Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP3536030B2 - Hybrid buttress type open dam - Google Patents
[go: Go Back, main page]

JP3536030B2 - Hybrid buttress type open dam - Google Patents

Hybrid buttress type open dam

Info

Publication number
JP3536030B2
JP3536030B2 JP2000379687A JP2000379687A JP3536030B2 JP 3536030 B2 JP3536030 B2 JP 3536030B2 JP 2000379687 A JP2000379687 A JP 2000379687A JP 2000379687 A JP2000379687 A JP 2000379687A JP 3536030 B2 JP3536030 B2 JP 3536030B2
Authority
JP
Japan
Prior art keywords
steel
buttress
dam
concrete
hybrid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2000379687A
Other languages
Japanese (ja)
Other versions
JP2002180441A (en
Inventor
利雄 野網
Original Assignee
共生機構株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 共生機構株式会社 filed Critical 共生機構株式会社
Priority to JP2000379687A priority Critical patent/JP3536030B2/en
Publication of JP2002180441A publication Critical patent/JP2002180441A/en
Application granted granted Critical
Publication of JP3536030B2 publication Critical patent/JP3536030B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Revetment (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、透過型砂防ダムに
関し、特に、バットレスおよび天端スラブを備え、かつ
鋼材とコンクリート材が複合して形成される鉄骨コンク
リート構造であることを特徴とするハイブリッドバット
レス型オープンダム(出願人はこれを略して「HB型オ
ープンダム」と称している。)に関し、別の見方をする
と、いわゆるバットレスダムの上流壁面を省いて開口状
態(オープン)とすることにより、透過型砂防ダムとし
ての機能をもたせようとした鉄骨コンクリート構造のダ
ムである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a transmission type erosion control dam, and more particularly to a hybrid steel structure having a buttress and a top end slab and having a steel concrete structure formed by combining steel and concrete materials. Regarding the buttress type open dam (the applicant abbreviates this as the "HB type open dam"), from another perspective, by omitting the so-called upstream wall of the so-called buttress dam and opening it (open) , A dam with a steel-framed concrete structure intended to function as a transparent erosion control dam.

【0002】即ち、本発明は、透過型砂防ダム、特に、
土石流が発生するような渓流の土石流区間において、土
石流の捕捉や土石流ピーク流量の減少等を目的として設
置され、また、中小の出水で堆砂することなく次の土石
流に対して貯砂容量を維持することが期待され、しかも
流木の流出が予想される場合には流木止めとしての効果
も期待できる、透過型砂防ダムの技術分野に属する。
That is, the present invention relates to a transmission type erosion control dam, in particular,
In a debris flow section of a mountain stream where a debris flow occurs, it is installed for the purpose of capturing the debris flow and reducing the peak flow rate of the debris flow, and maintaining the sand storage capacity for the next debris flow without sedimentation by small and medium floods. It belongs to the technical field of the transmission type sabo dam, which can be expected to be effective and can also be expected to be effective as a driftwood stop when driftwood is expected to flow out.

【0003】また、掃流区間においても、常時出水のと
き土砂の流出が少なく下流河床の低下が激しい河川では
できるだけ土砂を下流に流下させ、多量の土砂流出が伴
う異常出水のときは土砂流出を調整することが期待され
る、透過型砂防ダムの技術分野にも属する。
Even in the scavenging section, when the river is constantly flooded, the amount of sediment is small and the downstream riverbed is severely deteriorated. It belongs to the technical field of transparent erosion control dams, which are expected to be adjusted.

【0004】[0004]

【従来の技術】従来、土石流区間の透過型砂防ダムに
は、櫛形コンクリートスリットダム、あるいは透過型鋼
製砂防ダムがある。櫛形コンクリートスリットダムは、
通常の不透過型コンクリート砂防ダムに多数のスリット
を開けて櫛形にしたもので、スリット間の多数の壁体は
鉄筋コンクリート造である。透過型鋼製砂防ダムは、鋼
管をフランジ継手によって接合させた骨組み構造であ
り、いわゆる格子形鋼製砂防ダムや鋼製スリットB型な
どと呼ばれているものである。
2. Description of the Related Art Conventionally, there have been comb-shaped concrete slit dams or transparent steel sabo dams as transparent sabo dams in debris flow sections. The comb-shaped concrete slit dam is
A large number of slits are opened in a normal impermeable concrete erosion control dam to form a comb, and the many walls between the slits are reinforced concrete structures. The transmission type steel sabo dam is a frame structure in which steel pipes are joined by a flange joint, and is called a so-called lattice type steel sabo dam or a steel slit B type.

【0005】[0005]

【発明が解決しようとする課題】従来技術にはそれぞれ
次のような問題点がある。 (1)従来の櫛形のコンクリートスリットダムには、次
の問題点がある。 スリット部側面コンクリートの損耗によって断面が縮
小してしまう。 コンクリートの水平打継目に生じるコールドジョイン
トによって対衝撃抵抗力の低下が生じる。 配筋や型枠使用で設計施工が複雑化することによって
建設コストが増大する。
Each of the conventional techniques has the following problems. (1) The conventional comb-shaped concrete slit dam has the following problems. The cross section is reduced due to the wear of concrete on the side surface of the slit portion. Cold joints that occur at horizontal joints of concrete cause a reduction in impact resistance. Construction costs increase due to the complexity of design and construction due to the use of reinforcements and formwork.

【0006】(2)従来の透過型鋼製砂防ダムは、次の
問題点がある。 鋼管の局部坐屈や全体構造の塑性変形を許すために複
雑な設計を必要とする。 鋼管フランジ継手を使用するためにコストが高い。
(2) The conventional transmission type steel sabo dam has the following problems. A complex design is required to allow local buckling of the steel pipe and plastic deformation of the overall structure. High cost due to the use of steel pipe flange joints.

【0007】従来の櫛形のコンクリートスリットダムや
透過型鋼製砂防ダムは、上記のような問題点があるか
ら、いずれも従来その使用が伸び悩みの状態にある。本
発明は、このような従来の問題点を解決し透過型砂防ダ
ムの普及を図るものである。
The conventional comb-shaped concrete slit dam and the transmission type steel sand erosion dam have the above-mentioned problems, and thus their use has been conventionally sluggish. The present invention solves the above-mentioned conventional problems and aims to popularize a transmission type erosion control dam.

