JP3554698B2 - Grout method of tube bottom plate and tube form - Google Patents
Grout method of tube bottom plate and tube form Download PDFInfo
- Publication number
- JP3554698B2 JP3554698B2 JP2000276357A JP2000276357A JP3554698B2 JP 3554698 B2 JP3554698 B2 JP 3554698B2 JP 2000276357 A JP2000276357 A JP 2000276357A JP 2000276357 A JP2000276357 A JP 2000276357A JP 3554698 B2 JP3554698 B2 JP 3554698B2
- Authority
- JP
- Japan
- Prior art keywords
- tube
- sewer
- grout
- bottom plate
- gap
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 239000011440 grout Substances 0.000 title claims description 47
- 238000000034 method Methods 0.000 title claims description 26
- 239000004567 concrete Substances 0.000 claims description 27
- 239000000463 material Substances 0.000 claims description 21
- 238000009415 formwork Methods 0.000 claims description 5
- 238000009434 installation Methods 0.000 claims description 5
- 238000004804 winding Methods 0.000 claims description 2
- 238000007872 degassing Methods 0.000 claims 1
- 229910000831 Steel Inorganic materials 0.000 description 9
- 239000010959 steel Substances 0.000 description 9
- 238000002347 injection Methods 0.000 description 4
- 239000007924 injection Substances 0.000 description 4
- 238000010276 construction Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 3
- 239000011347 resin Substances 0.000 description 3
- 229920005989 resin Polymers 0.000 description 3
- 238000009412 basement excavation Methods 0.000 description 2
- 239000011083 cement mortar Substances 0.000 description 2
- 230000002093 peripheral effect Effects 0.000 description 2
- 239000011178 precast concrete Substances 0.000 description 2
- 229920003051 synthetic elastomer Polymers 0.000 description 2
- 239000005061 synthetic rubber Substances 0.000 description 2
- 238000009423 ventilation Methods 0.000 description 2
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000002474 experimental method Methods 0.000 description 1
- 239000000945 filler Substances 0.000 description 1
- 239000004088 foaming agent Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
- 239000010865 sewage Substances 0.000 description 1
- 230000000087 stabilizing effect Effects 0.000 description 1
Images
Landscapes
- Sewage (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は管渠底版のグラウト方法及びチューブ型枠に係り、特にプレキャストコンクリート製ボックスカルバートを所定連結位置まで横引きし、複数基を連結させ管渠を構築し、定置された管渠安定のために行う管渠底版のグラウト方法及びグラウト工の範囲を規定するチューブ型枠に関する。
【0002】
【従来の技術】
出願人の一は、都市部等における狭隘な道路下に建設される下水幹線等に用いられるプレキャストコンクリート製の管渠の合理的な布設方法として、摩擦低減手段としてのベアリングボールを利用した横引き工法を開発している(特許第2879021号参照)。本工法によれば、開削トンネル部の構築後に、地上のわずかなスペースに単位管体としてのボックスカルバートの搬入部を設け、そこから搬入されたボックスカルバートを所定連結位置まで横引きし、これらを連結した管渠を迅速に構築することができる。
【0003】
図8は、この管渠の布設方法における横引き作業状態を示した概略側面図である。同図に示したように、開削トンネル100内に施工された基礎コンクリート101上にはボックスカルバート102の延長方向に沿って横引き用レール103が布設されている。横引き用レール103としては、図9に示したように横置きの細幅系H形鋼が使用されている。この細幅系H形鋼は、そのほとんどの部分が基礎コンクリート101内に埋設された埋設された状態にあり、ウェブ103aの片面がレール面となり、わずかに端部が露出したフランジ103bが側壁となっている。さらに、レール面上には摩擦低減を図る球状体としてのベアリングボール104が適当に分散するように配置されている。たとえば、ベアリングボール104にはφ11mm程度の鋼球が使用されている。これらのベアリングボール104の上には、底面に板厚鋼板からなるガイドプレート105が固着されたボックスカルバート102が載置されている。ボックスカルバート102は、ガイドプレート105を介して多数のベアリングボール104に点支持されるようになっている。
【0004】
ボックスカルバート102の移送に際し、図8に示したように、ボックスカルバート102が図示しないウインチ等の横引き(牽引)装置により矢印方向へ牽引されるのに伴い、ボックスカルバート102を支持するベアリングボール104は転動する。これによりガイドプレート105とレール103間の動摩擦が大幅に低減される。実験によれば動摩擦係数はそり等の横引き工法の場合に比べて1/4まで低減される。なお、図8,9においてベアリングボール104は説明のために拡大して示している。
【0005】
以上に述べたように、連結位置まで移送されたボックスカルバート102は、所定の基数ごとに順次、公知の連結手段により管渠縦断方向に連結される。この連結作業が完了した状態では、一体化したボックスカルバート102はレール103上に摩擦低減手段であるベアリングボール104上に載置された状態であり、基礎コンクリート101とボックスカルバート102の底面102a間には隙間106があいたままになっている。
【0006】
そこで、この隙間106を閉塞するためにグラウト工が行われている。横引き工法でない従来の管渠布設方法の場合は、ボックスカルバートの布設では、カルバートのレベル及び勾配を調整した後にその底面と基礎コンクリートとの間に敷きモルタルを打設し、その上に載置していた。これに対して上述の横引き工法では管渠がレール上に載置されているので、図10に示したように、ボックスカルバート102の底版102Aに設けられたグラウト孔107を用いたグラウト工を行っている。このグラウト孔107は、ボックスカルバート102の奥行き(1m)のほぼ中央位置に、幅方向に所定の離れをとって2個設けられている。
【0007】
グラウト工では図10に示したように、ボックスカルバート102の設置位置でグラウト孔107に接続されたグラウトホース(図示せず)を介してポンプから圧送されたグラウト材109を充填する。グラウト材109は高い流動性を有しているため、基礎コンクリート101上を流れるように広がる。グラウト材109はレール103で一旦せき止められるが、さらに充填が進むとレール103上面を越え、ベアリングボール104の間を通り抜けていく。グラウト材109の充填範囲は最終的に同図に示したように、ボックスカルバート102の側壁102bの外側の山留め壁120との間のクリアランス121の底部の一部まで広がり、その一部109aがクリアランス121に堆積する。
【0008】
【発明が解決しようとする課題】
このように、上述した管渠底版のグラウト方法では、使用するグラウト材の流動性が高いため、底版と基礎コンクリートとの間に充填されたグラウト材の一部が山留め壁側まで広がる。このため、基礎コンクリートと管渠の底版との間を確実に充填するためには、大量のグラウト材が必要になる。また、注入するグラウト材に十分な注入圧が加えられないので、基礎コンクリートと底版下面との密着性も確保できないおそれもある。
【0009】
そこで、本発明の目的は上述した従来の技術が有する問題点を解消し、ベアリングボールを用いた横引き工法により所定位置まで搬入され連結されたボックスカルバートを基礎コンクリート上に確実に定置させるようにした管渠底版のグラウト方法及びグラウト工に用いられるチューブ型枠を提供することにある。
【0010】
【課題を解決するための手段】
上記目的を達成するために、本発明は複数基を連結して管渠を構成する単位管体を山留め空間内に搬入し、該山留め空間内の基礎コンクリート上に敷設されたレール面に球状体を分散して配置し、前記単位管体を前記球状体で支持した状態で、管体の連結位置まで移送し、前記連結位置で一体的に管渠延長方向に連結された管渠の底版と前記基礎コンクリートとの隙間を注入グラウト材で閉塞する管渠底版のグラウト方法において、前記山留め空間を画成する山留め壁下端に、前記管渠の延長方向に沿って、膨張可能な筒状チューブ内に延長方向に沿ってワイヤが、端部での気密性を保持して挿通された、チューブ型枠を配置し、搬入された前記単位管体を所定連結位置まで移送して所定長さの管渠として連結し、前記チューブ型枠を前記管渠の延長方向に沿って筒状に膨張させて前記管渠底版の両側方から前記基礎コンクリートとの隙間を閉塞し、この隙間にグラウト材を注入し、該グラウト材の硬化後に前記チューブ型枠を、脱気後に前記ワイヤを巻き取ることにより前記設置位置から回収するようにしたことを特徴とする。
【0011】
管渠が延長方向に沿って連結設置される山留め空間を画成する山留め壁の下端に、その延長方向に沿って配置され、筒状に膨張して前記管渠底版の側方から、管渠底版と前記基礎コンクリートとの隙間を閉塞する、膨張可能な筒状のチューブ内に、その延長方向に沿って、前記配置位置からの回収用ワイヤが、チューブ端での気密性を保持して挿通されたことを特徴とする。
【0014】
【発明の実施の形態】
以下、本発明の管渠底版のグラウト方法及びチューブ型枠の実施の形態について添付図面を参照して説明する。
図1は、根切り工により構築された山留め空間1の底盤の基礎コンクリート2に、上述した横引き工法により所定位置まで搬入されたボックスカルバート3の下半断面と、ボックスカルバート3の側壁と山留め壁7との間のクリアランス8の底部に設けられたチューブ型枠10とを示している。
【0015】
同図に示したように、山留め空間1の基礎コンクリート2上の所定位置にはH形鋼を横置きしてなるガイドレール4が敷設されている。このガイドレール4は、H形鋼のウェブを底面とする凹状溝内に多数のベアリングボール5が敷き並べられ、このベアリングボール5上にボックスカルバート3が、底面に取り付けられたガイドプレート9を介して載置されるようになっている。この状態では、前述したように、各ボックスカルバート3の底面3bと基礎コンクリート2との間には隙間6があいている。また、ボックスカルバート3は管渠延長方向に複数基が連結され、全体としては安定した状態にあるが、実際には転動可能なベアリングボール5上に載置されているので、固定的に支持された状態にはない。そこで、次工程としてグラウト工を行い、隙間6にグラウト材を充填し、硬化させることによりボックスカルバート3の自重及び上載荷重を基礎コンクリート2に直接支持させるようにしている。グラウト工に際し、ボックスカルバート3の両側の側壁下端の山留め壁7とのクリアランス8に、図示したような膨張させて使用するチューブ型枠10を備えることにより、注入されたグラウト材がボックスカルバート3の底面の隙間のみに確実に行き渡るようにすることができる。
【0016】
このチューブ型枠10の全体構成について、図2,図3を参照して説明する。図2は、所定基数のボックスカルバート3が連結され、チューブ型枠10にエアが供給された状態を模式的に示した管渠全体縦断図である。チューブ型枠10は、本実施の形態では全長約50mの長い筒状をなし、この区間に布設された複数基のボックスカルバート3の底版と基礎コンクリート2との隙間のグラウト工が一挙に行われる。このチューブ型枠10の長さは、予定している範囲の管渠のグラウト範囲に合わせて適宜設定することができる。チューブ型枠10のエアチューブには、坑内に設置されたエアコンプレッサ45から圧縮空気が供給され、図3(b)にあるような断面形状に膨張可能となっている。同図には、グラウトポンプ43からボックスカルバート3の底版に設けられたグラウト孔42にグラウト材を供給するグラウト材供給ライン40も示されている。なお、チューブ型枠10は空気が抜けた状態では扁平形状の状態で山留め壁7側に寄せられている(図3(a)参照)。このため、ボックスカルバート3の横引き作業において障害とならない。
【0017】
エアチューブ11の膨張時の断面形状としては、一般的な円形断面の他、ボックスカルバート3と山留め壁7間のクリアランス8の幅におおよそ相当する底面幅を有する馬蹄形断面チューブ(図3(c)参照)等を採用することができる。円形断面の場合、エアチューブ11が膨張した際、側部11aがボックスカルバート3と山留め壁7との間に挟まれ、図3(b)に示したように全体形状が縦長の長円形状なる。このため、後述するように、グラウト材が隙間に注入されて端部に達した状態で、グラウト材はエアチューブ11の下側に潜り込み、グラウト圧がエアチューブ11に上向きに作用することが予想される。しかし、エアチューブ11はボックスカルバート3と山留め壁7との間に生じる摩擦抵抗により図示した位置に保持される。このため、ボックスカルバート3の底版と基礎コンクリート2との間に注入されたグラウト材はチューブ型枠10の下側でせき止められ、山留め壁7との間のクリアランス8まで回り込まない。図3(b)に示したような底部11bが平らな馬蹄形状のエアチューブ11によれば、グラウト圧はエアチューブ11に側圧としてのみ作用し、浮き上がりが生じない。エアチューブ11は確実に据え付け位置に保持される。
【0018】
チューブ型枠10の一実施の形態における詳細構成について図4を参照して説明する。チューブ型枠10は所定長さの円筒形状のエアチューブ11と、エアチューブ11の両端を気密構造とするための口金12,13と、エアチューブ11内に圧縮空気を供給するエア供給ホース14と、チューブ型枠10の撤去用のワイヤ15とから構成されている。エアチューブ11の材質としては、本実施の形態では合成ゴムホースが用いられているが、合成ゴムホースの他、樹脂ホース、樹脂被覆された織布ホース等を用いることができる。通常はホース全体断面は扁平形状をなし、空気送気時に所定断面を構成するようになっている(図3(a),(b)参照)。エアチューブ11内には樹脂被覆されたワイヤ15が挿通されており、エアチューブ11の先端はワイヤ15に固着された緊結口金12Aと緊結リング12Bとを介して気密を保持するように封止されている。エアチューブ11の口元端には注入口金13が嵌着されている。この注入口金13にエア供給ホース14の先端が取着されている。注入口金13は図示したように、ボス13aによってワイヤ15の所定位置に位置保持され、ボス13aと外側リング13bを連結するウェブ13cにエア供給ホース14が固着されている。エアチューブ11の端部11cはボス13aと外側リング13bとの間の凹所に気密性を保持するように、収容され定着されている。エア供給ホース14から供給される圧縮空気によりエアチューブ11を所定形状に膨張させることができる
【0019】
図5,図6はチューブ型枠10の変形例を示した構成と、この変形例におけるチューブ型枠10の撤去時のエアチューブ11の回収方法を示した断面図である。本変形例ではホース端口金20A,20Bは両端同形で、それぞれのホース端口金の外側端にエア供給ホース21あるいはワイヤカップラ32のいずれかを螺着するかでその用途を異ならせることができる。
ホース端口金20Aの構成について、図5(a)を参照して説明する。ホース端口金20Aは内周面がねじ切りされた外筒23と、この外筒23の内部に螺合して収容されるバルブ内筒24とからなり、バルブ内筒24の内面に形成された外側ネジ部24aにはエア供給ホース21の口金28が螺着されている。バルブ内筒24内には圧縮スプリング26の作用により常閉となる逆止バルブ27が組み込まれている。この逆止バルブ27は、図5(a)に示したように、バルブ内筒24にエア供給ホース21の口金28が螺合されると、口金28によりロッド27aが押し縮められ、連通路29が開状態となる。この結果、圧縮空気はバルブを通過してエアチューブ11内に導かれる。
【0020】
一方、バルブ内筒24のエアチューブ11内の内周面に形成された内側ネジ部には図5(a)に示したように、内側ワイヤ35が取着されたワイヤカップラ31が螺着されている。このワイヤカップラ31は外周がネジ切りされたカップ状をなし、プレート31aの中央部分に内側ワイヤ35の端部が定着されている。また、プレート31aには多数の通気孔33が形成されており、バルブを通過した圧縮空気は、通気孔33を通ってエアチューブ11内に供給される。
【0021】
ホース先端側のホース端口金20Bにも上述と同様の逆止バルブ27の構成が組み込まれている。バルブ内筒24の内面に形成された外側ネジ部24aには外側ワイヤ36を接続するためのワイヤカップラ32が螺着されている。このワイヤカップラ32もカップ状をなし、凹所部分にバルブ27のロッド27aが干渉しないで入り込むようになっている。バルブ内筒24のエアチューブ11の内側ネジ部には、ホース端口金20Aと同形のワイヤカップラ31が螺着され、ワイヤカップラ31にはホース端口金20A側から延びた内側ワイヤ35が定着されている。
【0022】
図5(b)は、エアチューブ11が完全に膨張した状態を示した断面図である。同図に示したように、エアチューブ11が膨張した段階でエア供給ホース14の口金28を取り外し、その代わりに反対側の外側ワイヤ36の定着端としてのワイヤカップラ32を螺着するようになっている。
【0023】
次に、このチューブ型枠10を撤去する際のエアチューブ11の回収方法について図6を参照して説明する。まず、口元側のホース端口金20Aの外筒23に螺合しているバルブ内筒24を外筒23から取り外す。このときエアチューブ11内の内側ワイヤ35が他方のホース端口金20Bに連結されているため、ホース端口金20Aの内筒23に接続されている外側ワイヤ36を巻き取ることにより、他端のホース端口金20Bがエアチューブ11内に入り込む。この結果、エアチューブ11の全長を短縮させてチューブ型枠の設置位置から順次回収することができる。
【0024】
図7各図を参照して本発明による管渠底版のグラウト方法について、その施工手順について説明する。
上述したボックスカルバート3の横引き工法により所定基数が配置された状態で各ボックスカルバート3は、PC鋼棒等の緊結手段(図示せず)によって管渠縦断方向が一体的に連結される。この横引き作業の間、チューブ型枠10は空気が供給されない扁平状態(図3(a)参照)にあり、山留め壁7側に沿って配置されている。ボックスカルバート3が縦断方向に連結された状態でチューブ型枠10のエアチューブ11を膨張させる。エアチューブ11を十分膨張させることでエアチューブ11の両側面がボックスカルバート3の側面と山留め壁7とに十分密着する(図3(b)参照)。この状態でボックスカルバート3の底版に形成されているグラウト孔42を利用してボックスカルバート3と基礎コンクリート2との間の隙間6を完全に閉塞することができる。グラウト材41にはセメントモルタル等の充填材が好適である。この場合、アルミニウム粉末等の発泡剤を添加して充填効果を高めることも好ましい。充填用のセメントモルタルはコンクリートミキサー車で供給できる。ミキサー車から充填位置まではグラウトポンプ43(図2参照)を用いて容易に圧送すればよい。このときグラウト材41は、ボックスカルバート3の底面3bの側方のクリアランス8のの底部に設けられたチューブ型枠10によってボックスカルバート3の底面3bの範囲に所定のグラウト圧を保持したまま充填される。縦断方向前方にある他のグラウト孔40からグラウト材41が流出する(戻り)のを確認して次区間のグラウト工を順次行うようにする。
【0025】
図7(b)は、グラウト工が完了し、所定の養生期間を経てチューブ型枠10が撤去された状態を示している。同図に示したように、グラウト材41をボックスカルバート3の底面と基礎コンクリート2との隙間のみに確実に充填することができる。
【0026】
図7(c)は、山留め壁7との間のクリアランス8を埋め戻した後の管渠の完成状態を示した断面図である。同図に示したように、山留め壁7を構成する親杭や鋼矢板等にグラウト材41が付着することがないので、親杭や鋼矢板等の仮設部材の撤去も容易に行える。
【0027】
【発明の効果】
以上の説明から明らかなように、本発明によれば、管渠安定のために行う管渠底版のグラウトを効率よく、またグラウト工のためのコストを大幅に低減することができるという効果を奏する。
【図面の簡単な説明】
【図1】本発明による管渠底版のグラウト方法の一実施の形態としてチューブ型枠の設置状態を示した部分正面図。
【図2】チューブ型枠がセットされた状態を模式的に示した管渠全体縦断図。
【図3】チューブ型枠のエアチューブ断面形状を示した部分拡大断面図。
【図4】チューブ型枠の一実施の形態による内部構成を示した縦断面図。
【図5】チューブ型枠の他の実施の形態による内部構成を示した縦断面図。
【図6】図5に示したチューブ型枠の回収時の構成を示した縦断面図。
【図7】管渠底版のグラウト工の手順を示した施工順序図。
【図8】ボックスカルバート横引き工法による管渠布設工の一例を示した側面図。
【図9】図8に示した管渠布設工における摩擦低減手段の一例を示した部分正面図。
【図10】図9に示した管渠の底面グラウト工の状態を示した部分正面図。
【符号の説明】
1 山留め空間
2 基礎コンクリート
3 ボックスカルバート
5 ベアリングボール
6 隙間
7 山留め壁
8 クリアランス
10 チューブ型枠
11 エアチューブ
12 緊結口金
13 注入口金
14 エア供給ホース
20,20A,20B ホース端口金
35 内側ワイヤ
36 外側ワイヤ[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to a grout method and a tube form of a sewer bottom plate, and in particular, draws a precast concrete box culvert to a predetermined connecting position, connects a plurality of units, constructs a sewer, and stabilizes a fixed sewer. The present invention relates to a method for grouting a sewer bottom plate and a tube form defining the range of grouting.
[0002]
[Prior art]
One of the applicants is one of the rational methods of laying precast concrete pipes used for sewage trunk lines constructed under narrow roads in urban areas, etc., as a rational method of laying using bearing balls as friction reducing means. A construction method has been developed (see Japanese Patent No. 2879021). According to this method, after the construction of the excavation tunnel section, a box culvert carry-in section as a unit pipe is provided in a small space above the ground, and the box culvert carried in from there is laterally drawn to a predetermined connection position, and these are laid. The connected sewer can be quickly constructed.
[0003]
FIG. 8 is a schematic side view showing a state of a horizontal pulling operation in the method of laying a sewer. As shown in the figure, a
[0004]
When the
[0005]
As described above, the
[0006]
Therefore, grouting is performed to close the
[0007]
In the grouting operation, as shown in FIG. 10, a
[0008]
[Problems to be solved by the invention]
As described above, in the grout method of the sewer bottom slab described above, since the grout material used has high fluidity, a part of the grout material filled between the bottom slab and the foundation concrete spreads to the retaining wall side. For this reason, a large amount of grout is required to reliably fill the space between the foundation concrete and the bottom slab of the sewer. Further, since sufficient injection pressure is not applied to the grout material to be injected, there is a possibility that the adhesion between the foundation concrete and the lower surface of the bottom slab cannot be ensured.
[0009]
Therefore, an object of the present invention is to solve the above-described problems of the conventional technology, and to surely place the box culverts which are carried to a predetermined position and connected by a horizontal drawing method using a bearing ball on foundation concrete. It is an object of the present invention to provide a method for grouting a sewer bottom plate and a tube form used for grouting.
[0010]
[Means for Solving the Problems]
In order to achieve the above object, the present invention conveys a unit pipe constituting a sewer by connecting a plurality of pipes into a retaining space, and forms a spherical body on a rail surface laid on foundation concrete in the retaining space. Dispersed and arranged, in a state where the unit pipe is supported by the spherical body, transferred to a connecting position of the pipe, and a bottom plate of the pipe connected integrally in the pipe extending direction at the connecting position. In the grouting method of a sewer bottom slab in which a gap between the foundation concrete and the grout is filled with a grout material, an inflatable tubular tube is provided along the extension direction of the sewer at the lower end of the sewer wall that defines the sewer space . A tube form in which a wire is inserted along the extension direction while maintaining the airtightness at the end is disposed, and the unit pipe body carried in is transported to a predetermined connection position to transfer a pipe of a predetermined length. Connected as a culvert, and Along the extending direction is expanded into a cylindrical shape to close the gap between the concrete foundation from both sides of the sewer bottom plate, the grout was injected into the gap, the tubular frame after curing of the grout And recovering the wire from the installation position by winding the wire after deaeration .
[0011]
At the lower end of a retaining wall that defines a retaining space in which a sewer is connected and installed along the extension direction, the sewer is disposed along the extension direction, expands in a tubular shape, and extends from the side of the sewer bottom plate. A collection wire from the arrangement position is inserted into an inflatable tubular tube , which closes a gap between the bottom slab and the foundation concrete , along the extension direction thereof while maintaining the airtightness at the tube end. It is characterized by having been done .
[0014]
BEST MODE FOR CARRYING OUT THE INVENTION
Hereinafter, embodiments of a grout method and a tube form of a sewer bottom plate according to the present invention will be described with reference to the accompanying drawings.
FIG. 1 shows a lower half section of a
[0015]
As shown in the figure, a
[0016]
The overall configuration of the
[0017]
As the cross-sectional shape of the
[0018]
The detailed configuration in one embodiment of the
5 and 6 are cross-sectional views illustrating a configuration of a modified example of the
The configuration of the
[0020]
On the other hand, as shown in FIG. 5A, a
[0021]
The same configuration of the
[0022]
FIG. 5B is a cross-sectional view showing a state where the
[0023]
Next, a method of collecting the
[0024]
Referring to FIGS. 7A and 7B, a procedure for grouting a sewer bottom plate according to the present invention will be described.
In a state where a predetermined radix is arranged by the above-described
[0025]
FIG. 7B shows a state where the grouting is completed and the
[0026]
FIG. 7C is a cross-sectional view showing a completed state of the sewer after the
[0027]
【The invention's effect】
As is apparent from the above description, according to the present invention, there is an effect that the grout of the culvert bottom plate for stabilizing the culvert can be efficiently performed and the cost for grouting can be significantly reduced. .
[Brief description of the drawings]
FIG. 1 is a partial front view showing an installed state of a tube form as an embodiment of a grout method of a sewer bottom plate according to the present invention.
FIG. 2 is an overall vertical sectional view of a sewer schematically showing a state where a tube formwork is set.
FIG. 3 is a partially enlarged cross-sectional view showing an air tube cross-sectional shape of a tube formwork.
FIG. 4 is a longitudinal sectional view showing an internal configuration according to an embodiment of the tube form.
FIG. 5 is a longitudinal sectional view showing an internal configuration according to another embodiment of a tube formwork.
FIG. 6 is a vertical cross-sectional view showing a configuration at the time of collecting the tube form shown in FIG. 5;
FIG. 7 is a construction sequence diagram showing a procedure for grouting a sewer bottom plate.
FIG. 8 is a side view showing an example of pipe laying work by a box culvert horizontal drawing method.
9 is a partial front view showing an example of the friction reducing means in the pipe laying work shown in FIG.
FIG. 10 is a partial front view showing a state of a bottom grouting work of the sewer shown in FIG. 9;
[Explanation of symbols]
DESCRIPTION OF
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2000276357A JP3554698B2 (en) | 2000-09-12 | 2000-09-12 | Grout method of tube bottom plate and tube form |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2000276357A JP3554698B2 (en) | 2000-09-12 | 2000-09-12 | Grout method of tube bottom plate and tube form |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2002088889A JP2002088889A (en) | 2002-03-27 |
| JP3554698B2 true JP3554698B2 (en) | 2004-08-18 |
Family
ID=18761831
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2000276357A Expired - Lifetime JP3554698B2 (en) | 2000-09-12 | 2000-09-12 | Grout method of tube bottom plate and tube form |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3554698B2 (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR20030008604A (en) * | 2001-07-19 | 2003-01-29 | 이윤주 | Construction Method of Precast Culvert using a Rolling Means |
| DE102010025250A1 (en) | 2009-08-18 | 2011-02-24 | Sms Logistiksysteme Gmbh | Method and device for handling slabs for grinding slab surfaces |
| CN112049218A (en) * | 2020-08-26 | 2020-12-08 | 中铁十局集团有限公司 | A construction method for laying municipal concrete drainage pipes |
-
2000
- 2000-09-12 JP JP2000276357A patent/JP3554698B2/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| JP2002088889A (en) | 2002-03-27 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR101415106B1 (en) | The back feel grouting apparatus for upper part of tunnel | |
| CN108301857B (en) | Rock anchor | |
| KR101500667B1 (en) | steel pipe grouting device and tunnel reinforcement andbarrier grouting method using this | |
| KR102598805B1 (en) | Construction method of tunnel lining back grouting of grouting tube recovery | |
| CN105155551A (en) | Pressure compensation type foundation pit supporting structure and construction method | |
| US6354768B1 (en) | Soil reinforcement method and apparatus | |
| CN110552371A (en) | Construction method for eliminating horizontal construction joints of annular lining wall based on reverse construction method | |
| KR101022505B1 (en) | Filling method for void space of lining concrete of top end tunnel | |
| JP2879021B2 (en) | How to lay a sewer | |
| JP3554698B2 (en) | Grout method of tube bottom plate and tube form | |
| CN112012762B (en) | Construction method of double-layer secondary lining multi-arch tunnel structure | |
| CN110424417A (en) | A kind of inflatable drainage slope anchorage system system and its construction method | |
| CN114150543A (en) | Pre-disintegrating soft rock embankment grouting anti-seepage lifting structure and its construction method | |
| CN108179730B (en) | A construction method for reinforcement structure of dam spillway | |
| CN120337356A (en) | A membrane bag pile advance support device for loose and soft strata and a support parameter calculation method | |
| CN108000699A (en) | Urban permeable rainwater pipeline and preparation process thereof | |
| CN115030744B (en) | Prefabricated tunnel lining PC structure and assembly device and construction method | |
| JPH0610344A (en) | Confirmation and increase method for support force of cast-in-place pile | |
| CN115369882B (en) | Post grouting device for cast-in-place pile and construction method | |
| JP3697525B2 (en) | Pipeline repair and rehabilitation method | |
| CN114508161B (en) | A Landslide Drainage System for Ecological Protection and Restoration | |
| JP3888956B2 (en) | Casting concrete pile construction method | |
| CN210827460U (en) | Drainage anchor and drainage system for slope drainage reinforcement | |
| CN108149676A (en) | Band expands shoe stake side two-step-filling construction of prefabricated piles structure and its construction method | |
| JP2001278421A (en) | Concrete product transfer device and concrete product installation method using this transfer device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20040119 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20040127 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20040325 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20040420 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20040510 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 3554698 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130514 Year of fee payment: 9 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313115 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| EXPY | Cancellation because of completion of term |