Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP3558427B2 - Tapered plate segment temporary mounting method and temporary mounting jig - Google Patents
[go: Go Back, main page]

JP3558427B2 - Tapered plate segment temporary mounting method and temporary mounting jig - Google Patents

Tapered plate segment temporary mounting method and temporary mounting jig Download PDF

Info

Publication number
JP3558427B2
JP3558427B2 JP25967295A JP25967295A JP3558427B2 JP 3558427 B2 JP3558427 B2 JP 3558427B2 JP 25967295 A JP25967295 A JP 25967295A JP 25967295 A JP25967295 A JP 25967295A JP 3558427 B2 JP3558427 B2 JP 3558427B2
Authority
JP
Japan
Prior art keywords
segment
plate segment
jig
tapered plate
tapered
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP25967295A
Other languages
Japanese (ja)
Other versions
JPH09100699A (en
Inventor
勉 今野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kubota Corp
Original Assignee
Kubota Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kubota Corp filed Critical Kubota Corp
Priority to JP25967295A priority Critical patent/JP3558427B2/en
Publication of JPH09100699A publication Critical patent/JPH09100699A/en
Application granted granted Critical
Publication of JP3558427B2 publication Critical patent/JP3558427B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)
  • Lining And Supports For Tunnels (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、トンネルのカーブ部分において、トンネルの軸芯方向に隣接するセグメントどうしを、これらの間にテーパープレートセグメントを挟込んだ状態で接続ボルトを用いて接続する際に、一方のセグメントに対してテーパープレートセグメントを仮装着するテーパープレートセグメント仮装着方法及び仮装着治具に関する。
【0002】
【従来の技術】
従来、この種のテーパープレートセグメントを仮装着するには以下のような方法を用いていた。
まず、既に設置が完了したリング状セグメントを構成する夫々のセグメント(以下「第1セグメント」という)に対して、同様に分割されたテーパープレートセグメントを芋継ぎ状に、つまり、トンネル軸芯方向において両者を千鳥状にではなく、完全に重ねた状態に配置し、前記テーパープレートセグメントと前記第1セグメントのセグメント接続部とに亘って仮止めボルトを挿通して両者を仮装着していた。
【0003】
【発明が解決しようとする課題】
しかし、上記従来の接続方法によれば、次のような問題があった。
上記の仮装着により、トンネルの全周に亘ってテーパープレートセグメントが仮装着されてテーパーリングが形成されるが、この後、当該テーパーリングの開放側の側面には、トンネル掘進機の推進機構であるジャッキが当接される。つまり、当該テーパーリングは、掘進機が進行するための反力受部となる。
しかし、上記従来の接続方法を用いる結果、テーパーリング側面の所々には仮止めボルトの頭部あるいはナット部が突出していることとなるので、この部位を避けてジャッキを固定しなければならなかった。この結果、掘進機に備わっているジャッキのうちのいくつかが使用できないこととなり、掘進機の運転管理が煩雑となり、あるいは、掘進機の能力を十分に引き出せない不都合が生じていた。さらに、所定の距離だけ掘削が終了した後、ジャッキを取外し、テーパーリングに次のセグメント(以下「第2セグメント」という)を接続するが、この際、仮止めボルトの頭部あるいはナット部が邪魔になるため、仮止めボルトを取り外す、いわゆる「ボルトの盛替え」が必要であった。
この盛替え作業は、それ自体が手間であるばかりでなく、盛替えに際しては、前記テーパープレートセグメントと前記第1セグメントとの位置ズレを生じさせないように前記テーパープレートセグメントを保持しながら行わなければならず、作業が煩雑となるうえ、前記テーパープレートセグメントが落下するおそれもあるため、安全上の改善の余地があった。
従来の接続方法においては、全てこのような盛替え作業を行いながらテーパープレートセグメントと第2セグメントとを位置合わせし、改めて、接続ボルトを挿入して第2セグメントを接続していた。
【0004】
本発明の目的は、このような従来技術の欠点を解消し、作業効率が良く、しかも、安全性に優れたテーパープレートセグメント仮装着方法及び仮装着治具を提供することにある。
【0005】
【課題を解決するための手段】
(構成1)
この目的を達成するための本発明の特徴手段は、請求項1に記載したごとく、1セグメントに対するセグメント側取付部と、テーパープレートセグメントに対するプレート側取付部とを有する治具本体、および、前記セグメント側取付部に装着されていて、前記第1セグメントのセグメント接続部に係合する係合部材からなる仮装着治具を使用して、前記仮装着治具の前記プレート側取付部を前記テーパープレートセグメントの内周側端面に脱着自在に取付けた後、このテーパープレートセグメントを、前記係合部材と前記テーパープレートセグメントとが、前記セグメント接続部を挟み込む状態であって、かつ、前記係合部材が前記セグメント接続部に設けられた接続ボルト用挿通孔に位置するよう配置して、前記係合部材を、前記接続ボルト用挿通孔に係合させる点にある。

【0006】
(作用・効果)
本発明のテーパープレートセグメント仮装着方法によれば、治具本体のプレート側取付部は、前記テーパープレートセグメントの内周側端面に取付き、治具本体のセグメント側取付部は、第1セグメントのセグメント接続部に形成された接続ボルト用挿通孔に係合部材を介して係合する。
このため、前記テーパープレートセグメントの両側面のうち、第2セグメントと当接する側の面には突出物は一切存在しないこととなり、掘進機のジャッキを配置するのに何ら障害とならない。
さらに、次の第2セグメントを接続する場合には、治具本体を前記テーパープレートセグメントに仮装着したままで、前記第2セグメントを前記テーパープレートセグメントに当接配置し、未使用の接続ボルト用挿通孔から先にボルト・ナットによって本締めを行う。そして、前記第2セグメントがリング状に構築された後に、前記テーパープレートセグメントから治具本体を取り外し、その後、前記仮装着治具が装着されている前記接続ボルト用挿通孔を含む残りの接続ボルト用挿通孔を本締めして接続作業が終了する。
このように、本発明の方法によれば、前記第1セグメントに対する前記テーパープレートセグメントの仮装着が短時間で効率よく行える。しかも、仮装着には前記接続ボルト用挿通孔を利用するから、前記テーパープレートセグメントの位置を正確に合わせることができる。
そして、治具本体を盛替える必要がないから、前記テーパープレートセグメントが落下するおそれがなくなって作業が安全に行えるうえ、次の第2セグメントの接続作業自体も容易に短時間に行うことができる。
さらに、掘進機の全てのジャッキを使用することができるから、掘進機の運転管理も容易になる。
以上のごとく、本方法によれば、セグメントの接続作業全体の効率および安全性を大幅に向上させることができる。
【0007】
(構成2)
本発明のテーパープレートセグメント仮装着方法を実施すべく、テーパープレートセグメント仮装着治具を請求項2に記載したように構成する。
つまり、前記第1セグメントのセグメント接続部に対するセグメント側取付部と、前記テーパープレートセグメントの内周側端面に脱着自在に取付くプレート側取付部とを有する治具本体、および、前記セグメント側取付部に装着されていて、前記セグメント接続部の接続ボルト用挿通孔に係合する係合部材からなるようにテーパープレートセグメント仮装着治具を構成する。
【0008】
(作用・効果)
本構成のテーパープレートセグメント仮装着治具によれば、簡単な構造の治具を用いるだけで、前述のごとく、セグメントの接続作業全体の効率および安全性を大幅に向上させることができる。
【0009】
(構成3)
前記請求項2のテーパープレートセグメント仮装着治具は、請求項3に記載したように構成してもよい。
即ち、前記係合部材が、前記治具本体に螺合するネジ部と、前記接続ボルト用挿通孔に係入する係入部と、前記接続ボルト用挿通孔の周縁部を前記テーパープレートセグメントの側に押圧する押圧部とを有するように構成する。
【0010】
(作用・効果)
本構成のテーパープレートセグメント仮装着治具によれば、前記係合部材が前記テーパープレートセグメントに対して、遠近方向に移動可能であるから、前記係合部材と前記テーパープレートセグメントとの間で挟持する前記第1セグメントのセグメント接続部の幅が多少変動しても、前記テーパープレートセグメントを確実に仮装着することができる。
また、前記係合部材の押圧部が前記接続ボルト用挿通孔の周縁部を前記テーパープレートセグメント側に押圧する際には、前記係合部材の先端部に形成された係入部が前記接続ボルト用挿通孔に係合しているから、前記係合部材を螺進させる最中に前記係合部材が位置ズレすることはない。
そして、前記係合部材を螺進させて、前記テーパープレートセグメントを前記第1セグメント側に引き込み、両者をガタなく当接させることで前記テーパープレートセグメントを確実に保持することができる。
【0011】
【発明の実施の形態】
以下に本発明の実施例を図面に基づいて説明する。
【0012】
本発明のテーパープレートセグメント仮装着方法及び仮装着治具は、図1に示すごとく、トンネル軸芯X方向の両端面が平行である通常のセグメントSを用いて構成した二つのリングrの間に、これらのリングrどうしがトンネルのカーブに沿った角度を有するように、円周方向の各部の厚みを変化させたテーパーリングRを介装する際に用いるものである。
【0013】
例えば、当該テーパーリングRは、図2に示すごとく七つのテーパープレートセグメントTから構成される。前記テーパーリングRの厚み分布は、トンネルの曲率中心側が最も薄く形成されており、一方、これと180度対立する側が最も厚く形成されている。
前記テーパープレートセグメントTは、例えば、FCD500等のダクタイル鋳鉄で構成されており、そのサイズは、外径が7050mm、内径が6550mm、最も薄い部分の厚みが24.5mm、最も厚い部分の厚みが65.5mmである。
図3に示すごとく、前記テーパープレートセグメントTには、その周方向に接続ボルト用挿通孔1Aを分散形成している。当該接続ボルト用挿通孔1Aは、例えば、35mmφのキリ孔で構成されている。
また、前記テーパープレートセグメントTの長手方向中央部付近の内周側端面2には、当該テーパープレートセグメントTの運搬を容易にするための運搬用吊部3が設けられている。当該運搬用吊部3は、一体成形によって、あるいは、吊部取付ボルト等によって前記内周側端面2に設けられている。ただし、当該運搬用吊部3は、トンネルが完成した後には除去される。
前記テーパープレートセグメントTは、テーパープレートセグメント仮装着治具J(以下「仮装着治具J」という)を用いて、既にリング状に構築された第1セグメントS1に芋継ぎされる。
【0014】
図4に示すごとく、当該仮装着治具Jは、治具本体4と、前記第1セグメントS1を係合押圧する係合部材8とから構成される。
前記治具本体4は、その一端が、前記テーパープレートセグメントTの内周側端面2に取付くプレート側取付部5として、他端が、前記第1セグメントS1のセグメント接続部13に対するセグメント側取付部6として機能する。
前記プレート側取付部5は、例えば、M10の治具本体固定ボルト7を3本用いて、前記テーパープレートセグメントTの内周側端面2に固定される。この状態で、前記テーパープレートセグメントTと前記仮装着治具Jとは、略コの字状を呈することとなり、当該コの字状の内部に、前記第1セグメントS1のセグメント接続部13が位置することとなる。また、前記治具本体4は、前記プレート側取付部5が、前記テーパープレートセグメントTの側面のうち前記第2セグメントS2が装着される側面側に突出しないよう構成されている。尚、当該治具本体4はSS400等の普通鋼材で構成されている。
前記セグメント側取付部6には、前記係合部材8が螺合されている。当該係合部材8は、前記治具本体4に螺合するネジ部9と、前記第1セグメントS1の接続ボルト用挿通孔1Bに係入する係入部10と、前記接続ボルト用挿通孔1Bの周縁部を前記テーパープレートセグメントTの側に押圧する押圧部11とからなる。当該係合部材8の材質も前記治具本体4と同様、SS400等の普通鋼材で構成されている。前記ネジ部9は、例えば、M39のボルト状に構成される。
前記係入部10は、前記接続ボルト用挿通孔1Bに係入して、前記テーパープレートセグメントTを前記第1セグメントS1に対してガタなく位置決めさせるものである。よって、前記係入部10の外径は、前記接続ボルト用挿通孔1Bの内径に対して僅かに小さい程度が望ましい。
尚、前記セグメント接続部13への係入を容易ならしめるため、当該係入部10の先端部は、テーパー状に形成しておくとよい。
さらに、当該係入部10の軸芯方向の長さは、前記接続ボルト用挿通孔1Bに対して確実に係入するためには長いほど好ましいが、長すぎると、後述する押圧部11が前記接続ボルト用挿通孔1Bの周縁部に当接するまでのストロークが長くなって取付けに手間がかかることとなり好ましくない。
前記押圧部11は、前記接続ボルト用挿通孔1Bの周縁部に当接し、前記係合部材8の螺進に伴って、前記テーパープレートセグメントTを前記セグメント接続部13の側に引き寄せるためのものである。当該押圧部11の押圧面は、前記係合部材8の軸芯方向に対して垂直な面となるように形成されているから、前記係合部材8が前記接続ボルト用挿通孔1Bに噛込んで抜けなくなることはない。
【0015】
(取付順序)
リング状に構築された前記第1セグメントS1に対して前記テーパープレートセグメントTおよび前記第2セグメントS2を取付ける手順は、概ね以下のとおりであり、その様子を図1、図5、図6に示す。
尚、前記テーパープレートセグメントTは、前記第1セグメントS1と同様に七分割されていて、前記第1セグメントS1に対して芋継ぎ状に接続される。
まず、前記第1セグメントS1のセグメント接続部13に前記仮装着治具Jを用いて前記テーパープレートセグメントTを取付ける。つまり、前記仮装着治具Jを二箇所に取付けた前記テーパープレートセグメントTを、前記セグメント接続部13に対して近接させ、前記係合部材8の前記係入部10を前記接続ボルト用挿通孔1Bに位置合わせする。この際、前記係合部材8は退避させた状態にしておき、前記テーパープレートセグメントTと当該係入部10との間隔を広く設定しておく。その後、前記係合部材8を前記テーパープレートセグメントT側に螺進させ、前記押圧部11が前記接続ボルト用挿通孔1Bの周縁部を押圧し、前記テーパープレートセグメントTを前記セグメント接続部13側に引き寄せて両者を仮装着する。
このようにトンネルの全周に亘って、順次、前記テーパープレートセグメントTを仮装着していき、前記テーパープレートセグメントTによるテーパーリングRを形成する。
次に、掘進機14の推進ジャッキ15を当該テーパーリングRにセットし、当該テーパーリングRを前記掘進機14の反力受部としてトンネルの掘削を行う。この際、前記仮装着治具Jは、前記テーパープレートセグメントTの開放側の側面から当該第2セグメントS2側には突出していないため、前記推進ジャッキ15の配置は支障無く行うことができる。
【0016】
所定の距離だけ掘削した後、前記推進ジャッキ15を前記テーパーリングRから取外し、前記第2セグメントS2を前記テーパーリングRに対して順次接続する。
図6に示すごとく、当該第2セグメントS2は前記第1セグメントS1に対して千鳥状となるよう、かつ、前記テーパープレートセグメントTおよび前記第1セグメントS1の夫々の接続ボルト用挿通孔1A,1Bと、当該第2セグメントS2の接続ボルト用挿通孔1Bとが一致する状態に配置する。
各接続ボルト用挿通孔1A,1Bのうち、前記仮装着治具Jが係合されていない部位からM30の接続ボルト12を用いて本締めを行う。
さらに、前記第2セグメントどうしの突合わせ部分も前記接続ボルト12を用いて本締めする。
少なくとも、何れの第2セグメントS2も脱落しない状態になるまで本締めが終了した段階で、前記仮装着治具Jを取外し、残りの接続ボルト用挿通孔1A,1Bを本締めする。
前記仮装着治具Jの取外しは、前記治具本体4を前記テーパープレートセグメントTに固定している前記治具本体固定ボルト7を取外して行う。
【0017】
セグメントS1,S2の接続構築は、以上のような手順で行われるが、本発明のテーパープレートセグメント仮装着方法によれば、従来の接続方法では不可欠であった仮止ボルトの盛替え作業を省略でき、当該盛替え作業中に前記テーパープレートセグメントTが落下するおそれ等も解消される。よって、前記テーパープレートセグメントTの仮装着作業における作業効率および作業の安全性を大幅に向上させることができる。
【0018】
〔別実施形態〕
上記実施例においては、前記治具本体4を前記テーパープレートセグメントTに取付ける手段としてM10ボルトを用いたが、これに限られるものではなく、前記治具本体4自身を磁性材料で構成し、前記テーパープレートセグメントTに磁力で吸着させる構成であってもよい。本構成であれば、前記治具本体4の脱着が更に迅速容易に行えてよい。
【0019】
上記実施例においては、前記係合部材8の係入部10が、前記第1セグメントS1の接続ボルト用挿通孔1Bに係入する構成としたが、これに限られるものではなく、前記セグメント接続部13の側面を単に押圧するだけのものであってもよい。要するに、前記テーパープレートセグメントTが前記第1セグメントS1に確実に仮装着できるものであれば、何れの構成であってもよい。
【0020】
尚、特許請求の範囲の項に、図面との対照を便利にするために符号を記すが、該記入により本発明は添付図面の構成に限定されるものではない。
【図面の簡単な説明】
【図1】テーパープレートセグメントを用いて構築されたトンネルのカーブ部分を示す斜視図
【図2】リング状に構築されたテーパープレートセグメントの正面図および平面図
【図3】テーパープレートセグメントの正面図および側面図
【図4】本発明のテーパープレートセグメント仮装着治具の使用状態を示す縦断面図
【図5】テーパープレートセグメントの仮装着要領を示す分解斜視図
【図6】第2セグメントの本締め要領を示す分解斜視図
【符号の説明】
1B 第1セグメントの接続ボルト用挿通孔
2 内周側端面
4 治具本体
5 プレート側取付部
6 セグメント側取付部
8 係合部材
9 ネジ部
10 係入部
11 押圧部
12 接続ボルト
13 セグメント接続部
T テーパープレートセグメント
J (テーパープレートセグメント)仮装着治具
S1 第1セグメント
S2 第2セグメント
[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention provides a method for connecting segments adjacent to each other in the axial direction of a tunnel in a curved portion of a tunnel using connection bolts with a tapered plate segment interposed therebetween, when connecting with one segment. TECHNICAL FIELD The present invention relates to a taper plate segment temporary mounting method for temporarily mounting a tapered plate segment and a temporary mounting jig.
[0002]
[Prior art]
Conventionally, the following method has been used to temporarily mount this type of tapered plate segment.
First, for each segment (hereinafter, referred to as a “first segment”) that constitutes a ring-shaped segment that has already been installed, similarly-divided tapered plate segments are connected in a tube-like manner, that is, in the tunnel axis direction. The two members are arranged not in a staggered pattern but in a completely overlapped state, and a temporary fixing bolt is inserted through the tapered plate segment and the segment connecting portion of the first segment to temporarily mount the two.
[0003]
[Problems to be solved by the invention]
However, the conventional connection method has the following problems.
By the above temporary mounting, the taper plate segment is temporarily mounted over the entire circumference of the tunnel to form a taper ring. Thereafter, on the open side surface of the taper ring, the propulsion mechanism of the tunnel excavator is used. A jack is abutted. That is, the tapered ring serves as a reaction force receiving portion for the excavator to advance.
However, as a result of using the above-mentioned conventional connection method, the head or the nut portion of the temporary fixing bolt protrudes in various places on the side surface of the tapered ring, so the jack had to be fixed avoiding this portion. . As a result, some of the jacks provided in the excavator cannot be used, so that the operation management of the excavator becomes complicated, or the inability of the excavator to take full advantage has arisen. Further, after the excavation is completed for a predetermined distance, the jack is removed and the next segment (hereinafter, referred to as “second segment”) is connected to the taper ring. Therefore, it was necessary to remove temporary fixing bolts, that is, so-called "bolt replacement".
This refilling operation is not only troublesome in itself, but also must be performed while holding the tapered plate segment so as not to cause a positional shift between the tapered plate segment and the first segment. In addition, the operation becomes complicated, and the tapered plate segment may fall, so there is room for improvement in safety.
In the conventional connection method, the tapered plate segment and the second segment are aligned with each other while performing such a rearrangement work, and a second connection bolt is inserted to connect the second segment.
[0004]
SUMMARY OF THE INVENTION An object of the present invention is to provide a method for temporarily mounting a tapered plate segment and a temporary mounting jig which solve the above-mentioned drawbacks of the prior art, have high working efficiency, and are excellent in safety.
[0005]
[Means for Solving the Problems]
(Configuration 1)
Characterized means of the present invention for achieving this objective, as set forth in claim 1, the jig body having a segment-side mounting portion with respect to the first segment, and a plate-side mounting portion for the tapered plate segments, and wherein The plate-side mounting portion of the temporary mounting jig is tapered by using a temporary mounting jig that is mounted on the segment-side mounting portion and that includes an engaging member that engages with the segment connecting portion of the first segment. After being detachably attached to the inner peripheral end face of the plate segment, the tapered plate segment is inserted into the engagement member and the tapered plate segment so as to sandwich the segment connecting portion, and the engagement member Are disposed so as to be positioned in connection bolt insertion holes provided in the segment connection portion, and the engagement member is connected to the connection bolt. It lies in engaging the insertion hole for the belt.

[0006]
(Action / Effect)
According to the tapered plate segment temporary mounting method of the present invention, the plate-side mounting portion of the jig main body is attached to the inner peripheral end surface of the tapered plate segment, and the segment-side mounting portion of the jig main body is formed of the first segment. It engages with the connection bolt insertion hole formed in the segment connection portion via the engagement member.
For this reason, there is no protrusion on the side of the taper plate segment on the side that comes into contact with the second segment, and there is no obstacle in arranging the jack of the excavator.
Further, when connecting the next second segment, the second segment is disposed in contact with the tapered plate segment while the jig body is temporarily attached to the tapered plate segment, and an unused connection bolt is used. Fully tighten the bolts and nuts first from the insertion holes. Then, after the second segment is constructed in a ring shape, the jig body is removed from the tapered plate segment, and thereafter, the remaining connection bolts including the connection bolt insertion holes in which the temporary mounting jigs are mounted. The connection work is completed by fully tightening the insertion hole.
Thus, according to the method of the present invention, the temporary attachment of the tapered plate segment to the first segment can be efficiently performed in a short time. Moreover, since the connection bolt insertion hole is used for the temporary mounting, the position of the tapered plate segment can be accurately adjusted.
And since there is no need to change the jig body, there is no danger of the tapered plate segment dropping, and the operation can be performed safely. In addition, the connection operation itself of the next second segment can be easily performed in a short time. .
Further, since all jacks of the excavator can be used, the operation management of the excavator becomes easy.
As described above, according to the present method, the efficiency and safety of the entire segment connection operation can be significantly improved.
[0007]
(Configuration 2)
In order to implement the taper plate segment temporary mounting method of the present invention, a taper plate segment temporary mounting jig is configured as described in claim 2.
That is, a jig main body having a segment-side attachment portion for the segment connection portion of the first segment, and a plate-side attachment portion detachably attached to an inner peripheral end surface of the tapered plate segment, and the segment-side attachment portion And a taper plate segment temporary mounting jig is formed so as to include an engaging member which is mounted on the segment connecting portion and is engaged with the connection bolt insertion hole of the segment connecting portion.
[0008]
(Action / Effect)
According to the tapered plate segment temporary mounting jig of this configuration, as described above, the efficiency and safety of the entire segment connecting operation can be significantly improved only by using a jig having a simple structure.
[0009]
(Configuration 3)
The tapered plate segment temporary mounting jig of the second aspect may be configured as described in the third aspect.
That is, the engaging member is a threaded portion that is screwed into the jig body, an engagement portion that engages with the connection bolt insertion hole, and a peripheral portion of the connection bolt insertion hole is positioned on the side of the tapered plate segment. And a pressing portion that presses the pressing portion.
[0010]
(Action / Effect)
According to the tapered plate segment temporary mounting jig of the present configuration, the engaging member is movable in the perspective direction with respect to the tapered plate segment, so that the engaging member is pinched between the engaging member and the tapered plate segment. Even if the width of the segment connecting portion of the first segment changes slightly, the tapered plate segment can be securely temporarily mounted.
Further, when the pressing portion of the engaging member presses the peripheral portion of the connection bolt insertion hole toward the tapered plate segment, the engaging portion formed at the distal end of the engaging member is used for the connection bolt. Since the engagement member is engaged with the insertion hole, the engagement member does not shift during the screwing of the engagement member.
Then, the taper plate segment is pulled into the first segment side by screwing the engagement member, and the taper plate segment can be securely held by contacting the two without play.
[0011]
BEST MODE FOR CARRYING OUT THE INVENTION
Hereinafter, embodiments of the present invention will be described with reference to the drawings.
[0012]
As shown in FIG. 1, the tapered plate segment temporary mounting method and the temporary mounting jig of the present invention are arranged between two rings r using a normal segment S whose both end surfaces in the tunnel axis X direction are parallel. The taper ring R in which the thickness of each portion in the circumferential direction is changed so that these rings r have an angle along the curve of the tunnel is used.
[0013]
For example, the tapered ring R includes seven tapered plate segments T as shown in FIG. In the thickness distribution of the taper ring R, the center of curvature of the tunnel is formed to be thinnest, while the side opposite to this by 180 degrees is formed to be thickest.
The tapered plate segment T is made of, for example, ductile cast iron such as FCD500 and has an outer diameter of 7050 mm, an inner diameter of 6550 mm, a thinnest portion having a thickness of 24.5 mm, and a thickest portion having a thickness of 65 mm. 0.5 mm.
As shown in FIG. 3, the tapered plate segment T is formed with connection bolt insertion holes 1A dispersed in the circumferential direction. The connection bolt insertion hole 1A is formed of, for example, a 35 mmφ drill hole.
On the inner peripheral end surface 2 near the center in the longitudinal direction of the tapered plate segment T, a transport suspending portion 3 for facilitating transport of the tapered plate segment T is provided. The transport suspending portion 3 is provided on the inner peripheral side end surface 2 by integral molding or by a suspending portion mounting bolt or the like. However, the transport hanging part 3 is removed after the completion of the tunnel.
The taper plate segment T is spliced to the first segment S1 already formed in a ring shape by using a taper plate segment temporary mounting jig J (hereinafter, referred to as “temporary mounting jig J”).
[0014]
As shown in FIG. 4, the temporary mounting jig J includes a jig main body 4 and an engaging member 8 that engages and presses the first segment S1.
One end of the jig main body 4 serves as a plate-side mounting portion 5 that is mounted on the inner peripheral end surface 2 of the tapered plate segment T, and the other end has a segment-side mounting with respect to the segment connecting portion 13 of the first segment S1. It functions as the unit 6.
The plate-side mounting portion 5 is fixed to the inner peripheral end surface 2 of the tapered plate segment T using, for example, three jig body fixing bolts 7 of M10. In this state, the tapered plate segment T and the temporary mounting jig J exhibit a substantially U-shape, and the segment connecting portion 13 of the first segment S1 is located inside the U-shape. Will be done. The jig body 4 is configured such that the plate-side mounting portion 5 does not protrude from the side surface of the tapered plate segment T on which the second segment S2 is mounted. The jig main body 4 is made of a normal steel material such as SS400.
The engaging member 8 is screwed to the segment-side mounting portion 6. The engaging member 8 includes a screw portion 9 that is screwed into the jig main body 4, an engagement portion 10 that engages with the connection bolt insertion hole 1 </ b> B of the first segment S <b> 1, and a connection bolt insertion hole 1 </ b> B. And a pressing portion 11 for pressing the peripheral portion toward the tapered plate segment T. The material of the engaging member 8 is also made of ordinary steel such as SS400 similarly to the jig main body 4. The screw portion 9 is formed in an M39 bolt shape, for example.
The engagement portion 10 engages with the connection bolt insertion hole 1B, and positions the tapered plate segment T without looseness with respect to the first segment S1. Therefore, the outer diameter of the engaging portion 10 is desirably slightly smaller than the inner diameter of the connection bolt insertion hole 1B.
In order to facilitate the engagement with the segment connecting portion 13, the distal end of the engaging portion 10 may be formed in a tapered shape.
Further, the length of the engaging portion 10 in the axial direction is preferably longer in order to securely engage with the connection bolt insertion hole 1B. However, if it is too long, the pressing portion 11 described later will The stroke before contacting the peripheral edge of the bolt insertion hole 1B is lengthened, and it takes time and effort to mount the bolt, which is not preferable.
The pressing portion 11 is in contact with a peripheral portion of the connection bolt insertion hole 1 </ b> B, and draws the tapered plate segment T toward the segment connection portion 13 as the engagement member 8 advances. It is. Since the pressing surface of the pressing portion 11 is formed so as to be perpendicular to the axial direction of the engaging member 8, the engaging member 8 bites into the connection bolt insertion hole 1B. It doesn't get stuck.
[0015]
(Mounting order)
The procedure for attaching the tapered plate segment T and the second segment S2 to the first segment S1 constructed in a ring shape is generally as follows, and the state is shown in FIGS. 1, 5, and 6. .
In addition, the taper plate segment T is divided into seven like the first segment S1, and is connected to the first segment S1 in a tube-like manner.
First, the tapered plate segment T is attached to the segment connecting portion 13 of the first segment S1 using the temporary attachment jig J. That is, the tapered plate segment T, to which the temporary attachment jig J is attached at two positions, is brought close to the segment connection portion 13 and the engagement portion 10 of the engagement member 8 is inserted into the connection bolt insertion hole 1B. Position. At this time, the engaging member 8 is kept in a retracted state, and the interval between the tapered plate segment T and the engaging portion 10 is set wide. Then, the engaging member 8 is screwed toward the tapered plate segment T side, the pressing portion 11 presses the peripheral portion of the connection bolt insertion hole 1B, and the tapered plate segment T is connected to the segment connecting portion 13 side. And temporarily attach them.
In this way, the tapered plate segment T is temporarily mounted sequentially over the entire circumference of the tunnel, and a tapered ring R is formed by the tapered plate segment T.
Next, the propulsion jack 15 of the excavator 14 is set on the tapered ring R, and the tapered ring R is used as a reaction force receiving portion of the excavator 14 to excavate a tunnel. At this time, since the temporary mounting jig J does not protrude from the open side surface of the tapered plate segment T to the second segment S2 side, the disposition of the propulsion jack 15 can be performed without any trouble.
[0016]
After excavating a predetermined distance, the propulsion jack 15 is removed from the tapered ring R, and the second segment S2 is connected to the tapered ring R sequentially.
As shown in FIG. 6, the second segment S2 is staggered with respect to the first segment S1, and the connection bolt insertion holes 1A and 1B of the taper plate segment T and the first segment S1 are respectively provided. And the connection bolt insertion hole 1B of the second segment S2.
From the portion of the connection bolt insertion holes 1A and 1B where the temporary mounting jig J is not engaged, the final fastening is performed using the connection bolt 12 of M30.
Further, the butted portions of the second segments are also fully tightened using the connection bolts 12.
At least at the stage where the final fastening is completed until none of the second segments S2 fall off, the temporary mounting jig J is removed, and the remaining connection bolt insertion holes 1A and 1B are fully tightened.
Removal of the temporary mounting jig J is performed by removing the jig main body fixing bolt 7 that fixes the jig main body 4 to the tapered plate segment T.
[0017]
The connection construction of the segments S1 and S2 is performed according to the above-described procedure. However, according to the taper plate segment temporary mounting method of the present invention, the temporary fixing bolt changing work which is indispensable in the conventional connection method is omitted. This also eliminates the possibility that the tapered plate segment T will fall during the refilling operation. Therefore, work efficiency and work safety in the temporary mounting work of the tapered plate segment T can be greatly improved.
[0018]
[Another embodiment]
In the above embodiment, M10 bolts are used as means for attaching the jig body 4 to the tapered plate segment T. However, the present invention is not limited to this. A configuration in which the taper plate segment T is attracted by magnetic force may be used. With this configuration, the attachment and detachment of the jig main body 4 may be performed more quickly and easily.
[0019]
In the above embodiment, the engagement portion 10 of the engagement member 8 is configured to engage with the insertion bolt insertion hole 1B of the first segment S1, but the invention is not limited to this, and the segment connection portion is not limited to this. 13 may be simply pressed. In short, any configuration may be used as long as the tapered plate segment T can be temporarily mounted on the first segment S1 reliably.
[0020]
In the claims, reference numerals are provided for convenience of comparison with the drawings, but the present invention is not limited to the configuration of the accompanying drawings by the entry.
[Brief description of the drawings]
FIG. 1 is a perspective view showing a curved portion of a tunnel constructed using a tapered plate segment. FIG. 2 is a front view and a plan view of a tapered plate segment constructed in a ring shape. FIG. 3 is a front view of a tapered plate segment. And FIG. 4 is an exploded perspective view showing a procedure for temporarily mounting the tapered plate segment. FIG. 6 is a second segment book. Exploded perspective view showing the tightening procedure [Description of reference numerals]
1B Insertion hole 2 for connection bolt of first segment 2 Inner peripheral end face 4 Jig body 5 Plate side attachment part 6 Segment side attachment part 8 Engagement member 9 Screw part 10 Engagement part 11 Pressing part 12 Connection bolt 13 Segment connection part T Taper plate segment J (taper plate segment) Temporary mounting jig S1 First segment S2 Second segment

Claims (3)

トンネルのカーブ部分において、トンネル軸芯方向に隣接する第1セグメント(S1)と第2セグメント(S2)とを、テーパープレートセグメント(T)を挟込んだ状態で、接続ボルト(12)を用いて接続する際に、前記第1セグメント(S1)に前記テーパープレートセグメント(T)を仮装着するテーパープレートセグメント仮装着方法であって、
記第1セグメント(S1)に対するセグメント側取付部(6)と、前記テーパープレートセグメント(T)に対するプレート側取付部(5)とを有する治具本体(4)、および、前記セグメント側取付部(6)に装着されていて、前記第1セグメント(S1)のセグメント接続部(13)に係合する係合部材(8)からなる仮装着治具(J)を使用して、
前記仮装着治具(J)の前記プレート側取付部(5)を前記テーパープレートセグメント(T)の内周側端面(2)に脱着自在に取付けた後、
このテーパープレートセグメント(T)を、前記係合部材(8)と前記テーパープレートセグメント(T)とが、前記セグメント接続部(13)を挟み込む状態であって、かつ、前記係合部材(8)が前記セグメント接続部(13)に設けられた接続ボルト用挿通孔(1B)に位置するよう配置して、前記係合部材(8)を、前記接続ボルト用挿通孔(1B)に係合させてなるテーパープレートセグメント仮装着方法。
In the curved portion of the tunnel, the first segment (S1) and the second segment (S2) adjacent in the tunnel axis direction are connected to each other with the connection bolt (12) sandwiching the tapered plate segment (T). A taper plate segment temporary mounting method for temporarily mounting the taper plate segment (T) to the first segment (S1) when connecting.
Segment side mounting portion for the previous SL first segment (S1) and (6), wherein the jig main body (4) having a plate-side mounting portion (5) with respect to the tapered plate segment (T), and said segment-side mounting portion Using a temporary mounting jig (J) that is mounted on (6) and that includes an engaging member (8) that engages with the segment connecting portion (13) of the first segment (S1) ,
After the plate-side attachment portion (5) of the temporary attachment jig (J) is detachably attached to the inner peripheral end surface (2) of the tapered plate segment (T),
The tapered plate segment (T) is in a state where the engagement member (8) and the tapered plate segment (T) sandwich the segment connecting portion (13), and the engagement member (8) Are arranged so as to be located in the connection bolt insertion holes (1B) provided in the segment connection portion (13), and the engaging member (8) is engaged with the connection bolt insertion holes (1B). Temporary mounting method of taper plate segment.
トンネル軸芯方向に隣接する第1セグメント(S1)と第2セグメント(S2)とを、テーパープレートセグメント(T)を挟込んだ状態で、接続ボルト(12)を用いて接続する際に、前記第1セグメント(S1)に前記テーパープレートセグメント(T)を仮装着するためのテーパープレートセグメント仮装着治具であって、
前記第1セグメント(S1)のセグメント接続部(13)に対するセグメント側取付部(6)と、前記内周側端面(2)に脱着自在に取付くプレート側取付部(5)とを有する治具本体(4)、および、前記セグメント側取付部(6)に装着されていて、前記接続ボルト用挿通孔(1B)に係合する係合部材(8)からなるテーパープレートセグメント仮装着治具。
When connecting the first segment (S1) and the second segment (S2) adjacent to each other in the tunnel axis direction using the connection bolt (12) with the tapered plate segment (T) sandwiched therebetween, A taper plate segment temporary mounting jig for temporarily mounting the taper plate segment (T) on a first segment (S1),
A jig having a segment-side attachment portion (6) for the segment connection portion (13) of the first segment (S1) and a plate-side attachment portion (5) detachably attached to the inner peripheral end surface (2). A temporary taper plate segment mounting jig comprising a main body (4) and an engaging member (8) mounted on the segment side mounting portion (6) and engaged with the connection bolt insertion hole (1B).
前記係合部材(8)が、前記治具本体(4)に螺合するネジ部(9)と、前記接続ボルト用挿通孔(1B)に係入する係入部(10)と、前記係合部材(8)自身の螺進により前記テーパープレートセグメント(T)を前記セグメント接続部(13)側に引寄せるべく、前記接続ボルト用挿通孔(1B)の周縁部を前記テーパープレートセグメント(T)の側に押圧する押圧部(11)とを有してなる請求項2に記載のテーパープレートセグメント仮装着治具。A screw portion (9) screwed into the jig body (4), an engagement portion (10) engaged in the connection bolt insertion hole (1B), and the engagement member; In order to draw the tapered plate segment (T) toward the segment connecting portion (13) by the screwing of the member (8) itself, the periphery of the connection bolt insertion hole (1B) is moved to the tapered plate segment (T). 3. The jig for temporarily mounting a tapered plate segment according to claim 2, further comprising a pressing portion (11) for pressing the tapered plate segment toward the side of the tapered plate segment.
JP25967295A 1995-10-06 1995-10-06 Tapered plate segment temporary mounting method and temporary mounting jig Expired - Fee Related JP3558427B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP25967295A JP3558427B2 (en) 1995-10-06 1995-10-06 Tapered plate segment temporary mounting method and temporary mounting jig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP25967295A JP3558427B2 (en) 1995-10-06 1995-10-06 Tapered plate segment temporary mounting method and temporary mounting jig

Publications (2)

Publication Number Publication Date
JPH09100699A JPH09100699A (en) 1997-04-15
JP3558427B2 true JP3558427B2 (en) 2004-08-25

Family

ID=17337305

Family Applications (1)

Application Number Title Priority Date Filing Date
JP25967295A Expired - Fee Related JP3558427B2 (en) 1995-10-06 1995-10-06 Tapered plate segment temporary mounting method and temporary mounting jig

Country Status (1)

Country Link
JP (1) JP3558427B2 (en)

Also Published As

Publication number Publication date
JPH09100699A (en) 1997-04-15

Similar Documents

Publication Publication Date Title
JP3558427B2 (en) Tapered plate segment temporary mounting method and temporary mounting jig
JPH03117504A (en) Tool partial coupling device
JPH0211992A (en) Piping clamp coupling for semiconductor manufacturing equipment
JP3727719B2 (en) Pile joint structure
JPH09184365A (en) Coupling member for sash mounting
JP3607749B2 (en) Segment fitting device
JP2000263292A (en) Centering jig for steel pipe welding
JPH10280899A (en) Nut and bearing plate combination
JPH02136499A (en) Steel segment
JP2733494B2 (en) Attachment structure of claw members to hold the pile
JPH089107Y2 (en) Cable fixture for cable drum
JPH1047566A (en) Connection tightening device for pipe shape member
JPS64373Y2 (en)
JPH0640332Y2 (en) Hybrid bolt
JPH087126Y2 (en) Guide clamp device
JP3395046B2 (en) How to connect plastic tubes
JPH0738556Y2 (en) Tool for attaching and detaching mold clamps
JPH03224301A (en) Waveguide connection mechanism
JPH0248227Y2 (en)
JPH0719718Y2 (en) Wrench for hydraulic cylinder
JPH0338531Y2 (en)
JPH1193919A (en) Fixing structure and fixture
JPH0411017Y2 (en)
JP2648632B2 (en) Concrete formwork binding device
JP2677499B2 (en) Assembly jig

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20040129

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20040205

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20040401

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20040506

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20040518

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees