JP3564614B2 - Gas supply system - Google Patents
Gas supply system Download PDFInfo
- Publication number
- JP3564614B2 JP3564614B2 JP11382097A JP11382097A JP3564614B2 JP 3564614 B2 JP3564614 B2 JP 3564614B2 JP 11382097 A JP11382097 A JP 11382097A JP 11382097 A JP11382097 A JP 11382097A JP 3564614 B2 JP3564614 B2 JP 3564614B2
- Authority
- JP
- Japan
- Prior art keywords
- pressure
- gas
- gas supply
- supply
- pipeline
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Filling Or Discharging Of Gas Storage Vessels (AREA)
- Pipeline Systems (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、ガス供給システムに関し、さらに詳しくは、既設配管が使用できない場合や配管の気密試験時などに簡易的にガスを供給できるガス供給システムに関する。
【0002】
【従来の技術】
地中に埋設されているガス管等の配管は、例えば、地震等の災害時に発生する外力によって損傷するとガス漏れが起きたり、あるいは水道管の破裂による漏水又は近い水の侵入によって供給不能に陥る虞があるので、その使用を中断して交換を必要とする場合がある。
従来、このような配管の修理に際しては次のような作業が実施されている。
配管の修理作業には、低圧管の一部や中圧管の一部を取り替える場合、およびこの他に、低圧管とこの低圧管から民地内に引き込まれている供内管との間あるいは、中圧管から供給先に引き込まれている供給管との間、若しくは取り替えられる管路の一部を跨いでそれぞれバイパス路を仮設する場合があり、バイパス路を仮設する場合には、バイパス路を介してガスの供給を維持しながら管路の修理を行う。
【0003】
【発明が解決しようとする課題】
配管の一部を交換する際にガスの供給を停止する場合には、ガスの使用者に対してガスの使用停止を要請しなければならないが、そのための事前通知等のPRを徹底させる必要がある。しかし、事前通知が行き届いたと判断しても、不在宅等もあり、交換作業に取り掛かる前の管理が困難な場合がある。しかも、不在宅がある場合には、交換作業後のガス器具の保守点検および点火試験を行うまでの間の待機時間が増加することがあり、集合住宅の場合などでは、ガスの供給再開までに不便をかけることもある。
さらに、バイパス路を設置する場合には、配管の交換作業以外にバイパス路の敷設工事や撤去工事等の交換作業本来の作業とは異なる作業が必要となることから、交換作業に要する作業時間が増加する事になり、交換およびガスの再供給までの時間が長大化してしまうことになる。
ところで、ガスの供給再開までの時間が長くなってしまう作業として、上記修理作業の他に、例えば、低圧本支管から引き込まれている供給管を対象とした気密試験がある。
気密試験は、低圧本支管から供給管へのガスの流れを遮断した上で、供給管内に対して通常設定される供給圧力よりも高い気密試験用圧力に設定された空気を封入し、試験後、封入された空気を排除するパージ作業が実行されている。このような気密試験が行われると、空気のパージ作業に時間がかかり、試験終了後に即座にガスの供給再開が行えないのが現状である。このような気密試験は、管路へのガスの供給を停止した場合、ガス供給再開の際にも実施される。
また、上記のバイパス路を仮設する場合には、当然のことではあるが、低圧管や中圧管等のように予め設定されている供給圧力のガスが流れている管路の一部を対象としてその管路からのガスの供給を受ける供給先との間にバイパス路が仮設されるだけであって、管路間で供給圧力が異なる供給先にガスを供給するような方式は採用されていないのが現状である。このため、供給先に近い位置に損傷を免れた管路が存在していても、その管路を簡易的なガスの供給源として用いることは不可能であった。
【0004】
一方、当然のことではあるが、上述したガス供給方式においては、所定のガス圧力であることが前提であるが、実際には、その圧力に維持されているかどうかを判断することができず、闇雲に供給を継続する場合がある。このような事態は、供給先での配管あるいはガス機器の損傷を招き、被害が甚大になる虞がある。
【0005】
本発明の目的は、上記従来のガス供給が中断された場合の問題に鑑み、地中の管路が使用できない場合、単一システムによって供給圧力の違いに関係なくガスの供給を可能にできるとともに、供給時での供給圧力が適性であるかどうかも判断できるようにして保安上での安全性を高めることができるガス供給システムを提供することにある。
【0006】
【課題を解決するための手段】
この目的を達成するため、請求項1記載の発明は、ガスが充填された高圧容器を入力側に位置させ、出力側にガス供給先と接続可能な第1の接続部を位置させたガス供給経路において、上記入力側には上記高圧容器を複数配置し、それら複数の高圧容器の中から選択された一つの高圧容器内のガスを取り込み、上記高圧容器から取り込まれたガスの圧力を複数段の減圧部によって上記ガス供給先で使用される最終圧力に減圧し、上記減圧部間を通過するガスを熱交換部に導入して温度の更正処理を行い、上記熱交換部を通過したガスの圧力が所定圧力以上に達した時に警告手段により警報するようにし、上記複数の減圧部のうちで最終圧力に減圧する減圧部よりも以前の配管経路中に上記出力側に位置する第1の接続部とは別に最終圧力よりも高い圧力のガスを取り出しおよび導入可能な第2の接続部を設け、その第2の接続部において最終圧力に減圧すべき圧力のガスの導入および最終圧力よりも高い圧力のガスを取り出し、上記警告手段は、上記熱交換部により温度の更生処理されたガスにより動作可能とされ、温度の更生処理を施されたガスの圧力が所定圧力よりも高い時に直接その圧力が作用することにより常態時と異なる表示を行うことで警告するようにしたことを特徴としている。
【0013】
請求項2記載の発明は、請求項1記載のガス供給システムにおいて、上記警告に用いられる構成は、上記出力側に至る管路の一部が分岐されて設けられている管路の末端部に配置された窓部と、上記窓部内に挿嵌されて回転可能に支持されている表示板と、上記表示板の裏面側で、その表示板の回転中心から偏寄した位置に上記ガスの吐出部を有し、上記管路の末端部に連通するガス誘導部材と、上記表示板の裏面側で、上記回転中心を境にして上記ガス誘導部材と反対位置に配置され、上記管路の末端部に導入されるガスの圧力が所定圧力のときに上記表示板を定位置に保持する規定部材と、を備え、上記表示板は、上記ガス誘導部材から吐出されるガスの圧力が上記所定圧力以上に達したときに、上記規定部材の保持力に抗して反転することを特徴としている。
【0014】
請求項3記載の発明は、請求項1記載のガス供給システムにおいて、上記警告に用いられる構成は、上記出力側に至る管路の一部が分岐されて設けられている管路の末端部に配置された窓部と、上記窓部の周方向に複数分割され、基部が上記窓部内に固定されて自由端が揺動可能であり、自由端が常時上記窓部を塞ぐ習性を有する可撓性の開閉部材と、上記開閉部材内にて上記管路の末端部に導入されるガスの圧力により摺動可能な移動体とを備え、上記開閉部材は、上記管路の末端部に導入されるガスの圧力が所定圧力である時に上記窓部を閉じ、上記管路の末端部に導入されるガスの圧力が所定圧力以上に達した際に上記移動体により押し広げられて移動体を露出させることを特徴としている。
【0015】
請求項4記載の発明は、請求項3記載のガス供給システムにおいて、上記開閉部材は、外表面に上記管路の末端部に導入されるガスの圧力が所定圧力以内であることを識別するための色彩表示が施され、上記移動体の外表面には上記管路の末端部に導入されるガスの圧力が所低圧力よりも高いことを識別するための色彩表示が施されていることを特徴としている。
【0016】
【作用】
請求項1記載の発明では、複数の高圧容器のうちから一つを選択してガスの取り込みを行い、取り込まれたガスが複数段の減圧部によりガス供給先での圧力に相当する最終圧力に減圧されて供給されることになるが、最終圧力のガスを取り出す第1の接続部とは別に設けられている第2の接続部により、最終圧力よりも高圧のガスの取り出しおよび最終圧力に減圧すべき圧力のガスを導入することができる。特に第2の接続部から取り出されるガスおよび導入されるガスは、最終圧力よりも高い圧力に設定されている中圧管で供給されるガスの圧力が対象とされているので、中圧管へのガス供給および低圧管へのガス供給を同一システムによって実行することができる。これにより、高圧容器からのガスを中圧管あるいは低圧管に対して供給することは勿論、既設管路間で異なる供給圧力の供給先に対しても簡易的なガスの供給が行えることになる。しかも、減圧されて温度の更生処理を施されたガスの圧力は警告手段により監視され、異常圧力にある場合には警報されて認知できる。
【0019】
請求項1乃至4記載の発明では、減圧されて出力側に至るガスの圧力が所定圧力以上である場合を警告することができる。特に、常態時でない場合、警告部材に直接作用するガスの圧力を用いて常態時とは異なる色彩表示によって警告することができるので、外部から容易に減圧状況の識別が行えるとともに、発火や構造の複雑化を生じることがない。
【0020】
【実施例】
以下、図示実施例により本発明の詳細を説明する。
本発明によるガス供給システムは、最終圧力に減圧されたガスを取り出すために設けられている第1の接続部とは別に、最終圧力よりも高い圧力のガスを取り出し可能および導入可能な第2の接続部を設け、第2の接続部において最終圧力のガスに減圧するためのガスの導入および最終圧力よりも高い圧力のガスを取り出せることおよび第2の接続部に至る配管中での圧力を監視できることを特徴としている。
本発明によるガス供給システムは、図1乃至図3に示すガス供給方式に適用される。
図1および図2は、入力側に位置している高圧容器のガスを供給先で必要な圧力に設定して供給する方式を示しており、また、図3は、交換や補修作業のために一部でガスが遮断されている既設管路内のガスを供給先で必要な圧力に設定して供給する方式を示している。
図1に示す方式では、後述するガス供給装置に装備されている高圧容器からガスを供内管に供給することができ、図2に示す方式では、上記高圧容器のガスを中圧管に供給することができる。
さらに、図3に示す方式では、既設管路が中圧管に相当し、その中圧管から供内管にガスを供給することができる。
なお、本実施例にいう中圧管は、ガスの供給圧力が1〜3Kg/cm2未満に設定されている中圧管Bを対象としたものであるが、本発明では、このような圧力仕様の中圧管に限らず、3〜10Kg/cm2未満の供給圧力が設定されている中圧管Aを対象とすることも可能であることを前置しておく。また、本実施例では、低圧管に対する圧力として240mmAqを例示しているが、低圧管に供給される圧力は、天然ガス(13A)の場合でいうと100〜250mmAqであるので、この範囲のいずれかを対象としてその中の圧力を選択できることも可能であることを併せて前置しておく。
【0021】
図1に示すガス供給方式においては、低圧管1から民地内に引き込まれている供内管2に接続されているガスメータ4と連通するメータ立て管5の一部に開口を形成し、その開口に後述する高圧容器3を装備したガス供給装置7の出力側に設けられている第1の接続部をなすカプラ50が取り付けられる。
また、図2に示すガス供給方式では、中圧管(便宜上、符号1’で示す)の一部に開口を形成し、その開口に、後述する高圧容器3を装備したガス供給装置7において第2の接続部をなすカプラ51が取り付けられる。
さらに、図3に示すガス供給方式では、図2に示した場合と同様に、中圧管1’に形成された開口にガス供給装置7において第2の接続部をなすカプラ51を取り付けると共に、ガス供給装置7において第1の接続部をなすカプラ50をメータ立て管5の一部に形成された開口に取り付ける。
【0022】
ガス供給装置7は、本発明の特徴をなす部分であり、図4に示すように、台車8に搭載されたガス供給制御部9と都市ガスが充填された高圧容器3に相当するボンベ10を含むガス供給部11とを備えている。
台車8は、ボンベ10を複数本、本実施例では2本搭載できる搭載部8Aを有し、この搭載部8Aに隣り合わせてガス供給制御部9が装備されている。
【0023】
図5は、上記したガス供給制御部9およびガス供給部11の関係構成を説明するためのブロック図であり、同図においてガス供給部11には、本実施例の場合、200Kg/cm2の圧力下で50L(リットル)の容器に10Nm3/本の都市ガスが充填されたボンベと200Kg/cm2の圧力下で10L(リットル)の容器に2Nm3/本の都市ガスが充填されたボンベとが用いられる2系統が設定されている(図5では、複数のボンベを対象としてそれらボンベの容量を意味する数字である50Lおよび10Lが付されている。)。なお、ボンベの容量は、上記した容量に限られるものではなく、供給先での仕様にあわせて選定できることも勿論可能である。
各系統からの配管は、適宜箇所にて纏められ、一次側減圧部12に向け接続されている。各系統の配管には、逆止弁11aが配置され、供給済のボンベに未使用のボンベ10からガスが逆流するのを防止している。また、各系統でのガス圧は圧力計11bによって監視できるようにすることも可能であり、ボンベ中のガスが供給され終わる時点での新たなボンベ10との交換作業や異常検出が行えるようになっている。ボンベ10の交換時には、交換を要するボンベ10が配置されている系統のガスを遮断する必要があるので、系統には、手動操作可能な開閉弁11cが設置されている。
【0024】
図5においてガス供給部11から供給されるガスの供給経路には、ガス供給部11側を入力側とし、供給先の配管との第1の接続部に相当するカプラ50を出力側とした場合、その間に複数段の減圧部、本実施例では、一次側減圧部12および二次側減圧部13がガスの供給方向に沿って設置されている。
一次側および二次側の減圧部12、13は、いずれもレギュレータ弁12a、13aが用いられており、一次側減圧部12では、ボンベ10に充填されている都市ガスの充填圧である200Kg/cm2を、中圧管での供給圧力の一例である2.5Kg/cm2に減圧する整圧特性が設定され、二次側減圧部13では、一次側減圧部12で減圧されたガス圧を一般家庭等の供給先での供給圧力である240mmAqに減圧する整圧特性が設定されている。なお、図5において、一次側および二次側の減圧部12、13に付してある数字および後述する弁に付してある数字は、入力圧力および出力(減圧)圧力をそれぞれ示している。
【0025】
一次側減圧部12には、減圧されたガスの圧力が所定圧力以上に達した場合のリリーフ機構が設けられている。リリーフ機構には、一次側減圧部12の出力側に配置されているアングル弁で構成されたリリーフ弁12bが用いられている。リリーフ弁12bは、一次側減圧部12にて減圧される圧力である2.5Kg/cm2よりも高い5.0Kg/cm2の圧力に達した場合に過剰圧力のガスを大気放出することができるようになっている。
【0026】
一次側減圧部12により所定圧(2.5Kg/cm2)に減圧されたガスが供給される側には二次側減圧部13が配置されているが、この二次側減圧部13の手前には、熱交換部14が配置されている。
熱交換部14は、雰囲気との接触が可能で加熱のための電源や熱源を要しないフィン付きチューブが所定の長さに設定されて直列に連結されて構成され、一次側減圧部12において断熱膨張することにより温度低下したガスの温度を使用環境雰囲気温度に更正するようになっている。熱交換部14を構成するフィン付きチューブは、ガスの通路長として、少なくとも1回の折り返し部を経る長さに設定されており、本実施例では、5回の折り返し部を経る長さに設定されている。このように、折返し部を含む通路長は、温度の更生に必要な熱の受渡しが可能なことおよびガス供給装置7の丈が大きくなるのを防止することを考慮して設定されている。
【0027】
熱交換部14におけるガス吐出部には、緊急遮断部15が接続されている。
緊急遮断部15は、熱交換部14におけるガス吐出部に連通する管路に配置された逆止弁16、バランス弁17および遮断弁18を備えている。
バランス弁17は、一次側減圧部12により減圧されて熱交換部14から吐出されるガスの圧力が所定圧力以上に達した際にその圧力のガスそのものを遮断弁18に作用させて遮断弁18に有する管路開閉部材(図示されず)を作動させ、管路を閉じさせることができるようになっている。バランス弁17の作動特性としては、通常、一次側減圧部12によって減圧されたガス圧である、2.5Kg/cm2が負荷されている時には遮断弁18の管路開閉部材を作動させない状態を維持し、所定圧力として一次側減圧部12でのガス吐出圧よりも高い4.5Kg/cm2が作用した場合にその圧力のガスを遮断弁18に供給して管路開閉部材を作動させる特性とされている。
バランス弁17に設定されている所定圧力は、一次側減圧部12のガス出力部(吐出部)から熱交換部14を通って二次側減圧部13のガス入力部に至る管路での耐圧(5.0K/cm2)を考慮したものであり、熱交換部14を構成しているフィン付きチューブの破壊も含めて一次側減圧部12のガス吐出部(出力側)から二次側減圧部13のガス入力部までの間の配管部の破損を防止するためである。
【0028】
遮断弁18は、一次側減圧部12の上流側の管路に配置され、内部に管路開閉部材(図示されず)を備えた開閉弁で構成されており、バランス弁17に作用するガスの圧力が所定圧力に達した場合に管路開閉部材を作動させて一次側減圧部12へのガス供給路を閉じ、ガスを遮断する。
【0029】
緊急遮断部15には、遮断弁18に至る配管の一部が分岐され、その分岐した管路に警告手段をなす警告部材19および大気放出部20が連結されている。
警告部材19は、その構成が図6に示されている。
図6において警告部材19は、緊急遮断部15に作用するガスの圧力が遮断時の圧力に達した場合に定常状態と異なる形態を設定されるようになっており、そのための構成は次の通りである。
図6(A)において、警告部材19は、外筺をなすブロック体19Eと、ブロック体19E内に挿嵌されて回転可能に支持されている表示板19Fとを備えている。
ブロック体19Eは、図4に示されているガス供給制御部9の外箱に装着された円筒状ケースで構成され、外部に露出する部分が着脱可能な透明体19Gで構成されて窓部を成している。
表示板19Fは、図6(A)において紙面と直交する方向に挿通された回転軸19Hを介してブロック体19Eにより回転可能に支持されている。回転軸19Hは、上下方向で中心部に位置させてあり外力が作用することで容易に表示板19Eを回転させるようになっている。回転軸19Hと表示板19Fとには、弦巻バネ19Jの各端部がそれぞれ係止され、表示板19Eを図中、時計方向に回転させる習性を付与している。また、表示板19Fの表裏各面には、異なる色の色彩表示部19F1、19F2が設けられている。定常状態を示す図6(A)において、透明体19G側に対向する面は、白色の色彩表示部19F1とされ、裏面は赤色の色彩表示部19F2とされている。
弦巻バネ19Jによる表示板19Fの回転は、表示板19Fの裏面、つまり、透明体19Gと反対側の面に対向してその上部側に位置する弾性体からなる規定部材を成すストッパ19Lで規定され、定常状態時、つまり、緊急遮断部15に作用するガスの圧力が所定圧力未満の場合に、図6(A)の状態である直立状態に保持するようになっている。本実施例での規定圧は、熱交換部14から吐出されるガスの圧力に相当する一次側減圧部12でのガス吐出圧よりも高い7Kg/cm2を閾値とする圧力とされている。このため、弦巻バネ19Jおよびストッパ19Lは、上記閾値以上の圧力が作用した場合に表示板19Fの回転および弾性変形が許容される。
一方、ブロック体19Eの下側には、表示板19Fの裏面で、回転軸19Hよりも下方に相当する表示板19Fの面に対向する吐出口19M1を備えたガス誘導部材19Mが配置されている。
ガス誘導部材19Mは、分岐した管路(便宜上、図5において符号P1で示す管路)の末端に接続されており、管路P1を流れるガスが導入されるようになっている。尚、図示しないが、ブロック体19Eには、誘導部材19Mによって導入されたガスが表示板19Fに作用した後に排出されるようになっている。
【0030】
このような構成の警告部材19は、誘導部材19Mを介して吐出口19M1から表示板19Fの裏面に作用するガスの圧力が上記閾値未満の場合、弦巻バネ19Jの付勢により図中、時計方向に回転しようとするが、ストッパ19Lによって回転を規定されて直立状態に保持され、誘導部材19Mの吐出口19M1と直交する状態に維持される。
一方、誘導部材19Mの吐出口19M1から吐出されるガスの圧力が上記閾値以上に達すると、表示板19Fが弦巻バネ19Jの付勢に抗して回転する。
表示板19Fは、図6(B)に示すように、反転することにより今まで透明体19G側に露呈していた面が反転させられるので、定常状態と異なる色彩表示によって異常圧力のガスが流れたことを警告することができる。なお、上記閾値以上のガスが導入された場合には、当然のことではあるが、緊急遮断部15においてガス供給が遮断されるので、表示板19Fが半回転した時点で表示板19Fが停止するようになっている。また、表示板19Fの定常状態の復帰は、透明体19Gを外して指などで回転さればよいが、弦巻バネの付勢により表示板19Fを時計方向に回転させてストッパ19Lに衝合させて直立状態に復帰させることも可能である。
【0031】
次に、図7を用いて警告部材(便宜上、符号19’で示す)の変形例を説明する。
図7は、警告部材19’の原理構成を説明するための模式図であり、同図(A)において警告部材19’は、分岐した管路(便宜上、図5において符号P1で示す管路)の末端に接続されているブロック体19Aと、そのブロック体19A内に配置されている開閉部材19Bと、開閉部材19Bの内部に位置する移動体19Cとを備えている。
ブロック体19Aは、図4に示されているガス供給制御部9の外箱に装着される円筒状ケースで構成されており、外部に露出する部分が透明体19Dで構成されて窓部を成している。
ブロック体19Aの内部には開閉部材19Bの基部が固着されている。開閉部材19Bは、図7(C)に示すように、ブロック体19Aの開口の周方向に沿って開口中心から放射状に分割された可撓性を有する複数の片部材で構成されており、その自由端がブロック体19Aの開口を閉じる状態に折曲げられている。ブロック体19Aの内部で透明体19Dの内側には、開閉部材19Bの自由端により開口を閉じた状態を維持するために、規定圧の不活性ガスが封入されている。本実施例での規定圧(図中、便宜上、符号P0で示す圧力)は、熱交換部14から吐出されるガスの圧力に相当する一次側減圧部12でのガス吐出圧よりも高い7Kg/cm2を閾値とする圧力とされている。このため、移動体19Cに上記の閾値未満の圧力が作用している場合には、ブロック体19Aの開口が閉じられた状態に維持され、閾値以上の圧力(図中、便宜上、符号P2で示す圧力)が移動体19Cの底部に作用した場合には移動体19Cの移動にともない不活性ガスが圧縮され、開閉部材19Bが中心側から押し広げられることになる。なお、この規定圧の不活性ガスに代えて、コイルバネ等の弾性体を用いることも可能である。
また、開閉部材19Aの自由端は、透明体19Dに対向する外表面に、常態時を意味する色彩表示が施されている。本実施例では、白あるいは緑等が用いられている(以下、便宜上、白色を対象として説明する)。
【0032】
移動体19Cは、透明体19Dの形状に見合うと共に、開閉部材19Bを押し広げることができる外形の頭部を有するピストン部材で構成され、底部が分岐された管路の末端と対向させてある。
移動体19Cは、その底部がブロック体19Aに形成されている圧力チャンバー19A1内に位置されており、分岐した管路P1に導入されるガスの圧力を受けるようになっている。移動体19Cの頭部表面には非常態時、つまり、減圧されるべき圧力以上の圧力(上記閾値としての圧力)が作用していることを意味する赤色の色彩表示が施されている。
【0033】
図5において、大気放出部20は、開閉弁で構成され、一次側減圧部12の入力側へのガス供給が遮断された後、一次側減圧部12へのガス遮断状態を解除する際に開放されてバランス弁17および遮断弁18に作用しているガスを大気放出する。
【0034】
一方、熱交換部14から吐出されるガスの配管は、上記した緊急遮断部15に向かう経路に加えて二次側減圧部13に向かう経路とに分岐され、二次側減圧部13に向かう経路には、第2の接続部に相当するカプラ51が設けられている。
第2の接続部に相当するカプラ51は、一次側減圧部12により減圧された所定圧力である、中圧管での供給圧力の一例である(2.5Kg/cm2)の取り出しおよび導入が可能なものであり、取り出しの場合には、中圧管1’(図2参照)からガスの供給を受ける供給先へのガス供給が行え、導入する場合には後述する二次側減圧部13での減圧対象となる圧力のガス、この場合には、民地内のメータ立て管5(図1参照)への供給圧力に減圧されるためのガスを取り込むことができるようになっている。
【0035】
二次側減圧部13は、一次側減圧部12によって減圧されたガスの圧力を一般家庭等の供給先での圧力に減圧するために設けられおり、一次側減圧部12により減圧された所定圧力(2.5Kg/cm2)を所定圧として開放状態になっている。
二次側減圧部13によって減圧されたガスが吐出される側には、過剰圧力が作用した際にそのガスを大気放散するためのリリーフ弁21が配置されている。
リリーフ弁21は、二次側減圧部13にて減圧されたガスの吐出圧力が所定の減圧圧力である240mmAqよりも高い圧力(390mmAq)に達すると過剰ガスを大気放出し、さらにその圧力よりも高い圧力(410mmAq)に上昇した場合にガスを遮断する。また、これとは逆に、リリーフ弁21は、減圧されたガスの圧力が減圧圧力よりも低い圧力である150mmAq以下に達した場合にもガスを遮断する機能を備えている。このようなリリーフ弁21の機能は、二次側減圧部13での圧力が異常に上昇するのを防止するためおよび圧力が異常に低下した際に供給先でガスの不完全燃焼が発生するのを未然に防止するためであり、これにより供給圧力に異変が発生した場合の対処が行えるようにしてある。
【0036】
二次側減圧部13のガス吐出部には、ヒューズ栓22が連結されている。
ヒューズ栓22は、接続部の抜け出し、所謂、外れたりした際の非常時に生ガスがそのまま噴出した場合に二次災害が起こるのを防止するために設けられた開閉弁を備えており、二次側減圧部13から吐出されるガスの流量が6Nm3/hを越えた時点でガスの出口側管路を遮断できるようになっている。
ヒューズ栓22には、出口弁に相当する開閉弁22aが付設されており、この開閉弁22aは、ヒューズ栓22により出力側の管路が閉じられた際に閉鎖され、出力側に至る供給経路内の大気放出部でガスが大気放出された後に再度閉じられる。さらに、ヒューズ栓22の近傍には、この管路での圧力を検知するための圧力計23が連結されている。
【0037】
本実施例は以上のような構成であるから、ガス供給制御部9が台車8に搭載される一方、必要な圧力を以て必要量の都市ガスが充填されたボンベ10がガス供給部11にセットされ、ガス供給制御部9における入力側に位置するホースをボンベ10に接続する。
ガス供給制御部9およびボンベ10が搭載された台車8は、図1乃至図3に示したように、ガスの供給が必要とされる供給先に運搬される。
つまり、図1に示すガス供給方式の場合には供内管2に連通しているメータ立て管5の近傍に、また図2に示すガス供給方式の場合には中圧管1’の近傍に、さらに図3に示すガス供給方式の場合にはメータ立て管5およびこのメータ立て管5に最も近い中圧管1’の近傍に運搬される。
【0038】
供給先に台車8が運搬されると、ガス供給制御部9における供給経路の出力側に位置して第1の接続部をなすカプラ50がメータ立て管(図1中、符号5で示す部材)に接続される場合と、第2の接続部をなすカプラ51が中圧管1’に接続される場合とが選択される。
図1に示したガス供給方式に対して本実施例によるガス供給システムを適用する場合には、ガス供給制御部9における供給経路の入力側がボンベ10に接続され、出力側の第1の接続部であるカプラ50がメータ立て管5に連結されると、ガスの供給が開始される。
【0039】
ガスを供給する際、ガス供給制御部9では、ガス供給部11に有する圧力計11bによりボンベ10内の圧力が確認され、使用可能な圧力である場合、開閉弁11cの一方が開放され、さらに図5において符号22aで示した出口弁に相当している開閉弁が開放される。
開閉弁11cが開放されると、選択された側のボンベ10からガス供給制御部9の入力側にガスが供給される。
【0040】
ガス供給制御部9では、ボンベ10から吐出されるガスが一次側減圧部12に供給され、ボンベ10内での圧力である200Kg/cm2から中圧管1’への供給圧力、本実施例では2.5Kg/cm2に減圧される。減圧されたガスは、減圧時に生じる断熱膨張によって温度低下しているが、熱交換部14を通過することにより使用環境雰囲気温度に更正され、熱交換部14から吐出される。
【0041】
熱交換部14は、温度低下しているガスの温度を上昇させるための電源や熱源を要しない雰囲気接触構造が用いられているので、供給されるガスに引火する要因を備えないですみ、これによって、ガス取り扱い上での安全を確保することができる。熱交換部14を通過するガスは、温度を更正されることにより断熱膨張により降下した温度のままで管路を通過しないようにされ、これによって、温度低下による機器類の損傷が防止される。
【0042】
一方、一次側減圧部12によって減圧されたガスの圧力が2.5Kg/cm2よりも高くなり、4.5Kg/cm2に達すると、緊急遮断部15によって一次側減圧部12に接続されている入力側の管路が閉じられてガスが遮断される。
緊急遮断部15では、バランス弁17において所定圧力以上のガス圧が作用すると、それまでの平衡状態がくずれて遮断弁18の管路開閉部材が作動されることにより一次側減圧部12に対するガスの入力側管路が閉じられる。
【0043】
さらに、このとき、本実施例による警告部材19は、図6あるいは、図7において説明した警告部材19、19’により監視される。
つまり、図6に示した警告部材19を用いた場合には、一次側減圧部12により減圧されたガスの圧力が所定圧力である4.5Kg/cm2未満に相当する常態時(図6(A)に示す状態)からその圧力以上に達すると、図6(B)に示すように、表示板19Fが回転し、いままで外部に露呈していた面を反転させて異常表示状態にする。
また、図7に示した警告部材19’の場合おいても、上記と同様な定常状態から圧力の異常上昇により、移動体19Cがブロック体19A内に封入されている不活性ガスの圧力に抗して透明体19D側に移動し、これによって開閉部材19Bが押し広げられて異常状態を表示する色彩表示を外部に露呈される。
これにより、一次側減圧部12から吐出されたガスが二次側減圧部13に入力されるまでの間の管路において、その管路の構成部材の耐圧に影響する圧力が発生した場合には、その管路でガスの供給が遮断されるので、一次側減圧部から二次側減圧部に至る管路の破損が未然に回避され、しかも、その状態が外部から容易に確認できる。
【0044】
一方、警告部材19、19’は、異常高圧の原因が取り除かれると、移動体19Cの底部に作用する圧力が閾値である規定値未満に復帰すると、図6に示した警告部材19の場合には、指の操作あるいは弦巻バネの付勢により表示板19Fを回転復帰させればよく、また図7に示した警告部材19’の場合には、ブロック体19A内に封入されている不活性ガスの圧力によって押し戻される。このため、開閉部材19Bがブロック体19Aの開口を閉じた状態に復元される。
このように、一次側減圧部12から吐出されたガスが二次側減圧部13に入力されるまでの間の管路において、その管路の構成部材の耐圧に影響する圧力が発生した場合には、その管路でガスの供給が遮断されるので、一次側減圧部から二次側減圧部13に至る管路の破損が未然に回避され、しかも、その状態が外部から容易に確認できる。換言すれば、減圧比率が高く、正常な減圧が得られない場合に供給管路への被害が大きくなりがちな箇所での減圧圧力の監視を正確に行うことでガス供給系での事故の発生する事態を迅速に予測して対策を採ることが可能になる。
【0045】
一次減圧部12において所定圧力である2.5Kg/cm2に減圧されたガスは、その所定圧力である場合に限って二次側減圧部13に供給され、供給先での使用圧力である240mmAqに減圧される。この場合には、第2の接続部に相当するカプラ51は閉じられ、ガスの吐出が行えない状態を維持されている。
二次側減圧部13では、入力されるべきガスの圧力が2.5Kg/cm2よりも高くなり、4.5Kg/cm2に達すると、その圧力のガスが緊急遮断部15に作用してガスが遮断される。また、二次側減圧部13で減圧されたガスの圧力が390mmAqに達した場合には、過剰ガスがリリーフ弁21により大気放出され、さらにガスの圧力が上昇して410mmAqに達した場合および、二次側減圧部13にて減圧されたガスの圧力が所定の圧力に満たない150mmAqよりも低い場合にもガスが遮断される。これにより、減圧されたガスは、その減圧圧力が所定の減圧圧力に維持されている場合に限ってヒューズ栓22に供給されることになる。またこの時の圧力は圧力計23により検知されるので、外部から監視することができる。
【0046】
二次側減圧部13により最終的な供給先での圧力に設定されたガスは、ヒューズ栓22により供給先、この場合には、二次側減圧部13において減圧された圧力を用いる一般家庭等の供給先に対して供給される。
二次側減圧部13により減圧されたガスの流量が所定値(6Nm3/h)を越えた場合には、ヒューズ栓22によってガスの出口側管路が閉じられてガスの供給が遮断される。これにより、接続部の抜け出し等の非常時には、二次側減圧部13から供給される生ガスが噴出するのを未然に防止して二次災害を招かないようにされる。
【0047】
一方、図2に示したガス供給方式に本実施例によるガス供給システムを適用する場合には、一次側減圧部12にて減圧され、中圧管1’に対する供給圧力、この場合は2.5Kg/cm2に設定されたガスを第1の接続部に相当するカプラ50からではなく第2の接続部に相当するカプラ51から中圧管1’へ供給するために、カプラ51が中圧管1’に取り付けられる。これにより、ガス供給部11に有するボンベ10からのガスは二次側減圧部13に達する前にカプラ51を通過して中圧管1’に向け供給される。
【0048】
また、図3に示したガス供給方式に対して本実施例によるガス供給システムを適用する場合には、第2の接続部に相当するカプラ51からガスを導入し、そのガスを二次側減圧部13において所定圧力(240mmAq)に減圧し、その所定圧力のガスをメータ立て管5に対して供給する。
この場合には、カプラ51が中圧管1’に取り付けられる一方、第1の接続部に相当するカプラ50がメータ立て管5に取り付けられる。
二次側減圧部13で減圧されたガスの圧力が供給先での使用圧力以上に相当する390mmAqに達すると、上記したように、過剰圧力がリリーフ弁21により大気放出される。さらに、減圧されたガスの圧力が大気開放圧力以上である410mmAqに達した時および150mmAqよりも低くなる場合にはガスが遮断される。
このような既設管路を利用したガス供給方式では、従来、用いられていなかった低圧管1と中圧管1’との間でのガスの流用が可能となり、供給先へのガスの供給元が圧力の違いによって限定されてしまうようなことがない。このため、管路の復旧作業時等の緊急時には簡易的なガスの供給を確保する上で供給元の選択肢が広がり、都合がよい。
【0049】
一方、ガス供給装置7に装備されている高圧容器であるボンベ10からガスを簡易的に供給する形態としては、上述したように、既設配管が使用できない場合に供給先でのガスの使用を可能にする形態に加えて、気密試験のために用いる形態がある。
気密試験が低圧管1から引き込まれた供内管(図1中、符号2で示す管路)を対象として行われる場合には、各減圧部12、13によって通常設定される供給管への供給圧力よりも高い気密試験用圧力がガスに付与され、そのガスが第1の接続部であるカプラ50から供給管に向けて供給される。気密試験が終了した場合には、供給管内に供給されたガスの圧力を通常設定される供給圧力に減圧するだけで供給管内をパージする必要がない。これにより、従来、空気を用いた場合に実施されていたパージ作業が不要となるので、気密試験後のガス使用までの間の無駄な時間が省かれ、ガスの供給再開までの時間を短くすることが可能になる。
【0050】
本実施例では、図7に示した警告部材19’を用いた場合には、ブロック体19A内に封入された不活性ガスによって移動体19Cを元の状態に復元することができるので、移動体19Cの復帰移動のための特別な構造を要しないですみ、警告装置の構造を簡単なものとすることが可能になる。なお、上記実施例では、既設配管が使用できない場合を対象として説明したが、本発明はこの実施例に限るものでなく、例えば、従来技術において説明したように、ビルなどの商業需要先での配管の気密試験を対象として用いることも可能である。この場合には、気密試験に必要な圧力およびボンベの容量を設定し、ガス供給制御部9における供給経路の出力側に位置する接続部をなすカプラ50からガスの供給を行う。このような場合には、気密試験が終了すると、配管中には、本来供給されるガスと同じガスが残留しているだけであるので、従来実行されていたパージ作業を要することなく、ガスの供給を再開することができるので、本来のガス供給までの復旧時間が短くなるという作用効果が得られる。特に、ボンベから供給圧力に減圧してガスを供給する際、その減圧比率が大きい場合には、上述した警告装置19が用いられるので、減圧状態を監視して事故の発生を未然に防止できる体制を採ることが可能になる。
【0051】
【発明の効果】
請求項1記載の発明によれば、複数の高圧容器のうちから一つを選択してガスの取り込みを行い、取り込まれたガスが複数段の減圧部によりガス供給先での圧力に相当する最終圧力に減圧されて供給されることになるが、最終圧力のガスを取り出す第1の接続部とは別に設けられている第2の接続部により、最終圧力よりも高圧のガスの取り出しおよび最終圧力に減圧すべき圧力のガスを導入することができる。特に第2の接続部から取り出されるガスおよび導入されるガスは、最終圧力よりも高い圧力に設定されている中圧管で供給されるガスの圧力が対象とされているので、中圧管へのガス供給および低圧管へのガス供給を同一システムによって実行することができる。これにより、高圧容器からのガスを中圧管あるいは低圧管に対して供給することは勿論、既設管路間で異なる供給圧力の供給先に対しても簡易的なガスの供給が行えることになるので、単一システムによって供給圧力の違いに関係なくガスの供給を維持することが可能になる。しかも、熱交換部において温度更生処理を施されたガスの圧力が警告手段により監視され、異常な圧力にある時には警報することで異常な供給状態を容易に識別することができるので、保安上の安全性を高めることが可能になる。
【0054】
請求項1乃至4記載の発明によれば、減圧されて出力側に至るガスの圧力が所定圧力以上である場合を警告することができる。特に、常態時でない場合、警告部材に直接作用するガスの圧力を用いて常態時とは異なる色彩表示によって警告することができるので、外部から容易に減圧状況の識別が行えるとともに、発火や構造の複雑化を生じることがない。これにより、異常な圧力が発生している状態であることを知らないでいつまでも放置しておくようなことをなくすことができ、原因究明および対策を迅速化することが可能になる。しかも、異常な圧力が得られていることを識別するためのエネルギー源として、ガス供給システム内で流動するガスを直接用いているので、電気系統や他の出力装置を要しない分、発火や構造の複雑化を招かないようにすることが可能になる。
【図面の簡単な説明】
【図1】本発明によるガス供給システムを用いたガス供給方式の一例を説明するための模式図である。
【図2】本発明によるガス供給システムを用いたガス供給方式の他の例を説明するための模式図である。
【図3】本発明によるガス供給システムを用いたガス供給方式の別の例を説明するための模式図である。
【図4】本発明によるガス供給システムに用いられるガス供給装置の外観図である。
【図5】図4に示したガス供給装置に有するガス供給制御部の構成を説明するためのブロック図である。
【図6】図5に示した警告装置の一例を示す図であり、(A)は定常状態を示し、(B)は異常状態を示す。
【図7】図5に示した警告装置の他の例に関する原理構成を説明するための図であり、(A)は常態時での構成を、(B)は非常態時での構成を、(C)は斜視図である。
【符号の説明】
1 低圧管
1’ 中圧管
2 供内管
7 ガス供給装置
9 ガス供給制御部
10 高圧容器をなすボンベ
12 一次側減圧部
13 二次側減圧部
14 熱交換部
15 緊急遮断部
19、19’ 警告装置
19A ブロック体
19B 開閉部材
19C 移動体
19D 透明体
19F 表示板
19L 規定部材を成すストッパ
19M ガス誘導部材
50 第1の接続部に相当するカプラ
51 第2の接続部に相当するカプラ[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to a gas supply system, and more particularly, to a gas supply system that can easily supply gas when an existing pipe cannot be used or when an airtight test of the pipe is performed.
[0002]
[Prior art]
Pipes such as gas pipes buried underground are damaged by external force generated at the time of disasters such as earthquakes, etc., resulting in gas leakage, or supply failure due to leakage of water pipes or intrusion of near water. There is a possibility that the use thereof is interrupted and replacement is required.
Conventionally, the following work has been performed when repairing such piping.
Repair work on pipes involves replacing part of the low-pressure pipe or part of the medium-pressure pipe, and in addition, between the low-pressure pipe and the service pipe drawn from the low-pressure pipe into the private area, or In some cases, bypass paths may be temporarily provided between the pressure pipe and the supply pipe being drawn into the supply destination, or over a part of the replaced pipeline, and when the bypass path is temporarily provided, the bypass path may be provided via the bypass path. Repair the pipeline while maintaining the gas supply.
[0003]
[Problems to be solved by the invention]
If the supply of gas is stopped when a part of the pipe is replaced, the gas user must be requested to stop using the gas. is there. However, even if it is determined that the advance notice has been received, there may be cases such as absence from home, etc., making it difficult to perform management before starting the replacement work. In addition, if there is no home, the standby time between maintenance and inspection of the gas appliances after the replacement work and the ignition test may be increased. It can be inconvenient.
In addition, when installing a bypass, it is necessary to perform a different work from the original work such as laying and removing the bypass, in addition to replacing the pipes. This increases the time required for replacement and resupply of gas.
By the way, in addition to the above-mentioned repair work, there is, for example, an airtightness test for a supply pipe drawn in from a low-pressure main branch pipe as a work that requires a long time until the gas supply is restarted.
In the airtightness test, after shutting off the gas flow from the low-pressure main pipe to the supply pipe, air that is set to an airtightness test pressure higher than the supply pressure normally set in the supply pipe is enclosed, and after the test, A purge operation is performed to remove the enclosed air. When such an airtight test is performed, it takes a long time to perform an air purge operation, and at present, it is impossible to immediately restart the gas supply after the test. Such an airtight test is also performed when the supply of gas to the pipeline is stopped and when the gas supply is restarted.
Further, when the above-mentioned bypass path is temporarily provided, as a matter of course, a part of a pipe line in which gas of a predetermined supply pressure flows, such as a low-pressure pipe or an intermediate-pressure pipe, is targeted. Only a bypass path is temporarily provided between a supply destination that receives supply of gas from the pipeline and a method of supplying gas to a supply destination having a different supply pressure between the pipelines is not adopted. is the current situation. For this reason, even if there is an inexpensive pipeline near the supply destination, it has not been possible to use that pipeline as a simple gas supply source.
[0004]
On the other hand, as a matter of course, in the above-described gas supply method, it is assumed that the gas pressure is a predetermined gas pressure, but in practice, it cannot be determined whether or not the gas pressure is maintained at that pressure. The supply may continue in the dark clouds. Such a situation may cause damage to the piping or gas equipment at the supply destination, and the damage may be serious.
[0005]
An object of the present invention is to provide a gas supply system irrespective of a difference in supply pressure by using a single system when an underground pipeline cannot be used, in view of the above-mentioned problem when the conventional gas supply is interrupted. Another object of the present invention is to provide a gas supply system capable of judging whether or not the supply pressure at the time of supply is appropriate to enhance safety in security.
[0006]
[Means for Solving the Problems]
In order to achieve this object, the invention according to
[0013]
[0014]
Claim 3 The invention described in the
[0015]
Claim 4 The invention described in the claims 3 In the gas supply system described above, the opening / closing member is provided with a color display on an outer surface to identify that a pressure of a gas introduced into a terminal end of the pipeline is within a predetermined pressure, and The outer surface is provided with a color display for identifying that the pressure of the gas introduced into the end of the pipe is higher than the low pressure.
[0016]
[Action]
[0019]
[0020]
【Example】
Hereinafter, the present invention will be described in detail with reference to illustrated embodiments.
The gas supply system according to the present invention has a second connection capable of extracting and introducing a gas having a pressure higher than the final pressure, separately from the first connection provided for extracting the gas reduced to the final pressure. Providing a connection, introducing a gas to reduce the pressure to a gas at the final pressure at the second connection, extracting a gas having a pressure higher than the final pressure, and monitoring a pressure in a pipe leading to the second connection It is characterized by being able to.
The gas supply system according to the present invention is applied to the gas supply system shown in FIGS.
1 and 2 show a system in which the gas in the high-pressure vessel located on the input side is set at a required pressure at the supply destination and supplied, and FIG. 3 is used for replacement or repair work. This shows a method in which gas in an existing pipeline, part of which is shut off, is set to a necessary pressure at a supply destination and supplied.
In the method shown in FIG. 1, gas can be supplied to the service pipe from a high-pressure container provided in a gas supply device described later, and in the method shown in FIG. 2, the gas in the high-pressure container is supplied to the medium-pressure pipe. be able to.
Further, in the method shown in FIG. 3, the existing pipeline corresponds to the medium pressure pipe, and the gas can be supplied from the medium pressure pipe to the service pipe.
The medium pressure pipe according to the present embodiment has a gas supply pressure of 1 to 3 kg / cm. 2 Although the present invention is intended for the medium-pressure pipe B set to a pressure less than or equal to, the present invention is not limited to the medium-pressure pipe having such a pressure specification, and may be 3 to 10 kg / cm. 2 It should be noted that it is also possible to target the medium pressure pipe A for which a supply pressure of less than is set. In this embodiment, the pressure applied to the low-pressure pipe is 240 mmAq. However, the pressure supplied to the low-pressure pipe is 100 to 250 mmAq in the case of natural gas (13A). It should be noted that it is also possible to select the pressure in the target.
[0021]
In the gas supply system shown in FIG. 1, an opening is formed in a part of a
In the gas supply system shown in FIG. 2, an opening is formed in a part of a medium-pressure pipe (indicated by a reference numeral 1 'for convenience), and the opening is formed in the
Further, in the gas supply system shown in FIG. 3, similarly to the case shown in FIG. 2, a
[0022]
The
The carriage 8 has a mounting
[0023]
FIG. 5 is a block diagram for explaining the relationship between the gas
The pipes from each system are collected at appropriate places and connected to the primary-side
[0024]
In FIG. 5, in the supply path of the gas supplied from the
[0025]
The primary
[0026]
A predetermined pressure (2.5 Kg / cm 2 A secondary
The
[0027]
An
The
When the pressure of the gas discharged from the
The predetermined pressure set in the balance valve 17 is a withstand pressure in a pipe from the gas output part (discharge part) of the primary
[0028]
The shut-off
[0029]
A part of a pipe leading to the
The configuration of the warning
In FIG. 6, when the pressure of the gas acting on the
In FIG. 6A, the warning
The
The
The rotation of the
On the other hand, below the
The
[0030]
When the pressure of the gas acting on the back surface of the
On the other hand, when the pressure of the gas discharged from the discharge port 19M1 of the
As shown in FIG. 6B, the surface of the
[0031]
Next, a modification of the warning member (indicated by reference numeral 19 'for convenience) will be described with reference to FIG.
FIG. 7 is a schematic diagram for explaining the principle configuration of the warning
The
The base of the opening / closing
In addition, the free end of the opening / closing
[0032]
The moving
The moving
[0033]
In FIG. 5, the
[0034]
On the other hand, the pipe of the gas discharged from the
The
[0035]
The secondary-side
On the side from which the gas decompressed by the secondary
The
[0036]
A
The fuse plug 22 is provided with an opening / closing valve provided to prevent a secondary disaster from occurring when raw gas is directly blown out in an emergency when the connection portion comes off, that is, when it comes off. The flow rate of the gas discharged from the side
The fuse plug 22 is provided with an on-off
[0037]
Since the present embodiment is configured as described above, the gas
The cart 8 on which the gas
That is, in the case of the gas supply system shown in FIG. 1, in the vicinity of the
[0038]
When the cart 8 is transported to the supply destination, the
When the gas supply system according to the present embodiment is applied to the gas supply system shown in FIG. 1, the input side of the supply path in the gas
[0039]
When the gas is supplied, the gas
When the on-off valve 11c is opened, gas is supplied from the
[0040]
In the gas
[0041]
Since the
[0042]
On the other hand, the pressure of the gas decompressed by the primary
In the
[0043]
Further, at this time, the warning
That is, when the warning
Also in the case of the warning member 19 'shown in FIG. 7, due to the abnormal increase in pressure from the same steady state as described above, the moving
Accordingly, when a pressure that affects the pressure resistance of the components of the pipeline occurs in the pipeline until the gas discharged from the primary-
[0044]
On the other hand, when the cause of the abnormally high pressure is removed, the
As described above, when a pressure that affects the pressure resistance of the components of the pipeline is generated in the pipeline until the gas discharged from the primary-
[0045]
2.5 kg / cm which is a predetermined pressure in the primary
In the secondary
[0046]
The gas set to the final pressure at the supply destination by the secondary
The flow rate of the gas decompressed by the secondary
[0047]
On the other hand, when the gas supply system according to the present embodiment is applied to the gas supply system shown in FIG. 2, the pressure is reduced in the primary side
[0048]
When the gas supply system according to the present embodiment is applied to the gas supply system shown in FIG. 3, a gas is introduced from the
In this case, the
When the pressure of the gas depressurized by the secondary
In such a gas supply system using an existing pipeline, the gas can be diverted between the low-
[0049]
On the other hand, as a mode for simply supplying gas from the
When the airtightness test is performed on the service pipe (the pipe indicated by
[0050]
In the present embodiment, when the warning member 19 'shown in FIG. 7 is used, the moving
[0051]
【The invention's effect】
[0054]
[Brief description of the drawings]
FIG. 1 is a schematic diagram for explaining an example of a gas supply system using a gas supply system according to the present invention.
FIG. 2 is a schematic diagram for explaining another example of the gas supply system using the gas supply system according to the present invention.
FIG. 3 is a schematic diagram for explaining another example of the gas supply system using the gas supply system according to the present invention.
FIG. 4 is an external view of a gas supply device used in the gas supply system according to the present invention.
FIG. 5 is a block diagram illustrating a configuration of a gas supply control unit included in the gas supply device illustrated in FIG. 4;
6A and 6B are diagrams showing an example of the warning device shown in FIG. 5, wherein FIG. 6A shows a steady state, and FIG. Abnormal Indicates the status.
7A and 7B are diagrams for explaining the principle configuration of another example of the warning device shown in FIG. 5; FIG. 7A shows a configuration in a normal state; FIG. 7B shows a configuration in an emergency state; (C) is a perspective view.
[Explanation of symbols]
1 Low pressure pipe
1 'medium pressure pipe
2 service pipes
7 Gas supply device
9 Gas supply control unit
10 Cylinder for high pressure vessel
12 Primary side decompression section
13 Secondary side decompression section
14 Heat exchange unit
15 Emergency shutoff
19, 19 'warning device
19A block body
19B Opening / closing member
19C mobile
19D transparent body
19F display board
19L Stopper as a specified member
19M gas guide member
50 Coupler corresponding to first connection
51 Coupler corresponding to second connection
Claims (4)
上記入力側には上記高圧容器を複数配置し、それら複数の高圧容器の中から選択された一つの高圧容器内のガスを取り込み、
上記高圧容器から取り込まれたガスの圧力を複数段の減圧部によって上記ガス供給先で使用される最終圧力に減圧し、
上記減圧部間を通過するガスを熱交換部に導入して温度の更正処理を行い、
上記熱交換部を通過したガスの圧力が所定圧力以上に達した警告手段により警報するようにし、
上記複数の減圧部のうちで最終圧力に減圧する減圧部よりも以前の配管経路中に上記出力側に位置する第1の接続部とは別に最終圧力よりも高い圧力のガスを取り出しおよび導入可能な第2の接続部を設け、その第2の接続部において最終圧力に減圧すべき圧力のガスの導入および最終圧力よりも高い圧力のガスを取り出し、
上記警告手段は、上記熱交換部により温度の更生処理されたガスにより動作可能とされ、温度の更生処理を施されたガスの圧力が所定圧力よりも高い時に直接その圧力が作用することにより常態時と異なる表示を行うことで警報するようにしたことを特徴とするガス供給システム。 In a gas supply path in which a high-pressure container filled with gas is located on the input side and a first connection portion connectable to a gas supply destination is located on the output side,
A plurality of the high-pressure vessels are arranged on the input side, and gas in one high-pressure vessel selected from the plurality of high-pressure vessels is taken in,
The pressure of the gas taken in from the high-pressure vessel is reduced to a final pressure used at the gas supply destination by a plurality of pressure reducing units,
The gas passing between the pressure reducing sections is introduced into the heat exchange section to perform a temperature correction process,
To warn by the warning means that the pressure of the gas that has passed through the heat exchange section has reached a predetermined pressure or more,
A gas having a pressure higher than the final pressure can be taken out and introduced separately from the first connection portion located on the output side in the piping path before the pressure reducing portion for reducing the pressure to the final pressure among the plurality of pressure reducing portions. A second connecting portion, introducing a gas having a pressure to be reduced to the final pressure at the second connecting portion and extracting a gas having a pressure higher than the final pressure;
The warning means can be operated by the gas whose temperature has been rehabilitated by the heat exchanging unit, and is normally operated when the pressure of the gas which has been subjected to the temperature rehabilitation is higher than a predetermined pressure. A gas supply system, wherein an alarm is issued by performing a display different from the time.
上記警告に用いられる構成は、
上記出力側に至る管路の一部が分岐されて設けられている管路の末端部に配置された窓部と、
上記窓部内に挿嵌されて回転可能に支持されている表示板と、
上記表示板の裏面側で、その表示板の回転中心から偏寄した位置に上記ガスの吐出部を有し、上記管路の末端部に連通するガス誘導部材と、
上記表示板の裏面側で、上記回転中心を境にして上記ガス誘導部材と反対位置に配置され、上記管路の末端部に導入されるガスの圧力が所定圧力のときに上記表示板を定位置に保持する規定部材とを備え、
上記表示板は、上記ガス誘導部材から吐出されるガスの圧力が上記所定圧力以上に達したときに、上記規定部材の保持力に抗して反転することを特徴とするガス供給システム。The gas supply system according to claim 1 ,
The configuration used for the above warning is
A window disposed at an end of the conduit provided by branching a part of the conduit leading to the output side,
A display plate inserted in the window portion and rotatably supported,
On the back side of the display panel, a gas guide member having the gas discharge unit at a position deviated from the rotation center of the display panel, and communicating with an end of the pipeline,
On the back side of the display plate, the display plate is disposed at a position opposite to the gas guide member with the rotation center as a boundary, and the display plate is fixed when the pressure of gas introduced into the end of the pipeline is a predetermined pressure. and a defining member for holding the position,
The gas supply system is characterized in that the display plate reverses when the pressure of the gas discharged from the gas guide member reaches or exceeds the predetermined pressure, against the holding force of the defining member.
上記警告に用いられる構成は、
上記出力側に至る管路の一部が分岐されて設けられている管路の末端部に配置された窓部と、
上記窓部の周方向に複数分割され、基部が上記窓部内に固定されて自由端が揺動可能であり、自由端が常時上記窓部を塞ぐ習性を有する可撓性の開閉部材と、
上記開閉部材内にて上記管路の末端部に導入されるガスの圧力により摺動可能な移動体とを備え、
上記開閉部材は、上記管路の末端部に導入されるガスの圧力が所定圧力である時に上記窓部を閉じ、上記管路の末端部に導入されるガスの圧力が所定圧力以上に達した際に上記移動体により押し広げられて移動体を露出させることを特徴とするガス供給システム。The gas supply system according to claim 1 ,
The configuration used for the above warning is
A window disposed at an end of the conduit provided by branching a part of the conduit leading to the output side,
A flexible opening / closing member that is divided into a plurality in the circumferential direction of the window, the base is fixed in the window, the free end is swingable, and the free end has a habit of always closing the window.
A movable body slidable by the pressure of the gas introduced into the end of the conduit in the opening / closing member,
The opening and closing member closes the window when the pressure of the gas introduced into the end of the pipeline is a predetermined pressure, and the pressure of the gas introduced into the end of the pipeline reaches a predetermined pressure or higher. A gas supply system that is expanded by the moving body to expose the moving body.
上記開閉部材は、外表面に上記管路の末端部に導入されるガスの圧力が所定圧力以内であることを識別するための色彩表示が施され、上記移動体の外表面には上記管路の末端部に導入されるガスの圧力が所低圧力よりも高いことを識別するための色彩表示が施されていることを特徴とするガス供給システム。The gas supply system according to claim 3 ,
The opening / closing member is provided on the outer surface thereof with a color display for identifying that the pressure of the gas introduced into the end of the pipeline is within a predetermined pressure, and the outer surface of the moving body is provided with the pipeline. A gas supply system characterized by being provided with a color display for identifying that the pressure of the gas introduced into the end of the gas is higher than the low pressure.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP11382097A JP3564614B2 (en) | 1997-05-01 | 1997-05-01 | Gas supply system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP11382097A JP3564614B2 (en) | 1997-05-01 | 1997-05-01 | Gas supply system |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH10306899A JPH10306899A (en) | 1998-11-17 |
| JP3564614B2 true JP3564614B2 (en) | 2004-09-15 |
Family
ID=14621872
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP11382097A Expired - Lifetime JP3564614B2 (en) | 1997-05-01 | 1997-05-01 | Gas supply system |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3564614B2 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103939740B (en) * | 2014-04-24 | 2016-06-29 | 云南大红山管道有限公司 | A kind of slurry classification conveying memory-sharing system |
-
1997
- 1997-05-01 JP JP11382097A patent/JP3564614B2/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| JPH10306899A (en) | 1998-11-17 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US6766835B1 (en) | Tank monitor system | |
| US20140026991A1 (en) | Modular Element for Distributing Pressurized Gas and Corresponding Installation | |
| NO338712B1 (en) | Device and method for protecting a wellhead | |
| CN110168275A (en) | Pressure Vessel Systems for Motor Vehicles | |
| JP3564614B2 (en) | Gas supply system | |
| JP3564615B2 (en) | Gas supply system | |
| JP3571453B2 (en) | Gas supply device | |
| JP3620948B2 (en) | Gas supply system | |
| JP3586346B2 (en) | Gas supply system | |
| JP3611938B2 (en) | Gas supply system | |
| CN112610797B (en) | Protection device and protection method for damage and fracture of gas transmission pipeline | |
| JP3274385B2 (en) | Gas supply system | |
| JP3148131B2 (en) | Gas supply system | |
| CN114017228A (en) | Double-inerting pipeline system of host | |
| JP4038647B2 (en) | Liquefied gas supply device | |
| CN218671617U (en) | Pneumatic smoke exhaust window failure prevention protection system | |
| JP2918501B2 (en) | Construction method of city gas pipeline and equipment used for it | |
| KR100702469B1 (en) | Cooling and heating system with pressure reduction conversion and nitrogen pressure sealed expansion tank for large capacity and high temperature high pressure system | |
| JP4206516B2 (en) | Leak detection device | |
| JP2000306839A (en) | Semiconductor process gas supply system | |
| CN214699753U (en) | Valve bank assembly | |
| KR20230138390A (en) | Chilling unit, control method, and program | |
| JPH10169900A (en) | Gas supply method | |
| JP4658718B2 (en) | Gas supply system | |
| JP3538237B2 (en) | Gas supply device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20040217 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20040416 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20040514 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20040525 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080618 Year of fee payment: 4 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090618 Year of fee payment: 5 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100618 Year of fee payment: 6 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100618 Year of fee payment: 6 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110618 Year of fee payment: 7 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110618 Year of fee payment: 7 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120618 Year of fee payment: 8 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120618 Year of fee payment: 8 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130618 Year of fee payment: 9 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| EXPY | Cancellation because of completion of term |