JP3540501B2 - Long material supply device - Google Patents
[go: Go Back, main page]

JP3540501B2 - Long material supply device - Google Patents

Long material supply device Download PDF

Info

Publication number
JP3540501B2
JP3540501B2 JP08375996A JP8375996A JP3540501B2 JP 3540501 B2 JP3540501 B2 JP 3540501B2 JP 08375996 A JP08375996 A JP 08375996A JP 8375996 A JP8375996 A JP 8375996A JP 3540501 B2 JP3540501 B2 JP 3540501B2
Authority
JP
Japan
Prior art keywords
long material
conveyor
delivery table
long
wedge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP08375996A
Other languages
Japanese (ja)
Other versions
JPH09278174A (en
Inventor
貴之 永山
慶二 甲野
昌朋 久代
浩 兼信
稔一 田中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hagihara Industries Inc
Original Assignee
Hagihara Industries Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hagihara Industries Inc filed Critical Hagihara Industries Inc
Priority to JP08375996A priority Critical patent/JP3540501B2/en
Publication of JPH09278174A publication Critical patent/JPH09278174A/en
Application granted granted Critical
Publication of JP3540501B2 publication Critical patent/JP3540501B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Intermediate Stations On Conveyors (AREA)
  • Basic Packing Technique (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、長尺材供給装置に関し、さらに詳しくは、管材や棒材等の長尺材を、自動的に、適宜本数ずつ、交差状態を整列しつつ、長手方向と直交方向に搬送するコンベアに供給する長尺材供給装置に関する。
【0002】
【従来の技術】
管材や棒材である長尺材は、出荷時の作業簡略化、輸送中の荷くずれ防止、保管中の損傷防止や管理上の利便等のために所定数ずつ結束バンド等により結束されることが多い。
このような結束作業を行うために長尺材を長手方向と直交方向にコンベア等により搬送することは広く行われている。しかしながら、このコンベアに長尺材を自動的、かつ迅速に、数量を調節しつつ交差状態をある程度整列した状態で供給することは極めて困難であった。
このような問題を解決するために、パレット上から荷崩れ的に供給された長尺体を鈍角なる山型斜面を有する分離片や受止片をそれぞれ独立して上昇および下降させて適宜本数毎に取り出す分離供給装置(特開平6ー179520号公報)などが開示されている。
しかしながら、従来の技術はいずれも満足されるものではなく、さらなる改良が要望されていた。
【0003】
【発明が解決しようとする課題】
本発明は、長尺材を自動的、かつ迅速に、適宜本数ずつ、交差状態を整列しつつ、長手方向と直交方向に搬送するコンベアに供給する長尺材供給装置を提供することを目的とする。
【0004】
【課題を解決する手段】
上記課題を技術的に解決するための手段として、本願の第1の発明は、長尺材を長手方向と直交方向に搬送するコンベアを有する搬送手段に長尺材を供給する供給装置であって、
少なくとも長尺材の送出時に先端がコンベアの始端部に連接すると共に傾斜上端となる、長尺材を一時貯溜しておくための送出台と、この送出台上を進退可能に設けられ、進行時に長尺材の一部をコンベア上に移載し、退行時に長尺材の一部を送出台に沿って崩落させる押出杆と、コンベア始端部において昇降し、移載された長尺材間を貫通して堰止することにより一時に適宜本数の長尺材を送出するウエッジとを有する送出手段からなる長尺材供給装置を要旨とする。
【0005】
本願の第2の発明は、長尺材を長手方向と直交方向に搬送するコンベアを有する搬送手段に長尺材を供給する供給装置であって、
少なくとも長尺材の送出時に先端がコンベアの始端部に連接すると共に傾斜上端となる、長尺材を一時貯溜しておくための送出台と、この送出台上を進退可能に設けられ、進行時に長尺材の一部をコンベア上に移載し、退行時に長尺材の一部を送出台に沿って崩落させる押出杆と、コンベア始端部において昇降し、移載された長尺材間を貫通して堰止することにより一時に適宜本数の長尺材を送出するウエッジとを有する送出手段と、
前記コンベア始端部において昇降するウエッジが、長尺材間を中央部に位置するウエッジから端部に位置するウエッジへと順次上昇させて長尺材を平行に整列させることを特徴とする整列手段と、
を備えた長尺材供給装置を要旨とする。
【0006】
【発明の実施の形態】
以下本発明の一実施例を添付図面に基づいて説明する。
図1、図2は本発明に係る長尺材供給装置の設置例を示し、図1は平面図、図2は側面図である。また図3は送出手段の側面図、図4は整列手段の正面図である。
この長尺材供給装置は、図1〜図4に示すように搬送手段1、送出手段2、整列手段3からその主要部が構成されている。
以下、順次、上記各構成部分について詳述する。
【0007】
搬送手段1は、長尺材Aを長手方向と直交方向(矢印L方向)にコンベアCで搬送するものである。
この搬送手段1は、図1、図2に示すように、搬送経路Xを形成するフレーム11と、フレーム11上に搬送経路Xの幅方向に並設された7系列のコンベアC1〜C7と、コンベアC始端部から所定距離下流側で、搬送経路Xの両端部から1番目と2番目のコンベアC1、C2およびコンベアC6、C7の間で起伏動してコンベアC面上へ出没するフック状のストッパーS1と、ストッパーS1よりさらに下流側で、搬送経路の両端部から1番目と2番目のコンベアC1、C2およびコンベアC6、C7の間で起伏動してコンベアC面上へ出没するフック状のストッパーS2とを主たる構成要素として備えている。
フレーム11上に形成された搬送経路Xは、長尺材Aを長手方向と直交方向に横置して搬送することが可能な幅を有している。
コンベアCは、互いに平行に間隔をおいて並設され、コンベアCの上面は同一高さを保って水平に設置されている。
また、長尺材の端部が異径部分を有する場合には、コンベアCが降下して異径部分に接触しないように両外側のコンベアC1およびC7は昇降シリンダー14により昇降可能となされている。。
コンベアCはベルトコンベア、チェーンコンベア、ローラコンベア等特に限定されないが、ベルトコンベアが好ましい。
図中の符号12は光電管からなる検知器であって、コンベアC上の長尺材Aの有無を検知する。その信号を受けてストッパーS1がコンベアC面上に起伏動し、コンベアC上の長尺材Aを搬送または堰止させる。図中の符号13は光電管からなる検知器であって、コンベアC上の長尺材Aの有無を検知する。その信号を受けてストッパーS2がコンベアC面上に起伏動し、コンベアC上の長尺材Aを搬送または堰止させる。
【0008】
このようになる搬送手段1は、コンベアCがそれぞれ同方向に同期して回転し、コンベアCの始端部に長手方向を搬送方向と直交方向に横置された長尺材Aを終端部方向へ搬送することができる。
ストッパーS1は光電管12の検知結果から、コンベアC上に長尺材Aの存在が確認されない場合には、その信号を受けて起立し、コンベアC上を搬送される長尺材Aを堰止する。また、送出手段4からの信号を受けて伏倒して堰止していた長尺材Aの搬送を開始する。
ストッパーS2は光電管13の検知結果から、コンベアC上に所定時間以上長尺材Aが存在していることが確認された場合には、その信号を受けて伏倒して堰止していた長尺材Aの搬送を開始する。
【0009】
送出手段2は、送出台21上に載置され一時貯溜された長尺材Aを進退する押出杆22によりコンベア上へ一時に適宜本数ずつ送出するものである。
この送出手段2は、図3に示すように、送出台21と、送出台21上を進退する押出杆22と、押出杆22を進退させる駆動モーター(図示外)と、コンベアC始端部に立設され、昇降シリンダー31によりコンベアC上に昇降可能で、かつ進退駆動用シリンダー32により送出台21下方へ進退可能となされたウエッジWとを主たる構成要素として備えている。
送出台21は、表面が所定の傾斜状態を有し、上端部がコンベアC始端部に連接している。傾斜角度は好ましくは5〜30゜、より好ましくは10〜20゜の範囲から選択されるとよい。送出台21上には長尺材Aが長手方向が搬送方向と直交方向に載置され、一時貯溜される。貯溜された長尺材Aは、長手方向と直交方向に押出杆22で押し出され、コンベアC上に送出されるようになされている。
押出杆22は、送出台上を摺動可能に取り付けられた立設されたプレートであって、駆動モーター(図示外)により送出台21上を搬送方向に平行に進退する。押出杆22は、長尺材Aの長手方向を均等に押出す必要があるので、複数本の押出杆22が並設されるのが好ましい。
図中の符号23は超音波センサーからなる検知器であって、コンベアC上の長尺材Aの積載レベルを検知し、その信号を受けて押出杆22を進退させる。また、図中の符号24は押出杆進退用エンコーダーで、その設定値の範囲内では押出杆は進退動作を行い、設定値を超えると進行動作のみを行うようになされている。
【0010】
このようになる送出手段2は、搬送経路Xに設けられたコンベアCの始端部に配設される。
長尺材Aはコンベア始端部に設けられた載置台25に長手方向を進行方向に揃えて積載される。載置台25を介して搬送経路Xの相対する位置には昇降装置4が配設されている。
昇降装置4は、長尺材Aを移載するアーム状の上記送出台21と、送出台21を昇降させるフレーム27と、フレーム27が取り付けられたガイド28とから構成され、送出台21の先端部を搬送経路X方向に向けて配設されている。
載置台25の下方に配置された送出台21は、載置台25上に設けられた枠体29中の長尺材A全量を一度に移載できる長さを有しており、移載した長尺材Aを載置台25および載置台25に設けられた枠体29およびコンベアC始端部と干渉することなく、フレーム27の作動により上昇して所定高さまで持上げることができる。
送出台21上に移載された長尺材Aを上昇して所定高さまで持上げた後、ガイド28に係設された傾斜用駆動シリンダーのシリンダーロッド30が退行することによりガイド28は立設点を軸にして送出台21の背面側に傾斜し、搬送経路X方向を上端部とする傾斜面を有する送出台21が形成される。送出台21の上端部はコンベアC始端部に連接するように位置される。
【0011】
送出台21上を押出杆22が、搬送方向と平行に進退する。コンベアC始端部上方において超音波センサー23が押出された長尺材Aの積載レベルを検知し、その検知結果が設定値以下の場合には、その信号を受けて押出杆22が送出台21上を進行して送出台21上の長尺材Aを送出台21の上端部へ押出す。
押出杆22が進行して、長尺材AをコンベアC始端部へ押出すと、コンベアC始端部の長尺材Aの積載レベルが上昇する。超音波センサー23が長尺材Aの積載レベルを検知し、その検知結果が設定値以上になると、その信号を受けて押出杆22が送出台21上を下端部まで退行する。このとき、送出台21の上端部へ押出された長尺材Aの一部は傾斜面を崩落し、押出杆22が退行した送出台21の下端部まで押出杆22とともに退行する。
コンベアC始端部に長尺材Aが積載されると、ウエッジWが昇降シリンダー31により上昇して長尺材A同士の間を貫通して長尺材Aを送出台21上の長尺材AとコンベアC上の長尺材Aとに区分けする。
ウエッジWが上昇して送出台21上の長尺材AとコンベアC上の長尺材Aとに区分けされると、搬送手段1のストッパーS1が伏倒して、ストッパーS1に堰止されていた長尺材AはコンベアCにより搬送経路Xを搬送されるが、ウエッジWにより送出台21上の長尺材Aが堰止されているため、コンベアC上に区分けされた適宜本数の長尺材Aのみが一時に搬送される。
搬送が開始後、光電管12がコンベアC上に長尺材Aを検知しなくなると、ストッパーS1が起立し、ついでウエッジWが降下し、押出杆22が進退して送出を繰り返すことになる。
このようにして送出を繰り返すことにより送出台21上の長尺材Aの量が減少する。長尺材Aの量が減少すると、押出杆22が一度の押出で進行する位置は次第に上端部に近ずくことになる。一度の押出で進行する位置が送出台21上において押出杆進退用エンコーダー24の設定位置を超えると、それ以降は押出杆22は退行動作は行わずに進行動作または停止動作のみを行い、進行限界点まで進行し長尺材AをコンベアC上に送出する。
押出杆22が、限界点まで進行したとき、押出杆22とコンベアCの間には、長尺材Aの一部が残存している。
そこで、コンベアC始端部に立設されているウエッジWの内の両端を除く4本が送出台21下方へ進行し、送出台21と干渉することなく送出台21の面上へ上昇し、続いてコンベアC始端部側へ退行することにより、送出台21上の長尺材Aを全数コンベアC上へ送出することができるようになされている。
【0012】
整列手段3は、コンベアC始端部に積み重ねられた長尺材Aの交差状態を整列するものである。
この整列手段3は、図3、図4に示すように、コンベア始端部から所定距離下流側において、コンベアCの間隙にコンベアCと干渉することなく昇降可能となされているウエッジWとを主たる構成要素として備えている。
ウエッジWは、6本のウエッジW1〜W6が搬送経路Xの幅方向に適度の間隔をとり、コンベアC1〜C7の間に配置され、搬送経路Xと直交方向の直線上に立設されている。両端部に位置するウエッジW1、W6は、搬送経路Xの両端部から1番目と2番目のコンベアC1、C2およびコンベアC6、C7の間に配設される。
ウエッジWの幅、厚みは、隣接するコンベアCに接触しない範囲で最も大きく設定されているのが整列効果を上げるために好ましい。
ウエッジの形状は角型でも円型でもよいが、その先端は長尺材A同士の間に容易に貫通できるように尖角であるのが好ましい。
【0013】
このようになる整列手段3は、コンベアC始端部に積み重ねられた交差状態にある長尺材Aに対して、先ず、中央のウエッジW3が駆動シリンダー31により上昇し、長尺材Aの上方に貫通して、ウエッジW3の長尺材Aの長手方向の両側に間隙を生じさせるように作動させる。
ついで、中央のウエッジW4が上昇して先に生じた間隙に介入して上方に貫通し、間隙を拡大させる。
次に、W3,W4の両外側のウエッジW2、W5が上昇し、先に生じた間隙を上方に貫通して間隙をさらに拡大させる。
最後に両端部のウエッジW1、W6が上昇して、上方に貫通して間隙をより一層拡大することにより、長尺材Aの軸心を平行にし、交差状態を整列することが可能となる。
【0014】
次に、以上説明した長尺材供給装置の動作について図5〜図15に示し、これに基づいて説明する。
先ず、多数の長尺材Aを、載置台25に長手方向が搬送方向と直交方向に載置される。
載置台25を挟んでコンベアCと相対する側には、昇降手段4が動作できる位置に配設されている。昇降手段4に設けられている送出台21は、載置台25および載置台25に積載した枠体29に干渉することなく長尺材Aの下方に配置されている。
このとき、コンベアC始端部において、ウエッジW(6本のウエッジW1〜W6)は上昇した位置にあり、昇降手段4により長尺材AがコンベアC始端部まで上昇した際に直ちにコンベアC上に崩れ落ちて搬送が開始しないようになされている(図5参照)。
【0015】
次に、送出台21がフレーム27と共に上昇し、長尺材Aを載置台25から送出台21へ移載し、さらに載置台25および載置台25に設置された枠体29およびコンベアC始端部と干渉することなく上昇して長尺材Aを持上げ、所定の高さまで上昇して停止する(図6参照)。
【0016】
送出台21が所定の高さまで上昇すると、ガイド28に係設されたロッド30が退行し、その結果ガイド28は立設点を軸にして送出台21の背面側に傾斜し、長尺材Aを移載した送出台21は、コンベアC方向を上端部とする傾斜面を有する送出台21として形成される。このとき、送出台21の上端部はコンベアに連接されている(図7参照)。
【0017】
長尺材Aを移載した送出台21が傾斜し、傾斜面を有する送出台21を形成すると、コンベアC始端部でウエッジWが昇降シリンダー31の作動により降下し、長尺材Aの一部はコンベアC上に崩落する。
このとき、ストッパーS1およびストッパーS2はいずれも起立しているので、崩落した長尺材AはストッパーS1で堰止されている(図8参照)。
【0018】
長尺材Aの一部がコンベアC上に崩落した状態では、コンベアC始端部における長尺材Aの積載レベルは搬送開始の設定値に到達していないので、そのレベルを検知した超音波センサー23の信号を受けて押出杆22が進行して、送出台21上からコンベアC始端部へ長尺材Aを押出す。
送出台21上を押出杆22が進行し長尺材Aを押出すことにより、送出台21上の長尺材Aは長手方向の両端部付近を押出杆22で押出される力により搖動を加えられて交差状態は一部整列される(図9参照)。
【0019】
コンベアC始端部における長尺材Aの積載レベルが設定値に到達すると、押出杆22は送出台21の下端部まで退行する。
このときコンベアC始端部における長尺材Aの一部は送出台21上を下端部方向へ崩落する。送出台21上を崩落することにより、押圧されていた長尺材Aは押圧状態が緩和して長尺材A同士に間隙が生じ、次に押圧力を受けたときに、交差状態が整列されやすい状態となる(図10参照)。
【0020】
コンベアC始端部に長尺材Aが積載されると、ウエッジWが昇降シリンダー31により上昇して長尺材A同士の間を貫通して長尺材Aを送出台21上の長尺材AとコンベアC上の長尺材Aとに区分けする。ここでのウエッジWの動作を図16〜19に示す。
このとき、中央のウエッジW3が上昇して長尺材Aの上方に貫通してウエッジW3の長尺材Aの長手方向の両側に間隙を生じさせる。このとき交差状態の長尺材Aに若干の衝動を加えることにより交差状態の一部が整列する(図16参照)。
【0021】
ついでウエッジW4が、先に上昇させたウエッジW3の片側の間隙に上昇し、間隙を拡大し、長尺材Aの軸心は平行に近づく(図17参照)。
【0022】
続いて、2本上昇しているウエッジW3、W4の両端側の間隙に、ウエッジW2、W5が上昇し、間隙をさらに拡大し、長尺材Aの軸心はさらに平行に近づく(図18参照)。
【0023】
さらに続いて、4本上昇しているウエッジW2、W3,W4,W5の両端側の間隙に、両端のウエッジW1、W6が上昇し、間隙をより一層拡大し、長尺材Aの軸心はほぼ平行となり交差状態は整列される(図19参照)。
【0024】
ウエッジWが全数上昇し交差状態が整列されると、中央の4本のウエッジW2、W3,W4,W5はコンベアC面から降下し、両端部の2本のウエッジW1、W6は上昇すると、ストッパーS1が伏倒し、長尺材AはコンベアCで下流方向へ搬送が開始される(図11参照)。
【0025】
搬送手段の工程を図20および図21に示す。
ストッパーS1が伏倒して搬送が開始されると、長尺材AはコンベアCの搬送方向から斜行して、ストッパーS2に斜行した状態で到達する場合がある(図21参照)。
【0026】
このとき、ストッパーS2は起立しているので、斜行して搬送されてきた長尺材の一端はストッパーS2で停止され、他の一端がストッパーS2に到達するまで保持される(図22参照)。
長尺材Aの両端がストッパーS2に到達し、光電管13がコンベアC上に長尺材Aが所定時間以上継続して存在することを検知した結果、その信号により長尺材Aの両端部が揃ったことを確認すると、ストッパーS2は伏倒して、さらに下流に搬送を開始する。
このようにして、コンベア終端部における斜行を防止しているものである。
【0027】
搬送が開始されると、ウエッジWにより送出台21上の長尺材Aが堰止されているため、コンベアC上に区分けされた長尺材Aが一時に搬送される。コンベアC始端部に存在する長尺材Aの搬送が終了すると、光電管12でコンベアC始端部に長尺材Aが存在しないことを検知し、ストッパーS1が起立するとともに、送出台21上の長尺材Aを堰止していたウエッジWが降下し、再び次の押出操作が開始され、前記操作が繰り返される(図12参照)。
【0028】
押出操作が繰り返され送出台21上に存在する長尺材A数が減少すると、押出杆22が一度の押出で進行する位置は次第に上端部に近ずくことになる。一度の押出で進行する位置が押出杆22進退用エンコーダー24の設定位置を超えると、それ以降は押出杆22は退行動作は行わずに、進行限界点まで進行し長尺材AをコンベアC上に送出する(図13参照)。
【0029】
押出杆22が進行を続けていくと、送出台21の上端部まで到達する。
しかしながら、このとき、押出杆22とコンベアC始端部との間には若干の長尺材Aが残存している。
ここで、両端を除く4本のウエッジW2,W3,W4,W5が、駆動シリンダー32により送出台21下方へ進行し、ついで送出台21および押出杆22と干渉することなく昇降シリンダー31により上昇して残存する長尺材Aを押圧する(図14参照)。
【0030】
続いて、上昇し長尺材Aを押圧するウエッジW2,W3,W4,W5が駆動シリンダー32によりコンベアC始端部側へ退行して、送出台21に残存する長尺材Aを全数コンベアC上に送出する(図15参照)。
【0031】
図22は、コンベアC始端部に送出台21’を形成する他の実施形態を示すものであり、コンベアC始端部に送出台21’を固定化して形成したものである。この場合、送出台21’上に長尺材Aを載置する方法としては、クレーンK等により送出台21’に長尺材Aを供給する方法でも差し支えない。
【0032】
本発明による長尺材整束装置で処理できる長尺材としては、丸棒鋼、圧延棒鋼、合成樹脂棒、合成樹脂製パイプ、金属管、木材等である。
口径としては、直径が10〜400mm程度で、長さが4〜5m前後の長尺材が処理可能であるが、直径が10〜40mm程度の小口径で可撓性を有するものに特に好適である。
【0033】
【発明の効果】
以上説明したように、本発明による長尺材供給装置は、適宜数の長尺材を、自動的に、かつ迅速に、交差状態を整列しつつコンベアに供給する装置であって、効率的に結束作業を可能ならしめる。
【図面の簡単な説明】
【図1】長尺材供給装置の平面図である。
【図2】長尺材供給装置の側面図である。
【図3】送出手段の側面図である。
【図4】整列手段の正面図である。
【図5】搬送手段、送出手段、整列手段の動作を示す側面図である。
【図6】搬送手段、送出手段、整列手段の動作を示す側面図である。
【図7】搬送手段、送出手段、整列手段の動作を示す側面図である。
【図8】搬送手段、送出手段、整列手段の動作を示す側面図である。
【図9】搬送手段、送出手段、整列手段の動作を示す側面図である。
【図10】搬送手段、送出手段、整列手段の動作を示す側面図である。
【図11】搬送手段、送出手段、整列手段の動作を示す側面図である。
【図12】搬送手段、送出手段、整列手段の動作を示す側面図である。
【図13】搬送手段、送出手段、整列手段の動作を示す側面図である。
【図14】搬送手段、送出手段、整列手段の動作を示す側面図である。
【図15】搬送手段、送出手段、整列手段の動作を示す側面図である。
【図16】整列手段におけるウエッジの動作を示す説明図である。
【図17】整列手段におけるウエッジの動作を示す説明図である。
【図18】整列手段におけるウエッジの動作を示す説明図である。
【図19】整列手段におけるウエッジの動作を示す説明図である。
【図20】搬送手段の工程を示す説明図である。
【図21】搬送手段の工程を示す説明図である。
【図22】送出手段に長尺材を供給する他の実施形態を示す側面図である。
【符号の説明】
1 搬送手段
2 送出手段
3 整列手段
4 昇降装置
21 送出台
22 押出杆
A 長尺材
C コンベア
C1〜C6 コンベア
K クレーン
L 搬送方向
S1、S2 ストッパー
W ウエッジ
W1〜W6 ウエッジ
X 搬送経路
[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to a long material supply device, and more specifically, a conveyor that automatically conveys long materials such as pipes and rods, in appropriate numbers, in a crossing state, and in a direction orthogonal to the longitudinal direction. The present invention relates to a long material supply device for supplying a long material.
[0002]
[Prior art]
Long materials such as pipes and rods should be bound by a predetermined number of binding bands to simplify work at the time of shipment, prevent collapse of cargo during transportation, prevent damage during storage, and provide administrative convenience. There are many.
In order to perform such a binding operation, it is widely performed to transport a long material by a conveyor or the like in a direction orthogonal to the longitudinal direction. However, it has been extremely difficult to automatically and quickly supply a long material to the conveyor in a state where the intersecting state is aligned to some extent while adjusting the quantity.
In order to solve such a problem, a long piece supplied from a pallet on a pallet basis is lifted and lowered independently by a separating piece and a receiving piece each having an obtuse angled slope, and the number of pieces is appropriately set according to the number of pieces. (Japanese Patent Laid-Open No. 6-179520) and the like are disclosed.
However, none of the conventional techniques are satisfactory, and further improvements have been demanded.
[0003]
[Problems to be solved by the invention]
An object of the present invention is to provide a long material supply device that automatically and quickly supplies a long material to a conveyor that conveys in a direction orthogonal to the longitudinal direction, while arranging the crossing state appropriately and in an appropriate number. I do.
[0004]
[Means to solve the problem]
As a means for technically solving the above problems, a first invention of the present application is a supply device for supplying a long material to a conveying means having a conveyor for conveying the long material in a direction orthogonal to the longitudinal direction, ,
