JP3550893B2 - How to check the filling status of cast concrete - Google Patents
How to check the filling status of cast concrete Download PDFInfo
- Publication number
- JP3550893B2 JP3550893B2 JP18738996A JP18738996A JP3550893B2 JP 3550893 B2 JP3550893 B2 JP 3550893B2 JP 18738996 A JP18738996 A JP 18738996A JP 18738996 A JP18738996 A JP 18738996A JP 3550893 B2 JP3550893 B2 JP 3550893B2
- Authority
- JP
- Japan
- Prior art keywords
- concrete
- electrodes
- residual voltage
- sensor
- filling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000000034 method Methods 0.000 claims description 24
- 238000009412 basement excavation Methods 0.000 claims description 16
- 239000007788 liquid Substances 0.000 claims description 15
- 230000003014 reinforcing effect Effects 0.000 claims description 13
- 239000000126 substance Substances 0.000 claims description 10
- 238000005266 casting Methods 0.000 claims description 5
- 238000012790 confirmation Methods 0.000 claims description 4
- 230000007423 decrease Effects 0.000 claims description 3
- 229910001294 Reinforcing steel Inorganic materials 0.000 claims 1
- 230000000087 stabilizing effect Effects 0.000 description 12
- 238000005259 measurement Methods 0.000 description 7
- 238000012360 testing method Methods 0.000 description 7
- 238000010276 construction Methods 0.000 description 5
- 239000000758 substrate Substances 0.000 description 5
- WABPQHHGFIMREM-UHFFFAOYSA-N lead(0) Chemical compound [Pb] WABPQHHGFIMREM-UHFFFAOYSA-N 0.000 description 4
- 238000002474 experimental method Methods 0.000 description 2
- RYGMFSIKBFXOCR-UHFFFAOYSA-N Copper Chemical compound [Cu] RYGMFSIKBFXOCR-UHFFFAOYSA-N 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 229910052802 copper Inorganic materials 0.000 description 1
- 239000010949 copper Substances 0.000 description 1
- 238000000280 densification Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000012530 fluid Substances 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 229910052751 metal Inorganic materials 0.000 description 1
- 230000002250 progressing effect Effects 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 229910001220 stainless steel Inorganic materials 0.000 description 1
- 239000010935 stainless steel Substances 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 238000012795 verification Methods 0.000 description 1
Images
Landscapes
- Piles And Underground Anchors (AREA)
- Underground Or Underwater Handling Of Building Materials (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
- Investigating Or Analyzing Materials By The Use Of Electric Means (AREA)
Description
【0001】
【発明の属する技術分野】
この発明は、打設コンクリートの充填状況の確認方法に関し、特に、鉄筋籠を掘削孔内に建込む地中連続壁や場所打ち杭などに適用される安定液中での打設コンクリートの充填状況の確認方法に関するものである。
【0002】
【従来の技術】
近年、地下構造物の大深度化や耐震性向上の観点から地中連続壁の高強度化が進められている。また、高層建築物などにおいては、地中連続壁の本体利用の観点から、高強度化の他、配筋の高密度化なども進んでいる。このような条件下でのコンクリートの打設は、通常、トレミー管を使用して行われている。コンクリートの打設で重要なことは、コンクリートが全域に均一に充填されていることであり、充填状況の改善を図るために、流動性および材料分離抵抗性に優れた高流動コンクリートなどを用いることも行われている。
【0003】
ところで、打設されたコンクリートの充填状況を確認する方法としては、従来、打設されたコンクリートの天端を下げ振りで確認することにより行うか、あるいは、目視不可能な部位については、硬化後堀り起こして行っていた。しかしながら、このような従来の打設コンクリート充填状況の確認方法には、以下に説明する問題があった。
【0004】
【発明が解決しようとする課題】
すなわち、下げ振りによる天端位置の確認方法では、錘が安定液中を降下して、コンクリートの天端に到達したときの手触りで、打設コンクリートの天端を確認するため、技術者の勘に頼っており、個人差がある。また、配筋が高密度化した部分での確認が難しく、高密度化された部分にコンクリートの未充填部分があっても、これを発見することができない。
【0005】
さらに、高強度や高流動コンクリートを採用した場合には、錘がコンクリートの天端に到達したときの張力変化が、従来のコンクリートよりも小さいので、天端自体の確認が難しくなる。一方、堀り起こしによる確認方法では、コンクリートの硬化後でなければ、充填状況の良否が判らないため、対策が必要な場合に迅速に対応することができないという問題があった。
【0006】
本発明は、このような従来の問題点に鑑みてなされたものであって、その目的とするところは、配筋の高密度化された部分でも、簡単かつ確実に打設されたコンクリートの充填状況が打設中に確認できる方法を提供することにある。
【0007】
【課題を解決するための手段】
上記目的を達成するために、本発明は、安定液を満たしながら掘削された地盤掘削孔内に鉄筋籠を建込んで、コンクリートを打設する際の、前記コンクリートの充填状況の確認方法において、前記鉄筋籠に前記掘削孔の深度方向に沿って、所定の間隔を隔てて複数のセンサーを予め配置し、前記センサーの電極間に介在する物質の電気的性質の相違により、前記コンクリートの打ち上がり位置を検出するようにした。
このように構成された確認方法によれば、センサーを鉄筋籠に予め配置するので、配筋の高密度部分であっても、センサーの電極間に介在する物質の電気的な性質の相違により、コンクリートの充填状況が確認できる。
この場合、前記センサーで測定する電気的性質は、前記電極間に低電圧を微小時間印加した後の前記電極間の残留電圧を採用することかできる。
この構成によれば、残留電圧の状態から、安定液,コンクリートと接触した安定液,コンクリートをそれぞれ明確に識別することができる。
さらに、本発明の打設コンクリートの充填状況の確認方法においては、前記残留電圧が上昇した後に低下して安定する点を打設コンクリートの天端位置とすることができる。
この判断方法を採用すると、正確に打設コンクリートの天端位置を知ることができる。
【0008】
【発明の実施の形態】
以下、本発明の好適な実施の形態について、添付図面に基づいて詳細に説明する。図1から図5は、本発明にかかる打設コンクリートの充填状況の確認方法の一実施例を示している。同図に示す実施例は、本発明を地中連続壁を構築する際に適用したものであり、地中連続壁の構築では、まず、図1(A)に示すように、泥水などの安定液10を満たしながら地盤中に掘削孔12が形成される。
【0009】
図1(A)に示した例では、ケリー掘削機14を使用して、地盤中に水平断面が略矩形状の掘削孔12が所定深度まで掘削形成される。掘削孔12の形成が終了すると、図1(B)に示すように、掘削孔12内に鉄筋籠16がクレーン18を用いて建込まれる。鉄筋籠16は、掘削孔12の形状に対応した形状に予め組み立てられている。
【0010】
なお、図1(B),(C)に示した符号17の部材は、地中連続壁パネルの側方への連結を確保するために、掘削孔12の端部に挿入設置されるロッキングパイプである。
鉄筋籠16が掘削孔12内の所定の位置に建込まれると、図1(C)に示すように、トレミー管19を使用してコンクリートCの打設が行われる。このコンクリートCの打設は、掘削孔12内に満たされている安定液10とコンクリートCとを置換するようにして行われる。
【0011】
このような地中連続壁の構築工程は、従来からよく知られている工法と同じであるが、本実施例では、特に、打設されたコンクリートCの充填状況を確認するために以下に説明する方法が採用されている。
すなわち、掘削孔12内に建込まれる鉄筋籠16には、掘削孔12の深度方向に沿って、所定の間隔を隔てて、複数のセンサー20が配置されている。センサー20は、鉄筋籠16の長手方向に沿って、中心部と左右方向の端部側に配列されていて、図1(B)には、一方の面しか示されていないが、鉄筋籠16の背面側にも同様な状態で配置されている。
【0012】
図2には、センサー20の取付状態の詳細を示している。センサー20は、平板状の絶縁基板20aと、この基板20a上に所定の間隔を隔てて対向配置された一対の電極20bと、各電極20bに接続されたリード線20cと、電極20bとリード線20cの接続部分を覆う絶縁カバー20dとから構成されている。一対の電極20bは、電気伝導性の良好な銅などの金属からなる板状ないしは棒状に形成されている。各センサー20は、絶縁基板20aを鉄筋籠16の縦筋16aの部分に接着などにより固着されている。
【0013】
各リード線20cは、鉄筋籠16の長手方向に沿ってその上端側まで延長され、地上に設置される測定装置22に接続されている。測定装置22は、各センサー20の電極22b間に直流の低電圧、例えば、6V程度の電圧を微小時間、例えば、数m乃至は数十sec程度供給して、電極20b間の残留電圧を測定する。
【0014】
このときの残留電圧は、電極20b間に介在する物質の電気的な性質によって異なり、残留電圧を測定することにより、電極20b間に介在する物質を知ることができる。図3から図5は、上記構成のセンサー20で電極20b間に介在する物質の電気的な特性を測定することにより、物質が識別されることを確認した試験の状態および結果を示している。
【0015】
この試験では、図3に示すように、容器内にセンサーsを吊り下げ支持し、容器内に安定液を満たし、容器の下方からコンクリートを充填し、コンクリートの天端面を徐々に上昇させながらセンサーs間の残留電圧を測定した。センサーsの電極には、直径が2mmのステンレス棒を用い、この電極間に6vの直流電圧を20msec間供給し、40msec経過後、スイッチを切り換えて、電極間の残留電圧を測定した。
【0016】
このときの測定ピッチは、5secとした。図4,5に、この時の測定結果を示している。同図から明らかなように、安定液だけの場合には、残留電圧が約1200mvであり、コンクリートと接触するとこれが約1500mv程度まで一旦上昇する。そして、コンクリート中では、残留電圧が約1300〜1400mvに低下する。
【0017】
つまり、残留電圧の大きさは、コンクリートと接触した安定液>コンクリート>安定液の順になり、これらの間に100mv以上の差があり、かつ、一旦上昇した残留電圧がその後低下するので、安定液とコンクリートとの区別は、十分に可能となる。なお、この試験では、コンクリートは、スランプ値が24cm程度の高い流動性のものを使用した。
【0018】
図5は、上記実験を踏まえて、実際の工事現場で鉄筋籠16にセンサー20を取付て電極20b間の残留電圧を測定した結果と、参照用の値(上記試験により得られた値)とを示している。同図に示す結果から明らかなように、実パネルでの残留電圧の挙動と参照用とは、ほぼ同じ傾向を示し、これにより実パネルでのコンクリート打設中の充填状況が良好であることも確認できる。
【0019】
さて、以上のようにセンサー20を配置した鉄筋籠16を掘削孔12内に建込んでトレミー管19によりコンクリートを打設すると、鉄筋籠16に配設された各センサー20は、コンクリートCの打設直前までは、全てのセンサー20が安定液10中に存在することになる。
従って、この状態で、測定装置22を介して各センサー20の電極20bに低電圧を微小時間供給して、電極20b間の残留電圧の測定を測定すると、各センサー20の測定値は、それぞれ安定液10の残留電圧となり、全センサー20でほぼ同じ測定値となる。
【0020】
このような残留電圧の測定は、測定装置22から所定の時間間隔毎に行われ、コンクリートCの打設により、その天端位置が徐々に上昇すると、鉄筋籠16の下方側に配置されているセンサー20から順次打設されたコンクリートC中に埋没することになる。
コンクリートC中に埋没したセンサー20では、残留電圧の大きさが安定液10の場合よりも小さくなるので、コンクリートCが当該センサー20の位置まで打ち上がり、充填されたことがリアルタイムで確認される。
【0021】
このような充填状況の確認方法では、技術者の勘に頼らないので、正確でかつ一様な結果が得られる。また、本実施例のセンサー20では、低電圧を微小時間印加した際の残留電圧が、安定液10がコンクリートCと接触することにより一旦上昇して、さらにその後に下降するので、単に残留電圧が低下する場合よりも、その状態を明確に認識できるとともに、残留電圧の下降が停止した後に安定した位置を打設されたコンクリートCの天端位置とすることができ、コンクリートCの打ち上がり状態も測定することができる。
【0022】
なお、コンクリートCの天端位置を測定する際には、上記実施例の構成によらず、例えば、下げ振りにセンサーsを設置しても測定することができる。さらに、本実施例のセンサー20は、絶縁基板20a上に一対の電極20bが形成されていて、厚みが薄いので、高密度化された配筋部分でも簡単に取り付けることが可能になる。
【0023】
なお、上記実施例では、本発明を地中連続壁を構築する際に適用した場合を例示したが、本発明の実施は、これに限定されることはなく、例えば、掘削孔内に鉄筋籠を建込む場所打ち杭の構築にも適用することができる。
また、上記実施例では、電極20b間に介在する物質を残留電圧の相違から検知するセンサー20を例示したが、本発明の実施は、このようなセンサー20を使用する場合に限定されることはなく、例えば、電極間に介在する物質の電気抵抗の相違から、介在物質を検知するセンサーであってもよい。
【0024】
【発明の効果】
以上、実施例で詳細に説明したように、本発明にかかる打設コンクリートの充填状況の確認方法によれば、コンクリート打設中にリアルタイムで充填状況の確認が行えるので、不都合があった場合に、迅速に対応することができる。また、本発明では、センサーにより充填状況を確認するので、個人差がなく一様な結果が得られるとともに、配筋の高密度化部分にも配置することかできる。
【図面の簡単な説明】
【図1】本発明にかかる打設コンクリートの充填状況の確認方法を地中連続壁の構築に適用した場合の工程を順に示す断面説明図である。
【図2】図1の要部拡大図である。
【図3】本発明の確認方法で使用するセンサーの試験状態の説明図である。
【図4】図3の試験で得られた試験結果を示すグラフである。
【図5】本発明の実証実験の測定結果を示すグラフである。
【符号の説明】
10 安定液
12 掘削孔
16 鉄筋籠
19 トレミー管
20 センサー
20a 絶縁基板
20b 電極
20c リード線
22 測定装置[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to a method for checking the state of filling of cast concrete, and in particular, the state of filling of cast concrete in a stable liquid applied to an underground continuous wall or a cast-in-place pile for building a reinforced cage in an excavation hole. This is related to the confirmation method.
[0002]
[Prior art]
In recent years, the strength of underground continuous walls has been increased from the viewpoint of increasing the depth of underground structures and improving earthquake resistance. In addition, in high-rise buildings and the like, from the viewpoint of using the main body of the underground continuous wall, in addition to increasing the strength, densification of reinforcing bars and the like are also progressing. The casting of concrete under such conditions is usually performed using a tremy tube. The important thing in concrete casting is that the concrete is uniformly filled in the whole area. To improve the filling condition, use high-fluid concrete with excellent fluidity and material separation resistance. Has also been done.
[0003]
By the way, as a method of confirming the filling condition of the poured concrete, conventionally, it is performed by checking the top of the poured concrete by swinging down, or, for a part that is not visible, after hardening, I was digging up. However, such a conventional method for checking the state of filling of cast concrete has the following problems.
[0004]
[Problems to be solved by the invention]
In other words, in the method of confirming the top position by swinging down, the technician's intuition is to confirm the top position of the poured concrete by touch when the weight descends in the stabilizing liquid and reaches the top of the concrete. And there are individual differences. In addition, it is difficult to check the portion where the arrangement of the reinforcing bars is high in density, and even if there is an unfilled portion of the concrete in the high density portion, it cannot be found.
[0005]
Furthermore, when high-strength or high-fluidity concrete is adopted, the change in tension when the weight reaches the top of the concrete is smaller than that of conventional concrete, so that it is difficult to confirm the top itself. On the other hand, the method of checking by digging raises the problem that the quality of the filling condition cannot be known unless concrete is hardened, so that it is not possible to respond promptly when measures are required.
[0006]
The present invention has been made in view of such a conventional problem, and an object of the present invention is to easily and surely fill concrete even in a high-density portion of a reinforcing bar. The purpose is to provide a method by which the situation can be checked during casting.
[0007]
[Means for Solving the Problems]
In order to achieve the above object, the present invention provides a method for confirming the state of filling of concrete, in which a steel cage is erected in a ground excavation hole excavated while filling with a stabilizing solution, and concrete is poured. A plurality of sensors are pre-arranged in the reinforced cage at predetermined intervals along the depth direction of the excavation hole, and the concrete is lifted due to a difference in electrical properties of a substance interposed between electrodes of the sensors. The position is detected.
According to the confirmation method configured as described above, since the sensor is pre-arranged in the reinforcing bar cage, even in the high-density portion of the reinforcing bar arrangement, due to the difference in the electrical properties of the substance interposed between the electrodes of the sensor, The concrete filling status can be confirmed.
In this case, the electrical property measured by the sensor may be a residual voltage between the electrodes after a low voltage is applied between the electrodes for a short time.
According to this configuration, the stabilizing liquid, the stabilizing liquid in contact with the concrete, and the concrete can be clearly identified from the state of the residual voltage.
Further, in the method for checking the filling state of the cast concrete according to the present invention, the point at which the residual voltage decreases and then stabilizes after rising can be regarded as the top end position of the cast concrete.
If this determination method is adopted, the top end position of the cast concrete can be accurately known.
[0008]
BEST MODE FOR CARRYING OUT THE INVENTION
Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings. FIG. 1 to FIG. 5 show one embodiment of a method for checking the filling condition of cast concrete according to the present invention. The embodiment shown in the figure applies the present invention to the construction of an underground continuous wall. In the construction of an underground continuous wall, first, as shown in FIG. An
[0009]
In the example shown in FIG. 1 (A), an
[0010]
A member indicated by
When the
[0011]
The process of constructing such underground continuous wall is the same as a conventionally well-known method, but in the present embodiment, in particular, the following description will be given in order to confirm the filling state of the poured concrete C. The method is adopted.
That is, a plurality of
[0012]
FIG. 2 shows details of the mounting state of the
[0013]
Each
[0014]
The residual voltage at this time differs depending on the electrical properties of the substance interposed between the
[0015]
In this test, as shown in FIG. 3, a sensor s is suspended and supported in a container, a stable liquid is filled in the container, concrete is filled from below the container, and the sensor is gradually moved up the top end surface of the concrete. The residual voltage during s was measured. A stainless steel rod having a diameter of 2 mm was used as an electrode of the sensor s, and a DC voltage of 6 V was supplied between the electrodes for 20 msec. After a lapse of 40 msec, a switch was switched to measure a residual voltage between the electrodes.
[0016]
The measurement pitch at this time was 5 seconds. 4 and 5 show the measurement results at this time. As is clear from the figure, when only the stabilizing liquid is used, the residual voltage is about 1200 mv, and when it comes into contact with concrete, the voltage temporarily rises to about 1500 mv. And in concrete, residual voltage falls to about 1300-1400mv.
[0017]
In other words, the magnitude of the residual voltage is in the order of the stabilizing liquid in contact with the concrete> the concrete> the stabilizing liquid, and there is a difference of 100 mv or more between them, and the residual voltage once rises and thereafter decreases. The distinction between concrete and concrete is quite possible. In this test, concrete having a high fluidity with a slump value of about 24 cm was used.
[0018]
FIG. 5 shows the result of measuring the residual voltage between the
[0019]
Now, when the reinforced
Therefore, in this state, when a low voltage is supplied to the
[0020]
Such measurement of the residual voltage is performed at predetermined time intervals from the measuring
In the
[0021]
In such a method of checking the state of filling, accurate and uniform results can be obtained because the method does not rely on the intuition of a technician. Further, in the
[0022]
When measuring the top position of the concrete C, the measurement can be performed, for example, even if the sensor s is installed in a down swing without depending on the configuration of the above embodiment. Further, the
[0023]
In the above embodiment, the case where the present invention is applied when constructing an underground continuous wall is exemplified. However, the present invention is not limited to this. It can also be applied to the construction of cast-in-place piles in which to build.
Further, in the above-described embodiment, the
[0024]
【The invention's effect】
As described above in detail in the examples, according to the method for checking the filling condition of cast concrete according to the present invention, the filling condition can be confirmed in real time during concrete placing, so that there is an inconvenience. , Can respond quickly. Further, in the present invention, since the filling status is confirmed by the sensor, a uniform result can be obtained without individual differences, and it can be arranged also in the high-density portion of the bar arrangement.
[Brief description of the drawings]
BRIEF DESCRIPTION OF DRAWINGS FIG. 1 is a cross-sectional explanatory view sequentially showing steps in a case where a method for checking a filling state of cast concrete according to the present invention is applied to construction of an underground continuous wall.
FIG. 2 is an enlarged view of a main part of FIG.
FIG. 3 is an explanatory diagram of a test state of a sensor used in the confirmation method of the present invention.
FIG. 4 is a graph showing test results obtained in the test of FIG.
FIG. 5 is a graph showing measurement results of a verification experiment of the present invention.
[Explanation of symbols]
Claims (3)
前記鉄筋籠に前記掘削孔の深度方向に沿って、所定の間隔を隔てて複数のセンサーを予め配置し、前記センサーの電極間に介在する物質の電気的性質の相違により、前記コンクリートの打ち上がり位置を検出することを特徴とする打設コンクリートの充填状況の確認方法。Reinforcing a reinforcing steel cage in a ground excavation hole excavated while filling the stable liquid, when casting concrete, in the method of checking the filling state of the concrete,
A plurality of sensors are pre-arranged in the reinforced cage at predetermined intervals along the depth direction of the excavation hole, and the concrete is lifted due to a difference in electrical properties of a substance interposed between electrodes of the sensors. A method for confirming a filling state of cast concrete, characterized by detecting a position.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP18738996A JP3550893B2 (en) | 1996-07-17 | 1996-07-17 | How to check the filling status of cast concrete |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP18738996A JP3550893B2 (en) | 1996-07-17 | 1996-07-17 | How to check the filling status of cast concrete |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH1031013A JPH1031013A (en) | 1998-02-03 |
| JP3550893B2 true JP3550893B2 (en) | 2004-08-04 |
Family
ID=16205175
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP18738996A Expired - Fee Related JP3550893B2 (en) | 1996-07-17 | 1996-07-17 | How to check the filling status of cast concrete |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3550893B2 (en) |
Families Citing this family (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2014021010A (en) * | 2012-07-20 | 2014-02-03 | Ohbayashi Corp | Filling detection apparatus for detecting filling of filling hardener, and method for checking filling |
| JP6197564B2 (en) * | 2013-10-15 | 2017-09-20 | 株式会社大林組 | Method for confirming filling state of filler filled in joint portion of PC member |
| CN104631517B (en) * | 2014-12-26 | 2016-08-24 | 湖北中南勘察基础工程有限公司 | Cast-in-situ bored pile concrete interface monitoring device and method |
| JP6211049B2 (en) * | 2015-12-22 | 2017-10-11 | 青木あすなろ建設株式会社 | Grout material detection method |
| CN106198641A (en) * | 2016-08-30 | 2016-12-07 | 北京智博联科技股份有限公司 | The probe of resistivity of media in measurement prefabricated concrete structure reinforced bar sleeve |
| CN106124569A (en) * | 2016-08-30 | 2016-11-16 | 北京智博联科技股份有限公司 | A kind of for measuring the reinforced bar sleeve grouting probe of plumpness and method |
| CN109695261A (en) * | 2018-12-20 | 2019-04-30 | 武汉长盛工程检测技术开发有限公司 | Underwater gliders interface pressure difference monitoring device and method |
| JP7389712B2 (en) * | 2020-05-22 | 2023-11-30 | 三井住友建設株式会社 | Filling detection device and filling detection system |
| CN113389202B (en) * | 2021-07-01 | 2022-07-05 | 山东省鲁南地质工程勘察院(山东省地勘局第二地质大队) | Device and method for preventing aligning deviation of pile foundation engineering reinforcement cage |
| CN117091497B (en) * | 2023-10-16 | 2024-01-16 | 中铁大桥局集团有限公司 | Device and method for dynamically monitoring concrete slurry interface of bored pile |
-
1996
- 1996-07-17 JP JP18738996A patent/JP3550893B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH1031013A (en) | 1998-02-03 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP3550893B2 (en) | How to check the filling status of cast concrete | |
| CN106638719B (en) | Bored pile piling quality automatic monitoring controller and method | |
| CN108593721B (en) | Method and device for detecting whether full grouting sleeve is full by resistance method | |
| KR100480297B1 (en) | Road-cell, apparatus for testing bearing power of subterranean concrete pile and method for testing bearing power using the same | |
| CN104988884B (en) | Mounting method of void deformation monitoring device for face plate rock-fill dam | |
| CN115679978A (en) | Unsupported Foundation Pit Support Structure and Construction Method Combining Anchor Cable and Surrounding Pile | |
| KR20050100086A (en) | The settlement measurement reinforcement system that use settlement measuring device | |
| CN110359506B (en) | Simple high-pressure grouting lifting deformation monitoring device and installation method thereof | |
| JP3413374B2 (en) | In-situ pile tester | |
| KR102511531B1 (en) | Static load test method for existing pile using displacement meter | |
| CN107816066A (en) | Miniature anti-floating pile resistance to plucking bearing capacity testing arrangement of fibre muscle | |
| CN211735555U (en) | Long spiral bored concrete pile overlength steel reinforcement cage back insertion construction verticality control assembly | |
| NL2000160C2 (en) | Method for checking the bearing capacity of a pole. | |
| JP5142054B2 (en) | Concrete filling condition inspection method | |
| CN108426624B (en) | Floating ball liquid level device for measuring concrete liquid level of cast-in-place pile foundation and using method thereof | |
| CN217150251U (en) | Digital verticality adjusting system for reverse steel stand column | |
| CN117738387A (en) | Conductive steel bar sleeve and PC component connection construction method | |
| JPH11209972A (en) | Method for constructing pile and foundation pile structure | |
| US8899106B2 (en) | Method for detecting structural stability of object area and apparatus for the same | |
| CN116356843B (en) | A support construction method based on prestressed pipe piles | |
| CN117091497B (en) | Device and method for dynamically monitoring concrete slurry interface of bored pile | |
| JP7557783B2 (en) | Fuel agent performance verification test method and test device | |
| CN106245689A (en) | A kind of monitoring method mixing materials for support stake axle power | |
| JP3713603B2 (en) | Method and apparatus for monitoring injection status of injection solution | |
| CN220849690U (en) | A cast-in-place structure of a tunnel cable trough and a concrete formwork for a cable trough |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20040330 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20040412 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080514 Year of fee payment: 4 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090514 Year of fee payment: 5 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100514 Year of fee payment: 6 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100514 Year of fee payment: 6 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110514 Year of fee payment: 7 |
|
| S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110514 Year of fee payment: 7 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110514 Year of fee payment: 7 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120514 Year of fee payment: 8 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120514 Year of fee payment: 8 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130514 Year of fee payment: 9 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130514 Year of fee payment: 9 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140514 Year of fee payment: 10 |
|
| LAPS | Cancellation because of no payment of annual fees |