Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP3593097B2 - Evacuation guidance system in power plants and factories - Google Patents
[go: Go Back, main page]

JP3593097B2 - Evacuation guidance system in power plants and factories - Google Patents

Evacuation guidance system in power plants and factories Download PDF

Info

Publication number
JP3593097B2
JP3593097B2 JP2001389476A JP2001389476A JP3593097B2 JP 3593097 B2 JP3593097 B2 JP 3593097B2 JP 2001389476 A JP2001389476 A JP 2001389476A JP 2001389476 A JP2001389476 A JP 2001389476A JP 3593097 B2 JP3593097 B2 JP 3593097B2
Authority
JP
Japan
Prior art keywords
disaster
information
evacuation
area
evacuation guidance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2001389476A
Other languages
Japanese (ja)
Other versions
JP2003187362A (en
Inventor
伸一 山本
昭彦 山藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Plant Systems and Services Corp
Original Assignee
Toshiba Plant Systems and Services Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Plant Systems and Services Corp filed Critical Toshiba Plant Systems and Services Corp
Priority to JP2001389476A priority Critical patent/JP3593097B2/en
Publication of JP2003187362A publication Critical patent/JP2003187362A/en
Application granted granted Critical
Publication of JP3593097B2 publication Critical patent/JP3593097B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/40Controlling or monitoring, e.g. of flood or hurricane; Forecasting, e.g. risk assessment or mapping