At least at the time of sending out the long material, the leading end is connected to the starting end of the conveyor and becomes the inclined upper end, and a delivery table for temporarily storing the long material, and provided on the delivery table so as to be able to advance and retreat, A part of the long material is transferred onto the conveyor, and a part of the long material collapses along the delivery table when retreating. The present invention provides a long material supply device including a sending means having a wedge for sending an appropriate number of long materials at a time by penetrating and blocking the material.
[0005]
A second invention of the present application is a supply device that supplies a long material to a conveying unit having a conveyor that conveys the long material in a direction orthogonal to the longitudinal direction,
At least at the time of sending out the long material, the leading end is connected to the starting end of the conveyor and becomes the inclined upper end, and a delivery table for temporarily storing the long material, and provided on the delivery table so as to be able to advance and retreat, A part of the long material is transferred onto the conveyor, and a part of the long material collapses along the delivery table when retreating. A sending means having a wedge for sending a suitable number of long materials at a time by penetrating and blocking,
A wedge that rises and falls at the start end of the conveyor, wherein the long members are sequentially raised from the wedge located at the center to the wedge located at the end to align the long members in parallel, and ,
The gist of the present invention is a long material supply device provided with:
[0006]
BEST MODE FOR CARRYING OUT THE INVENTION
An embodiment of the present invention will be described below with reference to the accompanying drawings.
1 and 2 show an installation example of a long material supply device according to the present invention, FIG. 1 is a plan view, and FIG. 2 is a side view. FIG. 3 is a side view of the sending means, and FIG. 4 is a front view of the aligning means.
As shown in FIG. 1 to FIG. 4, the main part of this long material supply device is constituted by a conveying means 1, a sending means 2, and an aligning means 3.
Hereinafter, each of the above components will be sequentially described in detail.
[0007]
The conveying means 1 conveys the long material A on the conveyor C in a direction (arrow L direction) orthogonal to the longitudinal direction.
As shown in FIGS. 1 and 2, the transport unit 1 includes a frame 11 forming a transport path X, and seven series of conveyors C1 to C7 arranged on the frame 11 in the width direction of the transport path X. A hook-like shape that moves up and down between the first and second conveyors C1 and C2 and the conveyors C6 and C7 from both ends of the transport path X at a predetermined distance downstream from the start end of the conveyor C and moves up and down on the conveyor C surface. A stopper S1 and a hook-like member that moves up and down between the first and second conveyors C1 and C2 and the conveyors C6 and C7 from both ends of the transport path further downstream from the stopper S1 to move up and down on the conveyor C surface. A stopper S2 is provided as a main component.
The transport path X formed on the frame 11 has a width that allows the long material A to be transported by being laid sideways in a direction orthogonal to the longitudinal direction.
The conveyors C are arranged side by side at an interval in parallel with each other, and the upper surface of the conveyor C is installed horizontally while maintaining the same height.
When the end of the long material has a different diameter portion, the conveyors C1 and C7 on both outer sides can be moved up and down by the lifting cylinder 14 so that the conveyor C does not descend and contact the different diameter portion. . .
The conveyor C is not particularly limited, such as a belt conveyor, a chain conveyor, and a roller conveyor, but a belt conveyor is preferable.
Reference numeral 12 in the figure denotes a detector formed of a photoelectric tube, which detects the presence or absence of the long material A on the conveyor C. Upon receiving the signal, the stopper S1 moves up and down on the surface of the conveyor C, and conveys or blocks the long material A on the conveyor C. Reference numeral 13 in the figure denotes a detector comprising a photoelectric tube, which detects the presence or absence of the long material A on the conveyor C. Upon receiving the signal, the stopper S2 moves up and down on the surface of the conveyor C to convey or block the long material A on the conveyor C.
[0008]
The conveying means 1 is configured such that the conveyors C rotate in synchronization with each other in the same direction. Can be transported.
When the presence of the long material A on the conveyor C is not confirmed from the detection result of the photoelectric tube 12, the stopper S1 stands up in response to the signal and stops the long material A conveyed on the conveyor C. . In addition, receiving the signal from the sending means 4, the conveyance of the long material A that has fallen down and is blocked is started.
When it is confirmed from the detection result of the photoelectric tube 13 that the long material A exists on the conveyor C for a predetermined time or more, the stopper S2 receives the signal and falls down to block the long material. The transfer of the material A is started.
[0009]
The sending means 2 sends the long material A, which is placed on the sending table 21 and temporarily stored, to the conveyer at appropriate times by a pushing rod 22 which advances and retreats.
As shown in FIG. 3, the delivery means 2 includes a delivery table 21, a pushing rod 22 moving forward and backward on the delivery table 21, a driving motor (not shown) for moving the pushing rod 22 forward and backward, and a standing end at the start end of the conveyor C. A wedge W is provided as a main component, and can be moved up and down on the conveyor C by an elevating cylinder 31 and can be advanced and retracted below the delivery table 21 by an advance / retreat driving cylinder 32.
The surface of the delivery table 21 has a predetermined inclined state, and the upper end is connected to the start end of the conveyor C. The inclination angle is preferably selected from the range of 5 to 30 °, more preferably 10 to 20 °. The long material A is placed on the delivery table 21 with its longitudinal direction orthogonal to the transport direction, and is temporarily stored. The stored long material A is pushed out by the pushing rod 22 in a direction orthogonal to the longitudinal direction, and is sent out onto the conveyor C.
The push rod 22 is an upright plate slidably mounted on the delivery table, and is advanced and retracted on the delivery table 21 by a drive motor (not shown) in parallel with the transport direction. Since the pushing rod 22 needs to uniformly push the longitudinal direction of the long material A, a plurality of pushing rods 22 are preferably arranged in parallel.
Reference numeral 23 in the figure denotes a detector comprising an ultrasonic sensor, which detects the loading level of the long material A on the conveyor C, and receives the signal to move the pushing rod 22 forward and backward. Reference numeral 24 in the drawing denotes a push-rod advance / retreat encoder. The push-rod moves forward and backward within a set value range, and performs only a forward movement when the set value is exceeded.
[0010]
The sending means 2 thus arranged is provided at the start end of the conveyor C provided on the transport path X.
The long material A is stacked on the mounting table 25 provided at the start end of the conveyor with its longitudinal direction aligned with the traveling direction. An elevating device 4 is provided at a position opposite to the transport path X via the mounting table 25.
The elevating device 4 includes the arm-shaped delivery table 21 for transferring the long material A, a frame 27 for moving the delivery table 21 up and down, and a guide 28 to which the frame 27 is attached. The unit is disposed with the unit facing the transport path X direction.
The delivery table 21 arranged below the mounting table 25 has a length capable of transferring the entire length of the long material A in the frame 29 provided on the mounting table 25 at one time. The length member A can be raised and raised to a predetermined height by the operation of the frame 27 without interfering with the mounting table 25 and the frame 29 provided on the mounting table 25 and the start end of the conveyor C.
After the long material A transferred on the delivery table 21 is lifted to a predetermined height and lifted to a predetermined height, the cylinder rod 30 of the tilting drive cylinder associated with the guide 28 retreats, so that the guide 28 is set at the standing point. , The delivery table 21 is formed, which is inclined to the rear side of the delivery table 21 and has an inclined surface whose upper end is in the transport path X direction. The upper end of the delivery table 21 is positioned so as to be connected to the start end of the conveyor C.
[0011]
The push rod 22 moves on the delivery table 21 in parallel with the transport direction. Above the start end of the conveyor C, the ultrasonic sensor 23 detects the loading level of the extruded long material A, and when the detection result is equal to or less than the set value, the push rod 22 receives the signal and the pushing rod 22 To push out the long material A on the delivery table 21 to the upper end of the delivery table 21.
When the push rod 22 advances and pushes the long material A to the start end of the conveyor C, the loading level of the long material A at the start end of the conveyor C increases. The ultrasonic sensor 23 detects the loading level of the long material A, and when the detection result is equal to or greater than a set value, the push rod 22 receives the signal and the push rod 22 retreats to the lower end of the delivery table 21. At this time, a part of the long material A extruded to the upper end of the delivery table 21 collapses on the inclined surface, and retreats together with the pushing rod 22 to the lower end of the delivery table 21 where the pushing rod 22 retreats.
When the long material A is loaded on the start end of the conveyor C, the wedge W is lifted by the elevating cylinder 31 and penetrates between the long materials A to send the long material A on the delivery table 21. And the long material A on the conveyor C.
When the wedge W rises and is divided into the long material A on the delivery table 21 and the long material A on the conveyor C, the stopper S1 of the transport means 1 falls down and is blocked by the stopper S1. The long material A is transported on the transport path X by the conveyor C, but since the long material A on the delivery table 21 is blocked by the wedge W, the appropriate number of long materials divided on the conveyor C Only A is transported at a time.
After the conveyance starts, when the photoelectric tube 12 no longer detects the long material A on the conveyor C, the stopper S1 stands up, then the wedge W descends, and the pushing rod 22 advances and retreats to repeat sending.
By repeating the sending in this manner, the amount of the long material A on the sending table 21 decreases. When the amount of the long material A decreases, the position at which the push rod 22 advances in one push is gradually approaching the upper end. If the position where the push rod advances at one time exceeds the set position of the push rod forward / backward encoder 24 on the delivery table 21, thereafter, the push rod 22 performs only the forward operation or the stop operation without performing the backward movement, and the forward travel limit is reached. It advances to the point and sends out the long material A onto the conveyor C.
When the pushing rod 22 has advanced to the limit point, a part of the long material A remains between the pushing rod 22 and the conveyor C.
Therefore, four of the wedges W at the starting end of the conveyor C, except for both ends, advance below the delivery table 21 and rise to the surface of the delivery table 21 without interfering with the delivery table 21. By retreating to the start end side of the conveyor C, all the long materials A on the delivery table 21 can be sent out onto the conveyor C.
[0012]
The aligning means 3 aligns the intersecting state of the long materials A stacked at the start end of the conveyor C.
As shown in FIGS. 3 and 4, the alignment means 3 mainly includes a wedge W which can be moved up and down in a gap between the conveyors C without interfering with the conveyors C at a predetermined distance downstream from the start end of the conveyors. Provided as an element.
The wedge W is disposed between the conveyors C1 to C7 with six wedges W1 to W6 at appropriate intervals in the width direction of the transport path X, and is erected on a straight line orthogonal to the transport path X. . The wedges W1, W6 located at both ends are disposed between the first and second conveyors C1, C2 and the conveyors C6, C7 from both ends of the transport path X.
It is preferable that the width and the thickness of the wedge W are set to be the largest in a range that does not make contact with the adjacent conveyor C in order to increase the alignment effect.
The shape of the wedge may be square or circular, but it is preferable that the tip is a pointed angle so that it can easily penetrate between the long members A.
[0013]
The arranging means 3 is configured such that the center wedge W3 is first raised by the drive cylinder 31 with respect to the long material A stacked in the crossing state at the start end of the conveyor C, and is positioned above the long material A. The wedge W3 is operated so as to penetrate and to form a gap on both sides in the longitudinal direction of the long material A of the wedge W3.
Next, the central wedge W4 rises and intervenes in the gap that has occurred earlier and penetrates upward to enlarge the gap.
Next, the wedges W2 and W5 on both outer sides of W3 and W4 are raised, and penetrate the gap previously generated upward to further expand the gap.
Finally, the wedges W1 and W6 at both ends rise and penetrate upward to further enlarge the gap, thereby making the axes of the long material A parallel and aligning the crossing state.
[0014]
Next, the operation of the long material supply device described above is shown in FIGS. 5 to 15 and will be described based on this.
First, a number of long materials A are placed on the mounting table 25 in the longitudinal direction orthogonal to the transport direction.
On the side opposite to the conveyor C with the mounting table 25 interposed therebetween, it is disposed at a position where the lifting / lowering means 4 can operate. The delivery table 21 provided in the lifting / lowering means 4 is arranged below the long material A without interfering with the mounting table 25 and the frame 29 loaded on the mounting table 25.
At this time, the wedges W (the six wedges W1 to W6) are at the raised position at the start end of the conveyor C, and immediately when the long material A is raised to the start end of the conveyor C by the elevating means 4, The transport is prevented from starting due to collapse (see FIG. 5).
[0015]
Next, the delivery table 21 rises together with the frame 27, transfers the long material A from the placement table 25 to the delivery table 21, and further places the placement table 25, the frame 29 installed on the placement table 25, and the start end of the conveyor C. And raises the long material A without interfering with it, and then rises to a predetermined height and stops (see FIG. 6).
[0016]
When the delivery table 21 rises to a predetermined height, the rod 30 associated with the guide 28 retreats, and as a result, the guide 28 inclines to the back side of the delivery table 21 about the upright point, and the long material A Is formed as a delivery table 21 having an inclined surface whose upper end is in the direction of the conveyor C. At this time, the upper end of the delivery table 21 is connected to the conveyor (see FIG. 7).
[0017]
When the delivery table 21 on which the long material A is transferred is inclined and the delivery table 21 having the inclined surface is formed, the wedge W is lowered by the operation of the lifting cylinder 31 at the start end of the conveyor C, and a part of the long material A is formed. Falls on conveyor C.
At this time, since both the stopper S1 and the stopper S2 are upright, the long material A that has collapsed is blocked by the stopper S1 (see FIG. 8).
[0018]
In the state where a part of the long material A has collapsed on the conveyor C, the loading level of the long material A at the start end of the conveyor C has not reached the set value of the start of conveyance, so the ultrasonic sensor which has detected the level has been used. Receiving the signal of 23, the pushing rod 22 advances, and pushes out the long material A from the delivery table 21 to the start end of the conveyor C.
When the pushing rod 22 advances on the delivery table 21 and pushes out the long material A, the long material A on the delivery table 21 is rocked by the force pushed by the pushing rod 22 near both ends in the longitudinal direction. The intersections are partially aligned (see FIG. 9).
[0019]
When the loading level of the long material A at the start end of the conveyor C reaches the set value, the push rod 22 retreats to the lower end of the delivery table 21.
At this time, a part of the long material A at the start end of the conveyor C falls on the delivery table 21 toward the lower end. By collapse on the delivery table 21, the pressed long material A relaxes the pressing state and a gap is generated between the long materials A, and when the pressing force is applied next, the crossing state is aligned. This is a state that is easy to perform (see FIG. 10).
[0020]
When the long material A is loaded on the start end of the conveyor C, the wedge W is lifted by the elevating cylinder 31 and penetrates between the long materials A to send the long material A on the delivery table 21. And the long material A on the conveyor C. The operation of the wedge W here is shown in FIGS.
At this time, the center wedge W3 rises and penetrates above the long material A, and a gap is generated on both sides in the longitudinal direction of the long material A of the wedge W3. At this time, a part of the intersecting state is aligned by applying a slight impulse to the long material A in the intersecting state (see FIG. 16).
[0021]
Next, the wedge W4 rises to the gap on one side of the wedge W3 that has been raised earlier, enlarges the gap, and the axis of the long material A approaches parallel (see FIG. 17).
[0022]
Subsequently, the wedges W2 and W5 rise in the gaps at both ends of the two rising wedges W3 and W4, and the gaps are further enlarged, and the axis of the long material A becomes closer to parallel (see FIG. 18). ).
[0023]
Subsequently, the wedges W1 and W6 at both ends rise in the gaps at both ends of the four rising wedges W2, W3, W4, and W5, and the gap is further enlarged. They are almost parallel and the intersections are aligned (see FIG. 19).
[0024]
When all the wedges W are raised and the intersections are aligned, the four wedges W2, W3, W4, and W5 at the center descend from the surface of the conveyor C, and the two wedges W1 and W6 at both ends rise. S1 falls down, and the long material A starts to be conveyed downstream by the conveyor C (see FIG. 11).
[0025]
FIG. 20 and FIG. 21 show the steps of the transfer means.
When the stopper S1 falls down and the conveyance is started, the long material A may skew in the conveyance direction of the conveyor C and reach the stopper S2 in a skewed state (see FIG. 21).
[0026]
At this time, since the stopper S2 is upright, one end of the long material that has been skewed and conveyed is stopped by the stopper S2, and is held until the other end reaches the stopper S2 (see FIG. 22). .
Both ends of the long material A arrive at the stopper S2, and the photoelectric tube 13 detects that the long material A continues on the conveyor C for a predetermined time or more. When it is confirmed that they are aligned, the stopper S2 falls down and starts transporting further downstream.
In this manner, skew at the end of the conveyor is prevented.
[0027]
When the conveyance is started, the long material A on the delivery table 21 is blocked by the wedge W, so that the long material A divided on the conveyor C is conveyed at a time. When the transport of the long material A present at the start end of the conveyor C is completed, the photoelectric tube 12 detects that the long material A does not exist at the start end of the conveyor C, and the stopper S1 stands up and the length on the delivery table 21 is raised. The wedge W that has blocked the length member A descends, the next extrusion operation is started again, and the above operation is repeated (see FIG. 12).
[0028]
When the pushing operation is repeated and the number of long materials A present on the delivery table 21 decreases, the position where the pushing rod 22 advances by one pushing gradually approaches the upper end. If the position where the push rod advances at one time exceeds the set position of the push rod 22 advance / retreat encoder 24, thereafter, the push rod 22 does not perform the retreat operation, but advances to the advance limit point and moves the long material A on the conveyor C. (See FIG. 13).
[0029]
As the push rod 22 continues to advance, it reaches the upper end of the delivery table 21.
However, at this time, some long material A remains between the pushing rod 22 and the start end of the conveyor C.
Here, the four wedges W2, W3, W4 and W5 excluding the both ends advance below the delivery table 21 by the drive cylinder 32, and then rise by the lifting cylinder 31 without interfering with the delivery table 21 and the pushing rod 22. To press the remaining long material A (see FIG. 14).
[0030]
Subsequently, the wedges W2, W3, W4, and W5 that rise and press the long material A are retreated to the start end side of the conveyor C by the drive cylinder 32, and all the long material A remaining on the delivery table 21 is transferred onto the conveyor C. (See FIG. 15).
[0031]
FIG. 22 shows another embodiment in which the delivery table 21 'is formed at the start end of the conveyor C, and is formed by fixing the delivery table 21' at the start end of the conveyor C. In this case, as a method of placing the long material A on the delivery table 21 ', a method of supplying the long material A to the delivery table 21' by a crane K or the like may be used.
[0032]
Examples of long materials that can be processed by the long material sizing device according to the present invention include round steel bars, rolled steel bars, synthetic resin bars, synthetic resin pipes, metal tubes, and wood.
As the caliber, a long material having a diameter of about 10 to 400 mm and a length of about 4 to 5 m can be processed, and is particularly suitable for a flexible material having a small caliber of about 10 to 40 mm in diameter. is there.
[0033]
【The invention's effect】
As described above, the long material supply device according to the present invention is an apparatus that automatically and quickly supplies an appropriate number of long materials to the conveyor while arranging the intersections, and efficiently. Make uniting work possible.
[Brief description of the drawings]
FIG. 1 is a plan view of a long material supply device.
FIG. 2 is a side view of the long material supply device.
FIG. 3 is a side view of the sending means.
FIG. 4 is a front view of the alignment means.
FIG. 5 is a side view showing the operation of the conveying means, the sending means, and the aligning means.
FIG. 6 is a side view showing the operation of the transporting means, the sending means, and the aligning means.
FIG. 7 is a side view showing the operation of the conveying means, the sending means, and the aligning means.
FIG. 8 is a side view showing the operation of the conveying means, the sending means, and the aligning means.
FIG. 9 is a side view showing the operation of the conveying means, the sending means, and the aligning means.
FIG. 10 is a side view showing the operation of the conveying means, the sending means, and the aligning means.
FIG. 11 is a side view showing the operation of the conveying means, the sending means, and the aligning means.
FIG. 12 is a side view showing the operation of the conveying means, the sending means, and the aligning means.
FIG. 13 is a side view showing the operation of the conveying means, the sending means, and the aligning means.
FIG. 14 is a side view showing the operation of the conveying means, the sending means, and the aligning means.
FIG. 15 is a side view showing the operation of the conveying means, the sending means, and the aligning means.
FIG. 16 is an explanatory diagram showing an operation of a wedge in the alignment means.
FIG. 17 is an explanatory diagram showing an operation of a wedge in the alignment means.
FIG. 18 is an explanatory view showing the operation of the wedge in the alignment means.
FIG. 19 is an explanatory diagram showing an operation of a wedge in the alignment means.
FIG. 20 is an explanatory view showing a process of a transport unit.
FIG. 21 is an explanatory view showing a step of a transport unit.
FIG. 22 is a side view showing another embodiment for supplying a long material to the sending means.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 Conveying means 2 Sending means 3 Aligning means 4 Elevating device 21 Sending stand 22 Extruded rod A Long material C Conveyor C1-C6 Conveyor K Crane L Transport direction S1, S2 Stopper W Wedge W1-W6 Wedge X Transport path

Claims (2)

長尺材を長手方向と直交方向に搬送するコンベアを有する搬送手段に長尺材を供給する供給装置であって、
少なくとも長尺材の送出時に先端がコンベアの始端部に連接すると共に傾斜上端となる、長尺材を一時貯溜しておくための送出台と、この送出台上を進退可能に設けられ、進行時に長尺材の一部をコンベア上に移載し、退行時に長尺材の一部を送出台に沿って崩落させる押出杆と、コンベア始端部において昇降し、移載された長尺材間を貫通して堰止することにより一時に適宜本数の長尺材を送出するウエッジとを有する送出手段からなる長尺材供給装置。
A supply device that supplies a long material to a conveying unit having a conveyor that conveys the long material in a direction orthogonal to the longitudinal direction,
At least at the time of sending out the long material, the leading end is connected to the starting end of the conveyor and becomes the inclined upper end, and a delivery table for temporarily storing the long material, and provided on the delivery table so as to be able to advance and retreat, A part of the long material is transferred onto the conveyor, and a part of the long material collapses along the delivery table when retreating. A long material supply device comprising a sending means having a wedge for sending an appropriate number of long materials at a time by penetrating and blocking.
長尺材を長手方向と直交方向に搬送するコンベアを有する搬送手段に長尺材を供給する供給装置であって、
少なくとも長尺材の送出時に先端がコンベアの始端部に連接すると共に傾斜上端となる、長尺材を一時貯溜しておくための送出台と、この送出台上を進退可能に設けられ、進行時に長尺材の一部をコンベア上に移載し、退行時に長尺材の一部を送出台に沿って崩落させる押出杆と、コンベア始端部において昇降し、移載された長尺材間を貫通して堰止することにより一時に適宜本数の長尺材を送出するウエッジとを有する送出手段と、
前記コンベア始端部において昇降するウエッジが、長尺材間を中央部に位置するウエッジから端部に位置するウエッジへと順次上昇させて長尺材を平行に整列させることを特徴とする整列手段と、
を備えた長尺材供給装置。
A supply device that supplies a long material to a conveying unit having a conveyor that conveys the long material in a direction orthogonal to the longitudinal direction,
At least at the time of sending out the long material, the leading end is connected to the starting end of the conveyor and becomes the inclined upper end, and a delivery table for temporarily storing the long material, and provided on the delivery table so as to be able to advance and retreat, A part of the long material is transferred onto the conveyor, and a part of the long material collapses along the delivery table when retreating. A sending means having a wedge for sending a suitable number of long materials at a time by penetrating and blocking,
A wedge that rises and falls at the start end of the conveyor, wherein the long members are sequentially raised from the wedge located at the center to the wedge located at the end to align the long members in parallel, and ,
Long material supply device provided with.
JP08375996A 1996-04-05 1996-04-05 Long material supply device Expired - Fee Related JP3540501B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP08375996A JP3540501B2 (en) 1996-04-05 1996-04-05 Long material supply device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP08375996A JP3540501B2 (en) 1996-04-05 1996-04-05 Long material supply device

Publications (2)

Publication Number Publication Date
JPH09278174A JPH09278174A (en) 1997-10-28
JP3540501B2 true JP3540501B2 (en) 2004-07-07

Family

ID=13811503

Family Applications (1)

Application Number Title Priority Date Filing Date
JP08375996A Expired - Fee Related JP3540501B2 (en) 1996-04-05 1996-04-05 Long material supply device

Country Status (1)

Country Link
JP (1) JP3540501B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111674876A (en) * 2020-06-10 2020-09-18 宁波永信钢管有限公司 Feeding device of steel pipe flaw detection equipment
CN112171353A (en) * 2020-09-25 2021-01-05 河北中建管业有限公司 Automatic logistics system device for threading and grooving of single-station pipeline and control method of automatic logistics system device

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5388588B2 (en) * 2009-01-14 2014-01-15 グンゼ株式会社 Turntable for signature transport
CN105584829B (en) * 2016-02-29 2018-02-16 东莞九兆金属科技有限公司 A kind of steel column cuts automatic charging device
KR102135321B1 (en) * 2020-03-31 2020-07-17 이용근 Food overlapping preventing apparatus for food packing device and food packing device comprising the food overlapping preventing apparatus for food packing device
CN112623755B (en) * 2020-12-21 2022-08-30 无锡洲翔成套焊接设备有限公司 Material loading letter sorting equipment
JP7663974B2 (en) * 2023-04-28 2025-04-17 トキワ工業株式会社 Conveyor
JP7772985B1 (en) * 2025-03-25 2025-11-18 ノリタケ株式会社 Bar feeder for circular saw cutting machine

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111674876A (en) * 2020-06-10 2020-09-18 宁波永信钢管有限公司 Feeding device of steel pipe flaw detection equipment
CN112171353A (en) * 2020-09-25 2021-01-05 河北中建管业有限公司 Automatic logistics system device for threading and grooving of single-station pipeline and control method of automatic logistics system device

Also Published As

Publication number Publication date
JPH09278174A (en) 1997-10-28

Similar Documents

Publication Publication Date Title
US6430800B1 (en) Automatic pallet fabrication apparatus and methods
JP4933565B2 (en) Method and apparatus for assembling palletable products
CN102448857A (en) Palletizer with box layer preparation
US4103786A (en) Board piling-up apparatus
JP3540501B2 (en) Long material supply device
US5454466A (en) Accumulating conveyor
CA2211384C (en) Method and apparatus for high speed variable tier width lumber stacking
US4441847A (en) Method and apparatus for producing bundles of cast iron pipes
JPS62111829A (en) Automatic loading device of wheel for car
JPH07300229A (en) Shifting/conveying device
US4423807A (en) Process and apparatus for the formation of setting layers made up of brick blanks
JP3490618B2 (en) Pipe delivery device to binding machine
JPS5849459B2 (en) Loading device
JP3593421B2 (en) Long material sorting apparatus and method
US6860709B2 (en) Apparatus and method for placing spacer sticks on a board stack
CN111422413A (en) Method and device for quantitative and stable conveying of blocks
JP3848634B2 (en) Plate body deposition equipment
JPH06278845A (en) Pallet transporting device
JPS6145827A (en) Aluminum section loader
JPH0638817Y2 (en) Seat palletizer
JPS6056724A (en) Device for inserting transfer pallette
US3869036A (en) I beam nesting and stacking method and apparatus
JP3321846B2 (en) Glass tube quantitative transfer device
JP2001080736A (en) Article sending device and article one row delivery machine
JPH11115979A (en) Long object packaging equipment

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20040224

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20040323

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20040325

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees