Ground reinforcement method using rock bolts Download PDF

Info

Publication number
JP3558280B2
JP3558280B2 JP2000093329A JP2000093329A JP3558280B2 JP 3558280 B2 JP3558280 B2 JP 3558280B2 JP 2000093329 A JP2000093329 A JP 2000093329A JP 2000093329 A JP2000093329 A JP 2000093329A JP 3558280 B2 JP3558280 B2 JP 3558280B2
Authority
JP
Japan
Prior art keywords
ground
hole
excavation
penetrating
reinforcing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2000093329A
Other languages
Japanese (ja)
Other versions
JP2001279668A (en
Inventor
弘一 横田
Original Assignee
ライト工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ライト工業株式会社 filed Critical ライト工業株式会社
Priority to JP2000093329A priority Critical patent/JP3558280B2/en
Publication of JP2001279668A publication Critical patent/JP2001279668A/en
Application granted granted Critical
Publication of JP3558280B2 publication Critical patent/JP3558280B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、地盤に形成した掘削孔に、ロックボルトなどの補強材を挿入するとともに固化材を注入し、前記補強材を地盤に定着させるロックボルト工法などにおける地盤補強工法に関する。
【0002】
【従来の技術】
ロックボルトによる地盤補強工法には、地盤の自立安定性によって施工形態を選択している。すなわち、掘削孔の自立が可能な地盤では、ケーシング削孔を行うことなく、掘削ロッド自体で地盤に掘削孔を形成し、次いで、形成された掘削孔にロックボルト補強材を挿入するとともに、固化材の注入管をそのロックボルト補強材の先端近傍まで挿入し、この注入管を通して掘削孔内に固化材を注入する。
【0003】
一方、掘削孔の自立が困難な地盤では、まず、ケーシング外管と内管とを備え、それらの先端に削孔ビットを取り付けた二重管ロッドを用いて地盤を掘削する。掘削完了後に前記内管のみを地盤より引き抜き、その引き抜き孔に、ロックボルト補強材を挿入する。次いで、注入管をケーシング外管の先端部近傍まで挿入する。この注入管の挿入後、注入管を通してセメントミルク等の固化材を掘削孔に注入しつつ、地盤よりケーシング外管を引き抜く。
【0004】
掘削孔の自立が困難な地盤についてかかる形態を採るのは、ケーシング外管により、掘削時及び固化材の注入時における孔壁の崩壊を防止するためである。
【0005】
【発明が解決しようとする課題】
しかしながら、前者の形態において、掘削時には掘削孔が自立していても、液状の固化材を注入段階までに孔壁が崩壊してはならないので、掘削時点から注入時点まで長時間放置することができず、ある地点で掘削及び注入を行った後に、次の地点に移行する個別地点ごとの施工を余儀なくされている。
【0006】
また、後者の形態において、ケーシング外管を用いても、地盤と補強材とを一体化させるためには、固化材の固化前にケーシング外管を引き抜かなければならないところ、このケーシング外管の引き抜きと同時または引き抜き後に、掘削孔の孔壁が崩壊することがあり、注入を確実に行うことができない事態を招く。
【0007】
このように、前述の何れの従来例も、孔壁の崩壊を防止する手段が講じられていない。
【0008】
固化材の注入後及びその固化前において孔壁が崩壊すれば、掘削孔の一部が土砂で埋まり、補強材と土砂とが直接接触する部分ができる。補強材が土砂と直接的に接触すると、その部分は固化材で覆われなくなり、補強材の地盤への定着力が弱くなって、所望の補強効果が得られなくなる。さらには、補強材と土砂や地下水とが直接接触すると、その部分が腐蝕しやすくなり、その耐久性が著しく低下する。
【0009】
そこで、本発明の第1の課題は、掘削孔の孔壁の崩壊を確実に防止することにあり、第2の課題は、地盤の掘削作業と固化材の注入作業とを並行的に実施できるようにすることにある。
【0010】
【課題を解決するための手段】
上記課題を解決した各請求項記載の発明とその作用効果は下記の通りである。
<請求項1記載の発明>
補強対象地盤に複数のロックボルト補強材を打設するロックボルトによる地盤補強工法において、
地盤に掘削管により掘削孔を形成し、前記掘削管内にロックボルト補強材と、これを被覆しかつ前記掘削孔に直接臨み固化材が浸透および透過可能な筒状浸透材とを挿入し、
前記掘削孔に固化材を注入し、前記浸透材の空隙に浸透させ、前記補強材をその外周面を介して地盤に対して定着させるとともに、前記掘削管の引き抜きを注入開始前または注入した固化材の硬化前の段階で行い、
当該掘削孔に対する注入作業と同時に、当該掘削孔に使用した当該掘削管は他の掘削孔の掘削作業に使用することを特徴とする地盤補強工法。
【0011】
(請求項1記載の発明の作用効果)
固化材が浸透および透過可能な浸透材で補強材を被覆し、その浸透材の空隙に固化材を浸透させるので、補強材の周囲に固化材を確実に存在させることができる。
【0012】
さらに、浸透材が補強材の周囲を被覆しているので、補強材の挿入後は孔壁の崩壊が防止されるか、少なくとも崩壊しても補強材と土砂とが直接的に接触することがなくなる。よって、補強材を挿入した状態で当該掘削孔を放置することができるようになり、補強材の挿入作業工程と固化材の注入工程とを、連続的にではなく、別々に行うこともできるようになる。
【0013】
また、掘削管で孔壁が保護されているので、補強材及び浸透材の挿入前に孔壁が崩壊することがなくなる。
【0014】
特に自立安定性地盤については、掘削ロッドにより掘削孔を形成し、前記掘削ロッドを引き抜いた掘削孔内に、補強材とこれを被覆する固化材が浸透可能な筒状浸透材とを挿入することで、浸透材が孔壁の崩壊を防止して、注入作業を確実に行うことができるようになる。
【0015】
また、ケーシング外管を用いることで、掘削孔の自立が困難な地盤においても、施工が可能となるとともに、ケーシング外管を引き抜いた段階でも、浸透材が孔壁の崩壊を防止して、注入作業を確実に行うことができるようになる。
【0016】
<請求項2記載の発明>
補強材に中空路を形成しておき、この中空路を通して固化材を供給して外部に吐出させ、掘削孔に固化材を注入し、この固化材を浸透材の空隙に浸透させ、前記補強材をその外周面を介して地盤に対して定着させる請求項1記載の地盤補強工法。
【0017】
(請求項2記載の発明の作用効果)
補強材の中空路を通して固化材を供給して外部に吐出させ、掘削孔に固化材を注入することにより、注入を確実に行うことができ、しかも、中空路の吐出口を補強材の先端部に形成することにより、掘削孔の底部まで確実に注入を行うことができる。
【0018】
<請求項3記載の発明>
浸透材は、若干の可撓性を有していてもよい、自体が形状保持性を示し孔壁の崩壊を阻止する形態のものであり、かつ固化材の浸透および透過に関して、固化材が浸透材の内部および内外面に浸透かつ透過可能な素材及び形状である請求項1または2に記載の地盤補強工法。
【0019】
(請求項3記載の発明の作用効果)
かかる浸透材によれば、孔壁の崩壊を確実に防止できる。
【0020】
<請求項4記載の発明>
補強材とこれを被覆する筒状浸透材とが、掘削孔内に同時に挿入される請求項1〜3のいずれか1項に記載の地盤補強工法。
【0021】
(請求項4記載の発明の作用効果)
補強材とこれを被覆する筒状浸透材とを掘削孔内に同時に挿入することで、筒状浸透材の形状が保持され、その折損などを防止できる。
【0022】
<請求項5記載の発明>
筒状浸透材の先端に先細の前記浸透材より強度が高い沓材が一体化された状態で、補強材とこれを被覆する筒状浸透材とが、掘削孔内に同時に挿入される請求項1〜4のいずれか1項に記載の地盤補強工法。
【0023】
(請求項5記載の発明の作用効果)
請求項4記載の効果と同様の効果を奏し、その効果に加えて、筒状浸透材の先端に前記浸透材より強度が高い沓材が一体化されているので、浸透材先端の保護を図ることができるとともに、沓材が先細であるので、挿入が容易となる。
【0024】
(その他の効果)
地盤の複数箇所の掘削孔に補強材及び浸透材を挿入した後に、それぞれの掘削孔に対して順次または同時的に注入を行うことにより、掘削孔の掘削工程、浸透材及びロックボルト補強材の挿入工程、並びに固化材の注入工程が分離可能であるので、掘削機及び掘削機材の有効利用を図ることができるとともに、ならびに固化待ち時間を生じることがないように作業員の有効配置が可能である。
【0025】
また、掘削孔を形成する毎に、その掘削孔に補強材及び筒状浸透材を挿入していくことにより、自立安定性が困難な地盤であっても、複数の掘削孔に補強材及び筒状浸透材を挿入した状態で、それぞれの掘削孔に対して順次または同時的に、固化材の注入を行うことができるようになる。
【0026】
【発明の実施の形態】
本発明の実施の形態を図面を参照しながら以下に詳述する。
本発明の地盤補強工法においては、基本として、図1に示すように、ロックボルト補強材1に対して、これを被覆する固化材が浸透および透過可能な筒状浸透材2を用いる。この浸透材2としては、孔壁の崩壊を阻止する限りにおいて、自体が形状保持性を示し(若干の可撓性を有していてもよい)、かつ固化材の浸透に関しては、固化材が浸透材2の内部及び内外面に浸透および透過可能な素材及び形状であれば限定されるものではない。図1に示される形状以外の好適な形状例を図2および図3に示す。また、何れの形状においても、浸透材の内部に固化材が十分浸透するように、浸透材の厚さTを10mm以上とすることが好ましい。また、好適な素材としては、内外面に対して連続的なまたは連通する空隙を有する多孔質材、繊維材、樹脂材、ネット状のもの等が挙げられる。
【0027】
一方、ロックボルト補強材1は、図4に示すように、その内部に中空路1hが形成されており、その中空路1hを通して掘削孔20(図8以降参照。)内、浸透材2の内部、及びロックボルト補強材1の外周面に対して、固化材Mを注入することができるようになっている。また、図5に示すように、浸透材2に固化材の注入路2hを形成し、この注入路2hを通して固化材Mを注入することも可能であり、このようにロックボルト補強材1内を注入路としない場合には、補強材1を中実とすることができる。
【0028】
他方、浸透材2を孔内に挿入し易いように、浸透材2の先端に、先細の浸透材2より強度が高い、金属あるいは硬質合成樹脂などからなる沓部材3を取り付けることができる。この沓部材3の詳細を図6及び7に示す。図6は沓部材の正面図であり、図7は図6中のVIIの方向から見た図である。この沓部材3には、筒状浸透材2の先端内面に密に嵌合するように形成された割型取り付け部3cと、この割型取り付け部3cで囲まれる部位内に、先端が挿嵌されるロックボルト補強材1の中空路1hを通した固化材Mを、浸透材2側に誘導する誘導路3gが形成されている。
【0029】
<補強材の打設例1:崩壊性地盤に対する例>
次いで本発明の地盤補強工法における、補強材の第1の打設例を下記に示す。
先ず、図8に示すように、先端に削孔ビット10bを取り付けた、ケーシング外管10c及び内管10iを有する二重管ロッド10を回転及び推進力を与えて地盤Gを掘削し掘削孔20を形成する。前記削孔ビット10bは、掘削孔20を形成した後、その掘削孔20内に放置される、捨てビットであってもよい。
【0030】
次いで、前記二重管ロッド10を地盤Gに挿入したならば、図9に示すように、前記二重管ロッド10の内管10iのみを引き抜く。内管10iを引き抜くと、ケーシング外管10c内に、引き抜き孔10hが形成されるので、続いて、図10に示されるように、その引き抜き孔10h内に、後に注入する固化材が浸透可能な素材でできた浸透材2で被覆したロックボルト補強材1を挿入する。
【0031】
なお、本発明において、上記例のように、ロックボルト補強材1を浸透材2で被覆した状態で挿入する必要はなく、掘削孔20内への挿入が完了した時点でロックボルト補強材1に対して浸透材2が被覆している状態にあればよい。従って、筒状の浸透材2を先に挿入して、その後にその内孔にロックボルト補強材1を挿嵌するようにしてもよいし、その逆でもよい。
【0032】
引き抜き孔10hに浸透材2で被覆したロックボルト補強材1を挿入したら、次いで、図11に示すように、前記掘削孔20よりケーシング外管10cを引き抜く。次いで、図12に示すように、固化材Mの注入作業を開始する。固化材Mは、前記浸透材2内の注入路2h,または図示のようにロックボルト補強材1内に形成した中空路1hを通して掘削孔20に注入する。
【0033】
固化材Mは、誘導路3g及び割型取り付け部3c相互の間隙を通りながら、順次浸透材2の下部から上部に浸透されるとともに、掘削孔20内に充填され、同時にロックボルト補強材1の外周面にも行き渡り、その外周面を覆う。固化材Mが固化すると、図13に示すように、浸透材2の空隙部分に固化材Mが浸透するので、ロックボルト補強材1と地盤Gとが一体化し、ロックボルト補強材1が地盤Gに対して定着される。
【0034】
このようにして、ロックボルト補強材1の打設が終了したら、従来技術に基づいて、目的に応じてロックボルト補強材の頭部1tを、法枠や構造体などに対する定着処理を行う。
【0035】
<補強材の打設例2:自立性地盤に対する例>
本発明の地盤補強工法における、ロックボルト補強材の第2の打設例を示す。
先ず、図14に示すように、先端に削孔ビット11bを取り付けた単管の削孔ロッド11を用いて、地盤Gを掘削しつつ前記削孔ロッド11を地盤Gに挿入する。前記削孔ビット11bは、捨てビットとすることが可能である。掘削が完了したら、図15に示すように、前記削孔ロッド11を地盤Gより引き抜き、図16に示すように掘削孔20を形成する。このように掘削孔20を形成したら、図17に示すように、その掘削孔20へ、予め固化材Mが浸透可能な浸透材2で被覆したロックボルト補強材1を挿入する。図示される例は、筒状の浸透材2の内孔に、予めロックボルト補強材1が挿嵌されている。このとき、筒状の浸透材2を先に挿入し、その後に、その内孔にロックボルト補強材1を挿嵌するようにしてもよい。
【0036】
掘削孔20に浸透材2で被覆したロックボルト補強材1を挿入したら、上記打設例1と同様に前記ロックボルト補強材1内の中空路1hまたは浸透材2内に形成した注入路2hを通して、図18に示すように、掘削孔20に固化材Mを注入する。固化材Mの注入作業が終了したら、その固化を待つ。固化材Mが固化すると、図19に示すように、浸透材2の空隙部分も含めて固化材Mが固化し、ロックボルト補強材1と地盤Gとが一体化し、ロックボルト補強材1が地盤Gに対して定着される。
【0037】
このようにして、ロックボルト補強材1の打設が終了したら、従来技術に基づいて、目的に応じてロックボルト補強材の頭部1tを、法枠や構造体などに対する定着処理を行う。
【0038】
<本発明第1の施工例>
本発明の地盤補強工法の施工例を説明する。
補強対象地盤に対して、一般的に、複数のロックボルト補強材1を打設する。そこで、具体的に下記のように施工を行うことで施工時間を短縮することが可能である。
【0039】
先ず、上記の打設例1または打設例2に従って、ある地点において、掘削孔20に浸透材2で被覆したロックボルト補強材1の挿入が終了したならば、すぐにその掘削孔20に対して固化材Mの注入作業を行うのではなく、他の地点で、同様にロックボルト補強材1の挿入工程までを行う。この作業をくり返し、地盤の所望地点すべてにロックボルト補強材1を挿入したら、次いでそれらの掘削孔20,20…の固化材の注入作業を開始する。固化材の注入は、ロックボルト補強材が挿入されている掘削孔に、順次固化材Mを注入していってもよいし、固化材Mの圧送経路を複数の掘削孔20,20…に対して接続し、掘削孔20,20…に対して、同時的に注入するようにしてもよい。なお、先に浸透材2のみを掘削孔20へ挿入しておく場合には、固化材Mの注入前までに、ロックボルト補強材1をその掘削孔20内に挿入する。
【0040】
このように、掘削孔の掘削工程、浸透材2及びロックボルト補強材1の挿入工程、並びに固化材の注入工程が分離可能であるので、掘削機及び掘削機材の有効利用を図ることができるとともに、ならびに固化待ち時間を生じることがないように作業員の有効配置が可能である。
【0041】
<本発明第2の施工例>
本発明の地盤補強工法は、下記のように施工をすることもできる。
ケーシング外管を用いて掘削孔を形成する場合、従来は固化材が注入されるまで、ケーシング外管を引き抜くことができなかった。しかし、本発明の地盤補強工法では、上記打設例2に記載した通り、ロックボルト補強材1を挿入した時点でケーシング外管10cを引き抜くことが可能である。そこで、本発明第2の施工例は、浸透材2で被覆したロックボルト補強材1を挿入した後、その挿入された掘削孔20への注入作業を行っている間に、他の場所で、その引き抜いたケーシング外管10cを用いて、他の掘削孔の掘削作業を行う。すなわち、注入作業と掘削作業とを同時に行う。このように作業を行えば、作業中に待ち時間がなくなり施工時間が短縮される。
【0042】
(その他)
上記例のロックボルト補強材1は、中空路1hの先端開口を固化材Mの吐出口としてあるが、途中または途中にも、壁を貫いて固化材Mの吐出口を形成することができる。浸透材2は、長手方向に複数分割されていてもよい。厚み方向に複層の素材が積層されたものでもよい。固化材の注入に際しては、ロックボルト補強材1と浸透材2との間に別途注入ホースを臨ませて、あるいは、浸透材2の外部に望ませて、その注入ホースを介して注入することも可能である。
【0043】
【発明の効果】
以上、詳述のとおり、本発明によれば、掘削孔の孔壁の崩壊を確実に防止することできるとともに、地盤の掘削作業と固化材の注入作業とを並行的に実施できるようにすることができる。
【図面の簡単な説明】
【図1】浸透材で被覆したロックボルト補強材の第1の例を示す図である。
【図2】浸透材で被覆したロックボルト補強材の第2の例を示す図である。
【図3】図2のIII−III断面図である。
【図4】図1の断面図である。
【図5】浸透材内に形成した固化材の注入路を示した図である。
【図6】ロックボルト補強材の先端に取り付ける沓部材を示す正面図である。
【図7】その沓部材を図6中に示すVIIの方向から見た図である。
【図8】ロックボルト補強材の第1の打設例における第1作業手順を示す図である。
【図9】ロックボルト補強材の第1の打設例における第2作業手順を示す図である。
【図10】ロックボルト補強材の第1の打設例における第3作業手順を示す図である。
【図11】ロックボルト補強材の第1の打設例における第4作業手順を示す図である。
【図12】ロックボルト補強材の第1の打設例における第5作業手順を示す図である。
【図13】ロックボルト補強材の第1の打設例における第6作業手順を示す図である。
【図14】ロックボルト補強材の第2の打設例における第1作業手順を示す図である。
【図15】ロックボルト補強材の第2の打設例における第2作業手順を示す図である。
【図16】ロックボルト補強材の第2の打設例における第3作業手順を示す図である。
【図17】ロックボルト補強材の第2の打設例における第4作業手順を示す図である。
【図18】ロックボルト補強材の第2の打設例における第5作業手順を示す図である。
【図19】ロックボルト補強材の第2の打設例における第6作業手順を示す図である。
【符号の説明】
1…ロックボルト補強材、2…浸透材、3…沓部材、10…二重管ロッド、11…削孔ロッド、20…掘削孔、G…地盤、M…固化材。
[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to a ground reinforcement method such as a rock bolt method in which a reinforcing material such as a rock bolt is inserted into a drilling hole formed in the ground and a solidifying material is injected to fix the reinforcing material to the ground.
[0002]
[Prior art]
For the ground reinforcement method using rock bolts, the construction form is selected depending on the self-sustained stability of the ground. That is, in the ground where the drilling hole can be self-supporting, the drilling rod itself forms a drilling hole in the ground without drilling the casing, then inserts the rock bolt reinforcement into the formed drilling hole and solidifies. An injection pipe of the material is inserted to the vicinity of the tip of the rock bolt reinforcement, and the solidified material is injected into the borehole through the injection pipe.
[0003]
On the other hand, in the ground where the excavation hole is difficult to stand on its own, first, the ground is excavated using a double pipe rod having a casing outer pipe and an inner pipe, and a drill bit at the tip thereof. After the excavation is completed, only the inner pipe is pulled out of the ground, and a rock bolt reinforcing material is inserted into the drawn hole. Next, the injection pipe is inserted to the vicinity of the distal end of the casing outer pipe. After inserting the injection pipe, the casing outer pipe is pulled out from the ground while a solidified material such as cement milk is injected into the drill hole through the injection pipe.
[0004]
The reason why such a form is adopted for the ground in which the excavation hole is difficult to stand by itself is to prevent the collapse of the hole wall at the time of excavation and injection of the solidified material by the casing outer tube.
[0005]
[Problems to be solved by the invention]
However, in the former mode, even if the drilling hole is self-supporting at the time of drilling, the hole wall must not collapse by the stage of injecting the liquid solidification material, so that it can be left for a long time from the time of excavation to the time of injection. In addition, after excavation and pouring at a certain point, the construction of each individual point that moves to the next point is inevitable.
[0006]
