Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP3558386B2 - Load loading method and device - Google Patents
[go: Go Back, main page]

JP3558386B2 - Load loading method and device - Google Patents

Load loading method and device Download PDF

Info

Publication number
JP3558386B2
JP3558386B2 JP25900694A JP25900694A JP3558386B2 JP 3558386 B2 JP3558386 B2 JP 3558386B2 JP 25900694 A JP25900694 A JP 25900694A JP 25900694 A JP25900694 A JP 25900694A JP 3558386 B2 JP3558386 B2 JP 3558386B2
Authority
JP
Japan
Prior art keywords
load
loading
slide plate
pusher device
pusher
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP25900694A
Other languages
Japanese (ja)
Other versions
JPH0891583A (en
Inventor
信博 田中
栄治 平田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kao Corp
Original Assignee
Kao Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kao Corp filed Critical Kao Corp
Priority to JP25900694A priority Critical patent/JP3558386B2/en
Priority to US08/346,072 priority patent/US5577873A/en
Priority to DE69414226T priority patent/DE69414226T2/en
Priority to EP94118754A priority patent/EP0655403B1/en
Publication of JPH0891583A publication Critical patent/JPH0891583A/en
Application granted granted Critical
Publication of JP3558386B2 publication Critical patent/JP3558386B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Loading Or Unloading Of Vehicles (AREA)

