Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP3591985B2 - Bolt supply device - Google Patents
[go: Go Back, main page]

JP3591985B2 - Bolt supply device - Google Patents

Bolt supply device Download PDF

Info

Publication number
JP3591985B2
JP3591985B2 JP14456796A JP14456796A JP3591985B2 JP 3591985 B2 JP3591985 B2 JP 3591985B2 JP 14456796 A JP14456796 A JP 14456796A JP 14456796 A JP14456796 A JP 14456796A JP 3591985 B2 JP3591985 B2 JP 3591985B2
Authority
JP
Japan
Prior art keywords
bolt
bolts
chuck
unit
pushed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP14456796A
Other languages
Japanese (ja)
Other versions
JPH09323228A (en
Inventor
好永 林本
琢磨 武田
文敬 勝又
一郎 真島
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sanyo Machine Works Ltd
Nissan Motor Co Ltd
Original Assignee
Sanyo Machine Works Ltd
Nissan Motor Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sanyo Machine Works Ltd, Nissan Motor Co Ltd filed Critical Sanyo Machine Works Ltd
Priority to JP14456796A priority Critical patent/JP3591985B2/en
Priority to KR1019970023467A priority patent/KR980000761A/en
Publication of JPH09323228A publication Critical patent/JPH09323228A/en
Application granted granted Critical
Publication of JP3591985B2 publication Critical patent/JP3591985B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23QDETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
    • B23Q7/00Arrangements for handling work specially combined with or arranged in, or specially adapted for use in connection with, machine tools, e.g. for conveying, loading, positioning, discharging, sorting
    • B23Q7/02Arrangements for handling work specially combined with or arranged in, or specially adapted for use in connection with, machine tools, e.g. for conveying, loading, positioning, discharging, sorting by means of drums or rotating tables or discs
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23QDETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
    • B23Q3/00Devices holding, supporting, or positioning work or tools, of a kind normally removable from the machine
    • B23Q3/18Devices holding, supporting, or positioning work or tools, of a kind normally removable from the machine for positioning only
    • B23Q3/186Aligning devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23QDETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
    • B23Q7/00Arrangements for handling work specially combined with or arranged in, or specially adapted for use in connection with, machine tools, e.g. for conveying, loading, positioning, discharging, sorting
    • B23Q7/06Arrangements for handling work specially combined with or arranged in, or specially adapted for use in connection with, machine tools, e.g. for conveying, loading, positioning, discharging, sorting by means of pushers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23QDETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
    • B23Q2707/00Automatic supply or removal of metal workpieces
    • B23Q2707/006Automatic supply or removal of metal workpieces for thread cutting, e.g. bolts or crews

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Automatic Assembly (AREA)
  • Branching, Merging, And Special Transfer Between Conveyors (AREA)
  • Feeding Of Articles To Conveyors (AREA)

Description

【0001】
【発明の属する技術分野】
この発明は、自動車エンジンの自動組立ライン等で使用されるボルト供給装置で、詳しくは、パーツフィーダ等で整列搬送されるボルトの複数個を所定の配列に整列させて、ボルト締めされるワークの所定の箇所に形成されたボルト挿通穴に一括して自動供給するボルト供給装置に関する。
【0002】
【従来の技術】
例えば、自動車の6気筒エンジン(V6エンジン)においては、図13に示されるように、1つのエンジンブロック1に一対の同一構造の3気筒式シリンダヘッド2、2’が並列に設置されて、夫々が8本のボルトで固定される。一対のシリンダヘッド2、2’には、各々縦横8箇所にボルト挿通穴3が形成され、この各ボルト挿通穴3にボルトを供給しておいてから、各シリンダヘッド2、2’がエンジンブロック1に装着されてボルト締めが行われる。
【0003】
上記のようなシリンダヘッドにボルトを自動供給する装置として、産業ロボットを使用した分配供給方式や、サーボモータを使用した供給シュート方式のものが知られている。前者のボルト供給装置は、ロボットアームを使ってボルト搬送機等からボルトを1個ずつ切り出してシリンダヘッドに直接に供給する、或いは、ロボットアームで切り出したボルトをダミープレート等に整列させてから、この整列させたボルトをシュート等を使ってシリンダヘッドに供給する。後者のボルト供給装置は、例えば直進フィーダで一列に整列搬送されてきたボルトをサーボモータを使って個々に直線切り式に切り出し、切り出したボルトを等ピッチ整列させてシュートを自重落下させ、シュート先端に在るシリンダヘッドのボルト挿通穴に供給する。
【0004】
【発明が解決しようとする課題】
上記の産業ロボットを使用した分配方式のボルト供給装置は、産業ロボット自体が高価で装置全体の設備費が高く付く問題と共に、V6エンジンの一対のシリンダヘッドへの計16本のボルト供給のように、1サイクルタイムで自動供給されるボルト数が多い場合、ボルトを1本ずつロボットアームで供給していては、全てのボルトをワークに供給し終わるまでの1サイクルタイムが長くなり、その時間短縮化が難しいという問題もあった。
【0005】
また、上記のサーボモータを使用した供給シュート方式のボルト供給装置においては、ワークのボルト挿通穴が等ピッチで一列に並ぶものであれば、直進フィーダから整列搬送されてくるボルトのピッチを一定にする簡単な機構を採用することで、設備的に有利に実施できる。しかし、図13のシリンダヘッド2、2’のようなワークのボルト挿通穴の配列が一列でない場合や、縦横で隣接するボルト挿通穴の配列ピッチが一定でない不等ピッチのような場合には(例えば図13でピッチPx≠Py)、そのボルト挿通穴の縦横の配列に応じたピッチ変更手段、ボルト整列変更手段等の複雑な機構を設置しなければならず、そのため、ボルト供給装置全体が複雑化して、結果的に高価なものとなる不具合があった。
【0006】
この発明の目的とするところは、ワークに所定の配列で形成されたボルト挿通穴にボルトを一括して自動供給可能にしてサイクルタイムを大幅に短縮し、かつ、ボルト供給装置自体の構造的な簡略化と低コスト化を図ることにある。
【0007】
【課題を解決するための手段】
この発明は、V6エンジンのシリンダヘッドのようなワークに4の整数倍の数で形成された各ボルト挿通穴にボルトを一括して自動供給するに有効なもので、次の構成にて上記目的を達成するものである。
【0008】
即ち、この発明は、頭部と軸部を有する複数のボルトを、各々の頭部を上に略鉛直にして一列に整列搬送する直線フィーダと、
直線フィーダの先端側に鉛直な中心線を中心に間欠回転可能に配置され、周辺部で直線フィーダからのボルトを1本ずつ切り出して4の整数倍の数のボルトを等ピッチで保持する割出しユニットと、
割出しユニットで保持された4の整数倍のボルトの正方形の頂点位置に在る4本のボルトが割出しユニットの間欠回転で定位置に移動すると、この4本を割出しユニットの上方に突き上げるプッシュロッドと、
割出しユニットの上方に横移動可能に配置され、上記プッシュロッドで突き上げられる4本のボルトの頭部に真上から自重で嵌合してプッシュロッドで突き上げられるボルトと共に上昇移動する押えロッドと、プッシュロッドで突き上げられ定位置まで上昇した4本のボルトを保持するチャック爪とを有するチャックユニットと、
チャックユニットを割出しユニットの上方定位置からボルトが供給されるワークの上方定位置の間で横移動させ、かつ、ワークの上方で上下移動させる駆動系とを具備する。
【0009】
上記発明のボルト供給装置においては、プッシュロッドで割出しユニットから突き上げた4本ずつのボルトを4本単位でチャックユニットに保持させてから、4本のボルトを保持したチャックユニットをワークの真上に移動させて降下させ、チャックユニットのチャック爪を開いて各ボルトを各々の押えロッドの自重を加えてワークのボルト挿通穴に一括して供給する。
【0010】
ここで、1台のチャックユニットにおけるチャック爪と押えロッドの設置箇所は、このチャックユニットが割出しユニットの真上に位置したときに、割出しユニットからプッシュロッドで突き上げられる4本のボルトの真上の4箇所で、各チャック爪でチャックされて保持されるボルトの中心線に同軸に押えロッドが上下動可能に設置される。
【0011】
以上の発明によるボルト供給装置で、ワークに4のN倍の数で形成された各ボルト挿通穴にボルトを一括して自動供給する場合には、N台のチャックユニットが使用され、このN台のチャックユニットに順に4本ずつのボルトが割出しユニットから切り出され、N台のチャックユニットが4本ずつのボルトを保持すると、このN台が同時に横移動してワークに4×Nの数のボルトを一括して自動供給する。
【0012】
また、この発明は、上記割出しユニットからプッシュロッドで突き上げられるボルトの軸線と、チャックユニットのチャック爪で保持されるボルトの軸線が偏心しているものにおいて、チャックユニットのチャック爪で保持されるボルトの軸線に同軸に押えロッドを上下動させると共に、割出しユニットに保持されてプッシュロッドで突き上げられるボルトの頭部とこの頭部に真上から嵌合する押えロッドの下端部との間に上記偏心量を吸収する偏心修正手段を形成し、押えロッドの下端部をボルト頭部に偏心させて嵌挿させた状態でボルトと押えロッドをプッシュロッドでチャックユニットへと上昇させる間に、偏心修正手段でボルトの軸線を押えロッドの軸線に一致させるようにしたことを特徴とする。
【0013】
即ち、割出しユニットからプッシュロッドで突き上げられる4本のボルトは、正方形の頂点位置に在る等ピッチ配列のものであるが、この等ピッチ配列とワークの4の整数倍のボルト挿通穴の配列が一致するとは限らない。ワークのボルト挿通穴の配列の直交2方向(X,Y)の穴間ピッチは、X方向とY方向で異なるのが普通である。ボルト挿通穴の配列ピッチと、割出しユニットから突き上げられるボルトの配列ピッチとが若干ずれていると、割出しユニットからプッシュロッドで突き上げられるボルトの軸線と、チャックユニットのチャック爪で保持されるボルトの軸線が偏心する。そこで、割出しユニットから突き上げられるボルトの頭部と、この頭部に嵌合する押えロッドの下端部の間に偏心量吸収用の偏心修正手段を形成して、ボルトがチャックユニットまで突き上げられる間に偏心修正手段でボルトの軸線位置を変更させて、4本のボルトの配列ピッチを自動修正させる。
【0014】
また、この発明においては、上記各チャックユニットに保持されたボルトをワークのボルト挿通穴に自重落下で供給するときの、ボルトと共に自重降下する押えロッドの降下の有無を検出してボルト供給の有無判定信号を出力するセンサーを各チャックユニットに付設する。このようにすると、押えロッドの位置確認でワークへのボルト装着の有無や良否の確認が容易にでき、ボルト自動供給の信頼性が確保される。
【0015】
【発明の実施の形態】
以下、本発明を、図13の一対の同一構造のシリンダヘッド2、2’の各8箇所のボルト挿通穴3に一括してボルト5を自動供給する装置に適用した一実施例を、図1乃至図12を参照して説明する。
【0016】
図1の平面図に示されるボルト供給装置は、一対のシリンダヘッド2、2’に対応させた一対のボルト移送系10、10から成る。一対のボルト移送系10、10は同一構造で、以下、一方のボルト移送系10を主体に説明する。
【0017】
ボルト移送系10は、図2及び図3に示すような構造で、パーツフィーダ11から直進フィーダ12に送られて一列に整列搬送されるボルト5を割出しユニット13で1本ずつ切り出して8本を等ピッチで整列させ、この8本の内の4本ずつをプッシュロッド17で突き上げて一対のチャックユニット20、20に移し替え、一対のチャックユニット20、20で8本のボルト5をシリンダヘッド2の対応するボルト挿通穴3に一括供給する。一対のチャックユニット20、20の各々は、ボルト5を4本単位で鉛直に保持して水平及び上下移動させるもので、各々が4本ずつのボルト5を保持するチャック爪21と、チャック爪21で保持されるボルト5上に乗り掛かる押えロッド22を備える。一対のチャックユニット20、20は、駆動系40にて同時に一体的に上下移動及び水平移動させられて、割出しユニット13からのボルト受け取り動作と、シリンダヘッド2へのボルト供給動作をする。
【0018】
ここで、一対のチャックユニット20、20の水平移動方向をX方向、このX方向と直交する水平方向をY方向、鉛直方向をZ方向とすると、各チャックユニット20、20を駆動させる駆動系40は、例えば3つの駆動源の第1、第2、第3シリンダ41、42、43を備える。各チャックユニット20、20は、X方向に水平なシフトスライド44にX方向に直列に支持され、かつ、シフトスライド44に設置した第1シリンダ41にて各チャックユニット20、20はシフトスライド44に対してX方向に相対移動可能に支持される。シフトスライド44は、X方向に水平なシフトレール45にX方向に相対移動可能に支持される。シフトレール45に設置された第2シリンダ42で、シフトスライド44とこれに支持された一対のチャックユニット20、20がシフトレール45に対してX方向に往復移動される。第2シリンダ42は、一対のボルト移送系10、10の各々のシフトレール45、45に対して共通の1基が設置される。第3シリンダ43は固定フレーム46にZ方向に設置されて、一対のボルト移送系10、10の各々のシフトレール45、45を同時に上下動させる。
【0019】
即ち、一対のチャックユニット20、20は、第1シリンダ41によって割出しユニット13の真上の定位置Bに交互に送られ、この定位置Bで割出しユニット13から4本のボルト5を受け取る。また、一対のチャックユニット20、20は、第2シリンダ42でもって定位置Bとこの定位置Bの側方近くに搬入されたシリンダヘッド2の真上の定位置Cの間をX方向に定ストロークで往復移動する。また、一対のチャックユニット20、20がシリンダヘッド2の真上の定位置Cに水平移動すると、第3シリンダ43が作動して全体が下降し、チャックユニット20、20に保持された8本のボルト5が定位置Dに設置されたシリンダヘッド2のボルト挿通穴3に一括して供給される。このボルト供給は、一対のボルト移送系10、10の両方で同時に行われて、一対のシリンダヘッド2、2’に計16本のボルト5が一括して供給される。
【0020】
図4および図5に示すように、パーツフィーダ11から直線フィーダ12に供給されるボルト5は、大径の頭部5aと小径の軸部である首部5b及びネジ部5cを有し、首部5bに頭部5aより大径のワッシャ6が頭部5aとネジ部5cの間で摺動可能に嵌挿される。ボルト5は直進フィーダ12に頭部5aとワッシャ6を上にして略鉛直に吊下支持され、そのままの状態で複数が一列に整列搬送される。直進フィーダ12の先端の定位置Aに割出しユニット13が水平に設置され、割出しユニット13の真下にプッシュロッド17が上下動可能に配置される。
【0021】
割出しユニット13は、直進フィーダ12からボルト5を1本ずつ切り出して、その周縁部に計8本のボルト5を等ピッチで鉛直に保持するもので、固定された円筒状のガイド筒14と、ガイド筒14の内周に沿って間欠回転する割出しロータ15と、割出しロータ15を45゜の定角度で間欠回転させる回転駆動源(図示せず)を備える。割出しロータ15の外周の45゜間隔の8箇所に切欠き16が形成され、割出しロータ15が45゜ずつ間欠回転する毎に直進フィーダ12の先端からボルト5が1本ずつ切欠き16に送り込まれる。切欠き16にボルト5の首部5bから下が嵌挿され、頭部5aとワッシャ6が切欠き16上に露出する。
【0022】
割出しロータ15の回転でボルト5は切欠き16と共にガイド筒14の内周に沿って移動し、割出しロータ15が45゜×7=315゜間欠回転したところで、8箇所の全ての切欠き16にボルト5が1本ずつ嵌挿されて、計8本のボルト5の等ピッチ割出しが行われる。この8本のボルト割出しが行われた段階で割出しロータ15の回転が停止して、割出された8本のボルト5が4本ずつ2回に分けて割出しユニット13からプッシュロッド17で突き上げられる。
【0023】
プッシュロッド17は、正方形配列で4本一組で鉛直上向きに突設配置され、割出しユニット13の側方にZ方向に設置された上下シリンダ18で4本一組でZ方向に定ストローク上下駆動される。4本のプッシュロッド17は、割出しユニット13に保持された8本のボルト5の内の正方形の頂点位置に在る4本が割出しロータ15の45゜間欠回転で同時移動する所定の4ボルト取出し箇所Q 〜Q の真下に配置される。
【0024】
即ち、図6に割出しユニット13で等ピッチ割出しされた8本のボルト5と、シリンダヘッド2のボルト挿通穴3の配列の寸法関係例を示し、これを説明すると、割出しユニット13で等ピッチ割出しされた8本のボルト5の内の1本置きの正方形の頂点位置に在る4本は等ピッチPで配列される。この場合、4本のプッシュロッド17は、割出しロータ15の4ボルト取出し箇所Q 〜Q の真下に同一高さで等ピッチPでもって配置される。ここで、シリンダヘッド2の8個のボルト挿通穴3のX方向での中心間距離である配列ピッチをPx、Y方向での中心間距離である配列ピッチをPyとすると、PはPxとPyのいずれかに等しく設定され、この場合、PとPxとPy間には次の▲1▼、▲2▼、▲3▼の3種類の寸法関係が可能である。
【0025】
P=Px=Py・・・・・▲1▼
P≠Px、P=Py・・・▲2▼
P=Px、P≠Py・・・▲3▼
▲1▼式の寸法関係の場合は、割出しユニット13に対して各チャックユニット20、20のチャック爪21と押えロッド22が等ピッチPで設置され、割出しユニット13からボルト5が4本ずつ等ピッチPのまま各チャックユニット20、20に供給され、等ピッチPのままシリンダヘッド2のボルト挿通穴3に供給される。
【0026】
▲2▼式と▲3▼式の場合は、各チャックユニット20、20のチャック爪21により4箇所のボルト保持位置の配列ピッチと4本の押えロッド22の配列ピッチをシリンダヘッド2に合わせてPxとPyの不等ピッチに設定される。以下、例えば▲2▼式の場合について、チャックユニット20、20の構造例と動作を図7乃至図11に基づき説明する。
【0027】
一対のチャックユニット20、20は同一構造で、その一方を図7乃至図11を参照して説明すると、チャックユニット20は、シフトスライド44に支持される枠状のユニット本体23と、ユニット本体23の下面に設置されたチャック爪21と、ユニット本体23をZ方向に貫通する4本の押えロッド22を備える。また、チャックユニット20は、ユニット本体23における4本の押えロッド22の高さ位置を検出するボルト装着確認用センサー24を備える。
【0028】
図7及び図8にチャック爪21の具体例を示すと、これは略十文字形の一対の水平な旋回爪27、28と、一対の旋回爪27、28を同時に反対方向に回転させる開閉シリンダ29を備える。一方の旋回爪27の中央部が内軸30に支持され、他の旋回爪28の中央部が内軸30と偏心して内軸30を囲繞する外軸31に支持され、各旋回爪27、28は各々の内軸30と外軸31を支点に回転する。略十文字状の各旋回爪27、28の4つの先端部の内側に、ボルト5を1本ずつ挟持して定位置に鉛直に保持するV形等のチャック面m、nが形成される。
【0029】
開閉シリンダ29で一対の旋回爪27、28を閉じると、各4箇所のチャック面m、nで4本のボルト5が同時に挟持される。このときの4本のボルト5は、X方向とY方向の矩形配列で、その各配列ピッチはPxとPyに設定される。また、開閉シリンダ29で一対の旋回爪27、28を開くと、各4箇所のチャック面m、nの間に、図9と図10に示すように、ボルト5の頭部5aが貫通するがワッシャ6は通らないだけの間隙gが形成され、この間隙gに真下から割出しユニット13から突き上げられたボルト5が挿通される。
【0030】
また、開いた一対の旋回爪27、28の各4箇所のチャック面m、nの間隙gの各々に、各間隙gの中心線に軸線を整合させた押えロッド22が配置される。4本の押えロッド22は、ユニット本体23にZ方向に自由移動可能に遊嵌されるもので、例えば図11に示すように、上端部に大径の円柱状ウエイト32を有し、ウエイト32の下端がユニット本体23上に当接する下限位置(図11鎖線位置)と、ウエイト32がユニット本体23から上方に所定高さ突出する上限位置(図11実線位置)との間で自由に上下移動する。尚、図9乃至図11には、X方向で隣接する2本の押えロッド22を示している。この2本の押えロッド22の中心線の配列ピッチはPxである。
【0031】
一対のチャックユニット20、20の一方が割出しユニット13の真上の定位置Bに移動したとき、このチャックユニット20の4本の押えロッド22は、割出しユニット13のボルト取出し箇所Q 〜Q の真上に位置する。このとき、チャック爪21は開き、各押えロッド22はユニット本体23に対して下限位置に在って、各押えロッド22の下端部22’が開いたチャック爪21から下がり、割出しユニット13のボルト取出し箇所Q 〜Q のボルト5の真上近くに位置する。ここで、ボルト取出し箇所Q 〜Q の4本のボルト5の内のX方向で隣接する2本の配列ピッチPと、その真上の押えロッド22の配列ピッチPxが上記▲2▼式のようにP≠Pxと相違して、上下で対応するボルト5と押えロッド22の中心線が段違い的に偏心する。この偏心量は、図10に示すように、P<Pxとすると(Px−P)/2に相当し、通常の偏心量は数mm程度である。
【0032】
割出しユニット13から1つのチャックユニット20への4本のボルト5の供給は、次の要領で行われる。割出しユニット13で8本のボルト5を等ピッチで割出して、その内のボルト取出し箇所Q 〜Q の4本のボルト5をプッシュロッド17で突き上げ、少し突き上げた状態で各ボルト5の頭部5aに対応する押えロッド22の下端部22’を嵌挿させ、以後、プッシュロッド17でボルト5と押えロッド22をユニット本体23に向けて突き上げる。突き上げられたボルト5の首部5bが開いたチャック爪21のチャック面m、nの間隙gの位置に達した時点で、チャック爪21を閉じて4本のボルト5を同時にチャックし、プッシュロッド17を下降させる。
【0033】
上記動作のように、4本の各ボルト5を上下からプッシュロッド17と押えロッド22で挾んだ状態で突き上げると、ボルト5が押えロッド22によってガイドないし支持された状態で正確にZ方向に突き上げられ、上昇途中で脱落する心配が無くて動作が安定する。このため、特に長尺のボルト5でも上昇途中にボルト5が傾斜することがない。また、開いたチャック爪21のチャック面m、nの間隙gを、ボルト5のワッシャ6の外径より小さくすることで、間隙gにボルト5が突き上げられたときに、チャック面m、nの下端がワッシャ6に当接してワッシャ6を確実にネジ部5cの位置まで相対的に押し下げるので、ボルト5のチャックがワッシャ6で邪魔されること無く確実に行われる。
【0034】
また、上記動作において、X方向で隣接する2本ずつのボルト5と押えロッド22の双方の配列ピッチP、Pxが相違して、この上下2本が偏心した位置に在るので、単にボルト5を鉛直に突き上げると頭部5aがチャック爪21に当たってチャックされない動作ミスや、チャック爪21等が損傷するトラブルが発生する可能性がある。そこで、かかる偏心によるトラブル発生を防止するために、この発明においては、ボルト5の頭部5aと押えロッド22の下端部22’の相互間に偏心修正手段35を形成する。
【0035】
偏心修正手段35は、例えば図10の下半分の図面に示すように、ボルト5の頭部5aの上面中央部に形成されたレンチ用角穴36と、押えロッド22の下端部22’の下面に形成した円錐状の突起37で構成される。ボルト5がプッシュロッド17で突き上げられたときに、頭部5aの角穴36の上端エッジに押えロッド22の突起37のテーパ面が当接し、このとき角穴36の中心線と突起37の中心線が偏心量(Px−P)/2で偏心するように、角穴36の突起37の形状が設定される。
【0036】
偏心したボルト5と押えロッド22が当接し、この両者が一体となってプッシュロッド17によりZ方向に突き上げられ、ボルト5が割出しユニット13から上昇するにつれて頭部5aの角穴36が突起37のテーパ面を滑り、頭部5aの中心がX方向の外方向に移動し、最後に図11の上半分の図面に示すように、頭部5aの中心と突起37の中心が一致して、上限まで突き上げられたボルト5とその上の押えロッド22の中心線が一致し、X方向で隣接する2本のボルト5の配列ピッチがPxに自動修正される。この直後にチャック爪21が閉じて、4本のボルト5がチャックユニット20に保持される。
【0037】
一対のチャックユニット20、20の一方が割出しユニット13から4本のボルト5を受け取ると、割出しユニット13が45゜間欠回転し、一対のチャックユニット20、20がX方向に移動して残りの一方が割出しユニット13の真上の定位置Bに移動し、割出しユニット13から4本のボルト5を受け取る。この後、一対のチャックユニット20、20がシリンダヘッド2の真上の定位置Cに水平移動して下降し、図11の鎖線で示すように、チャック爪21で保持されたボルト5の下端がシリンダヘッド2の対応するボルト挿通穴3に入るか接近するとチャック爪21が開く。これにより、ボルト5は自らの自重と押えロッド22の自重でもってボルト挿通穴3へと自重落下にて供給される。
【0038】
以上のように、一対のチャックユニット20、20で計8本のボルト5を保持したまま降下させて、各々を押えロッド22を利用してシリンダヘッド2の計8個のボルト挿通穴3に一括して自重落下させることにより、一度に多数のボルト供給が可能となり、ボルト供給のサイクルタイムの短縮化が可能となる。また、押えロッド22の重量でボルト5をボルト挿通穴3に強制的に挿入するため、ボルト供給ミスが減少し、ボルト供給動作の信頼性が高くなる。
【0039】
また、シリンダヘッド2のボルト挿通穴3に正常に供給されたボルト5の押えロッド22は、ボルト5と共に下降してユニット本体23に対して下限位置に在り、この押えロッド22のウエイト32が図11の鎖線で示す位置に下がる。そこで、ユニット本体23に設置したセンサー24でウエイト32の上限位置又は下限位置を検出するようにする。例えば、図11に示されるセンサー24は、投光器25と受光器26で構成され、投光器25と受光器26を結ぶ光軸27がウエイト32を横切る所定の高さに設定される。
【0040】
即ち、ウエイト32が下限位置まで下がると、光軸27からウエイト32が外れて投光器25の光が受光器26に受光されて、ボルト5の正常な供給が確認される。ボルト5がボルト挿通穴3に引っ掛かる等して正常に挿通されない供給不良が発生した場合、この供給不良ボルト5と共に押えロッド22も正常に下降せず、そのウエイト32が光軸27を遮ったままとなって、受光器26が受光せず、ボルト5の供給不良が確認される。このような押えロッド22とセンサー24を使ったボルト供給の良否等の確認動作は、ボルト5の位置を直接に検出して行う確認動作よりも確実性に優れ、また、確認のためのセンサー類の設置場所が広い範囲で選択できる設計上の有利さもある。
【0041】
以上の実施例においては、図1に示す一対の同一構成であるボルト移送系10、10が、上記したような同一の動作をして、一対のシリンダヘッド2、2’に8本ずつの計16本のボルト5を同時供給する。このボルト供給装置でボルト自動供給を受ける一対のシリンダヘッド2、2’の定位置Dでの搬入搬出は、例えば図12に示すように行われる。
【0042】
一対のシリンダヘッド2、2’を、V6エンジンの左シリンダヘッド2と右シリンダヘッド2’に分け、各々を個々のパレット4に1台ずつ乗せる。各パレット4には、その上の右半分に右シリンダヘッド2が乗せられ、左半分に左シリンダヘッド2’が乗せられる。これらパレット4の多数を、左シリンダヘッド2搭載パレット4と右シリンダヘッド搭載パレット4を交互にして水平な搬送路7上で一列に整列搬送させる。搬送路7の先端が上記した定位置Dに相当し、この先端位置に右シリンダヘッド2を乗せたパレット4が搬入されるとこれを停止させる。そして、後続のパレットで左シリンダヘッド2’を乗せたパレット4の一番先頭にあるものを、図12の矢印で示すように横スライドさせて前進させ、搬送路7の先端の右シリンダヘッド2のパレット4の真横に並べて停止させる。
【0043】
搬送路7の先端で横並びした2枚のパレット4、4の上の一対のシリンダヘッド2、2’にボルト供給が行われると、これを搬出して、搬送路7の先端に次の右シリンダヘッド2を乗せたパレット4を移動させて、上記動作を繰り返し行う。
【0044】
尚、この発明におけるボルト供給の対象となるワークは自動車エンジンのシリンダヘッドに限らず、要は縦横の配列で4の整数倍のボルト挿通穴を有するワークであれば適用可能である。
【0045】
【発明の効果】
請求項1記載のボルト供給装置によれば、割出しユニットで等ピッチ割出しされた4の整数倍のボルトを4本ずつチャックユニットで保持し、4本ずつのボルトを保持した複数のチャックユニットを移動させて、4の整数倍のボルトを対応するワークのボルト挿通穴に一括して供給するようにしたから、1回のボルト供給数が多くなるほど1回のボルト供給のサイクルタイムが短縮される。また、チャックユニットに保持されたボルトを押えロッドの自重を利用してワークのボルト挿通穴に自重落下させて供給するようにしたから、ボルト供給動作が押えロッドで確実性良く行えるようになり、高信頼性のボルト供給装置が提供できる。更に、ボルトを4本単位で移送等する割出しユニットやチャックユニットは、簡単で確実な動作をする機構のものが適用できて、ボルト供給装置の設備費の低減化が可能となる。
【0046】
請求項2記載のボルト供給装置によれば、割出しユニットで割出されたボルトの配列ピッチとワークのボルト挿通穴の配列ピッチが不等ピッチで相違していても、割出しユニットからプッシュロッドで4本一組のボルトをチャックユニットまで突き上げる間に、ボルト頭部と押えロッドの間に形成した偏心修正手段でもってボルトが不等ピッチに自動修正されるので、ワークの不等ピッチのボルト挿通穴へのボルト自動供給も可能となり、汎用性の高いボルト供給装置が提供できる。また、上記の偏心修正手段は、ボルト頭部の既存の穴と押えロッド下端部のテーパ突起のような形状簡単なもので構成できるから設備的に有利である。
【0047】
請求項3記載のボルト供給装置によれば、ワークのボルト挿通穴にボルトを自重落下させるときに押えロッドがボルトと共に下降するため、この押えロッドの位置をセンサーで確認することで、ボルト装着の有無、良否の確実な確認ができるようになり、ボルト供給装置の尚一層の信頼性向上が図れる。
【図面の簡単な説明】
【図1】この発明の一実施例を示すボルト供給装置の平面図。
【図2】図1装置の側面図。
【図3】図1装置によるボルト移送形態を示す斜視図。
【図4】図2装置における割出しユニットの平面図。
【図5】図4の割出しユニットの部分断面を含む要部の側面図。
【図6】図4の割出しユニットにおけるボルトの配列ピッチをワーク(シリンダヘッド)のボルト挿通穴の配列ピッチの関係を示す平面図。
【図7】図2装置におけるチャックユニットのチャック爪の部分断面を含む下面図。
【図8】図7のチャック爪の側面図。
【図9】図2装置における割出しユニットとチャックユニットの関係を示す要部の側面図。
【図10】図9の割出しユニットからチャックユニットに上昇するボルトの軌道修正を説明するための各上下位置でのボルトと押えロッドの拡大側面図。
【図11】図2装置におけるチャックユニットのボルト装着時での要部の側面図。
【図12】図1装置でボルト供給を受ける一対のワーク(シリンダヘッド)の搬送形態を示す平面図。
【図13】ボルト供給を受ける一対のワーク(シリンダヘッド)の平面図。
【符号の説明】
2、2’ ワーク(シリンダヘッド)
3 ボルト挿通穴
5 ボルト
5a 頭部
12 直進フィーダ
13 割出しユニット
17 プッシュロッド
20 チャックユニット
21 チャック爪
22 押えロッド
24 センサー
35 偏心修正手段
40 駆動系
[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to a bolt supply device used in an automatic assembly line of an automobile engine or the like. More specifically, a plurality of bolts that are aligned and conveyed by a parts feeder or the like are aligned in a predetermined arrangement, and a work for bolting a workpiece is bolted. The present invention relates to a bolt supply device that automatically supplies a bolt to a bolt insertion hole formed at a predetermined location.
[0002]
[Prior art]
For example, in a six-cylinder engine (V6 engine) of an automobile, as shown in FIG. 13, a pair of three-cylinder cylinder heads 2 and 2 ′ having the same structure are installed in one engine block 1 in parallel, and Are fixed with eight bolts. Each of the pair of cylinder heads 2, 2 ′ has bolt insertion holes 3 formed at eight locations in the vertical and horizontal directions. After bolts are supplied to the respective bolt insertion holes 3, each cylinder head 2, 2 ′ is mounted on the engine block. 1 and bolted.
[0003]
As a device for automatically supplying bolts to the cylinder head as described above, a distribution supply system using an industrial robot and a supply chute system using a servomotor are known. The former bolt supply device uses a robot arm to cut out bolts one by one from a bolt carrier or the like and supplies the bolts directly to the cylinder head, or after aligning the bolts cut out by the robot arm on a dummy plate or the like, The aligned bolts are supplied to the cylinder head using a chute or the like. The latter bolt supply device, for example, uses a servomotor to individually cut out the bolts that have been lined up and conveyed in a straight line using a straight-ahead feeder, aligns the cut out bolts at equal pitches, drops the chute under its own weight, To the bolt insertion hole of the cylinder head located at
[0004]
[Problems to be solved by the invention]
The distribution type bolt supply device using the industrial robot described above has a problem that the industrial robot itself is expensive and the equipment cost of the whole device is high, and also a supply of a total of 16 bolts to a pair of cylinder heads of a V6 engine. If the number of bolts automatically supplied in one cycle time is large, if one bolt is supplied by the robot arm one by one, the one cycle time until all bolts are supplied to the work will be longer and the time will be shortened. There was also a problem that conversion was difficult.
[0005]
In the supply chute type bolt supply device using the above servomotor, if the bolt insertion holes of the work are arranged in a line at an equal pitch, the pitch of the bolts conveyed from the linear feeder is made constant. By adopting a simple mechanism to perform the above, it can be implemented advantageously in terms of equipment. However, in the case where the arrangement of the bolt insertion holes of the work such as the cylinder heads 2 and 2 ′ in FIG. 13 is not one line, or in the case where the arrangement pitch of the vertically and horizontally adjacent bolt insertion holes is not constant, ( For example, a complicated mechanism such as a pitch changing means and a bolt alignment changing means corresponding to the pitch Px ≠ Py in FIG. 13 and the vertical and horizontal arrangement of the bolt insertion holes must be installed, and therefore, the entire bolt supply device is complicated. There is a problem that the cost increases as a result.
[0006]
An object of the present invention is to make it possible to automatically and collectively supply bolts to bolt insertion holes formed in a predetermined arrangement on a work, to greatly reduce cycle time, and to reduce structural problems of a bolt supply device itself. An object is to simplify and reduce costs.
[0007]
[Means for Solving the Problems]
The present invention is effective for automatically and collectively supplying bolts to respective bolt insertion holes formed in integral multiples of four on a work such as a cylinder head of a V6 engine. Is to achieve.
[0008]
That is, the present invention provides a linear feeder that aligns and conveys a plurality of bolts having a head and a shaft in a line with each head substantially vertically upward,
An indexer that is arranged at the end of the linear feeder so as to be intermittently rotatable around a vertical center line, cuts out the bolts from the linear feeder one by one at the periphery, and holds an integral multiple of 4 bolts at equal pitch Unit and
When the four bolts at the vertex positions of the squares of the integral multiple of four bolts held by the indexing unit are moved to the fixed position by the intermittent rotation of the indexing unit, these four bolts are pushed up above the indexing unit. A push rod,
A holding rod that is arranged to be able to move laterally above the indexing unit, fits with the head of the four bolts pushed up by the push rod by its own weight from directly above, and moves up with the bolt pushed up by the push rod; A chuck unit having a chuck jaw for holding four bolts pushed up by a push rod and raised to a fixed position;
A drive system for moving the chuck unit laterally from a fixed position above the indexing unit to a fixed position above the work to which the bolt is supplied, and moving the chuck unit up and down above the work.
[0009]
In the bolt supply device according to the invention, the four bolts pushed up from the indexing unit by the push rod are held by the chuck unit in units of four, and then the chuck unit holding the four bolts is placed directly above the work. Then, the chuck jaws of the chuck unit are opened, and the bolts are supplied to the bolt insertion holes of the work at once by adding the weight of each holding rod.
[0010]
Here, the installation position of the chuck jaws and the holding rod in one chuck unit is based on the four bolts pushed up by the push rod from the indexing unit when the chuck unit is located directly above the indexing unit. At the upper four positions, a holding rod is installed so as to be able to move up and down coaxially with the center line of the bolt that is chucked and held by each chuck claw.