In the latter case, even if a casing outer tube is used, in order to integrate the ground and the reinforcing material, the casing outer tube must be pulled out before the solidified material is solidified. Simultaneously or after withdrawal, the hole wall of the borehole may collapse, leading to a situation where injection cannot be performed reliably.
[0007]
As described above, none of the conventional examples described above takes measures for preventing collapse of the hole wall.
[0008]
If the hole wall collapses before and after the solidification material is injected, a part of the excavation hole is filled with earth and sand, and a portion where the reinforcing material and the earth and sand are in direct contact is formed. When the reinforcing material comes into direct contact with the earth and sand, the portion is no longer covered with the solidifying material, the fixing power of the reinforcing material to the ground is weakened, and a desired reinforcing effect cannot be obtained. Further, when the reinforcing material comes into direct contact with earth and sand or groundwater, the portion is easily corroded, and its durability is significantly reduced.
[0009]
Therefore, a first object of the present invention is to reliably prevent collapse of a hole wall of an excavation hole, and a second object is to perform an operation of excavating a ground and an operation of injecting a solidified material in parallel. Is to do so.
[0010]
[Means for Solving the Problems]
The inventions described in the respective claims that have solved the above-mentioned problems and the functions and effects thereof are as follows.
<Invention according to claim 1>
In the ground reinforcement method by the rock bolt which drives a plurality of rock bolt reinforcements on the ground to be reinforced,
Forming a drilling hole in the ground with a drilling pipe, inserting a rock bolt reinforcing material in the drilling pipe, and a tubular penetrating material that covers and covers the drilling hole and allows the solidified material to penetrate and penetrate,
The solidification material is injected into the excavation hole, penetrates into the voids of the infiltration material, the reinforcing material is fixed to the ground through the outer peripheral surface thereof, and the solidification is performed before the injection of the excavation pipe is started or the injection is performed. Before the hardening of the material,
A ground reinforcement method characterized in that the excavation pipe used for the excavation hole is used for excavation work for another excavation hole at the same time as the injection work for the excavation hole.
[0011]
(Operation and Effect of the Invention of Claim 1)
Since the solidifying material covers the reinforcing material with a penetrating material that can penetrate and permeate, and allows the solidifying material to penetrate into the voids of the penetrating material, the solidifying material can reliably exist around the reinforcing material.
[0012]
Furthermore, since the penetrating material covers the periphery of the reinforcing material, the hole wall is prevented from collapsing after the reinforcing material is inserted, or at least even if the collapsing occurs, the reinforcing material and the earth and sand are in direct contact. Disappears. Therefore, the excavation hole can be left in a state where the reinforcing material is inserted, and the reinforcing material inserting operation step and the solidifying material injection step can be performed separately, not continuously. become.
[0013]
Further, since the hole wall is protected by the drilling pipe, the hole wall does not collapse before the reinforcing material and the penetrating material are inserted.
[0014]
In particular, for a self-sustaining stable ground, a drilling hole is formed by a drilling rod, and a reinforcing material and a tubular infiltration material through which a solidified material covering the reinforcing material can penetrate is inserted into the drilling hole from which the drilling rod is pulled out. Thus, the penetrating material prevents the collapse of the pore wall, and the injection operation can be performed reliably.
[0015]
In addition, by using the casing outer pipe, construction is possible even on the ground where it is difficult to self-support the excavation hole, and at the stage where the casing outer pipe is pulled out, the penetrating material prevents collapse of the hole wall and injects Work can be performed reliably.
[0016]
<Invention according to claim 2>
A hollow channel is formed in the reinforcing material, the solidified material is supplied through the hollow channel and discharged to the outside, the solidified material is injected into a drilling hole, and the solidified material is permeated into the voids of the penetrating material, The ground reinforcement method according to claim 1, wherein the ground is fixed to the ground via the outer peripheral surface.
[0017]
(Operation and Effect of the Invention of Claim 2)
By supplying the solidified material through the hollow passage of the reinforcing material and discharging the solidified material to the outside and injecting the solidified material into the excavation hole, the injection can be reliably performed, and the discharge port of the hollow passage is connected to the tip of the reinforcing material. By doing so, the injection can be reliably performed up to the bottom of the excavation hole.
[0018]
<Invention of Claim 3>
The infiltration material may have some flexibility, is in a form that itself exhibits shape retention and prevents collapse of the pore walls, and with respect to penetration and permeation of the solidification material, The ground reinforcement method according to claim 1 or 2, wherein the material and the shape are materials and shapes that can penetrate and penetrate inside and outside surfaces of the material.