Description

【0001】
【産業上の利用分野】
本発明は、パレット荷等の多段に積まれた荷をトラックの荷台に積込む、荷の積込方法及び装置に関する。
【0002】
【従来の技術】
図12は従来の荷の積込方法を示す模式図である。この従来技術では、荷1をパレット2からフォークリフト3に受入れ、このフォークリフト3によってトラック4の荷台4Aに積み込んでいる。
【0003】
図13はプッシュプル方式のフォークリフト3によって、荷1を荷台4Aの奥へ積込む状態を示したものであり、フォークリフト3のフォーク3Aを荷台4Aに挿入した後、フォーク3A上の荷1をプッシャ装置3Bにより荷台4Aの奥へと押込む。
【0004】
【発明が解決しようとする課題】
然しながら、従来技術では、下記▲1▼〜▲3▼の問題点がある。
▲1▼プッシャ装置3Bでフォーク3A上の荷1を押し出すとき、フォーク3Aから荷台4Aの奥の壁までの距離が遠く離れているので、フォーク3Aと荷台4Aとの段差で荷1がつまづいたとき、この荷1を支えるものがなく荷崩れを生じてしまう(図13(B))。また、プッシャ装置3Bで荷1を滑らせながら移動するので、荷1が荷台4Aとの摩擦でつまづき易いし、少しバランスを崩すと後ろの荷1に押されて倒れ易い。
【0005】
▲2▼プッシャ装置3Bで荷1を荷台4Aに押込む際、荷1やプッシャ装置3Bが作業者の視界を遮り、作業者が荷台4Aの奥を見通しできず、荷1が荷台4Aの奥まで入ったかどうかわからない。このため、荷1を押し過ぎて潰したり、押し足りなくて荷台上の次の荷のための積込スペースを失い次の荷を積めなかったりする(図13(C))。
【0006】
本発明は、荷崩れを生ずることなく、荷を荷台の積込位置に積込み可能とすることを目的とする。
【0007】
また、本発明は、荷を荷台奥側の正面壁体寄りの適宜位置に安定的に積込み可能とすることを目的とする。
【0008】
【課題を解決するための手段】
請求項1に記載の本発明は、荷を荷台の荷積込位置に積込む荷の積込方法において、荷をスライドプレートの荷台側に寄せて積み、プッシャ装置が荷に接触したところでプッシャ装置とスライドプレート連結し、このスライドプレートをプッシャ装置で押込位置まで押込み、荷及びスライドプレートを荷台上の正面壁体に近接して相対する荷積込位置まで移動した後、プッシャ装置とスライドプレートとの連結を解除し、プッシャ装置を上記押込位置に保持したまま、スライドプレートを荷積込位置から引き戻すことにより、荷を荷積込位置へ移載するようにしたものである。
【0009】
請求項2に記載の本発明は、請求項1に記載の本発明において更に、前記荷をスライドプレートの荷台側に寄せて積み、スライドプレートの先端を荷積込位置の前記正面壁体から荷長さ分手前に位置させた後、スライドプレートをプッシャ装置で押込むようにしたものである。
【0010】
請求項3に記載の本発明は、荷台の荷積込位置に対して進退する載荷台車と、載荷台車上に設けられ、荷を載せる載荷体と、載荷台車上に設けられ、載荷体上の荷を荷積込位置に向けて移動するプッシャ装置とを有してなる荷の積込装置において、載荷体が、載荷台車側に固定されたベースプレートと、ベースプレートに対して出入自在なスライドプレートとからなり、荷をスライドプレートの荷台側に寄せて積み、プッシャ装置が荷に接触したところでプッシャ装置とスライドプレートを連結し、このスライドプレートをプッシャ装置で押込位置まで押込み、荷及びスライドプレートを荷台上の正面壁体に近接して相対する荷積込位置まで移動した後、プッシャ装置とスライドプレートとの連結を解除し、プッシャ装置を上記押込位置に保持したまま、スライドプレートを荷積込位置から引き戻すことにより、荷を荷積込位置へ移載可能としてようにしたものである。
請求項4に記載の本発明は、請求項3に記載の本発明において更に、前記プッシャ装置とスライドプレートとの連結装置を変更可能にしてなるようにしたものである。
請求項5に記載の本発明は、請求項3又は4に記載の本発明において更に、前記荷台の長さ寸法を測定する測距装置を設けたものである。
【0011】
【作用】
本発明によれば、下記(1)(5)の作用がある。
(1)プッシャ装置により荷とスライドプレートを荷台上の正面壁体(荷台の壁面もしくは先行して積込済の荷の壁面)に近接して相対する荷積込位置まで積込んだ後、プッシャ装置をそのまま保持しながら、スライドプレートのみを引き抜いて荷を積込むものとなる。従って、スライドプレートを引抜くとき、もし荷がつまづいても、荷は荷台上の正面壁体に支えられるので、荷崩れしない。
【0012】
(2)プッシャ装置で押込むとき、荷及びスライドプレートを荷台上の正面壁体に近接して相対する位置まで移動する。即ち、荷を荷台奥側の正面壁体寄りの適宜位置に安定的に積込みできる。このため、荷が押込まれ過ぎて潰されることがない。また、荷の積込み不足によって荷台上の次の荷のための積込スペースを失うこともない。
【0013】
(3)プッシャ装置により荷を積込むとき、プッシャ装置をスライドプレートに連結してスレイドプレートを押込むことのメリット
(a)プッシャ装置が直接的に荷を押込む場合、荷が軽いと、荷とスライドプレートの間の摩擦抵抗が小さいので、プッシャ装置が荷を押したとき、スライドプレートが止まったまま、荷だけ押出されて、荷が崩れることがある(図14)。
【0014】
スライドプレートを荷台との間で転がり接触させても、スライドプレートの自重が例えば250kg あるため、荷の重さが8kg 程度だと、
(250 +8kg )×0.01=2.5kg >8kg ×0.3 =2.4kg
となり(但し、スライドプレートと荷台との転がり摩擦係数を0.01、荷とスライドプレートとの滑り摩擦係数を0.3 とした)、荷とスライドプレートの摩擦抵抗が小さくなる(紙おむつ等の軽い荷が多く、荷の量が少ないときに起こる)。
【0015】
また、スライドプレートを引き戻すためのチェーンがスライドプレートに連結されていて、荷の押込み時にスライドプレートがチェーンを引き出す機構になっている場合に、チェーンの引出し抵抗がスライドプレートを制止する力として作用し、荷が重いときでも上述の問題が起きる。
【0016】
(b) これに対し、本発明では、プッシャ装置をスライドプレートに連結してスライドプレートを確実に押込むもので、荷が軽い場合にも、スライドプレートが止まったまま荷だけ押し出されて荷崩れする等がない。即ち、プッシャ装置は、スライドプレートを確実に押込むことを介して、スライドプレート上の荷を確実かつ安定的に荷積込位置に位置付けることができる。
【0017】
(4)スライドプレートに載せる荷の位置を予めスライドプレートの荷台側に寄せておくとともに、プッシャ装置をスライドプレートに連結してスライドプレートを押込む。これによって、プッシャ装置によりスライドプレートを押込んで荷を荷台上の正面壁体に近接して相対する荷積込位置に設定するとき、荷はスライドプレート上をその中間位置から荷台側に滑らされる如くがなく、スライドプレートとともに上記荷積込位置に設定される。従って、荷が上記荷積込位置に設定される前の段階で、荷がスライドプレート上を滑るとしたら生じ得る荷のつまづき、荷崩れの発生を回避できる。
【0018】
また、荷をスライドプレート先端側に寄せて積みスライドプレートを初期位置(荷台奥から荷長さ分手前)まで移動して、プッシャ装置によりスライドプレートを一定量押込むだけで、荷を荷台奥の積込位置まで正確に移動するので、荷を押し過ぎて潰したり、押し足りなくて積込みスペースを失う等がない。
【0019】
(5)荷積込装置を構成する載荷体がベースプレートとスライドプレートとからなり、プッシャ装置とスライドプレートとを連結可能とした。従って、プッシャ装置をスライドプレートに連結してプッシャ装置により荷とスライドプレートを荷台上の正面壁体に近接して相対する荷積込位置に押込んだ後、プッシャ装置とスライドプレートとの連結を解除することにより、プッシャ装置をそのまま保持しながら、スライドプレートのみを引き戻すことが可能となり、上記(1) (4)を実現する装置として用いることができる。
【0020】
【実施例】
図1は出荷設備を示す模式図、図2は荷積込装置を示す模式図、図3は載荷体を示す模式図、図4は連結装置を示す模式図、図5は連結装置の変形例を示す模式図、図6は荷移載手順(1) 〜(4) を示す模式図、図7は荷積込手順(1) 〜 (3)を示す模式図、図8は荷積込手順(4) 〜 (6)を示す模式図、図9は荷積込手順(7) 〜 (9)を示す模式図、図10は荷積込手順(10)を示す模式図、図11は本発明例における荷積込作業スペースを示す模式図、図12は従来例における荷積込作業スペースを示す模式図、図13は従来例の荷積込方法を示す模式図、図14は比較例の荷崩れ発生状態を示す模式図である。
【0021】
(A) 出荷設備(図1)
出荷設備10は、荷1をパレット2から移し替える荷移載装置20と、荷1をトラック4の荷台4Aに積込む荷積込装置30とで構成される。
【0022】
尚、トラック4は、荷積込装置30の走行経路に沿うトラックヤードに配置されている。
【0023】
荷移載装置20は、フォークリフト3によりパレット荷姿の荷1を供給され、荷1のみを荷積込装置30へ移載する。
【0024】
荷積込装置30は、荷移載装置20から荷1を受取り、荷1を積込もうとするトラック4まで運び、荷1をトラック4の荷台4Aに積込む。
【0025】
(B) 荷1(図1)
パレット荷姿は、パレット2上にスリップシート(樹脂製のシート)2Aを敷き、その上に段ボール箱やプラスチックコンテナ等の荷1を積み重ねたものである。
【0026】
パレット2の大きさは、ここでは約 2.2mである。パレット荷姿の種類は2種類ある。
▲1▼ 2.2m分にわたって荷を積付けたもの(大荷姿)。
▲2▼上記▲1▼の半分の 1.1mだけ荷を積付けたもの(小荷姿)。
【0027】
このパレット荷姿の種類はもっと多くても良いし、1種類でも良い。ここで2種類としたのは、トラック4のサイズに合わせて荷1を効率良く収納するためである。配送用の2トントラックのサイズは▲1▼ショート、▲2▼標準、▲3▼ロングの3種類あり、それぞれに対して上記荷姿を
ショート:大荷姿を1枚
標準:大荷姿を1枚と小荷姿を1枚
ロング:大荷姿を2枚
のように積むと荷台4Aに丁度収まるようになっている。
【0028】
(C) トラックの配置(図1)
出荷設備10のトラックヤードでは、複数のトラック4の荷台積込側端を互いに揃えて、荷積込装置30の走行経路に対向させて停車させる。この際、トラック4を位置決め用のライン5に平行に停止させる。位置決め用のライン5は、荷積込装置30の走行方向と直角方向に引いてある。これは、荷積込装置30が荷1を出退及び押込む方向にトラック4の荷台4Aの前後方向を合わせるためである。ここでは、荷積込装置30が走行方向と直角方向に荷1を出退しているので、ライン5も直角方向に引いてある。荷1の出退方向は走行方向に対して斜めにすることも可能であり、その場合、ライン5も斜めに引く。
【0029】
(D) 荷移載装置(図1、図6)
荷移載装置20は、荷受コンベヤ21と荷移載用プッシャー22と、荷受台23とを有する。
【0030】
荷受コンベヤ21は、フォークリフト3からパレット荷姿の荷1を受入れ、このパレット荷姿をプッシャ22の前面に運ぶ。
【0031】
荷移載用プッシャ22は、パレット荷姿のスリップシート2Aを押えるシート押え爪(不図示)を有し、このシート押え爪でスリップシート2Aを押えた状態で、プッシャ22によりシート2A上の荷1だけを荷受台23の側に押し出す。
【0032】
荷受台23は、荷積込装置30の走行経路の荷受入端に対向して配置され、荷積込装置30の後述する載荷体61を支える。このとき、載荷体61を構成するスライドプレート63の上面がパレット荷姿のスリップシート2Aの上面とほぼ同じ高さ(厳密にはスライドプレート63の上面を少し低くして、コンテナ等の荷1の乗り移りを良くする)となるように設定される。
【0033】
尚、荷受コンベヤ21の荷受台23に臨む側部フレームには可倒式の渡しプレート24が取付けられ、荷受台24上に設定された載荷体61のスライドプレート63と荷受コンベヤ21上のパレット2との隙間を、荷1の乗移り時にこの渡しプレート24によって埋め、荷1がこの隙間でつまづく如くを防止する。
【0034】
(E) 荷積込装置(図1〜図5)
荷積込装置30は、トラックヤードに停車されるトラック4の荷台積込側端に沿って走行する走行体31を備える。走行体31は、レール32に載架される車輪33を備え、走行用モータ34により駆動される。
【0035】
荷積込装置30は、走行体31上でトラック4の荷台前後方向に移動(荷台4Aの荷積込位置に対して進退)し得る載荷台車35を備える。走行体31は台車用レール36を備えている。載荷台車35は、台車用レール36に載架される車輪37を備え、台車走行用モータ38により駆動される。
【0036】
荷積込装置30は、載荷台車35にマストフレーム41を支持している。マストフレーム41は、マストフレーム支軸42を介して、載荷台車35に傾動自在に支持され、チルト用シリンダ43により傾斜角度を変えられる。このマストフレーム41には、昇降フレーム44がガイドレール45とカムフォロワ46を介して昇降自在に設けられている。昇降フレーム44の昇降量は、昇降用シリンダ47により任意に変えることができる。
【0037】
荷積込装置30は、昇降フレーム44に、プッシャ装置51と載荷体61とを設けている。
【0038】
プッシャ装置51は、プッシャ用シリンダ52により伸縮せしめらるパンタグラフ53の先端部にプッシャ板54を取付け、このプッシャ板54を出退可能としている。プッシャ装置51は、載荷体61上の荷1を荷積込位置に向けて移動する。
【0039】
載荷体61は、昇降フレーム44に固定されるベースプレート62と、荷1を載せられてベースプレート62に対して出入自在なスライドプレート63とからなり、スライドプレート63上に荷1を載せられる(図3)。
【0040】
このとき、プッシャ装置51とスライドプレート63とは、連結装置110により連結可能とされている。連結装置110は、図2、図4に示す如く、プッシャ板54の側部に固定されるシリンダ111のピストンロッド先端に連結ピン112を設け、この連結ピン112をスライドプレート63の側縁部に設けた係合孔113に係脱可能としている。114は連結ピン112のガイドである。
【0041】
本実施例において、スライドプレート63は2個の係合孔113A、113Bを備えている。係合孔113Aはスライドプレート63の基端側に設けられて、大荷姿の荷1の積込み時に用いられる。係合孔113Bはスライドプレート63の中央部に設けられて、小荷姿の荷1の積込み時に用いられる。
【0042】
プッシャ装置51とスライドプレート63との連結は下記(a) 又は(b) にてなされる。
(a) 大荷姿の荷1の積込み時、プッシャ装置51が原位置、スライドプレート63も原位置に設定されている状態で、シリンダ111の作動により、連結ピン112を係合孔113Aに係入することにて、プッシャ装置51とスライドプレート63とを連結する。
【0043】
(b) 小荷姿の荷1の積込み時、プッシャ装置51を前進させながら、プッシャ板54の下部に設けてある光センサ等の検出器115によりスライドプレート63の係合孔113Bと同一ライン上に設けられている反射板等の係合孔表示部116を検出し、その検出によってプッシャ装置51を停止する(図4(B))。そして、シリンダ111の作動により、連結ピン112を係合孔113Bに係入することにて、プッシャ装置51とスライドプレート63とを連結する。
【0044】
尚、上述の係合孔113は、スライドプレート63の側縁部に2個(113A、113B)設けるものに限らず、3以上の多数個を設け、プッシャ装置51とスライドプレート63との連結位置を多段階状に変更可能とするものであっても良い。
【0045】
また、連結装置110は、図5(A)に示す如く、シリンダ111のピストンロッド先端に吸着パッド112Aを設け、この吸着パッド112Aをスライドプレート63の側縁部に係脱可能とするものであっても良い。
【0046】
また、連結装置110は、図5(B)に示す如く、シリンダ111のピストンロッド先端に係合爪112Bを設け、この係合爪112Bをスライドプレート63の側縁部に設けたラック117の任意の歯に係脱可能とするものであっても良い。
【0047】
また、連結装置110は、図5(C)に示す如く、シリンダ111のピストンロッド先端にゴムパッド112Cを設け、このゴムパッド112Cをスライドプレート63の上面に押圧して、プッシャ装置51とスライドプレート63とを連結可能とするものであっても良い。このとき、連結装置110によるプッシャ装置51とスライドプレート63の連結は、プッシャ板54が荷1に接触したところで行なうものとし、プッシャ板54と荷1との接触を検出する検出器120が用いられる。検出器120は、プッシャ板54の幅方向の全域に渡って設けられる荷検出板121と、この荷検出板121の揺動によってオン/オフせしめられるリミットスイッチ122とから構成される。そして、連結装置110のシリンダ111は、リミットスイッチ122のオンにより伸長動作してゴムパッド112Cをスライドプレート63の上面に押圧せしめるものとなる。
【0048】
ベースプレート62は、ローラ64を備え、この上にスライドプレート63を出入自在に支持している。即ち、プッシャ装置51が連結装置110により連結されたスライドプレート63を荷積込位置に向けて押込むとき、スライドプレート63はベースプレート62から引き出されて荷1を載せた状態で荷積込位置に向けて移動する。
【0049】
スライドプレート63は車輪65を備え、この車輪65を介してトラック4の荷台4A上を軽快に移動できる。尚、スライドプレート63はトラック4の荷台4A上を軽快に移動できるものであれば、車輪65に限らず、荷台4Aに相対する空気吹出装置等を有するものであっても良い。
【0050】
また、荷積込装置30は、ベースプレート62から引き出されたスライドプレート63を引き戻すため(この引き戻しはプッシャ装置51とスライドプレート63との連結装置110による連結を解除して行なう)、スライドプレート引き戻し用のチェーン66をスライドプレート63のマストフレーム側端部に取付けてある。昇降フレーム44に設けた巻取装置67によりチェーン66を巻取り、スライドプレート63を引き戻す。巻取られたチェーン66は、チェーン受68に引掛けられて、絡まないように格納される。尚、巻取装置67はモータ67Aにより駆動される。また、巻取装置67とスライドプレート63との間のチェーン66は、不図示のチェーンガイドによりガイドされる。
【0051】
スライドプレート63の先端には、壁体検出用リミットスイッチ71が設けられている。このリミットスイッチ71は、プッシャ装置51がスライドプレート63を押込んだとき、このスライドプレート63が荷台4A上の正面壁体(荷台4Aの奥の壁面4B、もしくは先行して積込済の荷1の壁面1B)に近接して相対する荷積込位置に到達したことを検出する。
【0052】
ベースプレート62の下面の、荷台前後方向に沿う3位置にはリミットスイッチ72A〜72Cが設けられている。このリミットスイッチ72A〜72Cは、荷台4Aの上面を検出し、荷台4Aに荷1を移載するとき、ベースプレート62を荷台4Aの上面に隙間なく添わせるために用いられる。
【0053】
尚、荷積込装置30において、走行体31の荷台側端部には測距装置81が設けられている。測距装置81は、荷積込装置30が走行経路を荷受入端から荷1を積込もうとするトラック4まで移動する過程で、該測距装置81が該トラック4の荷台4Aの正面を通過するときにレーザー等により、該トラック4の荷台長さ寸法Lを測定する。
【0054】
以下、荷移載装置20による荷移載手順と、荷積込装置30による荷積込手順について説明する。
【0055】
荷移載手順(図6)
(1) 荷受コンベヤ21にパレット荷姿を置く(図6(A))。
フォークリフト3によりコンベヤ21上にパレット荷姿の荷1を置くと、コンベヤ21は、荷1をプッシャ22の正面に運ぶ。
【0056】
(2) 荷積込装置30の載荷体61を荷受台23上に移動する(図6(B))。
荷積込装置30は、荷1を受取るために載荷台車35を前進して、載荷体61のベースプレート62及びスライドプレート63を荷受台23上に移動する。ベースプレート62の下面のリミットスイッチ72A〜72Cのうち根本側(マストフレーム41側)のリミットスイッチ72Cが荷受台23の上面を検出するまで、ベースプレート62を下降した後、前端側のリミットスイッチ72Aが荷受台23の上面を検出するまでベースプレート62を前方に傾け(チルトし)、ベースプレート62を荷受台23の上面に倣わせる。このとき、スライドプレート63の上面がパレット荷姿のスリップシート2Aの上面とほぼ同じ高さになる(厳密にはスライドプレート63の上面を少し低くして、コンテナ等の荷1の乗り移りを良くする)。
【0057】
(3) パレット2上の荷1だけを受け取る(図6(C))。
荷移載用プッシャ22の図示していないシート押え爪によりスリップシート2Aを押えて、荷移載用プッシャ22によりスリップシート2Aの上の荷1(コンテナや段ボール箱)だけを押し、スライドプレート63の上に移し替える。このとき、荷1は、スライドプレート63の先端側に寄った状態になるように、予め荷1をパレット2の上に積んでおく。
【0058】
(4) パレット2を排出する(図6(D))。
荷積込装置30は、スライドプレート63上に荷1を受取った後、載荷台車35を後退させ、載荷体61のベースプレート62及びスライドプレート63を荷受台23の上から戻り移動させる。また、荷受コンベヤ21により空パレット2を排出する。
【0059】
(荷積込手順)(図7〜図10)
(1) 荷1(大荷姿)を積込もうとするトラック4まで移動する(図7(A))。
作業者は積込みを開始する際、積込もうとするトラック4のタイプ(ショート、標準、ロング)及びトラック停止位置番号を荷積込装置30の制御装置に入力する。
【0060】
次に、前述のようにして荷積込装置30に荷1を受取った後、この荷積込装置30を荷1を積込もうとするトラック4まで移動する。このとき、測距装置81により目標のトラック4の荷台長さ寸法Lを測定する。測距装置81は前述の如く荷積込装置30の走行体31により取付けられており、荷受台23から目標のトラック4へ走行する途中で測距装置81がトラック4の荷台4A正面を通過する際にレーザー等により測定する。
【0061】
測距結果によって、トラック4のタイプが制御装置に入力されたデータと合っているかを照合し、間違っていれば、表示により作業者に知らせる。例えば、標準タイプと入力したのにショートであれば、そのことが警告され、作業者は、次に小の荷1を積めないことを理解する。従って、小の荷1を別のトラック4に積むか判断する。このことは詳述すると以下の如くである。即ち、標準タイプのトラック4には、大の荷を1枚と小の荷を1枚載せることができる。そして、これを見込んで、予め大の荷と小の荷を組み合わせて積むように、小のほうが先に届ける店への品物、大はその次に届ける店の品物という具合に積付けておく。従って、標準タイプと思っていた場合、大の荷を積んだ後、更にそれと対になる小の荷を積む必要があるが、もし、間違ってショートタイプのトラックに大の荷を積み込んでしまうと、それと対の小の荷を積めなくなる。従って、このようなことがないように、違っていた場合は、別の標準タイプのトラックにその荷を積むか、その荷を一旦降ろして、別のショートタイプ用の荷を持ってくるかを作業者が判断するものとするのである。
【0062】
測距結果が合っている場合、荷1をトラック4に積込む。
荷積込装置30は、目標のトラック4を設定すると、自動的に移動し、目標のトラック4の荷台4Aに位置決めされるが、この際、トラック4を検出して停止するのではなく、各位置決め用のライン5に対応して設けたドグを参照して停止するようになっている。従って、トラック4が位置決めライン5からずれている場合、トラック荷台4Aに正確に位置決めされ得ない。この場合は、荷積込装置30を手動で走行させて調整する。
【0063】
(2) 載荷台車35を移動し、載荷体61を荷台4Aに挿入する(図7(B))。
載荷台車35をトラック荷台4A側へ移動して、荷1と載荷体61を荷台4Aの内部へ挿入する。
【0064】
この際、荷台4Aの奥から荷の長さk +αを残すようにする。上記▲1▼で荷台長さLを測定したので、載荷台車35を
移動量=(L−(k +α))+a …(1)
(a:荷台端面とスライドプレート63の先端との距離(一定))
だけ移動することとなる(荷長さkは大: 2.2m、小: 1.1m)。
【0065】
また、載荷体61を荷台4Aの内部へ挿入したとき、ベースプレート62の姿勢は荷台4Aに沿うように自動調整される。即ち、ベースプレート62を荷台4Aの上面より少し上にし、載荷体61の先端を少し持ち上げた状態で荷台4Aの内部へ載荷体61を挿入すると、ベースプレート62の中央のリミットスイッチ72Bが荷台4Aの上面を検出するまで、載荷体61を下降し、次に、先端のリミットスイッチ72Cが荷台4Aの上面を検出するまで、載荷体61を傾斜させて、ベースプレート62の姿勢を荷台4Aの上面に沿わせる。
【0066】
また、載荷体61を荷台4Aの内部へ挿入する前後の間に、プッシャ装置51とスライドプレート63とを連結装置110により連結する。具体的には、シリンダ111により連結ピン112を係合孔113Aに係入する。
【0067】
(3) プッシャ装置51でスライドプレート63を押込む(図7(C))。
プッシャ装置51により連結装置110を介してスライドプレート63を押す。スライドプレート63はベースプレート62上を滑り、荷1を載せて荷台4A内へ移動する。
【0068】