【0008】本発明は、従来櫛形のコンクリートスリッ
トダムや透過型鋼製砂防ダム等のコンクリートや鋼製に
よる構造のいずれにも属さない新しいコンセプトによる
高強度の構造形式を実現しようとするものである。本発
明は、構造面からいえば、鉄筋コンクリート構造と鋼構
造の中間に位置づけされる、いわゆる鉄骨コンクリート
構造(鉄骨とコンクリートによるハイブリッド構造)の
透過型ダム構造物を実現しようとするものである。
The present invention is intended to realize a high-strength structural type based on a new concept that does not belong to any concrete or steel structure such as a comb-shaped concrete slit dam or a transmission steel erosion control dam. . The present invention aims to realize a transmission dam structure of a so-called steel-framed concrete structure (hybrid structure of steel frame and concrete), which is positioned between a reinforced concrete structure and a steel structure in terms of structure.

【0009】本発明は、櫛形コンクリートスリットダム
に対して、鉄筋工ではなく、せん断補強用の鉄骨形鋼群
や壁面補強用の軽量形鋼群を利用して構成することで、
単にせん断耐力や磨耗耐力向上のためばかりでなく、コ
ンクリート打設(コンクリートを充填して固める)のた
めの型枠支保工および壁面パネルとしても役立たせるこ
とによって、設計施工の単純合理化を行ってコスト縮減
を図り、上記従来の問題を解消しようとするものであ
る。
According to the present invention, the comb-shaped concrete slit dam is constructed by utilizing not steel bars but steel frame steel groups for shear reinforcement and lightweight steel groups for wall reinforcement.
Not only to improve shear strength and abrasion resistance, but also to serve as formwork support and wall panels for concrete placement (filling and hardening concrete), thereby simplifying and streamlining design and construction, and reducing costs. This is intended to reduce the above problem and solve the above conventional problems.

【0010】本発明は、透過型鋼製砂防ダムに対して、
鋼材メンバー同士のつなぎ役をコンクリートが受持つよ
うな構造とすることによって、弾性領域内での設計を可
能にし、かつ継手構造を省略することでコスト縮減を図
り、上記従来の問題を解消しようとするものである。
The present invention relates to a sabo dam made of transparent steel,
By constructing a structure in which concrete takes the role of connecting steel members, it is possible to design in the elastic region, and by omitting the joint structure, it is possible to reduce costs and solve the above-mentioned conventional problems. To do.

【0011】[0011]

【課題を解決するための手段】本発明は上記課題を解決
するために、河川の横断方向に一定の間隔をおいて開口
部を形成するように配置された複数のバットレスと、該
複数のバットレス天端上に架設された天端スラブを備
え、透過型砂防ダムとしての機能を有することを特徴と
するハイブリッドバットレス型オープンダムを提供す
る。
In order to solve the above-mentioned problems, the present invention provides a plurality of buttresses arranged so as to form openings at regular intervals in the transverse direction of a river, and the plurality of buttresses. Provided is a hybrid buttress type open dam having a top end slab installed on the top end and having a function as a transmission type sand control dam.

【0012】上記バットレスは、河川の上下流方向に配
置された上流側柱材、下流側柱材、中間柱材およびこれ
らの3つの柱材を支保工として組立てられる両側面材に
よって形成される鉄骨組の内部空間に、コンクリートを
充填することで、上記3つの柱材および両側面材相互を
連結して構築された鉄骨コンクリート造である。
[0012] The buttress is a steel frame formed by an upstream side column material, a downstream side column material, an intermediate column material, and both side surface materials assembled by using these three column materials as a support work, which are arranged in the upstream and downstream directions of the river. It is a steel-framed concrete structure constructed by connecting the above three pillar members and both side surface members to each other by filling the interior space of the set with concrete.

【0013】上記上流側柱材、下流側柱材および中間柱
材は、各々耐衝撃せん断抵抗をもたせるようにH形鋼を
用いて、かつ礫衝突による偏心荷重(河川横断方向)に
対する抵抗力を持たせ、両側面パネルの支保工としての
役目も持たせるように、河川横断方向にH形鋼の強軸を
向けて、しかも上記上流側柱材および下流側柱材と、中
間柱材とで断面高さを変えたものを配置する。
Each of the upstream side column member, the downstream side column member and the intermediate column member is made of H-shaped steel so as to have impact shear resistance, and has resistance to eccentric load (cross river direction) due to gravel collision. In order to have a function as a supporting work for both side panels, the strong axis of the H-section steel is directed in the transverse direction of the river, and the upstream side column material and the downstream side column material and the intermediate column material are also provided. Arrange different heights.

【0014】上記中間柱材には多段に開けられた孔を有
し、該孔を通して水平にせん断補強鉄筋が配置されるこ
とで、上記中間柱材とコンクリート間ですべりが生じバ
ットレスの躯体としてのせん断変形を起こさないような
構造とされており、上記上流側柱材および下流側柱材
は、せん断補強機能をもつ天端タイ材を有している。
The intermediate pillar has holes formed in multiple stages, and by placing shear reinforcing bars horizontally through the holes, slippage occurs between the intermediate pillar and concrete, and as a skeleton of a buttress, The structure is such that shear deformation does not occur, and the upstream side column member and the downstream side column member have top end tie members having a shear reinforcing function.

【0015】上記上流側柱材および下流側柱材の両方ま
たは一方には、H形鋼柱に円形鋼管を半割した半割鋼管
を一体に溶接して成る柱材を用いる。
For both or one of the upstream side column material and the downstream side column material, a column material formed by integrally welding a half-divided steel pipe obtained by half-dividing a circular steel pipe into an H-shaped steel column is used.

【0016】上記上流側柱材および下流側柱材には、円
形鋼管あるいは角形鋼管を用いてもよい。
A circular steel pipe or a square steel pipe may be used for the upstream side column member and the downstream side column member.

【0017】上記上流側柱材、下流側柱材および中間柱
材の全てまたはそのいずれかは、CT形鋼を両側に配
し、該両側に配したCT形鋼を鉄筋で連結して成るH形
状の部材を使用してもよい。
All or one or both of the above-mentioned upstream side pillar material, downstream side pillar material and intermediate pillar material are formed by arranging CT section steels on both sides and connecting the CT section steels arranged on both sides with reinforcing bars. Shaped members may be used.

