JP3582971B2 - Reinforcement construction method for concrete structures - Google Patents
[go: Go Back, main page]

JP3582971B2 - Reinforcement construction method for concrete structures - Google Patents

Reinforcement construction method for concrete structures Download PDF

Info

Publication number
JP3582971B2
JP3582971B2 JP30612397A JP30612397A JP3582971B2 JP 3582971 B2 JP3582971 B2 JP 3582971B2 JP 30612397 A JP30612397 A JP 30612397A JP 30612397 A JP30612397 A JP 30612397A JP 3582971 B2 JP3582971 B2 JP 3582971B2
Authority
JP
Japan
Prior art keywords
reinforcing
concrete structure
rod
floor slab
jig
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP30612397A
Other languages
Japanese (ja)
Other versions
JPH11140823A (en
Inventor
政勝 福岡
Original Assignee
サン・ロード株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by サン・ロード株式会社 filed Critical サン・ロード株式会社
Priority to JP30612397A priority Critical patent/JP3582971B2/en
Publication of JPH11140823A publication Critical patent/JPH11140823A/en
Application granted granted Critical
Publication of JP3582971B2 publication Critical patent/JP3582971B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements
    • E04G2023/0251Increasing or restoring the load-bearing capacity of building construction elements by using fiber reinforced plastic elements
    • E04G2023/0255Increasing or restoring the load-bearing capacity of building construction elements by using fiber reinforced plastic elements whereby the fiber reinforced plastic elements are stressed
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements
    • E04G2023/0251Increasing or restoring the load-bearing capacity of building construction elements by using fiber reinforced plastic elements
    • E04G2023/0255Increasing or restoring the load-bearing capacity of building construction elements by using fiber reinforced plastic elements whereby the fiber reinforced plastic elements are stressed
    • E04G2023/0259Devices specifically adapted to stress the fiber reinforced plastic elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements
    • E04G2023/0251Increasing or restoring the load-bearing capacity of building construction elements by using fiber reinforced plastic elements
    • E04G2023/0262Devices specifically adapted for anchoring the fiber reinforced plastic elements, e.g. to avoid peeling off