[0011]
In the bolt supply apparatus according to the above invention, when automatically supplying bolts to the bolt insertion holes formed in the workpiece N times as many as 4 times, N chuck units are used, and the N chuck units are used. When four bolts are sequentially cut out from the indexing unit in the chuck unit of N, and N chuck units hold four bolts at a time, the N units simultaneously move sideways, and a work of 4 × N is added to the work. Automatically supply bolts all at once.
[0012]
Further, according to the present invention, when the axis of the bolt pushed up by the push rod from the indexing unit and the axis of the bolt held by the chuck jaws of the chuck unit are eccentric, the bolt held by the chuck jaws of the chuck unit The holding rod is moved up and down coaxially with the axis of the bolt, and the head is held between the indexing unit and pushed up by the push rod and the lower end of the holding rod fitted to the head from directly above the head. Forming eccentricity correcting means to absorb the amount of eccentricity, eccentricity correction while raising the bolt and the holding rod to the chuck unit with the push rod with the lower end of the holding rod eccentric to the bolt head and inserted. It is characterized in that the axis of the bolt is made to coincide with the axis of the holding rod by means.
[0013]
That is, the four bolts pushed up by the push rod from the indexing unit are of a regular pitch arrangement at the apex position of the square, and the regular pitch arrangement and the arrangement of the bolt insertion holes of an integral multiple of 4 of the work. Does not always match. The pitch between the holes in the two orthogonal directions (X, Y) of the arrangement of the bolt insertion holes of the work is generally different between the X direction and the Y direction. If the arrangement pitch of the bolt insertion holes and the arrangement pitch of the bolts pushed up from the indexing unit are slightly shifted, the axis of the bolt pushed up by the push rod from the indexing unit and the bolt held by the chuck jaws of the chuck unit Axis is eccentric. Therefore, eccentricity correcting means for absorbing the eccentricity is formed between the head of the bolt pushed up from the indexing unit and the lower end of the presser rod fitted to the head, so that the bolt is pushed up to the chuck unit. Then, the eccentricity correcting means changes the axial position of the bolts to automatically correct the arrangement pitch of the four bolts.
[0014]
Further, in the present invention, when the bolt held by each of the chuck units is supplied to the bolt insertion hole of the work by its own weight, the presence or absence of the bolt supply is detected by detecting whether or not the holding rod that descends with the bolt by its own weight is dropped. A sensor for outputting a judgment signal is attached to each chuck unit. By doing so, it is easy to confirm whether or not the bolt is attached to the work by checking the position of the holding rod, and the reliability of automatic bolt supply is ensured.
[0015]
BEST MODE FOR CARRYING OUT THE INVENTION
An embodiment in which the present invention is applied to an apparatus for automatically supplying bolts 5 to eight bolt insertion holes 3 of each of a pair of cylinder heads 2 and 2 'having the same structure in FIG. This will be described with reference to FIGS.
[0016]
The bolt supply device shown in the plan view of FIG. 1 includes a pair of bolt transfer systems 10, 10 corresponding to a pair of cylinder heads 2, 2 '. The pair of bolt transfer systems 10, 10 have the same structure, and one of the bolt transfer systems 10 will be mainly described below.
[0017]
The bolt transfer system 10 has a structure as shown in FIG. 2 and FIG. 3, and the indexing unit 13 cuts out eight bolts 5 sent from the parts feeder 11 to the straight-ahead feeder 12 and conveyed in a line. Are arranged at equal pitches, four of these eight are pushed up by the push rod 17 and transferred to the pair of chuck units 20, 20, and the eight bolts 5 are moved by the pair of chuck units 20, 20 to the cylinder head. 2 are supplied collectively to the corresponding bolt insertion holes 3. Each of the pair of chuck units 20 and 20 vertically and horizontally moves the bolt 5 in units of four bolts, and each of the chuck jaws 21 holds four bolts 5, and the chuck jaws 21. And a holding rod 22 that rides on the bolt 5 held by the holding member. The pair of chuck units 20, 20 are simultaneously moved up and down and horizontally by the drive system 40 simultaneously to perform a bolt receiving operation from the indexing unit 13 and a bolt supplying operation to the cylinder head 2.
[0018]
Here, assuming that a horizontal movement direction of the pair of chuck units 20, 20 is an X direction, a horizontal direction orthogonal to the X direction is a Y direction, and a vertical direction is a Z direction, a driving system 40 for driving the chuck units 20, 20 is provided. Includes, for example, first, second, and third cylinders 41, 42, and 43 of three drive sources. Each chuck unit 20, 20 is supported in series in the X direction on a shift slide 44 that is horizontal in the X direction, and each chuck unit 20, 20 is attached to the shift slide 44 by a first cylinder 41 installed on the shift slide 44. It is supported so as to be relatively movable in the X direction. The shift slide 44 is supported by a shift rail 45 horizontal in the X direction so as to be relatively movable in the X direction. The shift slide 44 and the pair of chuck units 20 and 20 supported by the shift slide 44 are reciprocated in the X direction with respect to the shift rail 45 by the second cylinder 42 installed on the shift rail 45. One common second cylinder 42 is installed for each shift rail 45, 45 of the pair of bolt transfer systems 10, 10. The third cylinder 43 is mounted on the fixed frame 46 in the Z direction, and simultaneously moves the respective shift rails 45 of the pair of bolt transfer systems 10, 10 up and down.
[0019]
That is, the pair of chuck units 20 and 20 are alternately sent to the fixed position B directly above the indexing unit 13 by the first cylinder 41, and receive the four bolts 5 from the indexing unit 13 at the fixed position B. . Further, the pair of chuck units 20 and 20 are fixed in the X direction between the fixed position B by the second cylinder 42 and the fixed position C just above the cylinder head 2 loaded near the side of the fixed position B. Reciprocates with a stroke. Further, when the pair of chuck units 20 and 20 move horizontally to the fixed position C directly above the cylinder head 2, the third cylinder 43 is operated and the whole is lowered, and the eight cylinder units held by the chuck units 20 and 20 are moved. The bolts 5 are collectively supplied to the bolt insertion holes 3 of the cylinder head 2 installed at the fixed position D. This bolt supply is performed simultaneously by both the pair of bolt transfer systems 10 and 10, and a total of 16 bolts 5 are collectively supplied to the pair of cylinder heads 2 and 2 '.
[0020]
As shown in FIGS. 4 and 5, the bolt 5 supplied from the parts feeder 11 to the linear feeder 12 has a large-diameter head 5a, a small-diameter shaft portion 5b and a screw portion 5c, and a neck portion 5b. A washer 6 having a larger diameter than the head 5a is slidably fitted between the head 5a and the screw portion 5c. The bolts 5 are suspended and supported substantially vertically by the straight feeder 12 with the head 5a and the washer 6 facing upward, and a plurality of the bolts 5 are aligned and conveyed as they are. An indexing unit 13 is horizontally installed at a fixed position A at the tip of the linear feeder 12, and a push rod 17 is disposed directly below the indexing unit 13 so as to be vertically movable.
[0021]
The indexing unit 13 cuts out the bolts 5 one by one from the rectilinear feeder 12 and holds a total of eight bolts 5 on the peripheral edge thereof at a uniform pitch. And an index rotor 15 intermittently rotating along the inner circumference of the guide cylinder 14, and a rotation drive source (not shown) for intermittently rotating the index rotor 15 at a constant angle of 45 °. Notches 16 are formed at eight positions at 45 ° intervals on the outer periphery of the indexing rotor 15, and each time the indexing rotor 15 rotates intermittently by 45 °, one bolt 5 is inserted into the notch 16 from the tip of the linear feeder 12. Sent in. The lower part of the bolt 5 is inserted into the notch 16 from the neck 5 b, and the head 5 a and the washer 6 are exposed on the notch 16.
[0022]
With the rotation of the indexing rotor 15, the bolt 5 moves along with the notch 16 along the inner circumference of the guide cylinder 14, and when the indexing rotor 15 rotates intermittently by 45 ° × 7 = 315 °, all eight notches are formed. The bolts 5 are inserted into the bolts 16 one by one, and a total of eight bolts 5 are indexed at the same pitch. At the stage when the eight bolts have been indexed, the rotation of the indexing rotor 15 is stopped, and the indexed eight bolts 5 are divided into two, four by two, from the indexing unit 13 to the push rod 17. Is pushed up.
[0023]
The four push rods 17 are arranged in a square arrangement and project vertically upward in a set of four, and a set of four push rods 17 is provided at the side of the indexing unit 13 in the Z direction. Driven. The four push rods 17 are provided at predetermined positions where four of the eight bolts 5 held at the indexing unit 13 at the apexes of the squares are simultaneously moved by the 45 ° intermittent rotation of the indexing rotor 15. Bolt extraction location Q 1 ~ Q 4 Is placed directly below.
[0024]
That is, FIG. 6 shows an example of the dimensional relationship between the arrangement of the eight bolts 5 indexed at equal pitches by the indexing unit 13 and the bolt insertion holes 3 of the cylinder head 2. Of the eight bolts 5 indexed at the same pitch, four bolts located at the apexes of every other square are arranged at the same pitch P. In this case, the four push rods 17 are connected to the four bolt take-out points Q of the index rotor 15. 1 ~ Q 4 Are placed at the same height and at the same pitch P directly below the Here, assuming that the arrangement pitch, which is the center distance in the X direction, of the eight bolt insertion holes 3 of the cylinder head 2 is Px, and the arrangement pitch, which is the center distance in the Y direction, is Py, P is Px and Py. In this case, the following three dimensional relationships (1), (2), and (3) are possible between P, Px, and Py.
[0025]
P = Px = Py ... 1
P ≠ Px, P = Py (2)
P = Px, P ≠ Py ... (3)
In the case of the dimensional relationship of the formula (1), the chuck claws 21 and the holding rods 22 of the chuck units 20 and 20 are installed at an equal pitch P with respect to the indexing unit 13, and four bolts 5 are provided from the indexing unit 13. These are supplied to the chuck units 20 and 20 at the same pitch P, respectively, and supplied to the bolt insertion holes 3 of the cylinder head 2 at the same pitch P.
[0026]
In the case of the formulas (2) and (3), the arrangement pitch of the four bolt holding positions and the arrangement pitch of the four holding rods 22 by the chuck claws 21 of the chuck units 20 and 20 are adjusted to the cylinder head 2. The pitch is set to be unequal between Px and Py. Hereinafter, for example, in the case of the formula (2), an example of the structure and operation of the chuck units 20, 20 will be described with reference to FIGS.
[0027]
The pair of chuck units 20 have the same structure, and one of them will be described with reference to FIGS. 7 to 11. The chuck unit 20 includes a frame-shaped unit main body 23 supported by the shift slide 44 and a unit main body 23. And a pressing rod 22 penetrating the unit body 23 in the Z direction. In addition, the chuck unit 20 includes a bolt attachment confirmation sensor 24 that detects the height positions of the four holding rods 22 in the unit body 23.
[0028]
FIGS. 7 and 8 show a specific example of the chuck pawl 21. This is a pair of substantially cross-shaped horizontal revolving pawls 27, 28 and an opening / closing cylinder 29 for simultaneously rotating the pair of revolving pawls 27, 28 in opposite directions. Is provided. The center of one of the turning claws 27 is supported by the inner shaft 30, and the center of the other turning claw 28 is eccentric to the inner shaft 30 and is supported by the outer shaft 31 surrounding the inner shaft 30. Rotate around the inner shaft 30 and the outer shaft 31 as fulcrums. Inside the four tips of the substantially cross-shaped turning claws 27, 28, V-shaped chuck surfaces m, n for holding the bolts 5 one by one and vertically holding them in place are formed.
[0029]
When the pair of revolving pawls 27 and 28 are closed by the opening / closing cylinder 29, four bolts 5 are simultaneously held by the four chuck surfaces m and n. At this time, the four bolts 5 are arranged in a rectangular array in the X and Y directions, and their arrangement pitches are set to Px and Py. When the pair of revolving claws 27 and 28 are opened by the opening / closing cylinder 29, the head 5a of the bolt 5 penetrates between the four chuck surfaces m and n as shown in FIGS. A gap g that does not pass through the washer 6 is formed, and the bolt 5 protruded from directly below from the indexing unit 13 is inserted into the gap g.
[0030]
In each of the gaps g between the four chuck surfaces m and n of the pair of opened revolving claws 27 and 28, a holding rod 22 whose axis is aligned with the center line of each gap g is arranged. The four holding rods 22 are loosely fitted to the unit body 23 so as to be freely movable in the Z direction. For example, as shown in FIG. Freely moves up and down between a lower limit position where the lower end of the unit comes into contact with the unit main body 23 (a chain line position in FIG. 11) and an upper limit position where the weight 32 projects above the unit main body 23 by a predetermined height (a solid line position in FIG. 11). I do. 9 to 11 show two pressing rods 22 adjacent in the X direction. The arrangement pitch of the center lines of the two holding rods 22 is Px.
[0031]
When one of the pair of chuck units 20 is moved to the fixed position B just above the indexing unit 13, the four holding rods 22 of the chuck unit 20 are moved to the bolt extraction positions Q of the indexing unit 13. 1 ~ Q 4 Is located directly above. At this time, the chuck claws 21 are opened, and each holding rod 22 is at the lower limit position with respect to the unit body 23, and the lower end 22 ′ of each holding rod 22 is lowered from the opened chuck claw 21, and the indexing unit 13 Bolt extraction location Q 1 ~ Q 4 Is located just above the bolts 5 of the above. Here, bolt extraction location Q 1 ~ Q 4 The two arrangement pitches P adjacent to each other in the X direction among the four bolts 5 and the arrangement pitch Px of the pressing rod 22 directly above the four bolts 5 are different from P ≠ Px as in the above equation (2). The upper and lower corresponding bolts 5 and the center lines of the holding rods 22 are stepwise eccentric. This amount of eccentricity corresponds to (Px-P) / 2 when P <Px, as shown in FIG. 10, and the normal amount of eccentricity is about several mm.
[0032]
The supply of the four bolts 5 from the indexing unit 13 to one chuck unit 20 is performed in the following manner. The indexing unit 13 indexes the eight bolts 5 at an equal pitch, and the bolt take-out location Q 1 ~ Q 4 The four bolts 5 are pushed up by the push rod 17 and the lower end portions 22 ′ of the holding rods 22 corresponding to the heads 5 a of the bolts 5 are fitted in a slightly pushed up state. The holding rod 22 is pushed up toward the unit body 23. When the neck 5b of the pushed-up bolt 5 reaches the position of the gap g between the chuck surfaces m and n of the opened chuck claw 21, the chuck claw 21 is closed and the four bolts 5 are simultaneously chucked, and the push rod 17 is pushed. Is lowered.
[0033]
When the four bolts 5 are pushed up from above and below while being sandwiched between the push rod 17 and the holding rod 22 as in the above operation, the bolts 5 are accurately guided or supported by the holding rod 22 in the Z direction. It is pushed up and there is no fear of falling off during ascent, and the operation is stable. Therefore, even when the bolt 5 is long, the bolt 5 does not incline during the ascent. Further, by making the gap g between the chuck surfaces m and n of the opened chuck claw 21 smaller than the outer diameter of the washer 6 of the bolt 5, when the bolt 5 is pushed up into the gap g, the gap g of the chuck surfaces m and n is reduced. Since the lower end abuts against the washer 6 and the washer 6 is reliably pushed down to the position of the screw portion 5c, the chuck of the bolt 5 is securely performed without being obstructed by the washer 6.
[0034]
Further, in the above operation, the arrangement pitches P and Px of both the two bolts 5 and the holding rod 22 which are adjacent to each other in the X direction are different, and these two upper and lower bolts are located at eccentric positions. If the head 5a is pushed up vertically, there is a possibility that an operation error in which the head 5a hits the chuck nail 21 and the chuck nail 21 is not chucked, or a trouble that the chuck nail 21 or the like is damaged may occur. Therefore, in order to prevent the occurrence of trouble due to such eccentricity, in the present invention, the eccentricity correcting means 35 is formed between the head 5a of the bolt 5 and the lower end 22 'of the holding rod 22.
[0035]
As shown in the lower half of FIG. 10, for example, the eccentricity correcting means 35 includes a wrench square hole 36 formed in the center of the upper surface of the head 5a of the bolt 5 and the lower surface of the lower end 22 ′ of the holding rod 22. Is formed by a conical projection 37 formed in the shape of a circle. When the bolt 5 is pushed up by the push rod 17, the tapered surface of the projection 37 of the holding rod 22 comes into contact with the upper end edge of the square hole 36 of the head 5 a, and at this time, the center line of the square hole 36 and the center of the projection 37 The shape of the projection 37 of the square hole 36 is set so that the line is eccentric by the amount of eccentricity (Px-P) / 2.
[0036]
The eccentric bolt 5 and the holding rod 22 come into contact with each other, and the two are integrally pushed up in the Z direction by the push rod 17. As the bolt 5 rises from the indexing unit 13, the square hole 36 of the head 5 a , The center of the head 5a moves outward in the X direction, and finally, as shown in the upper half of FIG. 11, the center of the head 5a coincides with the center of the protrusion 37, The center line of the bolt 5 pushed up to the upper limit and the center line of the pressing rod 22 thereon coincide with each other, and the arrangement pitch of the two bolts 5 adjacent in the X direction is automatically corrected to Px. Immediately thereafter, the chuck claws 21 are closed, and the four bolts 5 are held by the chuck unit 20.
[0037]
When one of the pair of chuck units 20, 20 receives four bolts 5 from the indexing unit 13, the indexing unit 13 intermittently rotates by 45 °, and the pair of chuck units 20, 20 move in the X direction and remain. Moves to the fixed position B just above the indexing unit 13 and receives four bolts 5 from the indexing unit 13. Thereafter, the pair of chuck units 20 and 20 move horizontally to the fixed position C directly above the cylinder head 2 and descend, and as shown by the chain line in FIG. When entering or approaching the corresponding bolt insertion hole 3 of the cylinder head 2, the chuck pawl 21 opens. Thus, the bolt 5 is supplied to the bolt insertion hole 3 by its own weight and the own weight of the holding rod 22 by its own weight.
[0038]
As described above, a total of eight bolts 5 are lowered while being held by the pair of chuck units 20, 20, and each of them is collectively inserted into the eight bolt insertion holes 3 of the cylinder head 2 using the holding rod 22. By dropping under its own weight, a large number of bolts can be supplied at one time, and the cycle time of the bolt supply can be shortened. Further, since the bolt 5 is forcibly inserted into the bolt insertion hole 3 by the weight of the holding rod 22, a mistake in bolt supply is reduced, and the reliability of the bolt supply operation is increased.
[0039]
Further, the holding rod 22 of the bolt 5 normally supplied to the bolt insertion hole 3 of the cylinder head 2 is lowered together with the bolt 5 to be at the lower limit position with respect to the unit body 23, and the weight 32 of the holding rod 22 is shown in FIG. It falls to the position shown by the chain line of No. 11. Therefore, the upper limit position or the lower limit position of the weight 32 is detected by the sensor 24 installed in the unit body 23. For example, the sensor 24 shown in FIG. 11 includes a light projector 25 and a light receiver 26, and an optical axis 27 connecting the light projector 25 and the light receiver 26 is set to a predetermined height crossing the weight 32.
[0040]
That is, when the weight 32 is lowered to the lower limit position, the weight 32 is disengaged from the optical axis 27 and the light of the light projector 25 is received by the light receiver 26, and the normal supply of the bolt 5 is confirmed. When a supply failure occurs in which the bolt 5 is caught in the bolt insertion hole 3 and is not properly inserted, the holding rod 22 does not normally descend together with the supply failure bolt 5, and the weight 32 keeps blocking the optical axis 27. As a result, the light receiver 26 does not receive light, and a supply failure of the bolt 5 is confirmed. The operation of confirming the quality of the bolt supply using the holding rod 22 and the sensor 24 is more reliable than the operation of directly detecting the position of the bolt 5, and the sensors for the confirmation are used. There is also a design advantage that the installation place can be selected in a wide range.
[0041]
In the above embodiment, the pair of bolt transfer systems 10 and 10 having the same configuration shown in FIG. Sixteen bolts 5 are supplied simultaneously. Loading and unloading at a fixed position D of a pair of cylinder heads 2 and 2 ′ receiving automatic bolt supply by this bolt supply device is performed, for example, as shown in FIG.
[0042]
The pair of cylinder heads 2 and 2 ′ are divided into a left cylinder head 2 and a right cylinder head 2 ′ of a V6 engine, and each of them is placed on an individual pallet 4. On each pallet 4, the right cylinder head 2 is mounted on the upper right half, and the left cylinder head 2 'is mounted on the left half. A large number of these pallets 4 are alternately transported in a line on a horizontal transport path 7 with the left cylinder head 2 mounted pallets 4 and the right cylinder head mounted pallets 4 alternately. The leading end of the transport path 7 corresponds to the above-described fixed position D. When the pallet 4 carrying the right cylinder head 2 is loaded at the leading end position, the pallet 4 is stopped. Then, the subsequent pallet at the forefront of the pallet 4 on which the left cylinder head 2 ′ is placed is advanced by being slid laterally as shown by the arrow in FIG. And stop it next to the pallet 4.
[0043]
When the bolts are supplied to the pair of cylinder heads 2 and 2 ′ on the two pallets 4 and 4 arranged side by side at the leading end of the transport path 7, the bolts are unloaded and the next right cylinder is placed at the leading end of the transport path 7. The above operation is repeated by moving the pallet 4 on which the head 2 is placed.
[0044]
The work to be supplied with bolts in the present invention is not limited to the cylinder head of an automobile engine, but can be applied to any work having a bolt insertion hole of an integral multiple of 4 in a vertical and horizontal arrangement.
[0045]
【The invention's effect】
According to the bolt supply device according to claim 1, a plurality of chuck units holding four bolts each of which is an integer multiple of 4 that has been indexed at equal pitches by the indexing unit and holding four bolts each. Is moved to supply bolts of an integral multiple of 4 to the bolt insertion holes of the corresponding work at once, so that the cycle time of one bolt supply is shortened as the number of bolts supplied one time increases. You. In addition, the bolt held by the chuck unit is supplied by being dropped by its own weight into the bolt insertion hole of the work using the own weight of the holding rod, so that the bolt supplying operation can be performed with a certainty by the holding rod. A highly reliable bolt supply device can be provided. Further, as the indexing unit and the chuck unit for transferring the bolts in units of four or the like, a mechanism having a mechanism that operates simply and surely can be applied, and the equipment cost of the bolt supply device can be reduced.
[0046]
According to the bolt supply device of the present invention, even if the arrangement pitch of the bolts indexed by the indexing unit and the arrangement pitch of the bolt insertion holes of the work are unequal pitches, the push rod is moved from the indexing unit. While pushing up a set of four bolts to the chuck unit, the bolts are automatically corrected to an irregular pitch by the eccentricity correcting means formed between the bolt head and the holding rod. Automatic bolt supply to the insertion hole is also possible, and a highly versatile bolt supply device can be provided. In addition, the eccentricity correcting means described above is advantageous in terms of equipment because it can be constituted by a simple shape such as an existing hole in the bolt head and a tapered projection at the lower end of the holding rod.
[0047]
According to the third aspect of the present invention, when the bolt is dropped by its own weight into the bolt insertion hole of the work, the holding rod is lowered together with the bolt. Presence / absence and quality can be reliably confirmed, and the reliability of the bolt supply device can be further improved.
[Brief description of the drawings]
FIG. 1 is a plan view of a bolt supply device showing one embodiment of the present invention.
FIG. 2 is a side view of the apparatus in FIG. 1;
FIG. 3 is a perspective view showing a bolt transfer mode by the apparatus of FIG. 1;
FIG. 4 is a plan view of an indexing unit in the apparatus in FIG. 2;
FIG. 5 is a side view of a main part including a partial cross section of the indexing unit of FIG. 4;
FIG. 6 is a plan view showing a relationship between an arrangement pitch of bolts in the indexing unit of FIG. 4 and an arrangement pitch of bolt insertion holes of a work (cylinder head).
FIG. 7 is a bottom view including a partial cross section of a chuck pawl of the chuck unit in the apparatus in FIG. 2;
FIG. 8 is a side view of the chuck claw of FIG. 7;
9 is a side view of a main part showing a relationship between an indexing unit and a chuck unit in the apparatus shown in FIG. 2;
FIG. 10 is an enlarged side view of the bolt and the holding rod at each vertical position for explaining the trajectory correction of the bolt ascending from the indexing unit to the chuck unit in FIG. 9;
FIG. 11 is a side view of a main part of the apparatus shown in FIG. 2 when bolts are mounted on the chuck unit.
FIG. 12 is a plan view showing a transport mode of a pair of works (cylinder heads) supplied with bolts by the apparatus in FIG.
FIG. 13 is a plan view of a pair of works (cylinder heads) that receive a bolt supply.
[Explanation of symbols]
2, 2 'work (cylinder head)
3 Bolt insertion hole
5 bolts
5a head
12 Straight feeder
13 Indexing unit
17 Push rod
20 Chuck unit
21 Chuck claw
22 Holding rod
24 sensors
35 Eccentricity correction means
40 drive system

Claims (3)

頭部と軸部を有する複数のボルトを、各々の頭部を上に略鉛直にして一列に整列搬送する直線フィーダと、
直線フィーダの先端側に鉛直な中心線を中心に間欠回転可能に配置され、周辺部で直線フィーダからのボルトを1本ずつ切り出して4の整数倍の数のボルトを等ピッチで保持する割出しユニットと、
割出しユニットで保持された4の整数倍のボルトの正方形の頂点位置に在る4本のボルトが割出しユニットの間欠回転で定位置に移動すると、この4本を割出しユニットの上方に突き上げるプッシュロッドと、
割出しユニットの上方に横移動可能に配置され、上記プッシュロッドで突き上げられる4本のボルトの頭部に真上から自重で嵌合してプッシュロッドで突き上げられるボルトと共に上昇移動する押えロッドと、プッシュロッドで突き上げられ定位置まで上昇した4本のボルトを保持するチャック爪とを有するチャックユニットと、
チャックユニットを割出しユニットの上方定位置からボルトが供給されるワークの上方定位置の間で横移動させ、かつ、ワークの上方で上下移動させる駆動系とを具備し、
プッシュロッドで割出しユニットから突き上げた4本一組のボルトをチャックユニットに保持させてから、4本のボルトを保持したチャックユニットをワークの真上に移動させて降下させ、チャックユニットのチャック爪を開いて各ボルトを各々の押えロッドの自重とでもってワークのボルト挿通穴に一括して供給するようにしたことを特徴とするボルト供給装置。
A plurality of bolts having a head and a shaft, a linear feeder that aligns and conveys the plurality of bolts in a line with each head being substantially vertical,
An indexer that is arranged at the end of the linear feeder so as to be intermittently rotatable around a vertical center line, cuts out the bolts from the linear feeder one by one at the periphery, and holds an integral multiple of 4 bolts at equal pitch Unit and
When the four bolts at the vertex positions of the squares of the integral multiple of four bolts held by the indexing unit are moved to the fixed position by the intermittent rotation of the indexing unit, these four bolts are pushed up above the indexing unit. A push rod,
A holding rod that is arranged to be able to move laterally above the indexing unit, fits with the head of the four bolts pushed up by the push rod by its own weight from directly above, and moves up with the bolt pushed up by the push rod; A chuck unit having a chuck jaw for holding four bolts pushed up by a push rod and raised to a fixed position;
A drive system for laterally moving the chuck unit from the upper fixed position of the indexing unit to the upper fixed position of the work to which the bolt is supplied, and moving the chuck unit up and down above the work;
A set of four bolts pushed up from the indexing unit by the push rod is held by the chuck unit, and then the chuck unit holding the four bolts is moved right above the work and lowered, and the chuck jaws of the chuck unit are lowered. Wherein the bolts are opened and the bolts are supplied collectively to the bolt insertion holes of the work under the own weight of the respective holding rods.
上記割出しユニットからプッシュロッドで突き上げられるボルトの軸線と、チャックユニットのチャック爪で保持されるボルトの軸線が偏心しているものにおいて、チャックユニットのチャック爪で保持されるボルトの軸線に同軸に押えロッドを上下動させると共に、割出しユニットに保持されてプッシュロッドで突き上げられるボルトの頭部とこの頭部に真上から嵌合する押えロッドの下端部との間に上記偏心量を吸収する偏心修正手段を形成し、押えロッドの下端部をボルト頭部に偏心させて嵌挿させた状態でボルトと押えロッドをプッシュロッドでチャックユニットへと上昇させる間に、偏心修正手段でボルトの軸線を押えロッドの軸線に一致させるようにしたことを特徴とする請求項1記載のボルト供給装置。When the axis of the bolt pushed up by the push rod from the indexing unit and the axis of the bolt held by the chuck claws of the chuck unit are eccentric, the shaft is held coaxially with the axis of the bolt held by the chuck claws of the chuck unit. The eccentricity which moves the rod up and down and absorbs the eccentricity between the head of the bolt held by the indexing unit and pushed up by the push rod and the lower end of the presser rod fitted to this head from directly above While the correction means is formed and the lower end of the holding rod is eccentrically fitted to the bolt head and the bolt and the holding rod are raised to the chuck unit by the push rod, the axis of the bolt is adjusted by the eccentricity correcting means. 2. The bolt supply device according to claim 1, wherein the bolt is aligned with the axis of the holding rod. 上記チャックユニットに保持されたボルトをワークのボルト挿通穴に自重落下で供給するときの、ボルトと共に自重降下する押えロッドの降下の有無を検出してボルト供給の有無判定信号を出力するセンサーを各チャックユニットに付設したことを特徴とする請求項1又は2記載のボルト供給装置。When supplying the bolt held by the chuck unit to the bolt insertion hole of the work by its own weight, a sensor that detects whether or not the holding rod that descends by its own weight together with the bolt and outputs a bolt supply presence / absence determination signal is provided. The bolt supply device according to claim 1, wherein the bolt supply device is attached to the chuck unit.
JP14456796A 1996-06-06 1996-06-06 Bolt supply device Expired - Lifetime JP3591985B2 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP14456796A JP3591985B2 (en) 1996-06-06 1996-06-06 Bolt supply device
KR1019970023467A KR980000761A (en) 1996-06-06 1997-06-05 Bolt supply device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP14456796A JP3591985B2 (en) 1996-06-06 1996-06-06 Bolt supply device

Publications (2)

Publication Number Publication Date
JPH09323228A JPH09323228A (en) 1997-12-16
JP3591985B2 true JP3591985B2 (en) 2004-11-24

Family

ID=15365233

Family Applications (1)

Application Number Title Priority Date Filing Date
JP14456796A Expired - Lifetime JP3591985B2 (en) 1996-06-06 1996-06-06 Bolt supply device

Country Status (2)

Country Link
JP (1) JP3591985B2 (en)
KR (1) KR980000761A (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101310343B1 (en) * 2011-06-23 2013-10-14 주식회사 삼빈테크 Auto conclusion apparatus for bolt
JP2013059850A (en) * 2011-09-12 2013-04-04 Yoshitaka Aoyama Part feeding device for screw fastening machine
JP5791525B2 (en) * 2012-01-06 2015-10-07 セイコーインスツル株式会社 Bearing device assembling apparatus and assembling method
JP6750484B2 (en) * 2016-11-30 2020-09-02 富士通株式会社 Screw supply device and screw supply method
CN108817945B (en) * 2018-07-11 2020-08-04 南通市国光光学玻璃有限公司 Automatic assembly device of hand-held glass sucker
JP7138922B2 (en) * 2018-07-18 2022-09-20 株式会社ワイテック Auxiliary tool for setting fasteners
CN113714791B (en) * 2021-09-09 2022-09-02 江苏中伟业通讯设备有限公司 Feeder line card assembling process
CN116216303A (en) * 2021-12-03 2023-06-06 汉达精密电子(昆山)有限公司 A kind of stud automatic placement equipment
CN116140979B (en) * 2023-02-28 2023-08-15 山东开一车桥有限公司 Automatic indexing pre-tightening device for axle hub brake drum nut
CN120395362A (en) * 2024-02-01 2025-08-01 宁德时代新能源科技股份有限公司 Bolt feeding device and method, bolt automatic assembly system and method

Also Published As

Publication number Publication date
JPH09323228A (en) 1997-12-16
KR980000761A (en) 1998-03-30

Similar Documents

Publication Publication Date Title
JP3591985B2 (en) Bolt supply device
KR101606334B1 (en) Pick-and-place head and method for picking workpieces
CN109483219A (en) A kind of automatic assembly production chain of socket and its operation method
US6293408B1 (en) Inspection handler apparatus and method
CN109604180A (en) A kind of cartridge case detection machine
KR102216779B1 (en) Vision inspection device for clutch hub
CN107931902A (en) Weld upset feed mechanism and its lithium battery welding equipment
CN107866653A (en) Transmit tool detent mechanism and its lithium battery welding equipment
CN107866384A (en) Battery-arrangements transfer device and its lithium battery test screen equipment
CN213103264U (en) Thread go-stop detection equipment
CN113526114A (en) Full-automatic feeding and visual detection device
CN107900572A (en) Lithium battery welding equipment
WO2021052745A1 (en) Component handling device with component inspecting device
CN110844858A (en) Automatic bottle capping machine
CN116119315A (en) Automatic detection and receiving equipment for vibration motor
CN107877061A (en) Spot-welding mechanism and its lithium battery welding equipment
CN117943749B (en) An intelligent welding system for the bottom frame of an elevator car
CN107914072A (en) Lithium battery transmits gauge and its lithium battery welding equipment
US4917568A (en) Suction pick-up apparatus for electrical or electronic components
CN111451164B (en) X-ray detection equipment
CN222779083U (en) O-ring automatic assembly device and ball valve production line
CN116691046B (en) Automatic assembly production line of high-protection seal
US20250128890A1 (en) Device For Handling Components
CN107891237A (en) Spot welding testing agency and its lithium battery welding equipment
CN219899171U (en) Receiving device for transistor and transistor detection equipment

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20040716

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20040811

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20040824

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313532

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080903

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080903

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090903

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100903

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100903

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110903

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110903

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120903

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130903

Year of fee payment: 9

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term