JP3600991B2 - Reinforcement embankment method using geotextile - Google Patents
[go: Go Back, main page]

JP3600991B2 - Reinforcement embankment method using geotextile - Google Patents

Reinforcement embankment method using geotextile Download PDF

Info

Publication number
JP3600991B2
JP3600991B2 JP08812396A JP8812396A JP3600991B2 JP 3600991 B2 JP3600991 B2 JP 3600991B2 JP 08812396 A JP08812396 A JP 08812396A JP 8812396 A JP8812396 A JP 8812396A JP 3600991 B2 JP3600991 B2 JP 3600991B2
Authority
JP
Japan
Prior art keywords
geotextile
embankment
soil
reinforced
earth wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP08812396A
Other languages
Japanese (ja)
Other versions
JPH09279580A (en
Inventor
吉秀 境
雄次 久保田
公利 了戒
栄治 荻迫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Corp
Original Assignee
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Corp filed Critical Shimizu Corp
Priority to JP08812396A priority Critical patent/JP3600991B2/en
Publication of JPH09279580A publication Critical patent/JPH09279580A/en
Application granted granted Critical
Publication of JP3600991B2 publication Critical patent/JP3600991B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Description

【0001】
【発明の属する技術分野】
本発明はジオテキスタイルを用いた補強盛土方法に関するものである。
【0002】
【発明が解決しようとする課題】
昨今、傾斜地盤を切り欠いて山側などに形成される盛土にあっては、盛土材として主にその切り欠きによって生じた現場発生土などを使用し、その盛土中にジオテキスタイルが上下複数段となるようにして敷設しながら、ジオテキスタイルの一端(法面側)を上方に巻き返してその一端側に位置する土壁材(盛土材がそのまま土壁材とされることもある)を巻き込むようにしており、前記ジオテキスタイルにより補強された補強盛土として構成され、法面を形成する土壁もこのジオテキスタイルにて支持された補強土壁とされるようになってきている。
【0003】
ところで、現場発生土が高含水粘性土であったり凍上性土であるなどして常に現場発生土が良好な盛土材となり得るということはない。このため、例えば盛土の土壁部分を安定的なものとするためにその土壁部分の形成に手数を要したり、また、ジオテキスタイルに対する所定の定着性を確保するために盛土全体を良質土にするなどの方法が行われており、所定の補強盛土を構築するために手間やコストが要求されている。即ち、このような良質の盛土材が得られない補強盛土の現状から、次のような問題がある。
例えば、法面仕上げとしてその法面部分を緑化する場合、植生土嚢をジオテキスタイルで巻き込むようにする方式と法面に鋼製枠を配置してこれに植生マッドを張り付ける鋼製枠方式とが提案されているが、前記植生土嚢方式ではその植生土嚢の作製及び土嚢積みに多くの労力を要して機械化施工が困難であり、土嚢積み作業で工期が長期化する問題がある。また、鋼製枠方式は高コストであり、山岳地などの変化の多い地形に合わせて自由に滑らかな法面形状を施工形成するのが困難になるという問題がある。
そして、その盛土材として高含水粘性土を採用する際には、排水補強効果と引っ張り強度効果との両方を併せ持つ高価な不織布などからなるジオテキスタイルを用いなければならない。一方、現場発生土が前記高含水粘性土であって、それを盛土材として使用することを諦める場合がある。つまり、盛土材が高含水粘性土のみであると、ジオテキスタイルの引き抜き抵抗、摩擦抵抗が不足するとともに、滑りに対する安全率が確保しにくいからである。この場合、他の良質土を用意するために不経済になるばかりでなく、その現地発生土である高含水粘性土の処理に問題が生じる。
さらに加えて、盛土材として使用される現場発生土が高含水粘性土などの凍上性材であると冬期の凍結によって凍上が発生し、その凍上性材中に敷設されているジオテキスタイルに凍着凍上力が作用してしまい、その破断、引き抜きなどが発生するという不具合があった。例えば、図はその一例を示している。盛土aを補強するため、上述したジオテキスタイルなどの補強材bをその盛土aの内部に設置する方法が採られ、北海道などの寒冷地では凍結面cが地表面や法面側から盛土内に進入し、2.0m近くまで凍結することがある。盛土材として現地発生土が非凍上性の砂、砂礫などあれば凍結しても凍上が非常に小さいため、地下水に対する適切な処理を行えば大きな問題とならない。しかし、盛土材としての現場発生土が高含水粘性土などの凍上性材であると凍結により凍上が発生し、ジオテキスタイルなどの補強材には凍着凍上力dが作用して、破断、引き抜きなどの不都合が発生していた。実際、北海道においては、アースアンカーによる法面補強において凍上によりアンカーが破断したり、引き抜けが生じることがあった。
【0004】
そこで本発明は上記事情に鑑み、補強盛土が経済的に構築できるようにすることを課題とし、補強盛土の補強土壁における法面仕上げを容易にし、また、盛土中のジオテキスタイルが適正に補強材として機能させるようにすることを目的とする。
【0005】
【課題を解決するための手段】
本発明は上記課題を考慮してなされたもので、盛土中に複数のジオテキスタイルを上下複数段にして敷設し、ジオテキスタイルそれぞれの一方の端部側に配置した土壁材をそのジオテキスタイルで巻き込んで補強土壁を設ける補強盛土方法において、少なくとも上記ジオテキスタイルの敷設個所において、上記補強土壁から凍結深度以上の間でジオテキスタイルを覆う非凍上性材からなる非凍上性部が設けられていることを特徴とするジオテキスタイルを用いた補強盛土方法を提供して、上記課題を解消するものである。
また、もう一つの発明は、盛土中に複数のジオテキスタイルを上下複数段にして敷設し、ジオテキスタイルそれぞれの一方の端部側に配置した土壁材をそのジオテキスタイルで巻き込んで補強土壁を設ける補強盛土方法において、上記補強土壁は少なくともこの補強土壁の法面から凍結深度までに及ぶ厚さを有し、かつ、該補強土壁の土壁材を非凍上性材にして補強土壁全体を非凍上性部としたことを特徴とするジオテキスタイルを用いた補強盛土方法であり、この補強盛土方法を提供して、上記課題を解消するものである。
【0006】
【発明の実施の形態】
つぎに本発明を図1から図に示す実施の形態に基づいて詳細に説明する。
図1から図3は切りかかれた地盤Aの山側に補強盛土1を構築した第一の例を示している。この補強盛土1は現場発生土などからなる盛土材2とジオテキスタイル3とを上下方向に交互にして敷設している。複数のジオテキスタイル3が所定の間隔を開いて上下に複数段にして敷設されていて、そのジオテキスタイル3それぞれの法面7側となる一方の端部4を巻き上げ、土壁材5を巻き込むようにしており、この巻き込み部分における土壁材5が上下に連続することで補強土壁6が設けられている。そして、この第一の例にあっては、ジオテキスタイル3の敷設個所において、補強土壁6から凍結深度以上の間で前記ジオテキスタイル3を覆う非凍上性材からなる非凍上性部10が設けられているものである。
図1に示す例での補強盛土1は、上記ジオテキスタイル3を保持する良質土からなる保持層9が上下複数段にして設けられ、その保持層9の間の盛土材2は粘性土などの現場発生土が使用されている。そして、ジオテキスタイル3が埋設されている部分において、補強土壁6から凍結深度11以上の間が非凍上性部10としているものとなっている。凍上対策としたこの非凍上性部10に使用される非凍上性材は、後述の安定処理土(ただし、セメント添加率15〜20%:高含水粘性土を非凍上性とするには、セメント添加率は15〜20%必要)又は砂、砂礫が使用される。非凍上性部10での前記安定処理土は上述のようにジオテキストタイルを保持するための良質土として使用できると共に、この凍上対策の非凍上性材としても使用できるものであることから、補強土壁6の裏面に連続する保持層をこの安定処理土とすれは、この保持層が前記非凍上性部10も併せ持ったものと して構成することができる。なお、図1に補強盛土1における補強土壁6は植生土嚢12を土壁材として使用したものであるが、これに限定されるものではない。
【0007】
この図1に示した例では上記非凍上性部10の間の盛土材2は通常のものであり高含水粘性土とされることもある。このため、非凍上性部10の間において補強土壁6は背面側から凍上力dを受けることがある。しかし、補強土壁6を巻き込むジオテキストタイル3の一方の端部4は、埋設されている部分に比べて拘束がなく遊びが存在しているため、前記凍上力をその遊びにて吸収することができる。
図2は上記図1に示した補強盛土1の変形であり、同様に補強土壁6が植生土嚢12から形成されている。そして、この図2に示した補強盛土1にあっては、ジオテキスタイル3が敷設されている部分以外においても、即ち、上下のジオテキスタイル3の間においても、補強土壁6の背面から凍結深度11以上に亘る間に上記安定処理土又は砂礫からなる非凍上性材にて非凍上性部13が設けられているものであり、前記補強土壁6の背面側全面に配置された非凍上性部10,13が凍結深度11以上の厚さで存在して凍上が生じないように設けられているものである。
【0008】
図3は上記図1に示した補強盛土1における補強土壁6のみが変更されている例であって、その補強土壁6は安定処理土を土壁材5としているものであり、法面7は植生マット8を配置したり吹き付け工法を採用することにより緑化されている。安定処理土を土壁材とする補強土壁を有するこの補強盛土1にあっては図1に示す例と同じように、補強土壁6が背面側から凍上力dを受けるが、ジオテキストタイル3の一方の端部4に上述の理由により遊びが存在し、前記凍着凍上力をその遊びにて吸収するようになる。なお、補強土壁6の厚さは0.5〜0.8mとしている。
【0009】
上記各例の安定処理土は、地盤Aを切り欠きしたことで生じた粘性土に、セメントや石灰などの保形剤を混合したものである。そして、上記土壁材での安定処理土は、保形剤混合初期時に整形容易な特性を有するものとし、盛土材2を盛って整地される毎に、ジオテキスタイル3の法面側に前記安定処理土を盛り、この安定処理土をバックホーの法面バケットなどにて整形して所要の法面を形成するものとする。
【0010】
図4は第二の例を示している。この第二の例の補強盛土1にあっても上記各例と同じように複数のジオテキスタイル3が上下に複数段にして敷設され、そのジオテキスタイル3それぞれの法面7側となる一方の端部4を巻き上げ、土壁材5を巻き込むようにしており、この巻き込み部分における土壁材5が上下に連続することで補強土壁6が設けられている。この第二の例における補強盛土1では、前記補強土壁6が図3に示す例と同じように非凍上性材である安定処理土を土壁材5としており、その法面に対して、植生マット8を配置したり吹き付け工法を採用することにより緑化されている。そして、この例の補強土壁6はその厚さを凍結深度11以上とし、かつ、補強土壁全体を非凍上性部としており、これによって凍上が生じないようにしているものである。
盛土中のジオテキスタイル3は補強土壁6の背面側から保持層9に埋設されている状態を示している。この保持層9は上記の例の場合と同じように砂礫や砂質土、または安定処理土からなる良質土からなるものである。しかし、補強土壁が安定処理土からなりその厚さも充分に大きいことから、補強土壁自体でジオテキスタイルを確実に保持して引き抜き抵抗、摩擦抵抗が確保するようになり、必ずしもこの保持層が必要となるものではない。
【0011】
このように、図4に示す例では凍結深度までに及ぶ厚さを有し、土壁材を非凍上性材にして補強土壁全体を非凍上性部としているので、ジオテキスタイルに作用する凍着凍上力の発生が抑えられ、そのジオテキスタイルの破断や引き抜けが防止できる。
【0012】
【発明の効果】
以上説明した本発明によれば、盛土中に複数のジオテキスタイルを上下複数段にして敷設し、ジオテキスタイルそれぞれの一方の端部側に配置した土壁材をそのジオテキスタイルで巻き込んで補強土壁を設ける補強盛土方法において、少なくとも上記ジオテキスタイルの敷設個所において、上記補強土壁から凍結深度以上の間でジオテキスタイルを覆う非凍上性材からなる非凍上性部が設けられていることを特徴とするので、ジオテキスタイルに対する凍上力が作用せずに破断、引き抜けが無くなり、引き抜き抵抗、摩擦抵抗が確保されるようになる。
さらにまた、補強土壁は少なくともこの補強土壁の法面から凍結深度までに及ぶ厚さを有し、かつ、該補強土壁の土壁材を非凍上性材にして補強土壁全体を非凍上性部としたことで、補強土壁側で凍上が生じないようになり、ジオテキスタイルの破断や引き抜けが防止できるなど、実用性に優れた効果を奏するものである。
【図面の簡単な説明】
【図1】本発明に係るジオテキスタイルを用いた補強盛土方法の第一の例においてジオテキスタイル敷設個所に非凍上性部が設けられた補強盛土を示す説明図である。
【図2】第一の例においてジオテキスタイル敷設個所の間に非凍上性部が設けられた補強盛土を示す説明図である。
【図3】第一の例において補強土壁の土壁材を安定処理土とした補強盛土を示す説明図である。
【図4】第二の例の補強盛土を示す説明図である。
【図5】従来のジオテキスタイルが設けられた補強盛土を示す説明図である。
【符号の説明】
1…補強盛土
2…盛土材
3…ジオテキスタイル
5…土壁材
6…補強土壁
7…法面
9…保持層
10,13…非凍上性部
11…凍結深度
[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to a reinforcing embankment method using geotextile.
[0002]
[Problems to be solved by the invention]
In recent years, in the case of embankments formed on the mountain side etc. by cutting out the sloped ground, geotextiles are used as embankment materials mainly in the field generated by the notch, and the geotextile becomes multiple steps up and down during the embankment While laying in this way, one end (slope side) of the geotextile is wrapped up and the earth wall material located on that one end side (the embankment material may be used as it is as the earth wall material) is rolled in. The geotextile is reinforced as an embankment reinforced with the geotextile, and the earth wall forming the slope is also becoming a reinforced earth wall supported by the geotextile.
[0003]
By the way, it is not always possible that the soil generated at the site can be a good embankment material because the soil generated at the site is a highly water-containing viscous soil or a frost-heaving soil. For this reason, for example, it takes time and effort to form the earth wall portion of the embankment in order to make the earth wall portion stable, and in order to secure a predetermined fixing property to the geotextile, the entire embankment is made of high quality soil. In order to construct a predetermined reinforcing embankment, labor and cost are required. That is, there is the following problem from the present state of the reinforcing embankment in which such a high quality embankment material cannot be obtained.
For example, when greening the slope part as a slope finish, a method of rolling the vegetation sandbags with geotextile and a steel frame method of placing a steel frame on the slope and attaching a vegetation mud to it are proposed. However, the above-mentioned vegetation sandbag method requires a lot of labor for production and laying of the vegetation sandbag, so that it is difficult to perform mechanized construction, and there is a problem that the construction period is prolonged in the sandbag loading operation. In addition, the steel frame method is expensive, and there is a problem that it is difficult to freely form a smooth slope in conformity with terrain such as mountainous land where there are many changes.
When a high water content viscous soil is used as the embankment material, a geotextile made of an expensive nonwoven fabric having both a drainage reinforcing effect and a tensile strength effect must be used. On the other hand, there is a case where the soil generated at the site is the highly water-containing viscous soil, and the use of the soil as the embankment material is abandoned. In other words, if the embankment material is only a highly water-containing viscous soil, the pull-out resistance and the frictional resistance of the geotextile are insufficient, and the safety factor against slipping is difficult to secure. In this case, not only is it uneconomical to prepare another good-quality soil, but also there is a problem in the treatment of the highly hydrated clayey soil that is the locally generated soil.
In addition, if the soil used as embankment material is frost-heaving material such as highly water-containing viscous soil, freezing in the winter will cause frost heaving and freeze-freeze on the geotextile laid in the frost-heaving material. There has been a problem that the force acts and breaks or pulls out. For example, FIG. 5 shows an example. In order to reinforce the embankment a, a method of installing the reinforcing material b such as the above-mentioned geotextile inside the embankment a is adopted. In a cold region such as Hokkaido, a frozen surface c enters the embankment from the ground surface or the slope side. And may freeze to near 2.0 m. If the generated soil is non-frost-absorbing sand or gravel as the embankment material, even if it freezes, the frost heaving will be very small, so if proper treatment of groundwater is not a serious problem. However, if the soil generated at the site as an embankment material is a frost-heaving material such as a highly hydrated viscous soil, frost heaving occurs due to freezing, and the frost-freezing frost heaving force d acts on the reinforcing material such as geotextile, causing breakage and pulling out. The inconvenience has occurred. In fact, in Hokkaido, when the slope was reinforced by an earth anchor, the anchor might break or be pulled out due to frost heave.
[0004]
In view of the above circumstances, it is an object of the present invention to make it possible to construct a reinforcing embankment economically, to facilitate the finishing of a slope on a reinforcing embankment wall of a reinforcing embankment, and to make sure that the geotextile in the embankment is properly reinforced. The purpose is to make it function.
[0005]
[Means for Solving the Problems]
The present invention has been made in consideration of the above problems, and lays a plurality of geotextiles in an embankment in a plurality of upper and lower stages, and wraps and reinforces a soil wall material disposed on one end side of each of the geotextiles with the geotextile. In the reinforcing embankment method of providing an earth wall, at least at a place where the geotextile is laid, a non-frost-free part made of a non-frost-resistant material that covers the geotextile between the reinforcing soil wall and the freezing depth or more is provided. An object of the present invention is to provide a reinforcing embankment method using geotextiles.
Further, another invention is a reinforcing embankment in which a plurality of geotextiles are laid in an embankment in a plurality of upper and lower stages, and a soil wall material arranged on one end side of each of the geotextiles is wound with the geotextile to provide a reinforcing earth wall. In the method, the reinforced earth wall has a thickness at least extending from a slope of the reinforced earth wall to a freezing depth, and the entire reinforced earth wall is formed by making the earth wall material of the reinforced earth wall non-freezing material. a reinforcing embankments method using a geotextile which is characterized in that a non-frost heaving of unit, to provide this reinforcement embankment method, Ru der which solve the above problems.
[0006]
BEST MODE FOR CARRYING OUT THE INVENTION
It will be described in detail with reference now to the present invention from Figure 1 in the embodiment shown in FIG.
FIGS. 1 to 3 show a first example in which a reinforcing embankment 1 is constructed on the mountain side of the ground A that has been cut. The reinforcing embankment 1 is composed of embankment materials 2 made of on-site generated soil and geotextiles 3 laid alternately in the vertical direction. A plurality of geotextiles 3 are laid in a plurality of steps vertically at predetermined intervals, and one end 4 of each of the geotextiles 3 on the side of the slope 7 is rolled up, and the earth wall material 5 is wound therein. In addition, a reinforcing earth wall 6 is provided by connecting the earth wall material 5 in the winding portion vertically. In the first example, the non-freezing portion 10 made of a non-freezing material that covers the geotextile 3 from the reinforced soil wall 6 to the freezing depth or more is provided at the place where the geotextile 3 is laid. Is what it is.
The reinforcing embankment 1 in the example shown in FIG. 1 is provided with a plurality of upper and lower holding layers 9 made of high quality soil for holding the geotextile 3, and the embankment material 2 between the holding layers 9 is a site such as clayey soil. The excavated soil is used. In the portion where the geotextile 3 is buried, the area between the reinforced earth wall 6 and the freezing depth of 11 or more serves as the non-freezing portion 10. The non-frosting material used in the non-frosting portion 10 as a measure against frost heaving is a stabilized soil described below (however, a cement addition rate of 15 to 20%: in order to make the highly water-containing viscous soil non-frosting, An addition rate of 15 to 20% is required) or sand or gravel is used. As described above, the stabilized soil in the non-frosting part 10 can be used as a high-quality soil for holding the geotextile tile as described above, and can also be used as a non-frosting material for measures against frost heave. them to holding layer continuous with the rear surface of the mud 6 this treated soil can be the holding layer is configured as that combines also the non-frost heaving of section 10. Although the reinforced earth wall 6 in the reinforced embankment 1 shown in FIG. 1 uses the vegetation sandbag 12 as an earth wall material, it is not limited to this.
[0007]
In the example shown in FIG. 1, the embankment material 2 between the non-frost-heavy portions 10 is a normal embankment material and may be a highly water-containing viscous soil. For this reason, the reinforced earth wall 6 may receive the frost heaving force d from the back side between the non-frost heaving portions 10. However, one end 4 of the geotextile tile 3 in which the reinforced earth wall 6 is wound is free from restraint as compared with the buried part and has play, so that the frost heave force is absorbed by the play. Can be.
FIG. 2 shows a modification of the reinforced embankment 1 shown in FIG. 1 described above. Similarly, a reinforced earth wall 6 is formed from a vegetation sandbag 12. In addition, in the reinforced embankment 1 shown in FIG. 2, the freezing depth is not less than 11 from the back of the reinforced earth wall 6 even at a portion other than the portion where the geotextile 3 is laid, that is, between the upper and lower geotextiles 3. The non-frosting part 13 is provided by the non-frosting material made of the above-mentioned stabilized soil or sand and gravel, and the non-frosting part 10 arranged on the entire back side of the reinforced soil wall 6 is provided. , And 13 are provided at a depth of the freezing depth of 11 or more and are provided so that freezing does not occur.
[0008]
FIG. 3 shows an example in which only the reinforced earth wall 6 in the reinforced embankment 1 shown in FIG. 1 is changed, and the reinforced earth wall 6 uses the stabilized soil as the earth wall material 5 and has a slope. 7 is greened by arranging a vegetation mat 8 or employing a spraying method. In the reinforced embankment 1 having the reinforced earth wall using the stabilized soil as the earth wall material, the reinforced earth wall 6 receives the frost heave force d from the back side as in the example shown in FIG. There is play at one end 4 of 3 for the above-described reason, and the freezing / freezing force is absorbed by the play. In addition, the thickness of the reinforcing earth wall 6 is 0.5 to 0.8 m.
[0009]
The stabilized soil in each of the above examples is obtained by mixing a shape retaining agent such as cement or lime with viscous soil generated by cutting the ground A. The soil treated with the earth wall material has characteristics that can be easily shaped at the initial stage of the mixing of the shape-retaining agent. Each time the embankment material 2 is embanked, the soil is stabilized on the slope side of the geotextile 3. The soil is laid, and the stabilized soil is shaped by a backhoe slope bucket or the like to form a required slope.
[0010]
FIG. 4 shows a second example. Even in the reinforced embankment 1 of the second example, a plurality of geotextiles 3 are laid up and down in a plurality of steps similarly to the above examples, and one end 4 of each of the geotextiles 3 on the side of the slope 7 is provided. Is wound up, and the earth wall material 5 is rolled up. The earth wall material 5 at the rolled-up portion is vertically continuous, so that the reinforcing earth wall 6 is provided. In the reinforced embankment 1 in the second example, the reinforced earth wall 6 is made of a stabilized treated soil which is a non-freezing material as in the example shown in FIG. It is greened by arranging the vegetation mat 8 or adopting the spraying method. The reinforced soil wall 6 of this example has a thickness of not less than a freezing depth of 11 and the entire reinforced soil wall is a non-frosting portion, thereby preventing frost heaving.
The geotextile 3 in the embankment has been buried in the holding layer 9 from the back side of the reinforced earth wall 6. This retaining layer 9 is made of good-quality soil made of gravel, sandy soil, or stabilized soil, as in the case of the above example. However, since the reinforced earth wall is made of stabilized soil and its thickness is sufficiently large, the reinforced earth wall itself securely holds the geotextile, ensuring pull-out resistance and frictional resistance. It is not something.
[0011]
As described above, in the example shown in FIG. 4, since the soil wall material has a thickness up to the freezing depth, the earth wall material is made of a non-freezing material, and the entire reinforced soil wall is made of a non-freezing portion, the freezing acting on the geotextile is performed. Generation of frost heave force is suppressed, and breakage and pull-out of the geotextile can be prevented.
[0012]
【The invention's effect】
According to the present invention described above, a plurality of geotextiles are laid in the embankment in upper and lower stages, and the earth wall material disposed on one end side of each of the geotextiles is wound around the geotextile to provide a reinforcing earth wall. In the embankment method, at least at the place where the geotextile is laid, the non-frozen portion made of a non-frozen material covering the geotextile is provided between the reinforced soil wall and the freezing depth or more. Without frost heaving force, breakage and pull-out are eliminated, and pull-out resistance and friction resistance are secured.
Furthermore, the reinforced earth wall has a thickness that extends at least from the slope of the reinforced earth wall to the freezing depth, and the reinforced earth wall is made of a non-frost-free material to make the entire reinforced earth wall non-freezing. By using the frost heaving portion, frost heaving does not occur on the reinforced soil wall side, and it is possible to prevent the geotextile from breaking or pulling out, thereby achieving an effect with excellent practicality.
[Brief description of the drawings]
FIG. 1 is an explanatory view showing a reinforced embankment in which a non-freezing portion is provided at a geotextile laying point in a first example of a reinforced embankment method using a geotextile according to the present invention.
FIG. 2 is an explanatory view showing a reinforced embankment in which a non-frosting portion is provided between geotextile laying points in a first example .
FIG. 3 is an explanatory view showing a reinforced embankment in which a soil wall material of a reinforced earth wall is a stabilized soil in the first example .
FIG. 4 is an explanatory diagram showing a reinforcing embankment of a second example .
FIG. 5 is an explanatory view showing a reinforced embankment provided with a conventional geotextile .
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 ... Reinforcement embankment 2 ... Embankment material 3 ... Geotextile 5 ... Earth wall material 6 ... Reinforcement earth wall 7 ... Slope 9 ... Retention layer 10, 13 ... Non-freezing part 11 ... Freezing depth

Claims (2)

盛土中に複数のジオテキスタイルを上下複数段にして敷設し、ジオテキスタイルそれぞれの一方の端部側に配置した土壁材をそのジオテキスタイルで巻き込んで補強土壁を設ける補強盛土方法において、
少なくとも上記ジオテキスタイルの敷設個所において、上記補強土壁から凍結深度以上の間でジオテキスタイルを覆う非凍上性材からなる非凍上性部が設けられていることを特徴とするジオテキスタイルを用いた補強盛土方法。
In the reinforcing embankment method of laying a plurality of geotextiles in the embankment in a plurality of steps up and down, and embedding the earth wall material arranged on one end side of each of the geotextiles with the geotextile to provide a reinforcing earth wall,
A reinforcing embankment method using a geotextile, characterized in that at least a place where the geotextile is laid, a nonfreezing part made of a nonfreezing material is provided to cover the geotextile from the reinforcing soil wall to a depth not lower than the freezing depth .
盛土中に複数のジオテキスタイルを上下複数段にして敷設し、ジオテキスタイルそれぞれの一方の端部側に配置した土壁材をそのジオテキスタイルで巻き込んで補強土壁を設ける補強盛土方法において、
上記補強土壁は少なくともこの補強土壁の法面から凍結深度までに及ぶ厚さを有し、かつ、該補強土壁の土壁材を非凍上性材にして補強土壁全体を非凍上性部としたことを特徴とするジオテキスタイルを用いた補強盛土方法。
In the reinforcing embankment method of laying a plurality of geotextiles in the embankment in a plurality of steps up and down, and embedding the earth wall material arranged on one end side of each of the geotextiles with the geotextile to provide a reinforcing earth wall,
The reinforced soil wall has a thickness ranging from at least the slope of the reinforced soil wall to the freezing depth, and the reinforced soil wall is made of a non-frosting material to make the entire reinforced soil wall non-frosting. Reinforcement embankment method using geotextile, characterized by having a part .
JP08812396A 1996-04-10 1996-04-10 Reinforcement embankment method using geotextile Expired - Fee Related JP3600991B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP08812396A JP3600991B2 (en) 1996-04-10 1996-04-10 Reinforcement embankment method using geotextile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP08812396A JP3600991B2 (en) 1996-04-10 1996-04-10 Reinforcement embankment method using geotextile

Publications (2)

Publication Number Publication Date
JPH09279580A JPH09279580A (en) 1997-10-28
JP3600991B2 true JP3600991B2 (en) 2004-12-15

Family

ID=13934139

Family Applications (1)

Application Number Title Priority Date Filing Date
JP08812396A Expired - Fee Related JP3600991B2 (en) 1996-04-10 1996-04-10 Reinforcement embankment method using geotextile

Country Status (1)

Country Link
JP (1) JP3600991B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011036991A1 (en) * 2009-09-28 2011-03-31 日本環境製造株式会社 Backfill structure and backfill method
JP5207496B1 (en) * 2012-09-06 2013-06-12 前田工繊株式会社 Reinforced earth wall
JP6280322B2 (en) * 2013-07-08 2018-02-14 大成建設株式会社 Greening slope structure and method for constructing green slope structure
JPWO2019054192A1 (en) 2017-09-14 2020-10-15 株式会社トッコン Connecting retaining wall structure of cylindrical block and reinforcing structure

Also Published As

Publication number Publication date
JPH09279580A (en) 1997-10-28

Similar Documents

Publication Publication Date Title
US4666334A (en) Erosion control system for bluffs located adjacent a body of water
EP2867415B1 (en) Ground anchor assembly
JP2002501583A (en) Retaining wall system
CN114703872B (en) Maintenance system for soil slope in permafrost region and construction method
CN109024486A (en) A kind of Han Qu paddles the freeze proof protection against erosion safeguard structure of side slope and its construction method
CN105200881A (en) Construction method for comprehensive treatment structure for subgrade frost damage in high cold region
KR20100027693A (en) Reinforcing method using structure for reinforcing slope
CA2561785A1 (en) A reinforced soil retaining wall system and method of construction
RU2248427C1 (en) Method for gabion consolidation structure erection in water stream
JP3600991B2 (en) Reinforcement embankment method using geotextile
JP6676462B2 (en) Embankment reinforcement method
JPH11323943A (en) Protective greening structure for slopes, walls, shores, etc.
JP2981839B2 (en) River structure
JP4696305B2 (en) Construction method of soil storage structure
CN112281806A (en) Spring soil roadbed unsaturated horizontal drainage device and construction method thereof
JPH10159102A (en) Protection structure of slope face, wall face and the like
CN111455931A (en) Cold region flexible integral ecological slope protection structure and construction method thereof
CN113430989B (en) Lifting construction method for sea pond
RU2090795C1 (en) Method laying underground pipe line
JP3572559B2 (en) Reinforcement embankment method using geotextile
KR100874961B1 (en) Reinforced earth retaining wall wire mesh
CN115852996A (en) Loess slope surface protection structure and construction method thereof
KR100597693B1 (en) Reinforcing method using structure for reinforcing slope
CN210712832U (en) Assembled anti-freezing ecological side slope retaining wall for climate yin-wet cold area
JP3364636B2 (en) Landslide prevention method by preventing rainwater penetration

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20040601

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20040608

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20040802

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20040831

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20040909

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees