JP3580598B2 - Method and apparatus for placing concrete on tunnel road surface - Google Patents
Method and apparatus for placing concrete on tunnel road surface Download PDFInfo
- Publication number
- JP3580598B2 JP3580598B2 JP08712295A JP8712295A JP3580598B2 JP 3580598 B2 JP3580598 B2 JP 3580598B2 JP 08712295 A JP08712295 A JP 08712295A JP 8712295 A JP8712295 A JP 8712295A JP 3580598 B2 JP3580598 B2 JP 3580598B2
- Authority
- JP
- Japan
- Prior art keywords
- concrete
- road surface
- groove
- formwork
- placing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000004567 concrete Substances 0.000 title claims description 103
- 238000000034 method Methods 0.000 title claims description 13
- 238000009415 formwork Methods 0.000 claims description 35
- 230000003014 reinforcing effect Effects 0.000 claims description 13
- 238000005266 casting Methods 0.000 description 5
- 238000010276 construction Methods 0.000 description 3
- 238000007796 conventional method Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Description
【0001】
【産業上の利用分野】
本発明はトンネル路面においてコンクリートを効率的に打設する方法及び装置に関する。
【0002】
【従来の技術】
一般に、トンネル路面におけるコンクリート打設方法としては図7に示すものがある。トンネルの路面部2の中央には後に点検通路となる溝部1が設けられている。路面部2にコンクリートを打設するに際しては、前記路面部2に型枠5を設置した後、この型枠5内に鉄筋6を配設する。一方、コンクリートポンプ車20を路面部2に乗り入れ、このコンクリートポンプ車20にコンクリート供給管40を接続する。このコンクリート供給管40は複数の接続点41で接続されており、先端にフレキシブルノズル42が設けられている。これにより接続点41を順次切り離すことで、前記型枠5内全域をカバーすることができるようになっている。
【0003】
そして、実際の施工に際しては、トンネルの奥部Aまでコンクリート供給管40を延ばし、まず最初の型枠5内にコンクリートを打設する。ここでフレキシブルノズル42がカバーできる範囲には限界があるため、前記接続点41を順次切り離し、フレキシブルノズル42を付け替えながら打設作業を行う。
【0004】
そして最初の区画の型枠5内全域にコンクリート50が打設された後、次の型枠5を設置し、同様にして打設作業を行うようにしている。
なお、これら一連の作業はすべて手作業で行われている。
【0005】
【発明が解決しようとする課題】
しかし、前記した従来の方法においては、重量のあるコンクリート供給管40を手作業により接続や切り離しを行う必要があるため、人手が必要であるとともに極めて作業能率が低いという問題がある。また、コンクリート供給管40は型枠5内に配管する必要があるため鉄筋6を変形させる虞れがあり、また、前記した接続作業を鉄筋上で行わなければならないため、足場が悪く安全性にも欠けるという問題がある。
【0006】
本発明は前記事項に鑑みてなされたもので、大幅な省人化を図ることができるとともに作業能率を大幅に向上させることができ、併せて鉄筋を変形させる虞れがないコンクリート打設方法を提供することを技術的課題とする。
【0007】
【課題を解決するための手段】
本発明は前記技術的課題を解決するために、中央に溝部1を有する路面部2にコンクリートを打設するためのトンネル路面におけるコンクリート打設方法において以下のような方法とした。
【0008】
即ち、本発明は、前記溝部1内にガイドされて移動する台車3を設ける工程、この台車3上にコンクリート供給管4を載置する工程、前記路面部2に前記溝部1を除いて型枠5を立設する工程、この型枠5内に鉄筋6を配設する工程、前記コンクリート供給管4にコンクリート供給部7を接続する工程とを有し、コンクリート供給部7から型枠5へのコンクリート打設を行った後、前記台車3を移動させて新たに立設した型枠5へ順次コンクリートを打設する。
【0009】
ここで前記溝部1は例えば、断面長方形の凹部とすることができ、前記台車3はこの溝部1の内面、即ち、底面と側面とにローラー等を介して移動自在に設けることができる。
【0010】
また、前記コンクリート供給部7は例えば、コンクリートポンプ車を例示できる。な
お、必ずしも自走式でなくてもよいのは勿論である。また、本発明は、前記溝部1内にガイドされて移動する台車3を設ける工程、この台車3上にコンクリート供給管4を載置する工程、前記路面部2に前記溝部1を除いて型枠5を立設する工程、この型枠5内に鉄筋6を配設する工程、前記コンクリート供給管4にコンクリート供給部7を接続する工程、このコンクリート供給部7を前記溝部1内にガイドされて移動する支持台車8上に載置する工程とを有し、コンクリート供給部7から型枠5へのコンクリート打設を行った後、前記台車3及び支持台車8を移動させて新たに立設した型枠5へ順次コンクリートを打設する。
【0011】
ここで前記支持台車8は例えば、コンクリートポンプ車を載置できる程度の面積を有しており、前記台車3と同様に溝部1の内面、即ち、底面と側面とにローラー等を介して移動自在に設けることができる。
【0012】
本発明は前記必須構成要素からなるが、コンクリートミキサー等のコンクリート搬入車を付加した上でも成立するのは勿論である。さらに、本発明では、前記溝部1内にガイドされて移動する台車3と、この台車3上に載置されたコンクリート供給管4と、前記コンクリート供給管4に接続されたコンクリート供給部7とを備え、前記コンクリート供給管4の先端を任意の位置に移動させつつコンクリート供給ができるように構成した。
【0013】
【作用】
コンクリートを打設するに際しては先ず、溝部1の左右に位置する路面部2に型枠5を設置する。この型枠5はトンネルの奥部側から設置する。
【0014】
そしてこの型枠5内に鉄筋6を配設する。
前記コンクリート供給管4は台車3により移動自在になっている。したがって、前記コンクリート供給管4は型枠5内のいかなる場所へも任意に移動させることができる。これにより、コンクリートは型枠5内に容易に打設される。
【0015】
このように最初の型枠5へのコンクリート打設が終了したら、前記台車3及び支持台車8を移動させて新たに設置した型枠5へ順次コンクリートを打設する。
前記した従来の方法とは異なり型枠5内にコンクリート供給管4が入ることはないため、打設作業中は必要最小限の作業員で済む。
【0016】
【実施例】
本発明の実施例を図1ないし図6に基づいて説明する。
まず、本発明の実施に使用する装置から説明する。
【0017】
図1はトンネル内部の路面を上方から見たものであり、路面部2の中央には溝部1が設けられている。この溝部1は図4及び図5に示すように、断面長方形になっており、深さ490mm、幅1000mmとなっている。なお、溝部1の底部両側には排水溝1aが形成されている。
【0018】
前記路面部2は予め下地としてのコンクリートが打設されているが、本発明はこの下地上に本コンクリートを打設するものである。
前記溝部1内には、この溝部1内に沿って移動する台車3が設けられている。この台車3は図2及び図3に示すように、管状のフレーム3aに床面滑車3bと側壁滑車3cとを設けて構成されている。前記床面滑車3bは溝部1の底部に接地して走行する車輪が設けられており、一方、側壁滑車3cは溝部1の側壁に臨んで車輪が設けられている。側壁滑車3cと溝部1の側壁との間には15mmのクリアランスが設定されている。このため、側壁滑車3cの両側に設けられている車輪は側壁に全く接しないか一方のみが接するようになっている。また、前記フレーム3aにはこれを牽引するための第1牽引レバー3dが接続されている。
【0019】
前記台車3上にはコンクリート供給管4が載置される。前記台車3上にはクランプ3eが設けられており、前記コンクリート供給管4を着脱自在に保持するようになっている。なお、前記コンクリート供給管4の基端にはフレキシブルホース4aが接続されており、このフレキシブルホース4aは前記台車3に立設されたフレキシブルホース揺れ止めクランプ3fで支持されるようになっている。
【0020】
一方、前記コンクリート供給管4の先端にはフレキシブルホース4bが設けられており、その先端ノズル4cからコンクリートが吐出するようになっている。
前記第1牽引レバー3dの先端には支持台車8が接続されている。この支持台車8はコンクリートポンプ車等のコンクリート供給部7を載置するためのものであり、載置板8aとこの載置板8aの下面に設けられた床面滑車8bと側壁滑車8dとが設けられている。前記床面滑車8bは溝部1の底部に接地して走行する車輪8cが設けられており、一方、側壁滑車8dは溝部1の側壁に臨んで車輪が設けられている。
【0021】
側壁滑車8dと溝部1の側壁との間には15mmのクリアランスが設定されている。載置板8aの上面には車止め8eが設けられており、前記コンクリートポンプ車が不用意に動かないようになっている。前記載置板8aの一端には第2牽引レバー8fが接続されており、この第2牽引レバー8fには牽引クローラ8gが接続されている。これにより、牽引クローラ8gの走行に伴って支持台車8、即ち、コンクリートポンプ車等のコンクリート供給部7を移動させることができるように構成されている。このように、コンクリート供給部7は移動可能であるから、必ずしもコンクリートポンプ車のような自走式でなくてもよい。なお、載置板8aの幅は約2430mm、長さは約7500mmとなっている。
【0022】
前記した構成において、コンクリートを打設するに際しては先ず、溝部1の左右に位置する路面部2に型枠5を設置する。この型枠5はトンネルの奥部A側から設置する。そしてこの型枠5内に鉄筋6を配設する。この鉄筋6は縦線と横線からなる網状のものである。
【0023】
前記コンクリート供給管4は台車3により矢示F方向に移動自在になっている。したがって、前記先端ノズル4cは型枠5内のいかなる場所へも任意に移動させることができる。これにより、コンクリートを型枠5内に容易に打設することができる。なお、前記コンクリートポンプ車へはコンクリートミキサー9でコンクリートを供給する。
【0024】
このように最初の型枠5へのコンクリート打設が終了したら、前記台車3及び支持台車8を移動させて新たに設置した型枠5へ順次コンクリートを打設する。
前記した従来の方法とは異なり型枠5内にコンクリート供給管4が入ることはないため、打設作業中は必要最小減の作業員で済み、鉄筋6が変形する虞れもない。また、コンクリート供給管4の接続や切り離しが不要となり大幅な省人化が可能となった。
【0025】
さらに、コンクリート未打設部分あるいはインバートが広く空くため、型組や鉄筋敷設を先行させることができ施工能率が著しく向上した。特に長大トンネルの路盤鉄筋コンクリート打設に有効である。
【0026】
前記実施例では支持台車8を有するものにつき述べたが、要するにコンクリート供給管4とコンクリート供給部7とが一体に移動すれば所期の目的を達成することができるため必須なものではない。
【0027】
【発明の効果】
本発明によれば、コンクリートを任意場所に吐出することができるとともに、コンクリート供給管は邪魔にならない溝部内に位置しているので、コンクリート打設工程に大幅な省人化を図ることができるとともに、作業能率を大幅に向上させることができる。
【0028】
しかも、鉄筋を変形させる虞れもなく、作業員の安全をも大きく向上させることができる。
【図面の簡単な説明】
【図1】本発明の実施例を示す概略の平面図である。
【図2】本発明の実施例を示す全体の側面図である。
【図3】本発明の実施例を示す全体の平面図である。
【図4】本発明の実施例を示す路面の縦断面図である。
【図5】本発明の実施例を示す路面の縦断面図である。
【図6】本発明の実施例を示す施工過程の平面図である。
【図7】従来のコンクリート打設方法を示す平面図である。
【符号の説明】
1・・溝部、
2・・路面部、
3・・台車、
4・・コンクリート供給管、
5・・型枠、
6・・鉄筋、
7・・コンクリート供給部、
8・・支持台車。[0001]
[Industrial applications]
The present invention relates to a method and an apparatus for efficiently placing concrete on a tunnel road surface .
[0002]
[Prior art]
Generally, there is a method shown in FIG. 7 as a method for placing concrete on a tunnel road surface . In the center of the
[0003]
Then, at the time of actual construction, the
[0004]
Then, after the
In addition, these series of operations are all performed manually.
[0005]
[Problems to be solved by the invention]
However, in the above-mentioned conventional method, since it is necessary to manually connect and disconnect the heavy
[0006]
The present invention has been made in view of the above-mentioned matters, and a concrete casting method that can greatly reduce labor and greatly improve work efficiency and has no risk of deforming a reinforcing bar. Making it a technical issue.
[0007]
[Means for Solving the Problems]
In order to solve the above technical problem, the present invention adopts the following method in a concrete placing method on a tunnel road surface for placing concrete on a
[0008]
That is, the present invention is the provision of the
[0009]
Here, the groove 1 can be, for example, a concave section having a rectangular cross section, and the
[0010]
The
[0011]
Here, the
[0012]
The present invention is composed of the essential components described above, but it is needless to say that the present invention can be realized even when a concrete carry-in vehicle such as a concrete mixer is added. Furthermore, in the present invention, a
[0013]
[Action]
When pouring concrete, first, the
[0014]
Then, a reinforcing
The
[0015]
When the concrete placement on the
Unlike the above-described conventional method, the
[0016]
【Example】
An embodiment of the present invention will be described with reference to FIGS.
First, an apparatus used for implementing the present invention will be described.
[0017]
FIG. 1 is a top view of a road surface inside a tunnel, and a groove 1 is provided at the center of a
[0018]
The
A
[0019]
A
[0020]
On the other hand, a
A
[0021]
A clearance of 15 mm is set between the
[0022]
In the above-described configuration, when casting concrete, first, the
[0023]
The
[0024]
When the concrete placement on the
Unlike the conventional method described above, since the
[0025]
Furthermore, since the unconcreted part or the invert is widely vacant, it is possible to precede the laying of the mold and the reinforcing bar, and the construction efficiency is remarkably improved. It is especially effective for placing reinforced concrete in the basement of long tunnels.
[0026]
In the above-described embodiment, the description has been made of the one having the
[0027]
【The invention's effect】
ADVANTAGE OF THE INVENTION According to this invention, while being able to discharge concrete to an arbitrary place, since a concrete supply pipe is located in the groove part which does not interfere, a large number of labor savings can be achieved in the concrete pouring process. In addition, work efficiency can be greatly improved.
[0028]
In addition, there is no fear of deforming the rebar, and the safety of the worker can be greatly improved.
[Brief description of the drawings]
FIG. 1 is a schematic plan view showing an embodiment of the present invention.
FIG. 2 is an overall side view showing an embodiment of the present invention.
FIG. 3 is an overall plan view showing an embodiment of the present invention.
FIG. 4 is a vertical sectional view of a road surface showing an embodiment of the present invention.
FIG. 5 is a longitudinal sectional view of a road surface showing an embodiment of the present invention.
FIG. 6 is a plan view of a construction process showing an embodiment of the present invention.
FIG. 7 is a plan view showing a conventional concrete placing method.
[Explanation of symbols]
1. Groove,
2 ・ ・ Road surface,
3 ・ Dolly,
4. Concrete supply pipe,
5 ... formwork,
6. Rebar,
7. Concrete supply department,
8. Support cart.
Claims (3)
前記溝部内にガイドされて移動する台車を設ける工程、この台車上にコンクリート供給管を載置する工程、前記路面部に前記溝部を除いて型枠を立設する工程、この型枠内に鉄筋を配設する工程、前記コンクリート供給管にコンクリート供給部を接続する工程とを有し、コンクリート供給部から型枠へのコンクリート打設を行った後、前記台車を移動させて新たに立設した型枠へ順次コンクリートを打設することを特徴とするトンネル路面におけるコンクリート打設方法。In a concrete placing method on a tunnel road surface for placing concrete on a road surface portion having a groove portion in the center,
A step of providing a carriage guided and moved in the groove , a step of placing a concrete supply pipe on the carriage, a step of erecting a formwork on the road surface except for the groove , and a reinforcing bar in the formwork. And a step of connecting a concrete supply section to the concrete supply pipe, and after placing concrete from the concrete supply section to the formwork, the carriage is moved and newly erected . A concrete placing method on a tunnel road surface, wherein concrete is placed sequentially on a formwork.
前記溝部内にガイドされて移動する台車を設ける工程、この台車上にコンクリート供給管を載置する工程、前記路面部に前記溝部を除いて型枠を立設する工程、この型枠内に鉄筋を配設する工程、前記コンクリート供給管にコンクリート供給部を接続する工程、このコンクリート供給部を前記溝部内にガイドされて移動する支持台車上に載置する工程とを有し、コンクリート供給部から型枠へのコンクリート打設を行った後、前記台車及び支持台車を移動させて新たに立設した型枠へ順次コンクリートを打設することを特徴とするトンネル路面におけるコンクリート打設方法。In a concrete placing method on a tunnel road surface for placing concrete on a road surface portion having a groove portion in the center,
A step of providing a carriage guided and moved in the groove , a step of placing a concrete supply pipe on the carriage, a step of erecting a formwork on the road surface except for the groove , and a reinforcing bar in the formwork. Arranging a concrete supply section to the concrete supply pipe, placing the concrete supply section on a support truck that moves while being guided in the groove , and after concreting into the mold, concrete設方method in tunnel road, characterized by pouring sequentially concrete to the newly erected the mold by moving the carriage and the support carriage.
前記溝部内にガイドされて移動する台車と、この台車上に載置されたコンクリート供給管と、前記コンクリート供給管に接続されたコンクリート供給部とを備え、前記コンクリート供給管の先端を任意の位置に移動させつつコンクリート供給ができることを特徴とするトンネル路面におけるコンクリート打設装置。A concrete placement device on a tunnel road surface for placing concrete on a road surface portion having a groove portion in the center,
A dolly guided and moved in the groove , a concrete supply pipe placed on the dolly, and a concrete supply section connected to the concrete supply pipe, and a tip of the concrete supply pipe is positioned at an arbitrary position. concreting device in tunnel road characterized by the while moving can concrete supply Turkey on.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP08712295A JP3580598B2 (en) | 1995-04-12 | 1995-04-12 | Method and apparatus for placing concrete on tunnel road surface |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP08712295A JP3580598B2 (en) | 1995-04-12 | 1995-04-12 | Method and apparatus for placing concrete on tunnel road surface |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH08284598A JPH08284598A (en) | 1996-10-29 |
| JP3580598B2 true JP3580598B2 (en) | 2004-10-27 |
Family
ID=13906160
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP08712295A Expired - Fee Related JP3580598B2 (en) | 1995-04-12 | 1995-04-12 | Method and apparatus for placing concrete on tunnel road surface |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3580598B2 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR102702747B1 (en) * | 2023-09-15 | 2024-09-04 | 아이에스동서(주) | The horizontal placing system and method of concrete in the molding mold |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP5355175B2 (en) * | 2009-03-27 | 2013-11-27 | 株式会社熊谷組 | Construction equipment and construction method for roadbed reinforced concrete |
| CN111365035B (en) * | 2020-05-14 | 2025-01-24 | 中铁四局集团第二工程有限公司 | A kind of pipe gallery diaphragm fast linkage construction trolley and pipe gallery diaphragm construction method |
| CN115539090B (en) * | 2022-11-02 | 2026-02-06 | 济南城建集团有限公司 | Integrated construction method for straight and inclined walls of tunnel partition wall |
-
1995
- 1995-04-12 JP JP08712295A patent/JP3580598B2/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR102702747B1 (en) * | 2023-09-15 | 2024-09-04 | 아이에스동서(주) | The horizontal placing system and method of concrete in the molding mold |
Also Published As
| Publication number | Publication date |
|---|---|
| JPH08284598A (en) | 1996-10-29 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP3946342B2 (en) | Bridge erection device | |
| CN202690081U (en) | Sliding type trolley used for vault lining of tunnel with light section | |
| CN104564102A (en) | Tunnel lining concrete grouting device | |
| JP3580598B2 (en) | Method and apparatus for placing concrete on tunnel road surface | |
| CN110617070B (en) | Tunnel construction method | |
| JPH0571159A (en) | Concrete block installing method | |
| JP3254610B2 (en) | Plumbing method and plumbing device used in the method | |
| JP7105439B2 (en) | Concrete placing device and concrete placing method | |
| CN205934962U (en) | A system of sliding for underground pipe gallery cast -in -situ construction | |
| JP3120980B2 (en) | Concrete unit manufacturing equipment | |
| CN218779942U (en) | Movable post-pouring belt template supporting device | |
| CN210637087U (en) | Inner and outer mould trolley lining system for open-cut underground canal | |
| JPS59102019A (en) | Trackless piping work in tunnel | |
| JP3121224B2 (en) | Assembling / arrangement of reinforcing bars for culverts | |
| JPH0355679Y2 (en) | ||
| JP7497865B2 (en) | Concrete pouring system | |
| JPH0639878B2 (en) | Moving mechanism for mobile formwork for lining | |
| JP3873101B2 (en) | Equipment for placing slabs | |
| CN224078703U (en) | Portable slot concrete placement device | |
| JP3080772B2 (en) | Tunnel drilling rig | |
| CN214887110U (en) | Template trolley for tunnel primary support | |
| JPH01187293A (en) | Method and apparatus for invert concrete covering work for tunnel | |
| JP4570063B2 (en) | Scaffold integrated moving formwork device | |
| CN2515424Y (en) | Horizontal pour sliding mould car | |
| CN216811713U (en) | Two lining structure construction self-propelled hydraulic pressure bow member platform trucks of excavation station of separate island formula subway |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20040517 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20040525 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20040615 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20040713 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20040720 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080730 Year of fee payment: 4 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090730 Year of fee payment: 5 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100730 Year of fee payment: 6 |
|
| LAPS | Cancellation because of no payment of annual fees |