JP3569729B2 - Hot water floor heating system - Google Patents
Hot water floor heating system Download PDFInfo
- Publication number
- JP3569729B2 JP3569729B2 JP29259595A JP29259595A JP3569729B2 JP 3569729 B2 JP3569729 B2 JP 3569729B2 JP 29259595 A JP29259595 A JP 29259595A JP 29259595 A JP29259595 A JP 29259595A JP 3569729 B2 JP3569729 B2 JP 3569729B2
- Authority
- JP
- Japan
- Prior art keywords
- floor heating
- floor
- remote controller
- temperature
- radiator
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Steam Or Hot-Water Central Heating Systems (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、床面に温水を循環させて暖房を行なう温水床暖房装置に関する。
【0002】
【従来の技術】
従来この種の温水床暖房装置においては、複数個の放熱器と床暖房用リモコンとが各部屋(系統)に対応して設置されており、これら放熱器および床暖房用リモコンが全て一台の熱源機に接続されている。そして、この熱源機は、各々の部屋が快適な暖房空間となるようにするため、各床暖房用リモコンからの信号に基づいて、各放熱器に対応した各々の熱動弁を開閉し、これによって各部屋への温水供給量を適宜調整するように制御していた。
【0003】
【発明が解決しようとする課題】
上述の温水床暖房装置の設置工事においては、一台の熱源機と複数個の放熱器および床暖房用リモコンをそれぞれ配管および配線で接続すると共に、各放熱器に個別に水張り作業を行ない、その後、試運転を行なうことにより、水張り状態の良否や誤配管または誤配線の確認などを行なっている。特に、熱源機から各放熱器に対して個別に温水を供給し、熱源機に戻ってくる温水の温度が所定の温度になるか否かで水張りの完了並びに誤配管および誤配線を確認するものであり、各放熱器への温水供給を所定時間ごとに順次切り替えて試運転を行なっている。しかしながら、この試運転作業では全体の作業時間としてかなり長い時間を要する一方、設置工事業者には熟練が要求される等、業者への負担が重くて作業効率が悪く、施工の面で問題があった。
【0004】
一方、各放熱器に対応する床暖房用リモコンに設けた室温検出手段としての室温サーミスタで室温の上昇の有無を判断することで、試運転とすることも可能であるが、床温が上昇して室温が上昇するまでにはかなりのタイムラグがあるため、試運転時間が先のものより長期化するので、この方式は殆ど行なわれていないのが現状である。
【0005】
そこで本発明では、従来の床暖房用リモコンに対して着脱可能な試運転完了コネクタを設けるか、床暖房用リモコンに合格判定キーを設けることにより、試運転時間を意識的に短縮すると共に、設置工事時やシーズン初め等の試運転時の水張り状態の良否や誤配管または誤配線の確認を短時間で且つ効率的に行なえるようにした温水床暖房装置を提供することを目的とする。
【0006】
【課題を解決するための手段】
すなわち本発明は、被加熱室の床面に配設された複数個の放熱器と、これら放熱器に温水を供給する熱源機と、各放熱器に対応して前記被加熱室内にそれぞれ設置された床暖房用リモコンと、一端にこの床暖房用リモコンに着脱自在に接続可能な接続部を有すると共に、他端に前記放熱器の上面温度を検出する温度検出手段を有する床温検出器とからなり、試運転時に前記床温検出器で検出された前記放熱器の上面温度が所定時間内に所定温度上昇したか否かによって試運転の合否判定を行なう温水床暖房装置であって、前記床暖房用リモコンに接続可能な接続部に所定抵抗値の抵抗器を接続した試運転完了コネクタを設けるようにして構成される。
【0007】
また本発明は、被加熱室の床面に配設された複数個の放熱器と、これら放熱器に温水を供給する熱源機と、各放熱器に対応して前記被加熱室内にそれぞれ設置された床暖房用リモコンと、一端にこの床暖房用リモコンに着脱自在に接続可能な接続部を有すると共に、他端に前記放熱器の表面に設置されてその放熱器の上面温度を検出する温度検出手段を有する床温検出器とからなり、試運転時に前記床温検出器で検出された前記放熱器の上面温度が所定時間内に所定温度上昇したか否かによって試運転の合否判定を行なう温水床暖房装置であって、前記床暖房用リモコンは、合格判定キーを備えると共に、その合格判定キーが試運転時に操作されると、試運転を正常終了と判断してそのデータを前記熱源機に送信する手段を備え、前記熱源機は、床暖房用リモコンからの試運転正常終了データを受信すると、前記床暖房用リモコンに次の放熱器の試運転を指示する信号を送信する手段を備えて構成される。
【0008】
また本発明は、上記床暖房用リモコン上の既存のキーを合格判定キーとして兼用するようにして構成される。
【0009】
さらに本発明は、上記床暖房用リモコン上の複数個の既存のキーの多重押しにて合格判定を行なうようにして構成される。
【0010】
【発明の実施の形態】
以下、本発明の実施形態を図面に基づいて説明する。
図1は本発明による温水床暖房装置の一実施形態を示す原理図、図2は図1に示す温水床暖房装置の制御ブロック図、図3は図1に示す温水床暖房装置の床暖房用リモコンの外観図、図4は試運転完了コネクタの一例を示す斜視図、図5は床温検出器の使用方法を示す斜視図、図6は試運転モード表示の一例を示す図、図7は通常運転プログラムのフローチャート、図8は試運転プログラムのフローチャートである。
【0011】
本発明による温水床暖房装置10は、図1及び図2に示すように、ガスや石油等を燃焼させ、その燃焼熱により温水を生成する熱源機1を有しており、熱源機1には暖房ポンプとしての循環ポンプ3が内蔵されている。循環ポンプ3には、被加熱室11の床面に配設された複数個(例えば、2個)の床マット2A、2Bが並列に接続されており、これら床マット2A、2Bと循環ポンプ3との間にはそれぞれ熱動弁5A、5Bが設けられている。また、被加熱室11内には床マット2A、2Bと同数(例えば、2個)の床暖房用リモコン4A、4Bが各床マット2A、2Bに対応した形で設置されており、各床暖房用リモコン4A、4Bと熱源機1との間で種々の信号を送受信することができる。
【0012】
更に、各床暖房用リモコン4A、4Bの操作パネル上にはそれぞれ、図3に示すように、運転キー4c、運転ランプ4d、LCD表示部4e、室温サーミスタ4f、プログラム運転ランプ4g、降温スイッチ4h、昇温スイッチ4j及び接続孔4k等が設けられており、接続孔4kには床温検出器7が着脱自在に装着されている。この床温検出器7は、図5に示すように、リード線7cを有しており、リード線7cの一端には、床暖房用リモコン4A、4Bの接続孔4kに着脱自在に接続可能な接続部7aが設けられている。一方、リード線7cの他端には温度検出手段としての床温サーミスタ7bが設けられており、床温サーミスタ7bの周囲には、ほぼ半球面状(椀状)に形成された合成樹脂製のケース8が床温サーミスタ7bを包囲する形で取り付けられている。
【0013】
また、温水床暖房装置10には試運転完了コネクタ9が付設されており、試運転完了コネクタ9は、図4に示すように、床暖房用リモコン4A、4Bの接続孔4kに接続可能な床温検出器7の接続部7aと同等機能の接続部9aを有している。接続部9aにはリード線9bを介してコネクタ9dが設けられており、コネクタ9dにはコネクタ9eが連結されている。コネクタ9eには、床温サーミスタ7bが所定温度を検出したときの抵抗値と同等の所定抵抗値の抵抗器を具備する基板9cが接続されている。
【0014】
本発明による温水床暖房装置10は以上のような構成を有するので、この温水床暖房装置10の通常運転および試運転は次に述べるようにして行なわれる。
【0015】
まず、通常運転について説明する。
【0016】
床暖房用リモコン4Aの運転キー4cをONすると、床暖房用リモコン4Aは、図7に示す通常運転プログラムに基づいて通常運転処理を実行する。即ち、運転ランプ4dとLCD表示部4eの運転部分が点灯すると共に、室温サーミスタ4fの検出する室内温度と床暖房用リモコン4Aで設定された設定温度とに基づいて、熱動弁5AのON−OFF時間を計算する。そして、熱源機1に運転ON信号データと熱動弁ON信号データを送信する。熱動弁5AのON−OFF時間は、20分を1サイクルとしてON時間を5〜20分(連続ON)の範囲で可変制御可能となっている。よって床暖房運転中は、20分毎に設定温度と室内温度との偏差によって、熱動弁5AのON−OFF時間を計算して制御することで、室内への温水供給量を制御して、室温を設定温度とすべく制御する。
【0017】
次に、試運転について説明する。
【0018】
熱源機1や暖房配管などの設置工事が終了した後、床マット2Aを配設した被加熱室11内の床表面に床温検出器7の床温サーミスタ7b及びケース8を設置し、床温検出器7の接続部7aを床暖房用リモコン4Aの接続孔4kに挿着する。すると、床温サーミスタ7bが床暖房用リモコン4Aに接続された状態となる。
【0019】
この状態で熱源機1の試運転スイッチ1aをONすると、熱源機1は、図8に示す試運転プログラムに基づいて試運転処理を実行する。即ち、熱源機1は試運転ONにより、各床暖房用リモコン4A、4Bに「試運転モード」への移行データを送信する。各床暖房用リモコン4A、4Bは、「試運転モード」への移行データを受信すると、通常運転中か否かに拘らず、運転ランプ4dとプログラム運転ランプ4gを点滅させ、試運転者に対して「試運転モード」への移行を視覚的に報知する。
【0020】
また、「試運転モード」への移行時には、このときに床温検出器7の床温サーミスタ7bで検出している床温を「T1」データとして記憶し、他系統の試運転中に床温が上昇するか否かを判定する。その結果、床温が上昇するようであれば、誤配管か誤配線が考えられるので、直ちに熱源機1に「異常データ」を送信(即ちエラー処理)し、熱源機1に試運転による異常発生とその内容を認識させる。なお、熱源機1に7セグメントによる異常コードの表示部を設けておき、異常発生時にはそのコード内容を表示させることで、試運転者が容易に異常原因を判定できるようにすることも可能である。
【0021】
熱源機1は、「試運転モード」に移行すると、まずポンプ3を駆動して各床暖房系統の配管内に暖房循環水を充填する「水張り」動作を1つの系統ごとに順次切り替えて行なう。
【0022】
そして、全ての床マット2A、2Bへの「水張り」が正常に完了すると、各床暖房用リモコン4A、4Bに順次試運転を行なわせる。
【0023】
以下、床暖房用リモコン4A、4Bによる試運転動作の詳細を説明する。
【0024】
熱源機1は、床マット2Aに対応している床暖房用リモコン4Aへ「試運転モード+水張り完了+運転ON」データを送信する。また、ポンプ3をONして通常の暖房燃焼運転を開始する。
【0025】
床暖房用リモコン4Aは、「試運転モード+水張り完了+運転ON」データを受信した1回目に、床温サーミスタ7bで検出している現在の床温を「T2」として記憶する。以降、ケース8内の床温サーミスタ7bにて、床温が「T2」+5deg上昇するか否かを所定時間としての試運転リミット時間(例えば50分)が経過するまで判定する。
【0026】
この試運転リミット時間は、試運転中はプログラム時刻表示部の「分桁」を利用して表示し、設定温度を変更する降温スイッチ4h及び昇温スイッチ4jの操作により、これらのスイッチ(キー)を変更手段として兼用して一定の時間範囲(例えば、20〜90分)で変更可能としている。よって、床マット2A、2Bの設置状況に応じて試運転リミット時間を変更できるので、色々な設置に対して試運転できるようにしている。また、この試運転リミット時間は、試運転の経過と共に残り時間を表示するように構成しているので、試運転の進行状況と残り時間を容易に判別することができる。更に、基板上にジャンパー線やスイッチを設けて、試運転リミット時間を切替えるよう構成してもよい。
【0027】
正常時は、床暖房用リモコン4Aが床温サーミスタ7bにより「T2」+5degに上昇した時点で、熱源機1に「試運転正常終了」データを送信し、試運転を終了する。熱源機1は「試運転正常終了」データを受信すると、次の床マット2Bの試運転を指示する信号を床暖房用リモコン4Bに送信することで、順次試運転を行なう。
【0028】
また、床暖房用リモコン4Aは、試運転開始後、試運転リミット時間(50分)を経過しても床温上昇しない場合に、誤配管か誤配線と判定し、熱源機1に「試運転異常」データを送信する。熱源機1は、「試運転異常」データを受信した時点でこの床マット2Aの試運転を中止し、次の床マット2Bの試運転を指示する信号を床暖房用リモコン4Bに送信し、前述したことと同様な試運転を行なう。
【0029】
更に、色々な理由により再度試運転を行なう場合、既に試運転を完了している系統の試運転を省略したいとき及び試運転が終了したことをはっきりさせたいときには、「試運転モード」中に合格判定キーを兼用する運転キー4cを操作することで、床暖房用リモコン4Aは「試運転正常終了」と判断して、このデータを熱源機1に送信するものである。また、不用意な操作を考慮して合格判定キーとしては降温スイッチ4h、昇温スイッチ4jの多重押しにて判定するようにしてもよい。
【0030】
更にまた、試運転の正常完了方法として、図4に示す試運転完了コネクタ9を使用してもよい。即ち、試運転完了コネクタ9の接続部9aを床暖房用リモコン4Aの接続孔4kに挿着して接続した状態で、床温が所定温度(例えば60〜70℃)を検出しているときと同様の所定抵抗値が床暖房用リモコン4Aに入力されるため、熱源機1から「試運転ON」データを受信すると、「試運転完了」と判定し、熱源機1にそのデータを送信することも可能である。
【0031】
以上、本発明の床暖房試運転動作について詳述したが、試運転中における各運転モード状態をプログラム表示部の「時桁」を利用して表示すれば、試運転者も試運転状況が一目で判定できる。例えば、下記のように、各モードを数字や記号にて表示することが可能である。各モードを記号(A、b、C、d、E)で表示した一例を図6に示す。
【0032】
A=「試運転モード+水張中+運転OFF」
b=「試運転モード+水張完了+運転OFF」
C=「試運転モード+水張完了+運転ON」
d=「試運転モード+試運転正常終了」
E=「試運転モード+試運転異常終了」
【0033】
【発明の効果】
以上説明したように本発明によれば、被加熱室の床面に配設された複数個の床マット等の放熱器と、これら放熱器に温水を供給する熱源機と、各放熱器に対応して前記被加熱室内にそれぞれ設置された床暖房用リモコンと、一端にこの床暖房用リモコンに着脱自在に接続可能な接続部を有すると共に、他端に前記放熱器の上面温度を検出する床温サーミスタ等の温度検出手段を有する床温検出器とからなり、試運転時に前記床温検出器で検出された前記放熱器の上面温度が所定時間内に所定温度上昇したか否かによって試運転の合否判定を行なう温水床暖房装置であって、前記床暖房用リモコンに接続可能な接続部に所定抵抗値の抵抗器を接続した試運転完了コネクタを設けるようにして構成したので、設置工事の終了後、熱源機は各放熱器毎に水張りを行なった後、各放熱器毎に温水を循環させ、各々の放熱器に対応した各床暖房用リモコンに実際に温度上昇するか否かを判定させる試運転を行なうが、各床暖房用リモコンは熱源機からの試運転信号を受信すると、床温検出器により放熱器の温度が所定時間内に所定温度に上昇することで、熱源機との配管接続が正常であることを簡単かつ確実に判定することができる。その結果、温水床暖房装置の設置工事などの際に誤配管や誤配線の有無を効率よく判断することが可能となる。しかも、試運転時において、床温検出器の代わりに試運転完了コネクタを床暖房用リモコンに接続することにより、この系統の試運転を合格判定することが可能となることから、既に床温度が高くなっている場合や放熱器と床暖房用リモコンの設置場所が異なる場合などに、その系統の試運転を容易に合格完了することができる。この場合、熱源機は次の試運転処理に移行することができ、試運転時間の短縮が可能となる。さらに、特別なキーやスイッチを設けることなく安価に実現することが可能となる。
【0034】
また本発明によれば、被加熱室の床面に配設された複数個の放熱器と、これら放熱器に温水を供給する熱源機と、各放熱器に対応して前記被加熱室内にそれぞれ設置された床暖房用リモコンと、一端にこの床暖房用リモコンに着脱自在に接続可能な接続部を有すると共に、他端に前記放熱器の表面に設置されてその放熱器の上面温度を検出する温度検出手段を有する床温検出器とからなり、試運転時に前記床温検出器で検出された前記放熱器の上面温度が所定時間内に所定温度上昇したか否かによって試運転の合否判定を行なう温水床暖房装置であって、前記床暖房用リモコンは、合格判定キーを備えると共に、その合格判定キーが試運転時に操作されると、試運転を正常終了と判断してそのデータを前記熱源機に送信する手段を備え、前記熱源機は、床暖房用リモコンからの試運転正常終了データを受信すると、前記床暖房用リモコンに次の放熱器の試運転を指示する信号を送信する手段を備えるようにして構成したので、設置工事の終了後、熱源機は各放熱器毎に水張りを行なった後、各放熱器毎に温水を循環させ、各々の放熱器に対応した各床暖房用リモコンに実際に温度上昇するか否かを判定させる試運転を行なうが、各床暖房用リモコンは熱源機からの試運転信号を受信すると、床温検出器により放熱器の温度が所定時間内に所定温度に上昇することで、熱源機との配管接続が正常であることを簡単かつ確実に判定することができる。その結果、温水床暖房装置の設置工事などの際に誤配管や誤配線の有無を効率よく判断することが可能となる。しかも、試運転時において、床温検出器を床暖房用リモコンに接続する代わりに合格判定キーを押すことにより、この系統の試運転を合格判定することが可能となることから、既に床温度が高くなっている場合や放熱器と床暖房用リモコンの設置場所が異なる場合などに、その系統の試運転を容易に合格完了することができる。この場合、熱源機は次の試運転処理に移行することができ、試運転時間の短縮が可能となる。
【0035】
また本発明によれば、上記床暖房用リモコン上の既存のキーを合格判定キーとして兼用するようにして構成したので、特別なキーやスイッチを設けることなく安価に実現することが可能となる。
【0036】
さらに本発明によれば、上記床暖房用リモコン上の複数個の既存のキーの多重押しにて合格判定を行なうようにして構成したので、不用意な操作を未然に防止することが可能となる。
【図面の簡単な説明】
【図1】本発明による温水床暖房装置の一実施形態を示す原理図である。
【図2】図1に示す温水床暖房装置の制御ブロック図である。
【図3】図1に示す温水床暖房装置の床暖房用リモコンの外観図である。
【図4】試運転完了コネクタの一例を示す斜視図である。
【図5】床温検出器の使用方法を示す斜視図である。
【図6】試運転モード表示の一例を示す図である。
【図7】通常運転プログラムのフローチャートである。
【図8】試運転プログラムのフローチャートである。
【符号の説明】
1……熱源機
2……放熱器(床マット)
4……床暖房用リモコン
7……床温検出器
7a……接続部
7b……温度検出手段(床温サーミスタ)
9……試運転完了コネクタ
10……温水床暖房装置
11……被加熱室[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to a hot-water floor heating device that circulates hot water on a floor surface to perform heating.
[0002]
[Prior art]
Conventionally, in this type of hot water floor heating apparatus, a plurality of radiators and a floor heating remote controller are installed corresponding to each room (system), and these radiators and the floor heating remote controller are all one unit. Connected to heat source unit. And, in order to make each room a comfortable heating space, this heat source unit opens and closes each thermal valve corresponding to each radiator based on a signal from each floor heating remote controller. To control the amount of hot water supplied to each room as appropriate.
[0003]
[Problems to be solved by the invention]
In the installation work of the above-mentioned hot water floor heating device, one heat source device and a plurality of radiators and a remote controller for floor heating are connected by piping and wiring, respectively, and water filling work is individually performed on each radiator. By conducting a test run, the quality of the water-filled state and the confirmation of incorrect piping or incorrect wiring are checked. In particular, one that supplies hot water individually to each radiator from the heat source unit, and confirms completion of water filling and incorrect piping and incorrect wiring by checking whether the temperature of the hot water returning to the heat source unit reaches a predetermined temperature. The test operation is performed by sequentially switching the hot water supply to each radiator at predetermined time intervals. However, this trial operation requires a considerably long time as the whole work time, but requires a skill for the installer, so the burden on the contractor is heavy, work efficiency is poor, and there is a problem in construction. .
[0004]
On the other hand, it is possible to perform a trial operation by determining the presence or absence of an increase in room temperature with a room temperature thermistor as room temperature detection means provided in a floor heating remote controller corresponding to each radiator, but it is possible to perform a trial operation, but the floor temperature increases. Since there is a considerable time lag before the room temperature rises, the test run time is longer than the previous one, so that this system is hardly used at present.
[0005]
Therefore, in the present invention, a trial run completion connector that can be attached to and detached from the conventional floor heating remote controller is provided, or a pass determination key is provided on the floor heating remote controller, so that the trial operation time is consciously shortened and the installation time is reduced. It is an object of the present invention to provide a hot-water floor heating device capable of confirming in a short time and efficiently whether or not water is filled up during a trial operation at the beginning of a season or the like, or incorrect piping or incorrect wiring.
[0006]
[Means for Solving the Problems]
That is, the present invention provides a plurality of radiators arranged on the floor of a heated room, a heat source device for supplying hot water to these radiators, and a plurality of radiators installed in the heated room corresponding to the respective radiators. Floor heating remote control, and a floor temperature detector having a connection portion detachably connectable to the floor heating remote control at one end and a temperature detection means for detecting the upper surface temperature of the radiator at the other end. A hot water floor heating apparatus for performing a pass / fail determination of a test operation based on whether or not an upper surface temperature of the radiator detected by the floor temperature detector during a test operation has increased by a predetermined temperature within a predetermined time; A test operation completion connector in which a resistor having a predetermined resistance value is connected to a connection portion connectable to the remote controller is provided.
[0007]
The present invention also provides a plurality of radiators arranged on the floor of the heated room, a heat source device for supplying hot water to the radiators, and a plurality of radiators installed in the heated room corresponding to the respective radiators. A remote control for floor heating, and a temperature detection device having a connection portion detachably connected to the remote control for floor heating at one end, and a temperature detection device installed at the other end on the surface of the radiator to detect an upper surface temperature of the radiator. A hot water floor heating system comprising: a floor temperature detector having a means for performing a test operation pass / fail determination based on whether or not the upper surface temperature of the radiator detected by the floor temperature detector during the test operation has risen a predetermined temperature within a predetermined time. The apparatus, wherein the floor heating remote controller includes a pass determination key, and when the pass determination key is operated during a trial run, a means for determining that the trial run is completed normally and transmitting the data to the heat source unit. Provided, the heat source machine When receiving the test run successful data from floor heating remote control, and comprises means for transmitting a signal instructing the commissioning of the next radiator to the floor heating remote control.
[0008]
Further, the present invention is configured such that an existing key on the floor heating remote controller is also used as a pass determination key.
[0009]
Further, the present invention is configured such that a pass determination is made by multiple pressing of a plurality of existing keys on the floor heating remote controller.
[0010]
BEST MODE FOR CARRYING OUT THE INVENTION
Hereinafter, embodiments of the present invention will be described with reference to the drawings.
1 is a principle diagram showing an embodiment of a hot water floor heating device according to the present invention, FIG. 2 is a control block diagram of the hot water floor heating device shown in FIG. 1, and FIG. 3 is a floor heating device of the hot water floor heating device shown in FIG. FIG. 4 is a perspective view showing an example of a test run completion connector, FIG. 5 is a perspective view showing a method of using a floor temperature detector, FIG. 6 is a view showing an example of a test run mode display, and FIG. FIG. 8 is a flowchart of a test operation program.
[0011]
As shown in FIGS. 1 and 2, the hot water
[0012]
Further, as shown in FIG. 3, an
[0013]
The hot-water
[0014]
Since the hot water
[0015]
First, normal operation will be described.
[0016]
When the
[0017]
Next, the trial operation will be described.
[0018]
After the installation work of the heat source unit 1 and the heating pipes is completed, the
[0019]
When the test run switch 1a of the heat source unit 1 is turned on in this state, the heat source unit 1 executes a test run process based on a test run program shown in FIG. That is, the heat source device 1 transmits the transition data to the “test operation mode” to each floor heating
[0020]
At the time of shifting to the "test operation mode", the bed temperature detected by the
[0021]
When the heat source unit 1 shifts to the “test operation mode”, the “water filling” operation of driving the pump 3 to fill the piping of each floor heating system with the heating circulating water is sequentially switched for each system.
[0022]
When the "water filling" of all the
[0023]
Hereinafter, the details of the test operation by the floor heating
[0024]
The heat source device 1 transmits “test operation mode + water filling completion + operation ON” data to the floor heating
[0025]
The floor heating
[0026]
The test operation limit time is displayed using the "minute digit" of the program time display section during the test operation, and these switches (keys) are changed by operating the
[0027]
In a normal state, when the floor heating thermistor 7A rises to "T2" +5 deg by the
[0028]
When the floor temperature does not rise even after the test operation limit time (50 minutes) has elapsed after the start of the test operation, the floor heating
[0029]
Further, when the test operation is performed again for various reasons, when it is desired to omit the test operation of the system which has already been completed the test operation and when it is necessary to clarify that the test operation has been completed, the pass judgment key is also used during the "test operation mode". By operating the
[0030]
Further, as a method for normally completing the test operation, the test operation completion connector 9 shown in FIG. 4 may be used. That is, in the state where the connection portion 9a of the test operation completion connector 9 is inserted and connected to the connection hole 4k of the floor heating
[0031]
As described above, the floor heating test run operation of the present invention has been described in detail. However, if each operation mode state during the test run is displayed using the "hour digit" of the program display unit, the test runner can also judge the test run status at a glance. For example, each mode can be displayed by a number or a symbol as described below. FIG. 6 shows an example in which each mode is represented by a symbol (A, b, C, d, E).
[0032]
A = "Test run mode + water filling + operation OFF"
b = "Test run mode + water filling completed + operation OFF"
C = "Test run mode + water filling completed + operation ON"
d = "Test run mode + Test run normally completed"
E = "Test run mode + Test run abnormal end"
[0033]
【The invention's effect】
As described above, according to the present invention, a radiator such as a plurality of floor mats disposed on the floor of a room to be heated, a heat source device for supplying hot water to these radiators, and a radiator corresponding to each radiator A floor heating remote controller installed in each of the heated chambers, and a floor for detecting an upper surface temperature of the radiator at one end having a connection portion detachably connected to the floor heating remote controller at one end. The temperature of the radiator detected by the floor temperature detector during the test operation has risen within a predetermined time by a predetermined temperature. In the hot water floor heating device for performing determination, since it is configured to provide a test run completion connector that connects a resistor of a predetermined resistance value to a connection portion connectable to the floor heating remote controller, after the installation work, Heat source unit is each radiator After water is filled, warm water is circulated for each radiator, and a test run is performed to determine whether or not the temperature of the floor heating remote controller corresponding to each radiator actually rises. When the remote control receives the test run signal from the heat source unit, the temperature of the radiator rises to the predetermined temperature within the predetermined time by the floor temperature detector, making it easy and reliable to confirm that the pipe connection with the heat source unit is normal. Can be determined. As a result, it is possible to efficiently determine whether there is erroneous piping or erroneous wiring during installation work of the hot water floor heating device or the like. In addition, at the time of the test operation, by connecting the test operation completion connector to the floor heating remote controller instead of the floor temperature detector, it is possible to determine whether the test operation of this system is acceptable. When the radiator and the floor heating remote controller are installed at different locations, the test run of the system can be easily completed. In this case, the heat source device can shift to the next test operation processing, and the test operation time can be reduced. Further, it can be realized at low cost without providing special keys and switches.
[0034]
Further, according to the present invention, a plurality of radiators arranged on the floor surface of the room to be heated, a heat source device for supplying hot water to the radiators, and An installed floor heating remote controller, and one end having a connection portion detachably connectable to the floor heating remote controller, and having the other end installed on the surface of the radiator to detect an upper surface temperature of the radiator. Hot water comprising a floor temperature detector having a temperature detecting means, and performing a pass / fail determination of test operation based on whether or not the upper surface temperature of the radiator detected by the floor temperature detector during the test operation has risen by a predetermined temperature within a predetermined time. The floor heating device, wherein the floor heating remote controller includes a pass determination key, and when the pass determination key is operated during a trial run, determines that the trial run is completed normally and transmits the data to the heat source unit. Means, Source machine receives the commissioning successful data from floor heating remote control, since it is configured so as to comprise means for transmitting a signal instructing the commissioning of the next radiator to the floor heating remote control, the installation work After completion, the heat source unit fills each radiator, circulates hot water for each radiator, and determines whether or not the temperature actually rises to each floor heating remote controller corresponding to each radiator. Each floor heating remote control receives a test operation signal from the heat source unit, and the floor temperature detector raises the temperature of the radiator to a predetermined temperature within a predetermined time by connecting a pipe connection with the heat source unit. Can be easily and reliably determined to be normal. As a result, it is possible to efficiently determine whether there is erroneous piping or erroneous wiring during installation work of the hot water floor heating device or the like. Moreover, at the time of the test operation, by pressing the pass judgment key instead of connecting the floor temperature detector to the floor heating remote controller, it is possible to judge the test run of this system as pass. When the radiator and the floor heating remote controller are installed at different locations, the test run of the system can be easily completed. In this case, the heat source device can shift to the next test operation processing, and the test operation time can be reduced.
[0035]
Further, according to the present invention, since the existing key on the floor heating remote controller is also used as a pass determination key, it can be realized at low cost without providing a special key or switch.
[0036]
Further, according to the present invention, since the pass determination is made by multiple pressing of a plurality of existing keys on the floor heating remote controller, it is possible to prevent an inadvertent operation beforehand. .
[Brief description of the drawings]
FIG. 1 is a principle view showing an embodiment of a hot water floor heating device according to the present invention.
FIG. 2 is a control block diagram of the hot water floor heating device shown in FIG.
FIG. 3 is an external view of a floor heating remote controller of the hot water floor heating device shown in FIG. 1;
FIG. 4 is a perspective view showing an example of a test run completion connector.
FIG. 5 is a perspective view showing how to use a floor temperature detector.
FIG. 6 is a diagram showing an example of a test operation mode display.
FIG. 7 is a flowchart of a normal operation program.
FIG. 8 is a flowchart of a test operation program.
[Explanation of symbols]
1 ... heat
4 Remote control for floor heating 7 Floor temperature detector
9 Test
Claims (4)
試運転時に前記床温検出器で検出された前記放熱器の上面温度が所定時間内に所定温度上昇したか否かによって試運転の合否判定を行なう温水床暖房装置であって、
前記床暖房用リモコンに接続可能な接続部に所定抵抗値の抵抗器を接続した試運転完了コネクタを設けたことを特徴とする温水床暖房装置。A plurality of radiators arranged on the floor of the room to be heated; a heat source device for supplying hot water to the radiators; and a remote controller for floor heating provided in the room to be heated corresponding to each radiator. And a floor temperature detector having a connection portion detachably connectable to the floor heating remote controller at one end, and a temperature detection means for detecting the upper surface temperature of the radiator at the other end.
A hot-water floor heating device that performs pass / fail determination of test operation based on whether or not the upper surface temperature of the radiator detected by the floor temperature detector during a test operation has increased by a predetermined temperature within a predetermined time,
A hot water floor heating device, comprising: a test operation completion connector in which a resistor having a predetermined resistance value is connected to a connection portion connectable to the floor heating remote controller.
前記床暖房用リモコンは、合格判定キーを備えると共に、その合格判定キーが試運転時に操作されると、試運転を正常終了と判断してそのデータを前記熱源機に送信する手段を備え、
前記熱源機は、床暖房用リモコンからの試運転正常終了データを受信すると、前記床暖房用リモコンに次の放熱器の試運転を指示する信号を送信する手段を備えたことを特徴とする温水床暖房装置。A plurality of radiators arranged on the floor of the room to be heated; a heat source device for supplying hot water to the radiators; and a remote controller for floor heating provided in the room to be heated corresponding to each radiator. A floor temperature having a connection portion detachably connectable to the floor heating remote controller at one end and a temperature detection means installed at the other end on the surface of the radiator to detect an upper surface temperature of the radiator. A hot water floor heating apparatus comprising a detector, and performing a pass / fail determination of the test operation based on whether or not the upper surface temperature of the radiator detected by the floor temperature detector during the test operation has increased by a predetermined temperature within a predetermined time,
The floor heating remote control includes a pass determination key, and when the pass determination key is operated during the test operation, includes means for transmitting the data to the heat source unit by determining that the test operation is completed normally,
The heat source unit further includes means for transmitting a signal for instructing a trial operation of a next radiator to the floor heating remote controller upon receiving test run normal end data from the floor heating remote controller. apparatus.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP29259595A JP3569729B2 (en) | 1995-11-10 | 1995-11-10 | Hot water floor heating system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP29259595A JP3569729B2 (en) | 1995-11-10 | 1995-11-10 | Hot water floor heating system |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH09133372A JPH09133372A (en) | 1997-05-20 |
| JP3569729B2 true JP3569729B2 (en) | 2004-09-29 |
Family
ID=17783823
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP29259595A Expired - Lifetime JP3569729B2 (en) | 1995-11-10 | 1995-11-10 | Hot water floor heating system |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3569729B2 (en) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP5934556B2 (en) * | 2012-04-02 | 2016-06-15 | 大阪瓦斯株式会社 | Solid oxide fuel cell system |
| JP6801991B2 (en) * | 2016-06-28 | 2020-12-16 | リンナイ株式会社 | Heating device |
-
1995
- 1995-11-10 JP JP29259595A patent/JP3569729B2/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| JPH09133372A (en) | 1997-05-20 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR100239596B1 (en) | Appliance model identification encoding | |
| JP3553703B2 (en) | Hot water floor heating system | |
| HK1025873A2 (en) | Method and apparatus for thermo-electric automatic cooking | |
| JP3569729B2 (en) | Hot water floor heating system | |
| JP3800359B2 (en) | Hot water floor heater | |
| US6701795B2 (en) | Method for testing a heating system | |
| JP2001132959A (en) | Hot-water heating system | |
| JP3622328B2 (en) | Hot water floor heater | |
| JP3490828B2 (en) | Hot water heating system | |
| JPH11101458A (en) | Remote controller for floor heating control | |
| JP4017438B2 (en) | Hot water floor heating system | |
| JP3753872B2 (en) | Commissioning device for floor heating system | |
| JP2001090963A (en) | Hot water heating system | |
| JP7516856B2 (en) | Storage water heater | |
| JP2001099430A (en) | Warm water heating system | |
| JPH09257260A (en) | Temperature detecting device for trial run for hot-water heating device | |
| JP2013108650A (en) | Hot water floor heating device, and method for determining piping connection of the same | |
| JPH09269132A (en) | Hot water floor heating device | |
| KR200202130Y1 (en) | Selectable temperature controller for air or floor temp | |
| KR20000019899A (en) | Method for sensing breakdown of three-way valve in gas boiler | |
| KR930008565B1 (en) | Operating control method of machinery | |
| JP2001099431A (en) | Warm water heating system | |
| JP3167946B2 (en) | Combustion equipment | |
| JP3660206B2 (en) | Water heater | |
| JP2006098008A (en) | Floor heating system test run device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| RD02 | Notification of acceptance of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7422 Effective date: 20040119 |
|
| RD02 | Notification of acceptance of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7422 Effective date: 20040120 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A821 Effective date: 20040120 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20040420 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20040519 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080702 Year of fee payment: 4 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080702 Year of fee payment: 4 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090702 Year of fee payment: 5 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090702 Year of fee payment: 5 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100702 Year of fee payment: 6 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110702 Year of fee payment: 7 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110702 Year of fee payment: 7 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120702 Year of fee payment: 8 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120702 Year of fee payment: 8 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130702 Year of fee payment: 9 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| EXPY | Cancellation because of completion of term |