JP3527655B2 - Underground buried structure of multistage pipeline and its burying method - Google Patents
Underground buried structure of multistage pipeline and its burying methodInfo
- Publication number
- JP3527655B2 JP3527655B2 JP08579099A JP8579099A JP3527655B2 JP 3527655 B2 JP3527655 B2 JP 3527655B2 JP 08579099 A JP08579099 A JP 08579099A JP 8579099 A JP8579099 A JP 8579099A JP 3527655 B2 JP3527655 B2 JP 3527655B2
- Authority
- JP
- Japan
- Prior art keywords
- pipe
- concrete
- nut
- bolt
- anchor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000000034 method Methods 0.000 title claims description 10
- 239000000463 material Substances 0.000 claims description 9
- 230000008878 coupling Effects 0.000 claims 1
- 238000010168 coupling process Methods 0.000 claims 1
- 238000005859 coupling reaction Methods 0.000 claims 1
- 238000007711 solidification Methods 0.000 claims 1
- 230000008023 solidification Effects 0.000 claims 1
- 238000010276 construction Methods 0.000 description 14
- 239000002184 metal Substances 0.000 description 8
- 238000010586 diagram Methods 0.000 description 6
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 6
- 238000009412 basement excavation Methods 0.000 description 5
- 230000003014 reinforcing effect Effects 0.000 description 5
- 239000004576 sand Substances 0.000 description 4
- 230000000630 rising effect Effects 0.000 description 3
- 238000003466 welding Methods 0.000 description 3
- 238000005266 casting Methods 0.000 description 2
- 238000003780 insertion Methods 0.000 description 2
- 230000037431 insertion Effects 0.000 description 2
- 239000004570 mortar (masonry) Substances 0.000 description 2
- 239000002689 soil Substances 0.000 description 2
- 101150096674 C20L gene Proteins 0.000 description 1
- 102220543923 Protocadherin-10_F16L_mutation Human genes 0.000 description 1
- 101100445889 Vaccinia virus (strain Copenhagen) F16L gene Proteins 0.000 description 1
- 101100445891 Vaccinia virus (strain Western Reserve) VACWR055 gene Proteins 0.000 description 1
- 238000009933 burial Methods 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000005056 compaction Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
Landscapes
- Laying Of Electric Cables Or Lines Outside (AREA)
- Electric Cable Installation (AREA)
Description
【0001】[0001]
【発明の属する技術分野】この発明は、多段管路の周り
をコンクリートなどの流動固化物で固めて地中に埋設配
管する際、その流動固化物打設時の多段管路の浮き上が
りを防止した多段管路の地中埋設構造及びその地中埋設
方法に関するものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention prevents floating of a multi-stage pipe when casting a fluidized solidified product when the fluidized solidified product such as concrete is solidified around the multi-staged pipe and buried in the ground. The present invention relates to an underground burying structure of a multi-stage pipe and a method of burying it underground.
【0002】[0002]
【従来の技術】近年、美感上の問題などから、電力線、
通信線等も地中に埋設されることが多くなり、その際、
それらの線はFRPなどの保護管に挿通される。その保
護管は、一般に、複数列・複数段に配設されて、すなわ
ち多段管路として地中に配管される。この多段管路の地
中埋設は、通常、地盤を開掘削した開削溝内に多段管路
を構築して土砂で埋め戻すことにより行われる。2. Description of the Related Art In recent years, due to aesthetic problems, power lines,
Communication lines are often buried underground, and at that time,
Those wires are inserted into a protective tube such as FRP. The protection pipe is generally arranged in a plurality of rows and a plurality of stages, that is, is piped in the ground as a multi-stage conduit. The underground embedding of the multistage pipe is usually performed by constructing the multistage pipe in an excavation trench obtained by excavating the ground and backfilling with earth and sand.
【0003】しかし、このとき、軽弱地盤、水場近くの
地盤、盛土地盤などであったり、超浅埋設であると、多
段管路の埋設による地盤沈下防止、外圧に対する強度ア
ップなどのため、多段管路の管間も含めてその周りをコ
ンクリート、エアーモルタル、流動化処理土などの流動
固化物で固めて補強を行なう。この補強は、土砂による
埋め戻しが不可能な使われていない古い水路、新設のシ
ールドなどの暗渠内に多段管路を構築する場合や、橋桁
近くの配管であって、橋桁の存在により、配管地盤上に
十分なスペースがなく、土砂による埋め戻しの際の締め
固めができない場合などにも行われる。However, at this time, if the ground is a light ground, a ground near a water field, an embankment ground, or an ultra-shallow burial, the ground subsidence is prevented and the strength against external pressure is increased by burying a multi-stage pipeline. Reinforce by solidifying the surroundings including the pipes of the multi-stage pipe with concrete, air mortar, fluidized solid such as fluidized soil. This reinforcement is used when constructing a multi-stage pipe in an underground channel such as an old unused canal that cannot be backfilled with earth and sand or a new shield, or when piping near a bridge girder. This is also done when there is not enough space on the ground and compaction cannot be performed when backfilling with earth and sand.
【0004】この流動固化物の打設による補強の際、そ
の打設による多段管路の浮き上がりを防止する必要があ
り、一般には、地盤内の多段管路配設孔、例えば、図1
3に示すような開削溝Uに、まずコンクリート基盤Cを
形成し、その基盤C上に多段管路Aを構成するととも
に、その多段管路Aを種々の手段によって基盤Cに締結
して、流動固化物の打設による多段管路Aの浮き上がり
を防止する。When the fluidized solidified product is reinforced by driving, it is necessary to prevent the multistage pipe line from rising due to the driving. Generally, the multistage pipe line mounting hole in the ground, for example, FIG.
First, a concrete base C is formed in the excavation groove U as shown in FIG. 3, a multi-stage pipeline A is formed on the base C, and the multi-stage pipeline A is fastened to the base C by various means to flow. Prevent the floating of the multi-stage conduit A due to the setting of the solidified product.
【0005】その従来の浮き上がり防止手段として、図
13に示すように、上記コンクリート基盤Cの打設時、
鉄筋Dにアンカーボルトtを溶接により立ち上げ、この
アンカーボルトtに管枕aを介して所要列、所要段に管
Pを配設し、その最上段の管列上面に管押えを当てがっ
て、その管押えをアンカーボルトtによりナットを介し
て締結することにより、多段管路Aを基盤Cに固定した
ものがある(実施例参照)。As a conventional means for preventing rising, as shown in FIG. 13, at the time of placing the concrete base C,
An anchor bolt t is erected on the reinforcing bar D by welding, and a pipe P is arranged on the anchor bolt t through a pipe pillow a in a required row and a required stage, and a pipe retainer is applied to the upper surface of the uppermost pipe row. In some cases, the multi-stage pipeline A is fixed to the base C by fastening the pipe retainer via a nut with an anchor bolt t (see the embodiment).
【0006】また、図14に示すように、コンクリート
基盤Cを打設する際、開削溝Uの長さ方向所要間隔にア
ンカーフックrを埋設取付けし、その基盤C上に管枕a
を介し管Pを配列し、その管列上面にターンバックルT
付きのワイヤーwを渡してその両端をフックrに係止し
て締結して、管路Aを基盤Cに固定し、さらに、その上
に、多数列、多数段の管路を形成する場合には、図15
に示すように、同様に、管枕aを配して所要段の管路A
を構成し、それAをワイヤーwでアンカーフックrを介
して締結している。Also, as shown in FIG. 14, when placing a concrete base C, anchor hooks r are embedded and installed at required intervals in the lengthwise direction of the excavation groove U, and a pipe pillow a is mounted on the base C.
The pipes P are arrayed through the turnbuckle T on the upper surface of the pipe row.
In the case of passing the attached wire w and fastening both ends to the hook r to fasten it to fix the pipeline A to the base C, and to form multiple rows and multiple stages of pipelines on it. Is shown in FIG.
Similarly, the pipe pillow a is arranged and the pipe line A at the required stage is similarly provided.
The wire A is fastened to the wire A via the anchor hook r.
【0007】[0007]
【発明が解決しようとする課題】上記図13に示す技術
は、コンクリート基盤Cに鉄筋Dを配しており、その配
筋及びアンカーボルトtの溶接は煩わしく、今日の技術
革新により、配筋しなくても十分な強度の基盤Cを得る
ことができる。According to the technique shown in FIG. 13, the reinforcing bar D is arranged on the concrete base C, and the reinforcing bar and the welding of the anchor bolt t are troublesome. Even without it, the base C having sufficient strength can be obtained.
【0008】また、その技術におけるアンカーボルトt
は、一定高さ(一定段数)の多段管路Aを構成するもの
に前もって決定されているため、その長さ(高さ)が全
て一定であり、例えば、一段しか管路Aを形成しなかっ
たり、異種配管、例えば水道管を併設する場合(図1
0、図11の場合)や、前もって決定した段数と異なる
段数(図8に対して図9又は図10)の場合には、その
アンカーボルトtでは、短かったり、長かったりして、
その配管作業が煩わしいものとなる。例えば、4段の多
段管路Aを構成する予定でアンカーボルトtを設けた
が、一段の管路Aになる場合、その一段目の管Pを締結
するには、例えば50cm程度もナットをアンカーボル
トt上をねじ込まねばならず、非常に煩わしい作業とな
る。Further, the anchor bolt t in that technique is used.
Has a predetermined height (constant number of stages) that constitutes the multi-stage pipeline A, so that its length (height) is all constant, for example, the pipeline A forms only one stage. Or when installing different types of pipes, such as water pipes (Fig. 1
0, the case of FIG. 11) or the number of steps different from the number of steps determined in advance (FIG. 9 or FIG. 10 with respect to FIG. 8), the anchor bolt t is short or long,
The piping work becomes troublesome. For example, although the anchor bolt t was provided to form the four-stage multi-stage conduit A, when the first-stage conduit A is to be tightened, the nut P is anchored by about 50 cm in order to fasten the first-stage pipe P. The bolt t must be screwed in, which is a very troublesome work.
【0009】図14で示す技術では、ワイヤーwによっ
ては管Pを並列に維持しにくいため、流動固化物Bの打
設により、管Pが浮き上がる恐れが多く(同図(C)参
照)、このため、図15に示すように、一段目と2段目
の高さhが一定にならず、2段目以降の配管が円滑にな
されない不都合が生じ易い。また、2段目以降のため
に、新たなフックrも必要となる。In the technique shown in FIG. 14, since it is difficult to keep the pipes P in parallel depending on the wire w, there is a possibility that the pipe P may float up due to the pouring of the fluidized solidified material B (see FIG. 14C). For this reason, as shown in FIG. 15, the heights h of the first and second stages are not constant, and it is easy to cause inconvenience that the pipes of the second and subsequent stages are not smoothed. In addition, a new hook r is required for the second and subsequent stages.
【0010】この発明は、上記実情の下、多段管路の浮
き上がりを確実に防止して、地中埋設配管の作業性を向
上させるとともに、上段管路の構成変化にも円滑に対応
し得るようにすることを課題とする。Under the above-mentioned circumstances, the present invention surely prevents the multistage pipeline from being lifted, improves the workability of the underground buried pipe, and can smoothly cope with the configuration change of the upper pipeline. The task is to
【0011】[0011]
【課題を解決するための手段】上記課題を解決するため
に、この発明は、まず、コンクリート基盤に設けるアン
カーボルトの長さを、一段の管路分としたのである。少
なくとも一段は管路が形成されるからである。In order to solve the above-mentioned problems, the present invention firstly sets the length of the anchor bolts provided on the concrete base to the length of one-stage pipeline. This is because the conduit is formed in at least one stage.
【0012】つぎに、この発明は、一段目の管路の上面
を、それより上に構成する管路の基礎面とするととも
に、アンカーボルトの上端をその上段管路の取付具の止
着部としたのである。このようにすれば、2段目以降は
自由な管路構成を組むことができる。Next, according to the present invention, the upper surface of the first-stage pipeline is used as the base surface of the pipeline formed above it, and the upper end of the anchor bolt is attached to the fastening portion of the fixture of the upper-stage pipeline. It was. In this way, it is possible to construct a free pipe line configuration after the second stage.
【0013】[0013]
【発明の実施の形態】この発明の実施形態としては、地
盤に形成した孔底面にコンクリート基盤が形成され、こ
のコンクリート基盤にそのコンクリートの打設時に下端
を埋設したアンカーボルトが立ち上がって、このアンカ
ーボルトに管押えが挿し通され、その管押えと前記コン
クリート基盤の間に管枕を介して管が位置され、前記ア
ンカーボルトの先端へのナットのねじ込みにより、管押
えを介し管がコンクリート基盤に締結されており、前記
管押えには種々の管が載って、その管は取付具で囲まれ
て、その取付具が前記アンカーボルトの先端に係止され
て、前記上段の管がアンカーボルトを介しコンクリート
地盤に固定され、前記孔内はコンクリートなどの流動固
化物で埋め戻しされて多段管路周りがその流動固化物で
固められている構成を採用し得る。BEST MODE FOR CARRYING OUT THE INVENTION As an embodiment of the present invention, a concrete base is formed on the bottom surface of a hole formed in the ground, and an anchor bolt having a lower end embedded at the time of placing the concrete rises up on the concrete base to raise the anchor. The pipe retainer is inserted through the bolt, the pipe is positioned between the pipe retainer and the concrete base via a pipe pillow, and the nut is screwed into the tip of the anchor bolt, so that the pipe becomes a concrete base through the pipe retainer. It is fastened, various pipes are placed on the pipe retainer, the pipe is surrounded by a fitting, and the fitting is locked to the tip of the anchor bolt, and the upper pipe holds the anchor bolt. It is fixed to the concrete ground through the inside, the inside of the hole is backfilled with a fluidized solidified material such as concrete, and the periphery of the multistage pipe is solidified with the fluidized solidified material. The may be employed.
【0014】この構成であれば、管枕と管押えにより管
が強固に支持され、それがアンカーボルトのナット締め
により締結されるため、流動固化物打設時の浮き上がり
を確実に防止する。With this construction, the pipe is firmly supported by the pipe pillow and the pipe retainer, and the pipe is firmly fastened by tightening the nut of the anchor bolt, so that it is possible to reliably prevent the floating of the solidified product during casting.
【0015】この構成において、コンクリートの打設を
一段目管路まで一度に行ってもよいが、上記コンクリー
ト基盤を形成した後、その上に、その上一段の管及び管
枕が埋設する程度にコンクリート層が形成され、このコ
ンクリート層と前記コンクリート基盤とでそれより上の
管路形成用基盤となっているようにすれば、アンカーボ
ルトも安定して立てることができるうえに、下段のコン
クリート基盤も薄くて、均しコンクリートとして円滑に
形成でき、その上に、一段目の管路を形成するため、そ
の一段目の管路基準も安定し、その上の管路構成も安定
化する。In this structure, the concrete may be cast up to the first-stage pipe line at a time, but after forming the concrete base, the pipe and pipe pillow on the first stage are buried on the concrete base. If a concrete layer is formed and the concrete layer and the concrete foundation serve as a pipeline-forming foundation above that, the anchor bolts can be stably erected, and the concrete foundation in the lower stage It is also thin and can be smoothly formed as leveled concrete, and since the first-stage pipeline is formed on it, the first-stage pipeline reference is stable and the pipeline configuration above it is also stable.
【0016】アンカーボルトは、従来と同様に鉄筋Dに
溶接してもよいが、コンクリート基盤内に埋設される板
状のアンカー台に立ち上げたものとすれば、工場等で量
産でき、安価となる。The anchor bolt may be welded to the reinforcing bar D as in the conventional case, but if it is set up on a plate-like anchor base embedded in a concrete base, it can be mass-produced in a factory or the like and is inexpensive. Become.
【0017】上記取付具としては、上記アンカーボルト
の先端にねじ込まれる連結ナットとその連結ナットにね
じ込まれるボルト棒と、このボルト棒の先端部にナット
を介して締結される管押えとから成り、前記アンカーボ
ルトに連結ナットを介してボルト棒を連結するととも
に、一段目管路上の管押え上に管枕を介して所要段数の
管を積層し、前記管押えをボルト棒上端に挿し通して最
上段の管上面に当てがい、そのボルト棒上端にナットを
ねじ込んで締結したものを採用し得る。The attachment includes a connecting nut screwed into the tip of the anchor bolt, a bolt rod screwed into the connecting nut, and a pipe retainer fastened to the tip end of the bolt rod through the nut. While connecting the bolt rod to the anchor bolt via the connecting nut, stacking the required number of pipes on the pipe retainer on the first stage pipe line via the pipe pillow, insert the pipe retainer into the upper end of the bolt rod, and insert It is possible to adopt a structure in which a pipe is applied to the upper surface of the upper stage and a nut is screwed and fastened to the upper end of the bolt rod.
【0018】この構成であると、2段目以降の管路も周
囲が型枠状態で締結され、浮き上がりがより確実に防止
される。With this structure, the pipe lines of the second and subsequent stages are also fastened with the surroundings in the form of a frame, and lifting can be more reliably prevented.
【0019】上記取付具の他の態様としては、締結バン
ドとその締結バンドの端を上記アンカーボルトの上端に
止着するナットとから成り、一段目管路上の管押え上に
管枕を介して管を載置し、その管に前記締結バンドを巻
回してその締結バンドの両端を前記アンカーボルトの上
端に挿し通し、その上に前記ナットをねじ込んで締結す
る構成も採用し得る。この構成は、上下水道管などの一
本管を締結する場合に有効である(図11参照)。As another mode of the above-mentioned fitting, a fastening band and a nut for fastening the end of the fastening band to the upper end of the anchor bolt are provided, and a pipe pillow is provided on the pipe retainer on the first stage pipeline. A configuration in which a pipe is placed, the fastening band is wound around the pipe, both ends of the fastening band are inserted through the upper ends of the anchor bolts, and the nut is screwed on and fastened may be employed. This configuration is effective when fastening a single pipe such as a water and sewer pipe (see FIG. 11).
【0020】上記多段管路を地中に埋設する方法として
は、地盤に形成された孔底面にアンカーボルトを立ち上
げたアンカー台を載置し、そのアンカー台に管枕を介し
て管を載置した後、前記アンカーボルトに管押えを挿し
通し、そのアンカーボルト上端にナットをねじ込んで管
押えを管に圧接して一段目の管路を構成し、その後、コ
ンクリートを前記アンカー台上面近くまで打設し、その
コンクリート層の固化後、前記管押えまでコンクリート
を打設して、コンクリート基盤を形成し、このコンクリ
ート基盤上に各種の管を載置し、その管を取付具で囲ん
で、その取付具の端を前記アンカーボルトの上端にナッ
ト締めして、その管を締結し、その後、前記孔内にコン
クリートなどの流動固化物を流し込んで埋設して、多段
管路の周りをその流動固化物で固める構成を採用し得
る。As a method of burying the above-mentioned multi-stage pipe in the ground, an anchor base with an anchor bolt raised is placed on the bottom of a hole formed in the ground, and the pipe is mounted on the anchor base via a pipe pillow. After placing it, insert the tube retainer into the anchor bolt, screw the nut onto the upper end of the anchor bolt, press the pipe retainer against the pipe to form the first-stage pipeline, and then place the concrete up to near the upper surface of the anchor stand. Placing, after solidifying the concrete layer, pouring concrete up to the pipe retainer to form a concrete base, placing various pipes on this concrete base, enclosing the pipe with a fixture, The end of the fixture is fastened to the upper end of the anchor bolt with a nut, the pipe is fastened, and then a fluidized solidified material such as concrete is poured into the hole and embedded to surround the multistage pipe line. It may employ a configuration in which harden in dynamic solidified.
【0021】このように、一段目管路を構成した後にコ
ンクリートの打設を行うと、アンカー台は動かず、安定
して定位置に固定し得る。また、一段目のコンクリート
打設をアンカー台上面近くまでにすることにより、一段
目管路の浮き上がりも殆んどなく、そのコンクリート層
に一段目管路が安定して固定される。このため、2段目
のコンクリート打設時には管路の浮き上がりを防止でき
る。As described above, when the concrete is poured after the first-stage pipeline is constructed, the anchor base does not move and can be stably fixed in place. In addition, by placing the first-stage concrete up to near the upper surface of the anchor base, the first-stage pipeline hardly rises, and the first-stage pipeline is stably fixed to the concrete layer. For this reason, it is possible to prevent the pipeline from rising when the second-stage concrete is placed.
【0022】なお、上記実施形態において、各管押え
は、管の上側に当てがわれる管枕と兼用することもでき
る。このとき、管枕にはアンカーボルトの挿通孔を形成
する。このように兼用すれば、管押えを別途に製作する
必要もない。また、流動固化物はコンクリートが一般的
であるが、エアーモルタル、流動化処理土などの種々の
ものを採用し得る。In the above embodiment, each tube retainer can also be used as a tube pillow applied to the upper side of the tube. At this time, an anchor bolt insertion hole is formed in the tube pillow. If it is also used as described above, it is not necessary to separately manufacture the tube retainer. The fluidized solidified material is generally concrete, but various materials such as air mortar and fluidized soil can be adopted.
【0023】[0023]
【実施例】一実施例を図1乃至図5に示し、図1には、
一段目の管路A1 を形成するためのアンカー金具を示
す。このアンカー金具10は、断面コ字状のアンカー台
11と、その両側に溶接により立ち上げたアンカーボル
ト12と、そのアンカーボルト12上端に挿し通される
管押え13及びナット14とから成る。図2には管枕1
5、16を示し、同図(a)で示す管枕15が最下段又
は最上段として使用され、同(b)で示す管枕16が中
間として使用される。これらの管枕15、16はその長
さ方向の凹部17に管Pの一部を嵌めて管Pを支持固定
する。なお、上段管枕15は管押え13と兼用し得る。
このとき、同図鎖線のごとく、管枕15、16にはアン
カーボルト12の挿通孔18を形成する。EXAMPLE One example is shown in FIGS. 1 to 5, and in FIG.
The anchor metal fitting for forming the pipe line A 1 of the first stage is shown. The anchor metal fitting 10 includes an anchor base 11 having a U-shaped cross section, anchor bolts 12 that are erected on both sides thereof by welding, and a pipe retainer 13 and a nut 14 that are inserted into the upper end of the anchor bolt 12. Figure 2 shows a tube pillow 1
The pipe pillow 15 shown in FIG. 5A is used as the lowermost stage or the uppermost stage, and the pipe pillow 16 shown in FIG. These tube pillows 15 and 16 support and fix the tube P by fitting a part of the tube P into the recess 17 in the length direction. The upper tube pillow 15 can also serve as the tube retainer 13.
At this time, the insertion holes 18 for the anchor bolts 12 are formed in the tube pillows 15, 16 as shown by the chain lines in the figure.
【0024】このアンカー金具10及び管枕15、16
を使用して、開削溝Uに多段管路Aを構成するには、ま
ず、図3に示すように、開削溝Uの底面にその長さ方向
適宜間隔にアンカー金具10を置き、そのアンカー台1
1上に管枕15を介して管Pを布設し、その上に管押え
13を当てがってナット14により締結する。この状態
で、図4に示すようにアンカー台11上面近くまで、均
しコンクリートを打設して基盤C1 を形成する。つぎ
に、図5に示すように、コンクリートC1 の養生固化
後、再び、管押え13近くまでコンクリートを打設し
て、管路A1 を有する基盤C2 を形成する。このとき、
アンカーボルト12の上端雄ねじ部12aにコンクリー
トが付着しないようにする。The anchor fitting 10 and the tube pillows 15 and 16
In order to configure the multi-stage pipeline A in the open cut groove U by using, the anchor metal fittings 10 are first placed on the bottom surface of the open cut groove U at appropriate intervals in the length direction as shown in FIG. 1
The pipe P is laid over the pipe 1 through the pipe pillow 15, and the pipe retainer 13 is placed on the pipe P and fastened with the nut 14. In this state, as shown in FIG. 4, leveling concrete is poured up to near the upper surface of the anchor base 11 to form the base C 1 . Next, as shown in FIG. 5, after curing and solidifying the concrete C 1 , the concrete is again poured up to near the pipe retainer 13 to form the base C 2 having the pipe A 1 . At this time,
Prevent the concrete from adhering to the upper male thread 12a of the anchor bolt 12.
【0025】このようにして、一段目管路A1 を有する
基盤Cが形成された後、図6に示すように、アンカーボ
ルト11の上端雄ねじ部12aにナット20をねじ込
み、そのナット20にボルト棒21をねじ込んでアンカ
ーボルトを長尺物とする。このとき、ナット20はボル
ト棒21に溶着したものでもよい。ボルト棒21が立ち
上がれば、図7に示すように、管枕15、16を介し管
Pを所要段数A2 、A3、A4 に積層し、その最上段A4
に管押え13を当てがって、ナット14で締結する。こ
の管路Aの段数は、図9、図10に示す2段A2 、
A3 、4段A2 、A3 、A4 、A5 以上と任意である。After the base C having the first-stage conduit A 1 is formed in this manner, as shown in FIG. 6, a nut 20 is screwed into the upper male thread 12a of the anchor bolt 11, and the nut 20 is bolted. The rod 21 is screwed in to make the anchor bolt a long one. At this time, the nut 20 may be welded to the bolt rod 21. When the bolt rod 21 rises, as shown in FIG. 7, the pipes P are stacked on the required number of stages A 2 , A 3 , and A 4 via the pipe pillows 15 and 16, and the uppermost stage A 4 thereof is stacked.
The tube retainer 13 is applied to and is fastened with the nut 14. The number of stages of this pipeline A is 2 stages A 2 shown in FIG. 9 and FIG.
A 3 , 4 stages A 2 , A 3 , A 4 , A 5 or more are optional.
【0026】このボルト棒21等により多段管路Aが締
結されれば、図8に示すように、コンクリートBを打設
して、多段管路Aの周りをコンクリートで固める。コン
クリート打設は、地表面まで行ってもよいが、その深さ
は任意であり、そのコンクリートBの打設によって埋ま
らない開削溝Uには土砂等を適宜に埋め戻しする。When the multi-stage pipeline A is fastened by the bolt rods 21 and the like, concrete B is cast and the periphery of the multi-stage pipeline A is solidified with concrete as shown in FIG. The concrete may be cast to the ground surface, but the depth thereof is arbitrary, and the excavation groove U that is not filled by the concrete B is appropriately backfilled with earth and sand.
【0027】この実施例では、同径管Pの場合であった
が、図10に示すように、異径などの異種管P’でも同
様にして多段管路Aとすることができる。また、図11
に示すように、一段目管路A1 も異径管P’とすること
もできる。さらに、水道管P”などの大径のものを併設
する場合には、図11に示すように、これに合った寸法
のアンカー台11、アンカーボルト12及び管押え13
のアンカー金具10とするとともに、そのアンカー金具
10の上に管枕30を介して上下水道管P”を載置し、
その管P”をターンバックルT付きの締結バンド31で
巻回し、そのバンド31の両端をアンカーボルト12の
上端12aにナット14で止めて締結する。In this embodiment, the pipe P having the same diameter was used. However, as shown in FIG. 10, a pipe P'of a different type having a different diameter can be similarly used as the multistage pipe line A. In addition, FIG.
As shown in, the first-stage conduit A 1 can also be the different diameter pipe P ′. Further, when a large diameter pipe such as a water pipe P ″ is installed side by side, as shown in FIG. 11, an anchor base 11, an anchor bolt 12, and a pipe retainer 13 having dimensions suitable for this are provided.
Of the anchor metal fittings 10, and the water and sewer pipe P ″ is placed on the anchor metal fittings 10 via the pipe pillow 30.
The pipe P ″ is wound around a fastening band 31 with a turnbuckle T, and both ends of the band 31 are fastened to the upper end 12a of the anchor bolt 12 with a nut 14 to be fastened.
【0028】また、アンカー金具10を、管路A1 を構
成することなく、別途の種々の手段により定位置に固定
できれば、図12に示すように、管路A1 を構成する前
のアンカー金具10の設置後にコンクリート基盤C1 を
打設し、その後に管路A1 を構成するようにし得る。以
後は上述と同様にして管路Aを構成する。If the anchor metal fitting 10 can be fixed in place by various other means without constructing the conduit A 1 , as shown in FIG. 12, the anchor metal fitting before the conduit A 1 is constructed. After the installation of 10, the concrete base C 1 may be placed and thereafter the conduit A 1 may be constructed. After that, the conduit A is constructed in the same manner as described above.
【0029】なお、実施例は、開削溝Uの場合であった
が、この発明は、上述の暗渠などの各種の流動固化物で
固定化する多段管路に採用し得ることは勿論である。ま
た、強度の面から一段目も含めて下段は電力管などの小
口径の管路とすることが好ましい。Although the embodiment has been described for the case of the excavation groove U, the present invention can be applied to a multi-stage conduit fixed with various fluidized solidified materials such as the above-mentioned underdrain. Further, from the viewpoint of strength, it is preferable that the lower stage including the first stage is a small-diameter conduit such as a power pipe.
【0030】[0030]
【発明の効果】この発明は以上のようにしたので、浮き
上がりを確実に防止して管路構成の変化に柔軟に対応で
き、また、その地中埋設作業も円滑となる。As described above, according to the present invention, it is possible to reliably prevent the floating and to flexibly respond to the change in the pipeline structure, and the underground burying work can be performed smoothly.
【図1】一実施例のアンカー金具の斜視図FIG. 1 is a perspective view of an anchor metal fitting according to an embodiment.
【図2】同実施例の管枕の斜視図FIG. 2 is a perspective view of the tube pillow of the same embodiment.
【図3】同実施例の施工説明図[Fig. 3] Construction explanatory diagram of the same embodiment
【図4】同実施例の施工説明図[Fig. 4] Construction explanatory diagram of the embodiment
【図5】同実施例の施工説明図[Fig. 5] Construction explanatory diagram of the embodiment
【図6】同実施例の施工説明図[Fig. 6] Construction explanatory diagram of the same embodiment
【図7】同実施例の施工説明図[FIG. 7] Construction explanatory diagram of the same embodiment
【図8】同実施例の施工説明図FIG. 8 is a construction explanatory view of the same embodiment.
【図9】他の実施例の施工説明図[Fig. 9] Construction explanatory view of another embodiment
【図10】他の実施例の施工説明図FIG. 10 is an explanatory view of construction of another embodiment.
【図11】他の実施例の施工説明図FIG. 11 is a construction explanatory view of another embodiment.
【図12】他の実施例の施工説明図FIG. 12 is a construction explanatory view of another embodiment.
【図13】従来の施工例の概略斜視図FIG. 13 is a schematic perspective view of a conventional construction example.
【図14】従来の他の施工例の説明図FIG. 14 is an explanatory view of another conventional construction example.
【図15】同施工例の説明図FIG. 15 is an explanatory diagram of the same construction example.
A1 、A2 、A3 、A4 、A5 管路 A 多段管路 B コンクリート(流動固化物) C、C1 、C2 基盤 D 鉄筋 P、P’ 管 P” 水道管 T ターンバックル U 開削溝 t アンカーボルト r アンカーフック w ワイヤー 10 アンカー金具 11 アンカー台 12 アンカーボルト 12a 雄ねじ部 13 管押え 14 ナット 15、16、30 管枕 20 ナット 21 ボルト棒 31 締結バンドA 1 , A 2 , A 3 , A 4 , A 5 Pipeline A Multi-stage pipeline B Concrete (fluidized solidified) C, C 1 , C 2 Foundation D Reinforcing bar P, P'pipe P "Water pipe T Turnbuckle U Cutting groove t Anchor bolt r Anchor hook w Wire 10 Anchor fitting 11 Anchor stand 12 Anchor bolt 12a Male screw part 13 Pipe retainer 14 Nuts 15, 16, 30 Pipe pillow 20 Nut 21 Bolt rod 31 Fastening band
───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) F16L 1/024 H02G 1/06 H02G 9/06 ─────────────────────────────────────────────────── ─── Continuation of the front page (58) Fields surveyed (Int.Cl. 7 , DB name) F16L 1/024 H02G 1/06 H02G 9/06
Claims (6)
ト基盤C1 が形成され、このコンクリート基盤C1 にそ
のコンクリートの打設時に下端を埋設したアンカーボル
ト12が立ち上がって、このアンカーボルト12に管押
え13が挿し通され、その管押えと前記コンクリート基
盤C1 の間に管枕15を介して管Pが位置されて一段目
の管路A 1 が形成され、前記アンカーボルト12の先端
へのナット14のねじり込みにより、前記管押え13を
介して管Pがコンクリート基盤C1 に締結されており、
さらに、前記コンクリート基盤C1 の上に、前記一段目
の管路A 1 の管P及び管枕15が埋設する程度にコンク
リート層C2 が形成され、このコンクリート層C2 と前
記コンクリート基盤C1 とでそれより上の管路形成用基
盤Cとなっており、前記管押え13には種々の管Pが載
ってその管Pは取付具で囲まれて、その取付具が前記ア
ンカーボルト12の先端に係止されて、前記上段の管P
がアンカーボルト12を介しコンクリート基盤C1 に固
定され、前記孔U内にはコンクリートなどの流動固化物
Bが埋め戻しされて多段管路A周りがその流動固化物B
で固められて成る多段管路の地中埋設構造。1. A concrete base C 1 is formed on the bottom surface of a hole U formed in the ground G, and an anchor bolt 12 having a lower end embedded therein rises when the concrete is placed on the concrete base C 1 , and the anchor bolt 12 is attached to the anchor bolt 12. The pipe retainer 13 is inserted, and the pipe P is positioned between the pipe retainer and the concrete base C 1 via the pipe pillow 15 so that the first stage
Are in line A 1 is formed by narrowing twisting of the nut 14 to the distal end of the anchor bolt 12, the pipe P via the Kan'osae 13 are fastened to the concrete foundation C 1,
Furthermore, on the concrete base C 1 , the first step
The concrete layer C 2 is formed to the extent that the pipe P and the pipe pillow 15 of the pipeline A 1 of FIG. 2 are buried, and the concrete layer C 2 and the concrete foundation C 1 serve as the pipeline C for forming a pipeline above the concrete layer C 2. and which, in the pipe presser 13 is the tube P rests various pipe P is enclosed in the fixture, the fixture is engaged with the distal end of the anchor bolt 12, the upper pipe P
Is fixed to the concrete base C 1 through the anchor bolts 12, and the fluidized solidified material B such as concrete is backfilled in the hole U so that the fluidized solidified material B around the multistage pipe A is
Underground structure of multi-stage pipelines that is solidified with.
の先端にねじ込まれる連結ナット20と、その連結ナッ
ト20にねじ込まれるボルト棒21と、このボルト棒2
1の先端部にナット14を介して締結される管押え13
とから成り、前記アンカーボルト12に連結ナット20
を介してボルト棒21が連結されているとともに、一段
目管路A1 上の管押え上に管枕15、16を介して所要
段数の管Pが積層され、前記管押えはボルト棒21上端
に挿し通して最上段の管上面に当てがわれ、そのボルト
棒21上端にナット14がねじ込まれて締結されている
ことを特徴とする請求項1に記載の多段管路の地中埋設
構造。2. The anchor bolt 12 is used as the attachment.
Nut 20 that is screwed into the tip of the bolt, bolt rod 21 that is screwed into the coupling nut 20, and bolt rod 2
A tube retainer 13 that is fastened to the tip portion of 1 via a nut 14.
And an anchor bolt 12 and a connecting nut 20.
The bolt rods 21 are connected via the pipe rods 15 and 16, and the pipe rods of the required number are stacked on the pipe retainers on the first-stage pipeline A 1 through the pipe pillows 15 and 16. 2. The underground buried structure for a multi-stage pipeline according to claim 1, wherein the pipe is inserted into the uppermost pipe and applied to the upper surface of the uppermost pipe, and the nut 14 is screwed and fastened to the upper end of the bolt rod 21.
結バンド31の端を上記アンカーボルト12の上端に止
着するナット14とから成り、一段目管路A1 上の管押
え13上に管枕30を介して管P”が載置され、その管
P”に前記締結バンド31が巻回されてその締結バンド
31の両端は前記アンカーボルト12の上端に挿し通さ
れ、その上にナット14がねじ込まれて締結されている
ことを特徴とする請求項1又は2に記載の多段管路の地
中埋設構造。3. The fitting comprises a fastening band 31 and a nut 14 for fastening the end of the fastening band 31 to the upper end of the anchor bolt 12, and is mounted on the pipe retainer 13 on the first-stage pipeline A 1. The pipe P ″ is placed via the pipe pillow 30, the fastening band 31 is wound around the pipe P ″, and both ends of the fastening band 31 are inserted into the upper ends of the anchor bolts 12 and nuts are mounted thereon. 14. The underground buried structure for a multi-stage pipeline according to claim 1 or 2, wherein 14 is screwed and fastened.
ーボルト12を立ち上げたアンカー台11を載置し、そ
のアンカー台11に管枕15を介して管Pを載置した
後、前記アンカーボルト12に管押え13を挿し通し、
そのアンカーボルト上端12aにナット14をねじ込ん
で管押え13を管Pに圧接して一段目の管路A1 を構成
し、その後、コンクリートを前記アンカー台11上面近
くまで打設し、そのコンクリート層C1 の固化後、前記
管押えまでコンクリートを打設してコンクリート基盤C
2 を形成し、このコンクリート基盤C2 上に各種の管P
を載置し、その管Pを取付具で囲んで、その取付具の端
を前記アンカーボルト12の上端12aにナット締めし
て、その各管Pを締結し、その後、前記孔U内にコンク
リートなどの流動固化物Bを流し込んで、多段管路A周
りをその流動固化物Bで固める多段管路の地中埋設方
法。4. An anchor base 11 on which an anchor bolt 12 is raised is placed on the bottom surface of a hole U formed in the ground G, and a pipe P is placed on the anchor base 11 via a pipe pillow 15, Insert the tube retainer 13 through the anchor bolt 12,
The nut 14 is screwed into the upper end 12a of the anchor bolt to press the pipe retainer 13 against the pipe P to form the first-stage pipeline A 1 , and then concrete is poured up to near the upper surface of the anchor base 11, and the concrete layer After solidification of C 1 , concrete is cast up to the pipe retainer and the concrete base C
2 to form various pipes P on this concrete base C 2.
Is placed, the pipe P is surrounded by a fixture, and the end of the fixture is nut-fastened to the upper end 12a of the anchor bolt 12 to fasten each pipe P, and then the concrete is placed in the hole U. A method for burying a multi-stage pipeline in the ground by pouring a fluidized solidified product B such as the above, and solidifying around the multi-stage pipeline A with the fluidized solidified product B.
の先端にねじ込まれる締結ナット20とその締結ナット
20にねじ込まれるボルト棒21と、このボルト棒21
の先端部にナット14を介して締結される管押え13と
から成り、前記アンカーボルト12に連結ナット20を
介してボルト棒21を連結するとともに、一段目管路A
1 上に管枕15、16を介して所要段数の管Pを積層
し、管押えをボルト棒21上端に挿し通して最上段の管
上面に当てがい、そのボルト棒21上端にナット14を
ねじ込んで締結したことを特徴とする請求項4に記載の
多段管路の地中埋設方法。5. The anchor bolt 12 is used as the attachment.
And a bolt rod 21 screwed into the fastening nut 20, and the bolt rod 21.
And a bolt 13 which is fastened to the tip end of the anchor bolt via a nut 14, and a bolt rod 21 is connected to the anchor bolt 12 via a connecting nut 20.
The required number of stages of pipes P are stacked on 1 through the pipe pillows 15 and 16, and the pipe retainer is inserted through the upper end of the bolt rod 21 and applied to the upper face of the uppermost pipe, and the nut 14 is screwed onto the upper end of the bolt rod 21. The method according to claim 4 , wherein the multistage pipe is buried underground.
結バンド31の端を上記アンカーボルト12の上端に止
着するナット14とから成り、一段目管路A1 上の管押
え上に管枕30を介して管P”を載置し、その管P”に
前記締結バンド31を巻回してその締結バンド31の両
端を前記アンカーボルト12の上端に挿し通して、その
上に前記ナット14をねじ込んで締結することを特徴と
する請求項4又は5に記載の多段管路の地中埋設方法。6. The fitting comprises a fastening band 31 and a nut 14 for fastening the end of the fastening band 31 to the upper end of the anchor bolt 12, and the pipe is mounted on the pipe retainer on the first-stage pipeline A 1. The pipe P ″ is placed via the pillow 30, the fastening band 31 is wound around the pipe P ″, both ends of the fastening band 31 are inserted into the upper ends of the anchor bolts 12, and the nut 14 is placed thereon. The method of embedding a multi-stage pipeline in the ground according to claim 4 or 5 , wherein the method is screwed and fastened.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP08579099A JP3527655B2 (en) | 1999-03-29 | 1999-03-29 | Underground buried structure of multistage pipeline and its burying method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP08579099A JP3527655B2 (en) | 1999-03-29 | 1999-03-29 | Underground buried structure of multistage pipeline and its burying method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2000283334A JP2000283334A (en) | 2000-10-13 |
| JP3527655B2 true JP3527655B2 (en) | 2004-05-17 |
Family
ID=13868694
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP08579099A Expired - Fee Related JP3527655B2 (en) | 1999-03-29 | 1999-03-29 | Underground buried structure of multistage pipeline and its burying method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3527655B2 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111064155A (en) * | 2019-12-17 | 2020-04-24 | 中国葛洲坝集团电力有限责任公司 | Calandria array installation and encapsulation construction method |
Families Citing this family (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR100415906B1 (en) * | 2001-07-26 | 2004-01-24 | 한국전력공사 | A Spacer for Underground Pipes |
| JP4224758B2 (en) * | 2002-04-05 | 2009-02-18 | 東拓工業株式会社 | Underground pipe and its burial method |
| JP4537228B2 (en) * | 2005-03-02 | 2010-09-01 | 徳倉建設株式会社 | Shallow buried method using fluidized soil |
| KR101019371B1 (en) | 2010-12-16 | 2011-03-07 | (유)남양기술단 | Cable Alignment Device for Underground Power |
| KR101582094B1 (en) * | 2015-04-17 | 2016-01-04 | 덕산콘크리트(주) | Ducts for power transmission lines |
| CN114421407B (en) * | 2022-01-18 | 2022-10-21 | 梁创 | Overhead insulated cable |
| CN119042448A (en) * | 2024-11-04 | 2024-11-29 | 中国水利水电第九工程局有限公司 | Protective construction structure for multiple converging open conditions of water pipe |
-
1999
- 1999-03-29 JP JP08579099A patent/JP3527655B2/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111064155A (en) * | 2019-12-17 | 2020-04-24 | 中国葛洲坝集团电力有限责任公司 | Calandria array installation and encapsulation construction method |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2000283334A (en) | 2000-10-13 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN100510280C (en) | Method for the earthwork of a foundation sunk for a wind energy facility | |
| US8161698B2 (en) | Foundation for monopole wind turbine tower | |
| US8109057B2 (en) | Tower foundation system | |
| JP4814269B2 (en) | Construction method of arc-shaped utility pole for overhead track using extended excavation unit for auger crane | |
| JP2002256573A (en) | Existing foundation reinforced steel tower foundation and its construction method | |
| JP3527655B2 (en) | Underground buried structure of multistage pipeline and its burying method | |
| WO2005017290A1 (en) | Street light foundation | |
| KR101973566B1 (en) | Sheathing method for constructing both sheathing wall and cutoff collar by bolting cutoff plate to phc pile with longitudinal plate | |
| JP3648219B2 (en) | Precast flexible box culvert and its construction method | |
| JP2981686B2 (en) | Conduit for fluid circulation | |
| JP6572469B1 (en) | Concrete foundation structure and its construction method | |
| JP2959502B2 (en) | Method of constructing perforated pipeline for CC box | |
| US5358002A (en) | Sewer chimney system | |
| JP2534138B2 (en) | Piping trench and its construction method | |
| JPH1082055A (en) | Method of earthquake-resisting pile foundation construction | |
| JPH1061266A (en) | Mounting method of wall and wall construction | |
| JP3168197B2 (en) | Caisson anchor structure and construction method | |
| CN115717407B (en) | Retaining wall single-sided formwork structure of ultra-high steep slope and construction method thereof | |
| KR20100037305A (en) | Method for laying sewer pipes underground | |
| JP2005127012A (en) | Anchor for retaining earth | |
| KR100394496B1 (en) | Foundation of precast easy to install a street lamp | |
| JPH08165671A (en) | Manhole lifting prevention construction | |
| JP3588523B2 (en) | Construction method of underground storage | |
| JPH07166652A (en) | Casing for mounting anchor bolt and mounting method of anchor bolt | |
| JPH04281988A (en) | Method and apparatus for constructing sheathing |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20040203 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20040220 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| LAPS | Cancellation because of no payment of annual fees |