JP3538301B2 - Building remote monitoring device - Google Patents
Building remote monitoring deviceInfo
- Publication number
- JP3538301B2 JP3538301B2 JP30075097A JP30075097A JP3538301B2 JP 3538301 B2 JP3538301 B2 JP 3538301B2 JP 30075097 A JP30075097 A JP 30075097A JP 30075097 A JP30075097 A JP 30075097A JP 3538301 B2 JP3538301 B2 JP 3538301B2
- Authority
- JP
- Japan
- Prior art keywords
- information
- centralized
- alert
- alarm
- building
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Alarm Systems (AREA)
- Selective Calling Equipment (AREA)
Description
【0001】[0001]
【発明の属する技術分野】本発明は、ビルに設けられた
設備機器を端末装置を介して監視センタにより監視する
ビル遠隔監視装置に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a building remote monitoring device for monitoring equipment provided in a building by a monitoring center via a terminal device.
【0002】[0002]
【従来の技術】従来、ビル遠隔監視装置は、複数のビル
にそれぞれ設けられ、同一ビル内の設備機器の異常を検
出する端末装置と、これらの端末装置と通信回線を介し
て接続され、送信された異常情報に基づき前記設備機器
を監視する監視センタとを備えている。そして、前記監
視センタには、端末装置からの異常情報、すなわち、発
報データを受信する受信部と、監視に必要な情報を記憶
するハードディスクと、発報データを解析する受信デー
タ解析部と、この受信データ解析部で解析された発報デ
ータに基づいてハードディスク内のデータの検索を行う
表示・印字検索部と、表示・印字検索部で検索された情
報を表示する表示部と、表示・印字検索部で検索された
情報を印字する印字部と、停電による発報データかどう
かを判定する停電判定部と、単位時間あたりの地区別の
停電に関する発報データの計算を行い、地区別に設定さ
れている値を超えたか否かの判定を行う地域停電判定部
とが設けられている。2. Description of the Related Art Conventionally, a building remote monitoring device is provided in each of a plurality of buildings, and is connected to a terminal device for detecting an abnormality of equipment in the same building via a communication line and transmitted. And a monitoring center for monitoring the equipment based on the received abnormality information. And the monitoring center has abnormality information from the terminal device, that is, a receiving unit for receiving alarm data, a hard disk for storing information necessary for monitoring, a reception data analyzing unit for analyzing alarm data, A display / print search unit for searching data in the hard disk based on the alarm data analyzed by the received data analysis unit; a display unit for displaying information searched by the display / print search unit; and a display / print A printing unit that prints the information retrieved by the search unit, a power outage determination unit that determines whether the data is alarm data due to a power outage, and calculates the alarm data related to the power outage per unit time per district And a local power outage determination unit that determines whether or not the value exceeds the threshold value.
【0003】このように構成された従来のビル遠隔監視
装置は、停電等により、端末装置からの発報データを集
中して受信すると、受信データ解析部により地域の判定
を行った後に、停電判定部により停電か否かの判定を行
う。このとき、停電による発報であると判定されると、
地域停電発報部により地域毎の停電による発報データの
件数がカウントされ、これに応じて一定時間内に地区毎
にあらかじめ設定された値を超えて発報データを受信す
ると、集中発報であることを判断し、同一地区の発報デ
ータについては、処理負荷の増加を防ぐため、通常の処
理を行わず、印字装置に地区を示すコード、端末装置の
識別番号および異常内容を印字するようになっている。[0003] In the conventional building remote monitoring device configured as described above, when the alarm data from the terminal device is intensively received due to a power failure or the like, the received data analysis unit determines the area, and then determines the power failure. The unit determines whether a power failure has occurred. In this case, if it is determined to be that by the power failure alarm,
The local power outage alerting unit counts the number of alert data due to power outage for each area, and if the alert data exceeds the preset value for each area within a certain period of time in response to this, the centralized alert Judgment is made, and for the alarm data in the same area, the code indicating the area, the identification number of the terminal device, and the details of the abnormality should be printed on the printing device without performing normal processing to prevent the processing load from increasing. It has become.
【0004】なお、この種のビル遠隔監視装置として、
例えば特開平6−162369号公報に記載されるもの
を挙げることができる。As this kind of building remote monitoring device,
For example, those described in JP-A-6-162369 can be mentioned.
【0005】[0005]
【発明が解決しようとする課題】ところで、前述した従
来のビル遠隔監視装置では、監視センタで発報データを
受信すると、監視センタの表示部および印字部により異
常の発生したビルの名称、住所、異常の発生した設備機
器の名称、出動拠点の情報、連絡先の情報等が表示およ
び印字される。このとき、対応要員は表示装置および印
字装置により出力された情報を確認し、出動拠点に電話
やファクシミリ等の手段により前記情報を連絡する必要
があり、多大な労力が必要であった。特に、地震や落雷
等により停電が発生した場合、短時間に多くの発報デー
タが監視センタに送信される、いわゆる集中発報の際、
対応要員はより多くの労力が求められる。By the way, in the above-mentioned conventional building remote monitoring apparatus, when alarm data is received by the monitoring center, the display, printing unit and the name, address, The name of the equipment in which the abnormality has occurred, information on the dispatch base, information on contact information, and the like are displayed and printed. At this time, the response staff must check the information output by the display device and the printing device, and notify the dispatch base of the information by means such as a telephone or a facsimile, which requires a great deal of labor. In particular, when a power outage occurs due to an earthquake or lightning strike, a large amount of alarm data is transmitted to the monitoring center in a short time.
Response personnel require more effort.
【0006】また、集中発報として受信した発報データ
は、ハードディスク内に記憶されず、印字のみのため、
後日、発報件数のカウントや、発報があったビルの抽出
は印字された情報から読み取り、ハードディスク内に対
応要員が手作業で入力を行い来歴情報を作成していた。[0006] In addition, the alarm data received as a centralized alarm is not stored in the hard disk, but is only for printing.
At a later date, the count of the number of alarms and the building where the alarm occurred were read from the printed information, and the corresponding personnel manually entered the hard disk to create log information.
【0007】本発明はこのような従来技術における実情
に鑑みてなされたもので、その第1の目的は、集中発報
が生じた場合であっても、監視センタの対応要員に負担
が生じることを防止できるビル遠隔監視装置を提供する
ことにある。[0007] The present invention has been made in view of the circumstances in the prior art, as its first object, concentrated onset report
Even if an incident occurs, the burden is placed on the response personnel at the monitoring center
It is an object of the present invention to provide a building remote monitoring device capable of preventing the occurrence of a building.
【0008】また、本発明の第2の目的は、集中発報が
生じた後、監視センタの対応要員を介すことなく来歴情
報の整合化を図ることのできるビル遠隔監視装置を提供
することにある。It is a second object of the present invention to provide a building remote monitoring apparatus capable of matching history information after a centralized alarm occurs without intervention of a corresponding person at a monitoring center. It is in.
【0009】[0009]
【課題を解決するための手段】前記
第1の目的を達成す
るために本発明の請求項1記載の発明は、複数のビルに
それぞれ設けられ、同一ビル内の設備機器の異常を検出
する端末装置と、これらの端末装置と通信回線を介して
接続され、送信された異常情報に基づき前記設備機器を
監視する監視センタとを備えたビル遠隔監視装置におい
て、前記設備機器の保守および修理を行なう出動拠点を
予め定めた複数の地区にそれぞれ配置し、前記監視セン
タに、異常が発生したビルおよび設備機器を特定する情
報があらかじめ記憶される第1の記憶手段と、この第1
の記憶手段に記憶された情報以外の他の情報があらかじ
め記憶される第2の記憶手段と、異常情報の受信に応じ
て集中発報であるか否かを判定する受信データ解析手段
と、この受信データ解析手段が集中発報であると判定し
た場合には異常情報の処理を、前記第1の記憶手段に記
憶された情報に基づき行い集中発報情報を作成する集中
発報処理手段と、前記受信データ解析手段が集中発報で
ないと判定した場合には異常情報の処理を、前記第1の
記憶手段および前記第2の記憶手段に記憶されたそれぞ
れの情報に基づき行い通常発報情報を作成する通常発報
処理手段と、前記集中発報処理手段により作成された集
中発報情報を記憶する第3の記憶手段と、前記通常発報
処理手段により作成された通常発報情報を記憶する第4
の記憶手段とを設け、前記受信データ解析手段が集中発
報であると判定したとき、前記監視センタから対応する
出動拠点に、集中発報を生じた旨を発報するものの、前
記集中発報処理手段で作成された集中発報情報は送信せ
ず、前記出動拠点から前記監視センタに前記集中発報に
係る集中発報情報の確認が要求されたときに、前記監視
センタは前記集中発報処理手段で作成された集中発報情
報を該当する出動拠点に送信する構成にしてある。The invention of claim 1, wherein the present invention in order to achieve the first object, there is solved the means for the] are respectively provided in multiple buildings, terminal for detecting the abnormality of the equipment in the same building The maintenance and repair of the equipment is performed in a building remote monitoring apparatus including a device and a monitoring center connected to the terminal device via a communication line and monitoring the equipment based on the transmitted abnormality information. Dispatch base
First storage means arranged in each of a plurality of predetermined areas, wherein the monitoring center previously stores information for identifying the building and the equipment in which the abnormality has occurred;
A second storage unit in which information other than the information stored in the storage unit is stored in advance, and
Receiving data analysis means for determining whether or not a centralized alert is issued, and determining that the received data analyzing means is a centralized alert.
In such a case, the centralized alert processing means for performing the processing of the abnormality information based on the information stored in the first storage means to create the centralized alert information, and the received data analyzing means is determined not to be the centralized alert In this case, the normal alert processing means for processing the abnormal information based on the respective information stored in the first storage means and the second storage means to create the normal alert information; A third storage unit for storing the concentrated alert information created by the alert processing unit, and a fourth storage unit for storing the normal alert information created by the normal alert processing unit.
Storage means, and the received data analysis means
When the monitoring center determines that the
Notifying the dispatched base that a centralized alert has occurred, but
Send the centralized alert information created by the centralized alert processing means.
From the dispatch base to the monitoring center
When confirmation of the centralized alert information is requested, the monitoring
The center is the centralized alert information created by the centralized alert processing means.
The information is transmitted to the corresponding dispatch base .
【0010】前記のように構成した本発明の請求項1記
載の発明によれば、ビル内の設備機器に異常が発生する
と、同一ビル内の端末装置は異常情報を通信回線を介し
て監視センタに送信する。これに応じて監視センタは、
まず、受信データ解析手段により前記異常情報が広域災
害の対象設備によるものかどうかを判断する。このと
き、前記異常情報が広域災害の対象設備によるものであ
り、かつ、同一地区からの受信数が所定時間内に所定数
を超えた場合、前記異常情報が集中発報を構成するもの
であることを検出し、これに応じて集中発報処理手段は
第1の記憶手段に記憶された異常が発生したビルおよび
設備機器を特定する情報に基づき行い集中発報情報を作
成するとともに、この集中発報情報を第3の記憶手段に
記憶する。一方、受信データ解析手段により前記異常情
報が集中発報でないことを検出した場合、通常発報処理
手段により前記第1の記憶手段および第2の記憶手段に
記憶されたそれぞれの情報に基づき行い通常発報情報を
作成するとともに、この通常発報情報を第4の記憶手段
に記憶する。このように、集中発報の対応処理を通常の
異常情報の対応処理よりも簡易化することにより、集中
発報の際に監視センタの対応要員に負担が生じることを
防止できる。According to the first aspect of the present invention configured as described above, when an abnormality occurs in the equipment in the building, the terminal device in the same building transmits the abnormality information to the monitoring center via the communication line. Send to In response, the monitoring center
First, it is determined by the reception data analysis means whether or not the abnormality information is due to a wide area disaster target facility. At this time, when the abnormal information is based on the target facility of the wide area disaster and the number of receptions from the same area exceeds a predetermined number within a predetermined time, the abnormal information constitutes a centralized alert. In response to this, the centralized alert processing unit creates centralized alert information based on the information stored in the first storage unit and identifying the building and the equipment in which the abnormality has occurred. The alarm information is stored in the third storage unit. On the other hand, when the received data analysis means detects that the abnormal information is not a centralized alarm, the normal alarm processing means performs the processing based on the respective information stored in the first storage means and the second storage means. The alarm information is created, and the normal alarm information is stored in the fourth storage unit. In this way, by simplifying the process of responding to the centralized alerting compared to the process of responding to the normal abnormality information, it is possible to prevent a burden on the response staff of the monitoring center during the centralized alerting.
【0011】また、第2の目的を達成するために本発明
の請求項2記載の発明は、前記監視センタに、前記第3
の記憶手段に記憶された集中発報情報を読み出すととも
に、この集中発報情報に、前記第2の記憶手段に記憶さ
れた情報を付加し通常発報情報に変換して第4の記憶手
段に記憶させる情報整合手段を設けた構成にしてある。[0011] The invention of claim 2 of the present invention in order to achieve the second object, the monitoring center, the third
The centralized alert information stored in the storage means is read out, and the information stored in the second storage means is added to the centralized alert information, converted into normal alert information, and transferred to the fourth storage means. The information matching means for storing is provided.
【0012】前記のように構成した本発明の請求項2記
載の発明によれば、集中発報に応じて第3の記憶手段に
記憶された集中発報情報は、後に、情報整合手段により
前記第3の記憶手段から読み出され、第2の記憶手段に
記憶された他の情報が付加されて通常発報情報に変換さ
れ第4の記憶手段に記憶される。これによって、集中発
報が生じた後、監視センタの対応要員を介すことなく来
歴情報の整合化を図ることができる。According to the second aspect of the present invention configured as described above, the centralized alert information stored in the third storage means in response to the centralized alert is later transmitted to the centralized alert information by the information matching means. The information is read out from the third storage means, converted into normal alert information by adding other information stored in the second storage means, and stored in the fourth storage means. As a result, it is possible to match the history information after the occurrence of the centralized alert without the intervention of the response staff of the monitoring center.
【0013】[0013]
【発明の実施の形態】以下、本発明のビル遠隔監視装置
の実施の形態を図に基づいて説明する。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of a building remote monitoring device according to the present invention will be described below with reference to the drawings.
【0014】図1は本発明のビル遠隔監視装置の一実施
形態を示すブロック図、図2は図1のビル遠隔監視装置
による受信データ解析の処理手順を示すフローチャー
ト、図3は図1のビル遠隔監視装置による発報内容確認
の処理手順を示すフローチャート、図4は図1のビル遠
隔監視装置による情報整合の処理手順を示すフローチャ
ートである。FIG. 1 is a block diagram showing an embodiment of a building remote monitoring apparatus according to the present invention. FIG. 2 is a flowchart showing a processing procedure of received data analysis by the building remote monitoring apparatus of FIG. 1. FIG. 3 is a building of FIG. FIG. 4 is a flowchart showing a processing procedure of the content confirmation of the alarm by the remote monitoring device, and FIG. 4 is a flowchart showing a processing procedure of information matching by the building remote monitoring device of FIG.
【0015】本実施形態のビル遠隔監視装置は図1に示
すように、複数のビルにそれぞれ設けられ、同一ビル内
の設備機器の異常を検出する端末装置1a〜1nと、こ
れらの端末装置1a〜1nと通信回線L1を介して接続
され、送信された異常情報に基づき設備機器を監視する
監視センタ10と、この監視センタ10、通信回線L2
を介して接続され、あらかじめ定めた複数の地区にそれ
ぞれ配置されて設備機器の保守および修理を行う出動拠
点30a〜30mとを有している。As shown in FIG. 1, the building remote monitoring apparatus of this embodiment is provided in each of a plurality of buildings, and detects terminal apparatuses 1a to 1n for detecting an abnormality of equipment in the same building, and these terminal apparatuses 1a. To 1n via a communication line L1, and a monitoring center 10 for monitoring equipment based on the transmitted abnormality information;
Are connected via a, and a plurality of the district are respectively arranged mobilization bases for maintenance and repair of the equipment 30A~30 m a predetermined.
【0016】また、前記の監視センタ10は、通信回線
L1と接続され、端末装置1a〜1nとの通信処理を行
う通信装置11a〜11iと、通信装置11a〜11i
と接続され、異常情報の受信に応じ、この異常情報が広
域災害の対象設備によるものかどうかを判断するととも
に、当該異常情報が広域災害の対象設備によるものであ
り、かつ、同一地区からの受信数が所定時間内に所定数
を超えたとき集中発報であることを検出する受信データ
解析手段、例えば受信データ解析装置12と、異常が発
生したビルおよび設備機器を特定する情報があらかじめ
記憶される第1の記憶手段、例えば一次情報格納装置1
5と、第1の記憶手段に記憶された情報以外の他の情報
があらかじめ記憶される第2の記憶手段、例えば二次情
報格納装置16と、受信データ解析手段が集中発報であ
ること検出した異常情報の処理を、第1の記憶手段に記
憶された情報に基づき行い集中発報情報を作成する集中
発報処理手段、例えば集中発報処理装置14と、受信デ
ータ解析手段が集中発報でないこと検出した異常情報の
処理を、第1の記憶手段および第2の記憶手段に記憶さ
れたそれぞれの情報に基づき行い通常発報情報を作成す
る通常発報処理手段、例えば通常発報処理装置13と、
集中発報処理手段により作成された集中発報情報を記憶
する第3の記憶手段、例えば集中発報記憶装置18と、
通常発報処理手段により作成された通常発報情報を記憶
する第4の記憶手段、例えば通常発報記憶装置17と、
第3の記憶手段に記憶された集中発報情報を読み出すと
ともに、この集中発報情報に、第2の記憶手段に記憶さ
れた情報を付加し通常発報情報に変換して第4の記憶手
段に記憶させる情報整合手段、例えば情報整合装置21
と、通常発報情報および集中発報情報等を表示する表示
装置19a〜19jと、通信回線L2と接続され、通常
発報情報あるいは集中発報情報を出動拠点30a〜30
mに配信する配信手段、例えば配信装置20a〜20k
とを備えている。The monitoring center 10 is connected to the communication line L1 and performs communication processing with the terminal devices 1a to 1n, and communication devices 11a to 11i.
Is connected to the system and, in response to the reception of the abnormal information, determines whether the abnormal information is due to the wide-area disaster target facility, and if the abnormal information is due to the wide-area disaster target facility and is received from the same area. When the number exceeds a predetermined number within a predetermined time, received data analysis means for detecting that the notification is a centralized alert, for example, the received data analysis device 12, and information for specifying the building and equipment in which the abnormality has occurred are stored in advance. First storage means, for example, a primary information storage device 1
5, a second storage unit in which information other than the information stored in the first storage unit is stored in advance, for example, a secondary information storage device 16, and a detection that the received data analysis unit is a centralized alert The centralized alarm processing means, for example, the centralized alarm processing device 14 and the received data analyzing means, which perform the processing of the abnormal information based on the information stored in the first storage means to generate the centralized alarm information, Normal alert processing means for performing processing of abnormal information detected not to be based on the respective information stored in the first storage means and the second storage means to create normal alert information, for example, a normal alert processing apparatus 13 and
A third storage unit for storing the centralized alarm information created by the centralized alarm processing unit, for example, a centralized alarm storage device 18;
A fourth storage unit for storing the normal alarm information created by the normal alarm processing unit, for example, a normal alarm storage device 17;
The centralized report information stored in the third storage unit is read, and the information stored in the second storage unit is added to the centralized report information to convert the information into normal report information. Information matching means, for example, information matching device 21
And display devices 19a to 19j for displaying normal alert information and centralized alert information, and a communication line L2 for transmitting normal alert information or centralized alert information to dispatch bases 30a to 30
m , for example, distribution devices 20a to 20k
And
【0017】なお、端末装置から送信される情報に基づ
き来歴情報を作成する処理手段は、例えば通常発報処理
手段13および集中発報処理手段14から成っており、
また、来歴情報を記憶する来歴情報記憶手段は、例えば
通常発報記憶装置17および集中発報記憶装置18から
成っている。The processing means for creating the history information based on the information transmitted from the terminal device includes, for example, a normal alert processing means 13 and a centralized alert processing means 14,
The history information storage means for storing the history information includes, for example, a normal alarm storage device 17 and a centralized alarm storage device 18.
【0018】また、出動拠点30a〜30mのそれぞれ
には、通信回線L2と接続され、監視センタ10との通
信処理を行う通信装置31a〜31mと、前記発報情報
を表示形式あるいは印字形式に変換する処理装置32a
〜32mと、変換された前記発報情報を表示する表示装
置33a〜33mと、変換された前記発報情報を印字す
る印字装置34a〜34mとを備えている。[0018] Each dispatch centers 30A~30 m, is connected to the communication line L2, and a communication device 31a~31m that processes communication with the monitoring center 10, the display format or print format the calling report information Conversion processing device 32a
32m, display devices 33a to 33m for displaying the converted alarm information, and printing devices 34a to 34m for printing the converted alarm information.
【0019】この実施形態にあっては、端末装置1aが
同一ビル内の設備機器の異常を検出すると、端末装置固
有に設定された識別番号と、異常があった設備機器を示
すデータを異常情報、すなわち、発報データとして通信
回線L1を介して監視センタ10の通信装置11aに送
信する。図2に示すように手順S12として監視センタ
10は通信装置11aにより発報データを受信すると、
この発報データを受信データ解析装置12に送り、手順
S13として受信データ解析装置12は発報データ内の
識別番号から異常が発生したビルの地区を選別する。次
いで、受信データ解析装置12は手順S14として発報
データ内の設備機器のデータの確認を行い、あらかじめ
設定していた広域災害の対象設備かどうかの判断を行
う。このあらかじめ設定していた広域災害の対象設備と
は、地震や停電等の広い範囲において設備機器に異常が
発生し、監視センタ10に発報データの集中が考えられ
るもので、例えば電源関係、設備の停止および水槽の水
位の異常等が挙げられる。そして、このときあらかじめ
設定した設備機器でないことが判断されると、手順S1
5として通常発報処理装置13に発報データが送られ、
この通常発報処理装置13は、発報データ内の識別番号
に基づき一次情報格納装置15を検索し、異常が発生し
たビルおよび設備機器を特定する情報、すなわち、監視
業務を行うために最低限必要な情報、例えば端末装置1
aが設置されているビルの名称、住所、異常があった設
備機器の名称およびその状態、出動拠点30a〜30m
の電話番号を読み出すとともに、同様に、識別番号に基
づき二次情報格納装置16を検索し、一次情報格納装置
15に記憶された情報以外の他の情報、すなわち、監視
業務を円滑に行うための更なる情報、例えば連絡先の情
報、当該ビルの最寄り駅、入館方法を読み出し、通常発
報情報を作成する。この通常発報情報は通常発報記憶装
置17に記憶されるとともに、表示装置19aに表示さ
れ、配信装置20aに送られる。配信装置20aは通常
発報情報に基づき出動拠点30aの通信装置31aにダ
イヤリングを行い、通信回線L2を介して通信装置31
aに通常発報情報を配信する。これに応じて通信装置3
1aは通常発報情報を処理装置32aに送り、処理装置
32aは通常発報情報を画面表示データおよび印字デー
タに変換し、画面表示データを表示装置33aにより表
示するとともに、印字データを印字装置34aにより印
字する。出動拠点30aの対応要員は、表示および印字
された情報を確認し、異常があったビルに出動し、適切
な対応を行う。その後、対応要員は行った対応の内容を
表示装置33aにより入力する。表示装置33aは入力
された情報を通信装置31a、通信回線L2、監視セン
タ10の配信装置20aを介して通常発報記憶装置17
に記憶させる。なお、出動拠点30aの対応要員は、表
示装置33aを操作することにより、通常発報記憶装置
17に記憶される過去の通常発報情報および対応した内
容の情報を表示装置33a、印字装置34aに出力させ
ることができる。In this embodiment, when the terminal device 1a detects an abnormality of the equipment in the same building, the identification number uniquely set to the terminal and the data indicating the equipment having the abnormality are stored in the abnormality information. That is, it transmits the alarm data to the communication device 11a of the monitoring center 10 via the communication line L1. As shown in FIG. 2, when the monitoring center 10 receives the alarm data by the communication device 11a in step S12,
The report data is sent to the reception data analysis device 12, and in step S13, the reception data analysis device 12 selects the district of the building where the abnormality has occurred from the identification number in the report data. Next, the reception data analyzer 12 checks the data of the equipment in the alarm data in step S14, and determines whether or not the equipment is a preset wide area disaster target equipment. The equipment set for the wide-area disaster set in advance refers to equipment in which an abnormality occurs in equipment in a wide range such as an earthquake or a power outage and concentration of alarm data in the monitoring center 10 is considered. And the water level of the water tank is abnormal. If it is determined at this time that the equipment is not a preset equipment, the procedure S1 is executed.
The alarm data is sent to the normal alarm processor 13 as 5,
The normal alert processing device 13 searches the primary information storage device 15 based on the identification number in the alert data, and identifies the building and the equipment in which the abnormality has occurred. Necessary information, for example, the terminal device 1
The name and address of the building in which a is installed, the name and status of the equipment having an abnormality, the dispatch bases 30a to 30m
Of the secondary information storage device 16 based on the identification number, and other information other than the information stored in the primary information storage device 15, that is, for performing the monitoring operation smoothly. Further information, for example, contact information, the nearest station of the building, and the admission method are read out, and normal alert information is created. The normal alarm information is stored in the normal alarm storage device 17, is displayed on the display device 19a, and is sent to the distribution device 20a. The distribution device 20a dials the communication device 31a of the dispatch base 30a based on the normal alert information, and communicates with the communication device 31 via the communication line L2.
The normal alert information is distributed to a. In response to this, the communication device 3
1a sends the normal alarm information to the processing device 32a, the processing device 32a converts the normal alarm information into screen display data and print data, displays the screen display data on the display device 33a, and prints the print data on the printing device 34a. Print with. The response staff at the dispatch base 30a checks the displayed and printed information, dispatches to the building where the abnormality has occurred, and takes appropriate measures. Thereafter, the response staff inputs the details of the response performed by using the display device 33a. The display device 33a transmits the input information to the normal alarm storage device 17 via the communication device 31a, the communication line L2, and the distribution device 20a of the monitoring center 10.
To memorize. By operating the display device 33a, the response staff at the dispatch base 30a transmits past normal alarm information stored in the normal alarm storage device 17 and information of corresponding contents to the display device 33a and the printing device 34a. Can be output.
【0020】一方、地震や停電等により広い範囲で災害
が発生した際、多くの端末装置が異常を検出することに
より、監視センタ10の通信装置11a〜11iに短時
間の間に集中して発報データが送信されることになる。
すなわち、手順S12に示すように発報データを受信す
ると、受信データ解析装置12は前述と同様にして手順
S13として発報があったビルの地区を選別するととも
に、手順S14として広域災害の対象設備かどうかの判
断を行う。このとき、広域災害の対象設備であることが
判断されると、手順S16として発報件数カウンタを+
1とする。この後、手順S17に示すように発報件数カ
ウンタが5以上になった場合、受信データ解析装置12
はその地区に広域災害が発生したことを検出し、配信装
置20aおよび通信回線L2を介してその地区を管轄し
ている例えば出動拠点30aの通信装置31aに集中発
報を検出したことを知らせる集中発報検出情報を送信す
るとともに、手順S18として同地区の発報データを集
中発報処理装置14に送る。なお、前記の発報件数カウ
ンタは、手順S21〜S23に示すような順を経て手順
S11として10分毎にクリアされ、次の10分間の発
報データの件数をカウントする。すなわち、まず、手順
S21に示すようにタイマーカウンタがクリアされ、次
に、手順S22として10分が経過したかどうか判断さ
れ、このとき、10分が経過したことが判断されると手
順S23として割込み処理が発生する。しかして、集中
発報処理装置14は発報データ内の識別番号により一次
情報格納装置15を検索し、監視業務を行うために必要
最小限な情報、例えば端末装置1aが設置されているビ
ルの名称、住所、異常があった設備機器の名称およびそ
の状態、出動拠点30a〜30mの電話番号を読み出
し、集中発報情報を作成し、この集中発報情報を集中発
報記憶装置18に記憶させる。ここで、監視センタ10
の負荷を低減するため、集中発報に基づいて作成された
集中発報情報は通常発報処理とは異なり、出動拠点30
aに配信されることはない。On the other hand, when a disaster occurs in a wide area due to an earthquake, a power outage, or the like, many terminal devices detect an abnormality, so that the communication devices 11a to 11i of the monitoring center 10 concentrate on the communication devices in a short time. Report data will be transmitted.
That is, when the alarm data is received as shown in step S12, the reception data analyzer 12 selects the district of the building where the alarm was issued in step S13 in the same manner as described above, and in step S14, the equipment targeted for the wide area disaster Determine whether or not. At this time, if it is determined that the equipment is a target of a wide area disaster, as a step S16, the number of alarms is incremented by +
Set to 1. Thereafter, as shown in step S17, when the number-of-reports counter reaches 5 or more, the reception data analysis device 12
Detects that a wide-area disaster has occurred in the area, and informs the communication apparatus 31a of the dispatch base 30a that is in charge of the area via the distribution device 20a and the communication line L2 that the centralized alert has been detected. In addition to transmitting the alarm detection information, the alarm data of the same area is sent to the centralized alarm processing device 14 in step S18. The above-mentioned alarm number counter is cleared every 10 minutes as step S11 through the order shown in steps S21 to S23, and counts the number of alarm data for the next 10 minutes. That is, first, the timer counter is cleared as shown in step S21, and then it is determined whether or not 10 minutes have elapsed in step S22. At this time, if it is determined that 10 minutes have elapsed, an interrupt is generated in step S23. Processing occurs. Thus, the centralized alarm processing device 14 searches the primary information storage device 15 by the identification number in the alarm data, and obtains the minimum necessary information for performing the monitoring operation, for example, the information of the building in which the terminal device 1a is installed. The name, address, name and state of the equipment having an abnormality, the state thereof, and the telephone numbers of the dispatch bases 30a to 30m are read out, centralized alarm information is created, and the centralized alarm information is stored in the centralized alarm storage device 18. . Here, the monitoring center 10
In order to reduce the load on the centralized alarm, the centralized alarming information created based on the centralized alarming is different from the normal alarming process, and is different from the dispatching base 30.
a.
【0021】一方、前記集中発報検出情報により集中発
報が生じたことを認知した出動拠点30aの対応要因が
出動拠点30a側から集中発報の内容を確認する場合、
図3に示すように、手順S31として出動拠点30aの
表示装置33aに集中発報内容確認のための画面を表示
する。この後、手順S32として同画面にある画面更新
ボタンを押下すると、手順S33として処理装置32a
は集中発報情報取得コマンドを作成し、通信装置31a
および通信回線L2を介して監視センタ10の集中発報
処理装置14に送信する。集中発報処理装置14は集中
発報情報取得コマンドを受信すると、集中発報記憶装置
18に記憶される集中発報情報を検索し、配信装置20
a、通信回線L2および通信装置31aを介して処理装
置32aに送信する。手順S34として集中発報情報を
受信した処理装置32aは、手順S35として集中発報
情報を画面表示する。また、前述の手順S31で集中発
報表示画面起動がなされた時点で、割込み処理が起動
し、手順S41としてタイマーカウンタがクリアされ、
手順S42に示すように3分が計測される。この後、3
分が経過すると手順S43として割込み処理を発生さ
せ、手順S33として表示装置33aの情報を更新し、
これにより、一定間隔で新しい情報を入手することが可
能となる。なお、以上の割込み処理は表示装置33aに
集中発報情報画面を起動している場合にのみ動作し、集
中発報情報画面が表示されている場合は動作しない。こ
の後、手順S36として集中発報表示画面の終了操作を
行うと、手順S37として割込み処理が停止されて、一
連の集中発報情報取得処理を終了する。On the other hand, when the corresponding factor of the dispatch base 30a that recognizes that the concentrated dispatch has occurred based on the concentrated dispatch detection information is to confirm the contents of the concentrated dispatch from the dispatch base 30a side,
As shown in FIG. 3, as step S31, a screen for confirming the centralized alert content is displayed on the display device 33a of the dispatch base 30a. Thereafter, when a screen update button on the same screen is pressed in step S32, the processing device 32a is pressed in step S33.
Creates a centralized alert information acquisition command and creates a communication device 31a.
Then, the information is transmitted to the centralized alarm processing device 14 of the monitoring center 10 via the communication line L2. When the centralized alert processing device 14 receives the centralized alert information acquisition command, the centralized alert processing device 14 searches for the centralized alert information stored in the centralized alert storage device 18, and the distribution device 20.
a, to the processing device 32a via the communication line L2 and the communication device 31a. The processing device 32a that has received the centralized alert information in step S34 displays the centralized alert information on the screen in step S35. Further, when the centralized alert display screen is activated in the above-described step S31, the interrupt process is activated, and the timer counter is cleared in step S41,
Three minutes are measured as shown in step S42. After this, 3
When the minute has elapsed, an interrupt process is generated in step S43, and information in the display device 33a is updated in step S33.
As a result, new information can be obtained at regular intervals. Note that the above interrupt processing operates only when the centralized alert information screen is activated on the display device 33a, and does not operate when the centralized alert information screen is displayed. Thereafter, when the end operation of the centralized alarm display screen is performed in step S36, the interrupt processing is stopped in step S37, and a series of centralized alarm information acquisition processing ends.
【0022】また、図3に示すように集中発報に応じて
集中発報記憶装置18に記憶された集中発報情報は、後
に、手順S51として情報整合装置21により集中発報
記憶装置18から読み出されるとともに、手順S52と
して二次情報格納装置16に記憶された当該集中発報情
報に対応する他の情報が検索されて読み出され、手順S
53として前記集中発報情報に前記他の情報が付加され
て新たに通常発報情報を作成し、手順S54として前記
通常発報情報を通常発報記憶装置17に記憶する。この
後、情報整合装置21は手順S55に示すように集中発
報記憶装置18に集中発報情報があるかどうかを判断
し、順次、前述と同様にして集中発報情報を通常発報情
報に変換する情報整合処理を行う。Further, as shown in FIG. 3, the centralized alarm information stored in the centralized alarm storage device 18 in response to the centralized alarm is later transmitted from the centralized alarm storage device 18 by the information matching device 21 in step S51. At the same time, other information corresponding to the centralized alert information stored in the secondary information storage device 16 is retrieved and read out as the procedure S52, and the procedure S52 is performed.
The normal alert information is newly created by adding the other information to the centralized alert information as 53, and the normal alert information is stored in the normal alert storage device 17 as step S54. Thereafter, the information matching device 21 determines whether or not the centralized alert information is present in the centralized alert storage device 18 as shown in step S55, and sequentially converts the centralized alert information into the normal alert information in the same manner as described above. Performs information matching processing for conversion.
【0023】このように構成した実施形態では、監視セ
ンタ10の対応要員による情報の確認、連絡等の作業を
低減することができる。また、集中発報の対応処理を通
常の異常情報の対応処理よりも簡易化することにより、
集中発報の際に監視センタ10の対応要員に負担が生じ
ることを防止できる。さらに、集中発報が生じた後、監
視センタ10の対応要員を介すことなく来歴情報の整合
化を図ることができる。In the embodiment configured as described above, it is possible to reduce operations such as confirmation and communication of information by the corresponding personnel of the monitoring center 10. In addition, by simplifying the process of responding to centralized alerting than the process of responding to normal abnormality information,
It is possible to prevent the response staff of the monitoring center 10 from being burdened when the centralized alert is issued. Further, after the centralized alert is generated, it is possible to match the history information without the intervention of the corresponding personnel of the monitoring center 10.
【0024】なお、本実施形態では集中発報検出手順時
の発報件数カウンタ値を5件、タイマー割込み値を10
分、および、集中発報の取得間隔を3分としているが、
これに限らず、監視を行っている端末装置の台数および
通信回線数等により変更が可能である。In this embodiment, the number-of-reports count value is 5 and the timer interrupt value is 10 at the time of the centralized report detection procedure.
Minutes and the interval between acquisitions of centralized alerts are 3 minutes,
However, the present invention is not limited to this, and can be changed depending on the number of monitoring terminal devices, the number of communication lines, and the like.
【0025】[0025]
【発明の効果】本発明の請求項1記載の発明は以上のよ
うに構成したので、集中発報が生じた場合でも監視セン
タの対応要員に負担が生じることを防止でき、さらに、
本発明の請求項2記載の発明は以上のように構成したの
で、集中発報が生じた後、監視センタの対応要員を介す
ことなく来歴情報の整合化を図ることができ、これによ
って、本発明によれば監視センタの対応要員の労力の低
減を図ることができるという効果がある。Since the invention of claim 1 of the present invention according to the present invention is configured as described above, it is possible to prevent the burden to the corresponding personnel monitoring center even when the current in the onset report occurs occurs, further,
Since the invention according to claim 2 of the present invention is configured as described above, it is possible to match the history information without the intervention of the corresponding personnel of the monitoring center after the centralized alarm occurs, thereby ADVANTAGE OF THE INVENTION According to this invention, there exists an effect that the effort of the response staff of a monitoring center can be reduced.
【図1】本発明のビル遠隔監視装置の一実施形態を示す
ブロック図である。FIG. 1 is a block diagram showing an embodiment of a building remote monitoring device according to the present invention.
【図2】図1のビル遠隔監視装置による受信データ解析
の処理手順を示すフローチャートである。FIG. 2 is a flowchart showing a processing procedure of received data analysis by the building remote monitoring device of FIG. 1;
【図3】図1のビル遠隔監視装置による発報内容確認の
処理手順を示すフローチャートである。FIG. 3 is a flowchart showing a processing procedure for confirming alarm contents by the building remote monitoring device of FIG. 1;
【図4】図1のビル遠隔監視装置による情報整合の処理
手順を示すフローチャートである。FIG. 4 is a flowchart showing a procedure of information matching by the building remote monitoring device of FIG. 1;
1a〜1n 端末装置 10 監視センタ 12 受信データ解析装置 13 通常発報処理装置 14 集中発報処理装置 15 一次情報格納装置 16 二次情報格納装置 17 通常発報記憶装置 18 集中発報記憶装置 19a〜19j 表示装置 20a〜20k 配信装置 21 情報整合装置 30a〜30m 出動拠点 32a〜32m 処理装置 L1、L2 通信回線 1a-1n terminal device 10 monitoring center 12 Received data analyzer 13 Normal alert processing device 14 Centralized alarm processing device 15 Primary information storage device 16 Secondary information storage device 17 Normal alarm storage 18 Centralized alarm storage 19a to 19j display device 20a-20k distribution device 21 Information Matching Device 30a-30m Dispatch base 32a-32m processing unit L1, L2 communication line
───────────────────────────────────────────────────── フロントページの続き (72)発明者 加藤 亨 東京都千代田区神田錦町1丁目6番地 株式会社日立ビルシステム内 (56)参考文献 特開 平9−251591(JP,A) (58)調査した分野(Int.Cl.7,DB名) G08B 23/00 - 31/00 ────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Tohru Kato 1-6-6 Kandanishikicho, Chiyoda-ku, Tokyo Inside Hitachi Building Systems Co., Ltd. (56) References JP-A-9-251591 (JP, A) (58) Survey Field (Int.Cl. 7 , DB name) G08B 23/00-31/00
Claims (2)
ル内の設備機器の異常を検出する端末装置と、これらの
端末装置と通信回線を介して接続され、送信された異常
情報に基づき前記設備機器を監視する監視センタとを備
えたビル遠隔監視装置において、前記設備機器の保守および修理を行なう出動拠点を予め
定めた複数の地区にそれぞれ配置し、 前記監視センタに、異常が発生したビルおよび設備機器
を特定する情報があらかじめ記憶される第1の記憶手段
と、この第1の記憶手段に記憶された情報以外の他の情
報があらかじめ記憶される第2の記憶手段と、異常情報
の受信に応じて集中発報であるか否かを判定する受信デ
ータ解析手段と、この受信データ解析手段が集中発報で
あると判定した場合には異常情報の処理を、前記第1の
記憶手段に記憶された情報に基づき行い集中発報情報を
作成する集中発報処理手段と、前記受信データ解析手段
が集中発報でないと判定した場合には異常情報の処理
を、前記第1の記憶手段および前記第2の記憶手段に記
憶されたそれぞれの情報に基づき行い通常発報情報を作
成する通常発報処理手段と、前記集中発報処理手段によ
り作成された集中発報情報を記憶する第3の記憶手段
と、前記通常発報処理手段により作成された通常発報情
報を記憶する第4の記憶手段とを設け、 前記受信データ解析手段が集中発報であると判定したと
き、前記監視センタから対応する出動拠点に、集中発報
を生じた旨を発報するものの、前記集中発報処理手段で
作成された集中発報情報は送信せず、前記出動拠点から
前記監視センタに前記集中発報に係る集中発報情報の確
認が要求されたときに、前記監視センタは前記集中発報
処理手段で作成された集中発報情報を該当する出動拠点
に送信する ことを特徴とするビル遠隔監視装置。1. A terminal device provided in each of a plurality of buildings, for detecting an abnormality of equipment in the same building, connected to the terminal device via a communication line, and configured based on the transmitted abnormality information. In a building remote monitoring device having a monitoring center for monitoring equipment, a dispatch base for performing maintenance and repair of the equipment is specified in advance.
A first storage unit which is arranged in each of a plurality of predetermined districts and in which the monitoring center previously stores information for identifying the building and the equipment in which the abnormality has occurred; and information stored in the first storage unit. Second storage means in which information other than the above is stored in advance, received data analysis means for determining whether or not a centralized alert is issued in response to reception of abnormal information; If it is determined that the centralized alert processing is performed based on the information stored in the first storage unit and the centralized alert processing unit creates the centralized alert information, When it is determined that the notification is not a notification, a normal notification processing unit that performs processing of the abnormality information based on the respective information stored in the first storage unit and the second storage unit to generate the normal notification information; , Said concentration A third storage means for storing a centralized onset report information created by the broadcast processing unit, said normal is provided a fourth storage means for storing a normal alarm information created by alarm processing unit, the received data The analysis means has determined that it is a concentrated alert
The centralized alert from the monitoring center to the corresponding dispatch base
Is issued, but the centralized report processing means
The created centralized alert information is not sent, and
The monitoring center confirms the centralized alert information related to the centralized alert.
When approval is requested, the monitoring center sends the centralized
The dispatch base corresponding to the centralized alert information created by the processing means
A building remote monitoring device for transmitting to a building.
に記憶された集中発報情報を読み出すとともに、この集
中発報情報に、前記第2の記憶手段に記憶された情報を
付加し通常発報情報に変換して第4の記憶手段に記憶さ
せる情報整合手段を設けたことを特徴とする請求項1記
載のビル遠隔監視装置。2. The method according to claim 1, further comprising: reading out the centralized alert information stored in said third storage means to said monitoring center; and adding information stored in said second storage means to said centralized alert information. building remote monitoring device according to claim 1, wherein the provided information matching means to be stored in the fourth memory means to convert the alarm information.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP30075097A JP3538301B2 (en) | 1997-10-31 | 1997-10-31 | Building remote monitoring device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP30075097A JP3538301B2 (en) | 1997-10-31 | 1997-10-31 | Building remote monitoring device |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH11134585A JPH11134585A (en) | 1999-05-21 |
| JP3538301B2 true JP3538301B2 (en) | 2004-06-14 |
Family
ID=17888654
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP30075097A Expired - Fee Related JP3538301B2 (en) | 1997-10-31 | 1997-10-31 | Building remote monitoring device |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3538301B2 (en) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP3494932B2 (en) * | 1999-10-08 | 2004-02-09 | 株式会社山武 | Wide-area building monitoring system |
| JP2001111704A (en) * | 1999-10-08 | 2001-04-20 | Yamatake Building Systems Co Ltd | Building group management system |
-
1997
- 1997-10-31 JP JP30075097A patent/JP3538301B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH11134585A (en) | 1999-05-21 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR102234285B1 (en) | system for real-time administrating fire fighting facilities | |
| JP7226670B2 (en) | Elevator suspension information provision system | |
| JPH11335021A (en) | Remote monitor system and maintenance support system | |
| JP2000174929A (en) | Emergency dispatch support device | |
| JP2003206081A (en) | Aseismic remote monitoring system of elevator | |
| JP3538301B2 (en) | Building remote monitoring device | |
| JP3037801B2 (en) | Building equipment remote monitoring device | |
| JP3279904B2 (en) | Remote monitoring system | |
| JPH06162369A (en) | Remote monitoring equipment for building equipment | |
| JPH05307693A (en) | Remote monitoring equipment | |
| JP3050418B2 (en) | Building remote monitoring device | |
| JP3025573B2 (en) | Building remote monitoring device | |
| JP3426714B2 (en) | Building group remote management device | |
| JPH09251591A (en) | Building remote monitoring system management device | |
| JPH08194877A (en) | Building remote monitoring device | |
| JP2774716B2 (en) | Elevator remote monitoring device | |
| JP3316624B2 (en) | Monitoring terminal controller for monitoring and alarm system | |
| JPH10111993A (en) | Remote monitoring system | |
| JP2002092772A (en) | Monitored information collecting system | |
| JP2971644B2 (en) | Remote monitoring device | |
| JP4909172B2 (en) | Alarm information remote notification device and alarm information remote notification system | |
| JP2000011279A (en) | Remote monitoring device | |
| JP2002269664A (en) | Centralized management system | |
| CN114143717A (en) | Intelligent maintenance system and method for equipment of community | |
| JP3152549B2 (en) | Building remote management device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20031212 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20031216 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20040204 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20040309 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20040319 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090326 Year of fee payment: 5 |
|
| LAPS | Cancellation because of no payment of annual fees |