 200 can exchange information via the wireless communication device 101 and the wireless communication device 201.

【0039】運行管理計算機10100のメモリ101
50上には、オペレーティングシステム10151(以
下、OS),ダイヤ情報プログラム10152が存在
し、これらをプロセッサ10120が読みだして実行す
る。
Memory 101 of operation management computer 10100
An operating system 10151 (hereinafter referred to as OS) and a timetable information program 10152 exist on the computer 50, and the processor 10120 reads and executes them.

【0040】運行管理計算機10100には、プロセッ
サ10120,入力デバイスインターフェース1011
0を介してマウス10111やキーボード10112等
の入力デバイスが、ディスプレイインターフェース10
130を介してディスプレイ10131が、ネットワー
クアダプタ10160を通じて中央ローカルネットワー
ク10300が、ディスクインターフェース10140
を通じてダイヤ記憶装置10141が接続されている。
The operation management computer 10100 includes a processor 10120 and an input device interface 1011.
The input device such as the mouse 10111 or the keyboard 10112 via the display interface 10
The display 10131 via the network 130, the central local network 10300 via the network adapter 10160, and the disk interface 10140.
A diamond storage device 10141 is connected through.

【0041】ダイヤ管理プログラム10152は、駅装
置11000から送信されてくる列車位置情報をディス
プレイ10131上へ表示したり、指令員がマウス1011
1 やキーボード10112を通じて入力した変更ダイヤ
から各駅毎の変更ダイヤ作成を行う。
The timetable management program 10152 displays train position information transmitted from the station device 11000 on the display 10131, and the commander sends a mouse 1011.
A change timetable for each station is created from the change timetable input via 1 or the keyboard 10112.

【0042】駅装置11000は、プロセッサ1112
0,メモリ11150のほか、外部機器インターフェー
ス11110を通じて無線通信装置11111が、ネッ
トワークアダプタ11130を介して駅ローカルネット
ワーク11200が、またディスクインターフェース1
1140を介して走行パターン記憶装置11141,駅
ダイヤ記憶装置11142,列車データ記憶装置111
43が接続されている。
The station device 11000 includes a processor 1112.
0, the memory 11150, the wireless communication device 11111 through the external device interface 11110, the station local network 11200 through the network adapter 11130, and the disk interface 1
Via 1140, a traveling pattern storage device 11141, a station timetable storage device 11142, a train data storage device 111
43 is connected.

【0043】駅計算機11100のメモリ11150上
には、OS11151,駅ダイヤ管理プログラム111
52,目標状態設定プログラム11153,列車監視プ
ログラム11154が存在する。
On the memory 11150 of the station computer 11100, an OS 11151, a station diagram management program 111
52, a target state setting program 11153, and a train monitoring program 11154.

【0044】列車監視プログラム11154は、列車か
らの情報を中央運行管理装置10000のダイヤ管理プログ
ラム10152へ送信するとともに目標へ列車が到達可
能か否かを監視する。駅ダイヤ管理プログラム1115
2は、中央運行管理装置10000のダイヤ管理プログ
ラム10153からの変更駅ダイヤを受信し、変更駅ダ
イヤの保存を行い、変更データを目標状態設定プログラ
ム11153へ送信する。目標設定プログラム1115
3は、目標の設定,ダイヤ変更による目標変更,到達可
能な目標の再設定を行う。
The train monitoring program 11154 transmits information from the train to the timetable management program 10152 of the central operation management device 10000 and monitors whether the train can reach the target. Station timetable management program 1115
2 receives the changed station timetable from the timetable management program 10153 of the central operation management device 10000, saves the changed station timetable, and transmits the changed data to the target state setting program 11153. Goal setting program 1115
3 sets the target, changes the target by changing the timetable, and resets the reachable target.

【0045】車上装置200は、車上計算機20100
と無線通信装置20111,記憶装置として走行パター
ン記憶装置20161,列車ダイヤ記憶装置2016
2,路線・列車データ記憶装置20163を有し、さら
に自動列車運転装置20200はモーター20300と
ブレーキ20400が接続され、また積算電力計20112,
乗車率計20113,速度計20114,積算距離計2
0115,時計20116 ,機器モニタ20117,ATC
信号受信器20118を有している。
The on-board device 200 is an on-board computer 20100.
And wireless communication device 20111, running pattern storage device 20161 as a storage device, train schedule storage device 2016
2, has a route / train data storage device 20163, and further, an automatic train operation device 20200 is connected to a motor 20300 and a brake 20400, and an integrated wattmeter 20112,
Passenger rate meter 20131, speedometer 20114, total distance meter 2
0115, clock 20116, device monitor 20117, ATC
It has a signal receiver 20118.

【0046】車上計算機20100は、メモリ2012
0,プロセッサ20130,外部機器インターフェース
20110,外部記憶インターフェース20150,タ
イマー20140がバス20160により相互に結合さ
れている。メモリ20120上には、OS20121,
列車データ送信プログラム20122,走行パターン生
成プログラム20123が存在する。自動列車運転装置
20200は、上記計器群、モーター20300,ブレ
ーキ20400と接続され、走行パターン生成プログラ
ム20123が生成する走行パターンに従うようにモー
ター20300,ブレーキ20400を制御する。そし
て外部機器インターフェース20110を介して図示の
ように各種機器が接続される。
The on-board computer 20100 has a memory 2012.
0, a processor 20130, an external device interface 20110, an external storage interface 20150, and a timer 20140 are mutually connected by a bus 20160. On the memory 20120, the OS 20121,
There are a train data transmission program 20122 and a running pattern generation program 20123. The automatic train operation device 20200 is connected to the instrument group, the motor 20300, and the brake 20400, and controls the motor 20300 and the brake 20400 so as to follow the travel pattern generated by the travel pattern generation program 20123. Then, various devices are connected via the external device interface 20110 as illustrated.

【0047】列車データ送信プログラム20122は、
一定時間毎に計器群からデータを取り込み、駅装置11
000の列車監視プログラム11154へ送信する。走
行パターン生成プログラム20123は、通常は列車ダ
イヤ記憶装置20162に記憶されている標準目標へ到
達する走行パターンを生成し、駅装置11000の目標
設定プログラム11153から新しい目標が送信されて
くると、新しい目標へ到達する走行パターンを生成す
る。
The train data transmission program 20122
The station device 11 takes in data from the instrument group at regular intervals.
000 train monitoring program 11154. The traveling pattern generation program 20123 generates a traveling pattern that normally reaches the standard target stored in the train schedule storage device 20162, and when a new target is transmitted from the target setting program 11153 of the station device 11000, the new target is generated. Generate a travel pattern that reaches.

【0048】次に、中央運行管理装置10000,駅装
置11000、及び車上装置200の動作を図14乃至
図20を用いて説明する。
Next, the operations of the central operation management device 10000, the station device 11000, and the on-board device 200 will be described with reference to FIGS. 14 to 20.

【0049】中央運行管理装置10000におけるダイ
ヤ管理プログラム10152は、図14に示すように、
全路線に渡る列車群のダイヤの作成、それぞれの駅装置
から提供される各列車の追跡情報の表示(1406,1
407),遅延状況に合わせた運転整理によるダイヤ変
更機能(1402〜1405)を有する。ダイヤの変更
は、遅延が発生して計画ダイヤ通りの運行が難しくなっ
た場合、指令員によって列車の運休,追越し駅の変更,
出発時刻の変更等現行ダイヤを変更し、極力遅延を解消
するために行う運転整理による。そして、ダイヤ管理プ
ログラム10152は、変更ダイヤを含む列車ダイヤを、各
駅装置の駅ダイヤ管理プログラム11152に通知する。
As shown in FIG. 14, the timetable management program 10152 in the central operation management device 10000 is as follows.
Create a train schedule for all train lines and display tracking information for each train provided by each station (1406, 1
407), and has a timetable change function (1402-1405) by rescheduling according to the delay situation. If there is a delay and it becomes difficult to operate according to the planned timetable, the dispatcher will cancel the train, change the train station, change the passing station,
This is due to the rescheduling carried out in order to eliminate the delay as much as possible by changing the current schedule such as changing the departure time. Then, the schedule management program 10152 notifies the train schedule management program 11152 of each station device of the train schedule including the modified schedule.

【0050】駅装置11000における駅ダイヤ管理プ
ログラム11152は、ダイヤ情報として、列車及び駅
毎に、各列車の列車番号,駅到着時刻,停車・通過の区
別,駅出発時刻,ダイヤ通りに運転されている場合の標
準目標状態のデータを記憶しており、列車の在線状況を
基にそれぞれの列車のダイヤ情報を目標設定装置111
53へ通知する機能を有する。また駅毎に、ポイント進
入位置や駅構内進入位置が決まっており、停車・通過の
区別によりそれぞれの位置における制限速度が定まって
いるので、これら情報を記憶しておく。なお、ダイヤが
変更された場合は、変更されたダイヤ情報を入力して記
憶するとともに、目標設定プログラム11153へ通知
する(図20、2200〜2203)。
The station timetable management program 11152 in the station device 11000, as the timetable information, for each train and each station, the train number of each train, the arrival time of the station, the distinction of stop / passage, the departure time of the station, and the operation according to the timetable. The data of the standard target state in the case where there is a train is stored, and the schedule information of each train is set as the target setting device 111 based on the status of the train.
It has a function of notifying 53. In addition, the point entry position and the station yard entry position are determined for each station, and the speed limit at each position is determined by the distinction between stopping and passing, so these pieces of information are stored. When the timetable is changed, the changed timetable information is input and stored, and the target setting program 11153 is notified (FIG. 20, 2200 to 2203).

【0051】目標設定プログラム11153は、駅ダイ
ヤ管理プログラム11152からデータを引き出して制
御対象列車の目標を作成する。目標は、駅ダイヤ管理プ
ログラム11152内に記憶されている標準目標を読み
出す。この標準目標は、基本的に停車駅若しくは通過駅
における(位置,時刻,速度)とするが、駅構内はポイ
ントや曲線が多く、停止のためのブレーキ所要時間,通
過時間が固定的に決まってしまい(標準所要時間とい
う)列車走行の自由度が減少してしまう。そこで、駅構
内に進入する手前の地点における(位置,時刻,速度)
を目標とする。すなわち、ダイヤによって与えられる駅
停車時刻若しくは駅通過時刻から標準所要時間を減算し
た時刻を時刻の標準目標とし、ポイントや駅構内進入速
度の制限速度に余裕をもたせた速度を速度の標準目標と
する。標準所要時間の計算は、ポイント進入位置または
駅構内進入位置に制限速度一杯で進入して停止、あるい
は通過する場合の最短所要時間または標準進入速度で進
入して停止、あるいは通過する場合の所要時間を標準所
要時間として採用する。そして最短所要時間若しくは標
準所要時間を、駅,列車の種類,停車・通過の区別,使
用番線,進入位置毎に記憶しておく。また、ダイヤ変更
があっても、変更されたダイヤ及び標準所要時間および
標準進入速度に基づいて算出する。
The target setting program 11153 draws data from the station timetable management program 11152 to create a target for the controlled train. As the target, the standard target stored in the station timetable management program 11152 is read. This standard target is basically (position, time, speed) at a stop or passing station, but there are many points and curves in the station yard, and the braking time for stopping and the passing time are fixed. This reduces the degree of freedom in running the train (called the standard time required). Therefore, at the point before entering the station (position, time, speed)
Target. That is, the standard goal of time is the time obtained by subtracting the standard required time from the station stop time or the station passing time given by the timetable, and the speed with a margin to the speed limit of the point or approach speed on the station premises is the standard target of speed. . The standard required time is calculated as the shortest required time when entering the point approach position or the station entrance position at the full speed limit and then stopping or passing, or the required time when entering and stopping at the standard approach speed or passing through. Is adopted as the standard required time. Then, the shortest required time or the standard required time is stored for each station, type of train, stop / passage distinction, use number line, and entry position. Even if the timetable is changed, it is calculated based on the changed timetable, the standard required time, and the standard approach speed.

【0052】このようにして生成された標準目標(図1
5、1604)は、列車監視プログラム11154に送
られその目標に制御対象列車が到達可能であるかどうか
前記したような原理に基づきその合理性をチェック(図
15、1606)する。
The standard goal generated in this way (see FIG.
5, 1604) is sent to the train monitoring program 11154 and checks the rationality based on the above-mentioned principle whether the controlled train can reach the target (FIG. 15, 1606).

【0053】このチェックの結果合理的な目標であると
判定された場合、目標設定プログラム11153は、制
御対象列車間に支障があるかどうかを調べる(図16、2
100)。支障とは、前記した如く、後続列車がATCやA
TS等により速度制限を受ける場合を言う。また、支障
の有無の確認は、先行列車の走行に応じてのATC制限
速度信号(先行列車位置に対応して閉塞区間毎に与えら
れる)を用いるが、閉塞区間は予め記憶されているの
で、これと先行列車の最も遅く走行するであろう走行パ
ターンから制限速度信号は演算される。この制限速度信
号と後続列車の存在可能領域とから支障を確認すること
ができる。なんらの支障もなければ、この標準目標を車
上装置200に送信する(図15、1704)。車上装
置における動作は後述する。
When it is determined that the target is a reasonable target as a result of this check, the target setting program 11153 checks whether there is any obstacle between the controlled trains (see FIGS. 16 and 2).
100). As mentioned above, the obstacle is that the succeeding train is ATC or A.
This refers to the case where the speed is limited by TS etc. In addition, the confirmation of the presence or absence of obstacles uses an ATC speed limit signal (given for each closed section corresponding to the position of the preceding train) according to the running of the preceding train, but since the closed section is stored in advance, The speed limit signal is calculated from this and the traveling pattern of the preceding train that will travel the slowest. The obstacle can be confirmed from the speed limit signal and the area where the following train can exist. If there is no problem, the standard target is transmitted to the on-board device 200 (FIG. 15, 1704). The operation of the on-board device will be described later.

【0054】以上は、目標が標準目標であるため、殆ど
問題なく標準目標が目標として採用されるのであるが、
遅延が発生したり、運転整理等によりダイヤ変更があっ
た場合は、目標の合理性が保たれなくなり、また後続列
車への支障が発生する。この支障については、列車に遅
延が発生していなくても計画ダイヤの段階で発生する場
合もある。以下、それらの処理について説明する。
In the above, since the target is the standard target, the standard target is adopted as the target with almost no problem.
If there is a delay or there is a schedule change due to traffic rescheduling, the rationality of the target will not be maintained, and the subsequent trains will be hindered. This obstacle may occur at the stage of the planning timetable even if the train is not delayed. Hereinafter, those processes will be described.

【0055】目標に列車が到達できないことを列車監視
プログラム11154において検知された場合は目標を
再設定する。図18に基づいて説明すると、もともと目
標は時刻,速度に余裕をもたせてあり、この余裕分だけ
時刻を遅らせたり速度を速めたりして、到達可能になる
よう目標を再設定(2003)する。再設定したら再
度、その目標に列車が到達できるかどうか判断する(2
004)。到達不可能ならば、列車が最も速く走行させ
た場合を想定して、そのときのポイント進入位置や駅構
内進入位置等の時刻,速度を目標として設定する(20
05)。この場合は、列車遅延を許容してしまう場合で
ある。
When the train monitoring program 11154 detects that the train cannot reach the target, the target is reset. Explaining with reference to FIG. 18, the target is originally provided with a margin in time and speed, and the target is reset (2003) so as to be reachable by delaying the time or increasing the speed by the margin. After resetting, determine again whether the train can reach the target (2
004). If the train is not reachable, assuming that the train runs the fastest, the time and speed such as the point entry position and the station entrance position at that time are set as targets (20
05). In this case, train delay is allowed.

【0056】このように列車到達可能な点を目標として
合理的に算出しても、前記したように、後続列車に対し
て支障を来たしてしまうと益々全線における列車遅延が
拡大してしまう。そこで図6,図7で原理説明した手法
を用いて支障を回避しうる新たな目標を中間目標として
設定する(図19、2103)。この中間目標は前記の
如く最終目標から得られる列車存在範囲内に設定される
ので合理性は保たれている。新しい目標として、位置を
2点の中間地点,時刻を2点の中間時刻,速度を2点間
の平均速度とすることが考えられる。
Even if the train reachable point is rationally calculated as described above, if the following train is disturbed as described above, the train delay on all lines will be further expanded. Therefore, a new target that can avoid obstacles is set as an intermediate target by using the method described in principle in FIGS. 6 and 7 (FIGS. 19 and 2103). Since this intermediate goal is set within the train existence range obtained from the final goal as described above, rationality is maintained. As a new target, it is conceivable to set the position to the midpoint of two points, the time to the midpoint of two points, and the speed to the average speed between the two points.

【0057】新しい目標により先行列車と後続列車の走
行可能範囲が限定され、支障が解消される。しかし、こ
の新しい目標を用いても支障が解消されない場合(図1
9、2102)は、さらに目標を加える(図19、21
03)ことにより、支障を生じる範囲を更に中間点を目
標として分割していくことにより支障を解消することが
できる。
The new target limits the travelable range of the preceding train and the following train, and the obstacle is eliminated. However, if using this new goal does not resolve the obstacle (Fig. 1
9, 2102) adds more goals (FIGS. 19, 21).
By doing so, the obstacle can be eliminated by further dividing the range in which the obstacle is generated with the intermediate point as a target.

【0058】しかし、これでは適切な中間目標ではない
かも知れない。無駄のない中間目標を算出する実施形態
を図5乃至図6を用いて説明する。
However, this may not be an appropriate intermediate goal. An embodiment for calculating a lean intermediate target will be described with reference to FIGS.

【0059】図5において、階段状のパターン410が
後続列車に対する制限速度信号であり、制限速度信号が
変化する位置が閉塞区間の境目である。図5のように後
続列車の支障がある場合、後続列車の運転によっては支
障を来たさない場合があるので、先ず後続列車の中間目
標を定める。この場合、後続列車が一番支障を来たす
(後続列車の最速パターンと制限速度信号との重なりが
一番大きい閉塞の入口を求める、この場合は点Aであ
る)閉塞は駅2の手前の閉塞であるから、この地点Aを
後続列車の新たな中間目標とする。
In FIG. 5, the staircase pattern 410 is the speed limit signal for the succeeding train, and the position where the speed limit signal changes is the boundary of the closed section. When the following train has a trouble as shown in FIG. 5, it may not occur depending on the operation of the following train. Therefore, first, the intermediate target of the following train is set. In this case, the following train causes the most trouble (the entrance of the blockage where the maximum speed pattern of the following train and the speed limit signal overlap is the largest, in this case point A) is the blockage in front of station 2. Therefore, this point A is set as a new intermediate target for the succeeding train.

【0060】後続列車の中間目標を求めた時点で、先行
列車の中間目標を求める前に、再度、支障チェックを行
う。支障がなければ、後続列車に対しては、中間目標及
び駅2における最終目標を与え、先行列車には駅2にお
ける目標を与える。
At the time when the intermediate target of the succeeding train is obtained, the obstacle check is performed again before the intermediate target of the preceding train is obtained. If there is no obstacle, the intermediate target and the final target at the station 2 are given to the succeeding train, and the target at the station 2 is given to the preceding train.

【0061】また、後続列車の中間目標でも支障がある
と判定された場合は、今度は先行列車に対する中間目標
を演算する。先行列車に中間目標を設定すると、前述し
た原理により制限速度信号が全体的に下がる(換言する
と、後続列車にとって速く制限速度信号が上昇する方
向)。図6より、後続列車は点Aを目標とすることで点
Aから駅2においては支障が解消されている。しかし、
駅1から点Aまでは支障が解消されるとは限らない(図
では支障が解消された図となっている)。そこで、本実
施形態では、点Aよりも一つ前の閉塞の入口を位置の中
間目標Bとする。位置が定まれば距離−時刻曲線により
時刻が定まり、速度は中間目標からの最速最低パターン
の平均とすることが考えられる。
If it is determined that the intermediate target of the succeeding train has a problem, the intermediate target for the preceding train is calculated this time. When the intermediate target is set in the preceding train, the speed limit signal generally decreases according to the above-mentioned principle (in other words, the speed limit signal increases faster for the succeeding train). From FIG. 6, the obstacle is eliminated from the point A to the station 2 by targeting the point A for the succeeding train. But,
The obstacle is not always eliminated from station 1 to point A (the figure shows the obstacle eliminated). Therefore, in this embodiment, the entrance of the block immediately before the point A is set as the intermediate target B of the position. When the position is determined, the time is determined by the distance-time curve, and it is considered that the speed is the average of the fastest and lowest patterns from the intermediate target.

【0062】これでもまだ支障があるようであれば、今
度は後続列車に対して更なる中間目標を点Bより駅1側
に同様の手法で定める。要は後続列車から交互に、駅2
側の閉塞から順に中間目標を作成していく。このように
することにより、前記のような単に中間目標を駅間の中
間にするという手法に比べ、最適な中間点が求まると共
に、演算回数も減少する。
If this still causes trouble, this time, a further intermediate target for the following train is set on the station 1 side from the point B by the same method. In essence, take turns from the following train to station 2
Create intermediate goals in order from the side blockage. By doing so, as compared with the method of simply setting the intermediate target between the stations as described above, the optimum intermediate point is obtained and the number of calculations is reduced.

【0063】以上のように算出された目標を車上装置2
00に伝送手段を介して伝送する。目標を受け取った車
上装置の動作説明を以下行う。
The target calculated as above is used as the on-board device 2
00 through the transmission means. The operation of the on-board device that has received the target will be described below.

【0064】車上装置200に搭載されている車上計算
機20100の走行パターン生成プログラム20123
は、走行開始する前に列車ダイヤ記憶装置20162に
記憶されている目標に到達する列車の走行パターン生成
を行う。走行パターン生成を行うと自動列車運転装置2
0200へパターンを送る。
A running pattern generation program 20123 for the on-board computer 20100 installed in the on-board device 200.
Generates a traveling pattern of a train that reaches a target stored in the train schedule storage device 20162 before starting traveling. Automatic train operation device 2 when running patterns are generated
Send the pattern to 0200.

【0065】また、車上装置200の列車データ送信プ
ログラム20122は一定時間毎に列車情報(時刻,位
置,速度のうち少なくとも位置及び速度、以下、列車情
報と呼ぶ)を計器群40で測定し駅装置11000の列
車監視プログラム11154に送る。列車監視プログラ
ム11154は列車情報を受け取ると中央の監視プログ
ラムへ送信し、列車情報表示プログラム10152は列
車情報をディスプレイ10131に表示する。
Further, the train data transmission program 20122 of the on-board device 200 measures train information (at least position and speed among time, position and speed, hereinafter referred to as train information) by the instrument group 40 at regular intervals. It is sent to the train monitoring program 11154 of the device 11000. Upon receiving the train information, the train monitoring program 11154 transmits it to the central monitoring program, and the train information display program 10152 displays the train information on the display 10131.

【0066】走行パターンの生成について説明する。目
標を受け取った車上の走行パターン生成プログラム20
123は、これに基づいて走行パターンを生成する。
Generation of the traveling pattern will be described. On-vehicle driving pattern generation program 20 that has received the target
123 generates a travel pattern based on this.

【0067】図21に走行パターン生成のフローを示し
た。走行パターン生成プログラム20123は、処理を
開始すると自列車の列車情報を取り込み(2301)、
列車ダイヤ記憶装置20163から次に到達すべき目標
を取りだし、走行パターン記憶装置20162から標準
パターン(標準目標に基づいて予め作成された走行パタ
ーン)を取り出す(2302)。次に、現在状態から目
標へ標準パターンで到達するか(目標と一致するかどう
か)を調べる(2303)。標準パターンで到達するの
であれば、パターンを出力する(2304)。標準パタ
ーンで到達しない場合は、パターン修正処理(240
0)を行い、修正したパターンを出力する(230
4)。パターンを出力した後は、駅装置から新しい目標
状態が通知されるか目標へ到達するまで待ち状態となる
(2305)。待ち状態(2305)において、駅装置1
1000の目標設定プログラム11153から新しい目
標が通知された場合は、列車情報を取り込み(230
7)パターン修正処理(2400)へ戻る。目標へ到達し
た場合は、列車情報取り込み(2301)へ戻る。
FIG. 21 shows a flow for generating a running pattern. When the process is started, the traveling pattern generation program 20123 takes in train information of the own train (2301),
A target to be reached next is retrieved from the train schedule storage device 20163, and a standard pattern (a traveling pattern created in advance based on the standard target) is retrieved from the traveling pattern storage device 20162 (2302). Next, it is checked whether the current state reaches the target in a standard pattern (whether it matches the target) (2303). If the standard pattern is reached, the pattern is output (2304). If the standard pattern is not reached, pattern modification processing (240
0) and output the corrected pattern (230
4). After outputting the pattern, the station device waits until a new target state is notified or the target is reached (2305). In the waiting state (2305), the station device 1
When a new target is notified from the 1000 target setting program 11153, train information is fetched (230
7) Return to the pattern correction processing (2400). When the target is reached, the process returns to the train information acquisition (2301).

【0068】図22にパターン修正処理(2400)の
処理を表すフローチャートを示す。パターン修正処理2
400では、前記のように曲線707,708を求め(2
401)、所定の補間関数に基づき曲線900,901を求
め(2402)、消費電力(乗り心地)を勘案して、走
行パターンとし(2403)、処理を終了する。
FIG. 22 is a flow chart showing the process of the pattern correction process (2400). Pattern correction process 2
In 400, the curves 707 and 708 are obtained as described above (2
401), the curves 900 and 901 are obtained based on a predetermined interpolation function (2402), a power consumption (riding comfort) is taken into consideration, and a running pattern is set (2403), and the process ends.

【0069】図23は、列車データ送信プログラム20
122の処理を表すフローチャートである。実行を開始
するとタイマー20140をセットし(2501)、タ
イマーの時間切れまたは機器モニタの異常検知通知待ち
(2502)となる。タイマーの時間切れの場合は、駅
装置11000の列車監視プログラム11154へ速
度,位置,時刻からなる列車情報を送信し(2504)、
タイマー10230セット(2501)へ戻る。異常検知
の場合は、駅装置11000の列車監視プログラム11
154へ機器モニタ情報,速度,位置,時刻からなる列
車情報を送信し(2505)、タイマーセット(250
1)へ戻る。
FIG. 23 shows a train data transmission program 20.
It is a flow chart showing processing of 122. When the execution is started, the timer 20140 is set (2501), and the timer expires or the device monitor waits for an abnormality detection notification (2502). If the timer expires, the train information including speed, position and time is transmitted to the train monitoring program 11154 of the station device 11000 (2504),
Return to timer 10230 set (2501). In the case of abnormality detection, the train monitoring program 11 of the station device 11000
Train information including equipment monitor information, speed, position, and time is transmitted to 154 (2505), and a timer set (250
Return to 1).

【0070】以上、本実施形態によれば、速度,位置,
時刻からなる目標を列車に送信することにより、支障を
来たさない列車制御が可能となる効果がある。
As described above, according to this embodiment, the speed, position,
By transmitting the time target to the train, there is an effect that train control can be performed without any trouble.

【0071】ところで、上記実施形態は、自動列車運転
装置について述べたが、現実には自動列車運転装置は全
面普及に至っていない。そこで、全面普及に至るまで本
発明を運転支援として用いる実施形態を説明する。
By the way, in the above-mentioned embodiment, the automatic train operation device is described, but in reality, the automatic train operation device has not been widely spread. Therefore, an embodiment will be described in which the present invention is used as driving support until it is fully spread.

【0072】図24は列車の運転台の図である。ディス
プレイ3000には図10において作成した曲線707
と708、及び、列車の現在位置が表示されるようにな
っている。その詳細を図25,図26を用いて説明す
る。
FIG. 24 is a diagram of a train cab. On the display 3000, the curve 707 created in FIG.
And 708 and the current position of the train are displayed. The details will be described with reference to FIGS. 25 and 26.

【0073】図25では、領域3005と共に列車の現
在位置3001(現在時刻3002及び現在位置300
3と共に動く)が表示され、運転士はこの領域に入るよ
うに主幹制御機を操作して列車を制御する。
In FIG. 25, the current position 3001 of the train (current time 3002 and current position 300) is displayed together with the area 3005.
3) is displayed, and the driver controls the train by operating the master controller so as to enter this area.

【0074】図26は現在位置,時刻,速度と目標間の
領域を作成する点で、図25と相違する。運転士はこの
領域3006が消えないように運転する。
FIG. 26 differs from FIG. 25 in that a region between the current position, time, speed and target is created. The driver drives so that the area 3006 does not disappear.

【0075】以上本実施形態によれば、列車に自動列車
運転装置が搭載されていなくても、適切な列車走行を実
現することができる。
As described above, according to this embodiment, even if the train is not equipped with the automatic train operation device, proper train running can be realized.

【0076】図10ないし図13に基づき走行パターン
生成の参考技術を説明する。
A reference technique for generating a traveling pattern will be described with reference to FIGS. 10 to 13.

【0077】与えられた目標は(位置,時刻,速度)を
示す点情報であるので、実際に列車を自動運転させるた
めにはこれを距離−時刻平面上の線情報に置き換えなけ
れば列車自動運転装置20200はフィードバック制御
を行うことができない。図10は、2目標701,70
2が与えられた場合に、図7及び図8にて説明した手法
を用いて領域を求める事を説明するものである。図10
において、先ず最速パターンを目標701に接続した曲
線703と、最速パターンを目標702に接続した曲線
704を求め、更に、目標701から最大減速度で減速
した曲線705と目標702に到達するように最大加速度
で加速する曲線706を求め、これにより図のような走
行可能範囲が作成される。
Since the given target is point information indicating (position, time, speed), in order to actually operate the train automatically, it must be replaced with line information on the distance-time plane to automatically operate the train. The device 20200 cannot perform feedback control. FIG. 10 shows two goals 701 and 70.
It will be described that the area is obtained by using the method described in FIGS. 7 and 8 when 2 is given. Figure 10
First, a curve 703 in which the fastest pattern is connected to the target 701 and a curve 704 in which the fastest pattern is connected to the target 702 are obtained, and further, the curve 705 decelerated from the target 701 at the maximum deceleration and the target 702 are maximized. A curve 706 that accelerates with acceleration is obtained, and a travelable range as shown in the figure is created by this.

【0078】これら目標間を結ぶ実走行パターンは、こ
れらの曲線を補間する曲線を算出することによって得ら
れる。以下、曲線704と曲線705を接続した曲線を
曲線707と呼び、曲線703と曲線706とを接続し
た曲線を曲線708と呼ぶ。
The actual running pattern connecting these targets is obtained by calculating a curve that interpolates these curves. Hereinafter, the curve connecting the curves 704 and 705 is called a curve 707, and the curve connecting the curves 703 and 706 is called a curve 708.

【0079】図11は、本実施形態で用いる補間関数を
示した図である。横軸は時刻t、縦軸は曲線707の時
刻tにおける距離と曲線708の時刻tにおける距離の
比を示す。2種類の補間関数f(t)(800),g
(t)(801)が示されている。これら補間関数を用
いて作成した走行パターンを図12,図13に示す。
FIG. 11 is a diagram showing an interpolation function used in this embodiment. The horizontal axis represents time t, and the vertical axis represents the ratio of the distance at time t on curve 707 to the distance at time t on curve 708. Two types of interpolation functions f (t) (800), g
(T) (801) is shown. Travel patterns created using these interpolation functions are shown in FIGS. 12 and 13.

【0080】図12は補間関数f(t)を用いて算出し
たものを示し、曲線900が得られた走行パターンであ
る。この曲線900の算出式は、 (曲線900の時刻tにおける距離)=f×(曲線707の時刻tにおける距離) +(1−f) ×(曲線708の時刻tにおける距離) である。
FIG. 12 shows a running pattern in which a curve 900 is obtained, which is calculated using the interpolation function f (t). The calculation formula of this curve 900 is (distance of curve 900 at time t) = f × (distance of curve 707 at time t) + (1-f) × (distance of curve 708 at time t).

【0081】また、図13は補間関数g(t)を用いて
算出したものを示し、曲線901が得られた走行パター
ンである。この曲線901の算出式は、 (曲線901の時刻tにおける距離)=g×(曲線707の時刻tにおける距離) +(1−g) ×(曲線708の時刻tにおける距離) である。
Further, FIG. 13 shows what was calculated using the interpolation function g (t), and a curve 901 is the obtained traveling pattern. The calculation formula of this curve 901 is (distance at time t of curve 901) = g × (distance at time t of curve 707) + (1-g) × (distance at time t of curve 708).

【0082】これら2通りの走行パターン900,90
1について、消費電力を概算し消費電力が小さいパター
ンを選択する。また、加速度変化の小さいパターン選択
すれば乗り心地の良いものとなる。これらの判断は、例
えば朝夕のラッシュ時には省電力を選び、昼間の閑散時
には乗り心地の良いパターンを選択するということも考
えられる。また、上記は2種類の補間関数を示している
が、時刻t1からt2において、補間関数の値が減少し
ない形の関数であれば実現可能な走行パターンが得られ
る。また、上記では同一時刻における距離を補間した
が、同一距離における時刻を補間しても良い。更に、走
行パターンは、列車走行可能範囲内に最終的に1つのパ
ターンを引くものであれば、上記した手法にこだわるこ
とはない。
These two traveling patterns 900, 90
For 1, the power consumption is roughly estimated and a pattern with low power consumption is selected. In addition, if a pattern with a small change in acceleration is selected, a comfortable ride is obtained. It is conceivable that these judgments include, for example, selecting power saving during the morning and evening rush hours, and selecting a comfortable riding pattern during the daytime during quiet times. Further, although the above shows two types of interpolation functions, a feasible traveling pattern can be obtained as long as the value of the interpolation function does not decrease from time t1 to t2. Further, although the distance at the same time is interpolated in the above, the time at the same distance may be interpolated. Further, as long as the travel pattern is such that one pattern is finally drawn within the train travelable range, the above-mentioned method is not intimidated.

【0083】[0083]

【発明の効果】以上、本発明によれば、到達目標を列車
に指示することで、遅延を極力回避することができると
いう効果がある。また、例え遅延が発生しても、到達目
標から決まる走行可能範囲内に新たに中間到達目標を設
定することで、支障を極力回避し、少なくとも遅延の拡
大を防止し、縮小させることができる。
As described above, according to the present invention, there is an effect that the delay can be avoided as much as possible by instructing the train to reach the target. Further, even if a delay occurs, by setting a new intermediate target within the travelable range determined by the target, it is possible to avoid obstacles as much as possible, and at least prevent delay from increasing and reduce it.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の一実施例である列車制御装置を示す
図。
FIG. 1 is a diagram showing a train control device according to an embodiment of the present invention.

【図2】本発明の原理を説明する図。FIG. 2 is a diagram illustrating the principle of the present invention.

【図3】本発明の原理を説明する図。FIG. 3 is a diagram illustrating the principle of the present invention.

【図4】本発明の原理を説明する図。FIG. 4 is a diagram illustrating the principle of the present invention.

【図5】本発明の原理を説明する図。FIG. 5 is a diagram illustrating the principle of the present invention.

【図6】本発明の原理を説明する図。FIG. 6 is a diagram illustrating the principle of the present invention.

【図7】本発明の原理を説明する図。FIG. 7 is a diagram illustrating the principle of the present invention.

【図8】目標に到達可能かどうかを判定する値を演算す
る説明図。
FIG. 8 is an explanatory diagram for calculating a value for determining whether or not a target can be reached.

【図9】目標に到達可能かどうかを判定する値を演算す
る説明図。
FIG. 9 is an explanatory diagram for calculating a value for determining whether or not a target can be reached.

【図10】目標から走行パターンを算出する事を説明す
る図。
FIG. 10 is a diagram illustrating calculation of a traveling pattern from a target.

【図11】走行パターン算出のための比を説明する図。FIG. 11 is a diagram illustrating a ratio for calculating a traveling pattern.

【図12】算出された走行パターン示す図。FIG. 12 is a diagram showing a calculated traveling pattern.

【図13】算出された走行パターン示す図。FIG. 13 is a diagram showing a calculated traveling pattern.

【図14】ダイヤ管理プログラムのフローチャート。FIG. 14 is a flowchart of a timetable management program.

【図15】列車監視プログラムのフローチャート。FIG. 15 is a flowchart of a train monitoring program.

【図16】目標設定プログラムのフローチャート。FIG. 16 is a flowchart of a goal setting program.

【図17】目標変更処理のフローチャート。FIG. 17 is a flowchart of target change processing.

【図18】目標再設定処理のフローチャート。FIG. 18 is a flowchart of target resetting processing.

【図19】目標分割処理のフローチャート。FIG. 19 is a flowchart of target division processing.

【図20】駅ダイヤ管理プログラムのフローチャート。FIG. 20 is a flowchart of a station timetable management program.

【図21】走行パターン生成プログラムのフローチャー
ト。
FIG. 21 is a flowchart of a travel pattern generation program.

【図22】パターン修正処理のフローチャート。FIG. 22 is a flowchart of pattern correction processing.

【図23】列車ダイヤ送信プログラムのフローチャー
ト。
FIG. 23 is a flowchart of a train schedule transmission program.

【図24】本発明の他の実施例に適用される運転台を示
す図。
FIG. 24 is a diagram showing a cab applied to another embodiment of the present invention.

【図25】運転台に表示される走行可能範囲を示す図。FIG. 25 is a diagram showing a travelable range displayed on the cab.

【図26】運転台に表示される走行可能範囲を示す図。FIG. 26 is a diagram showing a travelable range displayed on the cab.

【符号の説明】[Explanation of symbols]

3000…ディスプレイ、11153…目標設定プログ
ラム、11154…列車監視プログラム、20123…
走行パターン生成プログラム。
3000 ... Display, 11153 ... Target setting program, 11154 ... Train monitoring program, 20123 ...
Running pattern generation program.

───────────────────────────────────────────────────── フロントページの続き (51)Int.Cl.7 識別記号 FI G08G 1/00 G08G 1/00 D (72)発明者 田代 維史 茨城県日立市大みか町七丁目1番1号 株式会社 日立製作所 日立研究所内 (72)発明者 諸岡 泰男 茨城県日立市大みか町七丁目1番1号 株式会社 日立製作所 日立研究所内 (72)発明者 八尋 正和 茨城県日立市大みか町五丁目2番1号 株式会社 日立製作所 大みか工場内 (72)発明者 片平 正樹 茨城県日立市大みか町五丁目2番1号 株式会社 日立製作所 大みか工場内 (72)発明者 解良 和郎 茨城県日立市大みか町五丁目2番1号 株式会社 日立製作所 大みか工場内 (56)参考文献 特開 平4−27661(JP,A) 特開 平3−289301(JP,A) 特開 平2−23003(JP,A) 特開 平5−319269(JP,A) 特開 平5−286441(JP,A) (58)調査した分野(Int.Cl.7,DB名) B61L 1/00 - 27/00 B60L 3/08 B60L 15/40 G08G 1/00 ─────────────────────────────────────────────────── ─── Continuation of the front page (51) Int.Cl. 7 Identification symbol FI G08G 1/00 G08G 1/00 D (72) Inventor Tashiro Isumi 7-1 Omikacho, Hitachi City, Ibaraki Hitachi, Ltd. Factory Hitachi Research Laboratory (72) Inventor Yasuo Morooka 7-1-1 Omika-cho, Hitachi-shi, Ibaraki Hitachi Ltd. Hitachi Research Laboratory (72) Inventor Masahiro Yahiro 5-2-1 Omika-cho, Hitachi City, Ibaraki Company Hitachi Ltd. Omika Factory (72) Inventor Masaki Katahira 52-1 Omika-cho, Hitachi City, Ibaraki Hitachi Ltd. Omika Factory Hitachi Ltd. (72) Inventor Kazuro Kira 5-2-1 Omika-cho, Hitachi City, Ibaraki Prefecture Issue Hitachi, Ltd. Omika Factory (56) Reference JP-A-4-27661 (JP, A) JP-A-3-289301 (JP, A) JP Flat 2-23003 (JP, A) JP 5-319269 (JP, A) JP 5-286441 (JP, A) (58) Fields investigated (Int.Cl. 7 , DB name) B61L 1 / 00-27/00 B60L 3/08 B60L 15/40 G08G 1/00

Claims (5)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】列車ダイヤに基づいて、制御対象列車に対
して、その列車の到達目標として到達位置,到達時刻,
到達時における目標速度を指令し、この到達目標を入力
して到達目標までの走行可能範囲を運転台に表示する列
車制御装置であって、 前記走行可能範囲は、距離−時刻平面上において、現在
位置から最大減速度で減速し、停止したら当該停止を維
持し、その後最大加速度で加速し、最高速度に至ったら
当該速度を維持し、その後最大減速度で減速して前記到
達目標に前記目標速度で到達する軌跡と、現在位置から
最大加速度で加速し、最高速度に至ったら当該速度を維
持し、その後最大減速度で減速し、停止したら当該停止
を維持し、その後最大加速度で加速して前記到達目標に
前記目標速度で到達する軌跡とに囲まれた領域である列
車制御装置。
According to a train schedule, an arrival position, an arrival time, and
A train control device for instructing a target speed upon arrival and inputting this arrival target to display a travelable range up to the arrival target on a driver's cab, wherein the travelable range is present on a distance-time plane. Decelerate from the position with maximum deceleration, maintain the stop when stopped, then accelerate with maximum acceleration, maintain the speed when reaching the maximum speed, and then decelerate with maximum deceleration to reach the target speed Acceleration from the current position with maximum acceleration, maintain the speed when reaching the maximum speed, decelerate with maximum deceleration after that, maintain the stop when stopped, and then accelerate with maximum acceleration A train control device that is an area surrounded by a locus of reaching a target at the target speed.
【請求項2】列車ダイヤに基づいて、制御対象である先
行列車と後続列車に対して、それら列車の到達目標とし
て到達位置,到達時刻,到達時における目標速度を指令
し、これら列車が目標に到達するための走行可能範囲を
演算して、当該走行可能範囲から前記後続列車に対して
走行支障の発生を検出したとき、前記いずれかの列車に
対してその列車の走行可能範囲内に新たに到達目標を設
定する列車制御装置であって、 前記走行可能範囲は、距離−時刻平面上において、現在
位置から最大減速度で減速し、停止したら当該停止を維
持し、その後最大加速度で加速し、最高速度に至ったら
当該速度を維持し、その後最大減速度で減速して前記到
達目標に前記目標速度で到達する軌跡と、現在位置から
最大加速度で加速し、最高速度に至ったら当該速度を維
持し、その後最大減速度で減速し、停止したら当該停止
を維持し、その後最大加速度で加速して前記到達目標に
前記目標速度で到達する軌跡とに囲まれた領域である列
車制御装置。
2. Based on a train timetable, an arrival position, an arrival time, and a target speed at the arrival are commanded to the preceding train and the succeeding train, which are control targets, as the arrival targets of those trains, and these trains are set as targets. When the travelable range for reaching is calculated and the occurrence of a travel obstacle for the following trains is detected from the travelable range, the train is newly added to the train within the travelable range of any of the trains. A train control device for setting a target to be reached, wherein the travelable range is, on the distance-time plane, decelerated from the current position at the maximum deceleration, maintained at the stop when stopped, and then accelerated at the maximum acceleration, When the maximum speed is reached, the speed is maintained, and then the locus of decelerating at the maximum deceleration and reaching the target at the target speed, and accelerating at the maximum acceleration from the current position to reach the maximum speed. Train control, which is an area surrounded by a locus of maintaining the speed, then decelerating at the maximum deceleration, maintaining the stop when stopped, and then accelerating at the maximum acceleration to reach the reaching target at the target speed. apparatus.
【請求項3】請求項1に記載の列車制御装置であって、 前記後続列車の前記走行支障とは、保安ブレーキによっ
て前記先行列車の位置に対応して前記後続列車に作用す
る速度制限である列車制御装置。
3. The train control device according to claim 1, wherein the traveling obstacle of the succeeding train is a speed limit that acts on the succeeding train in accordance with a position of the preceding train by a safety brake. Train control device.
【請求項4】請求項2に記載の列車制御装置であって、 前記保安ブレーキは自動列車制御装置(ATC)ブレー
キである列車制御装置。
4. The train control device according to claim 2, wherein the safety brake is an automatic train control (ATC) brake.
【請求項5】請求項1に記載の列車制御装置であって、 前記いずれかの列車に対してその列車の走行可能範囲に
新たに到達目標を設定する手段と、この到達目標を列車
に指令する手段とを地上側に備えた列車制御装置。
5. The train control device according to claim 1, further comprising: means for newly setting a target to be reached within a travelable range of the train for any one of the trains, and commanding the target to reach the train. Train control device equipped with a means for performing on the ground side.
JP04540994A 1993-03-17 1994-03-16 Train control device Expired - Fee Related JP3525481B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP04540994A JP3525481B2 (en) 1993-03-17 1994-03-16 Train control device

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP5-56750 1993-03-17
JP5675093 1993-03-17
JP04540994A JP3525481B2 (en) 1993-03-17 1994-03-16 Train control device

Publications (2)

Publication Number Publication Date
JPH06321115A JPH06321115A (en) 1994-11-22
JP3525481B2 true JP3525481B2 (en) 2004-05-10

Family

ID=26385387

Family Applications (1)

Application Number Title Priority Date Filing Date
JP04540994A Expired - Fee Related JP3525481B2 (en) 1993-03-17 1994-03-16 Train control device

Country Status (1)

Country Link
JP (1) JP3525481B2 (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4027521B2 (en) * 1998-12-28 2007-12-26 日本信号株式会社 Train operation control device
US6308110B1 (en) * 1999-11-24 2001-10-23 Xerox Corporation Apparatus and method of distributed object handling
JP2003054408A (en) * 2001-08-08 2003-02-26 Toshiba Transport Eng Inc Train operation management device
JP5012722B2 (en) * 2008-08-05 2012-08-29 三菱電機株式会社 Operation prediction information provision system
JP5428380B2 (en) * 2009-02-24 2014-02-26 村田機械株式会社 Tracked vehicle system
JP5364682B2 (en) * 2010-11-26 2013-12-11 株式会社日立製作所 Train speed control method and apparatus
JP2013132980A (en) * 2011-12-26 2013-07-08 Toshiba Corp Transportation management device, transportation management system and control program
CN103661498B (en) * 2013-12-09 2016-03-02 中铁十局集团有限公司 Railway laying machine car Traffic dispatching system
EP2979952B1 (en) * 2014-07-29 2017-02-01 Mitsubishi Electric R&D Centre Europe B.V. Method for reducing the delay of a rail vehicle to reach a destination
JP6912896B2 (en) * 2017-02-09 2021-08-04 三菱重工機械システム株式会社 Vehicle type discrimination device, vehicle type discrimination method and program

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0223003A (en) * 1988-07-12 1990-01-25 Hitachi Ltd Operation supporting system for rolling stock
JPH03289301A (en) * 1990-04-03 1991-12-19 Toshiba Corp Safety controller for train
JP2726548B2 (en) * 1990-05-23 1998-03-11 株式会社東芝 Train operation management device
JPH05286441A (en) * 1992-04-10 1993-11-02 Toshiba Corp Train schedule management device
JPH05319269A (en) * 1992-05-18 1993-12-03 Hitachi Ltd Transportation system evaluation simulator

Also Published As

Publication number Publication date
JPH06321115A (en) 1994-11-22

Similar Documents

Publication Publication Date Title
US12304539B2 (en) Automatic driving methods, vehicle on-board controllers, traffic control integrated automation systems, and zone controllers
CN114771607B (en) Integrated method, system and application of railway operation scheduling and train operation control
CA2281683C (en) A system and method for automatic train operation
US5487516A (en) Train control system
US8751073B2 (en) Method and apparatus for optimizing a train trip using signal information
JP5271772B2 (en) Train operation control method and on-board control device
JP5380193B2 (en) Operation management method
CN113496590B (en) Traffic system, operation management device, and operation management method
EP3219573A1 (en) Train driving assistance system
US20120197466A1 (en) Operation support device and automatic operation device
KR20090122847A (en) Joining Control Method and Joining Control System for Automatic Vehicles
JP3525481B2 (en) Train control device
JP2002204507A (en) Train group control system, train group control method, onboard ATO device, and ground control device
CN113650658B (en) Tramcar is at plane intersection control system
CN109625029A (en) Train group station entrance and exit control method and system
JP2018172053A (en) Train operation control system
JP2003095109A (en) Train group control system
JPH0976914A (en) Train running operation control method and device
JP3222700B2 (en) Train operation management system
JP2005231447A (en) Train operation support device
JPH06284519A (en) Train travelling controller
CN112907116B (en) Method and system for scheduling multiple trackless vehicles of amusement item
CN114572274B (en) Train control method, computer device, and readable storage medium
JP2001030905A (en) Train control system, train operation support system
JP2726548B2 (en) Train operation management device

Legal Events

Date Code Title Description
TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20040127

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20040209

LAPS Cancellation because of no payment of annual fees