Landscapes

  • Alarm Systems (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、最適な避難誘導情報を提供する発電所・工場等における避難誘導システムに関する。
【0002】
【従来の技術】
従来、発電所・工場・化学プラント・備蓄基地など例えば化学工場における災害は、予期せぬときに突然発生し、後を絶たない。化学工場の事故には、業務中に限らず、休日において爆発事故が発生し、近隣の民家や商店などに大きな災害を発生させている。最近では爆発中の化学工場の近隣にガソリンスタンドが存在したりして戦争状態の大規模な火の海となった事故もあった。
【0003】
このような事故における現在の避難誘導は、爆発発生後に非常ベルを鳴らし、施設内放送などにより災害を報知し、避難誘導させている。突然の爆発であるため、防災責任者もパニックとなり、安全を確認した避難案内はされていない。
【0004】
【発明が解決しようとする課題】
しかしながら、避難先や災害情報は、災害発生時に防災センターから構内放送または文字表示により案内する方式であるため、避難時には、タイムリーに避難誘導されず、必ず犠牲者が発生している。災害発生時、防災センターは災害状況の把握や災害現場近隣の情報が無い為、安全な避難誘導をするための情報が無いという課題があった。特に、発電所・工場・化学プラント・備蓄基地などの関係者からは、危険物や危険ガスを取り扱っており二次災害防止の面からも「災害の予報」が強く望まれている。
【0005】
本発明は、従来の問題を解決すべくなされたもので、発電所・工場・化学プラント・備蓄基地などの災害の発生を事前に予測して避難誘導させるようにした発電所・工場等における避難誘導システムを提供することを目的とする。
【0006】
【課題を解決するための手段】
上記目的を達成するため、次の構成からなる発電所・工場等における避難誘導システムを提供するものである。
【0007】
すなわち、本発明の発電所・工場等における避難誘導システムは、発電所・工場等の生産関連箇所のエリア毎に避難所への避難誘導径路図を避難径路情報記憶装置に予め記憶する避難径路情報記憶手段と、発電所・工場等に設置されている設備に設けられ、前記設備の運転状態監視情報を出力するセンサと、予め定められた計測項目毎に前記設備の運転状態監視情報の計測値の経時的変化を記憶する運転状態監視情報記憶手段と、前記センサにより出力された前記設備の運転状態監視情報より予め定められた計測項目を計測し、この計測値の経時的変化を監視して前記運転状態監視情報記憶手段に記憶する運転状態監視手段と、前記設備の安全な正常運転動作状態の情報が記憶された正常運転範囲データテーブルと、前記運転状態監視情報記憶手段に記憶されている運転状態監視情報を連続的又は間欠的に読出し、正常運転範囲データテーブルの情報と照合して異常な経時変化の有無を検出する異常検出手段と、設備の各計測項目について経時的変化の災害が発生する閾値が記憶された災害発生閾値テーブルと、前記異常検出手段により異常が検出されたとき前記災害発生閾値テーブルの各測定項目の閾値を読出し、前記運転状態監視情報と照合することで災害か故障かを判定する災害・故障判定手段と、前記災害・故障判定手段により、計測値の経時的変化から災害の発生と判定された場合、災害発生予測場所情報、災害の内容情報および災害の発生予測時刻情報から選ばれた少なくとも一つの情報を含む災害発生予測情報を出力する災害発生予測情報出力手段と、各エリア毎の出入口に設けられ、各エリアへの人の出入りを監視する監視センサと、前記災害発生予測情報を出力したとき安全な避難路を検索条件として前記監視センサによる監視で人が存在するエリアからの避難誘導径路図、前記避難径路情報記憶装置から検索する避難径路図選択手段と、検索された前記避難誘導径路図を該当エリアに報知する避難誘導情報報知手段とを具備してなることを特徴とする。
【0008】
発明によれば、発電所、工場等の設備の物理的、化学的状態の計測値の経時的変化を監視し、災害か故障かを判定した上で、災害の場合に、人が存在するエリアからの避難誘導径路図を該当エリアへ報知するので、比較的余裕をもって最適な避難誘導径路図により避難誘導させることができる。
【0012】
上記避難誘導システムにおいては、災害発生予測情報は場所、内容、時刻などであるので、各避難者は避難能力に応じた避難方法が選択できるため、身体障害者や病人などの弱者を救済した避難を考慮することができる。
【0013】
上記避難誘導システムにおいては、災害発生予測情報を出力したとき予め定められた各エリアでの人の有無情報を確認し、「有り」のエリアから優先的に最適な避難誘導径路図を報知することを特徴とする。
【0014】
また、災害発生予測情報を出力したとき人有りのエリアから優先的に最適な避難誘導径路図を報知するので、避難対象者は最先的に最適な避難誘導径路図を知ることができる。
【0015】
上記避難誘導システムにおいては、災害発生予測情報を出力したとき、当該エリアでの災害発生の有無情報を確認し、「有り」の場合に最適避難径路情報を出力する。
【0016】
これにより、災害発生予測地にいる人を確認し適切な最適避難径路情報を報知することができる。
【0020】
上記避難誘導システムにおいては、避難誘導径路図は、予め定められた各エリアの障害有無情報を確認し、「無し」のエリアから選択される。
【0021】
これにより、信頼性の高い避難誘導径路図の提供を受けることができる。
【0022】
発電所・工場等における避難誘導システムは発電所、工場、化学プラント、原子炉、備蓄基地などの比較的災害が発生した場合、人災を伴う生産関連個所での災害時の避難誘導システムである。発電所、工場、化学プラント、原子炉、備蓄基地などとは、稼動中、待機中、工事中に物理的、化学的変化が発生して、火災や爆発、また危険ガスや放射能の流出などの災害が発生する可能性のある対象をいう。
【0023】
災害時の避難誘導とは災害の発生を予告したとき、災害が発生したときの避難者に対する誘導である。災害の内容情報は計測値の経時的変化から災害の発生を予測したときの当該計測センサの取付け装置、機器、計測項目から予測される例えば火災、爆発、危険ガス漏れ、放射能漏れなどの災害と、その規模などの情報である。
【0024】
【発明の実施の形態】
次に、本発明の発電所・工場等における避難誘導システムの実施形態について図1を参照して説明する。この実施形態は火力発電所を構成する各機器運転中の物理的、化学的計測項目を予め設定して、計測し、計測値を監視することにより異常動作の兆候を予測して、発電所内で働いている作業者など所員に最適避難誘導径路図情報を報知するようにした避難誘導システムである。
【0025】
この避難誘導システム1は火力発電所2での発電中の予め定められた物理的、化学的計測項目を計測する各種センサ3と、各種センサ3出力の計測値を夫々収集して記憶する情報記憶装置4と、情報記憶装置4に記憶された各種センサ3出力の計測値を読出し、各種センサ3出力の経時的変化を運転状態監視情報として監視し、異常な経時的変化を示したとき、災害発生の可能性を予測する災害予測演算部5と、災害予測演算部5が計測値の経時的変化から災害の発生を予測したとき災害発生予測情報を出力する災害予測情報出力装置6と、災害予測情報出力装置6が災害予測情報を出力したとき予め定められた各エリア毎に最適な避難誘導径路図を、予め記憶された前記避難径路情報記憶装置7から自動的に検索して出力する最適避難誘導径路図の選択部8と、各エリア毎の検索された最適避難誘導径路図を各エリアに自動的に報知する避難誘導情報報知装置9と、避難誘導情報報知装置9が出力する各エリア10の最適避難誘導径路図を発電所2内の各エリア10に表示する表示装置11とからなる。
【0026】
火力発電所2は中央にタービン発電機15が設置され、この周囲にタービン発電機15を駆動、制御するための燃料である石油が収納されている燃料タンク16、ボイラを介して煙を排気するするための煙突17、タービン発電機15が発電した電力を送配電する送・配電路の漏電時や短絡時など回路を遮断する遮断機が設置された開閉所18、タービン発電機15の運転状態を監視し、制御する発電機制御装置14を構成する制御卓が設置された事務所19、守衛所20などが設置されている。さらに、火力発電所2内にはこれらの設備位置間を通行する自動車・人間用通路21が敷設され、災害発生時火力発電所員が避難する安全な場所には避難所22が設定され、この避難所22に所員が避難するための案内の単位としてエリア10が設けられている。火力発電所2はこのように設備されている。
【0027】
この火力発電所2には災害を予測するために運転状態監視情報を出力する各種センサ3が設置されている。火力発電所2の運転状態監視情報は、例えば事務所19内に設置された発電制御装置14の制御卓において監視されている情報である。運転状態監視情報は、発電設備に装備された各種センサ3により出力された情報で、物理的、化学的計測項目としてたとえば発電電力、送電電流、送電電圧、タービン回転数、タービン温度、発電周波数、発電機回転数、発電機温度、燃料タンク内圧力、燃料タンク内温度、燃料の消費量などの計測値である。これらの運転状態監視情報は連続的または間欠的に情報記憶装置4に各計測年月日時刻情報と関連付けて記憶される。制御卓の監視情報で充分であれば、制御卓の監視情報が運転状態監視情報として利用される。運転状態監視情報は災害の発生を予想するための計測項目で、災害の発生や予想するために有効な項目であれば一項目でもよい。
【0028】
各種センサ3は例えば圧力、温度、時間、湿度、流量、流速、粘度、電圧、電流、電力など各項目を測定し、電気信号に変換して出力する各センサである。圧力、流量、流速、粘度は圧電センサにより圧力値を電気信号で出力する。温度はサーミスタにより温度の変化を電気の変化で出力する。湿度は湿度センサにより計測される。
【0029】
各エリア10の各出入口には所員の出入を監視し、各エリア10内に現在所員(人間)がいるか、いないかを判定するための出入監視センサ25が設置されている。即ち、あるエリア10において、例えば入所者が5人で出所者が3人であれば当該エリア10には、入所者が存在すると出力し、人数は2人と出力する。各エリア10の出入監視センサ25の出力は、各エリア出入監視装置26を介して人の有無判定部27に供給され、人情報記憶装置28には各エリア10内での人の有無情報が監視年月日時刻情報、エリア名などに関連付けて記憶される。
【0030】
各エリア10の各種センサ3および出入監視センサ25などの関係は、判り易くするために拡大図が図2に示されている。図2には監視装置29例えばITVカメラが1機又は複数機各エリア10内を監視できる台数設置されている。監視装置29はエリア10内に存在する装置や人間(所員)30の状態を撮像し、出力する。装置から火災が発生した場合は、その火災の映像が、人間30が避難を開始していればその避難の状態の映像が出力される。従って、監視装置29は負傷して動けない人や身体障害者で動けない人などの現在位置の映像を出力する。このように動くことの出来ない人のいる場所が判ることは、救助において極めて有効である。各エリア10に設けられた各監視装置29の出力は、各エリア監視データ収集装置23を介して情報記憶装置4に年月日時刻情報、エリア情報に関連付けて記憶される。
【0031】
次に、災害予測について説明する。
災害予測演算部5は情報記憶装置4に記憶された各種センサ3出力の計測値を連続的又は間欠的(予め定められた期間)に読出し、各種センサ3出力の経時的変化を運転状態監視情報として監視し、異常な経時的変化を示したとき、予め記憶された災害発生の変化値と比較演算してAI論理演算して災害発生の可能性を予測する。異常な経時的変化とは正常な運転状態での経時的変化と異なる勾配の大きい変化をいう。
【0032】
災害予測演算部5は図3に示すような構成により運転状態の監視をし、異常を検出すると災害予測を出力する。次に、運転状態を監視して災害を予測する具体的実施例について図3を参照して説明する。予め各機器、各装置の安全な正常運転動作状態(条件)は、発電機動作正常運転範囲データテーブル35に記憶される。情報記憶装置4に記憶された各種センサ3の計測値36は、読み出されて順次発電機動作正常運転範囲データテーブル35に記憶されている正常運転動作値と照合回路37で照合し、予め定められた正常運転動作状態の計測値であれば正常状態である。
【0033】
他方、照合回路37が照合の結果、正常状態と異なる変化を示したとき、異常検出部38は、異常な経時的変化の有無を検出する。異常検出部38は経時的変化有を検出したとき異常と判断し、出力する。また、異常検出部38は経時的変化無しを検出したとき正常運転と見なす出力をする。異常検出部38が異常を出力したとき(計測値が経時変化を示したとき)、災害・故障判定部39は、「故障」か、「災害の発生」かを次のようにして判定する。
【0034】
「故障」か、「災害の発生」かを判定するために、災害発生閾値データテーブル40には、各装置、各機器の各計測項目について多種多様な実験により求めた経時的変化の災害が発生する閾値が記憶されている。災害・故障判定部39は災害発生閾値データテーブル40から異常と判定した計測項目の閾値を読出し、照合回路41で照合する。経時的変化は例えば勾配値情報で処理する。即ち、照合回路41は照合の結果、異常値を計測した項目の勾配値が災害発生閾値データテーブル40から読み出した閾値以上42を出力すると、危険変化値と判定して災害の発生可能性有りの判定を出力する。
【0035】
他方、照合回路41は照合の結果、異常値を計測した項目の勾配値が災害発生閾値データテーブル40から読み出した閾値以下44を出力すると故障45の判定を出力する。
【0036】
故障45の判定結果は火力発電所2の運転を停止46させて、修理47して終了する。災害となる可能性のある異常45は、例えば図4に示すような特性曲線図から判定する。例えば横軸に時間軸、縦軸にたとえばタービン温度にしたグラフにより判定する。
【0037】
このグラフには正常動作温度Nの変化が実線で示されている。正常動作を示す実線Nはスイッチオン後タービンの温度が常温から時間の経過により温度上昇し、定常運転時に予め設定された温度に到達すると動作温度を示し、安定な飽和特性を示しながら定常運転を継続する。このグラフにおいて一点鎖線は、タービンの正常運転最大温度Mを示す。
【0038】
あるとき、温度検出センサ3の温度計測値が点線Gで示すように上昇を開始し、正常運転最大温度Mを超える速度で温度上昇していると判断したとき、災害が発生すると判定する。正常運転最大温度Mを超える速度で温度上昇し、かつ災害が発生する可能性があるとの判定は、点線Gの示す角度(勾配)即ち経時的変化から推論して予測する。点線Gの示す角度(勾配)即ち経時的変化値は、各装置の計測項目毎に予め多種多数の実験データを収集して災害発生(例えば火災の発生)の閾値として記憶される。点線Gの示す角度即ち経時的変化値は、災害発生閾値データテーブル40に各装置、型名に関連付けて記憶される。
【0039】
点線Gの示す角度(経時的変化)は、災害発生閾値データテーブル51に記憶された当該装置の災害発生閾値データと照合回路52で照合し、災害発生閾値以上であれば災害の発生可能性有りと判断して災害発生予測を出力する。災害発生閾値以下であれば、故障と判断して火力発電所2の発電を停止させ、修理する。これらの出力は当該装置名と関連付けて情報記憶装置4に記憶される。
【0040】
点線Gの点G1は災害発生予測情報を出力するための計測値を得た時を示している。点G1より延長線G2はAI論理演算により求めた予測線である。この予測線G2とタービンの正常運転最大温度Mとの交点の時刻Sが災害の発生予測時刻情報の目安である。このようにして災害予測情報出力装置6は事前に災害発生予測情報を出力する。災害発生予測情報は異常を計測したセンサからの災害発生予測場所情報や災害の内容情報、そして図4に示すグラフから災害の発生予測時刻情報などである。この実施例の災害の内容情報は計測値の経時的変化から災害の発生を予測したときの当該計測センサの取付け装置、機器、計測項目から予測される例えば火災、爆発などの災害と、その規模などの情報である。
【0041】
次に、災害予測の報知について説明する。
災害予測情報装置6は情報記憶装置4からタービン発電機で災害の発生する可能性の予測情報を読出したとき、パソコン55及び防災盤56に表示すると同時に防災センタ57を介して警察署・消防署などの官庁58に報告する。さらに、災害予測情報装置6は各エリアの最適な避難誘導径路図を選択する最適避難誘導径路図の選択部8に出力する。
【0042】
最適避難誘導径路図の選択部8は、災害の発生を予測されたエリア10にいる所員30が避難所22へ避難するのに最適な案内図が示された避難誘導径路図を検索する。避難所22へ避難するのに最適な建屋内の通路及び敷地内の道路には、危険なガス漏れや、工事中の道路など障害のない安全な避難路が選択条件として自動的に検索(選択)される。また、所員30は状況判断により自分のパソコン55を操作して最適避難誘導径路図の選択部8へ、直接アクセスして避難経路を選択することもできる。最適避難誘導径路図の選択部8は多数の避難誘導径路図が記憶収納された避難誘導径路装置7から避難誘導径路図パターンを順次読出し、予め定められた避難所22までの最適避難誘導径路図を自動的に検索して出力する。最適避難誘導径路図は、パニック状態でも瞬時に誤りなく判断できるように例えば構内地図に避難する方向が記載された図である。最適避難誘導径路図の選択部8で選択された最適避難誘導径路図情報は、避難誘導情報報知装置9に入力される。避難所22への避難通路及び道路は、監視カメラや光ファイバセンサなどにより通行が可能であることが確認された最新の情報である。
【0043】
避難誘導径路記憶装置7には予め火力発電所2内の各エリア10から避難所22に避難するために考えられる多数の避難誘導径路図が、各エリア10に関連付けて記憶収納されている。即ち、避難誘導径路記憶装置7には、予め各エリア10から予め定められた避難所22までの多数の避難誘導経路図が記憶されている。避難誘導経路は地図に現れている総ての道路及び建屋内の通路が対象であり、避難所22に通ずる多種多様な道程である。
【0044】
災害発生の予測は突然発生するため、常に最適避難誘導径路図が異なる、従って、最適避難誘導径路図の選択部8はそのときでの最適避難誘導径路図を選択する。さらに、最適避難誘導径路図は火力発電所2内の所員(人間)30の存在するエリア10から避難誘導径路記憶装置7を検索して選択することができるし、総てのエリア10の所員30が同時に最適避難誘導径路図を選択することもできる。即ち、災害発生予測情報を出力したとき、最適避難誘導径路図の選択部8は、当該エリアでの災害発生の有無を確認したのち最適避難径路図情報を出力する。また、最適な避難誘導径路図は予め定められた各エリア10の監視装置29が撮像する障害有無情報を確認し、障害無しのエリアから選択される。
【0045】
最適避難誘導径路図の選択部8は各エリア10の最適避難誘導径路図を避難誘導情報報知装置9に出力する。避難誘導情報報知装置9は各エリア10に設けられている各表示装置11を駆動する回路群である。各エリア10の各表示装置11には、避難所22までの避難対象者である所員30を案内するための最適誘導避難径路図が同時に表示される。各表示装置11は案内表示として光学的表示手段と音響的表示手段とがある。
【0046】
光学的表示手段は例えば電光表示板、LED配列の表示板、プラズマディスプレイ、カーナビゲーションなどである。音響的表示手段は例えば放送してスピーカからの音声により報知する。また、最適避難誘導径路図情報は、予め登録された情報端末例えばイントラネットやインターネットに接続されたパソコンや携帯電話にも出力される。避難誘導情報報知装置9にはこれらの表示手段を駆動するための駆動回路が用意されている。また、最適避難誘導径路図情報は、災害発生を予測されたエリア10以外に迂回させることを目的として案内される。
【0047】
人情報記憶装置28には災害発生の予測を受けたエリア10や、他のエリア10に所員30が居るかどうかの情報が記憶されている。この所員30のいるエリア30の情報は最適避難誘導径路図の選択部8に出力され、最適避難誘導径路図の選択部8は人間30がいないエリア10の情報を入手している。従って、最適避難誘導径路図の選択部8は所員30のいるエリア10から優先的に最適避難誘導径路図を検索することができる。
【0048】
避難所22には、避難者確認装置60例えばITVカメラが設置され、避難した人数などを調査し、避難完了判定部61で避難対象者の避難状況を確認できるようになっている。即ち、避難者確認装置60は避難所22に避難対象者(所員)30が避難したかどうかの監視を行う。また、避難所22に設けられた避難者確認装置60は避難所22への避難状況を監視して、避難完了判定部61に「避難対象者中何人が避難したか」「避難対象者の全員が避難完了」などの避難情報を出力する。避難完了判定部61は避難完了を確認すると、この避難完了情報は人情報記憶装置28に記憶される。このようにして人情報記憶装置28に記憶された避難完了情報は、避難状況の確認部62により読み出されて消防署・警察署などの官庁58に自動的に出力(報告)される。消防署・警察署などの官庁58は災害予測が出力された後の避難対象者の避難状況を確認できるようになっている。
【0049】
次に、火力発電所での避難誘導方法について図5のフローチャートを参照して説明する。図1〜4と同一部分については同一符号を付与して説明し、その詳細な説明を省略する。
準備工程としてデータベースを作成する。
【0050】
防災センタ57は避難誘導径路記憶装置7に各エリア10から避難所22までの多種多様の避難誘導径路図を各エリア10に関連付けて蓄積する。防災センタ57は避難径路に工事中、通行禁止道路・通路があれば都度、入力して避難径路図を修正して記憶する(S−1)。防災センタ57は正常値データテーブル40に火力発電所2を構成する各装置、機器の型名に相当する物理的、化学的各計測項目の正常動作範囲を設定し、各計測項目に関連付けて記憶する(S−2)。防災センタ57は災害発生閾値データテーブル51に火力発電所2を構成する各装置、機器の物理的、化学的各計測項目の災害が発生する経時的変化値を設定し、各計測項目に関連付けて記憶する(S−3)。このようにして準備工程を終了する。
【0051】
次に、避難誘導システムの動作を開始する。
火力発電所2の発電中各種センサ3は火力発電所2を構成する各装置、機器の物理的、化学的各計測項目を自動的に監視し、計測し(S−4)、この計測値を運転状態監視情報として情報記憶装置4に記憶する(S−5)。災害予測演算部5は情報記憶装置4に記憶された各計測値を連続的又は間欠的に自動的に読出し、各計測項目毎に図4に示すようなグラフに計測値を自動的にプロットし、実線Nで動作する正常動作を確認する。
【0052】
この正常動作の確認は正常値データテーブル40から読み出した各計測項目の正常値と照合回路42で照合することにより確認する(S−6)。この過程において、図4に点線Gで示すような経時的変化の有無を検出し、災害発生予想情報として記憶する(S−7)。経時的変化の無の場合は正常動作中と判定して発電動作を継続する(S−8)。災害発生予想情報には当該センサから災害発生の可能性が予想された装置(機器)名、エリア名、災害発生予想時間などが含まれる。
【0053】
経時的変化の有りの場合、異常検出部43は異常動作を出力する(S−9)。この異常有りの場合、災害・故障判定部44は災害か、故障かの判定をする(S−10)。即ち、災害・故障判定部44は災害発生閾値データテーブル51から経時的変化を示した計測項目の災害発生閾値を読出し、経時的変化値が読み出された災害発生閾値を超えていれば、危険変化値と判定して、災害が発生する可能性があるものとして災害発生予測情報を出力する。他方、経時的変化値が災害発生閾値を超えていなければ故障と判定した出力をする(S−11)。
【0054】
災害・故障判定部44が故障と判定した場合、発電制御装置14は火力発電所2の発電動作を停止46させて修理47をした(S−12)後、火力発電を再開する。
【0055】
災害・故障判定部44が災害発生の可能性有りと判定した場合、災害予測情報出力部6は最適避難誘導径路図の選択部8に災害発生の可能性の有る装置名およびこの装置が設置されているエリア名などの災害の内容情報を出力する(S−13)。さらに、人情報記憶装置28は最適避難誘導径路図の選択部8に所員30のいるエリア10情報を出力する。最適避難誘導径路図の選択部8は各エリア10から避難所22に避難するのに最適避難誘導径路図を検索して避難誘導情報報知装置9に出力する。
【0056】
即ち、最適避難誘導径路図の選択部8は災害発生の可能性の有る装置名およびこの装置が設置されているエリア10にいる所員30に対し最適避難誘導径路図を避難誘導径路図記憶装置7から検索すると、ともに他の各エリア10から避難所22に避難するのに最適な避難誘導径路図を避難誘導径路図記憶装置7から検索し出力する。最適避難誘導径路図の選択部8は所員30のいるエリア10に対して優先的に最適避難誘導径路図を出力することができる。最適避難誘導径路図の選択部8は災害発生予測情報を出力したとき、監視装置29からの当該エリアでの災害発生の有無を確認したのち最適避難径路図情報を出力する(S−14)避難誘導情報報知装置9は各エリア10に設けられている各表示装置11の駆動回路を介して各表示装置11に最適避難誘導径路図を表示する(S−15)。避難誘導情報報知装置9はエリア10以外の火力変電所2の外にいる人へも報知することができる。
【0057】
各エリア10にいる避難対象者は、表示された最適避難誘導径路図を確認したのち避難所22に避難する。この避難の状態は避難者確認装置60により監視され(S−16)、身体障害者など自力で避難できない所員30がいる場合、警察署・消防署などの官庁58は、人情報記憶装置28の情報をもとに当該エリア10に行き救済を円滑に行うことができる。これらの避難状況は避難状況確認部62により確認され、避難完了が確認される(S−17)。
【0058】
上記実施例において、災害・故障判定部44は図4から明らかなように横軸が時間軸であるから災害又は故障が発生する時期を予想として出力することができる。この場合は、避難の緊急性や時間的ゆとりをもった避難など区別して出力することができる。災害又は故障が発生する時期の情報としては、例えば約何分後、約何時間後、約何日後、約何ヵ月後、緊急、出来る限りすみやかになどの情報である。この情報は予め記憶しておき、選択して音声合成により出力できる。
【0059】
上記実施形態は火力発電所の災害時避難誘導システムに適用した実施例について説明したが、工場・化学プラント・備蓄基地などでの温度、圧力、流量、流速などの物理的、化学的データを監視することにより化学工場の災害時避難誘導するシステムや石油タンクなどの備蓄場の災害を予想し避難誘導するシステムなどに適用でき、同様な効果を得ることができる。
【0060】
上記実施形態によれば、発電所・工場・化学プラント・備蓄基地などでの災害の発生を予測できるので、比較的ゆとりをもって避難することができる。さらに、災害の発生予想時間を報知することができるので、瞬時と、他の弱者を支援しながらの避難をすることができる。
【0061】
【発明の効果】
この発明によれば、発電所・工場・化学プラント・備蓄基地などの災害発生を事前に予測して避難誘導させることができる。
【図面の簡単な説明】
【図1】本発明の発電所・工場等における避難誘導システムの実施形態を説明するためのシステム構成図。
【図2】図1の各エリアの構成を拡大して示す説明図。
【図3】図1の災害予測演算部の実施例を説明するための回路構成図。
【図4】図3の災害発生可能性有りを予測するプロセスの実施例を説明するための時間軸に対するタービン温度の関係を示す特性曲線図。
【図5】本発明の避難誘導方法の実施例を説明するためのフローチャート。
【符号の説明】
1…避難誘導システム、2…火力発電所、3…各種センサ、4…情報記憶装置、5…災害予測演算部、6…災害予測情報出力装置、7…避難径路情報記憶装置、8…最適避難誘導径路図の選択部、9…避難誘導情報報知装置、10…エリア、11…表示装置、14…発電制御装置、15…タービン発電機、16…燃料タンク、17…煙突、18…開閉所、19…事務所、20…守衛所、21…通路、22…避難所、23…各エリア監視データ収集装置、25…出入監視センサ、26…各エリア出入監視装置、27…人の有無判定部、28…人情報記憶装置、29…監視装置、30…人間、35…正常運転範囲データテーブル、36…計測値、37,41…照合回路、38…異常検出部、39…災害・故障検出部、40…災害発生閾値データテーブル、42…閾値以上、43…災害発生可能性あり、44…閾値以下、45…故障、46…停止、47…修理、55…パソコン、56…防災盤、57…防災センタ、58…消防署・警察署などの官庁、60…避難確認装置、61避難完了判定部、52…避難状況の確認部。
[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to an evacuation guidance system in a power plant, a factory, or the like that provides optimal evacuation guidance information.
[0002]
[Prior art]
2. Description of the Related Art Conventionally, disasters in, for example, chemical plants such as power plants, factories, chemical plants, and stockpiling bases have occurred suddenly at unexpected times, and have not stopped. Chemical factory accidents include explosions not only during business but also on holidays, causing major disasters in nearby private houses and shops. In recent years, a gas station has been located near an exploding chemical plant, which has led to a large-scale sea of fire in a war situation.
[0003]
The current evacuation guidance in such an accident is to ring the emergency bell after the explosion occurs, to notify the disaster by broadcasting in the facility, etc., and to guide the evacuation. Due to the sudden explosion, the chief of disaster prevention also panicked, and no evacuation guide was issued to confirm safety.
[0004]
[Problems to be solved by the invention]
However, since evacuation destinations and disaster information are guided from the disaster prevention center by on-premise broadcasting or text display when a disaster occurs, evacuation is not guided in a timely manner at the time of evacuation, and casualties always occur. At the time of the disaster, the disaster prevention center did not have information on the evacuation guidance, because there was no information about the disaster situation or the vicinity of the disaster site. In particular, related parties such as power plants, factories, chemical plants, and stockpiling bases handle hazardous materials and gases, and there is a strong demand for "disaster forecasting" in terms of preventing secondary disasters.
[0005]
The present invention has been made to solve the conventional problems, and evacuation in power plants, factories, etc., in which the occurrence of disasters in power plants, factories, chemical plants, stockpiling bases, etc. is predicted in advance and evacuation is guided. It is intended to provide a guidance system.
[0006]
[Means for Solving the Problems]
In order to achieve the above object, the present invention provides an evacuation guidance system in a power plant, a factory, or the like having the following configuration.
[0007]
That is,The present inventionEvacuation guidance systems at power plants and factories inProduction-related locations such as power plants and factoriesEvacuation route information storage means for storing in advance an evacuation route map to an evacuation center in an evacuation route information storage device for each area;A sensor that is provided in the equipment installed in the apparatus and outputs operating state monitoring information of the equipment, and an operating state that stores a change over time of a measured value of the operating state monitoring information of the equipment for each predetermined measurement item Monitoring information storage means, based on the operation state monitoring information of the equipment output by the sensor;Measures a predetermined measurement item and monitors the change over time of this measurement value.In the operating state monitoring information storage means.Operation status supervisorSightStep and saidA normal operating range data table in which information on a safe normal operating state of the equipment is stored, and operating state monitoring information stored in the operating state monitoring information storage means are continuously or intermittently read out, and normal operating range data is read out. Abnormality detection means for detecting the presence or absence of abnormal temporal change by comparing the information with a table; a disaster occurrence threshold table storing a threshold value at which a temporal change disaster occurs for each measurement item of the equipment; Disaster / failure determination means for reading a threshold value of each measurement item in the disaster occurrence threshold value table when the abnormality is detected, and comparing it with the operation state monitoring information to determine whether the disaster is a failure or not; By means,If it is determined that a disaster has occurred based on the change over time in the measured values,Includes at least one information selected from disaster occurrence predicted location information, disaster content information, and disaster occurrence predicted time informationDisaster occurrence prediction information output means for outputting disaster occurrence prediction information,A monitoring sensor that is provided at an entrance and exit for each area and monitors entry and exit of people into each area;When the disaster occurrence prediction information is outputAs a search condition, a safe evacuation route is used as a search condition.Evacuation guidance route mapToFrom the evacuation route information storage device.SearchEvacuation route map selecting means and before searchingEvacuationDifficult to navigate route mapIn the areaAnd an evacuation guidance information informing means for informing.
[0008]
BookAccording to the invention,Of facilities such as power plants and factoriesMonitor changes in physical and chemical measurements over timeAfter determining whether it is a disaster or a failure, in the event of a disaster, the evacuation guidance route map from the area where people are present to the relevant areaSince the notification is made, the evacuation guidance can be performed with an appropriate evacuation guidance route diagram with a relatively margin.
[0012]
In the above evacuation guidance system,Since the disaster occurrence prediction information includes a place, contents, time, and the like, each evacuee can select an evacuation method according to the evacuation ability, so that evacuation in which a weak person such as a physically handicapped or sick person has been rescued can be considered.
[0013]
In the above evacuation guidance system,When the disaster occurrence prediction information is output, the presence / absence information of the person in each predetermined area is confirmed, and the optimum evacuation guidance route map is preferentially notified from the “present” area.
[0014]
AlsoWhen the disaster occurrence prediction information is output, the optimal evacuation guidance route map is notified preferentially from the area where people are present, so that the evacuation target person can know the optimal evacuation guidance route diagram first.
[0015]
In the above evacuation guidance system,When disaster occurrence prediction information is output, information on the presence / absence of a disaster in the area is checked, and if "Yes", the optimal evacuation route information is output.You.
[0016]
This allowsCheck who is in the disaster forecast areaSuitableIt is possible to report the shortest optimal evacuation route information.
[0020]
In the above evacuation guidance system,The evacuation guidance route map is selected from the “none” area by checking the presence / absence information of each predetermined area.You.
[0021]
This allowsA highly reliable evacuation guidance route map can be provided.
[0022]
The evacuation guidance system in a power plant / factory is an evacuation guidance system for a power plant, a factory, a chemical plant, a nuclear reactor, a stockpiling base, and the like when a relatively disaster occurs, at a production-related site involving a man-made disaster. Power plants, factories, chemical plants, nuclear reactors, stockpiling bases, etc. are subject to physical and chemical changes during operation, standby, and construction, resulting in fires and explosions, spills of dangerous gases and radioactivity, etc. Refers to an object that may cause a disaster.
[0023]
Evacuation guidance at the time of disaster is guidance to evacuees when a disaster occurs, when the occurrence of a disaster is announced. Disaster content information is based on the change in measured values over time, and when the occurrence of a disaster is predicted, a disaster such as a fire, explosion, dangerous gas leak, or radioactive leak is predicted from the mounting device, equipment, or measurement item of the measurement sensor. And information such as its scale.
[0024]
BEST MODE FOR CARRYING OUT THE INVENTION
Next, an embodiment of an evacuation guidance system in a power plant / factory or the like of the present invention will be described with reference to FIG. In this embodiment, the physical and chemical measurement items during operation of each equipment constituting the thermal power plant are set in advance, measured, and the signs of abnormal operation are predicted by monitoring the measured values. This is an evacuation guidance system that informs staff such as working workers of optimal evacuation guidance route map information.
[0025]
The evacuation guidance system 1 includes various sensors 3 for measuring predetermined physical and chemical measurement items during power generation in a thermal power plant 2 and information storage for collecting and storing the measured values of the outputs of the various sensors 3. The device 4 and the measured values of the outputs of the various sensors 3 stored in the information storage device 4 are read, and the temporal changes of the outputs of the various sensors 3 are monitored as operating state monitoring information. A disaster prediction operation unit 5 for predicting the possibility of occurrence, a disaster prediction information output device 6 for outputting disaster occurrence prediction information when the disaster prediction operation unit 5 predicts the occurrence of a disaster from a change over time of the measured value, When the prediction information output device 6 outputs disaster prediction information, an optimal evacuation guidance route map is automatically retrieved from the previously stored evacuation route information storage device 7 for each predetermined area and output. Evacuation guidance The selection unit 8 of the road map, the evacuation guidance information notifying device 9 for automatically notifying the retrieved optimal evacuation guidance route map for each area to each area, and the area 10 output by the evacuation guidance information notifying device 9 A display device 11 for displaying the optimal evacuation guidance route map in each area 10 in the power plant 2.
[0026]
In the thermal power plant 2, a turbine generator 15 is installed at the center, and around this, a fuel tank 16 containing oil as a fuel for driving and controlling the turbine generator 15 is discharged, and smoke is exhausted through a boiler. , A switch station 18 equipped with a circuit breaker that cuts off a circuit such as a leak or short circuit in the transmission / distribution path that transmits and distributes power generated by the turbine generator 15, and the operating state of the turbine generator 15. An office 19 in which a control console constituting the generator control device 14 for monitoring and controlling the work is installed, a guardhouse 20 and the like are installed. Furthermore, a passage 21 for automobiles and humans passing between these facility locations is laid in the thermal power plant 2, and an evacuation site 22 is set as a safe place where thermal power plant personnel can evacuate in the event of a disaster. An area 10 is provided at a place 22 as a unit of guidance for evacuation of the staff. The thermal power plant 2 is provided in this manner.
[0027]
The thermal power plant 2 is provided with various sensors 3 that output operating state monitoring information for predicting a disaster. The operating state monitoring information of the thermal power plant 2 is information monitored on a control console of the power generation control device 14 installed in the office 19, for example. The operation state monitoring information is information output by various sensors 3 provided in the power generation equipment, and includes physical and chemical measurement items such as power generation, transmission current, transmission voltage, turbine rotation speed, turbine temperature, power generation frequency, and the like. These are measured values such as the generator rotation speed, generator temperature, fuel tank pressure, fuel tank temperature, and fuel consumption. These pieces of operation state monitoring information are continuously or intermittently stored in the information storage device 4 in association with each piece of measurement date / time information. If the monitoring information of the console is sufficient, the monitoring information of the console is used as the operating state monitoring information. The operating state monitoring information is a measurement item for predicting the occurrence of a disaster, and may be a single item as long as the item is effective for occurrence or prediction of a disaster.
[0028]
The various sensors 3 are sensors that measure, for example, items such as pressure, temperature, time, humidity, flow rate, flow velocity, viscosity, voltage, current, and electric power, and convert the electric signals into electric signals and output the electric signals. The pressure, the flow rate, the flow rate, and the viscosity output a pressure value by a piezoelectric sensor as an electric signal. As for temperature, a change in temperature is output as a change in electricity by a thermistor. Humidity is measured by a humidity sensor.
[0029]
At each entrance of each area 10, an entrance / exit monitoring sensor 25 is installed for monitoring the entry / exit of a staff member and determining whether or not a staff member (human) is present in each area 10. That is, in a certain area 10, for example, if there are five resident persons and three source persons, it is output that there are resident persons in the area 10 and the number of persons is output as two. The output of the entry / exit monitoring sensor 25 in each area 10 is supplied to the presence / absence determination unit 27 via each area entry / exit monitoring device 26, and the person information storage device 28 monitors the presence / absence information of the person in each area 10. It is stored in association with year, month, day, time information, area name, and the like.
[0030]
FIG. 2 is an enlarged view showing the relationship between the various sensors 3 and the access monitoring sensor 25 in each area 10 for easy understanding. In FIG. 2, a monitoring device 29, for example, a number of ITV cameras that can monitor one or a plurality of devices in each area 10 is installed. The monitoring device 29 captures and outputs the state of the devices and the persons (members) 30 existing in the area 10. When a fire occurs from the device, an image of the fire is output, and if the human 30 has started evacuation, an image of the evacuation state is output. Therefore, the monitoring device 29 outputs an image of the current position of a person who is injured and cannot move or a physically disabled person and cannot move. Knowing where people cannot move in this way is extremely useful in rescue. The output of each monitoring device 29 provided in each area 10 is stored in the information storage device 4 via each area monitoring data collection device 23 in association with the date and time information and the area information.
[0031]
Next, disaster prediction will be described.
The disaster prediction calculation unit 5 reads the measured values of the outputs of the various sensors 3 stored in the information storage device 4 continuously or intermittently (for a predetermined period), and monitors the change over time of the outputs of the various sensors 3 with the operation state monitoring information. When an abnormal time-dependent change is indicated, a comparison operation is performed with a change value of the disaster occurrence stored in advance, and an AI logical operation is performed to predict the possibility of the occurrence of the disaster. An abnormal change with time refers to a change with a large gradient different from the change with time in a normal operating state.
[0032]
The disaster prediction calculation unit 5 monitors the operation state by the configuration shown in FIG. 3, and outputs a disaster prediction when an abnormality is detected. Next, a specific embodiment for monitoring a driving state and predicting a disaster will be described with reference to FIG. The safe normal operation state (condition) of each device and each device is stored in the generator operation normal operation range data table 35 in advance. The measured values 36 of the various sensors 3 stored in the information storage device 4 are read out and sequentially collated by the collation circuit 37 with the normal operation value stored in the generator operation normal operation range data table 35, and are determined in advance. If it is the measured value in the normal operation operation state obtained, it is a normal state.
[0033]
On the other hand, when the comparison circuit 37 shows a change different from the normal state as a result of the comparison, the abnormality detection unit 38 detects whether there is an abnormal change with time. When detecting the presence of a change with time, the abnormality detection unit 38 determines that an abnormality has occurred and outputs the result. Further, the abnormality detection unit 38 outputs an output that is regarded as normal operation when detecting no change with time. When the abnormality detection unit 38 outputs an abnormality (when the measured value indicates a temporal change), the disaster / failure determination unit 39 determines whether “failure” or “disaster has occurred” as follows.
[0034]
In order to determine whether a failure has occurred or a disaster has occurred, the disaster occurrence threshold data table 40 includes information on the occurrence of a disaster with time-dependent changes obtained by various experiments for each device and each measurement item of each device. Is stored. The disaster / failure determination unit 39 reads the threshold value of the measurement item determined to be abnormal from the disaster occurrence threshold data table 40, and compares the threshold value with the matching circuit 41. The change with time is processed by, for example, gradient value information. That is, when the collation circuit 41 outputs the gradient value of the item for which the abnormal value is measured is equal to or greater than the threshold value read from the disaster occurrence threshold data table 40 as a result of the collation, the collation circuit 41 determines that the value is a dangerous change value and determines that there is a possibility of a disaster. Output the judgment.
[0035]
On the other hand, as a result of the comparison, when the gradient value of the item for which the abnormal value is measured outputs a value equal to or smaller than the threshold value read from the disaster occurrence threshold data table 40, the collation circuit 41 outputs a failure 45 determination.
[0036]
As a result of the determination of the failure 45, the operation of the thermal power plant 2 is stopped 46, repaired 47, and the process ends. The abnormality 45 that may become a disaster is determined from a characteristic curve diagram as shown in FIG. 4, for example. For example, the determination is made based on a graph with the horizontal axis representing the time axis and the vertical axis representing the turbine temperature, for example.
[0037]
In this graph, the change in the normal operating temperature N is indicated by a solid line. The solid line N indicating normal operation shows the operating temperature when the temperature of the turbine rises with the passage of time from normal temperature after switch-on and reaches a preset temperature during steady operation, and indicates steady operation while exhibiting stable saturation characteristics. continue. In this graph, the dashed line indicates the normal operating maximum temperature M of the turbine.
[0038]
At some point, the temperature measurement value of the temperature detection sensor 3 starts increasing as indicated by the dotted line G, and when it is determined that the temperature is increasing at a speed exceeding the normal operation maximum temperature M, it is determined that a disaster occurs. The determination that the temperature rises at a speed exceeding the normal operation maximum temperature M and that there is a possibility of occurrence of a disaster is predicted by inferring from the angle (gradient) indicated by the dotted line G, that is, a change with time. The angle (gradient) indicated by the dotted line G, that is, the time-dependent change value, is obtained by collecting a large number of various types of experimental data in advance for each measurement item of each device and storing the data as a threshold value of disaster occurrence (for example, fire occurrence). The angle indicated by the dotted line G, that is, the change with time, is stored in the disaster occurrence threshold data table 40 in association with each device and model name.
[0039]
The angle indicated by the dotted line G (change with time) is compared with the disaster occurrence threshold data of the device stored in the disaster occurrence threshold data table 51 by the matching circuit 52. If the angle is equal to or greater than the disaster occurrence threshold, there is a possibility of occurrence of a disaster. And outputs the disaster occurrence prediction. If it is equal to or less than the disaster occurrence threshold, the power generation of the thermal power plant 2 is stopped by determining that it is out of order and repaired. These outputs are stored in the information storage device 4 in association with the device name.
[0040]
A point G1 of a dotted line G indicates a time when a measurement value for outputting disaster occurrence prediction information is obtained. An extension line G2 extending from the point G1 is a prediction line obtained by the AI logical operation. The time S at the intersection of the predicted line G2 and the normal operating maximum temperature M of the turbine is a standard of the predicted disaster occurrence time information. Thus, the disaster prediction information output device 6 outputs disaster occurrence prediction information in advance. The disaster occurrence prediction information includes disaster occurrence prediction location information and disaster content information from the sensor that measured the abnormality, and disaster occurrence prediction time information from the graph shown in FIG. The content information of the disaster in this embodiment is based on the change in the measured value over time, and when the occurrence of the disaster is predicted, the mounting device of the measurement sensor, the equipment, the disaster such as a fire or an explosion predicted from the measurement item, and the scale thereof Such information.
[0041]
Next, notification of disaster prediction will be described.
When the disaster prediction information device 6 reads out the prediction information of the possibility of occurrence of a disaster by the turbine generator from the information storage device 4, it displays it on the personal computer 55 and the disaster prevention board 56, and at the same time, through the disaster prevention center 57, the police station and the fire station. To Government Office 58. Further, the disaster prediction information device 6 outputs the information to the optimum evacuation guidance route selection unit 8 for selecting the optimal evacuation guidance route map for each area.
[0042]
The optimal evacuation guidance route selection unit 8 searches for an evacuation guidance route map showing an optimal guide map for evacuation of the staff 30 in the area 10 where the occurrence of the disaster is predicted to the evacuation center 22. In the passages in the building and the road in the site that are most suitable for evacuating to the evacuation center 22, a safe evacuation route without hazard such as dangerous gas leaks or roads under construction is automatically searched (selected). ) Is done. In addition, the staff 30 can operate his / her personal computer 55 to directly access the selection unit 8 of the optimal evacuation guidance route map and select an evacuation route according to the situation judgment. The optimal evacuation guidance route map selecting unit 8 sequentially reads the evacuation guidance route map patterns from the evacuation guidance route device 7 in which a large number of evacuation guidance route diagrams are stored and stored, and optimally guides the evacuation guidance route map to a predetermined evacuation site 22. Is automatically searched and output. The optimal evacuation guidance route diagram is a diagram in which evacuation directions are described, for example, in a campus map so that an instantaneous and error-free determination can be made even in a panic state. The optimum evacuation guidance route map information selected by the optimal evacuation guidance route map selection unit 8 is input to the evacuation guidance information notification device 9. The evacuation passage and the road to the evacuation center 22 are the latest information that has been confirmed by a surveillance camera and an optical fiber sensor to be able to pass.
[0043]
In the evacuation guidance route storage device 7, a large number of evacuation guidance route maps which can be considered for evacuation from each area 10 in the thermal power plant 2 to the evacuation site 22 are stored in advance in association with each area 10. That is, the evacuation guidance route storage device 7 stores a large number of evacuation guidance routes from each area 10 to a predetermined evacuation site 22 in advance. The evacuation guidance route covers all roads and passages in the building shown on the map, and is a variety of routes leading to the evacuation site 22.
[0044]
Since the prediction of the occurrence of a disaster occurs suddenly, the optimal evacuation guidance route map is always different. Therefore, the selection unit 8 of the optimal evacuation guidance route map selects the optimal evacuation guidance route map at that time. Further, the optimal evacuation guidance route map can be searched and selected from the evacuation guidance route storage device 7 from the area 10 where the staff (human) 30 in the thermal power plant 2 exists, and the staff 30 in all the areas 10 can be searched. Can also select the optimal evacuation guidance route map at the same time. That is, when the disaster occurrence prediction information is output, the selection unit 8 of the optimal evacuation guidance route map outputs the optimal evacuation route map information after confirming whether or not a disaster has occurred in the area. Further, the optimum evacuation guidance route map is selected from the areas where there is no obstacle, by confirming the obstacle presence / absence information captured by the monitoring device 29 of each predetermined area 10.
[0045]
The optimal evacuation guidance route map selection unit 8 outputs the optimal evacuation guidance route map of each area 10 to the evacuation guidance information notification device 9. The evacuation guidance information notification device 9 is a circuit group that drives each display device 11 provided in each area 10. On each display device 11 of each area 10, an optimal guide evacuation route map for guiding the staff 30 who is the evacuation target person to the evacuation center 22 is simultaneously displayed. Each display device 11 has an optical display unit and an acoustic display unit as a guide display.
[0046]
The optical display means is, for example, an electric light display panel, a display panel having an LED array, a plasma display, a car navigation, or the like. The acoustic display means broadcasts, for example, and notifies by sound from a speaker. The optimal evacuation guidance route map information is also output to an information terminal registered in advance, for example, a personal computer or a mobile phone connected to an intranet or the Internet. The evacuation guidance information notification device 9 is provided with a drive circuit for driving these display means. In addition, the optimal evacuation guidance route map information is provided for the purpose of making a detour to an area other than the area 10 where the occurrence of a disaster is predicted.
[0047]
The human information storage device 28 stores information on whether or not the staff 30 is present in the area 10 where the occurrence of the disaster has been predicted or in another area 10. The information of the area 30 where the staff 30 is present is output to the selection unit 8 of the optimal evacuation guidance route map, and the selection unit 8 of the optimal evacuation guidance route map obtains the information of the area 10 where no person 30 exists. Therefore, the selection unit 8 for the optimal evacuation guidance route map can preferentially retrieve the optimal evacuation guidance route map from the area 10 where the staff 30 exists.
[0048]
In the evacuation center 22, an evacuation person confirmation device 60, for example, an ITV camera is installed so that the number of evacuated persons can be checked, and the evacuation completion determination unit 61 can confirm the evacuation status of the evacuation target person. That is, the evacuation person confirmation device 60 monitors whether the evacuation target person (member) 30 has evacuated to the evacuation site 22. Further, the evacuation person confirmation device 60 provided in the evacuation center 22 monitors the evacuation status to the evacuation site 22, and the evacuation completion determination unit 61 determines “how many of the evacuation target persons have evacuated”, “ Is the evacuation completion. When the evacuation completion determination section 61 confirms the evacuation completion, the evacuation completion information is stored in the person information storage device 28. The evacuation completion information stored in the human information storage device 28 in this manner is read out by the evacuation status confirmation unit 62 and automatically output (reported) to the government office 58 such as a fire station or police station. Government offices 58 such as fire departments and police stations can check the evacuation status of evacuees after the disaster prediction is output.
[0049]
Next, an evacuation guidance method in a thermal power plant will be described with reference to the flowchart in FIG. The same parts as those in FIGS. 1 to 4 are denoted by the same reference numerals and described, and detailed description thereof will be omitted.
Create a database as a preparation process.
[0050]
The disaster prevention center 57 accumulates various evacuation guidance route maps from each area 10 to the evacuation center 22 in association with each area 10 in the evacuation guidance route storage device 7. During construction on the evacuation route, the disaster prevention center 57 corrects and stores the evacuation route map by inputting any roads and passages that are not allowed to pass (S-1). The disaster prevention center 57 sets the normal operation range of each physical and chemical measurement item corresponding to the model name of each device and equipment constituting the thermal power plant 2 in the normal value data table 40, and stores it in association with each measurement item. (S-2). The disaster prevention center 57 sets, in the disaster occurrence threshold data table 51, the physical and chemical measurement items of the thermal power plant 2 with respect to the physical and chemical measurement items over time at which the disaster occurs, and associates them with each measurement item. It is stored (S-3). Thus, the preparation process is completed.
[0051]
Next, the operation of the evacuation guidance system is started.
During the power generation of the thermal power plant 2, the various sensors 3 automatically monitor and measure physical and chemical measurement items of each device and equipment constituting the thermal power plant 2 (S-4), and measure the measured values. It is stored in the information storage device 4 as operating state monitoring information (S-5). The disaster prediction calculation unit 5 automatically or continuously reads out each measurement value stored in the information storage device 4 continuously or intermittently, and automatically plots the measurement values in a graph as shown in FIG. 4 for each measurement item. , The normal operation which operates with the solid line N is confirmed.
[0052]
This normal operation is confirmed by comparing the normal value of each measurement item read from the normal value data table 40 with the matching circuit 42 (S-6). In this process, the presence or absence of a temporal change as indicated by a dotted line G in FIG. 4 is detected and stored as disaster occurrence prediction information (S-7). If there is no change over time, it is determined that normal operation is being performed, and the power generation operation is continued (S-8). The disaster occurrence prediction information includes a device (equipment) name, an area name, a disaster occurrence expected time, and the like, for which a possibility of a disaster is predicted from the sensor.
[0053]
If there is a change with time, the abnormality detection unit 43 outputs an abnormal operation (S-9). If there is an abnormality, the disaster / failure determination unit 44 determines whether it is a disaster or a failure (S-10). That is, the disaster / failure determination unit 44 reads the disaster occurrence threshold value of the measurement item indicating the temporal change from the disaster occurrence threshold data table 51, and if the temporal change value exceeds the read disaster occurrence threshold value, It is determined as a change value, and disaster occurrence prediction information is output on the assumption that a disaster may occur. On the other hand, if the time-dependent change value does not exceed the disaster occurrence threshold, an output is determined to be a failure (S-11).
[0054]
When the disaster / failure determination unit 44 determines that a failure has occurred, the power generation control device 14 stops the power generation operation of the thermal power plant 2 and performs repair 47 (S-12), and then resumes thermal power generation.
[0055]
When the disaster / failure determination unit 44 determines that there is a possibility of occurrence of a disaster, the disaster prediction information output unit 6 sets the name of the device with the possibility of occurrence of the disaster and this device in the selection unit 8 of the optimal evacuation guidance route map. Information on the contents of the disaster, such as the name of the area where the disaster has occurred, is output (S-13). Further, the human information storage device 28 outputs information on the area 10 where the staff 30 is present to the selection unit 8 of the optimal evacuation guidance route map. The optimal evacuation guidance route map selection unit 8 searches for the optimal evacuation guidance route map to evacuate from each area 10 to the evacuation site 22 and outputs the retrieved evacuation guidance route map to the evacuation guidance information notification device 9.
[0056]
That is, the selection unit 8 of the optimal evacuation guidance route map stores the optimal evacuation guidance route map for the name of the device that may cause a disaster and the staff 30 in the area 10 where the device is installed. From the evacuation guidance route map storage device 7, the most suitable evacuation guidance route map for evacuating to the evacuation site 22 from each of the other areas 10 is retrieved and output. The selection unit 8 of the optimal evacuation guidance route map can preferentially output the optimal evacuation guidance route map to the area 10 where the staff 30 is present. When outputting the disaster occurrence prediction information, the selection unit 8 of the optimal evacuation guidance route map outputs the optimal evacuation route map information after confirming whether or not a disaster has occurred in the area from the monitoring device 29 (S-14). The guidance information notification device 9 displays the optimal evacuation guidance route map on each display device 11 via the drive circuit of each display device 11 provided in each area 10 (S-15). The evacuation guidance information notification device 9 can also notify a person outside the thermal power substation 2 other than the area 10.
[0057]
The evacuation target person in each area 10 evacuates to the evacuation center 22 after checking the displayed optimal evacuation guidance route map. The state of evacuation is monitored by the evacuation person confirmation device 60 (S-16). If there is a staff member 30 such as a physically handicapped person who cannot evacuate on his own, the government office 58 such as a police station or a fire department stores the information in the person information storage device 28. And the relief can be performed smoothly. These evacuation statuses are confirmed by the evacuation status confirmation unit 62, and completion of the evacuation is confirmed (S-17).
[0058]
In the above-described embodiment, the disaster / failure determination unit 44 can output the predicted time when a disaster or a failure occurs because the horizontal axis is the time axis, as is clear from FIG. In this case, it is possible to separately output the urgency of evacuation and the evacuation with time allowance. The information on the time when a disaster or a failure occurs is, for example, information about about minutes, about hours, about days, about months, emergency, and as soon as possible. This information is stored in advance and can be selected and output by speech synthesis.
[0059]
The above embodiment described an example applied to a disaster evacuation guidance system for a thermal power plant, but monitors physical and chemical data such as temperature, pressure, flow rate, flow velocity, etc. at factories, chemical plants, storage bases, etc. By doing so, it can be applied to a system for evacuation guidance at the time of a disaster in a chemical factory or a system for evacuation guidance in anticipation of a disaster at a storage yard such as an oil tank, and similar effects can be obtained.
[0060]
According to the above embodiment, it is possible to predict the occurrence of a disaster at a power plant, a factory, a chemical plant, a stockpiling base, and the like, and thus it is possible to evacuate relatively easily. Furthermore, since the estimated time of occurrence of a disaster can be notified, evacuation can be performed instantaneously and while assisting other vulnerable people.
[0061]
【The invention's effect】
According to the present invention, it is possible to predict the occurrence of a disaster in a power plant, a factory, a chemical plant, a stockpiling base, or the like in advance and guide the evacuation.
[Brief description of the drawings]
FIG. 1 is a system configuration diagram for describing an embodiment of an evacuation guidance system in a power plant, factory, or the like of the present invention.
FIG. 2 is an explanatory diagram showing an enlarged configuration of each area in FIG. 1;
FIG. 3 is a circuit configuration diagram for explaining an embodiment of the disaster prediction calculation unit in FIG. 1;
FIG. 4 is a characteristic curve diagram illustrating a relationship between a turbine temperature and a time axis for explaining an example of the process of predicting the possibility of occurrence of disaster in FIG. 3;
FIG. 5 is a flowchart illustrating an embodiment of an evacuation guidance method according to the present invention.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 ... Evacuation guidance system, 2 ... Thermal power plant, 3 ... Various sensors, 4 ... Information storage device, 5 ... Disaster prediction calculation unit, 6 ... Disaster prediction information output device, 7 ... Evacuation route information storage device, 8 ... Optimal evacuation Selection section of guide route map, 9 evacuation guidance information notification device, 10 area, 11 display device, 14 power generation control device, 15 turbine generator, 16 fuel tank, 17 chimney, 18 switchyard, 19 ... office, 20 ... guardhouse, 21 ... passage, 22 ... shelter, 23 ... each area monitoring data collection device, 25 ... access monitoring sensor, 26 ... each area access monitoring device, 27 ... presence or absence of people 28 human information storage device, 29 monitoring device, 30 human, 35 normal operation range data table, 36 measured value, 37, 41 verification circuit, 38 abnormality detection unit, 39 disaster / failure detection unit, 40: Disaster occurrence threshold data 42, above threshold, 43: possible disaster, 44: below threshold, 45: breakdown, 46: stop, 47: repair, 55: personal computer, 56: disaster prevention board, 57: disaster prevention center, 58: fire department Government offices such as police stations, 60: evacuation confirmation device, 61 evacuation completion determination unit, 52: evacuation status confirmation unit.

Claims (1)

発電所・工場等の生産関連箇所のエリア毎に避難所への避難誘導径路図を避難径路情報記憶装置に予め記憶する避難径路情報記憶手段と、
発電所・工場等に設置されている設備に設けられ、前記設備の運転状態監視情報を出力するセンサと、
予め定められた計測項目毎に前記設備の運転状態監視情報の計測値の経時的変化を記憶する運転状態監視情報記憶手段と、
前記センサにより出力された前記設備の運転状態監視情報より予め定められた計測項目を計測し、この計測値の経時的変化を監視して前記運転状態監視情報記憶手段に記憶する運転状態監視手段と、
前記設備の安全な正常運転動作状態の情報が記憶された正常運転範囲データテーブルと、
前記運転状態監視情報記憶手段に記憶されている運転状態監視情報を連続的又は間欠的に読出し、正常運転範囲データテーブルの情報と照合して異常な経時変化の有無を検出する異常検出手段と、
設備の各計測項目について経時的変化の災害が発生する閾値が記憶された災害発生閾値テーブルと、
前記異常検出手段により異常が検出されたとき前記災害発生閾値テーブルの各測定項目の閾値を読出し、前記運転状態監視情報と照合することで災害か故障かを判定する災害・故障判定手段と、
前記災害・故障判定手段により、計測値の経時的変化から災害の発生と判定された場合、災害発生予測場所情報、災害の内容情報および災害の発生予測時刻情報から選ばれた少なくとも一つの情報を含む災害発生予測情報を出力する災害発生予測情報出力手段と、
各エリア毎の出入口に設けられ、各エリアへの人の出入りを監視する監視センサと、
前記災害発生予測情報を出力したとき安全な避難路を検索条件として前記監視センサによる監視で人が存在するエリアからの避難誘導径路図、前記避難径路情報記憶装置から検索する避難径路図選択手段と、
検索された前記避難誘導径路図を該当エリアに報知する避難誘導情報報知手段と
を具備してなることを特徴とする発電所・工場等における避難誘導システム。
Evacuation route information storage means for storing in advance an evacuation guidance route map to an evacuation site in an evacuation route information storage device for each area of a production-related location such as a power plant or a factory ;
A sensor that is provided in a facility installed in a power plant, a factory, or the like , and outputs operation state monitoring information of the facility,
Operating state monitoring information storage means for storing a change over time of the measured value of the operating state monitoring information of the equipment for each predetermined measurement item,
The predetermined measurement item from the operation state monitoring information of the output equipment by the sensor are measured, change over time of watching to memorize the operation state monitoring information storage unit operating state monitoring of the measured value and hand-stage,
A normal operation range data table in which information on a safe normal operation state of the facility is stored,
Abnormality detecting means for continuously or intermittently reading out the operating state monitoring information stored in the operating state monitoring information storage means, collating it with information in a normal operation range data table and detecting the presence or absence of abnormal temporal change,
A disaster occurrence threshold table in which a threshold at which a disaster of temporal change occurs for each measurement item of the facility is stored,
When an abnormality is detected by the abnormality detection unit, a threshold of each measurement item of the disaster occurrence threshold table is read, and a disaster / failure determination unit that determines whether a disaster or a failure by comparing the threshold with the operating state monitoring information,
When it is determined by the disaster / failure determination means that a disaster has occurred based on the change over time in the measured value, at least one piece of information selected from disaster occurrence predicted location information, disaster content information, and disaster occurrence predicted time information is used. Disaster occurrence prediction information output means for outputting disaster occurrence prediction information including :
A monitoring sensor that is provided at an entrance and exit for each area and monitors entry and exit of people into each area;
Wherein the evacuation path view from the area where a person exists in the monitoring by the monitoring sensor, the evacuation path diagram you search from the evacuation path information storage device as a search condition for safe evacuation route when outputting the disaster prediction information Selecting means;
Evacuation system in power plants, factories, etc., characterized in that the Ki避 flame induction path diagram before retrieved formed by and a evacuation guidance information informing means for informing the relevant area.
JP2001389476A 2001-12-21 2001-12-21 Evacuation guidance system in power plants and factories Expired - Fee Related JP3593097B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001389476A JP3593097B2 (en) 2001-12-21 2001-12-21 Evacuation guidance system in power plants and factories

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001389476A JP3593097B2 (en) 2001-12-21 2001-12-21 Evacuation guidance system in power plants and factories

Publications (2)

Publication Number Publication Date
JP2003187362A JP2003187362A (en) 2003-07-04
JP3593097B2 true JP3593097B2 (en) 2004-11-24

Family

ID=27597682

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001389476A Expired - Fee Related JP3593097B2 (en) 2001-12-21 2001-12-21 Evacuation guidance system in power plants and factories

Country Status (1)

Country Link
JP (1) JP3593097B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6485428B2 (en) 2016-10-06 2019-03-20 住友電気工業株式会社 Management system, management apparatus, management method, and management program
CN112164208B (en) * 2020-10-12 2022-04-01 天津飞眼无人机科技有限公司 Emergency method and emergency system for chemical industry park
JP7685420B2 (en) * 2021-10-20 2025-05-29 株式会社日立製作所 PLANT OPERATION ASSISTANCE DEVICE AND PLANT OPERATION ASSISTANCE METHOD

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02226500A (en) * 1989-02-28 1990-09-10 Takenaka Komuten Co Ltd Disaster prevention supervising device for precise environmental space
JPH0528389A (en) * 1991-07-23 1993-02-05 Toshiba Corp Disaster prevention system
JP3298940B2 (en) * 1992-09-28 2002-07-08 富士通株式会社 Evacuation guidance system
JP3446996B2 (en) * 1998-09-30 2003-09-16 日立ソフトウエアエンジニアリング株式会社 Comprehensive disaster prevention and rescue system
JP2001022441A (en) * 1999-07-13 2001-01-26 Toshiba Corp Plant monitoring equipment
JP2001216591A (en) * 2000-02-01 2001-08-10 Shimizu Corp Emergency information system using portable telephone set

Also Published As

Publication number Publication date
JP2003187362A (en) 2003-07-04

Similar Documents

Publication Publication Date Title
KR102164651B1 (en) Integrated management system for industrial gas supply facility
KR102126281B1 (en) System for detecting fire using smart fire detector based on IoT and the smart fire detector
CN103041521B (en) Environmental safety monitoring and escape guide system and warning escape method
KR101025550B1 (en) Disaster Management System and Its Method
KR102476821B1 (en) hazard assessment methods for fire safety diagnosis of facility
KR101638972B1 (en) Built-in structures smart for safe emergency evacuation and provide information
KR102339691B1 (en) Intelligent centralized disaster control platform server for industrial estate
US20100090856A1 (en) Emergency alarming apparatus
JP2000113357A (en) Comprehensive disaster prevention and belief system
JP2003196770A (en) Escape guiding method in power plant, factory or the like at accident occurrence
KR20220133137A (en) Method and system for preventing serious disaster accidents
JP2008181498A (en) Monitoring device, monitoring program, and monitoring method
KR102312310B1 (en) Fire escape system capable of guidance of evacuation route
KR102229620B1 (en) Smart IOT gas alarm system
KR20220071880A (en) Digital twin disaster management system customized for underground public areas
JP3523230B2 (en) Evacuation guidance system for disasters such as earthquakes
Suryoputro et al. Active and passive fire protection system in academic building KH. Mas Mansur, Islamic University of Indonesia
JP2011151656A (en) Disaster situation display system
JP2008158879A (en) Evacuation route calculation device, evacuation route calculation method, and evacuation route calculation program
JP3593097B2 (en) Evacuation guidance system in power plants and factories
JP6469824B1 (en) Disaster information support system and disaster information support method
CN114913662A (en) Emergent visual safety supervisory systems based on block chain technique
JP2003173486A (en) Evacuation guide system using communication means in disaster time
KR102266545B1 (en) Central monitoring and management system for detecting dangerous substances
JP2023181762A (en) Evacuation support device, evacuation support method, and evacuation support system

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20040106

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20040308

A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A712

Effective date: 20040319

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20040824

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20040826

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20070903

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080903

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090903

Year of fee payment: 5

LAPS Cancellation because of no payment of annual fees