Landscapes

  • Working Measures On Existing Buildindgs (AREA)
  • Bridges Or Land Bridges (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、たとえば橋梁等のコンクリート構造物の補強に係り、特に亀裂を生じた橋梁床版や壁体の補修のほか既設構造物に対して新たに鉄筋を追加施工して補強するための補強用治具とこれを用いた補強構造及びその補強施工方法に関する。
【0002】
【従来の技術】
コンクリート構造によって構築される道路橋では、車両の通過による動荷重を繰り返し受けるため、道路橋の主要部材の中でも橋梁の床版に対する負荷はかなり大きい。そして、橋梁自身が持つ強度に対して、過大な負荷の繰り返しや衝撃荷重が大きかったり耐用年限を大きく越えたりすると、床版の下面にクラックが発生し、このクラックは次第に下面を縦横に走るようにまでなって細網化し、コンクリートの剥落などを招くことになる。
【0003】
このようなクラックの発生は、コンクリート中の鉄筋の腐食や破断の原因となるので、通常の場合はクラックが発生した初期の段階で床版を補強することが好ましいとされている。この床版の補修施工としては、クラック内にエポキシ樹脂などを注入する樹脂注入法や、床版に発生した空洞部分やコンクリート剥離部分をセメントモルタルで修復する断面修復工法が従来から行われている。
【0004】
ところが、これらの工法の殆どは破損部位の修復を主な目的とするものであって、鉄筋の腐食の進行等を防くことなどには有効であるものの、構造物自体の強度を上げるという施工には対応できない。これに対し、橋梁などを含めて既設のコンクリート構造体に対して好適な補修及び補強のための施工及びこのための治具も既に開発され、たとえば特許第2521644号の特許公報に記載されたものがその一例として挙げられる。
【0005】
この公報に記載の補強構造は、たとえば施工対象が橋梁の床版であれば、この床版の下面に沿って格子状に編んだ網鉄筋を配置し、この網鉄筋の鉄筋どうしがほぼ直交して交差する部分に沿って床版にアンカーピンを打ち込んで網鉄筋を床版の下面に裏打ちするというものである。そして、アンカーピンにはそのヘッド側にテーパ部を形成しておき、このテーパ部分を鉄筋が交差する部分に当たるように打設することで、網鉄筋に対してプレストレスを加えるようにし、更に網鉄筋の全体を樹脂モルタルで封止する施工が行われる。
【0006】
このようなピンと網鉄筋を用いた施工であれば、床版に網鉄筋を一体に接合する構造体が得られるので、床版の補修と同時にプレストレスを付与された網鉄筋により長期間に及んで安定した補強が維持される。
【0007】
【発明が解決しようとする課題】
ところが、アンカーピンを打設する作業では、網鉄筋の格子配列に対応して床版にドリル等によって多数の打設孔を予め穿った後に、これらの打設孔にアンカーピンが打ち込まれることになる。そして、従来のアンカーピンは、圧入していくにしたがってこのピンの先端の外形が膨出変形してこの変形によって打設孔との間に係止力を持たせるというものである。したがって、クラックが発生していて強度的に劣化している補修前の床版に対して多数のアンカーピンを打ち込むと、床版に既に発生しているクラックに打設時の衝撃力が作用してしまい、施工時にクラックの発生を助長してしまう結果となる。
【0008】
また、アンカーピンの打設によるクラックの成長を抑えるためには、たとえばアンカーピンの打設ピッチを長くすることで一応は対応できる。しかしながら、打設ピッチが長いと、床版に対する網状鉄筋の拘束点が減ることになり、両者の接合強度が低下してしまうだけでなく、アンカーピンによる網状鉄筋に対するプレストレス負荷も不十分になる可能性がある。
【0009】
更に、網状鉄筋をアンカーピンで床版に固定した後に、樹脂モルタル等を塗布して網状鉄筋を被覆する施工では、既設の橋梁であればその施工面が下向きなので、塗布する樹脂モルタルはその塗布面から下に剥がれやすい。このため、樹脂モルタルと床版の底面との間に空洞状の隙間が残ったままとなったり、網鉄筋と床版との間に樹脂モルタルが充填されないままとなることが多い。このように、床版との間に隙間ができたり樹脂モルタルの充填が不十分な領域があると、この部分での補強度が劣化することになる。
【0010】
また、床版の底面に発生しているクラックにも樹脂モルタルが塗布されることになるが、施工面が下向きになっていることから、クラックに十分に充填されないままとなりやすい。このため、補修施工後においてもクラックが成長していく可能性が残り、再補修が必要となることにもなる。
【0011】
このように、従来の補修施工では、補修を施すときに橋梁等の構造体に強度的な劣化を与える恐れがあるほか、特に施工面が下向きのような場合には樹脂モルタルを塗布しても施工面との間に空洞が発生して所期の強度補償までに至らない可能性がある。
【0012】
本発明において解決すべき課題は、補修及び補強しようとするコンクリート構造物に強度的な劣化を与えないように施工できしかも発生しているクラックについてもその成長が抑制できるようにすることにある。
【0013】
【課題を解決するための手段】
本発明のコンクリート構造物の補強用治具は、既設のコンクリート構造物の表面に複数の鉄筋をほぼ格子状に交差させた鉄筋網を固定する補強用治具であって、鉄筋網の交差する2本の鉄筋を固定方向に拘束するヘッドと、このヘッドからその軸線方向に突き出されてコンクリート構造物に開けた打設孔に差し込み可能なロッドと、このロッドとヘッドとの間の周面に形成され且つ差し込み方向側が先細りするテーパと、ヘッドからロッドの先端まで貫通させた合成樹脂の注入孔とからなることを特徴とする。
【0014】
この補強用治具を用いた本発明のコンクリート構造物の補強構造は、2本の交差する鉄筋からテーパが受ける拘束力とロッドが打設孔の内周面から受ける拘束力とによって補強用治具をコンクリート構造物側に連接し、鉄筋網及び補強用治具を含めて被覆層によって被覆するとともに、外部から注入孔に供給した合成樹脂をコンクリート構造部の表面と被覆層との間で充填固化させてなることを特徴とする。
【0015】
また、請求項1の補強用治具を用いる本発明の補強施工方法は、2本の交差する鉄筋の両方にテーパの周面が突き当たる位置に対応してコンクリート構造物にロッドの外径よりも大きな打設孔を穿設し、ロッドを打設孔に差し込むとともに2本の交差する鉄筋からテーパが受ける拘束力とロッドが打設孔の内周面から受ける拘束力とによって補強用治具をコンクリート構造物側に連接し、鉄筋網及び補強用治具を含めて被覆層によって被覆し、外部から合成樹脂を注入孔に供給してこの合成樹脂を打設孔からコンクリート構造部の表面と被覆層との間に注入することを特徴とする。
【0016】
この補強施工方法においては、コンクリート構造物の表面に、少なくとも鉄筋網の鉄筋と交差する向きに走る溝を予め形成しておき、合成樹脂の注入時に鉄筋に沿う合成樹脂の流れを溝に導入するようにしてもよい。
【0017】
【発明の実施の形態】
図1は本発明の施工方法によって橋梁の床版を補強した例を示す概略図、図2は図1のA−A線矢視であって網状鉄筋及びアンカーピンの配置を示す底面図である。
【0018】
図1において、路幅方向の両端に地覆2をそれぞれ一体に形成するとともに内部には鉄筋をスラブ状に配筋した橋梁の床版1が橋桁3によって支持されている。そして、床版1は既設のものであって、通過車両Vによる動荷重を繰り返し受けてその下面にクラックが発生していたものを補修するために、図2に示す格子状に縦及び横の鉄筋4a,4bを予め溶接によって一体化した鉄筋網4を本実施の形態における補強用治具としてのアンカーピン5によって固定保持している。なお、網鉄筋4の施工後には、後述するようにアンカーピン5のヘッド部分を除いて被覆するモルタル樹脂等による被覆層を施工するものとし、図1においては被覆層6として一点鎖線でその概略を示している。
【0019】
図3はアンカーピン5の詳細であって、同図の(a)は切欠正面図、同図の(b)は同図(a)の平面図である。
【0020】
図示のアンカーピン5は図1において下側から床版1に打設するときの姿勢として示したもので、同図の(a)に示すように下端にはその端面を緩やかな円弧面状としたヘッド5aを形成し、このヘッド5aから上端に向けてロッド5bを形成したものである。ロッド5bはヘッド5aとの間を上端側すなわち打設方向に外形を先細りさせたテーパ5cを形成するとともに、ヘッド5aに連ねて軸線方向に貫通させた一様な内径の注入孔5dを設けたものである。そして、テーパ5cよりも先端側のロッド5bの外周面には雄ネジ5eを刻むとともに、先端側には注入孔5dの周壁を形成している部分を半径方向に切開してスリット5fとしている。
【0021】
アンカーピン5は図2に示したように、縦及び横配列の鉄筋4a,4bが交差する部分に対応させてそれぞれ床版1に打設される。すなわち、図4に示すように鉄筋4a,4bが十字状に交差しているコーナ部であってこれらの鉄筋4a,4bにロッド5bの周面が同時に接触するような位置にアンカーピン5を打設する。そして、アンカーピン5を床版1に打ち込んでいくと、ロッド5b部分に変わって図5に示すようにテーパ5cが鉄筋4a,4bの周面に当たるようになり、アンカーピン5の打設中心から見るとこのテーパ5cによってその外形半径が大きくなる。したがって、アンカーピン5は図2において矢印方向に鉄筋4a,4bを押すようになり、これらの鉄筋4a,4bには引張りが作用してプレストレスの負荷が作用する。なお、このようなテーパ5cによるプレストレスの負荷は、従来技術の項で挙げた特許公報のものと同様である。
【0022】
このようにアンカーピン5にテーパ5cを設けることによって、図2に示す格子状の鉄筋網4に対してアンカーピン5の位置を適切にすれば、図中の矢印で示すように鉄筋網4の中心から格子と45度の角度を持つ方向への一様な引張りを作用させることができ、鉄筋網4の全体に均一なプレストレスが付与される。したがって、図1に示すように床版1に対して施工したときには、この床版1が撓み変形しても網鉄筋4がこの撓み変形に追従し、アンカーピン5と鉄筋4a,4bとの間に隙間が発生することが防止される。
【0023】
以上のアンカーピン5を用いた鉄筋網4による床版1に対する補修施工の要領は次のとおりである。
【0024】
まず、床版1の底面には、図6に示すように溝1aを刻む施工を行う。この溝1aはたとえば幅が3〜5mm程度で深さが5〜10mm程度として、注入される樹脂が速やかに流れることができるようにし、格子状の網鉄筋4の縦,横の鉄筋4a,4bの配列方向だけでなく、斜めに走る線も含むランダムな配列とする。このような溝1aの現場での施工は、たとえばサンダー等の工具を用いれば比較的容易にしかも一様な深さに形成することができる。
【0025】
次いで、網鉄筋4を床版1の下面に沿わせてその位置を仮決めし、図4で説明したように、鉄筋4a,4bの両方にアンカーピン5のロッド5bが接触できる位置を芯出し棒等を使って床版1の下面に墨出しする。なお、このときの芯出し棒はロッド5bと同じ外形を持つ金属棒等を利用すればよく、アンカーピン5の打設数は網鉄筋4の大きさに応じて適宜選択すればよい。
【0026】
アンカーピン5の打設位置の墨付け後には、網鉄筋4を床版1から離すかまたは保持具によって位置を仮決めしたままとして、墨付けマークを目印にして図5に示すように打設孔1bをドリルによって穿孔する。この打設孔1bの内径はロッド5bの外径よりも大きくて注入樹脂の流れの詰まりがない程度とし、アンカーピン5をきっちり打設したときにその先端に開放している注入孔5dが閉塞しない穿ち長さとする。
【0027】
打設孔1bの穿孔作業を全て終えると、鉄筋網4の位置を再び正確に位置合わせして鉄筋網4a,4bが交差する部分と打設孔1bの間の位置関係を調整して、再度床版1の底面に沿わせて仮固定する。そして、アンカーピン5のロッド5bを打設孔1bの中に差し込んでいくと、テーパ5cが鉄筋4a,4bの周面に当たるようになり、アンカーピン5はこれらの鉄筋4a,4bによって保持される。すなわち、アンカーピン5を打設孔1bの中に打ち込んでいくにつれて、テーパ5cが鉄筋4a,4bに対して楔のように係合していき、テーパ5cはこれらの鉄筋4a,4bによってその周面の2点が拘束される。
【0028】
一方、打設孔1bの中に差し込まれたロッド5bは、鉄筋4a,4bとの接触点から受ける反作用方向すなわち図2において示した矢印方向と逆向きの作用力を受け、この作用力が働く方向に打設孔1bの中で位置を変える。
【0029】
したがって、図5に示すように、ヘッド5aが鉄筋4aに突き当たって打ち込み完了となったときには、テーパ5cが鉄筋4a,4bによって2点が拘束され、ロッド5bは打設孔1bの中で移動して位置を変えたときにその周面が打設孔1bの内周面にほぼ線接触する。これにより、アンカーピン5はテーパ5cで2点及びロッド5bで1点が拘束されてその周面が3点で保持されることになり、アンカーピン5はこれらの3点による拘束によって図5の状態に保持される。
【0030】
このように、アンカーピン5は従来のコンクリート用打設ピンのようにロッドの先端が膨出変形してこれによって係合力を作用させるのではなく、鉄筋4a,4bによるテーパ5cへの拘束力を利用することで仮固定することができる。したがって、アンカーピン5を打設するときに既設の床版1に対して無用な内部応力を発生させることはなく、アンカーピン5の打設ピッチも短くなる。
【0031】
なお、アンカーピン5のロッド5bは打設孔1bの内周面に接触した状態で保持されるが、この部分だけがほぼ線接触状態になるだけであって、ロッド5bと打設孔1bとの間には十分な隙間が保たれ、後述する樹脂の注入には何ら支障はない。
【0032】
以上の要領でアンカーピン5を打設孔1bに打ち込んだ後には、図5に示すように、注入孔5dが開放している部分をたとえばスポンジを利用した取り外し可能なシール材5d−1で封止する。そして、吹き付け装置によって塗布材6aを吹き付けて、床版1の下面に刻んだ溝1aをこの塗布材6aによって覆う。
【0033】
塗布材6aはたとえばポリマー等の速乾性のものを用いることができ、吹き付け装置によって床版1の真下から吹き付けるように作業することで、図5及び図7に示すように鉄筋4aと床版1の下面との間には入り込まないように施工し、その層厚は2mm程度とする。この塗布材6aによる被覆施工により、図6に示すように床版1に刻んだ溝1aは塗布材6aによって閉じられる。
【0034】
塗布材6aの吹き付けが完了すると、防水性を持つ適切な材料の中塗材6bを図7及び図8に示すように塗布する。この中塗材6bはコテを利用して塗っていく作業によって行ない、その厚さはヘッド5aが埋没しない程度とする。そして、コテ塗りしていくとき、鉄筋4aの上側にまで十分に充填することが好ましいが、作業性の面からもこのような充填塗布は困難である。これに対し、本発明の施工では、空洞ができてこれが残ったままでも、後述するように注入樹脂が代わって充填されるので、最終的な施工には何ら影響はない。
【0035】
中塗材6bの塗布の後には、図7に示すように注入孔5dからシール材5d−1を抜き取り、エポキシ樹脂7を外部から注入する。このエポキシ樹脂7の注入にはアンカーピン5の1個毎に行なうこもできるが、それほど数が多くない場合にはエポキシ樹脂7の圧送装置から複数のホースを分岐させてこれらを各アンカーピン5の注入孔5dに接続して同時に注入作業してもよい。この同時作業であれば、各アンカーピン5からのエポキシ樹脂7の注入量及び注入圧を一様化できるので、施工上では非常に好ましい。
【0036】
なお、エポキシ樹脂7の充填の後には、図9に示すように中塗材6bの表面に上塗材6cをコテによって塗布し、塗布材6a,中塗材6b及び上塗材6cによって被覆層6が形成される。
【0037】
注入孔5dに供給されたエポキシ樹脂7は、図7及び図8に示すように注入孔5dの上端から吹き出して打設孔1bの中に送り出され、打設孔1bの中では重力と注入圧力とによってエポキシ樹脂7は下向きに速やかに流れ出ていく。そして、打設孔1bから抜けたエポキシ樹脂7は、床版1の下面に刻んだ溝1aの中に流れ込んでクラックに浸透していくほか、塗布材6aが被覆していない床版1の下面と鉄筋4a,4bとの間の隙間を充填するように流れていく。
【0038】
すなわち、鉄筋4a,4bが走っている部分と床版1の底面との間には、塗布材6a及び中塗材6bが充填されていないままか充填されていても隙間が多数できている状態になっている。このため、打設孔1bの下端から流れ出たエポキシ樹脂7は、図7及び図8において矢印で示す方向に鉄筋4a,4bに沿う部分を流路として供給装置からの注入圧によって順次送り込まれる。したがって、鉄筋4a,4bと床版1との間の隙間にはエポキシ樹脂7が充填されていき、下側からの中塗材6bのコテによる塗布では解消できなかった空洞部の全てがこのエポキシ樹脂7によって封止充填される。
【0039】
また、床版1の底面に刻んだ溝1aはランダムに形成されているので、図4に示すように鉄筋4a,4bと交差する部分ができる。このため、鉄筋4a,4bに沿って流れてきたエポキシ樹脂7はこの交差部分から溝1aの中に入り込み、図9に示すように塗布材6aによって囲まれた溝1aの空間はエポキシ樹脂によって充填される。そして、溝1aが縦横に走っているので、図4に示すように床版1に発生しているクラックCに対して交差する関係を持つので、溝1aからクラックCにまでエポキシ樹脂7を浸透させることができる。
【0040】
すなわち、クラックCは塗布材6aによって被覆された状態となっているが、溝1aと同様に切開された断面形状を持つので、溝1aからのエポキシ樹脂7がその注入圧によって流動すると、塗布材6aを押し広げるようにしてクラックCの中に浸透させることができる。また、鉄筋4a,4bが直にクラックCと交差している部分では、これらの鉄筋4a,4bに沿って供給されてくるエポキシ樹脂7は直接クラックCの中に入り込んでいく。したがって、クラックCの発生の仕方が不定型であっても、鉄筋4a,4bの配筋及びランダムに形成した溝1aを利用してエポキシ樹脂7をクラックCに充填することができる。
【0041】
このようにアンカーピン5の注入孔5dから注入されたエポキシ樹脂7は打設孔1bの中だけに止まるのではなく、床版1のほぼ全体の広い領域に分布させることができる。したがって、エポキシ樹脂7を適当な量だけ注入した後に養生期間を置くと、エポキシ樹脂7の固化によってアンカーピン5のロッド5bは打設孔1bの中に強固に固定され、これによって鉄筋網4を安定して床版1に保持することができる。
【0042】
また、床版1の下面と鉄筋4a,4bとの間にも固化したエポキシ樹脂7がそのまま残るので、床版1の下面を強固に被覆でき床版1内の既設配筋の腐食の防止だけでなく、新たに補強用として施工した鉄筋網4も同様にその腐食が防止される。
【0043】
更に、クラックCについてもエポキシ樹脂7が充填されることから、衝撃荷重等を受けてもその成長を抑えることができ、その補修だけでなく補強強度も十分に高くすることができる。
【0044】
以上の例では橋梁の床版の補強施工としたが、これに代えて各種のコンクリート構造体を施工対象としてもよいことは無論である。
【0045】
【発明の効果】
本発明で用いる補強用治具は、鉄筋網の鉄筋が交差する部分に適切に配置してコンクリート構造体に打設すれば、テーパによって鉄筋網に対してプレストレスを負荷して連結することができ、コンクリート構造体の撓み変形に対しても鉄筋網を倣わせて保持でき、その補強効果を長く持続させることができる。そして、合成樹脂の注入孔を備えたことによって、コンクリート構造物の表面と被覆層との間に合成樹脂を充填することができるので、鉄筋網の錆の発生及びクラックの補修も十分に行える。
【0046】
また、補強用治具を注入された合成樹脂の固化によってコンクリート構造体に固定するようにすれば、従来のアンカーピン等のように膨出変形による係合力を得られないでも済むので、補強用治具の配列ピッチを短くしてより一層強度を上げることができ、打設時にコンクリート構造体に無用な負荷を与えないのでその強度的な劣化も防止できる。
【0047】
本発明の補強施工方法で形成される補強構造では、補強用治具によりプレストレスを付与された鉄筋網によってコンクリート構造体の補強が確実に得られるほか、合成樹脂をコンクリート構造物と被覆層との間に注入して固化させるので、空隙の発生によるコンクリートの剥落が防止されるほか、鉄筋網の防錆効果も得られるので、構造体の耐久性の向上が図れる。
【0048】
本発明の補強施工方法では、鉄筋網の固定を兼ねる補強用治具を用して合成樹脂を注入するので、この注入のために必要な特別の部材を必要とすることがなく、施工も容易に行なえる。
【0049】
ンクリート構造物の表面に予め溝を設けることで、コンクリート構造物の表面と被覆層との間に注入した合成樹脂をこの溝に伝わせてコンクリート構造物の表面の全体に行き渡らせることができるので、表面に散在しているクラックにも合成樹脂を分布させることができ、クラックも含めて補修できる。
【図面の簡単な説明】
【図1】本発明の補強施工方法によって床版を補強した橋梁を示す概略断面図である。
【図2】図1のA−A線矢視であって床版の下面に配置する補強用の鉄筋網及びこれを固定するためのアンカーピンの配置を示す底面図である。
【図3】補強用治具としてのアンカーピンの詳細であって、(a)は切欠正面図、(b)は平面図である。
【図4】鉄筋網の鉄筋に対するアンカーピンの配置の概略を示す底面図である。
【図5】アンカーピンを打設孔に差し込んで鉄筋の拘束力を利用して固定した後に塗布材を塗布したときの要部の断面図である。
【図6】床版の底面に刻む溝の施工例であって、(a)は床版を斜め下方から見たときの概略図、(b)は溝の形状を示す断面図である。
【図7】打設孔にロッドを差し込んだアンカーピンからエポキシ樹脂を注入したときの樹脂の流れを示す要部の断面図である。
【図8】図7のB−B線矢視による縦断面図である。
【図9】エポキシ樹脂の注入によって床版の溝に樹脂が充填されたときの要部の断面図である。
【符号の説明】
1 床版
1a 溝
1b 打設孔
2 地覆
3 橋桁
4 鉄筋網
4a,4b 鉄筋
5 アンカーピン(補強用治具)
5a ヘッド
5b ロッド
5c テーパ
5d 注入孔
5d−1 シール材
5e 雄ネジ
5f スリット
6 被覆層
6a 塗布材
6b 中塗材
6c 上塗材
7 エポキシ樹脂
[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to reinforcement of concrete structures such as bridges, for example, in particular, for repairing cracked bridge decks and walls, and additionally for reinforcing existing structures by adding new reinforcing bars. TECHNICAL FIELD The present invention relates to a jig for use, a reinforcing structure using the same, and a reinforcing construction method.
[0002]
[Prior art]
In a road bridge constructed of a concrete structure, a dynamic load due to the passage of a vehicle is repeatedly received, so that the load on the floor slab of the bridge is considerably large among the main members of the road bridge. If the bridge itself repeats excessive loads, impact loads, or greatly exceeds the service life of the bridge itself, cracks will occur on the underside of the floor slab, and these cracks will run vertically and horizontally across the underside. It becomes a fine mesh until it comes off, causing concrete to come off.
[0003]
Since the occurrence of such cracks causes corrosion or breakage of the reinforcing steel in concrete, it is generally considered preferable to reinforce the floor slab at the initial stage of the occurrence of cracks. As the repair work of the floor slab, a resin injection method of injecting epoxy resin or the like into a crack, and a cross section repair method of repairing a hollow portion or a concrete peeling portion generated in the floor slab with cement mortar have been conventionally performed. .
[0004]
However, most of these construction methods are mainly for the purpose of repairing damaged parts, and are effective in preventing the progress of corrosion of reinforcing bars, etc., but construction to increase the strength of the structure itself Can not respond. On the other hand, construction for repair and reinforcement suitable for existing concrete structures including bridges and the like and jigs for this purpose have already been developed, for example, those described in Japanese Patent No. 2521644. Is an example.
[0005]
In the reinforcement structure described in this publication, for example, if the construction target is a floor slab of a bridge, mesh reinforcing bars woven in a lattice shape are arranged along the lower surface of the floor slab, and the reinforcing bars of the mesh reinforcing bars are substantially orthogonal to each other. An anchor pin is driven into the floor slab along the intersecting portion to line the rebar with the lower surface of the floor slab. A tapered portion is formed on the head side of the anchor pin, and the tapered portion is driven so as to hit a portion where the reinforcing bar intersects, so that a prestress is applied to the reinforcing bar. An operation of sealing the entire reinforcing bar with resin mortar is performed.
[0006]
In the case of construction using such pins and mesh reinforcing bars, a structure can be obtained in which the mesh bars are integrally joined to the floor slab. And stable reinforcement is maintained.
[0007]
[Problems to be solved by the invention]
However, in the operation of placing anchor pins, after many drilling holes are drilled in advance in the floor slab with a drill or the like corresponding to the grid arrangement of the mesh reinforcing bar, the anchor pins are driven into these placing holes. Become. In the conventional anchor pin, the outer shape of the tip end of the pin bulges and deforms as the pin is pressed in, and this deformation gives a locking force to the driving hole. Therefore, if a large number of anchor pins are driven into a repaired slab that has cracks and has deteriorated in strength, the impact force at the time of driving will act on cracks that have already occurred in the slab. As a result, cracks are promoted during construction.
[0008]
In addition, in order to suppress the growth of cracks due to the driving of the anchor pins, it is possible to respond to the problem by increasing the driving pitch of the anchor pins, for example. However, when the casting pitch is long, the restraining points of the rebar on the floor slab are reduced, and not only the joining strength of both is reduced, but also the prestress load on the rebar by the anchor pin becomes insufficient. there is a possibility.
[0009]
Furthermore, in the construction where the mesh reinforcing steel is fixed to the floor slab with anchor pins and then the resin mortar is applied to cover the mesh reinforcing steel, if the existing bridge is used, the construction surface faces downward. It is easy to peel off from the surface. For this reason, a cavity-shaped gap is often left between the resin mortar and the bottom surface of the floor slab, or the resin mortar is not filled between the mesh reinforcing bar and the floor slab. As described above, if there is a gap between the floor slab and a region where the resin mortar is insufficiently filled, the degree of reinforcement at this portion is deteriorated.
[0010]
Further, the resin mortar is also applied to the cracks generated on the bottom surface of the floor slab, but since the construction surface faces downward, the cracks are likely not to be sufficiently filled. For this reason, there is a possibility that cracks will grow even after the repair work, and it will be necessary to perform repair again.
[0011]
As described above, in the conventional repair work, there is a possibility that the structure such as a bridge may be deteriorated in strength when performing the repair, and even when the construction surface is downward, even if the resin mortar is applied, There is a possibility that a cavity may be formed between the surface and the construction surface, and the required strength compensation may not be achieved.
[0012]
It is an object of the present invention to provide a concrete structure to be repaired and reinforced so that the concrete structure to be repaired and reinforced can be constructed without giving a strong deterioration, and that the growth of a crack that has occurred can be suppressed.
[0013]
[Means for Solving the Problems]
The reinforcing jig for a concrete structure according to the present invention is a reinforcing jig for fixing a reinforcing bar network in which a plurality of reinforcing bars are substantially crossed in a lattice shape on the surface of an existing concrete structure, wherein the reinforcing bar crosses. A head for restraining two rebars in a fixed direction, a rod protruding in the axial direction from the head and capable of being inserted into a driving hole formed in a concrete structure, and a peripheral surface between the rod and the head It is characterized by comprising a taper formed and tapering on the side of the insertion direction, and a synthetic resin injection hole penetrating from the head to the tip of the rod.
[0014]
The reinforcing structure for a concrete structure according to the present invention using this reinforcing jig is provided by the restraining force of the taper from two intersecting reinforcing bars and the restraining force of the rod from the inner peripheral surface of the driving hole. The fixture is connected to the concrete structure side and covered with the coating layer including the reinforcing bar and the reinforcing jig, and the synthetic resin supplied to the injection hole from the outside is filled between the surface of the concrete structure and the coating layer. It is characterized by being solidified.
[0015]
In addition, the reinforcing construction method of the present invention using the reinforcing jig according to claim 1 is a concrete structure corresponding to a position where a tapered peripheral surface abuts both of two intersecting reinforcing bars. A large driving hole is drilled, a rod is inserted into the driving hole, and a reinforcing jig is formed by the restraining force received by the taper from the two intersecting reinforcing bars and the restraining force received by the rod from the inner peripheral surface of the driving hole. Connected to the concrete structure side, covered with a coating layer including a reinforcing steel net and a reinforcing jig, supplied synthetic resin from the outside to the injection hole, and coated this synthetic resin with the surface of the concrete structure from the casting hole It is characterized by being injected between layers.
[0016]
In this reinforcing construction method, at least a groove running in a direction intersecting with a reinforcing bar of a reinforcing bar network is formed in advance on the surface of the concrete structure, and a flow of the synthetic resin along the reinforcing bar is introduced into the groove when the synthetic resin is injected. You may do so.
[0017]
BEST MODE FOR CARRYING OUT THE INVENTION
FIG. 1 is a schematic view showing an example in which a floor slab of a bridge is reinforced by the construction method of the present invention, and FIG. 2 is a bottom view showing an arrangement of a mesh reinforcing bar and an anchor pin taken along line AA of FIG. .
[0018]
In FIG. 1, a floor slab 1 of a bridge in which ground covers 2 are integrally formed at both ends in the road width direction and in which reinforcing bars are arranged in a slab shape is supported by a bridge girder 3. In order to repair the floor slab 1 which has been existing and has been cracked on its lower surface by repeatedly receiving the dynamic load of the passing vehicle V, the slab 1 is vertically and horizontally arranged in a lattice shape as shown in FIG. The reinforcing bar 4 in which the reinforcing bars 4a and 4b are integrated in advance by welding is fixed and held by the anchor pin 5 as a reinforcing jig in the present embodiment. After the rebar 4 is applied, a coating layer made of mortar resin or the like is applied except for the head portion of the anchor pin 5 as described later. In FIG. Is shown.
[0019]
3A and 3B show details of the anchor pin 5, in which FIG. 3A is a cutaway front view, and FIG. 3B is a plan view of FIG. 3A.
[0020]
The illustrated anchor pin 5 is shown in a posture in which the anchor pin 5 is driven into the floor slab 1 from below in FIG. 1, and as shown in FIG. A head 5a is formed, and a rod 5b is formed from the head 5a toward the upper end. The rod 5b forms a taper 5c with an outer diameter tapered in the upper end side, that is, in the driving direction, between the rod 5b and the head 5a, and has an injection hole 5d having a uniform inner diameter penetrated in the axial direction in connection with the head 5a. Things. A male screw 5e is formed on the outer peripheral surface of the rod 5b on the tip side with respect to the taper 5c, and a portion forming the peripheral wall of the injection hole 5d is radially cut on the tip side to form a slit 5f.
[0021]
As shown in FIG. 2, the anchor pins 5 are driven into the floor slab 1 so as to correspond to the portions where the reinforcing bars 4 a and 4 b intersect vertically and horizontally. That is, as shown in FIG. 4, the anchor pin 5 is struck at a corner where the reinforcing bars 4a, 4b cross in a cross shape, and at a position where the peripheral surface of the rod 5b simultaneously contacts these reinforcing bars 4a, 4b. Set up. Then, when the anchor pin 5 is driven into the floor slab 1, the taper 5c comes into contact with the peripheral surfaces of the reinforcing bars 4a, 4b instead of the rod 5b as shown in FIG. When viewed, the outer radius is increased by the taper 5c. Accordingly, the anchor pin 5 pushes the rebars 4a, 4b in the direction of the arrow in FIG. 2, and a tension acts on these rebars 4a, 4b to apply a prestress load. The pre-stress load by such a taper 5c is the same as that of the patent publication mentioned in the section of the prior art.
[0022]
By providing the anchor pin 5 with the taper 5c as described above, if the position of the anchor pin 5 is appropriately adjusted with respect to the lattice-shaped reinforcing net 4 shown in FIG. Uniform tension can be exerted from the center in a direction having an angle of 45 degrees with the lattice, and uniform prestress is applied to the entire reinforcing bar 4. Therefore, when the floor slab 1 is constructed as shown in FIG. 1, even when the floor slab 1 is bent and deformed, the mesh reinforcing bar 4 follows the bending and deformation, and the distance between the anchor pin 5 and the reinforcing bars 4a and 4b is increased. Is prevented from being generated.
[0023]
The procedure for repairing the floor slab 1 with the reinforcing bar 4 using the anchor pins 5 is as follows.
[0024]
First, on the bottom surface of the floor slab 1, as shown in FIG. The groove 1a has, for example, a width of about 3 to 5 mm and a depth of about 5 to 10 mm so that the resin to be injected can flow quickly, and the vertical and horizontal reinforcing bars 4a and 4b of the grid-like mesh reinforcing bar 4. Not only the arrangement direction but also a random arrangement including diagonally running lines. Such a groove 1a can be formed on-site relatively easily and at a uniform depth by using a tool such as a sander.
[0025]
Next, the position of the mesh reinforcing bar 4 is temporarily determined along the lower surface of the floor slab 1, and as described with reference to FIG. 4, the position where the rod 5b of the anchor pin 5 can contact both the reinforcing bars 4a and 4b is centered. Using a stick or the like, ink is printed on the lower surface of the floor slab 1. In this case, a metal rod or the like having the same outer shape as the rod 5b may be used as the centering rod at this time, and the number of the anchor pins 5 to be driven may be appropriately selected according to the size of the mesh reinforcing bar 4.
[0026]
After inking the anchoring position of the anchor pin 5, the net reinforcing bar 4 is separated from the floor slab 1 or the position is temporarily determined by a holding tool, and the inking mark is used as a mark as shown in FIG. The hole 1b is drilled by a drill. The inner diameter of the driving hole 1b is larger than the outer diameter of the rod 5b so as not to block the flow of the injected resin, and the injection hole 5d opened at the tip when the anchor pin 5 is driven exactly is closed. Do not pierce length.
[0027]
When all the drilling work of the driving holes 1b is completed, the position of the reinforcing net 4 is accurately adjusted again, and the positional relationship between the intersection of the reinforcing bars 4a and 4b and the driving hole 1b is adjusted. Temporarily fix along the bottom of the floor slab 1. When the rod 5b of the anchor pin 5 is inserted into the driving hole 1b, the taper 5c comes into contact with the peripheral surface of the reinforcing bars 4a and 4b, and the anchor pin 5 is held by the reinforcing bars 4a and 4b. . That is, as the anchor pin 5 is driven into the driving hole 1b, the taper 5c is engaged with the reinforcing bars 4a, 4b like a wedge, and the taper 5c is circumferentially formed by the reinforcing bars 4a, 4b. Two points on the surface are constrained.
[0028]
On the other hand, the rod 5b inserted into the driving hole 1b receives a reaction force received from a contact point with the reinforcing bars 4a, 4b, that is, a force acting in a direction opposite to the direction of the arrow shown in FIG. The position is changed in the driving hole 1b in the direction.
[0029]
Therefore, as shown in FIG. 5, when the head 5a strikes the reinforcing bar 4a and the driving is completed, the taper 5c is restricted at two points by the reinforcing bars 4a and 4b, and the rod 5b moves in the driving hole 1b. When the position is changed, the peripheral surface substantially makes line contact with the inner peripheral surface of the driving hole 1b. As a result, two points of the anchor pin 5 are constrained by the taper 5c and one point is constrained by the rod 5b, and the peripheral surface thereof is held at three points. Held in state.
[0030]
In this manner, the anchor pin 5 does not exert the engaging force by the tip of the rod swelling and deforming due to the swelling like the conventional casting pin for concrete, but the restraining force on the taper 5c by the rebars 4a, 4b. By using it, it can be temporarily fixed. Therefore, when the anchor pins 5 are driven, unnecessary internal stress is not generated on the existing floor slab 1, and the driving pitch of the anchor pins 5 is shortened.
[0031]
Although the rod 5b of the anchor pin 5 is held in contact with the inner peripheral surface of the driving hole 1b, only this portion is substantially in line contact with the rod 5b and the driving hole 1b. A sufficient gap is maintained between them, and there is no hindrance to resin injection described later.
[0032]
After the anchor pin 5 is driven into the driving hole 1b in the manner described above, as shown in FIG. 5, the portion where the injection hole 5d is open is sealed with a removable sealing material 5d-1 using, for example, a sponge. Stop. Then, the coating material 6a is sprayed by a spraying device, and the groove 1a cut on the lower surface of the floor slab 1 is covered with the coating material 6a.
[0033]
As the coating material 6a, for example, a quick-drying material such as a polymer can be used, and the rebar 4a and the floor slab 1 as shown in FIGS. It is constructed so as not to penetrate between the lower surface and the layer thickness thereof is about 2 mm. By the coating with the coating material 6a, the groove 1a cut in the floor slab 1 is closed by the coating material 6a as shown in FIG.
[0034]
When the spraying of the coating material 6a is completed, an intermediate coating material 6b having a suitable waterproof property is applied as shown in FIGS. The intermediate coating material 6b is applied by using a soldering iron, and the thickness thereof is set so that the head 5a is not buried. When ironing is performed, it is preferable to sufficiently fill the upper side of the reinforcing bar 4a, but such filling and coating is difficult from the viewpoint of workability. On the other hand, in the construction of the present invention, even if a cavity is formed and remains, since the injected resin is filled instead as described later, there is no influence on the final construction.
[0035]
After the application of the intermediate coating material 6b, as shown in FIG. 7, the sealing material 5d-1 is extracted from the injection hole 5d, and the epoxy resin 7 is injected from the outside. The injection of the epoxy resin 7 can be performed for each of the anchor pins 5. However, when the number is not so large, a plurality of hoses are branched from the pumping device for the epoxy resin 7 and these are separated from each other. The injection operation may be performed simultaneously by connecting to the injection hole 5d. This simultaneous operation is very preferable in terms of construction because the injection amount and injection pressure of the epoxy resin 7 from each anchor pin 5 can be made uniform.
[0036]
After filling with the epoxy resin 7, as shown in FIG. 9, a top coat 6c is applied to the surface of the middle coat 6b with an iron, and the coating layer 6 is formed by the coat 6a, the middle coat 6b, and the top coat 6c. You.
[0037]
The epoxy resin 7 supplied to the injection hole 5d is blown out from the upper end of the injection hole 5d and sent out into the casting hole 1b, as shown in FIGS. As a result, the epoxy resin 7 quickly flows downward. The epoxy resin 7 that has escaped from the casting hole 1b flows into the groove 1a cut in the lower surface of the floor slab 1 and penetrates into cracks, and the lower surface of the floor slab 1 that is not covered with the coating material 6a. It flows so as to fill the gap between the reinforcing bars 4a and 4b.
[0038]
That is, between the portion where the reinforcing bars 4a, 4b are running and the bottom surface of the floor slab 1, there is a large number of gaps left unfilled or filled even if the coating material 6a and the intermediate coating material 6b are filled. Has become. For this reason, the epoxy resin 7 that has flowed out from the lower end of the casting hole 1b is sequentially fed by the injection pressure from the supply device in the direction shown by the arrows in FIGS. Accordingly, the gap between the reinforcing bars 4a, 4b and the floor slab 1 is filled with the epoxy resin 7, and all of the cavities which could not be eliminated by the application of the middle coat material 6b from below with the iron are used for this epoxy resin. 7 for sealing and filling.
[0039]
Further, since the grooves 1a cut in the bottom surface of the floor slab 1 are formed at random, there are portions intersecting with the reinforcing bars 4a and 4b as shown in FIG. For this reason, the epoxy resin 7 flowing along the reinforcing bars 4a and 4b enters the groove 1a from the intersection, and the space of the groove 1a surrounded by the coating material 6a is filled with the epoxy resin as shown in FIG. Is done. Since the groove 1a runs vertically and horizontally, it has a relation of intersecting with the crack C generated in the floor slab 1 as shown in FIG. 4, so that the epoxy resin 7 penetrates from the groove 1a to the crack C. Can be done.
[0040]
That is, although the crack C is covered with the coating material 6a, the crack C has a cross-sectional shape cut out similarly to the groove 1a, so that when the epoxy resin 7 from the groove 1a flows due to the injection pressure, the coating material is coated. 6a can be penetrated into the crack C by spreading it. Further, in a portion where the reinforcing bars 4a, 4b directly intersect the crack C, the epoxy resin 7 supplied along the reinforcing bars 4a, 4b directly enters the crack C. Therefore, even if the manner in which the crack C occurs is irregular, the crack C can be filled with the epoxy resin 7 using the arrangement of the reinforcing bars 4a and 4b and the groove 1a formed at random.
[0041]
As described above, the epoxy resin 7 injected from the injection hole 5d of the anchor pin 5 can be distributed not only in the driving hole 1b but also in a wide area of almost the entire floor slab 1. Therefore, when a curing period is set after injecting an appropriate amount of the epoxy resin 7, the rod 5 b of the anchor pin 5 is firmly fixed in the driving hole 1 b by solidification of the epoxy resin 7, whereby the reinforcing bar 4 is connected. The slab 1 can be stably held.
[0042]
Further, since the solidified epoxy resin 7 remains between the lower surface of the floor slab 1 and the reinforcing bars 4a, 4b, the lower surface of the floor slab 1 can be firmly covered, and only the prevention of corrosion of the existing reinforcing bars in the floor slab 1 is achieved. In addition, the corrosion of the reinforcing steel net 4 newly constructed for reinforcement is similarly prevented.
[0043]
Further, since the crack C is also filled with the epoxy resin 7, the growth thereof can be suppressed even when an impact load or the like is received, and not only the repair but also the reinforcing strength can be sufficiently increased.
[0044]
In the above example, the reinforcement of the floor slab of the bridge is used. However, it is a matter of course that various concrete structures may be used instead.
[0045]
【The invention's effect】
The reinforcing jig used in the present invention can be pre-stressed and connected to the rebar network by taper if properly placed at the intersection of the rebars of the rebar network and cast into a concrete structure. It is also possible to follow and hold the reinforcing steel mesh against the flexural deformation of the concrete structure, and the reinforcing effect can be maintained for a long time. Since the synthetic resin can be filled between the surface of the concrete structure and the coating layer by providing the injection hole for the synthetic resin, the generation of rust and the repair of cracks in the reinforcing net can be sufficiently performed.
[0046]
In addition, if the reinforcing jig is fixed to the concrete structure by solidifying the injected synthetic resin, it is not necessary to obtain the engaging force due to the bulging deformation unlike the conventional anchor pin or the like. By shortening the arrangement pitch of the jigs, the strength can be further increased, and unnecessary deterioration is not applied to the concrete structure at the time of casting, so that the deterioration of the strength can be prevented.
[0047]
In the reinforcing structure formed by the reinforcing construction method of the present invention, the reinforcement of the concrete structure can be reliably obtained by the reinforcing mesh prestressed by the reinforcing jig. In addition, the concrete is prevented from peeling due to the generation of voids, and the rust prevention effect of the reinforcing steel mesh is obtained, so that the durability of the structure can be improved.
[0048]
The reinforcing construction method of the present invention, since then take advantage of the reinforcing jig serving also as the fixing of the reinforcing bar network injecting synthetic resin, without requiring a special member required for this injection, also construction Easy to do.
[0049]
By providing the pre-groove on the surface of the concrete structure, it is possible the injected synthetic resin between the surface and the coating layer of the concrete structure by Tsutawa the groove to spread across the surface of the concrete structure Therefore, the synthetic resin can be distributed to the cracks scattered on the surface, and the cracks and the cracks can be repaired.
[Brief description of the drawings]
FIG. 1 is a schematic sectional view showing a bridge in which a slab is reinforced by a reinforcing construction method of the present invention.
FIG. 2 is a bottom view showing the reinforcement reinforcing wire network arranged on the lower surface of the floor slab and the arrangement of anchor pins for fixing the reinforcing reinforcing mesh network, taken along the line AA of FIG. 1;
3A and 3B are details of an anchor pin as a reinforcing jig, wherein FIG. 3A is a cutaway front view and FIG. 3B is a plan view.
FIG. 4 is a bottom view schematically showing the arrangement of anchor pins with respect to the reinforcing bars of the reinforcing bar network.
FIG. 5 is a cross-sectional view of a main part when an application material is applied after an anchor pin is inserted into a driving hole and fixed using a binding force of a reinforcing bar.
6A and 6B are working examples of a groove cut into the bottom surface of the floor slab, wherein FIG. 6A is a schematic view when the floor slab is viewed from obliquely below, and FIG. 6B is a cross-sectional view illustrating the shape of the groove.
FIG. 7 is a cross-sectional view of a main part showing a flow of resin when epoxy resin is injected from an anchor pin having a rod inserted into a driving hole.
8 is a vertical sectional view taken along line BB of FIG. 7;
FIG. 9 is a cross-sectional view of a main part when a resin is filled in a groove of a floor slab by injecting an epoxy resin.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 Floor slab 1a Groove 1b Driving hole 2 Ground covering 3 Bridge girder 4 Reinforcing network 4a, 4b Reinforcing bar 5 Anchor pin (reinforcing jig)
5a Head 5b Rod 5c Taper 5d Injection hole 5d-1 Sealing material 5e Male screw 5f Slit 6 Coating layer 6a Coating material 6b Middle coating material 6c Top coating material 7 Epoxy resin

Claims (1)

既設のコンクリート構造物の表面に複数の鉄筋をほぼ格子状に交差させた鉄筋網を固定する補強用治具であって、鉄筋網の交差する2本の鉄筋を固定方向に拘束するヘッドと、このヘッドからその軸線方向に突き出されてコンクリート構造物に開けた打設孔に差し込み可能なロッドと、このロッドとヘッドとの間の周面に形成され且つ差し込み方向が先細りするテーパと、ヘッドからロッドの先端まで貫通させた合成樹脂の注入孔とからなるコンクリート構造物用の補強用治具を用いたコンクリート構造物の補強施工方法であって、
既設のコンクリート構造物の表面に複数の鉄筋をほぼ格子状に交差させた鉄筋網を配置し、2本の交差する鉄筋の両方に前記補強用治具のテーパ周面が突き当たる位置に対応させ、コンクリート構造物にロッドの外径よりも大きな複数の打設孔を穿設し、
複数の前記補強治具のロッドをそれぞれの打設孔に差し込むとともに2本の交差する鉄筋からテーパが受ける拘束力とロッドが打設孔の内周面から受ける拘束力とで前記補強用治具をコンクリート構造物側に連接することによって前記鉄筋網をコンクリート構造物の表面に固定し、
鉄筋網および補強用治具を含めて被覆層によって被覆した後、
前記補強用治具の注入孔に外部から合成樹脂を供給して、この合成樹脂を打設孔からコンクリート構造部の表面と被覆層との間に注入する
コンクリート構造物の補強施工方法。
A reinforcing jig for fixing a rebar network in which a plurality of rebars intersect substantially in a grid on the surface of an existing concrete structure, and a head for restraining two rebars intersecting the rebar net in a fixing direction, A rod protruding from the head in the axial direction and insertable into a casting hole formed in a concrete structure, a taper formed on a peripheral surface between the rod and the head and having a tapered insertion direction, A method for reinforcing a concrete structure using a reinforcing jig for a concrete structure comprising a synthetic resin injection hole penetrated to the tip of a rod ,
A reinforcing bar network in which a plurality of reinforcing bars are crossed substantially in a lattice pattern on the surface of an existing concrete structure is arranged, and a position where the tapered peripheral surface of the reinforcing jig abuts on both of the two reinforcing bars, Drilling a plurality of casting holes larger than the outer diameter of the rod in the concrete structure,
The reinforcing jig is inserted by inserting the rods of the plurality of reinforcing jigs into the respective driving holes, and by using the restraining force of the taper from two intersecting reinforcing bars and the restraining force of the rod from the inner peripheral surface of the driving hole. Is fixed to the surface of the concrete structure by connecting the rebar net to the concrete structure side,
After being covered with a coating layer including a reinforcing mesh and a reinforcing jig,
A synthetic resin is supplied from the outside to the injection hole of the reinforcing jig, and the synthetic resin is injected between the surface of the concrete structure and the coating layer from the casting hole.
Reinforcement construction method for concrete structures.
JP30612397A 1997-11-07 1997-11-07 Reinforcement construction method for concrete structures Expired - Lifetime JP3582971B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP30612397A JP3582971B2 (en) 1997-11-07 1997-11-07 Reinforcement construction method for concrete structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP30612397A JP3582971B2 (en) 1997-11-07 1997-11-07 Reinforcement construction method for concrete structures

Publications (2)

Publication Number Publication Date
JPH11140823A JPH11140823A (en) 1999-05-25
JP3582971B2 true JP3582971B2 (en) 2004-10-27

Family

ID=17953335

Family Applications (1)

Application Number Title Priority Date Filing Date
JP30612397A Expired - Lifetime JP3582971B2 (en) 1997-11-07 1997-11-07 Reinforcement construction method for concrete structures

Country Status (1)

Country Link
JP (1) JP3582971B2 (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100501747B1 (en) * 2002-01-21 2005-07-18 주식회사 동일화스너상사 Sealing constructing method for preventing epoxy leakage when attaching steel plates on by anchor bolts and apparatus thereof
EP1336704B1 (en) * 2002-02-15 2013-02-13 NTT Infrastructure Network Corporation Concrete electric pole and method for reinforcing the same
JP3973542B2 (en) * 2002-11-12 2007-09-12 コニシ株式会社 How to repair the structure
JP2006183240A (en) * 2004-12-27 2006-07-13 Masatoshi Okura Reinforced concrete structure repairing method and tool for the same
JP4808062B2 (en) * 2006-03-28 2011-11-02 大成建設株式会社 Reinforcement structure of existing concrete structures
JP2008202251A (en) * 2007-02-16 2008-09-04 Sunroad Co Ltd Reinforcing tool for concrete structure, and reinforcing structure and reinforcing construction method using the same
JP5660823B2 (en) * 2010-08-11 2015-01-28 株式会社川嶋建設 Bracing connection structure, bracing anchor structure using it, and seismic reinforcement structure for existing buildings with the structure

Also Published As

Publication number Publication date
JPH11140823A (en) 1999-05-25

Similar Documents

Publication Publication Date Title
JP6316665B2 (en) Composite structure of steel girder and precast slab and its construction method
JPH09151613A (en) Reinforcement structure of existing concrete columns
KR20070083474A (en) Shear force reinforcement structure and shear force reinforcement member
JP3582971B2 (en) Reinforcement construction method for concrete structures
US5044139A (en) Method of replacing post tensioned beams
CN107165435B (en) A kind of reinforcement construction method of cracked inner wall
JP2017128860A (en) Reinforcing construction method and reinforcement structure of concrete structure
JPH08338005A (en) Reinforcement method of concrete bridge
JPH11193640A (en) Repair method of existing concrete structure and construction method of new concrete structure
JP4137287B2 (en) High durability structure embedded formwork method
KR100530025B1 (en) Section enlargement repairing and reinforcing apparatus for reinforcing earing power of reinforced concrete structures by introducing prestress to entended section and repairing and reinforcing construction method using the apparatus
JP2008202251A (en) Reinforcing tool for concrete structure, and reinforcing structure and reinforcing construction method using the same
JPH0518120A (en) How to repair concrete skeleton
JP7222824B2 (en) Wall balustrade reinforcement method and reinforcement structure
JP3751258B2 (en) Reinforcement method for concrete structures
JP2001164504A (en) Repair execution method of joint section for viaduct
JP6995584B2 (en) Bearing replacement method for existing concrete girders
JP7595983B1 (en) Resin injection anchor and method for reinforcing concrete structures using same
JP2005023693A (en) How to repair incomplete grout
JP7363374B2 (en) Repair method for concrete structures
JP2521644B2 (en) Reinforcement method of concrete structure
CN112593493A (en) Construction method for void treatment structure at bottom of active bridge bearing platform
JP3455198B2 (en) Repair method for buried bars in concrete structures
CN221298401U (en) Shear force wall reinforcement protection layer thickness and reinforcement interval control assembly
JP3437818B2 (en) Construction method of post tension type prestressed concrete

Legal Events

Date Code Title Description
TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20040629

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20040727

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080806

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090806

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090806

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100806

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110806

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120806

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120806

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130806

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140806

Year of fee payment: 10

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term