[0019]
(Operation and Effect of the Invention of Claim 3)
According to such a penetrating material, collapse of the pore wall can be reliably prevented.
[0020]
<Invention of Claim 4>
The ground reinforcing method according to any one of claims 1 to 3, wherein the reinforcing material and the tubular penetrating material covering the reinforcing material are simultaneously inserted into the excavation hole.
[0021]
(Operation and effect of the invention according to claim 4)
By simultaneously inserting the reinforcing material and the tubular penetrating material covering the same into the drilling hole, the shape of the tubular penetrating material is maintained, and breakage of the tubular penetrating material can be prevented.
[0022]
<Invention according to claim 5>
The reinforcing material and the cylindrical penetrating material covering the reinforcing material are simultaneously inserted into the excavation hole in a state in which the tip of the cylindrical penetrating material is integrated with the tapered shoe material having a higher strength than the penetrating material. The ground reinforcement method according to any one of Items 1 to 4.
[0023]
(Operation and effect of the invention according to claim 5)
The same effect as that of the fourth aspect is obtained, and in addition to the effect, the tip of the tubular permeable material is integrated with the shoe material having higher strength than the permeable material, so that the tip of the permeable material is protected. In addition, the tapering of the shoe material facilitates insertion.
[0024]
(Other effects)
After inserting the reinforcing material and the penetrating material into multiple excavation holes in the ground, by sequentially or simultaneously injecting into each excavation hole, the excavation process of the excavation hole, the penetration material and the rock bolt reinforcement material Since the insertion step and the solidification material injection step are separable, it is possible to effectively use the excavator and the excavation equipment, and it is possible to effectively arrange the workers so that the solidification waiting time does not occur. is there.
[0025]
In addition, every time a drilling hole is formed, a reinforcing material and a cylindrical penetrating material are inserted into the drilling hole, so that even in the case of a ground where self-sustainability is difficult, the reinforcing material and the cylindrical material can be inserted into a plurality of drilling holes. The solidified material can be sequentially or simultaneously injected into each of the excavation holes with the shape-penetrating material inserted.
[0026]
BEST MODE FOR CARRYING OUT THE INVENTION
Embodiments of the present invention will be described below in detail with reference to the drawings.
In the ground reinforcement method of the present invention, as shown in FIG. 1, a tubular penetrating material 2 that allows a solidified material covering the same to penetrate and permeate a rock bolt reinforcing material 1 is basically used as shown in FIG. 1. As long as the permeation material 2 prevents the collapse of the pore wall, the permeation material 2 itself exhibits shape retention properties (may have some flexibility). The material and shape are not limited as long as the material and shape can penetrate and penetrate into the inside and the inside and outside surfaces of the penetrating material 2. Examples of suitable shapes other than the shape shown in FIG. 1 are shown in FIGS. In any shape, the thickness T of the penetrating material is preferably 10 mm or more so that the solidified material sufficiently penetrates into the penetrating material. Suitable materials include a porous material, a fibrous material, a resin material, and a net-like material having a void that is continuous or communicated with the inner and outer surfaces.
[0027]
On the other hand, as shown in FIG. 4, the lock bolt reinforcing member 1 has a hollow passage 1h formed therein, and through the hollow passage 1h, the inside of the excavation hole 20 (see FIG. 8 et seq.) And the inside of the penetrating material 2. , And the solidified material M can be injected into the outer peripheral surface of the lock bolt reinforcing material 1. As shown in FIG. 5, it is also possible to form an injection path 2h of the solidifying material in the infiltration material 2 and to inject the solidification material M through the injection path 2h. If the injection path is not used, the reinforcing material 1 can be made solid.
[0028]
On the other hand, to facilitate insertion of the penetrating material 2 into the hole, a shoe member 3 made of a metal or a hard synthetic resin or the like having a higher strength than the tapered penetrating material 2 can be attached to the tip of the penetrating material 2. Details of the shoe member 3 are shown in FIGS. FIG. 6 is a front view of the shoe member, and FIG. 7 is a view seen from the direction of VII in FIG. The split member attachment portion 3c formed to fit tightly on the inner surface of the distal end of the tubular penetrating material 2 and the distal end is inserted into a portion surrounded by the split member attachment portion 3c. A guide path 3g is formed to guide the solidified material M that has passed through the hollow path 1h of the rock bolt reinforcing material 1 to the penetrating material 2 side.
[0029]
<Reinforcing example 1: Example for collapsed ground>
Next, a first example of placing a reinforcing material in the ground reinforcement method of the present invention will be described below.
First, as shown in FIG. 8, a double pipe rod 10 having a casing outer pipe 10c and an inner pipe 10i having a drill bit 10b attached to the tip thereof is rotated and propelled to excavate the ground G to excavate the excavation hole 20. To form The drill bit 10b may be a discard bit that is left inside the drill hole 20 after forming the drill hole 20.
[0030]
Next, when the double pipe rod 10 is inserted into the ground G, as shown in FIG. 9, only the inner pipe 10i of the double pipe rod 10 is pulled out. When the inner tube 10i is pulled out, a drawing hole 10h is formed in the casing outer tube 10c. Then, as shown in FIG. 10, the solidified material to be injected later can penetrate into the drawing hole 10h. A rock bolt reinforcing material 1 covered with a penetrating material 2 made of a material is inserted.
[0031]
In the present invention, it is not necessary to insert the lock bolt reinforcing material 1 covered with the penetrating material 2 as in the above-described example. On the other hand, it is sufficient if the penetrating material 2 is in a state of being covered. Therefore, the cylindrical penetrating material 2 may be inserted first, and then the lock bolt reinforcing material 1 may be inserted into the inner hole, or vice versa.
[0032]
After the rock bolt reinforcing member 1 covered with the penetrating material 2 is inserted into the extraction hole 10h, the casing outer tube 10c is extracted from the excavation hole 20 as shown in FIG. Next, as shown in FIG. 12, the operation of injecting the solidified material M is started. The solidified material M is injected into the excavation hole 20 through the injection path 2h in the infiltration material 2 or the hollow path 1h formed in the lock bolt reinforcing material 1 as shown in the figure.
[0033]
The solidified material M is sequentially penetrated from the lower part to the upper part of the infiltration material 2 while passing through the gap between the guide path 3g and the split mold attachment part 3c, and is also filled into the excavation hole 20, and at the same time, It also extends to the outer peripheral surface and covers the outer peripheral surface. When the solidified material M is solidified, as shown in FIG. 13, the solidified material M penetrates into the void portion of the infiltration material 2, so that the rock bolt reinforcing material 1 and the ground G are integrated, and the rock bolt reinforcing material 1 It is established against.
[0034]
In this manner, when the driving of the lock bolt reinforcing member 1 is completed, the head 1t of the lock bolt reinforcing member is subjected to a fixing process to a legal frame, a structure, or the like according to the purpose, based on the related art.
[0035]
<Reinforcing material placing example 2: example for self-supporting ground>
7 shows a second example of placing a rock bolt reinforcing material in the ground reinforcement method of the present invention.
First, as shown in FIG. 14, the drilling rod 11 is inserted into the ground G while excavating the ground G using a single pipe drilling rod 11 having a drilling bit 11b attached to the tip. The drill bit 11b can be a discard bit. When the excavation is completed, as shown in FIG. 15, the drilling rod 11 is pulled out from the ground G, and an excavation hole 20 is formed as shown in FIG. After the excavation hole 20 is formed in this way, as shown in FIG. 17, the rock bolt reinforcing material 1 previously covered with the penetrating material 2 through which the solidified material M can penetrate is inserted into the excavation hole 20. In the illustrated example, the lock bolt reinforcing material 1 is inserted in advance into the inner hole of the cylindrical penetrating material 2. At this time, the tubular penetrating material 2 may be inserted first, and then the lock bolt reinforcing material 1 may be inserted into the inner hole.
[0036]
When the rock bolt reinforcing material 1 covered with the penetrating material 2 is inserted into the excavation hole 20, through the hollow passage 1 h in the rock bolt reinforcing material 1 or the injection passage 2 h formed in the penetrating material 2, as in the case of the casting example 1 described above. As shown in FIG. 18, the solidified material M is injected into the excavation hole 20. When the operation of injecting the solidified material M is completed, the solidification is waited for. When the solidified material M is solidified, as shown in FIG. 19, the solidified material M is solidified including the void portion of the infiltration material 2, the rock bolt reinforcing material 1 and the ground G are integrated, and the rock bolt reinforcing material 1 G is fixed.
[0037]
In this manner, when the driving of the lock bolt reinforcing member 1 is completed, the head 1t of the lock bolt reinforcing member is subjected to a fixing process to a legal frame, a structure, or the like according to the purpose, based on the related art.
[0038]
<First Construction Example of the Present Invention>
A construction example of the ground reinforcement method of the present invention will be described.
Generally, a plurality of lock bolt reinforcing members 1 are cast on the ground to be reinforced. Then, it is possible to shorten construction time by specifically performing construction as described below.
[0039]
First, according to the casting example 1 or the casting example 2, when the insertion of the rock bolt reinforcing material 1 covered with the penetrating material 2 into the excavation hole 20 is completed at a certain point, the solidification is immediately performed on the excavation hole 20. Rather than performing the operation of injecting the material M, the process up to the step of inserting the lock bolt reinforcing material 1 is similarly performed at another point. This operation is repeated, and after the rock bolt reinforcing material 1 is inserted into all the desired points on the ground, the operation of injecting the solidified material into those excavation holes 20 is started. The solidification material may be injected by sequentially injecting the solidification material M into the excavation hole into which the lock bolt reinforcing material is inserted, or the solidified material M may be pumped through the plurality of excavation holes 20, 20,. , And may be simultaneously injected into the excavation holes 20. In the case where only the penetrating material 2 is inserted into the excavation hole 20 first, the rock bolt reinforcing material 1 is inserted into the excavation hole 20 before the solidification material M is injected.
[0040]
As described above, since the excavation step of the excavation hole, the insertion step of the penetrating material 2 and the lock bolt reinforcing material 1, and the injection step of the solidified material can be separated, the excavator and the excavation equipment can be effectively used. , As well as the effective placement of workers so that no solidification waiting time occurs.
[0041]
<Second embodiment of the present invention>
The ground reinforcement method of the present invention can also be performed as follows.
Conventionally, when forming a borehole using a casing outer tube, the casing outer tube cannot be pulled out until a solidifying material is injected. However, in the ground reinforcement method of the present invention, the casing outer tube 10c can be pulled out when the lock bolt reinforcement 1 is inserted, as described in the casting example 2. Therefore, the second construction example of the present invention is that, after inserting the rock bolt reinforcing material 1 covered with the penetrating material 2, while performing the injection work into the inserted excavation hole 20, at another place, Using the extracted casing outer tube 10c, excavation work for another excavation hole is performed. That is, the injection operation and the excavation operation are performed simultaneously. By performing the work in this way, there is no waiting time during the work, and the construction time is shortened.
[0042]
(Other)
The lock bolt reinforcing member 1 of the above example has the opening at the tip end of the hollow passage 1h as a discharge port for the solidified material M. However, the discharge port for the solidified material M can be formed in the middle or midway through the wall. The penetrating material 2 may be divided into a plurality of pieces in the longitudinal direction. A multilayer material may be laminated in the thickness direction. When injecting the solidified material, a separate injection hose may be provided between the rock bolt reinforcing material 1 and the infiltration material 2 or may be injected through the injection hose as desired outside the infiltration material 2. It is possible.
[0043]
【The invention's effect】
As described above in detail, according to the present invention, it is possible to reliably prevent the collapse of the hole wall of the excavation hole, and to perform the excavation work of the ground and the injection work of the solidified material in parallel. Can be.
[Brief description of the drawings]
FIG. 1 is a diagram showing a first example of a rock bolt reinforcing material covered with a penetrating material.
FIG. 2 is a view showing a second example of a rock bolt reinforcing material covered with a penetrating material.
FIG. 3 is a sectional view taken along the line III-III of FIG. 2;
FIG. 4 is a sectional view of FIG.
FIG. 5 is a view showing an injection path of a solidifying material formed in a penetrating material.
FIG. 6 is a front view showing a shoe member attached to a tip of a lock bolt reinforcing member.
7 is a view of the shoe member as viewed from the direction of VII shown in FIG.
FIG. 8 is a diagram showing a first operation procedure in a first example of placing a lock bolt reinforcing material.
FIG. 9 is a view showing a second operation procedure in a first example of placing a lock bolt reinforcing material.
FIG. 10 is a diagram showing a third operation procedure in a first example of placing a lock bolt reinforcing material.
FIG. 11 is a diagram showing a fourth operation procedure in a first example of placing a lock bolt reinforcing member.
FIG. 12 is a diagram showing a fifth operation procedure in a first example of placing a lock bolt reinforcing material.
FIG. 13 is a view showing a sixth operation procedure in the first example of placing the lock bolt reinforcing member.
FIG. 14 is a diagram showing a first operation procedure in a second example of placing a lock bolt reinforcing member.
FIG. 15 is a diagram showing a second operation procedure in a second example of placing a lock bolt reinforcing material.
FIG. 16 is a view showing a third operation procedure in a second example of placing a lock bolt reinforcing material.
FIG. 17 is a diagram showing a fourth operation procedure in the second example of placing the lock bolt reinforcing member.
FIG. 18 is a diagram illustrating a fifth operation procedure in the second example of placing the lock bolt reinforcing member.
FIG. 19 is a diagram showing a sixth operation procedure in the second example of placing the lock bolt reinforcing member.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 ... Rock bolt reinforcement, 2 ... Penetration material, 3 ... Shoe member, 10 ... Double pipe rod, 11 ... Drilling rod, 20 ... Drilling hole, G ... Ground, M ... Solidified material.

Claims (5)

補強対象地盤に複数のロックボルト補強材を打設するロックボルトによる地盤補強工法において、
地盤に掘削管により掘削孔を形成し、前記掘削管内にロックボルト補強材と、これを被覆しかつ前記掘削孔に直接臨み固化材が浸透および透過可能な筒状浸透材とを挿入し、
前記掘削孔に固化材を注入し、前記浸透材の空隙に浸透させ、前記補強材をその外周面を介して地盤に対して定着させるとともに、前記掘削管の引き抜きを注入開始前または注入した固化材の硬化前の段階で行い、
当該掘削孔に対する注入作業と同時に、当該掘削孔に使用した当該掘削管は他の掘削孔の掘削作業に使用することを特徴とする地盤補強工法。
In the ground reinforcement method by the rock bolt which drives plural rock bolt reinforcements to the ground to be reinforced,
Forming a drilling hole in the ground with a drilling pipe, inserting a rock bolt reinforcing material in the drilling pipe, and a tubular infiltration material that covers the same and directly faces the drilling hole so that the solidified material can penetrate and permeate,
A solidifying material is injected into the excavation hole, penetrates into the voids of the penetrating material, and the reinforcing material is fixed to the ground via the outer peripheral surface thereof. Performed before the hardening of the material,
A ground reinforcement method characterized in that the excavation pipe used for the excavation hole is used for excavation work for another excavation hole at the same time as the injection work for the excavation hole.
補強材に中空路を形成しておき、この中空路を通して固化材を供給して外部に吐出させ、掘削孔に固化材を注入し、この固化材を浸透材の空隙に浸透させ、前記補強材をその外周面を介して地盤に対して定着させる請求項1記載の地盤補強工法。A hollow channel is formed in the reinforcing material, a solidified material is supplied through the hollow channel and discharged to the outside, the solidified material is injected into a drilling hole, and the solidified material is permeated into the voids of the penetrating material, The ground reinforcement method according to claim 1, wherein the ground is fixed to the ground via the outer peripheral surface. 浸透材は、若干の可撓性を有していてもよい、自体が形状保持性を示し孔壁の崩壊を阻止する形態のものであり、かつ固化材の浸透および透過に関して、固化材が浸透材の内部および内外面に浸透かつ透過可能な素材及び形状である請求項1または2に記載の地盤補強工法。The osmotic material may have some flexibility, is in a form that itself exhibits shape retention and prevents collapse of the pore walls, and with respect to permeation and permeation of the solidified material, The ground reinforcement method according to claim 1 or 2, wherein the material and the shape are materials and shapes that can penetrate and permeate the inside and inside and outside surfaces of the material. 補強材とこれを被覆する筒状浸透材とが、掘削孔内に同時に挿入される請求項1〜3のいずれか1項に記載の地盤補強工法。The ground reinforcing method according to any one of claims 1 to 3, wherein the reinforcing material and the tubular penetrating material covering the reinforcing material are simultaneously inserted into the excavation hole. 筒状浸透材の先端に先細の前記浸透材より強度が高い沓材が一体化された状態で、補強材とこれを被覆する筒状浸透材とが、掘削孔内に同時に挿入される請求項1〜4のいずれか1項に記載の地盤補強工法。The reinforcing material and the tubular penetrating material covering the reinforcing material are simultaneously inserted into the excavation hole in a state in which the tip of the tubular penetrating material is integrated with the tapered shoe material having a higher strength than the penetrating material. The ground reinforcement method according to any one of Items 1 to 4.
JP2000093329A 2000-03-30 2000-03-30 Ground reinforcement method using rock bolts Expired - Fee Related JP3558280B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000093329A JP3558280B2 (en) 2000-03-30 2000-03-30 Ground reinforcement method using rock bolts

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000093329A JP3558280B2 (en) 2000-03-30 2000-03-30 Ground reinforcement method using rock bolts

Publications (2)

Publication Number Publication Date
JP2001279668A JP2001279668A (en) 2001-10-10
JP3558280B2 true JP3558280B2 (en) 2004-08-25

Family

ID=18608525

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000093329A Expired - Fee Related JP3558280B2 (en) 2000-03-30 2000-03-30 Ground reinforcement method using rock bolts

Country Status (1)

Country Link
JP (1) JP3558280B2 (en)

Also Published As

Publication number Publication date
JP2001279668A (en) 2001-10-10

Similar Documents

Publication Publication Date Title
JP3558280B2 (en) Ground reinforcement method using rock bolts
JP2001234690A (en) Natural ground consolidation method
JP4657402B2 (en) Injection pipe used for consolidation and reinforcement of natural ground
JP4341029B2 (en) Pile foundation method
JP2019031893A (en) Drilling tool, rod-shaped member and drilling method
KR100991248B1 (en) Micro pile foundation method using a pack and pile assembly used therein
JP2002167746A (en) Ground reinforcement method and casing tube for retaining hole wall used for it
JP2006097272A (en) Method for removing surplus part of pipe for ground reinforcement
JP3467221B2 (en) Ground reinforcement method
JP3675705B2 (en) Ground reinforcement method
JP3710991B2 (en) Ground reinforcement method
JP2003055985A (en) Column and pile connection method
JP3987234B2 (en) Ground mountain tip receiving reinforcement method
JP5495874B2 (en) Removal method of shield excavator
JP3515046B2 (en) Ground reinforcement method
JPH02304119A (en) Slope stabilization method
JPH11182172A (en) Ground mountain consolidation method
JP3524493B2 (en) Ground reinforcement method
JPH1046573A (en) Bottom enlarged cast-in-place pile and its construction method
JP2001336147A (en) Rotary cap with pile top treatment function, pile top treatment method, and embedding method of pile
JP4414844B2 (en) Reinforcement method of natural ground
JP3298845B2 (en) Ground reinforcement method
JPS6340555Y2 (en)
JP4026771B2 (en) Ground reinforcement structure and ground reinforcement construction method
JP6628360B2 (en) Ground reinforcement method

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20031216

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20031219

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20040217

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20040514

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20040514

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 3558280

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080528

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090528

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100528

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110528

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110528

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120528

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120528

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130528

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140528

Year of fee payment: 10

LAPS Cancellation because of no payment of annual fees