【0018】上記両側面材は、上記上流側柱材、下流側
柱材および中間柱材を支保工として組立てられ、かつ耐
磨耗抵抗をもたせるように軽量形鋼を用いた両側面パネ
ルである。
The above-mentioned both-sides panels are both-sides panels assembled by using the above-mentioned upstream-side pillars, downstream-side pillars and intermediate pillars as a support work and using lightweight shaped steel so as to have abrasion resistance. .

【0019】上記天端スラブは、バットレス天端上に架
設された耐衝撃せん断抵抗をもつ多数のH形鋼桁ならび
に耐磨耗抵抗をもつ底面スラブプレート、上流面形鋼お
よび下流面形鋼によって形成される鉄骨組の内部空間
に、コンクリートを充填することで鋼材相互を連結して
構築された鉄骨コンクリート造である。
The top slab is made up of a large number of H-shaped steel girders having shock-shear resistance installed on the buttress top and a bottom slab plate having wear resistance, an upstream surface steel and a downstream surface steel. It is a steel-framed concrete structure constructed by connecting steel materials by filling concrete into the internal space of the formed steel frame.

【0020】[0020]

【発明の実施の形態】本発明に係るハイブリッドバット
レス型オープンダム実施の形態を実施例に基づいて図面
を参照して詳細に説明する。図1〜7は、本発明の実施
例を説明する図である。図1は、本発明に係るハイブリ
ッドバットレス型オープンダムの実施例の概略構造を示
す斜視図である。図2〜4は、本発明に係るハイブリッ
ドバットレス型オープンダムの実施例の施工手順を説明
する図であり、図5〜7は本発明に係るハイブリッドバ
ットレス型オープンダムの実施例の細部構造を示す図で
ある。これらの図に基づいて、本発明に係るハイブリッ
ドバットレス型オープンダムについて説明する。
BEST MODE FOR CARRYING OUT THE INVENTION Embodiments of the hybrid buttress type open dam according to the present invention will be described in detail based on examples with reference to the drawings. 1 to 7 are views for explaining an embodiment of the present invention. FIG. 1 is a perspective view showing a schematic structure of an embodiment of a hybrid buttress type open dam according to the present invention. 2 to 4 are views for explaining the construction procedure of the embodiment of the hybrid buttress type open dam according to the present invention, and FIGS. 5 to 7 show the detailed structure of the embodiment of the hybrid buttress type open dam according to the present invention. It is a figure. The hybrid buttress type open dam according to the present invention will be described based on these drawings.

【0021】(全体構造)このハイブリッドバットレス
型オープンダムの特徴は、河川横断方向に設けられた複
数のバットレス間に中小出水での流水や土砂が流れる開
口部を設けた構造であり、しかもコンクリート構造の内
外を鉄骨で補強したハイブリッド構造(複合構造)であ
ることを特徴とするバットレス型のオープンダムであ
る。
(Overall Structure) The feature of this hybrid buttress type open dam is that it has a structure in which openings for flowing running water and sediment in small and medium floods are provided between a plurality of buttresses provided in a river transverse direction, and moreover, a concrete structure. It is a buttress type open dam characterized by a hybrid structure (composite structure) in which the inside and outside of the are reinforced with steel frames.

【0022】図1、図5〜7において、このハイブリッ
ドバットレス型オープンダムは、基礎コンクリート1上
に、河川横断方向に適切な間隔をおいて開口部2を形成
するように設けられた複数のバットレス(扶壁)3を設
置し、この複数のバットレス3の天端部に天端スラブ4
を架設して全体が構築される。複数のバットレス3の間
の開口部2を通して中小出水での流水や土砂が流下す
る。
In FIGS. 1 and 5 to 7, this hybrid buttress type open dam comprises a plurality of buttresses provided on a concrete foundation 1 so as to form openings 2 at appropriate intervals in the river transverse direction. (Bulletin wall) 3 is installed, and the top end slab 4 is attached to the top end of the plurality of buttresses 3.
Is built and the whole is built. Through the openings 2 between the plurality of buttresses 3, running water or sediment in small and medium floods flows down.

【0023】バットレス3は、各々鋼製の、上流側柱材
5、下流側柱材6、中間柱材7、両側面材(実施例では
両側面パネルとして示されている。)10、せん断補強
鉄筋8および天端タイ材9等からなる鉄骨組11と、鉄
骨相互を連結するために鉄骨組11で形成される内部ス
ペースに打設された(充填されて固められた)コンクリ
ート(バットレス内部コンクリート)12とから構築さ
れる。
The buttress 3 is made of steel, and each is made of steel, such as an upstream side column member 5, a downstream side column member 6, an intermediate column member 7, both side face members (shown as both side face panels in the embodiment) 10, and shear reinforcement. Concrete (filled and solidified) cast into (filled and solidified) an internal space formed by the steel frame 11 to connect the steel frame 11 and the steel frame 11 including the reinforcing bars 8 and the top end tie material 9 and the like. ) 12 and.

【0024】上流側柱材5、下流側柱材6、中間柱材7
は、対衝撃抵抗力をもたせるためにH形鋼柱、場合によ
って前2者については円形鋼管、角形鋼管が使用され、
これらの柱材5、6、7が複数組み立てられて集合され
た鉄骨鋼柱群が形成される。また、側面パネル10は、
耐磨耗性を有する軽量形鋼が使用され、複数の側面パネ
ル10の集合体が側面に設置されることにより、軽量形
鋼群から成る壁面が形成される。
Upstream side column 5, downstream side column 6, intermediate column 7
Is an H-shaped steel column to provide impact resistance, and in some cases circular steel pipes and square steel pipes are used for the former two,
A plurality of these column members 5, 6, and 7 are assembled to form a group of steel-framed steel columns. In addition, the side panel 10 is
A lightweight shaped steel having abrasion resistance is used, and an assembly of a plurality of side panels 10 is installed on the side surface to form a wall surface made of the lightweight shaped steel group.

