JP3581685B2 - Steel frame rebuilding adjustment jig - Google Patents
Steel frame rebuilding adjustment jig Download PDFInfo
- Publication number
- JP3581685B2 JP3581685B2 JP2001374242A JP2001374242A JP3581685B2 JP 3581685 B2 JP3581685 B2 JP 3581685B2 JP 2001374242 A JP2001374242 A JP 2001374242A JP 2001374242 A JP2001374242 A JP 2001374242A JP 3581685 B2 JP3581685 B2 JP 3581685B2
- Authority
- JP
- Japan
- Prior art keywords
- insertion member
- erection piece
- steel column
- jig
- base plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims description 125
- 239000010959 steel Substances 0.000 title claims description 125
- 238000003780 insertion Methods 0.000 claims description 129
- 230000037431 insertion Effects 0.000 claims description 129
- 238000003825 pressing Methods 0.000 description 9
- 230000002093 peripheral effect Effects 0.000 description 5
- 238000009434 installation Methods 0.000 description 4
- 238000004519 manufacturing process Methods 0.000 description 4
- 238000000034 method Methods 0.000 description 4
- 238000003466 welding Methods 0.000 description 4
- 238000006073 displacement reaction Methods 0.000 description 3
- 238000005304 joining Methods 0.000 description 3
- 238000004891 communication Methods 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 230000007423 decrease Effects 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 238000000465 moulding Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 1
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、下側の鉄骨柱に上側の鉄骨柱を接合するために用いられる鉄骨建入直し調整治具に関する。
【0002】
【従来の技術】
従来より、建設現場において、下側の鉄骨柱に上側の鉄骨柱を接合する時には、まず、クレーンによって上側の鉄骨柱を吊り上げて、下側の鉄骨柱の上方に配置した後、治具を用いて、これら下側の鉄骨柱と上側の鉄骨柱とを連結させた後、その下側の鉄骨柱の上端部と上側の鉄骨柱の下端部とを溶接または高力ボルトによって、接合するようにしている。
【0003】
このような治具としては、たとえば、特開平8−189201号公報に記載されるものが知られている。すなわち、特開平8−189201号公報に記載される治具は、エレクションピースの側面を遊動自在に挟持できるように構成されており、この挟持部分に、その先端がエレクションピースの両側面にそれぞれ対接可能な1対の水平位置調整ボルトが螺合されている。そして、この治具では、下側の鉄骨柱に上側の鉄骨柱を連結する時に、1対の水平位置調整ボルトをそれぞれ進退させてエレクションピースの両側面を調整しながら押圧することにより、下側の鉄骨柱に対する上側の鉄骨柱の水平方向位置を調整して、これら下側の鉄骨柱と上側の鉄骨柱とを連結するようにしている。
【0004】
【発明が解決しようとする課題】
しかし、特開平8−189201号公報に記載される治具では、水平位置調整ボルトを挟持部分に螺合させ、これを螺進および螺退させることにより、直接、エレクションピースの両側面を押圧するので、エレクションピースの移動を微調整することが煩雑かつ困難で、また、その挟持部分や水平位置調整ボルトの耐力などによっては、それらが損傷あるいは変形して、確実な水平方向位置の調整を行なうことができない場合があり、さらには、修理や廃棄の必要を生じるという不具合がある。
【0005】
さらに、エレクションピースの側面を水平位置調整ボルトによって押圧する場合には、エレクションピースの側面に対して直交する方向からの押圧力のみが作用するので、水平方向位置の調整後における確実な位置固定ができず、その後に、たとえば、鉛直方向位置を調整した時に、折角調整した水平方向位置がずれるという不具合を生じる場合がある。
【0006】
本発明は、このような不具合に鑑みなされたものであり、その目的とするところは、簡易な構成および操作によって、エレクションピースの移動を微調整して、確実な水平方向位置の調整および固定を行なうことができ、しかも、水平方向位置の調整後における確実な位置固定を実現することのできる鉄骨建入直し調整治具を提供することにある。
【0007】
【課題を解決するための手段】
上記の目的を達成するため、請求項1に記載の発明は、エレクションピースが取り付けられている下側の鉄骨柱に、エレクションピースが取り付けられている上側の鉄骨柱を接合するために用いられる鉄骨建入直し調整治具であって、前記上側の鉄骨柱のエレクションピースに取付可能な上側取付部と、前記下側の鉄骨柱のエレクションピースに取付可能な下側取付部とを備え、前記上側取付部および/または前記下側取付部には、前記下側の鉄骨柱に対する前記上側の鉄骨柱の水平方向位置を調整するための水平方向位置調整手段が設けられており、前記水平方向位置調整手段は、前記エレクションピースの前方に対向配置され、そのエレクションピースの両側に挿入可能な右側挿入部材および左側挿入部材と、前記右側挿入部材および前記左側挿入部材が進退自在に挿入される支持部とを備えており、前記右側挿入部材および前記左側挿入部材の先端部には、前記エレクションピースに当接可能な傾斜面が形成されていることを特徴としている。
【0008】
このような構成によると、エレクションピースの前方から、支持部に進退自在に挿入されている右側挿入部材を、その傾斜面がエレクションピースの右側に当接するように挿入すれば、右側挿入部材の挿入とともに、エレクションピースがその傾斜面の傾斜方向に沿って徐々に移動される。また、エレクションピースの前方から、支持部に進退自在に挿入されている左側挿入部材を、その傾斜面がエレクションピースの左側に当接するように挿入すれば、左側挿入部材の挿入とともに、エレクションピースがその傾斜面の傾斜方向に沿って徐々に移動される。そのため、このような右側挿入部材および左側挿入部材のエレクションピースの両側に対する選択的な挿入によって、エレクションピースを水平方向両方向において徐々に移動させることができ、また、挿入方向に押圧することができる。そのため、簡易かつ確実に、エレクションピースの移動を微調整して、下側の鉄骨柱に対する上側の鉄骨柱の水平方向位置を調整および固定することができる。
【0009】
しかも、右側挿入部材および左側挿入部材は、傾斜面においてエレクションピースと当接されるので、損傷や変形が少なく、長期にわたって使用することができる。
【0010】
さらに、右側挿入部材および左側挿入部材は、支持部に挿入されており、その支持部からそれぞれ進退させるのみで、各傾斜面をエレクションピースに当接させることができるので、簡易な操作によって、確実な作業を達成することができる。
【0011】
また、請求項2に記載の発明は、請求項1に記載の発明において、前記上側取付部および/または前記下側取付部は、前記エレクションピースを挟んで両側に対向配置される右側ベースプレートおよび左側ベースプレートを備えており、前記右側挿入部材および前記左側挿入部材の先端部は、前記傾斜面を有する楔状をなし、前記右側挿入部材の先端部は、前記右側ベースプレートと前記エレクションピースの右側面との間に挿入されるとともに、前記左側挿入部材の先端部は、前記左側ベースプレートと前記エレクションピースの左側面との間に挿入されることを特徴としている。
【0012】
このような構成によると、楔状とされた右側挿入部材の先端部を右側ベースプレートとエレクションピースの右側面との間に挿入し、また、これとは選択的に、楔状とされた左側挿入部材の先端部を左側ベースプレートとエレクションピースの左側面との間に挿入することによって、エレクションピースの移動をより一層確実に微調整することができる。そのため、下側の鉄骨柱に対する上側の鉄骨柱の水平方向位置の調整および固定を、より一層、簡易かつ確実に達成することができる。
【0013】
また、請求項3に記載の発明は、請求項1または2に記載の発明において、前記右側挿入部材および前記左側挿入部材の先端部に形成される傾斜面が、前記エレクションピースの角に当接されるように、前記右側挿入部材および前記左側挿入部材が、前記支持部に挿入されていることを特徴としている。