スライドプレート63は車輪65を備えるので荷台4の上をスムーズに移動できる。このとき、荷1とスライドプレート63は密着しているので、ずれない。
【0069】
プッシャ装置51のストロークは 2.2m以上あり、スライドプレート63の先端のリミットスイッチ71が荷台4Aの奥の壁面4Bを検出したとき、プッシャ装置51の押出し動作を停止することで、スライドプレート63の先端を荷台奥壁面4Bまで正確に挿入できる。
【0070】
尚、プッシャ装置51のストロークを(2.2m+α)として、フルストローク押し出しても良い。この場合も同様にスライドプレート63の先端を荷台奥壁面4Bまで正確に挿入できる。ここで、リミットスイッチ71を用いる方法を取るのは、荷台長さの測定が正確に行なわれなかった場合にも荷1を荷台奥まで確実に挿入可能とするためである。
【0071】
尚、荷1の積込作業中も荷台4Aに対するベースプレート62の姿勢調整を行なう。荷1を積込むと荷台4Aが荷の重みで下がるので、リミットスイッチ72B、72Cの奥によりこれを検出したときは、積込作業を一時中断して前述(2) のベースプレート62の姿勢調整を行なう。これは、作業を一時中断せずにベースプレート62の姿勢を荷台4Aのレベルに常に追従するようにしても良い。ここでは、荷台4Aの下降が急激に起こるため、ベースプレート62の姿勢の追従が間に合わなかった場合、ベースプレート62とスライドプレート63が互いに折れる如くになって、スライドプレート63の引き戻しをスムーズに行なえなくなる危険があるので中断するようにしている。
【0072】
(4) 連結装置110によるプッシャ装置51とスライドプレート63の連結を解除してスライドプレート63を引き戻し、荷1を降ろす(図8(A))。具体的には、シリンダ111により、連結ピン112を係合孔113Aから引き抜く。
【0073】
プッシャ装置51の位置をそのままに保持してスライドプレート63を引き戻し、荷1を荷台4Aに降ろす。
【0074】
荷1はその場に降ろされるので、荷台4Aの上を押されて荷台4Aとの摩擦力により前のめりに倒れることがない。また、荷1はスライドプレート63の前端側に寄せて積まれているので、荷1の直近に荷台4Aの奥の壁面4Bがある。従って、スライドプレート63と荷台4Aとの段差により荷1が倒れようとしても、壁4Bに寄りかかって支えられるので倒れずに済む。
【0075】
また、荷1が前から順に荷台4Aに乗移っていくので、荷台4Aが「とん、とん」と下がっていくが、ベースプレート62が荷台4Aの上面より高くなると、このベースプレート62と荷台4Aの上に設けられているスライドプレート63とが互いに折れる如くになってスライドプレート63をベースプレート62から引き戻す動作がスムーズに行なえなくなるので、この場合にも前述(2) のベースプレート62の姿勢調整を行ない、ベースプレート62の姿勢を荷台4Aの上面に沿わせる。
【0076】
(5) プッシャ装置51及び載荷台車35を戻す(図8(B))。
プッシャ装置51を縮めるとともに、載荷台車35を元の位置まで戻し、更に荷1を積む場合には次の荷1を受取りに荷移載装置20に対する荷受入端まで移動して荷1を受取る。
【0077】
(6) 更に積込む荷1(小荷姿)を受取り、トラック4まで移動する(図8(C))。
更に荷1を積み足す場合(標準、或いはロングのトラック4)、同様に、荷1はスライドプレート63の先端側に寄せて積まれる。
【0078】
(7) 載荷台車35を移動する(図9(A))。
前記(1) で測定した荷台長さLと積み込んだ荷の長さK から載荷体61を挿入する位置を決め、載荷台車35を荷台4Aに向けて移動する。
【0079】
荷の長さk は、 1.1mなので、
移動量=L−k −(k +α)+a …(2)
だけ載荷台車35を移動すると、既に積んだ荷1Aとスライドプレート63の先端の間に荷長さk +αだけ隙間を残して載荷体61を挿入することができる。
【0080】
(8) プッシャ装置51とスライドプレート63とを連結装置110により連結する(図9(B))。
【0081】
プッシャ装置51を前進し、プッシャ板54の下部の検出器115によりスライドプレート63側の係合孔表示部116を検出したときに、プッシャ装置51を停止する。そして、シリンダ111の作動により、連結ピン112を係合孔113Bに係入する。
【0082】
(9) プッシャ装置51でスライドプレート63を押込む(図9(C))。
プッシャ装置51により連結装置110を介してベースプレート63を押し、荷1とスライドプレート63を荷台4Aの内部に挿入する。
【0083】
この場合も前記(3) と同様にスライドプレート63の先端のリミットスイッチ71が荷1を検出したときにプッシャ装置51の押込み動作を静止する。
【0084】
また、前述と同様に、プッシャ装置51のフルストロークを(2.2m+α)としてフルストローク押出しても良い。
【0085】
(10)連結装置110によるプッシャ装置51とスライドプレート63の連結を解除してスライドプレート63を引き戻し、荷1を降ろす(図10(A))。具体的には、シリンダ111により、連結ピン112を係合孔113Bから引き抜く。
【0086】
プッシャ装置51の位置をそのまま保持してスライドプレート63を引き戻し、荷1を荷台4Aに降ろす。
【0087】
(11)プッシャ装置51及び載荷台車35を戻す(図10(B))。
プッシャ装置51及び載荷台車53を戻し、次のトラック4へのサービスを行なう。
【0088】
以下、本実施例の作用について説明する。
▲1▼プッシャ装置51により荷1とスライドプレート63を荷台4A上の正面壁体(荷台4Aの壁面4Bもしくは先行して積込済の荷1の壁面1B)に近接して相対する荷積込位置まで積込んだ後、プッシャ装置51をそのまま保持しながら、スライドプレート63のみを引抜いて荷1を積込むものとなる。従って、スライドプレート63を引抜くとき、もし荷1がつまづいても、荷1は荷台4A上の正面壁体に支えられるので、荷崩れしない。
【0089】
▲2▼プッシャ装置51で押込むとき、荷1及びスライドプレート63を荷台4A上の正面壁体に近接して相対する位置まで移動する。即ち、荷1を荷台4A奥側の正面壁体寄りの適宜位置に安定的に積込みできる。このため、荷1が押込まれ過ぎて潰されることがない。また、荷1の積込み不足によって荷台4A上の次の荷1のための積込スペースを失うこともない。
【0090】
▲3▼プッシャ装置51により荷1を積込むとき、プッシャ装置51をスライドプレート63に連結してスライドプレート63を確実に押込むので、荷1が軽い場合にも、スライドプレート63が止まったまま荷1だけ押し出されて荷崩れする等がない。即ち、プッシャ装置51は、スライドプレート63を確実に押込むことを介して、スライドプレート63上の荷1を確実かつ安定的に荷積込位置に位置付けることができる。
【0091】
▲4▼スライドプレート63に載せる荷1の位置を予めスライドプレート63の荷台4A側に寄せておくとともに、プッシャ装置51をスライドプレート63に連結してスライドプレート63を押込む。これによって、プッシャ装置51によりスライドプレート63を押込んで荷1を荷台4A上の正面壁体に近接して相対する荷積込位置に設定するとき、荷1はスライドプレート63上をその中間位置から荷台4A側に滑らされる如くがなく、スライドプレート63とともに上記荷積込位置に設定される。従って、荷1が上記荷積込位置に設定される前の段階で、荷1がスライドプレート63上を滑るとしたら生じ得る荷1のつまづき、荷崩れの発生を回避できる。
【0092】
また、荷1をスライドプレート63先端側に寄せて積みスライドプレート63を初期位置(荷台4A奥から荷長さ分手前)まで移動して、プッシャ装置51によりスライドプレート63を一定量押し込むだけで、荷1を荷台4A奥の積み込み位置まで正確に移動するので、荷1を押し過ぎて潰したり、押し足りなくて積み込みスペースを失う等がない。
【0093】
▲5▼荷積込装置30はその載荷体61がベースプレート62とスライドプレート63とからなり、プッシャ装置51とスライドプレート63とを連結可能とした。従って、プッシャ装置51をスライドプレート63に連結してプッシャ装置51により荷1とスライドプレート63を荷台4A上の正面壁体に近接して相対する荷積込位置に押込んだ後、プッシャ装置51とスライドプレート63との連結を解除することにより、プッシャ装置51をそのまま保持しながら、スライドプレート63のみを引き戻すことが可能となり、上記▲1▼〜▲4▼を実現する装置として用いることができる。
【0094】
【発明の効果】
以上のように本発明によれば、荷崩れを生ずることなく、荷を荷台の積込位置に積込み可能とすることができる。
また、本発明によれば、荷を荷台奥側の正面壁体寄りの適宜位置に安定的に積込み可能とすることができる。
【図面の簡単な説明】
【図1】図1は出荷設備を示す模式図である。
【図2】図2は荷積込装置を示す模式図である。
【図3】図3は載荷体を示す模式図である。
【図4】図4は連結装置を示す模式図である。
【図5】図5は連結装置の変形例を示す模式図である。
【図6】図6は荷移載手順(1) 〜(4) を示す模式図である。
【図7】図7は荷積込手順(1) 〜 (3)を示す模式図である。
【図8】図8は荷積込手順(4) 〜 (6)を示す模式図である。
【図9】図9は荷積込手順(7) 〜 (9)を示す模式図である。
【図10】図10は荷積込手順(10)を示す模式図である。
【図11】図11は本発明例における荷積込作業スペースを示す模式図である。
【図12】図12は従来例における荷積込作業スペースを示す模式図である。
【図13】図13は従来例の荷積込方法を示す模式図である。
【図14】図14は比較例の荷崩れ発生状態を示す模式図である。
【符号の説明】
1 荷
4 トラック
4A 荷台
30 荷積込装置
31 走行体
35 載荷台車
51 プッシャ装置
61 載荷体
62 ベースプレート
63 スライドプレート
81 測距装置
110 連結装置
[0001]
[Industrial applications]
The present invention relates to a method and an apparatus for loading a load, which loads loads stacked in multiple stages, such as pallet loads, on a truck bed.
[0002]
[Prior art]
FIG. 12 is a schematic view showing a conventional load loading method. In this conventional technique, a load 1 is received from a pallet 2 into a forklift 3 and is loaded on a loading platform 4A of a truck 4 by the forklift 3.
[0003]
FIG. 13 shows a state where the load 1 is loaded into the back of the loading platform 4A by the push-pull forklift 3. After the fork 3A of the forklift 3 is inserted into the loading platform 4A, the load 1 on the fork 3A is pushed. It is pushed into the back of the bed 4A by the device 3B.
[0004]
[Problems to be solved by the invention]
However, the prior art has the following problems (1) to (3).
{Circle around (1)} When the load 1 on the fork 3A is pushed out by the pusher device 3B, since the distance from the fork 3A to the deep wall of the load 4A is far away, the load 1 is stumbled by the step between the fork 3A and the load 4A. When this occurs, there is nothing to support the load 1 and the load collapses (FIG. 13B). In addition, since the load 1 is moved while sliding with the pusher device 3B, the load 1 is easily tripped due to friction with the loading platform 4A, and if the balance is slightly lost, the load 1 is easily pushed by the load 1 behind and easily falls down.
[0005]
{Circle around (2)} When the load 1 is pushed into the bed 4A by the pusher device 3B, the load 1 and the pusher device 3B obstruct the field of view of the worker, and the worker cannot see into the back of the bed 4A. I don't know if I entered. For this reason, the load 1 may be crushed by being pushed too much, or the loading space for the next load on the bed may be lost due to lack of the load, and the next load may not be loaded (FIG. 13C).
[0006]
SUMMARY OF THE INVENTION It is an object of the present invention to enable a load to be loaded at a loading position of a loading platform without causing load collapse.
[0007]
Another object of the present invention is to enable a load to be stably loaded at an appropriate position near the front wall on the back side of the loading platform.
[0008]
[Means for Solving the Problems]
According to the first aspect of the present invention, there is provided a loading method for loading a load to a loading position of a loading platform, wherein the load is a slide plate.To the loading side, Pusher deviceWhen it comes into contact with the load,slide plateToLinkingAnd thisPush the slide plate to the push position with the pusher device, move the load and the slide plate to the loading position opposite to the front wall on the loading platform, then release the connection between the pusher device and the slide plate, and push the pusher device. The load is transferred to the loading position by pulling back the slide plate from the loading position while holding the apparatus at the pushing position.
[0009]
According to a second aspect of the present invention, in the first aspect of the present invention, the load is further moved toward the loading platform side of the slide plate and the leading end of the slide plate is loaded from the front wall at the loading position. The slide plate is pushed in by a pusher device after being positioned in front by the length.
[0010]
According to a third aspect of the present invention, there is provided a loading truck that moves forward and backward with respect to a loading position of a loading platform, a loading body provided on the loading truck, and a loading body for loading a load, and a loading body provided on the loading truck and mounted on the loading truck. In a load loading device having a pusher device that moves a load toward a load loading position, a loading body includes a base plate fixed to a loading cart side, and a slide plate that can move in and out of the base plate. Consisting ofThe load is brought to the loading platform side of the slide plate and stacked, and when the pusher device comes into contact with the load, the pusher device and the slide plate are connected, and this slide plate is pushed to the pushing position by the pusher device, and the load and the slide plate are placed in front of the loading platform. Disconnecting the pusher device from the slide plate after moving to the opposing loading position close to the wall, and pulling back the slide plate from the loading position while holding the pusher device at the pushing position. To transfer the load to the loading positionIt was made possible.
According to a fourth aspect of the present invention, in the third aspect of the present invention, the connecting device between the pusher device and the slide plate can be changed.
According to a fifth aspect of the present invention, in the third or fourth aspect of the present invention, a distance measuring device for measuring the length of the cargo bed is further provided.
[0011]
[Action]
According to the present invention,(1)~(Five)Has the effect of
(1)After loading the load and slide plate close to the front wall on the loading platform (wall surface of the loading platform or the wall surface of the previously loaded load) by the pusher device, the pusher device is left as it is. While holding, only the slide plate is pulled out and the load is loaded. Therefore, when the slide plate is pulled out, even if the load is stumbled, the load is supported by the front wall body on the loading platform and does not collapse.
[0012]
(2)When pushing in with the pusher device, the load and the slide plate are moved to a position close to and facing the front wall on the loading platform. That is, the load can be stably loaded at an appropriate position near the front wall on the back side of the loading platform. For this reason, a load is not pushed too much and crushed. Also, there is no loss of loading space for the next load on the bed due to insufficient loading.
[0013]
(3)Advantages of connecting the pusher device to the slide plate and pushing the slide plate when loading the load with the pusher device
(a) When the pusher device directly pushes the load, if the load is light, the frictional resistance between the load and the slide plate is small. And the load may collapse (FIG. 14).
[0014]
Even if the slide plate is brought into rolling contact with the loading platform, the weight of the load is about 8 kg because the weight of the slide plate is, for example, 250 kg.
(250 + 8 kg) × 0.01 = 2.5 kg> 8 kg × 0.3 = 2.4 kg
(However, the rolling friction coefficient between the slide plate and the loading platform is set to 0.01, and the sliding friction coefficient between the load and the slide plate is set to 0.3), and the frictional resistance between the load and the slide plate is reduced (light weight such as disposable diapers). It happens when the load is high and the load is low).
[0015]
When a chain for pulling back the slide plate is connected to the slide plate and the slide plate has a mechanism for pulling out the chain when the load is pushed in, the pull-out resistance of the chain acts as a force for stopping the slide plate. However, the problem described above occurs even when the load is heavy.
[0016]
(B) On the other hand, in the present invention, the pusher device is connected to the slide plate and the slide plate is securely pushed in. Even when the load is light, the load is pushed out while the slide plate is stopped and the load collapses. Nothing to do. That is, the pusher device can reliably and stably position the load on the slide plate to the load position through the reliable pushing of the slide plate.
[0017]
(Four)The position of the load to be placed on the slide plate is previously moved to the slide platform side of the slide plate, and the pusher device is connected to the slide plate to push the slide plate. Thus, when the pusher device pushes the slide plate to set the load to the loading position close to the front wall on the loading platform, the load is slid on the slide plate from the intermediate position to the loading platform side. However, it is set at the loading position together with the slide plate. Therefore, before the load is set at the loading position, the load can be prevented from tripping and collapsing if the load slides on the slide plate.
[0018]
In addition, the load is moved to the slide plate tip side, the slide plate is moved to the initial position (from the back of the bed to the side of the load length), and the pusher device pushes the slide plate by a certain amount, and the load is moved to the back of the bed. Since it moves accurately to the loading position, there is no such thing as crushing the load by pushing too much or losing the loading space due to lack of pushing.
[0019]
(Five)The loading body constituting the loading device is composed of a base plate and a slide plate, and the pusher device and the slide plate can be connected. Therefore, after the pusher device is connected to the slide plate and the load and the slide plate are pushed by the pusher device to the loading position opposed to and close to the front wall on the loading platform, the connection between the pusher device and the slide plate is established. By releasing, it is possible to pull back only the slide plate while holding the pusher device as it is,(1) ~ (Four)Can be used as a device for realizing.
[0020]
【Example】
1 is a schematic diagram showing a shipping facility, FIG. 2 is a schematic diagram showing a loading device, FIG. 3 is a schematic diagram showing a loading body, FIG. 4 is a schematic diagram showing a connecting device, and FIG. 5 is a modified example of the connecting device. , FIG. 6 is a schematic view showing the load transfer procedures (1) to (4), FIG. 7 is a schematic view showing the load procedures (1) to (3), and FIG. 8 is a load procedure. (4) to (6), FIG. 9 is a schematic diagram showing loading procedures (7) to (9), FIG. 10 is a schematic diagram showing loading procedure (10), and FIG. FIG. 12 is a schematic view showing a loading work space in a conventional example, FIG. 12 is a schematic view showing a loading work space in a conventional example, FIG. 13 is a schematic view showing a loading method of a conventional example, and FIG. 14 is a comparative example. It is a schematic diagram which shows a load collapse occurrence state.
[0021]
(A) Shipping equipment (Figure 1)
The shipping equipment 10 includes a load transfer device 20 that transfers the load 1 from the pallet 2 and a load loading device 30 that loads the load 1 on the loading platform 4A of the truck 4.
[0022]
Note that the truck 4 is disposed in a truck yard along the traveling route of the loading device 30.
[0023]
The load transfer device 20 is supplied with the load 1 in the form of pallets by the forklift 3, and transfers only the load 1 to the load loading device 30.
[0024]
The loading device 30 receives the load 1 from the load transfer device 20, carries the load 1 to the truck 4 where the load 1 is to be loaded, and loads the load 1 onto the loading platform 4A of the truck 4.
[0025]
(B) Load 1 (Fig. 1)
The pallet packing form is obtained by laying a slip sheet (resin sheet) 2A on a pallet 2 and stacking a load 1 such as a cardboard box or a plastic container thereon.
[0026]
The size of the pallet 2 is about 2.2 m here. There are two types of pallet packing.
(1) A load loaded for 2.2m (large load).
(2) One half of the above (1), with a load of 1.1m (package appearance).
[0027]
The number of types of the pallet packing may be more or may be one. Here, the two types are used to efficiently store the load 1 according to the size of the truck 4. There are three types of 2-ton trucks for delivery: (1) short, (2) standard, and (3) long.
Short: One large package
Standard: One large package and one small package
Long: 2 large packages
When it is loaded like this, it just fits on the loading platform 4A.
[0028]
(C) Track layout (Figure 1)
In the truck yard of the shipping facility 10, the truck loading ends of the plurality of trucks 4 are aligned with each other, and the trucks 4 are stopped facing the traveling route of the loading device 30. At this time, the track 4 is stopped parallel to the positioning line 5. The positioning line 5 extends in a direction perpendicular to the traveling direction of the loading device 30. This is because the front-rear direction of the loading platform 4A of the truck 4 matches the direction in which the loading device 30 moves in and out of the load 1. Here, since the loading device 30 is moving the load 1 in and out of the direction perpendicular to the traveling direction, the line 5 is also drawn in the direction perpendicular to the traveling direction. The direction in which the load 1 moves can be made oblique to the traveling direction, in which case the line 5 is also drawn obliquely.
[0029]
(D) Load transfer device (Figs. 1 and 6)
The load transfer device 20 includes a load receiving conveyor 21, a load transfer pusher 22, and a load receiving table 23.
[0030]
The load receiving conveyor 21 receives the load 1 of the pallet packing form from the forklift 3 and carries the pallet packing form to the front of the pusher 22.
[0031]
The load transfer pusher 22 has a sheet pressing claw (not shown) that presses the slip sheet 2A in the pallet packing state. When the slip sheet 2A is pressed by the sheet pressing claw, the load on the sheet 2A is pushed by the pusher 22. Only 1 is pushed out toward the receiving platform 23.
[0032]
The load receiving table 23 is disposed to face a load receiving end of the traveling route of the load loading device 30 and supports a loading body 61 of the load loading device 30 described later. At this time, the upper surface of the slide plate 63 constituting the loading body 61 is almost the same height as the upper surface of the slip sheet 2A in the form of a pallet (strictly speaking, the upper surface of the slide plate 63 is slightly lowered, and (To improve the transfer).
[0033]
A retractable transfer plate 24 is attached to a side frame facing the load receiving table 23 of the load receiving conveyor 21, and a slide plate 63 of a loading body 61 set on the load receiving table 24 and a pallet 2 on the load receiving conveyor 21. Is filled by the transfer plate 24 when the load 1 is transferred, and the load 1 is prevented from tripping in the gap.
[0034]
(E) Loading device (Figs. 1 to 5)
The loading device 30 includes a traveling body 31 that travels along the loading end of the truck 4 stopped at the truck yard. The traveling body 31 includes wheels 33 mounted on rails 32 and is driven by a traveling motor 34.
[0035]
The loading device 30 includes a loading truck 35 that is movable on the traveling body 31 in the front-rear direction of the loading platform of the truck 4 (moves forward and backward with respect to the loading location of the loading platform 4A). The traveling body 31 includes a bogie rail 36. The loading truck 35 includes wheels 37 mounted on a truck rail 36 and is driven by a truck traveling motor 38.
[0036]
The loading device 30 supports a mast frame 41 on a loading cart 35. The mast frame 41 is supported by a loading cart 35 via a mast frame support shaft 42 so as to be tiltable, and the tilt angle can be changed by a tilt cylinder 43. A lifting frame 44 is provided on the mast frame 41 via a guide rail 45 and a cam follower 46 so as to be movable up and down. The elevating amount of the elevating frame 44 can be arbitrarily changed by the elevating cylinder 47.
[0037]
The loading device 30 is provided with a pusher device 51 and a loading body 61 on a lifting frame 44.
[0038]
In the pusher device 51, a pusher plate 54 is attached to the tip of a pantograph 53 that is expanded and contracted by a pusher cylinder 52, and the pusher plate 54 can be moved back and forth. The pusher device 51 moves the load 1 on the load body 61 toward the loading position.
[0039]
The loading body 61 includes a base plate 62 fixed to the elevating frame 44, and a slide plate 63 on which the load 1 is placed and which can move in and out of the base plate 62. The load 1 is placed on the slide plate 63 (FIG. 3). ).
[0040]
At this time, the pusher device 51 and the slide plate 63 can be connected by the connecting device 110. As shown in FIGS. 2 and 4, the connecting device 110 is provided with a connecting pin 112 at the tip of a piston rod of a cylinder 111 fixed to the side of the pusher plate 54, and the connecting pin 112 is attached to the side edge of the slide plate 63. The engaging hole 113 provided can be disengaged. Reference numeral 114 denotes a guide for the connection pin 112.
[0041]
In this embodiment, the slide plate 63 has two engagement holes 113A and 113B. The engagement hole 113A is provided on the base end side of the slide plate 63 and is used when loading a large load 1. The engagement hole 113B is provided at the center of the slide plate 63 and is used when loading the small load 1.
[0042]
The connection between the pusher device 51 and the slide plate 63 is made in the following (a) or (b).
(A) When loading the load 1 in a large load, the connection pin 112 is engaged with the engagement hole 113A by the operation of the cylinder 111 with the pusher device 51 set to the original position and the slide plate 63 also set to the original position. Then, the pusher device 51 and the slide plate 63 are connected.
[0043]
(B) At the time of loading the load 1 in a small package, while the pusher device 51 is advanced, the detector 115 such as an optical sensor provided at the lower portion of the pusher plate 54 is on the same line as the engagement hole 113B of the slide plate 63. The pusher device 51 is stopped by the detection of the engagement hole display section 116 such as a reflection plate provided in the apparatus (FIG. 4B). Then, the pusher device 51 and the slide plate 63 are connected by engaging the connection pin 112 into the engagement hole 113B by the operation of the cylinder 111.
[0044]
The number of the engagement holes 113 is not limited to two (113A, 113B) provided at the side edge of the slide plate 63, and three or more engagement holes 113 are provided at a connection position between the pusher device 51 and the slide plate 63. May be changed in multiple stages.
[0045]
Further, as shown in FIG. 5A, the coupling device 110 is provided with a suction pad 112A at the tip of the piston rod of the cylinder 111, and the suction pad 112A is detachable from the side edge of the slide plate 63. May be.
[0046]
Further, as shown in FIG. 5B, the coupling device 110 is provided with an engaging claw 112B at the tip of the piston rod of the cylinder 111, and the engaging claw 112B is provided on the side edge of the slide plate 63. It may be one that can be disengaged from the teeth.
[0047]
Further, as shown in FIG. 5C, the connecting device 110 is provided with a rubber pad 112C at the tip of the piston rod of the cylinder 111, and presses the rubber pad 112C against the upper surface of the slide plate 63 to connect the pusher device 51 with the slide plate 63. May be connectable. At this time, the connection of the pusher device 51 and the slide plate 63 by the connecting device 110 is performed when the pusher plate 54 comes into contact with the load 1, and the detector 120 that detects the contact between the pusher plate 54 and the load 1 is used. . The detector 120 includes a load detection plate 121 provided over the entire area of the pusher plate 54 in the width direction, and a limit switch 122 which is turned on / off by the swing of the load detection plate 121. The cylinder 111 of the connecting device 110 is extended when the limit switch 122 is turned on to press the rubber pad 112C against the upper surface of the slide plate 63.
[0048]
The base plate 62 includes a roller 64 on which the slide plate 63 is supported so as to be able to move in and out. That is, when the pusher device 51 pushes the slide plate 63 connected by the connecting device 110 toward the loading position, the slide plate 63 is pulled out from the base plate 62 and is moved to the loading position with the load 1 placed thereon. Move toward.
[0049]
The slide plate 63 has wheels 65, and can move lightly on the loading platform 4 </ b> A of the truck 4 via the wheels 65. The slide plate 63 is not limited to the wheels 65 as long as it can move lightly on the loading platform 4A of the truck 4, and may have an air blowing device or the like facing the loading platform 4A.
[0050]
Further, the loading device 30 pulls back the slide plate 63 pulled out from the base plate 62 (this pullback is performed by releasing the connection of the pusher device 51 and the slide plate 63 by the connection device 110), and thus the slide plate pullback. Is attached to the end of the slide plate 63 on the mast frame side. The chain 66 is wound by the winding device 67 provided on the lifting frame 44, and the slide plate 63 is pulled back. The wound chain 66 is hooked on the chain receiver 68 and stored so as not to be entangled. The winding device 67 is driven by a motor 67A. The chain 66 between the winding device 67 and the slide plate 63 is guided by a chain guide (not shown).
[0051]
At the tip of the slide plate 63, a wall body detection limit switch 71 is provided. When the pusher device 51 pushes the slide plate 63, the limit switch 71 moves the slide plate 63 to the front wall body (the back wall 4B of the load bed 4A or the load 1 previously loaded). Is reached in the vicinity of the wall surface 1B).
[0052]
Limit switches 72A to 72C are provided at three positions on the lower surface of the base plate 62 along the front-rear direction of the carrier. The limit switches 72A to 72C are used to detect the upper surface of the carrier 4A and to attach the base plate 62 to the upper surface of the carrier 4A without any gap when transferring the load 1 to the carrier 4A.
[0053]
In the loading device 30, a distance measuring device 81 is provided at an end of the traveling body 31 on the platform side. In the process in which the loading device 30 moves the traveling route from the receiving end to the truck 4 where the load 1 is to be loaded, the ranging device 81 moves the front surface of the loading platform 4A of the truck 4 in the process of moving. When passing, the length L of the bed of the truck 4 is measured by a laser or the like.
[0054]
Hereinafter, a description will be given of a loading procedure by the loading apparatus 20 and a loading procedure by the loading apparatus 30.
[0055]
Load transfer procedure (Fig. 6)
(1) The pallet packing is placed on the receiving conveyor 21 (FIG. 6A).
When the load 1 in a pallet package is placed on the conveyor 21 by the forklift 3, the conveyor 21 carries the load 1 to the front of the pusher 22.
[0056]
(2) The loading body 61 of the loading device 30 is moved onto the receiving table 23 (FIG. 6B).
The loading device 30 advances the loading cart 35 to receive the load 1 and moves the base plate 62 and the slide plate 63 of the loading body 61 onto the loading tray 23. After lowering the base plate 62 until the limit switch 72C on the bottom side (mast frame 41 side) of the lower limit switches 72A to 72C on the lower surface of the base plate 62 detects the upper surface of the receiving tray 23, the limit switch 72A on the front end side receives the load. The base plate 62 is tilted (tilted) forward until the upper surface of the base 23 is detected, so that the base plate 62 follows the upper surface of the receiving base 23. At this time, the upper surface of the slide plate 63 is almost the same height as the upper surface of the slip sheet 2A in the form of a pallet (strictly, the upper surface of the slide plate 63 is slightly lowered to improve the transfer of the load 1 such as a container. ).
[0057]
(3) Only the load 1 on the pallet 2 is received (FIG. 6C).
The slip sheet 2A is pressed by a sheet pressing claw (not shown) of the load transfer pusher 22, and only the load 1 (container or cardboard box) on the slip sheet 2A is pressed by the load transfer pusher 22, and the slide plate 63 is pressed. Transfer to the top. At this time, the load 1 is loaded on the pallet 2 in advance so that the load 1 is shifted toward the leading end side of the slide plate 63.
[0058]
(4) The pallet 2 is discharged (FIG. 6D).
After receiving the load 1 on the slide plate 63, the loading device 30 retreats the loading cart 35 and returns the base plate 62 and the slide plate 63 of the loading body 61 from above the loading tray 23. The empty pallets 2 are discharged by the receiving conveyor 21.
[0059]
(Loading procedure) (Figs. 7 to 10)
(1) Move to the truck 4 where the load 1 (large load) is to be loaded (FIG. 7A).
When starting loading, the operator inputs the type (short, standard, long) of the truck 4 to be loaded and the truck stop position number to the control device of the loading device 30.
[0060]
Next, after the load 1 is received by the loading device 30 as described above, the loading device 30 is moved to the truck 4 where the load 1 is to be loaded. At this time, the length L of the target truck 4 is measured by the distance measuring device 81. The distance measuring device 81 is attached by the traveling body 31 of the loading device 30 as described above, and the distance measuring device 81 passes in front of the loading platform 4A of the truck 4 while traveling from the load receiving platform 23 to the target truck 4. At this time, it is measured with a laser or the like.
[0061]
Based on the distance measurement result, it is checked whether the type of the track 4 matches the data input to the control device, and if incorrect, the operator is notified by a display. For example, if the standard type is input but a short is issued, that is warned, and the operator understands that the next small load 1 cannot be loaded. Therefore, it is determined whether to load the small load 1 on another truck 4. This will be described in detail below. That is, one large load and one small load can be placed on the standard type truck 4. In anticipation of this, the small cargo is loaded in advance to the store to be delivered first, and the large cargo to the store to be delivered next, so that the large cargo and the small cargo are combined and loaded in advance. Therefore, if you think that it is a standard type, after loading a large load, it is necessary to load a small load that complies with it, but if you mistakenly load a large load on a short type truck, You will not be able to load the opposite small load. Therefore, in order to avoid such a case, if it is different, work to load the load on another standard type truck or unload the load once and bring another short type load The person shall judge.
[0062]
If the result of the distance measurement is correct, the load 1 is loaded on the truck 4.
When the target truck 4 is set, the loading device 30 automatically moves and is positioned on the loading platform 4A of the target truck 4. At this time, instead of detecting the truck 4 and stopping, the loading device 30 does not stop. Stopping is performed with reference to a dog provided corresponding to the positioning line 5. Therefore, when the track 4 is displaced from the positioning line 5, it cannot be accurately positioned on the truck bed 4A. In this case, the adjustment is performed by manually running the loading device 30.
[0063]
(2) The loading cart 35 is moved, and the loading body 61 is inserted into the loading platform 4A (FIG. 7B).
The loading truck 35 is moved to the truck loading platform 4A side, and the load 1 and the loading body 61 are inserted into the loading platform 4A.
[0064]
At this time, the length k of the load from the back of the loading platform 4A1  + Α is left. Since the carrier length L was measured in the above (1), the carrier 35 was
Movement amount = (L− (k1  + Α)) + a (1)
(A: distance between the end face of the loading platform and the tip of the slide plate 63 (constant))
(Load length k is large: 2.2 m, small: 1.1 m).
[0065]
When the loading body 61 is inserted into the loading platform 4A, the posture of the base plate 62 is automatically adjusted so as to be along the loading platform 4A. That is, when the load 61 is inserted into the load 4A while the base plate 62 is slightly higher than the upper surface of the load 4A and the tip of the load 61 is slightly lifted, the limit switch 72B at the center of the base plate 62 moves to the upper surface of the load 4A. , The loading body 61 is lowered, and then the loading body 61 is tilted until the limit switch 72C at the tip detects the upper surface of the loading platform 4A so that the attitude of the base plate 62 follows the upper surface of the loading platform 4A. .
[0066]
The pusher device 51 and the slide plate 63 are connected by the connection device 110 before and after the loading body 61 is inserted into the loading platform 4A. Specifically, the connecting pin 112 is engaged with the engagement hole 113A by the cylinder 111.
[0067]
(3) The slide plate 63 is pushed in by the pusher device 51 (FIG. 7C).
The slide plate 63 is pushed by the pusher device 51 via the connecting device 110. The slide plate 63 slides on the base plate 62, and loads the load 1 and moves into the loading platform 4A.
[0068]
Since the slide plate 63 includes the wheels 65, the slide plate 63 can move on the carrier 4 smoothly. At this time, since the load 1 and the slide plate 63 are in close contact with each other, they do not shift.
[0069]
The stroke of the pusher device 51 is 2.2 m or more. When the limit switch 71 at the tip of the slide plate 63 detects the inner wall surface 4B of the loading platform 4A, the pushing operation of the pusher device 51 is stopped. The tip can be accurately inserted to the back wall 4B of the carrier.
[0070]
Note that the stroke of the pusher device 51 may be set to (2.2 m + α), and the pusher device 51 may be pushed out by a full stroke. Also in this case, similarly, the tip of the slide plate 63 can be accurately inserted to the back wall 4B of the loading platform. Here, the reason for using the limit switch 71 is to ensure that the load 1 can be reliably inserted into the back of the bed even when the length of the bed is not accurately measured.
[0071]
Note that the posture of the base plate 62 with respect to the loading platform 4A is also adjusted during the loading operation of the load 1. When the load 1 is loaded, the loading platform 4A is lowered by the weight of the load. Therefore, when this is detected by the depth of the limit switches 72B and 72C, the loading operation is temporarily stopped and the posture adjustment of the base plate 62 described in the above (2) is performed. Do. In this case, the posture of the base plate 62 may always follow the level of the carrier 4A without suspending the work. Here, the descent of the loading platform 4A occurs rapidly, so that if the posture of the base plate 62 cannot be followed in time, the base plate 62 and the slide plate 63 may be broken together, and the slide plate 63 may not be able to be pulled back smoothly. There is a break so there is.
[0072]
(4) The connection between the pusher device 51 and the slide plate 63 by the connection device 110 is released, the slide plate 63 is pulled back, and the load 1 is unloaded (FIG. 8A). Specifically, the connecting pin 112 is pulled out from the engagement hole 113A by the cylinder 111.
[0073]
The slide plate 63 is pulled back while the position of the pusher device 51 is kept as it is, and the load 1 is lowered to the loading platform 4A.
[0074]
Since the load 1 is unloaded on the spot, the load 1 is not pushed down on the loading platform 4A and falls down due to frictional force with the loading platform 4A. Since the load 1 is stacked near the front end of the slide plate 63, there is a wall surface 4B at the back of the loading platform 4A in the immediate vicinity of the load 1. Therefore, even if the load 1 tries to fall down due to the step between the slide plate 63 and the loading platform 4A, the load 1 leans against the wall 4B and is supported.
[0075]
In addition, since the load 1 is transferred to the loading platform 4A in order from the front, the loading platform 4A is lowered as "ton", but when the base plate 62 is higher than the upper surface of the loading platform 4A, the base plate 62 and the loading platform 4A are moved. Since the slide plate 63 provided on the base plate breaks with each other and the operation of pulling the slide plate 63 back from the base plate 62 cannot be performed smoothly, the posture adjustment of the base plate 62 described in (2) is performed in this case also. The posture of the base plate 62 is made to follow the upper surface of the carrier 4A.
[0076]
(5) The pusher device 51 and the loading cart 35 are returned (FIG. 8B).
When the pusher device 51 is contracted, the loading cart 35 is returned to the original position, and when the load 1 is further loaded, the load 1 is moved to the load receiving end of the load transfer device 20 to receive the next load 1 and receives the load 1.
[0077]
(6) Further, the load 1 (small package) to be received is received and moved to the truck 4 (FIG. 8C).
When the load 1 is further added (standard or long truck 4), similarly, the load 1 is stacked near the leading end of the slide plate 63.
[0078]
(7) The loading cart 35 is moved (FIG. 9A).
The length L of the loading platform measured in the above (1) and the length K of the loaded cargo.1  Then, the position where the loading body 61 is inserted is determined, and the loading truck 35 is moved toward the loading platform 4A.
[0079]
Length of load k2  Is 1.1m
Movement amount = L-k1  − (K2  + Α) + a (2)
When the loading cart 35 is moved only, the load length k is between the already loaded load 1A and the tip of the slide plate 63.2  The loaded body 61 can be inserted with a gap left by + α.
[0080]
(8) The pusher device 51 and the slide plate 63 are connected by the connecting device 110 (FIG. 9B).
[0081]
The pusher device 51 is moved forward, and when the detector 115 below the pusher plate 54 detects the engagement hole display portion 116 on the slide plate 63 side, the pusher device 51 is stopped. Then, the operation of the cylinder 111 causes the connection pin 112 to engage with the engagement hole 113B.
[0082]
(9) The slide plate 63 is pushed in by the pusher device 51 (FIG. 9C).
The base plate 63 is pushed by the pusher device 51 via the connecting device 110, and the load 1 and the slide plate 63 are inserted into the loading platform 4A.
[0083]
In this case as well, as in (3) above, when the limit switch 71 at the tip of the slide plate 63 detects the load 1, the pushing operation of the pusher device 51 is stopped.
[0084]
In the same manner as described above, the full stroke of the pusher device 51 may be set to (2.2 m + α) to perform the full stroke extrusion.
[0085]
(10) The connection between the pusher device 51 and the slide plate 63 by the connection device 110 is released, the slide plate 63 is pulled back, and the load 1 is unloaded (FIG. 10A). Specifically, the connecting pin 112 is pulled out of the engaging hole 113B by the cylinder 111.
[0086]
The slide plate 63 is pulled back while the position of the pusher device 51 is kept as it is, and the load 1 is lowered to the loading platform 4A.
[0087]
(11) The pusher device 51 and the loading cart 35 are returned (FIG. 10B).
The pusher device 51 and the loading truck 53 are returned, and the service to the next truck 4 is performed.
[0088]
Hereinafter, the operation of the present embodiment will be described.
{Circle around (1)} The load 1 and the slide plate 63 are loaded by the pusher device 51 such that the load 1 and the slide plate 63 are brought into close proximity to the front wall (the wall 4B of the load 4A or the wall 1B of the load 1 previously loaded). After loading to the position, the load 1 is loaded by pulling out only the slide plate 63 while holding the pusher device 51 as it is. Therefore, when the slide plate 63 is pulled out, even if the load 1 is stumbled, the load 1 is supported by the front wall on the loading platform 4A and does not collapse.
[0089]
(2) When pushing in with the pusher device 51, the load 1 and the slide plate 63 are moved to a position close to and opposed to the front wall on the loading platform 4A. That is, the load 1 can be stably loaded at an appropriate position near the front wall on the back side of the loading platform 4A. For this reason, the load 1 is not pushed too much and is not crushed. In addition, the loading space for the next load 1 on the loading platform 4A is not lost due to insufficient loading of the load 1.
[0090]
(3) When the load 1 is loaded by the pusher device 51, the pusher device 51 is connected to the slide plate 63 and the slide plate 63 is securely pushed, so that even when the load 1 is light, the slide plate 63 remains stopped. There is no such thing as the load 1 is pushed out and the load collapses. In other words, the pusher device 51 can reliably and stably position the load 1 on the slide plate 63 at the load position through the reliable pushing of the slide plate 63.
[0091]
{Circle around (4)} The position of the load 1 placed on the slide plate 63 is previously brought to the loading platform 4A side of the slide plate 63, and the pusher device 51 is connected to the slide plate 63 to push the slide plate 63. Thereby, when pushing the slide plate 63 by the pusher device 51 and setting the load 1 to the loading position close to the front wall on the loading platform 4A, the load 1 moves on the slide plate 63 from the intermediate position. It is set to the loading position together with the slide plate 63 without being slid to the loading platform 4A side. Therefore, before the load 1 is set at the loading position, the load 1 can be prevented from tripping and collapsing if the load 1 slides on the slide plate 63.
[0092]
Further, the load 1 is moved to the leading end side of the slide plate 63, the stacking slide plate 63 is moved to the initial position (from the back of the loading platform 4A to the front of the load length), and the pusher device 51 pushes the slide plate 63 by a fixed amount. Since the load 1 is accurately moved to the loading position at the back of the loading platform 4A, the load 1 is not excessively pushed and crushed, and the loading space is not lost due to insufficient pushing.
[0093]
{Circle around (5)} In the loading device 30, the loading body 61 includes a base plate 62 and a slide plate 63, and the pusher device 51 and the slide plate 63 can be connected. Therefore, after the pusher device 51 is connected to the slide plate 63 and the load 1 and the slide plate 63 are pushed by the pusher device 51 to the loading position close to the front wall on the loading platform 4A, the pusher device 51 is pushed. By releasing the connection between the slide plate 63 and the slide plate 63, it is possible to pull back only the slide plate 63 while holding the pusher device 51 as it is, and it can be used as a device that realizes the above (1) to (4). .
[0094]
【The invention's effect】
As described above, according to the present invention, it is possible to load a load to the loading position of the loading platform without causing load collapse.
Further, according to the present invention, it is possible to stably load a load at an appropriate position near the front wall on the back side of the loading platform.
[Brief description of the drawings]
FIG. 1 is a schematic diagram showing shipping equipment.
FIG. 2 is a schematic view showing a loading device;It is.
FIG. 3 is a schematic view showing a loading body;It is.
FIG. 4 is a schematic view showing a connecting device.It is.
FIG. 5 is a schematic view showing a modification of the connecting device.It is.
FIG. 6 is a schematic view showing a procedure (1) to (4) for transferring a load;It is.
FIG. 7 is a schematic diagram showing loading procedures (1) to (3).It is.
FIG. 8 is a schematic diagram showing loading procedures (4) to (6).It is.
FIG. 9 is a schematic view showing loading procedures (7) to (9).It is.
FIG. 10 is a schematic view showing a loading procedure (10).It is.
FIG. 11 is a schematic view showing a loading work space in the example of the present invention.It is.
FIG. 12 is a schematic diagram showing a loading work space in a conventional example.It is.
FIG. 13 is a schematic diagram showing a conventional loading method.
FIG. 14 is a schematic diagram illustrating a collapse occurrence state of a comparative example.
[Explanation of symbols]
1 load
4 tracks
4A carrier
30 Loading device
31 Running body
35 loading trolley
51 Pusher device
61 loading body
62 Base plate
63 slide plate
81  Distance measuring device
110 coupling device

Claims (5)

荷を荷台の荷積込位置に積込む荷の積込方法において、
荷をスライドプレートの荷台側に寄せて積み
プッシャ装置が荷に接触したところでプッシャ装置とスライドプレート連結し、このスライドプレートをプッシャ装置で押込位置まで押込み、荷及びスライドプレートを荷台上の正面壁体に近接して相対する荷積込位置まで移動した後、
プッシャ装置とスライドプレートとの連結を解除し、プッシャ装置を上記押込位置に保持したまま、スライドプレートを荷積込位置から引き戻すことにより、荷を荷積込位置へ移載することを特徴とする荷の積込方法。
In the loading method of loading a load to the loading position of the loading platform,
Load the cargo by bringing it to the loading platform side of the slide plate,
Pusher device connects the pusher device and the slide plate was in contact with the load, pushing the slide plate to the depressed position by the pusher device, facing in proximity the load and the slide plate to the front wall of the loading platform loading write position After moving to
The connection between the pusher device and the slide plate is released, and the load is transferred to the load position by pulling back the slide plate from the load position while holding the pusher device at the pushing position. How to load.
前記荷をスライドプレートの荷台側に寄せて積み、
スライドプレートの先端を荷積込位置の前記正面壁体から荷長さ分手前に位置させた後、
スライドプレートをプッシャ装置で押込む請求項1記載の荷の積込方法。
The load is moved to the slide plate carrier side and stacked,
After positioning the tip of the slide plate from the front wall at the loading position by the load length,
The load loading method according to claim 1, wherein the slide plate is pushed by a pusher device.
荷台の荷積込位置に対して進退する載荷台車と、
載荷台車上に設けられ、荷を載せる載荷体と、
載荷台車上に設けられ、載荷体上の荷を荷積込位置に向けて移動するプッシャ装置とを有してなる荷の積込装置において、
載荷体が、載荷台車側に固定されたベースプレートと、ベースプレートに対して出入自在なスライドプレートとからなり、
荷をスライドプレートの荷台側に寄せて積み、プッシャ装置が荷に接触したところでプッシャ装置とスライドプレートを連結し、このスライドプレートをプッシャ装置で押込位置まで押込み、荷及びスライドプレートを荷台上の正面壁体に近接して相対する荷積込位置まで移動した後、プッシャ装置とスライドプレートとの連結を解除し、プッシャ装置を上記押込位置に保持したまま、スライドプレートを荷積込位置から引き戻すことにより、荷を荷積込位置へ移載可能としてなることを特徴とする荷の積込装置。
A loading truck that moves back and forth with respect to the loading position of the loading platform,
A loading body provided on the loading trolley for loading the load;
A loader provided on the loading cart and having a pusher device for moving the load on the loader toward the loading position,
The loading body is composed of a base plate fixed to the loading cart side, and a slide plate that can freely enter and exit the base plate,
The load is brought to the slide plate carrier side and stacked, and when the pusher device comes into contact with the load, the pusher device and the slide plate are connected, the slide plate is pushed to the pushing position by the pusher device, and the load and the slide plate are placed in front of the load platform. After moving to the loading position opposed to the wall, the connection between the pusher device and the slide plate is released, and the slide plate is pulled back from the loading position while the pusher device is held at the pushing position. The load loading device is capable of transferring a load to a loading position .
前記プッシャ装置とスライドプレートとの連結装置を変更可能にしてなる請求項3に記載の荷の積込装置。4. The load loading device according to claim 3, wherein a connection device between the pusher device and the slide plate can be changed. 前記荷台の長さ寸法を測定する測距装置を設けた請求項3又は4に記載の荷の積込装置。The load loading device according to claim 3 or 4, further comprising a distance measuring device that measures a length dimension of the loading platform.
JP25900694A 1993-11-30 1994-09-29 Load loading method and device Expired - Fee Related JP3558386B2 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
JP25900694A JP3558386B2 (en) 1994-09-29 1994-09-29 Load loading method and device
US08/346,072 US5577873A (en) 1993-11-30 1994-11-29 Method and apparatus for stowing a load
DE69414226T DE69414226T2 (en) 1993-11-30 1994-11-29 Method and device for stowing a cargo
EP94118754A EP0655403B1 (en) 1993-11-30 1994-11-29 Method and apparatus for stowing a load

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP25900694A JP3558386B2 (en) 1994-09-29 1994-09-29 Load loading method and device

Publications (2)

Publication Number Publication Date
JPH0891583A JPH0891583A (en) 1996-04-09
JP3558386B2 true JP3558386B2 (en) 2004-08-25

Family

ID=17328051

Family Applications (1)

Application Number Title Priority Date Filing Date
JP25900694A Expired - Fee Related JP3558386B2 (en) 1993-11-30 1994-09-29 Load loading method and device

Country Status (1)

Country Link
JP (1) JP3558386B2 (en)

Also Published As

Publication number Publication date
JPH0891583A (en) 1996-04-09

Similar Documents

Publication Publication Date Title
EP0655403B1 (en) Method and apparatus for stowing a load
FI82667C (en) VAGN FOER TRANSPORT AV EN CYLINDERFORMAD KROPP.
KR102229951B1 (en) battery pack transfer apparatus for electric vehicle
US6390759B1 (en) Integrated brake/tilt-release mechanism for a dolly with a pivoting carriage
JPS59177248A (en) Device for automatically stacking flat element
US4606690A (en) Method and apparatus for load transfer
JP3558386B2 (en) Load loading method and device
JP2868402B2 (en) Load loading method and device
JP3128358B2 (en) Automatic picking method and apparatus for stacking sheet packages
JP2000238904A (en) Stacker crane
JPH06100108A (en) Rolled article transfer device
JP3294122B2 (en) Article processing equipment
JP4552766B2 (en) Goods storage facility
CN212531389U (en) Stacking device and container loading system
JP3510045B2 (en) Article storage facility
JP2008179427A (en) Conveying device
CN222432669U (en) Tilting equipment and packaging system
JP5532340B2 (en) Goods transport equipment
JP4298440B2 (en) Tilt detection device
JP2001206517A (en) Mobile loader in commodity shipping system
JP2524221B2 (en) Integrated bundle delivery device
JP2512682B2 (en) Truck loader
JPH0474250B2 (en)
JPH10279015A (en) Controller of article take out device
JP2551142Y2 (en) A device for preventing articles from jumping out of an article storage / shelf shelf provided on an article storage shelf

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20040106

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20040303

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20040518

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20040518

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090528

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090528

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100528

Year of fee payment: 6

LAPS Cancellation because of no payment of annual fees