【0025】本発明のバットレス3の鉄骨コンクリート
構造体は、このように対衝撃抵抗力を有する鉄骨鋼柱群
と、耐磨耗性を有する軽量形鋼の壁面パネル群と、内部
コンクリートから形成されるハイブリッド構造であるか
ら、土石流の衝撃力に対してきわめて大きな強度を有す
るだけでなく、土石流や土砂流にその表面が接触して
も、壁面パネルの耐磨耗性によりその表面の損耗を抑え
ることができる。
The steel concrete structure of the buttress 3 according to the present invention is formed from the steel frame column group having impact resistance, the wall panel group of lightweight shaped steel having abrasion resistance, and the inner concrete. Since it has a hybrid structure, it not only has extremely high strength against the impact force of debris flow, but also suppresses the wear of the surface due to the abrasion resistance of the wall panel even if the surface comes in contact with debris flow and sediment flow. be able to.

【0026】さらに、鉄骨組11は、構造強度を高める
部材として機能するだけでなく、コンクリートを打設す
るための型枠支保工や型枠パネルとしても機能する。
Further, the steel frame 11 not only functions as a member for enhancing the structural strength, but also as a frame support and a frame panel for placing concrete.

【0027】天端スラブ4は、複数のバットレス3上に
河川横断方向に架設されるスラブプレート13、その上
に同じ方向に設けられたスラブ桁材14、上流側に面し
て設けられるスラブ上流面材(以下、上流面材とい
う。)15、下流側に面して設けられるスラブ下流面材
(以下、下流面材という。)16からなるスラブ鉄骨組
17と、このスラブ鉄骨組17で形成される内部スペー
スに打設されるコンクリート(スラブ内部コンクリー
ト)18とから構築される。
The top end slab 4 is composed of a slab plate 13 which is installed on a plurality of buttresses 3 in a transverse direction of the river, a slab girder material 14 provided on the slab plate 13 in the same direction, and an upstream slab facing the upstream side. Formed by a slab steel frame 17 composed of a face material (hereinafter referred to as upstream surface material) 15 and a slab downstream surface material (hereinafter referred to as downstream surface material) 16 provided facing the downstream side, and this slab steel frame 17. It is constructed from concrete (slab internal concrete) 18 that is cast into the internal space.

【0028】上記スラブ桁材14は、上流側柱材5、下
流側柱材6等と同様に土石流に対する耐衝撃抵抗力をも
たせるためにH形鋼が使用される。また、上流面材15
および下流面材16は、土石流や流木が衝突することを
考え、耐衝撃性、耐磨耗性をもたせるために形鋼が使用
される。
The slab girder material 14 is made of H-shaped steel in order to have impact resistance against debris flow, like the upstream side pillar material 5, the downstream side pillar material 6 and the like. In addition, the upstream surface material 15
For the downstream surface material 16, a shaped steel is used in order to have impact resistance and abrasion resistance in consideration of collision with debris flow or driftwood.

【0029】(細部構造および施工法)本発明に係るハ
イブリッドバットレス型オープンダムの細部構造につい
て、図2〜4によりその施工手順の説明を通して、さら
にその構造を明確にする。
(Detailed Structure and Construction Method) The detailed structure of the hybrid buttress type open dam according to the present invention will be further clarified through the explanation of the construction procedure with reference to FIGS.

【0030】施工手順は、その工程を大きく把握する
と、I.準備工(程)、II.柱材の建込み、III.バッ
トレス内部コンクリートの打設、IV.天端スラブの施
工、から成るが、全体を通しての施工手順は次の(a)
〜(l)(図2〜4中の(a)〜(l)に対応する。)
に分けて順次説明する。
The construction procedure is as follows: Preparatory work (degree), II. Construction of pillars, III. Placing buttress internal concrete, IV. It consists of the construction of the top slab, but the whole construction procedure is as follows (a)
-(L) (corresponding to (a)-(l) in FIGS. 2-4)
Will be described in order.

【0031】I.準備工程 (a)基礎コンクリートの箱抜き(図2(a)) 基礎コンクリート1の面上に、上流側柱材5、下流側柱
材6、中間柱材7を建込むための箱抜き19を行う。箱
抜き19の寸法は、上記柱材5、6、7を各々建込める
範囲内でできるだけ小さく形成する。また、あらかじめ
バットレス鉄骨組全体を隣接ヤードで仮組みし、それを
一体として建込むときには、柱ごとに箱抜きを別々に行
わないで、上下流方向に1列の柱材すべてが入るような
長い平面形をもつ箱抜きを設けることもできる。
I. Preparation Step (a) Boxing of Basic Concrete (Fig. 2 (a)) On the surface of the basic concrete 1, a boxing 19 for building the upstream side pillar material 5, the downstream side pillar material 6, and the intermediate pillar material 7 is provided. To do. The size of the box punch 19 is formed as small as possible within the range in which the pillars 5, 6, and 7 can be built. In addition, when the entire buttress steel frame is temporarily assembled in an adjacent yard in advance and it is built as a unit, it is not necessary to open each box separately for each column, but it is long so that one row of column members can be inserted in the upstream and downstream directions. It is also possible to provide a box opener having a planar shape.

【0032】(b)足場の組立(図2(b)) 基礎コンクリート1上に作業用足場20を組立てる。(B) Assembly of scaffold (Fig. 2 (b)) Assemble the working scaffold 20 on the foundation concrete 1.

【0033】II.柱材の建込み (c)柱材の建込み (図2(c)) 上流側柱材5、下流側柱材6、中間柱材7をクレーンで
吊り、各々の下端部を建込み用の箱抜き19内に入れ建
込む。上流側柱材5、下流側柱材6、中間柱材7につい
ては、この実施例では、各々H型鋼柱材が利用される。
なお、上流側柱材5や下流側柱材6は、H型鋼の代わり
に円形鋼管または角形鋼管を使用してもよい。
II. Pillar material installation (c) Pillar material installation (Fig. 2 (c)) The upstream side pillar material 5, the downstream side pillar material 6, and the intermediate pillar material 7 are hung by a crane, and the lower end of each is erected. It is put in the box open box 19 and built. Regarding the upstream side column member 5, the downstream side column member 6, and the intermediate column member 7, H-shaped steel column members are used in this embodiment.
In addition, as the upstream side column member 5 and the downstream side column member 6, a circular steel pipe or a square steel pipe may be used instead of the H-shaped steel.