【0014】
このような構成によると、右側挿入部材および前記左側挿入部材の先端部に形成される傾斜面は、エレクションピースの角に当接されるので、右側挿入部材および前記左側挿入部材からの押圧力は、エレクションピースに対して、エレクションピースの側面に沿う方向と、それに直交する方向、つまり、鉄骨柱の周方向との分力として作用する。そして、鉄骨柱の周方向に作用する分力によって、水平方向位置の調整を確実に達成することができるとともに、エレクションピースの側面に沿う方向の分力によって、水平方向位置の調整後において、エレクションピースを位置固定することができる。そのため、水平方向位置の調整後における位置固定ができ、たとえば、その後に、鉛直方向位置を調整した時にも、水平方向位置がずれることを有効に防止することができる。
【0015】
また、請求項4に記載の発明は、請求項2または3に記載の発明において、前記右側挿入部材および前記左側挿入部材は、楔状に形成される前記先端部に連結される軸部を備え、前記軸部には螺着部が形成されるとともに、前記軸部は、前記先端部に対して相対回転可能に連結されており、前記右側挿入部材および前記左側挿入部材の螺着部が、前記支持部に螺着されていることを特徴としている。
【0016】
このような構成によると、右側挿入部材および左側挿入部材の螺着部が支持部に螺着されているので、右側挿入部材および左側挿入部材の軸部を螺進または螺退させることにより、より一層確実に、右側挿入部材および左側挿入部材を進退させて、先端部に形成される傾斜面を正確にエレクションピースに当接させることができる。
【0017】
また、この構成では、軸部が螺進または螺退によって回転しても、軸部が先端部に対して相対回転可能に連結されているので、先端部を回転させることなくエレクションピースに対して進退させることができる。そのため、より一層確実な作業を達成することができる。
【0018】
また、請求項5に記載の発明は、請求項1ないし4のいずれかに記載の発明において、前記支持部が、前記上側取付部および/または前記下側取付部に一体的に設けられていることを特徴としている。
【0019】
このような構成によると、支持部が、上側取付部および/または下側取付部に一体的に設けられているので、右側挿入部材および左側挿入部材の進退方向の精度を向上させることができるとともに、剛性の強度アップを図ることができ、さらには、簡易な成形によって、鉄骨建入直し調整治具を製造することができ、製造コストの低減化を図ることができる。
【0020】
また、請求項6に記載の発明は、請求項3ないし5のいずれかに記載の発明において、右側ベースプレートまたは左側ベースプレートには、前記水平方向位置調整手段による前記下側の鉄骨柱に対する前記上側の鉄骨柱の水平方向位置の調整後に、前記エレクションピースの移動を規制するための移動規制手段を備えていることを特徴としている。
【0021】
このような構成によると、水平方向位置調整手段による下側の鉄骨柱に対する上側の鉄骨柱の水平方向位置の調整後に、移動規制手段によりエレクションピースの移動を規制すれば、下側の鉄骨柱に接合された上側の鉄骨柱に、横梁などが組み付けられた場合において、その横梁の組み付け精度の誤差や、材料の残留応力、さらには、溶接時の引っ張り応力などによって、下側の鉄骨柱と上側の鉄骨柱との間の接合部分に変形応力が作用しても、その接合部分における位置ずれを有効に防止することができる。
【0022】
しかも、この構成では、右側挿入部材および前記左側挿入部材からの押圧力によっても、エレクションピースを位置固定することができるので、移動規制手段は、右側ベースプレートまたは左側ベースプレートのいずれか一方のみに設ければよく、部品点数の低減化によるコストの低減化を図ることができる。
【0023】
【発明の実施の形態】
図1は、本発明の鉄骨建入直し調整治具の一実施形態としての治具を示す斜視図、図2は、図1に示す治具のジャッキ装置の要部断面図、図3は、図1に示す治具の水平方向調整装置の支持部の要部斜視図、図4は、図1に示す治具の水平方向調整装置の右側挿入部材の要部断面図、図5は、図1に示す治具の水平方向調整装置の要部斜視図、図6は、図1に示す治具を上側エレクションピースに連結した状態を示す正面図、図7は、図1に示す治具を上側エレクションピースおよび下側エレクションピースに連結した状態を示す正面図、図8ないし図11は、図1に示す治具の水平方向調整装置の使用状態を説明するための平面断面図、図12は、図1に示す治具のジャッキ装置の使用状態を説明するための斜視図、図13は、図1に示す治具の使用状態を示す正面図、図14は、図1に示す治具に用いられる歯付き固定ボルトの一実施形態を示す、(a)は斜視図、(b)は側断面図、図15は、上側の鉄骨柱に横梁が組み付けられた状態を示す概略説明図である。これら図1ないし図15を参照して、本発明の鉄骨建入直し調整治具の一実施形態について説明する。
【0024】
図1、図6および図7において、この治具1は、治具本体2、ジャッキ装置3および水平方向位置調整手段としての水平方向調整装置4を備えている。
【0025】
治具本体2は、下方が開放される略逆U字板状をなし、互いに所定の間隔を隔てて対向する右側ベースプレート5および左側ベースプレート6と、これら右側ベースプレート5および左側ベースプレート6の上端部を連結する上側ベースプレート7とが一体として形成されており、その下部には、右側ベースプレート5と左側ベースプレート6との間を前方側において連結する2つの連結プレート8を備えている。
【0026】
そして、右側ベースプレート5および左側ベースプレート6における上部が、後述する上側エレクションピース65に取付可能な上側取付部9とされ、また、右側ベースプレート5および左側ベースプレート6における下部が、後述する下側エレクションピース63に取付可能な下側取付部10とされている。
【0027】
上側取付部9には、後で詳述する水平方向調整装置4が設けられるとともに、上側エレクションピース65の上側挿通孔66に挿通される上側挿通ボルト11が、右側ベースプレート5および左側ベースプレート6に螺着されている。また、上側エレクションピース65の右側面に当接可能な2つの移動規制手段としての上側固定ボルト12および13が、右側ベースプレート5において、上側挿通ボルト11の上下方向両側において、それぞれ螺着されている。
【0028】
また、下側取付部10には、下側エレクションピース63の下側挿通孔64に挿通される下側挿通ボルト14が、右側ベースプレート5および左側ベースプレート6に螺着されるとともに、下側エレクションピース63の左側面に当接可能な2つの下側固定ボルト15および16が、左側ベースプレート6において、下側挿通ボルト14の上下方向両側において、それぞれ螺着されている。
【0029】
また、上側ベースプレート7には、上側エレクションピース65の上面に当接される上部固定ボルト17が螺着されている。
【0030】
また、2つの連結プレート8は、下側取付部10における右側ベースプレート5および左側ベースプレート6の間において、互いに所定の間隔を隔てて上下方向に平行する状態で、略コ字状に前方に向かって突出するように形成されている。
【0031】
また、ジャッキ装置3は、上側取付部9と下側取付部10との間であって、右側ベースプレート5と左側ベースプレート6との間の空間において、治具本体2に、ねじ41および42を介して取り付けられている略U字状のバンドホルダ43によって支持されている。
【0032】
すなわち、このジャッキ装置3は、1つのユニットとして構成され、図2に示すように、ジャッキ本体44、プランジャ部材45、ピストン部材46、受け部材47およびばね48などを備えている。
【0033】
ジャッキ本体44は、略L字円筒形状をなし、プランジャ部材45が収容されるプランジャ筒部49と、そのプランジャ筒部49から略直角上方に延び、ピストン部材46が収容されるピストン筒部50とが一体に形成されており、プランジャ筒部49内とピストン筒部50内とは、連通路51によって連通されている。
【0034】
プランジャ部材45は、軸方向に沿ってねじ山が形成されるプランジャ軸52と、そのプランジャ軸52の一端に設けられるボルト頭部53と、その他端に設けられるプランジャ54とからなり、プランジャ54がシールされた状態でプランジャ筒部49内に挿入されるとともに、プランジャ軸52が、プランジャ筒部49の遊端部に設けられているシールナット55に螺進および螺退可能に螺着されている。
【0035】
また、ピストン部材46は、大径部56と小径軸部58とが一体に形成されており、大径部56がシールされるとともに、小径軸部58のまわりにばね48が配置された状態で、ピストン筒部50内に収容され、その状態において、ピストン筒部50の先端に、小径軸部58を進退自在に挿通する蓋57が設けられている。また、小径軸部58の先端部には、上側エレクションピース65の下面を受ける溝が形成されている円板状の受け部材47がボルトを介して取り付けられている。
【0036】
そして、プランジャ筒部49内、ピストン筒部50内および連通路51内には、オイルが充填されており、レンチ59(図12参照)によってボルト頭部53をプランジャ軸52の螺進方向に回動させれば、油圧により、ピストン部材46が移動して受け部材47が上昇し、一方、レンチ59によってボルト頭部53をプランジャ軸52の螺退方向に回動させれば、ばね48の付勢力により、ピストン部材46が逆方向に移動して、受け部材47が下降される。
【0037】
また、水平方向調整装置4は、上側取付部9における右側ベースプレート5および左側ベースプレート6の前方側に設けられており、支持部21と、右側挿入部材22と、左側挿入部材23とを備えている。
【0038】
支持部21は、上側取付部9に一体に設けられており、図1に示すように、上側取付部9における右側ベースプレート5および左側ベースプレート6の間を連結するように前方に突出する平面視略U字板状をなし、上側エレクションピース65を遊嵌し得る隙間を隔てて対向配置される右側壁部24および左側壁部25と、それら右側壁部24および左側壁部25の前端部を連結し、前方に向かってややV字状に湾曲する前壁部26とが一体に形成されている。
【0039】
右側壁部24には、後述する右側挿入部材22の挿入方向を案内するための右側ガイド溝27が形成されている。この右側ガイド溝27は、図3に示すように、側面視略矩形状かつ平面視略三角形状をなし、右側壁部24における左側壁部25に対向する内側面の上下方向中央部に、右側壁部24の前端部から後端部に向かって水平方向の厚みが次第に小さくなるような深さで、右側壁部24の長手方向に沿って形成されている。
【0040】
これによって、右側ガイド溝27は、右側壁部24の内側面において、前端部が深く、後端部が浅いテーパ状(傾斜状)に形成され、後述する右側挿入部材22の先端部34aを傾斜状に受け入れるように形成されている。
【0041】
また、左側壁部25にも、後述する左側挿入部材23の挿入方向を案内するための左側ガイド溝28が形成されている。この左側ガイド溝28は、側面視略矩形状かつ平面視略三角形状をなし、左側壁部25における右側壁部24に対向する内側面の上下方向中央部に、左側壁部25の前端部から後端部に向かって水平方向の厚みが次第に小さくなるような深さで、左側壁部25の長手方向に沿って形成されている。
【0042】
これによって、左側ガイド溝28は、左側壁25の内側面において、前端部が深く、後端部が浅いテーパ状(傾斜状)に形成され、後述する左側挿入部材23の先端部34bを傾斜状に受け入れるように形成されている。
【0043】
また、前壁部26には、右側挿入部材22および左側挿入部材23を挿入して螺着させるための右側螺着孔29および左側螺着孔30が所定の間隔を隔てて並列状に設けられている。
【0044】
右側螺着孔29は、前壁部26の右側部を前後方向(右側ガイド溝27の傾斜方向)に貫通するように円筒状に形成され、その内周面には、後述する右側挿入部材22の螺着部36aのねじ山が螺着されるねじ溝31が、上述した右側ガイド溝27の傾斜方向に沿って形成されている。
【0045】
左側螺着孔30は、前壁部26の左側部を前後方向(左側ガイド溝28の傾斜方向)に貫通するように円筒状に形成され、その内周面には、後述する左側挿入部材23の螺着部36bのねじ山が螺着されるねじ溝32が、上述した左側ガイド溝28の傾斜方向に沿って形成されている。
【0046】
また、右側挿入部材22は、図4に示すように、円柱状の軸部33aと、その軸部33aに連結される先端部34aとを備えている。
【0047】
軸部33aは、後端軸部35aと、後端軸部35aから軸方向に延びる螺着部36aと、螺着部36aから軸方向に延びる前端軸部37aとが一体に形成されている。後端軸部35aは、工具(レンチ)を嵌合させるための略六角ナット状に形成されている。また、螺着部36aの表面には、支持部21に形成される右側螺着孔29に螺着させるためのねじ山が形成されている。また、前端軸部37aは、後述する先端部34aの連結溝部40に嵌入される略半球状の頭部38と、この頭部38と螺着部36aとを連結するための頭部38よりも小径の連結軸部39とが一体に形成されている。
【0048】
先端部34aは、平面視において軸部33aに連結される基端から先端に向かって先細状に形成される楔形をなし、その外側面81aが軸部33aの軸方向に対して平行方向に延びるとともに、その内側面が、基端から先端に向かって外側(支持部21に挿入された状態における右側壁部24側)に傾斜する傾斜面82aとされている。また、先端部34aの基端部には、基端側に向かって開口するような平断面視略矩形状の連結溝部40が形成されており、この連結溝部40において、軸部33aの前端軸部37aを受け入れるようにしている。
【0049】
そして、先端部34aの連結溝部40に受け入れられた前端軸部37aは、連結軸部39の両側において、頭部38の直径よりも狭い間隔で先端部34aの厚さ方向に沿って立設されている2つのピン部材91a、91aによって、先端部34aから抜け止めされるとともに、先端部34aに対して相対回転可能に連結される。
【0050】
また、左側挿入部材23も、図8に示すように、上述した右側挿入部材22と同様に、後端軸部35bと、螺着部36bと、前端軸部37bとが一体に形成される軸部33bと、その軸部33bに連結される先端部34bとを備えている。そして、先端部34bが、軸部33bに連結される基端から先端に向かって先細状に形成される楔形をなし、その外側面81bが軸部33bの軸方向に対して平行方向に延びるとともに、その内側面が、基端から先端に向かって外側(支持部21に挿入された状態における左側壁部25側)に傾斜する傾斜面82bとされている。
【0051】
また、先端部34bの連結軸部(図示せず)に受け入れられた前端軸部37bは、連結軸部の両側において、前端軸部37aの頭部(図示せず)の直径よりも狭い間隔で先端部34bの厚さ方向に沿って立設されている2つのピン部材91b、91bによって、先端部34bから抜け止めされるとともに、先端部34bに対して相対回転可能に連結される。
【0052】
そして、図5に示すように、右側挿入部材22は、その軸部33aの螺着部36aが支持部21の右側螺着孔29に螺着されるとともに、その先端部34aが右側ガイド溝27内に挿入されるように支持部21に組み付けられる。これによって、右側挿入部材22の軸部33aを螺進および螺退させれば、その先端部34aは、軸部33aと伴回りすることなく、右側ガイド溝27に沿って進退される。
【0053】
また、左側挿入部材23は、その軸部33bの螺着部36bが支持部21の左側螺着孔30に螺着されるとともに、その先端部34bが左側ガイド溝28内に挿入されるように支持部21に組み付けられる。これによって、左側挿入部材23の軸部33bを螺進および螺退させれば、その先端部34bは、軸部33bと伴回りすることなく、左側ガイド溝28に沿って進退される。
【0054】
そして、このように右側螺着孔29および左側螺着孔30に挿入される右側挿入部材22および左側挿入部材23は、先端部34aおよび34bに形成される傾斜面82aおよび82bが後述する上側エレクションピース65の左右の角にそれぞれ当接されるような配置で、支持部21において、互いにハの字状に傾斜するように支持部21に支持されている。
【0055】
なお、支持部21は、上側取付部9に一体に設けられているので、右側挿入部材22および左側挿入部材23の進退方向の精度を向上させることができるとともに、剛性の強度アップを図ることができ、さらには、簡易な成形によって、治具1を製造することができ、製造コストの低減化が図られている。
【0056】
また、この治具1において、上側取付部9における右側ベースプレート5および左側ベースプレート6の間は、下側取付部10における右側ベースプレート5および左側ベースプレート6の間よりも幅広に形成されており、これによって、後述するように、下側エレクションピース63に対する下側取付部10の確実な取り付けを図るとともに、上側エレクションピース65に対する水平方向調整装置4による水平方向位置の調整を容易にしている。
【0057】
また、この治具1では、下側取付部10における互いに対向する右側ベースプレート5および左側ベースプレート6の間が、その互いに対向する対向距離が下端縁部に向かって拡がるように形成されており、これによって、下側エレクションピース63を良好に誘い込むことができるようにされている。
【0058】
さらに、この治具1では、上側固定ボルト12および13、下側固定ボルト15および16、上部固定ボルト17は、図14(a)および(b)に示すように、歯付き固定ボルト71として構成されている。すなわち、この歯付き固定ボルト71は、工具(レンチ)によって回転させるための頭部72と、頭部72から軸方向に延び、右側ベースプレート5または左側ベースプレート6に形成される各螺着孔に螺着するためのねじ山が形成されている螺合部73と、その螺合部73の先端部に、上側エレクションピース65または下側エレクションピース63の表面に食い込み可能な歯部74とが形成されている。この歯部74は、略円筒形状をなし、その先端部が円環状の楔状に形成されており、上側エレクションピース65または下側エレクションピース63の表面に食い込んで確実な固定を確保している。
【0059】
また、この治具1では、上側固定ボルト12および13、下側固定ボルト15および16、上部固定ボルト17を、1つの工具(レンチ)で作業できるように、すべて同一形状の歯付き固定ボルト71として形成されており、現場における高所作業の利便性を図っている。
【0060】
次に、図6ないし図13を参照して、この治具1を用いて、下側の鉄骨柱61の上に、上側の鉄骨柱62を連結する方法について説明する。
【0061】
下側の鉄骨柱61は、既にその下端部が他の鉄骨柱に接合された状態にある鉄骨柱であって、たとえば、その断面形状が略四角形状をなし、その上端部および下端部において、外周面の各辺の中央部に、4つの略矩形板状の下側エレクションピース63が、この下側の鉄骨柱61の周方向に対する直交方向において、それぞれ溶接固定されている。また、各下側エレクションピース63の中央部には、図6に示すように、クレーンの吊り具(図示せず)を挿通するために用いられる下側挿通孔64が、厚さ方向を貫通するようにして、それぞれ形成されている。
【0062】
また、上側の鉄骨柱62は、これから、その下端部を下側の鉄骨柱61の上端部に接合しようとする鉄骨柱であって、たとえば、その断面形状が略四角形状をなし、その上端部および下端部において、外周面の各辺の中央部に、4つの略矩形板状の上側エレクションピース65が、この上側の鉄骨柱62の周方向に対する直交方向において、それぞれ溶接固定されている。また、各上側エレクションピース65の中央部には、図6に示すように、クレーンの吊り具(図示せず)を挿通するために用いられる上側挿通孔66が、厚さ方向を貫通するようにして、それぞれ形成されている。
【0063】
そして、この方法では、まず、上側の鉄骨柱62の下端部に設けられている4つの上側エレクションピース65のそれぞれに、4つの治具1をそれぞれ連結する。各治具1を各上側エレクションピース65に連結するには、図6に示すように、治具1の上側取付部9における右側ベースプレート5および左側ベースプレート6の間に上側エレクションピース65を挿入して挟んだ後、上側挿通ボルト11を、上側エレクションピース65の上側挿通孔66に挿通するとともに、これら右側ベースプレート5および左側ベースプレート6に螺着させる。これによって、この治具1が、上側エレクションピース65に連結される。
【0064】
次いで、この上側の鉄骨柱62をクレーンによって吊り上げて、下側の鉄骨柱61の上方において、各上側エレクションピース65と各下側エレクションピース63とが対向するように配置する。この上側の鉄骨柱62のクレーンによる吊り上げは、公知の方法で行なうことができ、たとえば、上側の鉄骨柱62の上端部に設けられる各上側エレクションピース65の上側挿通孔66に、吊り具を挿入して吊り上げればよい。
【0065】
そして、下側の鉄骨柱61の上端部に設けられている4つの下側エレクションピース63のそれぞれに、4つの治具1をそれぞれ連結する。各治具1を各下側エレクションピース63に連結するには、まず、図6に示すように、クレーンによって上側の鉄骨柱62を徐々に下げ、治具1の下側取付部10における右側ベースプレート5および左側ベースプレート6の間に下側エレクションピース63を挿入して挟むようにする。
【0066】
この挿入においては、上記したように、右側ベースプレート5および左側ベースプレート6の下端部の間が、その互いに対向する対向距離が下端縁部に向かって拡がるように形成されているので、下側エレクションピース63を良好に誘い込んで、下側取付部10において簡易かつ円滑に挟むことができる。そのため、従来では、この治具1を誘導するための作業者が4人程度必要とされていたが、この治具1を用いれば、2人程度でも良好な作業が可能であり、効率的な作業を達成することができる。
【0067】
次いで、図7に示すように、下側挿通ボルト14を、下側エレクションピース63の下側挿通孔64に挿通するとともに、これら右側ベースプレート5および左側ベースプレート6に螺着させる。これによって、この治具1が、下側エレクションピース63に連結される。
【0068】
その後、下側の鉄骨柱61に対する上側の鉄骨柱62の水平方向位置を、水平方向調整装置4を用いて調整する。すなわち、この調整は、まず、左側ベースプレート6の下側取付部10の下側固定ボルト15および16を螺進させて、下側エレクションピース63を、右側ベースプレート5に向けて押圧することにより、下側取付部10を下側エレクションピース63に対して固定する。なお、この固定においては、下側固定ボルト15および16の歯部74が、下側エレクションピース63の側面に食い込むので、下側エレクションピース63は確実に固定される。
【0069】
次いで、図8に示すように、たとえば、右側ベースプレート5および左側ベースプレート6の間の中心に対して上側エレクションピース65が右側に偏っている場合には、工具(レンチ)により右側挿入部材22の軸部33aを螺進させ、支持部21に形成された右側ガイド溝27に沿って、楔状に形成される先端部34aを右側ベースプレート5と上側エレクションピース65の右側面との間に挿入する。そうすると、先端部34aに形成される傾斜面82aが、上側エレクションピース65の右側の角に当接し、右側挿入部材22の軸部33aの螺進とともに、その傾斜面82aの傾斜方向に沿って、上側エレクションピース65が徐々に左方向に移動される。
【0070】
そして、図9に示すように、たとえば、右側挿入部材22の軸部33aを螺進させ過ぎて、右側ベースプレート5および左側ベースプレート6の間の中心に対して、上側エレクションピース65が左側に偏ってしまった場合には、図10に示すように、右側挿入部材22の軸部33aを、一旦、螺退させて、右側挿入部材22の傾斜面82aを上側エレクションピース65の右側の角から離間させ、その後、左側挿入部材23の軸部33bを螺進させて、支持部21に形成された左側ガイド溝28に沿って楔状に形成される先端部34bを左側ベースプレート6と上側エレクションピース65の左側面との間に挿入する。そうすると、先端部34bに形成される傾斜面82bが、上側エレクションピース65の左側の角に当接し、左側挿入部材23の軸部33bの螺進とともに、その傾斜面82bの傾斜方向に沿って、上側エレクションピース65が徐々に右方向に移動され、これにより、上側エレクションピース65が右側ベースプレート5および左側ベースプレート6の間の中心に配置されるように調整される。
【0071】
このように、この水平方向調整装置4では、上側エレクションピース65の両側に対して、右側挿入部材22および左側挿入部材23を選択的に挿入し、これら右側挿入部材22および左側挿入部材23を進退させることによって、上側エレクションピース65を水平方向両方向において徐々に移動させることができ、また、挿入方向に押圧することができるので、簡易かつ確実に、上側エレクションピース65の移動を微調整して、下側の鉄骨柱61に対する上側の鉄骨柱62の水平方向位置を調整および固定することができる。
【0072】
また、右側挿入部材22および左側挿入部材23は、その先端部34aおよび34bにそれぞれ形成される傾斜面82aおよび82bにおいて、上側エレクションピース65の左右の角と当接されるので、損傷や変形が少なく、長期にわたって使用することができる。
【0073】
さらに、右側挿入部材22および左側挿入部材23は、支持部21に挿入され、軸部33aおよび33bの螺進および螺退によって支持部21からそれぞれ進退させるのみで、右側挿入部材22および左側挿入部材23の傾斜面82aおよび82bを上側エレクションピース65に正確に当接させることができるので、簡易な操作によって、確実な作業を達成することができる。
【0074】
そして、上側エレクションピース65が、右側ベースプレート5および左側ベースプレート6の間の中心に配置された後は、図11に示すように、左側挿入部材23の先端部34bに形成される傾斜面82bを、そのまま上側エレクションピース65の左側の角に当接させた状態で、右側挿入部材22の軸部33aを螺進させて、右側挿入部材22の先端部34aに形成される傾斜面82aを、上側エレクションピース65の右側の角に当接させることにより、上側の鉄骨柱62の下側の鉄骨柱61に対する水平方向位置を両側から確実に固定する。
【0075】
この時、上側エレクションピース65の両側面に当接される右側挿入部材22の傾斜面82aおよび左側挿入部材23の傾斜面82bからの押圧力は、上側エレクションピース65に対して、上側エレクションピース65の側面に沿う方向と、それに直交する方向、つまり、上側の鉄骨柱62の周方向との分力として作用する。
【0076】
そのため、上側の鉄骨柱62の周方向に作用する分力によって、上記したように、上側の鉄骨柱62の水平方向位置の調整を確実に達成することができるとともに、水平方向位置の調整後においては、上側エレクションピース65の側面に沿う方向の分力によって、上側エレクションピース65を確実に位置固定することができ、たとえば、その後に鉛直方向位置を調整する時にも、水平方向位置がずれることを有効に防止することができる。
【0077】
すなわち、実際には、4つの治具1が上側の鉄骨柱62の4辺すべてにおいて各辺の上側エレクションピース65に連結されるので、各上側エレクションピース65は、右側挿入部材22および左側挿入部材23の先端部34aおよび34bによって、各上側エレクションピース65の側面に沿う上側の鉄骨柱62の内側方向に押圧される。これによって、上側の鉄骨柱62は各辺の上側エレクションピース65からの押圧力によって、下側の鉄骨柱61に対する水平方向位置が十分強固に固定される。
【0078】
また、このような下側の鉄骨柱61に対する上側の鉄骨柱62の水平方向位置の調整とともに、図7に示すように、上部固定ボルト17を螺進させて、上側エレクションピース65の上面を下方に向けて押圧することにより、上側の鉄骨柱62を下側の鉄骨柱61に対して密着するように調整する。
【0079】
さらに、図12に示すように、ジャッキ装置3のボルト頭部53をレンチ59で回動させることにより、受け部材47を昇降させて、上側エレクションピース65の下面を、持ち上げ、または、持ち下げることにより、上側エレクションピース65を適正位置で支持することにより、下側の鉄骨柱61に対する上側の鉄骨柱62の鉛直方向の姿勢を調整する。
【0080】
なお、このような下側の鉄骨柱61に対する上側の鉄骨柱62の姿勢調整、すなわち、水平方向調整装置4による水平方向位置調整、上部固定ボルト17による密着調整、および、ジャッキ装置3による鉛直方向の姿勢調整は、その順序は適宜決定すればよく、いずれが先後してもよい。
【0081】
そして、下側の鉄骨柱61に対する上側の鉄骨柱62の姿勢調整が終了した後には、必要により、図13に示すように、右側ベースプレート5の上側取付部9の上側固定ボルト12および13を螺進させて、上側エレクションピース65を、左側ベースプレート6側に向けて押圧することにより、上側取付部9を上側エレクションピース65に対してさらに強固に固定する。なお、この固定においては、上側固定ボルト12および13の歯部74が、上側エレクションピース65の側面に食い込むので、上側エレクションピース65は確実に固定される。
【0082】
これによって、下側エレクションピース63に対する上側エレクションピース65の移動が確実に規制されるので、たとえば、図15に示すように、下側の鉄骨柱61に接合された上側の鉄骨柱62に、横梁68などが組み付けられた場合において、その横梁68の組み付け精度の誤差や、材料の残留応力、さらには、溶接時の引張り応力などによって、下側の鉄骨柱61と上側の鉄骨柱62との間の接合部分69に変形応力が作用しても、その接合部分69における位置ずれが有効に防止される。
【0083】
なお、この治具1では、上記したように、右側挿入部材22および左側挿入部材23からの押圧力によって、上側エレクションピース65の位置が確実に固定されるので、上側固定ボルト12および13は、必要に応じて、右側ベースプレート5(または、左側ベースプレート6)のみに設ければよく、部品点数の低減化によるコストの低減化を図ることができる。
【0084】
そして、このようにして、下側の鉄骨柱61に対する上側の鉄骨柱62の姿勢を調整した後に、下側の鉄骨柱61の上端部と、上側の鉄骨柱62の下端部とを溶接または高力ボルトによって接合する。なお、この方法においては、各治具1によって、上側の鉄骨柱62と下側の鉄骨柱61とが連結されていれば、その後、適宜の時点において、クレーンの吊り具を、上側の鉄骨柱62の上端部に設けられる各上側エレクションピース65から取り外すようにすればよい。
【0085】
このような治具1を用いることにより、簡易かつ確実に、下側の鉄骨柱61に対する上側の鉄骨柱62の位置調整が達成され、精度の良い建方を実現することができる。
【0086】
なお、以上の説明においては、下側の鉄骨柱61および上側の鉄骨柱62は、その断面形状が略四角形状をなし、その外周面の各辺の中央部に形成される各下側エレクションピース63および各上側エレクションピース65のそれぞれに、各治具1を連結するようにしたが、下側の鉄骨柱61および上側の鉄骨柱62の形状は、何ら限定されず、たとえば、断面多角形状、断面円形状などであってもよく、また、各下側エレクションピース63および各上側エレクションピース65の数も限定されず、さらには、各治具1を、各下側エレクションピース63および各上側エレクションピース65に必ず対応させて連結する必要もない。
【0087】
【発明の効果】
以上述べたように、請求項1に記載の発明によれば、簡易かつ確実に、エレクションピースの移動を微調整して、下側の鉄骨柱に対する上側の鉄骨柱の水平方向位置を調整および固定することができるとともに、損傷や変形が少なく長期にわたって使用することができ、しかも、簡易な操作によって、確実な作業を達成することができる。
【0088】
請求項2に記載の発明によれば、下側の鉄骨柱に対する上側の鉄骨柱の水平方向位置の調整および固定を、より一層、簡易かつ確実に達成することができる。
【0089】
請求項3に記載の発明によれば、鉄骨柱の周方向に作用する分力によって、水平方向位置の調整を確実に達成することができるとともに、エレクションピースの側面に沿う方向の分力によって、水平方向位置の調整後において、エレクションピースを位置固定することができ、たとえば、その後に、鉛直方向位置を調整した時にも、水平方向位置がずれることを有効に防止することができる。
【0090】
請求項4に記載の発明によれば、より一層確実に、右側挿入部材および左側挿入部材を進退させて、先端部に形成される傾斜面を正確にエレクションピースに当接させることができ、しかも、より一層確実な作業を達成することができる。
【0091】
請求項5に記載の発明によれば、右側挿入部材および左側挿入部材の進退方向の精度を向上させることができるとともに、製造コストの低減化を図ることができる。
【0092】
請求項6に記載の発明によれば、水平方向位置の調整後に、移動規制手段によってエレクションピースの移動を規制して、下側の鉄骨柱に接合された上側の鉄骨柱に、横梁などが組み付けられた場合における接合部分の位置ずれを有効に防止することができる。また、移動規制手段は、右側ベースプレートまたは左側ベースプレートのいずれか一方のみに設ければよく、部品点数の低減化によるコストの低減化を図ることができる。
【図面の簡単な説明】
【図1】本発明の鉄骨建入直し調整治具の一実施形態としての治具を示す斜視図である。
【図2】図1に示す治具のジャッキ装置の要部断面図である。
【図3】図1に示す治具の水平方向調整装置の支持部の要部斜視図である。
【図4】図1に示す治具の水平方向調整装置の右側挿入部材の要部断面図である。
【図5】図1に示す治具の水平方向調整装置の要部斜視図である。
【図6】図1に示す治具を上側エレクションピースに連結した状態を示す正面図である。
【図7】図1に示す治具を上側エレクションピースおよび下側エレクションピースに連結した状態を示す正面図である。
【図8】図1に示す治具の水平方向調整装置の使用状態(右側挿入部材を挿入する状態)を説明するための平面断面図である。
【図9】図1に示す治具の水平方向調整装置の使用状態(エレクションピースを左方向に移動させる状態)を説明するための平面断面図である。
【図10】図1に示す治具の水平方向調整装置の使用状態(エレクションピースを右方向に移動させる状態)を説明するための平面断面図である。
【図11】図1に示す治具の水平方向調整装置の使用状態(エレクションピースを固定させる状態)を説明するための平面断面図である。
【図12】図1に示す治具のジャッキ装置の使用状態を説明するための斜視図である。
【図13】図1に示す治具の使用状態を示す正面図である。
【図14】図1に示す治具に用いられる歯付き固定ボルトの一実施形態を示す、(a)は斜視図、(b)は側断面図である。
【図15】上側の鉄骨柱に横梁が組み付けられた状態を示す概略説明図である。
【符号の説明】
1 治具
4 水平方向調整装置
5 右側ベースプレート
6 左側ベースプレート
9 上側取付部
10 下側取付部
12 上側固定ボルト
13 上側固定ボルト
21 支持部
22 右側挿入部材
23 左側挿入部材
33a 軸部
33b 軸部
34a 先端部
34b 先端部
36a 螺着部
36b 螺着部
61 下側の鉄骨柱
62 上側の鉄骨柱
63 下側エレクションピース
65 上側エレクションピース
82a 傾斜面
82b 傾斜面[0001]
TECHNICAL FIELD OF THE INVENTION
BACKGROUND OF THE
[0002]
[Prior art]
Conventionally, at the construction site, when joining the upper steel column to the lower steel column, first, lift the upper steel column with a crane, place it above the lower steel column, and then use a jig. After connecting the lower steel column and the upper steel column, the upper end of the lower steel column and the lower end of the upper steel column are joined by welding or high-strength bolts. ing.
[0003]
As such a jig, for example, a jig described in JP-A-8-189201 is known. That is, the jig described in Japanese Patent Application Laid-Open No. 8-189201 is configured so that the side surface of the erection piece can be movably pinched. A pair of contactable horizontal position adjustment bolts are screwed. In this jig, when the upper steel column is connected to the lower steel column, a pair of horizontal position adjustment bolts are respectively advanced and retracted to adjust and press both side surfaces of the erection piece, thereby pressing the lower side. The horizontal position of the upper steel column with respect to the upper steel column is adjusted to connect the lower steel column and the upper steel column.
[0004]
[Problems to be solved by the invention]
However, in the jig described in Japanese Patent Application Laid-Open No. 8-189201, a horizontal position adjustment bolt is screwed into a holding portion, and is screwed and retreated, thereby directly pressing both side surfaces of the erection piece. Therefore, it is difficult and difficult to finely adjust the movement of the erection piece. In addition, depending on the strength of the clamping portion and the horizontal position adjustment bolt, they are damaged or deformed, and the horizontal position is surely adjusted. In some cases, and may require repair or disposal.
[0005]
Furthermore, when the side surface of the erection piece is pressed by the horizontal position adjustment bolt, only the pressing force from the direction perpendicular to the side surface of the erection piece acts, so that the position can be securely fixed after the adjustment of the horizontal position. In some cases, for example, when the vertical position is adjusted, the horizontal position adjusted at the angle is shifted.
[0006]
The present invention has been made in view of such a problem, and a purpose thereof is to finely adjust the movement of the erection piece by a simple configuration and operation, and to surely adjust and fix the horizontal position. It is an object of the present invention to provide a steel frame re-installation adjustment jig that can be performed and that can realize a secure position fixing after the horizontal position adjustment.
[0007]
[Means for Solving the Problems]
In order to achieve the above object, an invention according to
[0008]
According to such a configuration, if the right insertion member inserted into the support portion from the front of the erection piece so as to be able to advance and retreat is inserted so that its inclined surface contacts the right side of the erection piece, the insertion of the right insertion member can be achieved. At the same time, the erection piece is gradually moved along the inclination direction of the inclined surface. Also, from the front of the erection piece, if the left-side insertion member inserted into the support portion so as to be able to move forward and backward is inserted so that its inclined surface contacts the left side of the erection piece, the erection piece is inserted together with the insertion of the left-side insertion member. It is gradually moved along the inclination direction of the inclined surface. Therefore, by such selective insertion of the right insertion member and the left insertion member into both sides of the erection piece, the erection piece can be gradually moved in both horizontal directions and can be pressed in the insertion direction. Therefore, it is possible to easily and surely finely adjust the movement of the erection piece to adjust and fix the horizontal position of the upper steel column with respect to the lower steel column.
[0009]
In addition, the right insertion member and the left insertion member are in contact with the erection piece on the inclined surface, so that they are less damaged and deformed, and can be used for a long time.
[0010]
Furthermore, the right insertion member and the left insertion member are inserted into the support portion, and each inclined surface can be brought into contact with the erection piece only by moving forward and backward from the support portion. Work can be achieved.
[0011]
According to a second aspect of the present invention, in the first aspect of the present invention, the upper mounting portion and / or the lower mounting portion are disposed on a right base plate and a left base which are opposed to each other with the erection piece interposed therebetween. The right insertion member and the left insertion member have a distal end in a wedge shape having the inclined surface, and the right insertion member has a distal end formed between the right base plate and the right side surface of the erection piece. The left insertion member is inserted between the left base plate and the left side surface of the erection piece.
[0012]
According to such a configuration, the distal end of the wedge-shaped right insertion member is inserted between the right base plate and the right side surface of the erection piece. By inserting the tip between the left base plate and the left side surface of the erection piece, the movement of the erection piece can be finely adjusted more reliably. Therefore, the adjustment and fixing of the horizontal position of the upper steel column with respect to the lower steel column can be more easily and reliably achieved.
[0013]
According to a third aspect of the present invention, in the first or second aspect of the present invention, the inclined surfaces formed at the distal ends of the right-side insertion member and the left-side insertion member abut against corners of the erection piece. As a result, the right insertion member and the left insertion member are inserted into the support portion.
[0014]
According to such a configuration, since the inclined surfaces formed at the distal end portions of the right insertion member and the left insertion member abut against the corners of the erection piece, the pressing force from the right insertion member and the left insertion member is reduced. Acts on the erection piece as a component force in a direction along the side surface of the erection piece and in a direction orthogonal to the side, that is, in the circumferential direction of the steel column. And, by the component force acting in the circumferential direction of the steel column, the adjustment of the horizontal position can be reliably achieved, and after the adjustment of the horizontal position, the component force in the direction along the side surface of the erection piece can be adjusted. The piece can be fixed in position. Therefore, the position can be fixed after the horizontal position is adjusted. For example, even when the vertical position is adjusted thereafter, it is possible to effectively prevent the horizontal position from being shifted.
[0015]
The invention according to
[0016]
According to such a configuration, the screw portions of the right insertion member and the left insertion member are screwed to the support portion, so that the shaft portions of the right insertion member and the left insertion member are advanced or retracted by screwing. The right insertion member and the left insertion member can be more reliably advanced and retracted so that the inclined surface formed at the distal end can accurately contact the erection piece.
[0017]
Further, in this configuration, even if the shaft portion rotates by screwing or retreating, the shaft portion is connected to the tip portion so as to be rotatable relative to the erection piece without rotating the tip portion. You can go back and forth. Therefore, more reliable work can be achieved.
[0018]
According to a fifth aspect of the present invention, in the first aspect of the present invention, the support portion is provided integrally with the upper mounting portion and / or the lower mounting portion. It is characterized by:
[0019]
According to such a configuration, since the support portion is provided integrally with the upper mounting portion and / or the lower mounting portion, the accuracy of the right and left insertion members in the forward and backward directions can be improved. In addition, it is possible to increase the rigidity, and furthermore, it is possible to manufacture an adjustment jig for rebuilding a steel frame by simple molding, and it is possible to reduce the manufacturing cost.
[0020]
The invention according to
[0021]
According to such a configuration, after adjusting the horizontal position of the upper steel column with respect to the lower steel column by the horizontal position adjusting unit, if the movement of the erection piece is restricted by the movement restricting unit, the lower steel column is When a cross beam or the like is assembled to the joined upper steel column, the lower steel column and the upper steel column may be attached due to errors in the assembly accuracy of the cross beam, residual stress in the material, and tensile stress during welding. Even if a deformation stress acts on a joint between the steel column and the steel column, displacement at the joint can be effectively prevented.
[0022]
Moreover, in this configuration, the position of the erection piece can be fixed also by the pressing force from the right insertion member and the left insertion member. Therefore, the movement restricting means is provided on only one of the right base plate and the left base plate. The cost can be reduced by reducing the number of parts.
[0023]
BEST MODE FOR CARRYING OUT THE INVENTION
FIG. 1 is a perspective view showing a jig as one embodiment of a steel frame re-installation adjusting jig of the present invention, FIG. 2 is a cross-sectional view of a main part of a jack device of the jig shown in FIG. 1, and FIG. FIG. 4 is a perspective view of a main part of a support portion of the horizontal direction adjusting device of the jig shown in FIG. 1, FIG. 4 is a cross-sectional view of a main part of a right insertion member of the horizontal direction adjusting device of the jig shown in FIG. 1, and FIG. 1, FIG. 6 is a front view showing a state in which the jig shown in FIG. 1 is connected to an upper erection piece, and FIG. 7 is a view showing the jig shown in FIG. FIG. 8 to FIG. 11 are front sectional views illustrating a state in which the jig shown in FIG. 1 is used in a horizontal direction adjusting device, and FIG. FIG. 13 is a perspective view for explaining a use state of the jack device of the jig shown in FIG. 1, and FIG. FIG. 14 is a front view showing a use state of the tool, FIG. 14 shows an embodiment of a toothed fixing bolt used in the jig shown in FIG. 1, (a) is a perspective view, (b) is a side sectional view, and FIG. FIG. 4 is a schematic explanatory view showing a state in which a cross beam is attached to an upper steel column. With reference to FIGS. 1 to 15, one embodiment of the steel frame re-installation adjusting jig of the present invention will be described.
[0024]
1, 6 and 7, this
[0025]
The jig
[0026]
The upper portions of the
[0027]
The upper mounting
[0028]
A
[0029]
Further, an
[0030]
Further, the two connecting
[0031]
The
[0032]
That is, the
[0033]
The
[0034]
The
[0035]
The
[0036]
The
[0037]
The horizontal
[0038]
The
[0039]
The right
[0040]
As a result, the
[0041]
Further, a
[0042]
As a result, the
[0043]
In the
[0044]
The
[0045]
The
[0046]
Further, as shown in FIG. 4, the
[0047]
The
[0048]
The
[0049]
The front
[0050]
As shown in FIG. 8, the
[0051]
The front
[0052]
As shown in FIG. 5, the
[0053]
The
[0054]
The
[0055]
Since the
[0056]
Further, in the
[0057]
Further, in the
[0058]
Further, in the
[0059]
In this
[0060]
Next, a method of connecting the
[0061]
The
[0062]
The
[0063]
Then, in this method, first, the four
[0064]
Next, the
[0065]
Then, the four
[0066]
In this insertion, as described above, the lower erection piece is formed between the lower end portions of the
[0067]
Next, as shown in FIG. 7, the
[0068]
Then, the horizontal position of the
[0069]
Next, as shown in FIG. 8, for example, when the
[0070]
Then, as shown in FIG. 9, for example, the
[0071]
As described above, in the horizontal
[0072]
Further, the
[0073]
Furthermore, the right-
[0074]
After the
[0075]
At this time, the pressing force from the
[0076]
Therefore, as described above, the horizontal position of the
[0077]
That is, in practice, since the four
[0078]
Further, along with the adjustment of the horizontal position of the
[0079]
Further, as shown in FIG. 12, by rotating the
[0080]
In addition, such posture adjustment of the
[0081]
Then, after the posture adjustment of the
[0082]
As a result, the movement of the
[0083]
In this
[0084]
Then, after the posture of the
[0085]
By using such a
[0086]
In the above description, the
[0087]
【The invention's effect】
As described above, according to the first aspect of the present invention, the movement of the erection piece is finely adjusted simply and reliably to adjust and fix the horizontal position of the upper steel column with respect to the lower steel column. It can be used for a long time with little damage or deformation, and a reliable operation can be achieved by a simple operation.
[0088]
According to the second aspect of the invention, the adjustment and fixing of the horizontal position of the upper steel column with respect to the lower steel column can be more easily and reliably achieved.
[0089]
According to the invention described in
[0090]
According to the fourth aspect of the present invention, the right and left insertion members can be more reliably advanced and retracted so that the inclined surface formed at the distal end can accurately contact the erection piece. Thus, a more reliable operation can be achieved.
[0091]
According to the fifth aspect of the present invention, the accuracy of the right and left insertion members in the forward and backward directions can be improved, and the manufacturing cost can be reduced.
[0092]
According to the invention as set forth in
[Brief description of the drawings]
FIG. 1 is a perspective view showing a jig as one embodiment of a steel frame re-installation adjustment jig of the present invention.
FIG. 2 is a sectional view of an essential part of the jack device of the jig shown in FIG.
FIG. 3 is a perspective view of a main part of a support portion of the horizontal direction adjusting device of the jig shown in FIG. 1;
FIG. 4 is a cross-sectional view of a main part of a right-side insertion member of the horizontal adjustment device of the jig shown in FIG. 1;
FIG. 5 is a perspective view of a main part of the jig horizontal direction adjusting device shown in FIG. 1;
FIG. 6 is a front view showing a state where the jig shown in FIG. 1 is connected to an upper erection piece.
FIG. 7 is a front view showing a state in which the jig shown in FIG. 1 is connected to an upper erection piece and a lower erection piece.
8 is a cross-sectional plan view for explaining a use state (a state in which a right-side insertion member is inserted) of the horizontal adjustment device of the jig shown in FIG. 1;
FIG. 9 is a plan sectional view for explaining a use state (a state in which the erection piece is moved to the left) of the horizontal adjustment device of the jig shown in FIG. 1;
10 is a cross-sectional plan view for explaining a use state (a state in which the erection piece is moved rightward) of the horizontal direction adjustment device of the jig shown in FIG. 1;
FIG. 11 is a plan sectional view for explaining a use state (a state in which an erection piece is fixed) of the horizontal direction adjusting device of the jig shown in FIG. 1;
FIG. 12 is a perspective view for explaining a use state of the jack device of the jig shown in FIG. 1;
FIG. 13 is a front view showing a use state of the jig shown in FIG. 1;
14 (a) is a perspective view and FIG. 14 (b) is a side sectional view showing one embodiment of a toothed fixing bolt used in the jig shown in FIG.
FIG. 15 is a schematic explanatory view showing a state where a cross beam is assembled to an upper steel column.
[Explanation of symbols]
1 jig
4 Horizontal adjustment device
5 Right base plate
6 Left base plate
9 Upper mounting part
10 Lower mounting part
12 Upper fixing bolt
13 Upper fixing bolt
21 Support
22 Right insertion member
23 Left Insertion Member
33a Shaft
33b Shaft
34a Tip
34b tip
36a screw part
36b screw part
61 Lower Steel Column
62 Upper steel column
63 Lower erection piece
65 Upper erection piece
82a slope
82b slope
Claims (6)
前記上側の鉄骨柱のエレクションピースに取付可能な上側取付部と、
前記下側の鉄骨柱のエレクションピースに取付可能な下側取付部とを備え、
前記上側取付部および/または前記下側取付部には、前記下側の鉄骨柱に対する前記上側の鉄骨柱の水平方向位置を調整するための水平方向位置調整手段が設けられており、
前記水平方向位置調整手段は、
前記エレクションピースの前方に対向配置され、そのエレクションピースの両側に挿入可能な右側挿入部材および左側挿入部材と、前記右側挿入部材および前記左側挿入部材が進退自在に挿入される支持部とを備えており、
前記右側挿入部材および前記左側挿入部材の先端部には、前記エレクションピースに当接可能な傾斜面が形成されていることを特徴とする、鉄骨建入直し調整治具。A steel frame rebuilding adjustment jig used to join an upper steel column to which an erection piece is attached to a lower steel column to which an erection piece is attached,
An upper attachment portion attachable to the erection piece of the upper steel column,
A lower attachment portion that can be attached to the erection piece of the lower steel column,
The upper mounting portion and / or the lower mounting portion are provided with horizontal position adjusting means for adjusting a horizontal position of the upper steel column with respect to the lower steel column,
The horizontal position adjusting means,
A right insertion member and a left insertion member that are arranged opposite to the front of the erection piece and can be inserted on both sides of the erection piece; and a support portion into which the right insertion member and the left insertion member are inserted so as to be able to advance and retreat. Yes,
The right-side insertion member and the left-side insertion member are formed at their distal ends with inclined surfaces capable of contacting the erection piece.
前記右側挿入部材および前記左側挿入部材の先端部は、前記傾斜面を有する楔状をなし、
前記右側挿入部材の先端部は、前記右側ベースプレートと前記エレクションピースの右側面との間に挿入されるとともに、前記左側挿入部材の先端部は、前記左側ベースプレートと前記エレクションピースの左側面との間に挿入されることを特徴とする、請求項1に記載の鉄骨建入直し調整治具。The upper mounting part and / or the lower mounting part includes a right base plate and a left base plate that are arranged on both sides of the erection piece to face each other,
The tip of the right insertion member and the left insertion member has a wedge shape having the inclined surface,
The tip of the right insertion member is inserted between the right base plate and the right side of the erection piece, and the tip of the left insertion member is located between the left base plate and the left side of the erection piece. The jig for re-installing a steel frame according to claim 1, wherein the jig is inserted into the jig.
前記右側挿入部材および前記左側挿入部材の螺着部が、前記支持部に螺着されていることを特徴とする、請求項2または3に記載の鉄骨建入直し調整治具。The right-side insertion member and the left-side insertion member each include a shaft portion connected to the distal end portion formed in a wedge shape. Are connected so that they can rotate relative to
4. The jig for refitting a steel frame according to claim 2, wherein screw portions of the right insertion member and the left insertion member are screwed to the support portion. 5.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2001374242A JP3581685B2 (en) | 2001-12-07 | 2001-12-07 | Steel frame rebuilding adjustment jig |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2001374242A JP3581685B2 (en) | 2001-12-07 | 2001-12-07 | Steel frame rebuilding adjustment jig |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2003172030A JP2003172030A (en) | 2003-06-20 |
| JP3581685B2 true JP3581685B2 (en) | 2004-10-27 |
Family
ID=19182833
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2001374242A Expired - Fee Related JP3581685B2 (en) | 2001-12-07 | 2001-12-07 | Steel frame rebuilding adjustment jig |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3581685B2 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103774858B (en) * | 2012-10-19 | 2016-02-03 | 上海宝冶集团有限公司 | The guide type mounting method that a kind of multitube mouth connects |
-
2001
- 2001-12-07 JP JP2001374242A patent/JP3581685B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JP2003172030A (en) | 2003-06-20 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP3034233B1 (en) | Method for fixing a workpiece on a table of a machine tool | |
| JP3850979B2 (en) | Piston pin press-fitting device | |
| JP2019058932A (en) | Support and welding system for vehicle frame member | |
| KR20130128343A (en) | Tool holder, tool, and work station with tool holder and tool attached thereto | |
| KR102581275B1 (en) | Cross member assemby system | |
| CN209850226U (en) | Welding tool for lower cross beam assembly of automobile front windshield | |
| KR101990282B1 (en) | Multipurpose welding worktable | |
| JP3581685B2 (en) | Steel frame rebuilding adjustment jig | |
| CN207026831U (en) | A kind of human weld's tool of pneumatic Quick-clamped | |
| CN218891742U (en) | Automatic clamping and positioning device | |
| JP2012106259A (en) | Welding angle forming device of butted portion of rail when welding railroad rails | |
| JP3619170B2 (en) | Steel frame adjustment jig | |
| JP2018140423A (en) | Welding jig and welding jig unit | |
| JP3641655B2 (en) | Steel cover re-adjustment adjustment jig protective cover and steel frame re-adjustment adjustment jig | |
| JP2005188136A (en) | Steel frame erection auxiliary adjusting tool and steel frame erection adjusting method | |
| CN219324873U (en) | Laser workstation welding jig suitable for battery package | |
| JP2002364180A (en) | Steel-replumbing adjustment jig | |
| JP2002339572A (en) | Jig for measurement and correction on plumbing to plumb for reinforcement | |
| KR101817166B1 (en) | Laser welder | |
| CN210121770U (en) | Fixture of milling machine | |
| CN115070448A (en) | Clamp for casting beam | |
| JP3641654B2 (en) | Steel frame adjustment jig | |
| CN220029176U (en) | Welding fixture | |
| CN120791105B (en) | A welding fixture for automotive structural components | |
| CN108608150B (en) | Hinge welding fixture |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20040706 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20040723 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| LAPS | Cancellation because of no payment of annual fees |