Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP3576777B2 - Pressure vessel stand pipe support device - Google Patents
[go: Go Back, main page]

JP3576777B2 - Pressure vessel stand pipe support device - Google Patents

Pressure vessel stand pipe support device Download PDF

Info

Publication number
JP3576777B2
JP3576777B2 JP31543397A JP31543397A JP3576777B2 JP 3576777 B2 JP3576777 B2 JP 3576777B2 JP 31543397 A JP31543397 A JP 31543397A JP 31543397 A JP31543397 A JP 31543397A JP 3576777 B2 JP3576777 B2 JP 3576777B2
Authority
JP
Japan
Prior art keywords
stand pipe
pressure vessel
support device
thermal expansion
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP31543397A
Other languages
Japanese (ja)
Other versions
JPH11148994A (en
Inventor
悦朗 堂本
陽一 馬原
洋治 浦上
正雄 久保
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Power Ltd
Original Assignee
Babcock Hitachi KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Babcock Hitachi KK filed Critical Babcock Hitachi KK
Priority to JP31543397A priority Critical patent/JP3576777B2/en
Publication of JPH11148994A publication Critical patent/JPH11148994A/en
Application granted granted Critical
Publication of JP3576777B2 publication Critical patent/JP3576777B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • Y02E30/30Nuclear fission reactors

Landscapes

  • Supports For Pipes And Cables (AREA)
  • Structure Of Emergency Protection For Nuclear Reactors (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、圧力容器スタンドパイプ支持装置に係り、特に熱膨張を拘束しないで吸収しつつ、地震等の水平力を支持するのに好適なサポート構造に関する。
【0002】
【従来の技術】
圧力容器1の上鏡2には、図12および図13に示すように、燃料交換および制御用棒駆動装置を収容するための多数のスタンドパイプ3が取付けられている。運転中における圧力容器1は熱膨張により、スタンドパイプ3に半径方向および軸方向の変位が生じることになる。この熱膨張による変位を拘束するとスタンドパイプ3には曲げ荷重が加わることになり、スタンドパイプ3にはこの曲げ荷重による応力が発生し、強度健全性上好ましくない。
【0003】
なお、これらの図において、6は遮蔽コンクリート、7は貫通孔である。
【0004】
従来の技術では、この熱膨張による変位を吸収(変位による曲げ荷重等が掛からない)する方法として、スタンドパイプ3に防振器(スナツバ)を取付ける構造や、図14〜図17に示すようなサポート構造が考えられている。
【0005】
図16、図17においては、遮蔽コンクリート6上に固定した一対のキーサポート9,9Aにそれぞれ図に示すように、キー溝S,SAを設け、これに係合するような互いに上下方向を逆にしたくさび形ラジアルキー8,8Aをスタンドパイプ3の外壁面に固定してスタンドパイプ3を支持している。そして、圧力容器1の熱膨張により、その半径方向および軸方向に生じる各スタンドパイプ3の変位(伸び)は、くさび形ラジアルキー8,8Aがキー溝S,SAに沿つて摺動することによつて吸収できる構造となつている。
【0006】
さらに、各スタンドパイプ3の支持を安定するように、各スタンドパイプ3の遮蔽コンクリート6に対する支持部すなわち、くさび形ラジアルキー8,8Aの取付部における圧力容器1の熱膨張による半径方向と軸方向との変位量の比が、これらくさび形ラジアルキー8,8Aのくさび角(θで図14に示す)、即ち上記キー溝S,SAの溝角の正接となるよう設定されている。
【0007】
従つて、圧力容器1が熱膨張してスタンドパイプ3の支持部が上向きに変位すると、キーサポート9,9A内の両方のくさび形ラジアルキー8,8Aはキー溝S,SA内を上方に沿つて摺動し、この上向き変位と同時に起こる半径方向変位量だけ半径方向に変位することになる。
【0008】
また、図16、図17のものでは、各スタンドパイプ3に2つ割り型バンド11,11Aを取付ボルト10により取付け、これに各くさび形ラジアルキー8,8Aを固定し、さらにスタンドパイプ3を巻いて固定したサポートリング12上に両バンド11,11Aを載置する構造となつている。
【0009】
なお、図14、図15に示す構造も、バンド11,11Aがないだけで上記と同様である。
【0010】
上記した従来技術においては、運転中における圧力容器1の熱膨張による変位は吸収できる構造ではあるが、圧力容器1の運転時における過大な地震荷重が作用した場合、当該くさび形ラジアルキー8,8Aにはモーメントが生じ、くさび形ラジアルキー8,8A取付部のスタンドパイプ3には局部的に大きな応力が発生し、スタンドパイプ3の強度健全性上問題がある。
【0011】
また、従来技術では図14〜図17に示すように、スタンドパイプ3を支持する構成部品が多数であり、製作は勿論のこと現地での取付け工数も大となり、経済的にも好ましくない。
【0012】
【発明が解決しようとする課題】
上記従来技術は、スタンドパイプ支持構造物において、運転中の圧力容器に地震等の水平力が作用した場合、スタンドパイプの局部に過大な応力が発生すること、あるいは支持構造物の構成部品が多く、製作性、現地での取付け・作業性が悪いという難点があり、スタンドパイプの強度健全性および経済性の問題があつた。また、据付け誤差が生じた場合の支持構造物の取付けが困難となる可能性があつた。
【0013】
本発明の目的は、スタンドパイプの支持構造物の現地での取付け作業を効率的に行い、かつ運転中における圧力容器の熱膨張を拘束しないで吸収しつつ、地震等の水平力を効果的に支持すること、および据付け誤差に対して調節可能にすることにある。
【0014】
【課題を解決するための手段】
上記目的は、格納室内に設置された圧力容器の上鏡に取付けられて上方に延びる多数のスタンドパイプの各上部を、当該格納室に固設した支持部材上に配設した多数の貫通孔のそれぞれに挿入して、当該スタンドパイプの水平位置の支持を行うようにした圧力容器スタンドパイプ支持装置において、前記貫通孔は前記支持部材に取り付けた第1の円筒形状傾斜付サポータで形成され、前記スタンドパイプに第2の円筒形状傾斜付サポータを設け、前記第1の円筒形状傾斜付サポータと第2の円筒形状傾斜付サポータのスライド面に、(圧力容器の半径方向の熱膨張量ΔR)/(圧力容器の軸方向の熱膨張量ΔV)の勾配を設けたことにより達成される。
【0015】
【発明の実施の形態】
前述のように支持構造方式として、円筒形状にすることにより、支持構造の構成部品が少なくなり、構造が簡素化され、スタンドパイプ3設置部のスペースが大となり、また、据付け誤差に対して調整可能とすることで、現地での据付け(取付け)作業性が向上する。
【0016】
また、スタンドパイプ3の円周上に本発明の支持装置を取付けることにより、地震等の水平力が作用した場合、荷重伝達部が円筒形状であることから、荷重を分散して作用させることにより、スタンドパイプ3における局部的に過大な応力の発生が防止でき、スタンドパイプ3の強度健全性の向上が図れる。
【0017】
以下、本発明の実施例を図面に基づいて説明する。図1は本発明の実施例に係る原子炉圧力容器格納室の縦断面図、図2は図1のA部の詳細であるスタンドパイプ支持装置の縦断面図、図3は同、平面図である。
【0018】
図1において、1は据付け時の圧力容器、1Aは運転時の圧力容器、2は上鏡、3は据付け時のスタンドパイプ、3Aは運転時のスタンドパイプ、4,4Aは円筒形状傾斜付サポート、5は支持部材である。
【0019】
図2、図3において、本発明の要部をなすところは、円筒形状傾斜付サポート4Aの外側にアダプタ13とスペーサ14を配置した部分である。つまり、スタンドパイプ3側に円筒形状傾斜付サポート4Aを、支持部材5側にアダプタ13、円筒形状傾斜付サポート4を取付ける。そして、円筒形状傾斜付サポート4には取付ボルト10よりも大きい取付穴17が設けられている。従つて、据付け誤差をこの取付穴17とスペーサ14により調整する。
【0020】
つまり、円筒形状傾斜付サポート4には取付ボルト10よりも大きい取付穴17が穿設されているので、取付け位置を左、右にずらせることによつて、円筒形状傾斜付サポート4A,4間の傾斜を調整することができる。
【0021】
次に、圧力容器1の運転中における熱膨張に対するこれらの作用を述べる。圧力容器1の運転中における、図1に示す半径方向の熱膨張量ΔRと軸方向の熱膨張量ΔVとの関係は、説明のため温度が全体均一の場合を例示すると、次のようになる。
【0022】

Figure 0003576777
ここで、T;圧力容器1の運転中の温度、T;圧力容器1の据付け時(停止時)の温度、α;温度Tから温度Tまでの圧力容器1の平均熱膨張係数、R;スタンドパイプ3の半径方向取付け位置(半径方向の熱膨張伸び基準長さ)、V;スタンドパイプ3の軸方向の長さ(軸方向の熱膨張伸び基準長さ)。
【0023】
従つて図1に示すように、円筒形状傾斜付サポート4A、円筒形状傾斜付サポート4のスライド面にΔR/ΔVの勾配を設けておけば、据付け時から運転中を通して、常にスタンドパイプ3の熱膨張を拘束しないでスライド支持されることになる。
【0024】
なお、温度が部分(場所)によつて異なる場合でも、予め半径方向の熱膨張量ΔRと上下方向の熱膨張量ΔVとの関係を求めておけば、同様にしてΔR/ΔVの勾配を定めることができる。
【0025】
次に、本発明となる支持装置の詳細を再び図2およず図3において説明する。本図に示す通り、従来の構造と比較して非常に簡素化されており、製作性、現地での据付け性において非常にメリツトがあり、圧力容器1の熱膨張を拘束しないで吸収しつつ、地震等の水平力を効果的に支持でき、据付け誤差の調整もできる。
【0026】
図2および図3は、任意の位置のスタンドパイプ3についての支持装置の詳細を示すものであるが、その他の多数のスタンドパイプ3についても支持部材5に円筒形状傾斜付サポート4とアダプタ13を設けることにより、同様な効果を得ることができる。
【0027】
本発明になる他の実施例を図4および図5に示す。本実施例は、図2および図3において、アダプタ13とスペーサ14を取付けることによつて据付け誤差を調整するのに対して、内周が外周に対して偏心させた偏心アダプタ15、偏心スペーサ16を二重に取付け、偏心アダプタ15、偏心スペーサ16を支持部材5上で自在に回転させて据付け誤差を調整できるようにしたもので、部品数が少なくなり、現地での取付け作業が容易となる特徴がある。
【0028】
図6および図7、図8および図9、図10および図11はそれぞれ異なる本発明の変形例を示すものであり、これらの実施例においても上記と同様に、円筒形状傾斜付サポート4,4Aをスタンドパイプ支持構造に組み込むことで、従来技術の問題点である、強度健全性、作業性、経済性上の問題を解決している。
【0029】
【発明の効果】
以上説明したように、本発明によれば、スタンドパイプの支持構造物の現地での取付け作業を効率的に行い、かつ運転中における圧力容器の熱膨張を拘束しないで吸収しつつ、地震等の水平力を効果的に支持すること、および据付け誤差に対して調節可能にすることができる。
【図面の簡単な説明】
【図1】本発明が適用される原子炉圧力容器格納室の縦断面図である。
【図2】本発明の実施例に係るスタンドパイプ支持装置の縦断面図である。
【図3】本発明の実施例に係るスタンドパイプ支持装置の平面図である。
【図4】本発明の他の実施例に係るスタンドパイプ支持装置の縦断面図である。
【図5】本発明の他の実施例に係るスタンドパイプ支持装置の平面図である。
【図6】本発明の変形例に係るスタンドパイプ支持装置の縦断面図である。
【図7】本発明の変形例に係るスタンドパイプ支持装置の平面図である。
【図8】本発明の他の変形例に係るスタンドパイプ支持装置の縦断面図である。
【図9】本発明の他の変形例に係るスタンドパイプ支持装置の平面図である。
【図10】本発明のさらに他の変形例に係るスタンドパイプ支持装置の縦断面図である。
【図11】本発明のさらに他の変形例に係るスタンドパイプ支持装置の平面図である。
【図12】従来例に係る原子炉圧力容器格納室の縦断面図である。
【図13】従来例に係る原子炉圧力容器格納室の平面図である。
【図14】従来例に係るスタンドパイプ支持装置の縦断面図である。
【図15】従来例に係るスタンドパイプ支持装置の平面図である。
【図16】他の従来例に係るスタンドパイプ支持装置の縦断面図である。
【図17】他の従来例に係るスタンドパイプ支持装置の平面図である。
【符号の説明】
1 圧力容器
2 上鏡
3 スタンドパイプ
4 円筒形状傾斜付サポート
5 支持部材
15 偏心アダプタ
16 偏心スペーサ[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to a pressure vessel stand pipe support device, and more particularly to a support structure suitable for supporting a horizontal force such as an earthquake while absorbing thermal expansion without restraint.
[0002]
[Prior art]
As shown in FIGS. 12 and 13, a number of stand pipes 3 for accommodating a refueling and control rod driving device are attached to the upper mirror 2 of the pressure vessel 1. During operation, the pressure vessel 1 undergoes radial expansion and axial displacement of the stand pipe 3 due to thermal expansion. When the displacement due to the thermal expansion is restricted, a bending load is applied to the stand pipe 3, and a stress is generated in the stand pipe 3 due to the bending load, which is not preferable in terms of strength and soundness.
[0003]
In these figures, 6 is a shielding concrete, and 7 is a through hole.
[0004]
In the prior art, as a method of absorbing the displacement due to the thermal expansion (a bending load or the like due to the displacement is not applied), a structure in which a vibration isolator (snubber) is attached to the stand pipe 3 or a method shown in FIGS. Support structure is considered.
[0005]
In FIGS. 16 and 17, a pair of key supports 9 and 9A fixed on the shielding concrete 6 are provided with key grooves S and SA, respectively, as shown in FIG. The wedge-shaped radial keys 8, 8A are fixed to the outer wall surface of the stand pipe 3 to support the stand pipe 3. The displacement (elongation) of each standpipe 3 generated in the radial direction and the axial direction due to the thermal expansion of the pressure vessel 1 is caused by the wedge-shaped radial keys 8, 8A sliding along the key grooves S, SA. It has a structure that can be absorbed.
[0006]
Furthermore, in order to stabilize the support of each standpipe 3, the radial direction and the axial direction due to the thermal expansion of the pressure vessel 1 at the support portion of the standpipe 3 to the shielding concrete 6, that is, the mounting portion of the wedge-shaped radial keys 8, 8A. Is set so that the wedge angles of these wedge-shaped radial keys 8 and 8A (shown by θ in FIG. 14), that is, the tangents of the groove angles of the key grooves S and SA.
[0007]
Therefore, when the support portion of the stand pipe 3 is displaced upward due to the thermal expansion of the pressure vessel 1, both wedge-shaped radial keys 8, 8A in the key supports 9, 9A move upward along the key grooves S, SA. , And is displaced in the radial direction by the amount of radial displacement that occurs simultaneously with the upward displacement.
[0008]
In FIGS. 16 and 17, split bands 11 and 11A are attached to each stand pipe 3 with mounting bolts 10, wedge-shaped radial keys 8, 8A are fixed thereto, and the stand pipe 3 is further attached. The structure is such that both bands 11, 11A are placed on a support ring 12 which is wound and fixed.
[0009]
The structure shown in FIGS. 14 and 15 is the same as above except that the bands 11 and 11A are not provided.
[0010]
In the above-described prior art, the displacement due to the thermal expansion of the pressure vessel 1 during operation can be absorbed, but when an excessive seismic load acts during operation of the pressure vessel 1, the wedge-shaped radial keys 8, 8A are applied. , A large stress is locally generated in the stand pipe 3 where the wedge-shaped radial keys 8, 8A are attached, and there is a problem in the strength soundness of the stand pipe 3.
[0011]
Further, in the prior art, as shown in FIGS. 14 to 17, there are a large number of components for supporting the stand pipe 3, so that not only the production but also the number of installation steps on site are large, which is not economically preferable.
[0012]
[Problems to be solved by the invention]
According to the above prior art, in a standpipe support structure, when a horizontal force such as an earthquake acts on a pressure vessel during operation, an excessive stress is generated in a local portion of the standpipe, or many components of the support structure are used. However, there is a problem that the productivity and the installation and workability in the field are poor, and there is a problem of strength soundness of the standpipe and economy. In addition, there is a possibility that it is difficult to mount the support structure when an installation error occurs.
[0013]
It is an object of the present invention to efficiently perform on-site installation work of a support structure for a standpipe, and to effectively absorb horizontal expansion such as an earthquake while absorbing thermal expansion of a pressure vessel during operation without restraint. To support and to be adjustable for installation errors.
[0014]
[Means for Solving the Problems]
The above object is achieved by providing the upper part of a number of stand pipes attached to the upper mirror of a pressure vessel installed in a containment chamber and extending upward to a plurality of through-holes provided on a support member fixed to the containment chamber. In the pressure vessel stand pipe support device inserted into each and adapted to support the horizontal position of the stand pipe, the through hole is formed by a first cylindrical inclined supporter attached to the support member, A standpipe is provided with a second cylindrical-shaped inclined supporter, and the slide surfaces of the first cylindrical-shaped inclined supporter and the second cylindrical-shaped inclined supporter are (thermal expansion amount ΔR in the radial direction of the pressure vessel) / This is achieved by providing a gradient of (the amount of thermal expansion ΔV in the axial direction of the pressure vessel) .
[0015]
BEST MODE FOR CARRYING OUT THE INVENTION
As described above, the cylindrical structure of the support structure reduces the number of components of the support structure, simplifies the structure, increases the space for the stand pipe 3 installation part, and adjusts for installation errors. By making it possible, on-site installation (installation) workability is improved.
[0016]
Also, by mounting the support device of the present invention on the circumference of the stand pipe 3, when a horizontal force such as an earthquake is applied, the load is distributed and applied since the load transmitting portion is cylindrical in shape. In addition, the occurrence of locally excessive stress in the stand pipe 3 can be prevented, and the strength and soundness of the stand pipe 3 can be improved.
[0017]
Hereinafter, embodiments of the present invention will be described with reference to the drawings. FIG. 1 is a vertical sectional view of a containment chamber of a reactor pressure vessel according to an embodiment of the present invention, FIG. 2 is a vertical sectional view of a stand pipe support device which is a detail of a portion A in FIG. 1, and FIG. is there.
[0018]
In FIG. 1, 1 is a pressure vessel at the time of installation, 1A is a pressure vessel at the time of operation, 2 is an upper mirror, 3 is a standpipe at the time of installation, 3A is a standpipe at the time of operation, and 4 and 4A are cylindrical inclined supports. 5 and 5 are support members.
[0019]
2 and 3, a main part of the present invention is a portion where the adapter 13 and the spacer 14 are arranged outside the cylindrical inclined support 4A. That is, the cylindrical inclined support 4A is mounted on the stand pipe 3 side, and the adapter 13 and the cylindrical inclined support 4 are mounted on the support member 5 side. The cylindrical inclined support 4 is provided with a mounting hole 17 larger than the mounting bolt 10. Therefore, the installation error is adjusted by the mounting hole 17 and the spacer 14.
[0020]
That is, since the mounting hole 17 larger than the mounting bolt 10 is formed in the cylindrical-shaped inclined support 4, the mounting position is shifted to the left or right, so that the cylindrical-shaped inclined support 4 A, 4 is moved. Can be adjusted.
[0021]
Next, these effects on thermal expansion during operation of the pressure vessel 1 will be described. The relationship between the radial thermal expansion ΔR and the axial thermal expansion ΔV shown in FIG. 1 during the operation of the pressure vessel 1 is as follows, for example, when the temperature is entirely uniform for the sake of explanation. .
[0022]
Figure 0003576777
Here, T: temperature during operation of the pressure vessel 1, T 0 : temperature at the time of installation (at the time of shutdown) of the pressure vessel 1, α: average thermal expansion coefficient of the pressure vessel 1 from the temperature T 0 to the temperature T, R A mounting position in the radial direction of the stand pipe 3 (standard length of thermal expansion and expansion in the radial direction), V; a length of the stand pipe 3 in the axial direction (standard length of thermal expansion and expansion in the axial direction).
[0023]
Therefore, as shown in FIG. 1, if a slope of ΔR / ΔV is provided on the slide surface of the cylindrical inclined support 4 A and the cylindrical inclined support 4, the heat of the stand pipe 3 is always maintained throughout the operation from the time of installation. The slide is supported without restricting the expansion.
[0024]
Even when the temperature differs depending on the portion (location), if the relationship between the radial thermal expansion ΔR and the vertical thermal expansion ΔV is determined in advance, the gradient of ΔR / ΔV is similarly determined. be able to.
[0025]
Next, details of the supporting device according to the present invention will be described with reference to FIGS. 2 and 3 again. As shown in this figure, the structure is greatly simplified as compared with the conventional structure, and has great advantages in terms of manufacturability and on-site installation, while absorbing the thermal expansion of the pressure vessel 1 without restraining it. It can effectively support horizontal forces such as earthquakes and can adjust installation errors.
[0026]
FIGS. 2 and 3 show details of the support device for the stand pipe 3 at an arbitrary position. The support member 5 is also provided with a cylindrical inclined support 4 and an adapter 13 for many other stand pipes 3. By providing the same, a similar effect can be obtained.
[0027]
Another embodiment according to the present invention is shown in FIGS. In this embodiment, the installation error is adjusted by attaching the adapter 13 and the spacer 14 in FIGS. 2 and 3, whereas the eccentric adapter 15 and the eccentric spacer 16 whose inner circumference is eccentric with respect to the outer circumference are used. Are mounted on the support member 5, and the installation error can be adjusted by freely rotating the eccentric adapter 15 and the eccentric spacer 16 on the support member 5. This reduces the number of parts and facilitates on-site installation work. There are features.
[0028]
FIGS. 6 and 7, FIGS. 8 and 9, FIGS. 10 and 11 show different modifications of the present invention. In these embodiments, similarly to the above, cylindrical supports 4 and 4A are provided. Incorporating this into the standpipe support structure solves the problems of the prior art, namely, the problems of strength soundness, workability, and economy.
[0029]
【The invention's effect】
As described above, according to the present invention, the work of mounting the support structure of the stand pipe on site is efficiently performed, and the thermal expansion of the pressure vessel during operation is absorbed without restraint, and the occurrence of the earthquake or the like is prevented. The horizontal force can be effectively supported and adjustable for installation errors.
[Brief description of the drawings]
FIG. 1 is a longitudinal sectional view of a reactor pressure vessel storage chamber to which the present invention is applied.
FIG. 2 is a longitudinal sectional view of the stand pipe support device according to the embodiment of the present invention.
FIG. 3 is a plan view of the stand pipe support device according to the embodiment of the present invention.
FIG. 4 is a longitudinal sectional view of a stand pipe support device according to another embodiment of the present invention.
FIG. 5 is a plan view of a standpipe support device according to another embodiment of the present invention.
FIG. 6 is a longitudinal sectional view of a stand pipe support device according to a modification of the present invention.
FIG. 7 is a plan view of a stand pipe support device according to a modification of the present invention.
FIG. 8 is a longitudinal sectional view of a stand pipe support device according to another modification of the present invention.
FIG. 9 is a plan view of a stand pipe support device according to another modification of the present invention.
FIG. 10 is a longitudinal sectional view of a stand pipe support device according to still another modified example of the present invention.
FIG. 11 is a plan view of a stand pipe support device according to still another modification of the present invention.
FIG. 12 is a longitudinal sectional view of a conventional reactor pressure vessel storage chamber.
FIG. 13 is a plan view of a conventional reactor pressure vessel storage chamber.
FIG. 14 is a longitudinal sectional view of a stand pipe support device according to a conventional example.
FIG. 15 is a plan view of a stand pipe support device according to a conventional example.
FIG. 16 is a longitudinal sectional view of a stand pipe support device according to another conventional example.
FIG. 17 is a plan view of a stand pipe support device according to another conventional example.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 Pressure vessel 2 Top mirror 3 Stand pipe 4 Cylindrical inclined support 5 Support member 15 Eccentric adapter 16 Eccentric spacer

Claims (1)

格納室内に設置された圧力容器の上鏡に取付けられて上方に延びる多数のスタンドパイプの各上部を、当該格納室に固設した支持部材上に配設した多数の貫通孔のそれぞれに挿入して、当該スタンドパイプの水平位置の支持を行うようにした圧力容器スタンドパイプ支持装置において、
前記貫通孔は前記支持部材に取り付けた第1の円筒形状傾斜付サポータで形成され、前記スタンドパイプに第2の円筒形状傾斜付サポータを設け、前記第1の円筒形状傾斜付サポータと第2の円筒形状傾斜付サポータのスライド面に、
(圧力容器の半径方向の熱膨張量ΔR)/(圧力容器の軸方向の熱膨張量ΔV)の勾配を設けたことを特徴とする圧力容器スタンドパイプ支持装置。
Insert each upper part of the many stand pipes attached to the upper mirror of the pressure vessel installed in the storage room and extending upward into each of the many through holes arranged on the support member fixed to the storage room. Therefore, in a pressure vessel stand pipe support device that supports the horizontal position of the stand pipe,
The through-hole is formed by a first cylindrical inclined supporter attached to the support member, a second cylindrical inclined supporter is provided in the stand pipe, and the first cylindrical inclined supporter and the second cylindrical inclined supporter are provided. On the slide surface of the cylindrical inclined supporter,
A pressure vessel stand pipe support device, wherein a gradient of (thermal expansion amount ΔR in the radial direction of the pressure vessel) / (thermal expansion amount ΔV in the axial direction of the pressure vessel) is provided .
JP31543397A 1997-11-17 1997-11-17 Pressure vessel stand pipe support device Expired - Fee Related JP3576777B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP31543397A JP3576777B2 (en) 1997-11-17 1997-11-17 Pressure vessel stand pipe support device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP31543397A JP3576777B2 (en) 1997-11-17 1997-11-17 Pressure vessel stand pipe support device

Publications (2)

Publication Number Publication Date
JPH11148994A JPH11148994A (en) 1999-06-02
JP3576777B2 true JP3576777B2 (en) 2004-10-13

Family

ID=18065323

Family Applications (1)

Application Number Title Priority Date Filing Date
JP31543397A Expired - Fee Related JP3576777B2 (en) 1997-11-17 1997-11-17 Pressure vessel stand pipe support device

Country Status (1)

Country Link
JP (1) JP3576777B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100695786B1 (en) 2005-08-09 2007-03-16 한국기초과학지원연구원 Eccentricity Measurement Tool and Eccentricity Correction Method for Two Concentric Eccentric Bolt Holes
CN109243628B (en) * 2018-08-01 2024-05-10 中广核研究院有限公司 Multi-point support device for multi-container system
CN108962406B (en) * 2018-08-01 2024-05-10 中广核研究院有限公司 Unidirectional sliding support device for reactor vessel
CN109036595B (en) * 2018-08-01 2023-10-31 中广核研究院有限公司 Multi-directional sliding support device for reactor vessel

Also Published As

Publication number Publication date
JPH11148994A (en) 1999-06-02

Similar Documents

Publication Publication Date Title
JPS598692B2 (en) Device for fixing bearings to concrete body
JPH0663605B2 (en) Lapper / pipe support plate connection assembly and method for assembling the same
JP3576777B2 (en) Pressure vessel stand pipe support device
JPH02290405A (en) Radial supporting device for outer shell member
JP2000129951A (en) Vibration control wall
JP2022130986A (en) Sliding seismic isolator installation method
JP2001289988A (en) Nuclear reactor containment supporting device, and nuclear reactor
JP2003302487A (en) Supporting device for nuclear reactor pressure vessel
JPS63219927A (en) Elastic/plastic damper
JP2536680B2 (en) Construction method of elasto-plastic damper unit
JP4076014B2 (en) Waste heat recovery boiler and its installation method
JP2006090078A (en) Base-isolated building and construction method for the same
CN108986932B (en) Modular layered supports for multi-container systems
JPS607388A (en) Supporter for nuclear reactor containing vessel
KR101941879B1 (en) Reactant gas insulated bus support structure
JPS61215825A (en) Anti-seismic supporting device
JPS624316B2 (en)
JPS585695A (en) Structure for supporting stand pipe of reactor pressure vessel
JP2005345397A (en) Spent fuel storage rack
JPH062804A (en) Anti-vibration device for boiler
JP7795447B2 (en) Support structure for reactor pressure vessel and nuclear power plant
JPH048396Y2 (en)
JPH11107384A (en) Building support structure
JP2856457B2 (en) High temperature gas furnace
JP4456211B2 (en) Piping structure for seismic isolation building and method for mounting the piping structure

Legal Events

Date Code Title Description
TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20040629

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20040708

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20031031

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20070716

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080716

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090716

Year of fee payment: 5

LAPS Cancellation because of no payment of annual fees