【0034】ちなみに、本実施例では上流側柱材5とし
て、図7(a)〜(c)に示すように、H形鋼柱材5の
前面に円形鋼管を半割した半割鋼管21を溶接で一体に
した柱材が使用されている。このように半割鋼管21を
前面に設けると、流体の抵抗が少なくなり、また土石流
などの衝撃も弱めることができる。
By the way, in this embodiment, as the upstream side column member 5, as shown in FIGS. 7 (a) to 7 (c), a half-divided steel pipe 21 in which a circular steel pipe is halved on the front surface of the H-shaped steel column member 5. The pillar material that is integrated by welding is used. When the half steel pipe 21 is thus provided on the front surface, the resistance of the fluid is reduced and the impact of debris flow or the like can be weakened.

【0035】(d)天端タイ材の仮留め(図2(d)) 2本の天端タイ材9を、中間柱材7を通して上流側柱材
5および下流側柱材6間に設置し、図7(a)、(b)
に示すように、ロックボルト22で上流側柱材5および
下流側柱材6に仮留めし、上流側柱材5、下流側柱材6
および中間柱材7を位置決めする。
(D) Temporary fastening of top end tie material (FIG. 2 (d)) Two top end tie materials 9 are installed between the upstream side pillar material 5 and the downstream side pillar material 6 through the intermediate pillar material 7. , FIG. 7 (a), (b)
As shown in FIG. 6, the upstream bolts 5 and the downstream pillars 6 are temporarily fastened to the upstream pillars 5 and the downstream pillars 6 with lock bolts 22.
And the intermediate pillar 7 is positioned.

【0036】(e)箱抜きへのコンクリート打設 箱抜き19へコンクリートを打設して、上流側柱材5、
下流側柱材6、中間柱材7を基礎コンクリート1に固定
する(図2(d)等参照)。
(E) Placing concrete into the box punch 19 Concrete is poured into the box punch 19, and the upstream side pillar material 5,
The downstream side column member 6 and the intermediate column member 7 are fixed to the basic concrete 1 (see FIG. 2D, etc.).

【0037】III.バットレス内へのコンクリート(バ
ットレス内部コンクリート)の打設 (f)せん断補強鉄筋の配置(図3(f)) コンクリートの1リフト高さ(1.5〜3m)分のせん
断補強鉄筋8を、中間柱材7の孔を通して配置する。せ
ん断補強鉄筋8は、必要に応じて重ね継手により継ぎな
がら配置される。
III. Placing concrete (butless internal concrete) in the buttress (f) Arrangement of shear reinforcement bars (Fig. 3 (f)) Shear reinforcement bars 8 for one lift height (1.5 to 3 m) of concrete It is arranged through the holes of the pillar 7. The shear reinforcing bar 8 is arranged while being spliced by a lap joint if necessary.

【0038】(g)側面パネルの取付(図3(g)、
(g)’) 上流側柱材5、下流側柱材6の内面に、また中間柱材7
の外面に当接し両側方から挟むように、1リフト高さ分
の一対の側面材(両側面材、実施例では「両側面パネ
ル」ともいう。)10を取付ける。
(G) Attachment of side panel (FIG. 3 (g),
(G) ') On the inner surfaces of the upstream side column member 5 and the downstream side column member 6, and the intermediate column member 7
A pair of side surface materials (both side surface materials, also referred to as “both side surface panels” in the embodiment) 10 for one lift height are attached so as to come into contact with the outer surface of and are sandwiched from both sides.

【0039】そして、図2(g)’に示すように、上下
の側面パネル10は、それらの互いに当接するフランジ
23をメタルフォーム用のUクリップ24で締着する。
また、一対の側面パネル10は、互いに、Uクリップ2
4を番線25で結び固定する。このようにして順次上方
に側面パネル10を積み重ねるようにして配置し両壁面
を形成していき、順次バットレスの鉄骨組11の函体を
構築していく。さらに、この側面パネル10は、その外
面に流砂、流木等が接触、衝突する壁面を形成する。
Then, as shown in FIG. 2 (g) ', the upper and lower side panels 10 have their flanges 23 that abut each other fastened with a U-clip 24 for metal foam.
Further, the pair of side panels 10 are connected to each other by the U-clip 2
4 is tied with a number 25 and fixed. In this manner, the side panels 10 are sequentially arranged on the upper side so as to form the two wall surfaces, and the box body of the buttress steel frame 11 is sequentially constructed. Further, the side panel 10 forms a wall surface on the outer surface thereof against which quicksand, driftwood or the like contacts and collides.

【0040】(h)1リフト分のバットレス内部コンク
リートの打設 1リフト毎に、側面パネル10、上流側柱材5、下流側
柱材6で囲まれた内部スペースに、1リフト分だけコン
クリートを打設する。そして、以上の(f)〜(h)の
施工工程を、天端スラブの下端まで繰り返す。これによ
り、鉄骨組11がコンクリートによって完全に固定され
堅固なハイブリッド構造のバットレス3が形成されるこ
ととなる。また、図7(c)に示すように、上流側柱材
5の半割鋼管21内にもコンクリート12が打設され
る。
(H) Placing Buttress Internal Concrete for 1 Lift For each lift, 1 lift of concrete is placed in the internal space surrounded by the side panel 10, the upstream side pillar 5 and the downstream side pillar 6. To set. Then, the above-described construction steps (f) to (h) are repeated until the lower end of the top slab. As a result, the steel frame 11 is completely fixed by the concrete and the buttress 3 having a solid hybrid structure is formed. Further, as shown in FIG. 7C, concrete 12 is also placed in the half steel pipe 21 of the upstream side column member 5.

【0041】IV.天端スラブの施工 (i)スラブプレートの設置(図4(i)) 次に河川横断方向に構築された複数のバットレス3の天
端部に、天端スラブ4が施工されるが、その手始めに、
バットレス3の天端部に、図7(a)で示す鋼製波板状
のスラブプレート13を架設する。
IV. Construction of top slab (i) Installation of slab plate (Fig. 4 (i)) Next, the top slab 4 is constructed at the top of the plurality of buttresses 3 constructed in the transverse direction of the river. To
A steel corrugated slab plate 13 shown in FIG. 7A is installed on the top end of the buttress 3.

【0042】(j)スラブ桁材の設置(図4(j)) 仮留めしてある天端タイ材9を取りはずして、複数のス
ラブ桁材14をスラブプレート13上に架設する。スラ
ブ桁材14は、図7(a)に示すように、H形鋼材を使
用する。スラブ桁材14の設置後、全ての天端タイ材9
を、中間柱材7を通して上流側柱材5と下流側柱材6の
間に設置する。
(J) Installation of slab girder material (FIG. 4 (j)) The temporarily fixed top end tie material 9 is removed, and a plurality of slab girder materials 14 are installed on the slab plate 13. As the slab girder material 14, as shown in FIG. 7A, an H-shaped steel material is used. After installing the slab girder material 14, all top tie materials 9
Is installed between the upstream side column member 5 and the downstream side column member 6 through the intermediate column member 7.

【0043】(k)上下流面材の設置(図4(k)) 天端スラブ4の上流端および下流端に、上流面材15お
よび下流面材16を支持斜材26で支えて内側に倒れな
いようにして設置する。このようにして天端スラブ4の
鉄骨組17が形成される。
(K) Installation of Upstream / Downstream Surface Material (FIG. 4 (k)) The upstream surface material 15 and the downstream surface material 16 are supported at the upstream end and the downstream end of the top slab 4 by the supporting diagonal members 26 and are placed inside. Install it so that it does not fall. In this way, the steel frame 17 of the top slab 4 is formed.

【0044】(l)スラブ内部コンクリートの打設 スラブプレート13、上流面材15および下流面材16
で囲まれるスペース(図4(k)参照)内にコンクリー
ト18を打設する。これにより、天端スラブ4が完成
し、ハイブリッドバットレス型オープンダムの施工が完
了する。
(L) Placing slab internal concrete Slab plate 13, upstream surface material 15 and downstream surface material 16
Concrete 18 is poured into the space surrounded by (see FIG. 4 (k)). As a result, the top slab 4 is completed and the construction of the hybrid buttress type open dam is completed.

【0045】以上が本発明に係るハイブリッドバットレ
ス型オープンダム構造物のバットレス3および天端スラ
ブ4の施工法である。なお、ダム高の低いハイブリッド
バットレス型オープンダムのバットレス3については、
周辺で仮組ヤードやクレーン稼働ヤードがとれるのであ
れば、必要に応じて、横倒しの状態で鋼柱、せん断補強
鉄筋8および側面パネルを仮組し、その仮組されたバッ
トレス鉄骨組11を起こして所定のところに設置し、そ
こに内部コンクリートを打設してバットレス3を構築す
る施工法も採用可能である。
The above is the construction method of the buttress 3 and the top slab 4 of the hybrid buttress type open dam structure according to the present invention. For the buttress 3 of the hybrid buttress type open dam with a low dam height,
If a temporary assembly yard or crane operation yard can be obtained in the surrounding area, if necessary, temporarily assemble the steel columns, shear reinforcing bars 8 and side panels in a state of lying down, and raise the temporarily assembled buttress steel frame 11. It is also possible to adopt a construction method in which the buttress 3 is constructed by placing it in a predetermined place and placing internal concrete therein.

【0046】本発明に係るハイブリッドバットレス型オ
ープンダム構造物の具体的な実施規模の範囲を以下に示
す。 ダム高・・・4〜14.5m(バットレス高:2〜
9.5m) 天端幅・・・1.5〜5m 勾配・・・・上流面 直立〜1:0.8、下流面 直
立〜1:0.5 オープン幅(開口幅)・・・ 1〜5m バットレス幅・・・0.6〜1.2m 天端スラブ厚・・・1.0〜2.0m
The range of specific implementation scale of the hybrid buttress type open dam structure according to the present invention is shown below. Dam height: 4-14.5m (Butless height: 2-
9.5m) Crown width ... 1.5-5m Gradient ... Upstream surface Upright-1: 0.8, Downstream surface Upright-1: 0.5 Open width (opening width) ... 1- 5m Buttress width ・ ・ ・ 0.6-1.2m Top end slab thickness ・ ・ ・ 1.0-2.0m

【0047】(作用)複数のバットレス3により、土石
流を捕捉するとともに、土石流のピーク流量をコントロ
ールし、さらに流木等も捕捉することができる。なお、
中小出水時での土砂は、バットレス3間の開口部2を通
して流下する。
(Operation) With the plurality of buttresses 3, the debris flow can be captured, the peak flow rate of the debris flow can be controlled, and further driftwood can be captured. In addition,
The earth and sand at the time of small and medium floods flow down through the openings 2 between the buttresses 3.

【0048】以上、本発明に係るハイブリッドバットレ
ス型オープンダムの実施の形態を実施例に基づいて説明
したが、本発明は特にこのような実施例に限定されるこ
となく、特許請求の範囲記載の技術的事項の範囲内でい
ろいろな実施例があることはいうまでもない。
Although the embodiment of the hybrid buttress type open dam according to the present invention has been described above based on the embodiments, the present invention is not particularly limited to such embodiments, and is described in the scope of claims. It goes without saying that there are various embodiments within the scope of technical matters.

【0049】[0049]

【発明の効果】以上のような本発明の構成によると、次
のような効果が生じる。 (1)従来の透過型鋼製砂防ダムに劣らない水通し部の
開口度をもっていることにより、確実な土石流捕捉効果
および土石流ピーク流量の低減効果を発揮するととも
に、中小出水時には土砂流下能力を低下させないで堆砂
させることなく貯砂容量を確保し次にくる土石流を捕捉
するように備えることができる。
According to the configuration of the present invention as described above, the following effects are produced. (1) The openness of the water passage part, which is not inferior to that of the conventional transmission steel sabo dam, exerts a definite debris flow trapping effect and a debris flow peak flow reduction effect, and also reduces the debris flow capability during small and medium floods. It can be prepared to secure the sand storage capacity and capture the debris flow that comes next without being allowed to sediment.

【0050】(2)従来の透過型鋼製砂防ダムや櫛形コ
ンクリートスリットダムと比べてより強固な鉄骨コンク
リートによるハイブリッド構造のダムが得られる。すな
わち、本発明のバットレスを構成する鉄骨コンクリート
構造体は、対衝撃抵抗力を有する鉄骨鋼柱群と、耐磨耗
性を有する軽量形鋼群の壁面パネルによってコンクリー
ト躯体の内外から補強されているものであるから、土石
流の衝撃力に対してきわめて大きなせん断強度を有する
だけでなく、土石流や土砂流にその表面が接触されて
も、壁面パネルの耐磨耗性によりバットレス側面の損耗
を抑えることができる。
(2) A dam having a hybrid structure made of steel concrete, which is stronger than the conventional transmission steel erosion control dam and comb concrete slit dam, can be obtained. That is, the steel-framed concrete structure constituting the buttress of the present invention is reinforced from inside and outside of the concrete frame by the steel-framed steel column group having impact resistance and the wall panel of the lightweight shaped steel group having abrasion resistance. Therefore, it not only has extremely high shear strength against the impact force of debris flow, but also suppresses the wear of the buttress side surface due to the abrasion resistance of the wall panel even if the surface comes in contact with debris flow or sediment flow. You can

【0051】(3)さらに、このようにして鋼部材同士
のつなぎ役をコンクリートが受け持つことで、強固な構
造体を形成することによって、透過型鋼製砂防ダムのよ
うに複雑な塑性設計をしなくても、簡単な弾性設計です
ませることができる。
(3) Further, the concrete plays a role of connecting the steel members to each other in this way to form a strong structure, thereby making a complicated plastic design like a transmission type steel sand dam. Even without it, you can do it with a simple elastic design.

【0052】(4)このように、鉄筋工の代わりの鉄骨
H形鋼柱群や表面補強用の軽量形鋼群を、単に強度およ
び耐力向上のためばかりでなく、コンクリート打設のた
めの型枠支保工や壁面パネルとして役立たせることがで
きるので、設計施工の単純化、合理化を達成できる。ま
た、これにより、建設コストを従来の透過型鋼製ダムに
比べて約半分のコストまで低減することができる。
(4) In this way, a steel frame H-shaped steel column group instead of a reinforcing bar and a lightweight shaped steel group for surface reinforcement are used not only for improving strength and proof strength but also for casting concrete. Since it can be used as a frame support and a wall panel, simplification and rationalization of design and construction can be achieved. Further, this can reduce the construction cost to about half the cost of the conventional transmission steel dam.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明に係るハイブリッドバットレス型オープ
ンダムの実施例の構成を示す斜視図である。
FIG. 1 is a perspective view showing a configuration of an embodiment of a hybrid buttress type open dam according to the present invention.

【図2】上記実施例のハイブリッドバットレス型オープ
ンダムの施工法を説明する斜視図である。
FIG. 2 is a perspective view illustrating a construction method of the hybrid buttress type open dam of the above embodiment.

【図3】上記実施例のハイブリッドバットレス型オープ
ンダムの施工法を説明する斜視図である。
FIG. 3 is a perspective view illustrating a construction method of the hybrid buttress type open dam of the above embodiment.

【図4】上記実施例のハイブリッドバットレス型オープ
ンダムの施工法を説明する斜視図である。
FIG. 4 is a perspective view illustrating a construction method of the hybrid buttress type open dam of the above embodiment.

【図5】(a)は側面を示す図であり、(b)は(a)
のA−A断面図である。
5A is a view showing a side surface, and FIG. 5B is a view showing FIG.
FIG.

【図6】上記実施例の上流側から見た一部正面図および
一部断面図である。
FIG. 6 is a partial front view and a partial cross-sectional view of the above embodiment as seen from the upstream side.

【図7】(a)は天端部スラブの断面を示す図であり、
(b)は(a)の平面図であり、(c)は(a)のA−
A断面図である。
FIG. 7 (a) is a view showing a cross section of the top end slab,
(B) is a plan view of (a), (c) is A- of (a).
FIG.

【符号の説明】[Explanation of symbols]

1 基礎コンクリート 2 開口部 3 バットレス 4 天端スラブ 5 上流側柱材 6 下流側柱材 7 中間柱材 8 せん断補強鉄筋 9 天端タイ材 10 側面材(側面パネル) 11 鉄骨組 12 バットレス内部コンクリート 13 スラブプレート 14 スラブ桁材 15 スラブ上流面材 16 スラブ下流面材 17 スラブ鉄骨組 18 スラブ内部コンクリート 19 箱抜き 1 foundation concrete 2 openings 3 buttress 4 top slab 5 Upstream side pillar material 6 Downstream column material 7 Middle pillar material 8 shear reinforcement 9 Top end Thai material 10 Side material (side panel) 11 steel frame 12 Buttress internal concrete 13 Slab plate 14 Slab girder material 15 Slab upstream surface material 16 Slab downstream surface material 17 Slab Steel Frame 18 Slab internal concrete 19 without box

Claims (4)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 河川の横断方向に一定の間隔をおいて
開口部を形成するように配置された複数のバットレス
と、該複数のバットレス天端上に架設された天端スラブ
を備え、 透過型砂防ダムとしての機能を有するハイブリッドバッ
トレス型オープンダムおいて、 上記バットレスは、柱材が複数組み立てられて集合され
た鉄骨鋼柱群を支保工として組立てられる両側面材によ
って形成される鉄骨組の内部空間に、コンクリートを充
填することで、上記柱材および両側面材相互を連結して
構築された鉄骨コンクリート造であることを特徴とする
ハイブリッドバットレス型オープンダム。
1. A transmission type comprising: a plurality of buttresses arranged so as to form openings at regular intervals in a transverse direction of a river; and a top slab installed on the tops of the plurality of buttresses. A hybrid bag that functions as a sabo dam
In the tres type open dam, the above buttress is assembled by assembling multiple pillars.
The steel plates on both sides are assembled by using the
The interior space of the steel frame formed by
By connecting the above-mentioned pillar material and both side surface materials,
It is characterized by being constructed of steel frame concrete
Hybrid buttress type open dam.
【請求項2】 河川の横断方向に一定の間隔をおいて
開口部を形成するように配置された複数のバットレス
と、該複数のバットレス天端上に架設された天端スラブ
を備え、 透過型砂防ダムとしての機能を有するハイブリッドバッ
トレス型オープンダムおいて、 上記バットレスは、河川の上下流方向に配置された上流
側柱材、下流側柱材、中間柱材およびこれらの3つの柱
材を支保工として組立てられる両側面材によって形成さ
れる鉄骨組の内部空間に、コンクリートを充填すること
で、上記3つの柱材および両側面材相互を連結して構築
された鉄骨コンクリート造であることを特徴とするハイ
ブリッドバットレス型オープンダム。
2. A certain interval is provided in the transverse direction of the river.
Multiple buttresses arranged to form an opening
And a crown slab installed on the plurality of buttress crowns
And a hybrid bag that has the function of a transparent erosion control dam.
In the tres type open dam, the buttress is composed of an upstream side pillar material, a downstream side pillar material, an intermediate pillar material and both side surface materials which are assembled as a supporting work of these three pillar materials arranged in the upstream and downstream directions of the river. It is a high- strength concrete structure constructed by connecting the above three pillar members and both side members by filling concrete into the internal space of the formed steel frame.
Brid buttress type open dam.
【請求項3】 上記上流側柱材、下流側柱材および中
間柱材は、各々耐衝撃せん断抵抗をもたせるようにH形
鋼を用いて、かつ礫衝突による偏心荷重に対する抵抗力
を持たせ、さらに両側面パネルの支保工としての役目も
持たせるように、河川横断方向にH形鋼の強軸を向け
て、しかも上記上流側柱材および下流側柱材と、中間柱
材とで断面高さを変えたものを配置することを特徴とす
る請求項2記載のハイブリッドバットレス型オープンダ
ム。
3. The upstream column member, the downstream column member, and the intermediate column member are made of H-shaped steel so as to have impact shear resistance, and have resistance to eccentric load due to gravel collision, In addition, the strong axis of the H-section steel is directed in the transverse direction of the river so that it also serves as a support for both side panels, and the cross-sectional height of the above-mentioned upstream-side pillar material and downstream-side pillar material and intermediate pillar material is increased. 3. The hybrid buttress type open dam according to claim 2, wherein different heights are arranged.
【請求項4】 上記天端スラブは、バットレス天端上
に架設された耐衝撃せん断抵抗をもつ多数のH形鋼桁な
らびに耐磨耗抵抗をもつ底面スラブプレート、上流面形
鋼および下流面形鋼によって形成される鉄骨組の内部空
間に、コンクリートを充填することで鋼材相互を連結し
て構築された鉄骨コンクリート造であることを特徴とす
る請求項1、 2または3記載のハイブリッドバットレス
型オープンダム。
4. The top slab is on the buttress top.
A large number of H-shaped steel girders installed on the
Rubbed bottom slab plate with abrasion resistance, upstream surface type
Internal void of steel frame formed by steel and downstream section steel
In the meantime, the steel materials are connected to each other by filling with concrete.
Characterized by being a steel-framed concrete structure constructed by
The hybrid buttress type open dam according to claim 1, 2 or 3.
JP2000379687A 2000-12-14 2000-12-14 Hybrid buttress type open dam Expired - Fee Related JP3536030B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000379687A JP3536030B2 (en) 2000-12-14 2000-12-14 Hybrid buttress type open dam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000379687A JP3536030B2 (en) 2000-12-14 2000-12-14 Hybrid buttress type open dam

Publications (2)

Publication Number Publication Date
JP2002180441A JP2002180441A (en) 2002-06-26
JP3536030B2 true JP3536030B2 (en) 2004-06-07

Family

ID=18848003

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000379687A Expired - Fee Related JP3536030B2 (en) 2000-12-14 2000-12-14 Hybrid buttress type open dam

Country Status (1)

Country Link
JP (1) JP3536030B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103437322B (en) * 2013-09-10 2015-03-04 宋国文 Method for flood control and reinforcement and dam protection
CN110158547A (en) * 2019-06-14 2019-08-23 贵州省水利水电勘测设计研究院 A kind of cement sand and gravel buttress dam
CN114875858B (en) * 2022-03-29 2025-04-15 华北水利水电大学 A comprehensive construction system for dam, road and bridge of steel structure dam

Also Published As

Publication number Publication date
JP2002180441A (en) 2002-06-26

Similar Documents

Publication Publication Date Title
CN107419824A (en) The full precast shear wall structural system of regenerative steel skeleton and construction method
CN110184903B (en) A truss-type prefabricated pipe column assembled bridge pier
CN207017483U (en) The full precast shear wall structural system of regenerative steel skeleton
CN111074775A (en) An assembled suspension bridge tower
KR100856723B1 (en) Steel frame reverse casting system and method using cantilever type girder
JP2008223291A (en) Revetment integrated ramen bridge and its construction method
JP3536030B2 (en) Hybrid buttress type open dam
JP2000104218A (en) Pier structure and pier construction method
CN116104104A (en) A construction method for deep and large foundation pits without changing braces
CN113026521A (en) Assembled cantilever composite structure bridge and construction method thereof
JP2005336802A (en) Horizontal beam type open dam
CN116717078B (en) Anti-seepage reinforcing structure and method for reverse ridge of top plate hole
JP3676442B2 (en) Filled coated steel pipe concrete structure
JP3766988B2 (en) Filled coated steel pipe concrete structure
CN212358031U (en) Cast-in-place folded section shared supporting system for box girder of steel bridge
CN215906998U (en) On-site assembling structure for steel frame modular building
KR100975539B1 (en) Steel box continuous bridge with irruglar span or regular span and this construction technique
CN216765557U (en) Pile slab bridge supporting structure
JP4387614B2 (en) Hybrid buttress-type open dam
CN214884632U (en) Assembled shaped steel composite wall
CN111851318B (en) Side span formwork system of cantilever bridge and its construction method
JP3992356B2 (en) Open steel sabo dam
CN210857267U (en) Pile sheet type retaining wall integral casting template structure
CN113565211A (en) Field Assembled Structures for Steel Frame Modular Buildings
JP5180763B2 (en) Cross beam buttress-type open embankment

Legal Events

Date Code Title Description
A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20031222

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20040309

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20040315

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees