Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP3602895B2 - Cleaning equipment for temporary scaffolding frames - Google Patents
[go: Go Back, main page]

JP3602895B2 - Cleaning equipment for temporary scaffolding frames - Google Patents

Cleaning equipment for temporary scaffolding frames Download PDF

Info

Publication number
JP3602895B2
JP3602895B2 JP22531495A JP22531495A JP3602895B2 JP 3602895 B2 JP3602895 B2 JP 3602895B2 JP 22531495 A JP22531495 A JP 22531495A JP 22531495 A JP22531495 A JP 22531495A JP 3602895 B2 JP3602895 B2 JP 3602895B2
Authority
JP
Japan
Prior art keywords
frame
building
building frame
width
leg
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP22531495A
Other languages
Japanese (ja)
Other versions
JPH0967931A (en
Inventor
広明 池井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nikko Co Ltd
Original Assignee
Nikko Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nikko Co Ltd filed Critical Nikko Co Ltd
Priority to JP22531495A priority Critical patent/JP3602895B2/en
Publication of JPH0967931A publication Critical patent/JPH0967931A/en
Application granted granted Critical
Publication of JP3602895B2 publication Critical patent/JP3602895B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Cleaning In General (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、建築工事完了によって回収した仮設足場用建枠に付着しているモルタル等を除去する研掃装置に関し、特に現場使用等により枠幅に偏位が生じた建枠を矯正することのできる仮設足場用建枠の研掃装置に関する。
【0002】
【従来の技術】
建築工事に使用した仮設足場用の建枠は、使用中に塗料やモルタル等が付着して汚れることが多く、これを建築現場より回収した時には次回の使用に備えて研掃機(例えば、特開平4−20657号公報に示す研掃機)により付着物を取り除いている。また、建築現場より回収した建枠には、図10に示すように、建枠Aの脚部の枠幅が外側に広がったり、狭まったりして基準寸法に対して変形しているものもあり、作業員が一枚づつ目視にてチェックし、変形している建枠は不良品として別途ストックし、後ほど矯正装置により矯正するようにしている。
【0004】
【発明が解決しようとする課題】
しかしながら、上記のような枠幅のチェックやその矯正作業は手作業で行なっているため、能率が上がらないうえ、作業者の負担も大きいものとなっている。
【0005】
本発明は上記の点に鑑み、枠幅のチェックやその矯正作業を研掃作業と組み合わせながらそれぞれの作業の自動化を図ることによって枠幅のチェック及び矯正作業の能率を向上させるようにした仮設足場用建枠の研掃装置を提供することを目的とする。
【0006】
【課題を解決するための手段】
本発明は上記の目的を達成するために、請求項1記載の研掃装置にあっては、建枠表面の付着物を除去する研掃機本体への建枠の搬入、搬出を行う建枠移送装置に建枠の枠幅の基準寸法からの偏位を検出する枠幅偏位検出装置と、枠幅を基準寸法に矯正する枠幅矯正装置とを配設すると共に、前記建枠移送装置によって移送される建枠の枠幅を前記枠幅偏位検出装置によって検出し、該検出した枠幅が基準寸法から所定寸法以上偏位しておれば前記枠幅矯正装置を作動して枠幅を矯正するように構成したことを特徴としている。
【0008】
【発明の実施の形態】
本発明に係る請求項1記載の研掃装置によれば、研掃機本体に対し建枠を搬入、搬出する建枠移送装置に配設した枠幅偏位検出装置によって移送される建枠の両側脚部の位置を検出し、枠幅が基準寸法からどの程度偏位しているかを測定する。そして測定した枠幅の偏位が基準寸法の許容寸法より外れておれば、枠幅矯正装置を作動制御して建枠の脚部を広げたり狭めたりして基準寸法の許容範囲内に収まるように矯正する。このように枠幅のチェックやその矯正作業を建枠の研掃作業ラインに組み込んで同時にこれら作業を行えるようにすることによって、建枠の維持管理作業の能率を向上させることができる。
【0010】
【実施例】
以下、本発明の実施例を図面に基づいて説明する。
【0011】
図1中の1は仮設足場用の建枠を研掃する研掃機本体であって、研掃機本体1の建枠投入側には建枠投入コンベヤ2を配設している。該建枠投入コンベヤ2はローラコンベヤ方式のもので、回転するローラにより建枠が研掃機本体1送り込まれるようになっている。
【0012】
建枠投入コンベヤ2の投入端側には建枠投入コンベヤ2の軸線方向に対して直交する方向に建枠移送装置であるチェーンコンベヤ3を配設しており、駆動用モータ4により移送用チェーン5を回転させて建枠Aを移送するようにしている。
【0013】
前記チェーンコンベヤ3の建枠投入コンベヤ2を臨む位置には、移送した建枠をチェーンコンベヤ3より前記建枠投入コンベヤ2に乗り移す移載装置6を配設している。該移載装置6は前記チェーンコンベヤ3の軸線方向に平行にローラ7を複数本並設してモータ8により回転させるようにし、更にローラ7をチェーンコンベヤ3の移送面に対して上下に昇降自在とし、通常はローラ7をチェーンコンベヤ3の移送面より下方に下降させた状態にしておき、該ローラ7上方に建枠が到達した時点でローラ7をチェーンコンベヤ3の移送面より上昇させ、建枠を移送用チェーン5より上方に若干持ち上げ、ローラ7の回転により建枠をチェーンコンベヤ3から建枠投入コンベヤ2に乗り移すようにしている。
【0014】
また、6´は汚れの少ない建枠を研掃機本体1を通過させずにバイパスさせるバイパスコンベヤ9に臨ませて配設した移載装置であって、前記移載装置6と同様の構造をしており、チェーンコンベヤ3の軸線方向に平行にローラ7´を複数本並設してモータ8´により回転させるようにし、またローラ7´をチェーンコンベヤ3の移送面に対して上下に昇降自在としている。
【0015】
チェーンコンベヤ3の他端側にはターンテーブル10を配設しており、該ターンテーブル10は積層した建枠を受け入れるローラ11を備え、該ローラ11をモータ12により駆動する。また、図3に示すように、ターンテーブル10は昇降用シリンダ13を備えたリフター14により昇降自在とし、かつ旋回用モータ15により旋回自在としており、建枠受け入れ時にはターンテーブル10を90度旋回して送り込まれてくる建枠の方向転換を行い、また積層した建枠の最上部の一枚取り出すとターンテーブル10を建枠一枚分上昇させて次の取り出しに備えるようになっている。
【0016】
ターンテーブル10の上流側には、前記チェーンコンベヤ3の軸線と直交する方向に研掃しようとする建枠Aを積層した状態でストックするストックコンベヤ16を配設しており、該ストックコンベヤ16もローラ17をモータ18により駆動するローラコンベヤを採用している。
【0017】
前記チェーンコンベヤ3のターンテーブル10側にはチェーンコンベヤ3を跨ぐようにフレーム19を配設し、該フレーム19の上部にはターンテーブル10の直上へと至る走行用レール20を取り付けている。そして走行用レール20には、図3のようにシリンダー21の縮小動作によって建枠の横地を掴む建枠掴み装置22を走行自在に取り付けると共に、走行用レール20の両端部に配設したスプロケット23、23´に巻回したチェーン24の両端を前記建枠掴み装置22に接続し、該チェーン24をモータ25により正逆方向に回転させて建枠掴み装置22を水平移動させ、ターンテーブル10上に載置した積層状の建枠を最上段から一枚ずつチェーンコンベヤ3側に取り込むことができるようにしている。
【0018】
また、フレーム19に配設した走行用レール20の下位には、建枠掴み装置22によって取り込んだ建枠を一旦受け止める建枠受ローラ26を配設しており、またその下位にはリフター27により昇降自在とし、かつモータ28により旋回自在としたタ−ンテ−ブル29を配設している。そして、建枠受ローラ26により受け止めた建枠をリフター27により上昇させたタ−ンテ−ブル29にて持ち上げ、モータ28の駆動によりタ−ンテ−ブル29を90度旋回させて建枠の向きを変えた後、リフター27によりタ−ンテ−ブル29を下降させて下位のチェーンコンベヤ3上に乗り移すようにしている。
【0019】
更に、フレーム19には、建枠の枠幅をチェックする枠幅偏位検出装置30、枠幅を基準寸法に矯正する枠幅矯正装置31を配設している。また、上下の建枠同士を連結するのにアームロックと呼ばれる連結部材に代えて、図11に示すようなピンBを備えた連結管Cに変更する場合もあり、これに対応するため、フレーム19には、建枠の脚部に連結管のピンを係止させる孔を穿設する穿孔装置32を配設している。
【0020】
枠幅偏位検出装置30は、図5、図6に示すように光電センサ33により前記建枠受ローラ26上の建枠Aの脚部の開き具合を検出するもので、図4に示すように、建枠受ローラ26の支持フレ−ムに固着した支持材34に建枠Aの脚部の基準位置に対して許容寸法分左右に寄った位置にそれぞれ一対ずつ光電センサ33を取り付けている。
また、建枠受ローラ26の側部には押板35をシリンダ36により進退自在とし、枠幅偏位検出時には建枠受ローラ24上に取り込んだ建枠Aを押板35によって反対側に配設した当板37に押し当てるようにして建枠Aを位置決めするようにしている。そして建枠Aが位置決めされると、図6の点線で示すように、一対の光電センサ33より建枠脚部に向けて検出光を出力し、この一対の光電センサ33のどちらか一方の検出光の遮りによって脚部の位置が基準位置に対して内側または外側のどちらかに偏位していることの検出が行われる。
【0021】
なお、図中の33´は枠幅が狭い種類の建枠の変形を検出する時に使用される光電センサ33である。
【0022】
枠幅矯正装置31は、図2、図4、図7に示すように、チェーンコンベヤ3の側部に配設した基板38上にガイドレール39をチェーンコンベヤ3の長手方向に沿って配設し、このガイドレール39に建枠の脚部を押し付けたり、引っ張ったりする一対の矯正金具40を摺動自在に取り付け、それぞれのシリンダ41の伸縮動作により矯正金具40を左右に移動できるようにしている。
【0023】
また、42は建枠の脚部の矯正時に脚部を固定する脚部固定装置であって、固定金具43をシリンダ44により下降させて建枠脚部を上方より押え付けて固定できるようにしている。
【0024】
そして、枠幅矯正は、タ−ンテ−ブル29上に建枠を載せた状態にて行うもので、脚部固定装置42の固定金具43にて建枠の脚部を固定し、建枠脚部が外側に偏位している場合は、図7に示すように、シリンダ41を伸長させて矯正金具40を脚部下部に当接させ、脚部下部を外側から内側に押し込むようにして矯正する。また、建枠の脚部が内側に偏位している場合には、矯正金具40を脚部下部の内側に位置させてから建枠を載置したタ−ンテ−ブル29を下降して矯正位置に位置させ、脚部固定装置42により建枠脚部を固定してから前記とは逆にシリンダ41を縮小させて脚部下部を外側に引っ張るようにして矯正する。
【0025】
穿孔装置32は、図2、図4、図8、図9に示すように、基板38上にガイドレール45を配設し、その上にスライド板46を配設している。そしてスライド板46には垂直材47を立設し、該垂直材47にピストンロッドを固定したシリンダ48をその後方に配設してシリンダ48の伸縮動作によりスライド板46を前後にスライド自在としている。
【0026】
このスライド板46上には垂直材47に沿わせて両端に一対の支持材49、49´を配設し、一方側の支持材49はスライド板46に固着し、他方側の支持材49´はスライド板46上に配設したガイドレール50に摺動自在に取り付け、垂直材47の上部に配設したシリンダ51の伸縮により移動可能としている。
【0027】
前記支持材49には、図9に示すように、ダイス52を有する芯金53と、ガイド体54に案内されながら油圧シリンダ55の伸縮によりダイス52に向けて前後に移動するパンチ56とを配設している。そして、建枠Aの脚柱の管穴に芯金53を挿入してからパンチ56により強打することによって連結ピン係止用孔を穿設する。
【0028】
また、支持材49´にも前記支持材49と同様に、建枠の脚部を挿入するダイス52´を有する芯金53´と、ガイド体54´に案内されながら油圧シリンダ55´の伸縮によりダイス52´に向けて前後に移動するパンチ56´を配設している。そして支持材49´は前述のとおり移動可能であって、枠幅の異なる建枠に対しては支持材49側の芯金53を原点として支持材49´側を移動させて芯金53´の位置調整を行うことによって対応している。
【0029】
また、図4に示すように、テ−ブルリフタ29を挾んで穿孔装置32の反対側には押圧具57をシリンダ58により前後に移動自在に配設し、穿孔作業時に押圧具57によって建枠を穿孔装置32側に押圧し、建枠脚柱の管穴に芯金53、53´の挿入を容易にすると共に、建枠を固定できるようにしている。
【0030】
前記枠幅矯正装置31や穿孔装置32は建枠の移送時に邪魔にならないように前後に移動自在としてあり、その機構としては、図4に示すように、これらの装置を搭載している基板38をその下位に配設したスライドシャフト59に摺動自在に取り付け、シリンダ60により前後に移動できるようにしている。
【0031】
また、図1中の61は研掃機本体1の建枠排出側に配設した建枠排出コンベヤであって、建枠排出コンベヤ61の先端部には実開平4−53955号公報に示されているような研掃機本体1より排出されてくる建枠を保管しやすいように順次積み上げるパレタイザー62を配設している。
【0032】
なお、本実施例では枠幅偏位検出装置30、枠幅矯正装置31、穿孔装置32等の各種装置を研掃機本体1の投入側に設置した例を示したが、これらの装置は研掃機本体1の排出側に設置することも可能であり、敷地や装置の能力に応じて適宜選択すると良い。
【0033】
しかして、本発明の研掃装置により建枠を研掃する場合、建築現場より積層梱包されて回収された建枠Aをフォークリフト等によりストックコンベヤ16上に載置する。そしてストックコンベヤ16を駆動してターンテーブル10に送り込む。
【0034】
この時、ターンテーブル10のローラ11はストックコンベヤ16のローラ17と平行になるように回転させておき、建枠Aがターンテーブル10上に移載されるとターンテーブル10を90度回転させ、最上段の建枠の横地がチェーンコンベヤ3側に向くようにする。次いで帯鉄等による梱包を解き、積層状態より一枚ずつ取り出せるようにする。
【0035】
そして、ターンテーブル10上の最上段の建枠を建枠掴み装置22と同一高さにセットすると、フレーム19の上部のモータ25を駆動させて建枠掴み装置22を前進させ、ターンテーブル10上の積層された建枠の最上段の建枠の横地を掴む。そしてモータ25を逆転させて掴んだ建枠をチェーンコンベヤ3側のフレーム19の上部に配設された建枠受ローラ26上の所定位置に引き入れる。
【0036】
建枠受ローラ26上に引き込まれた建枠Aは図5に示すように押板35により押し出され、反対側に配設した当板37に押し当てられて所定の位置にセットされる。この間にターンテーブル10では建枠を一枚分上昇させて次の引き出しに備えて待機する。
【0037】
建枠受ローラ26上の所定位置に建枠がセットされると、建枠受ローラ26に配設された光電センサ33により建枠の脚部下部の位置が検出される。この時、図6の点線で示すように、光電センサ33より脚部の上方から下方に向けて検出光が出力されており、脚部下部の位置が基準位置に対して内側あるいは外側に偏位して許容範囲を越えておれば、脚部下部が検出光を遮ることとなり、その偏位が一対の光電センサ33により検出されて内側あるいは外側のいずれかに変形しているかが検出される。図中の脚部Eは正常位置、脚部Fは外側に偏位、脚部Gは内側に偏位している。
【0038】
枠幅偏位検出装置30による建枠脚部の検査が終了すると、タ−ンテ−ブル29を上昇させて検査済の建枠を建枠受ローラ26より若干浮かしてからタ−ンテ−ブル29を建枠脚部の下端部が枠幅矯正装置31側に向くように90度回転させ、下位のチェーンコンベヤ3へと下降させる。
【0039】
この時、枠幅偏位検出装置30により建枠脚部の偏位が検出されておれば、建枠を載置したタ−ンテ−ブル29をチェーンコンベヤ3の移送面より若干上位の位置で停止する。そして図4のシリンダ60により基板38を前進させて枠幅矯正装置31を建枠側に接近させる。この時、建枠脚部が外側に偏位している場合には、図7に示すように、脚部固定装置42のシリンダ44を伸長動作して固定金具43により建枠脚部を上方より押え付けて固定し、その後、シリンダ41を伸長動作させて枠幅矯正装置31の矯正金具40を脚部下部を外側から押し込み、基準寸法の許容範囲内に納まるように矯正する。
【0040】
また、建枠脚部が内側に偏位している場合には、シリンダ41を伸長動作させて建枠脚部の内側に矯正金具40が位置するようにしてから建枠脚部側に接近させ、脚部固定装置42によって建枠脚部を固定してから、シリンダ41を縮小動作させて矯正金具40を内側から外側に向けて移動させ、脚部下部を外側に引っ張るようにして矯正する。
【0041】
次に、建枠脚部に連結ピン係止用孔を穿設する場合について説明する。
【0042】
連結ピン係止用孔を穿設する場合も、前記矯正の場合と同じく、建枠を載置したタ−ンテ−ブル29をチェーンコンベヤ3の移送面より若干上位の位置で停止する。そして、図4に示すシリンダ58を伸長動作させて押圧具57を押し出して建枠Aを所定位置に押し出すと共に、穿孔装置32のシリンダ48を作動させて芯金53、53´を押し出してこれらの芯金53、53´を建枠の脚柱管穴に挿入する。この時、押圧具57により建枠Aを突っ張るようにして芯金53、53´の脚柱管穴への挿入を容易にする。また、図8に示すように、建枠Aの品種により脚部の幅が異なる場合には、シリンダ51を動作させて芯金53´を適宜移動させて対応する。
【0043】
そして図9に示すように、油圧シリンダ55、55´を伸長動作させてパンチ56、56´を前進させて脚部に連結ピン係止用孔を穿設する。連結ピン係止用孔の穿設が完了するとパンチ56、56´を後退させた後、芯金53、53´を後退させ、更にシリンダ60により基板38を後退させてP穿孔装置32を元の位置に戻す。
【0044】
このようにして枠幅矯正や穿孔作業が完了すると、タ−ンテ−ブル29を降下させて建枠を下位に配設したチェーンコンベヤ3上に移載して移載装置6のところまで移送する。そして移載装置6ではローラ7を上昇させて建枠を持ち上げ、これを90度回転させた後、ロ−ラ7を駆動して建枠投入コンベヤ2上に移載させる。
【0045】
建枠投入コンベヤ2に移載された建枠を研掃機本体1へと送り込まれ、研掃機本体1で建枠表面の付着物が除去され後、建枠排出コンベヤ61によってパレタイザー62へと移送され、ここで順次積層されて梱包される。
【0046】
また、研掃を必要としない建枠は、チェーンコンベヤ3により移送中に移載装置6´によって研掃機本体1の手前に配設したバイパスコンベヤ9へと乗り移され、研掃機本体1を通過せずにパレタイザー62へと送り込まれて積層される。
【0047】
【発明の効果】
以上のように本発明に係る請求項1記載の研掃装置にあっては、研掃機本体への建枠の搬入、搬出を行う建枠移送装置3に建枠の枠幅の基準寸法からの偏位を検出する枠幅偏位検出装置30と、枠幅を基準寸法に矯正する枠幅矯正装置31とを配設すると共に、前記建枠移送装置3によって移送される建枠の枠幅を前記枠幅偏位検出装置30によって検出し、該検出した枠幅が基準寸法から所定寸法以上偏位しておれば前記枠幅矯正装置31を作動して枠幅を矯正するように構成したので、従来研掃作業の前工程として手作業で行っていた枠幅の検査や矯正作業を研掃作業と同時に自動的に行えるようになり、作業者の負担を軽減すると共に、作業の能率を向上させることができる。
【図面の簡単な説明】
【図1】本発明に係る研掃装置の平面図である。
【図2】図1の要部の拡大図である。
【図3】図2の一部を省略したA−A方向矢視図であり、タ−ンテ−ブル29を上昇させた状態を示す。
【図4】図2の一部を省略したB−B方向矢視図である。
【図5】図3の一部を省略したC−C方向矢視図である。
【図6】建枠脚部と光電センサとの配置を示す説明図である。
【図7】図4の一部を省略して拡大したD−D方向拡大矢視図である。
【図8】図2の要部の拡大図である。
【図9】図8の要部の拡大図である。
【図10】脚部が変形した建枠を示す斜視図である。
【図11】上下に配設した建枠を連結管により連結した例を示す説明図である。
【符号の説明】
1…研掃機本体 2…建枠投入コンベヤ
3…チェーンコンベヤ(建枠移送装置) 6、6´…移載装置
6、6´…移載装置 9…バイパスコンベヤ
10…ターンテーブル 16…ストックコンベヤ
22…建枠掴み装置 26…建枠受ローラ
29…ターンテーブル 30…枠幅偏位検出装置
31…枠幅矯正装置 32…穿孔装置
62…パレタイザー
[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to a blast device for removing mortar adhered to the collected temporary scaffold for construction frame by building work completed, correct矯the Kenwaku that deviation occurs in the frame width in particular field use such Rukoto The present invention relates to a scavenging apparatus for a temporary scaffolding frame that can be used.
[0002]
[Prior art]
Building frames for temporary scaffolds used for construction work often become stained with paint or mortar during use, and when they are collected from the building site, they must be cleaned with a scrubber (for example, Deposits are removed by a scrubber disclosed in Japanese Unexamined Patent Publication No. Hei 4-20657. In addition, as shown in FIG. 10, some building frames recovered from the building site have a frame width of a leg portion of the building frame A which is expanded or narrowed outward and deformed with respect to a reference dimension. The worker visually checks each sheet one by one, and the deformed building frame is separately stocked as a defective product, and is later corrected by a correction device.
[0004]
[Problems to be solved by the invention]
However, checks and the remedial work on any frame width as described above because it is done by hand, after which efficiency does not rise, has become a greater burden on the operator.
[0005]
As the present invention In view of the above problems, to improve the efficiency of checking and矯Tadashisaku industry frame width by achieving automation of each work while combining the check and the矯Tadashisaku industry frame width and Ken掃作industry It is an object of the present invention to provide a polishing apparatus for a temporary scaffolding frame.
[0006]
[Means for Solving the Problems]
In order to achieve the above object, the present invention provides a cleaning apparatus according to claim 1, wherein the building frame is loaded into and removed from the main body of the cleaning machine for removing deposits on the surface of the building frame. A frame width deviation detecting device for detecting a deviation of the frame width of the building frame from a reference size in the transfer device, and a frame width correcting device for correcting the frame width to the reference size, and the building frame transferring device; Is detected by the frame width deviation detecting device, and if the detected frame width deviates from a reference dimension by a predetermined size or more, the frame width correcting device is operated to operate the frame width. It is characterized in that it is configured to correct.
[0008]
BEST MODE FOR CARRYING OUT THE INVENTION
According to the polishing apparatus according to claim 1 of the present invention, the construction frame transferred by the frame width deviation detecting device disposed in the construction frame transfer device that loads and unloads the building frame from and to the main body of the cleaning machine. The positions of both side legs are detected, and the extent to which the frame width deviates from the reference size is measured. If the measured deviation of the frame width is out of the permissible dimension of the reference dimension, the operation of the frame width correction device is controlled to widen or narrow the legs of the building frame so as to fall within the permissible range of the reference dimension. To correct. As described above, the efficiency of the maintenance work of the building frame can be improved by incorporating the checking and correcting work of the frame width into the cleaning work line of the building frame so that these operations can be performed at the same time.
[0010]
【Example】
Hereinafter, embodiments of the present invention will be described with reference to the drawings.
[0011]
In FIG. 1, reference numeral 1 denotes a main body of a cleaning machine that cleans a construction frame for a temporary scaffold, and a construction frame input conveyor 2 is disposed on the construction frame input side of the main body of the cleaning machine 1. The building frame feeding conveyor 2 is of a roller conveyor type, and the building frame is fed into the main body 1 by a rotating roller.
[0012]
A chain conveyor 3, which is a building frame transfer device, is provided at a loading end side of the building frame feeding conveyor 2 in a direction orthogonal to an axial direction of the building frame feeding conveyor 2, and a transfer chain is driven by a driving motor 4. 5 is rotated to transfer the building frame A.
[0013]
A transfer device 6 for transferring the transferred building frame from the chain conveyor 3 to the building frame input conveyor 2 is provided at a position of the chain conveyor 3 facing the building frame input conveyor 2. The transfer device 6 has a plurality of rollers 7 arranged in parallel in the axial direction of the chain conveyor 3 to be rotated by a motor 8, and the rollers 7 can be moved up and down with respect to the transfer surface of the chain conveyor 3. Normally, the roller 7 is lowered below the transfer surface of the chain conveyor 3, and when the building frame reaches above the roller 7, the roller 7 is raised above the transfer surface of the chain conveyor 3, and The frame is lifted slightly above the transfer chain 5 and the building frame is transferred from the chain conveyor 3 to the building frame input conveyor 2 by the rotation of the rollers 7.
[0014]
Reference numeral 6 'denotes a transfer device which is disposed so as to face a bypass conveyor 9 which allows a dirt-free building frame to bypass without passing through the polisher main body 1, and has the same structure as the transfer device 6. A plurality of rollers 7 'are arranged side by side in parallel with the axial direction of the chain conveyor 3 to be rotated by a motor 8', and the rollers 7 'can be moved up and down with respect to the transfer surface of the chain conveyor 3. And
[0015]
A turntable 10 is provided on the other end side of the chain conveyor 3, and the turntable 10 includes a roller 11 for receiving the stacked building frames, and the roller 11 is driven by a motor 12. As shown in FIG. 3, the turntable 10 can be raised and lowered by a lifter 14 having a lifting cylinder 13 and can be turned by a turning motor 15. When the building frame is received, the turntable 10 is turned 90 degrees. When the direction of the incoming frame is changed, and one of the uppermost frames of the stacked frames is taken out, the turntable 10 is raised by one frame to prepare for the next take-out.
[0016]
On the upstream side of the turntable 10, a stock conveyor 16 for stocking the building frames A to be cleaned in a direction orthogonal to the axis of the chain conveyor 3 in a stacked state is arranged. A roller conveyor that drives the roller 17 by a motor 18 is employed.
[0017]
A frame 19 is arranged on the turntable 10 side of the chain conveyor 3 so as to straddle the chain conveyor 3, and a traveling rail 20 extending right above the turntable 10 is mounted on an upper portion of the frame 19. As shown in FIG. 3, as shown in FIG. 3, a frame holding device 22 for gripping the side of the building frame is mounted on the running rail 20 so as to be able to run freely, and sprockets 23 provided at both ends of the running rail 20. , 23 ′ are connected to the frame holding device 22, and the chain 24 is rotated in the forward and reverse directions by a motor 25 to horizontally move the frame holding device 22, Can be taken into the chain conveyor 3 one by one from the uppermost stage.
[0018]
A frame receiving roller 26 for temporarily receiving the frame taken by the frame grabber 22 is provided below the traveling rail 20 provided on the frame 19, and a lifter 27 is provided below the frame receiving roller 26. A turntable 29 which can be raised and lowered and which can be turned by a motor 28 is provided. Then, the building frame received by the building frame receiving roller 26 is lifted by the turntable 29 raised by the lifter 27, and the turntable 29 is turned by 90 degrees by the drive of the motor 28, and the orientation of the frame is turned. Then, the turntable 29 is moved down by the lifter 27 to be transferred onto the lower chain conveyor 3.
[0019]
Further, the frame 19 is provided with a frame width deviation detecting device 30 for checking the frame width of the building frame and a frame width correcting device 31 for correcting the frame width to the reference size . Further, in order to connect the upper and lower building frames to each other, a connecting pipe C having a pin B as shown in FIG. 11 may be used instead of a connecting member called an arm lock. 19, a drilling device 32 for drilling a hole for locking the pin of the connecting pipe to the leg of the building frame is provided.
[0020]
As shown in FIGS. 5 and 6, the frame width deviation detecting device 30 detects the degree of opening of the legs of the building frame A on the building frame receiving roller 26 by the photoelectric sensor 33, as shown in FIG. In addition, a pair of photoelectric sensors 33 are mounted on the support member 34 fixed to the support frame of the building frame receiving roller 26 at a position shifted left and right by an allowable dimension with respect to the reference position of the leg of the building frame A. .
A push plate 35 can be moved forward and backward by a cylinder 36 on the side of the frame receiving roller 26. When the frame width deviation is detected, the frame A taken in on the frame receiving roller 24 is arranged on the opposite side by the push plate 35. The building frame A is positioned so as to be pressed against the provided contact plate 37. When the building frame A is positioned, detection light is output from the pair of photoelectric sensors 33 toward the building frame legs as indicated by the dotted line in FIG. 6, and detection of either one of the pair of photoelectric sensors 33 is performed. It is detected that the position of the leg is deviated to either the inside or the outside with respect to the reference position due to light blocking.
[0021]
Reference numeral 33 'in the figure denotes a photoelectric sensor 33 used for detecting deformation of a type of building frame having a small frame width.
[0022]
As shown in FIGS. 2, 4, and 7, the frame width correcting device 31 has a guide rail 39 disposed on a substrate 38 disposed on the side of the chain conveyor 3 along the longitudinal direction of the chain conveyor 3. A pair of correction fittings 40 for pressing or pulling the legs of the building frame against the guide rail 39 are slidably attached, and the correction fittings 40 can be moved to the left and right by the expansion and contraction operations of the respective cylinders 41. .
[0023]
Reference numeral 42 denotes a leg fixing device for fixing the legs when correcting the legs of the building frame. The fixing bracket 43 is lowered by the cylinder 44 so that the legs of the building frame can be pressed down from above and fixed. I have.
[0024]
The correction of the frame width is performed with the building frame placed on the turntable 29. The legs of the building frame are fixed by the fixing bracket 43 of the leg fixing device 42, and the frame frame legs are fixed. In the case where the portion is deviated outward, as shown in FIG. 7, the cylinder 41 is extended to bring the correction fitting 40 into contact with the lower portion of the leg, and the lower portion of the leg is pushed in from outside to inside. I do. If the legs of the frame are deviated inward, the correction bracket 40 is positioned inside the lower portion of the legs, and the turntable 29 on which the frame is placed is lowered to correct the level. Then, the leg is fixed by the leg fixing device 42, and then the cylinder 41 is contracted and the lower part of the leg is pulled outward to correct it.
[0025]
As shown in FIGS. 2, 4, 8, and 9, the punching device 32 has a guide rail 45 disposed on a substrate 38 and a slide plate 46 disposed thereon. A vertical member 47 is erected on the slide plate 46, and a cylinder 48 having a piston rod fixed to the vertical member 47 is disposed behind the vertical member 47 so that the slide plate 46 can slide back and forth by the expansion and contraction operation of the cylinder 48. .
[0026]
On the slide plate 46, a pair of support members 49, 49 'are disposed at both ends along the vertical member 47. One support member 49 is fixed to the slide plate 46, and the other support member 49' is provided. Is slidably mounted on a guide rail 50 disposed on a slide plate 46, and is movable by expansion and contraction of a cylinder 51 disposed above the vertical member 47.
[0027]
As shown in FIG. 9, the support 49 is provided with a cored bar 53 having a die 52 and a punch 56 that moves back and forth toward the die 52 by expansion and contraction of a hydraulic cylinder 55 while being guided by a guide body 54. Has been established. Then, the core bar 53 is inserted into the tube hole of the pillar of the building frame A, and the connection pin locking hole is formed by banging with the punch 56.
[0028]
Similarly to the support member 49, the support member 49 'has a core bar 53' having a die 52 'for inserting the leg of the building frame, and a hydraulic cylinder 55' extended and contracted while being guided by a guide body 54 '. A punch 56 'that moves back and forth toward the die 52' is provided. The support member 49 'is movable as described above. For the building frames having different frame widths, the support member 49' side is moved with the core bar 53 on the support member 49 side as the origin to move the support bar 49 '. This is addressed by adjusting the position.
[0029]
As shown in FIG. 4, on the opposite side of the punching device 32 across the table lifter 29, a pressing tool 57 is provided so as to be movable back and forth by a cylinder 58. It is pressed against the perforation device 32 to facilitate insertion of the cores 53 and 53 'into the tube holes of the pillars of the building frame, and to fix the building frame.
[0030]
The frame width correcting device 31 and the punching device 32 are movable back and forth so as not to be in the way when the building frame is transported, and as a mechanism, as shown in FIG. Is slidably mounted on a slide shaft 59 disposed therebelow so that the cylinder 60 can move back and forth.
[0031]
Also, reference numeral 61 in FIG. 1 denotes a construction frame discharge conveyor disposed on the construction frame discharge side of the polisher main body 1, and the leading end of the construction frame discharge conveyor 61 is shown in Japanese Utility Model Laid-Open No. 4-53954. A palletizer 62 is provided for sequentially stacking the building frames discharged from the main body 1 as described above.
[0032]
In this embodiment, an example is shown in which various devices such as the frame width deviation detecting device 30, the frame width correcting device 31, and the perforating device 32 are installed on the input side of the polisher main body 1. It is also possible to install it on the discharge side of the sweeper main body 1, and it is good to select as appropriate according to the site and the capacity of the device.
[0033]
When the building frame is cleaned by the cleaning apparatus of the present invention, the building frame A that has been stacked and collected from the construction site and collected is placed on the stock conveyor 16 by a forklift or the like. Then, the stock conveyor 16 is driven and sent to the turntable 10.
[0034]
At this time, the rollers 11 of the turntable 10 are rotated so as to be parallel to the rollers 17 of the stock conveyor 16, and when the building frame A is transferred onto the turntable 10, the turntable 10 is rotated by 90 degrees, The side of the uppermost building frame faces the chain conveyor 3. Next, the package made of a steel band or the like is unpacked so that the sheets can be taken out one by one from the stacked state.
[0035]
Then, when the uppermost building frame on the turntable 10 is set at the same height as the building frame gripping device 22, the motor 25 above the frame 19 is driven to move the building frame gripping device 22 forward, and the turntable 10 Grab the side of the top frame of the stacked frame. Then, the motor 25 is rotated in the reverse direction, and the building frame grasped is drawn into a predetermined position on the building frame receiving roller 26 disposed above the frame 19 on the side of the chain conveyor 3.
[0036]
The building frame A pulled into the building frame receiving roller 26 is pushed out by a push plate 35 as shown in FIG. 5, is pressed against a contact plate 37 disposed on the opposite side, and is set at a predetermined position. During this time, the turntable 10 raises the building frame by one sheet and waits for the next drawer.
[0037]
When the building frame is set at a predetermined position on the building frame receiving roller 26, the position of the lower part of the leg of the building frame is detected by the photoelectric sensor 33 disposed on the building frame receiving roller 26. At this time, as shown by the dotted line in FIG. 6, the detection light is output from the upper part to the lower part of the leg from the photoelectric sensor 33, and the position of the lower part of the leg is shifted inward or outward with respect to the reference position. If it exceeds the allowable range, the lower part of the leg blocks the detection light, and the deviation is detected by the pair of photoelectric sensors 33 to detect whether it is deformed inside or outside. In the figure, the leg E is in a normal position, the leg F is deviated outward, and the leg G is deviated inward.
[0038]
When the inspection of the frame leg by the frame width deviation detecting device 30 is completed, the turntable 29 is raised to slightly lift the inspected frame from the frame receiving roller 26, and then the turntable 29 is turned on. Is rotated 90 degrees so that the lower end of the frame leg is directed toward the frame width correcting device 31, and is lowered to the lower chain conveyor 3.
[0039]
At this time, if the deviation of the leg of the building frame is detected by the frame width deviation detecting device 30, the turntable 29 on which the building frame is placed is moved to a position slightly higher than the transfer surface of the chain conveyor 3. Stop. Then, the substrate 38 is advanced by the cylinder 60 shown in FIG. 4 to move the frame width correcting device 31 closer to the building frame. At this time, when the building frame legs are displaced outward, as shown in FIG. 7, the cylinder 44 of the leg fixing device 42 is extended and the fixing frame 43 is used to extend the frame legs from above. Then, the cylinder 41 is extended and the correction metal fitting 40 of the frame width correction device 31 is pushed in from below the lower part of the leg to correct it so as to be within the allowable range of the reference dimension.
[0040]
When the leg of the building frame is displaced inward, the cylinder 41 is extended so that the correction metal fitting 40 is positioned inside the leg of the building frame, and then the cylinder 41 is moved closer to the leg side of the building frame. After fixing the leg of the building frame by the leg fixing device 42, the cylinder 41 is contracted to move the correction metal fitting 40 from the inside to the outside, and the lower leg portion is pulled outward to perform the correction.
[0041]
Next, a case where a connection pin locking hole is formed in the leg portion of the building frame will be described.
[0042]
Also in the case of forming the connection pin locking hole, the turntable 29 on which the building frame is mounted is stopped at a position slightly higher than the transfer surface of the chain conveyor 3 as in the case of the above-described correction. Then, the cylinder 58 shown in FIG. 4 is extended and the pressing tool 57 is pushed out to push out the building frame A to a predetermined position, and the cylinder 48 of the punching device 32 is operated to push out the metal cores 53 and 53 ′. The cores 53 and 53 'are inserted into the pillar tube holes of the building frame. At this time, the building frame A is stretched by the pressing tool 57 to facilitate the insertion of the metal cores 53, 53 'into the pillar tube holes. In addition, as shown in FIG. 8, when the width of the leg differs depending on the type of the building frame A, the cylinder 51 is operated to move the cored bar 53 'as appropriate.
[0043]
Then, as shown in FIG. 9, the hydraulic cylinders 55, 55 'are extended to move the punches 56, 56' forward, and holes for locking the connection pins are formed in the legs. When the hole for connecting pin locking is completed, the punches 56 and 56 'are retracted, the metal cores 53 and 53' are retracted, and the substrate 38 is further retracted by the cylinder 60, and the P punching device 32 is returned to its original position. Return to position.
[0044]
When the frame width correction and the perforation work are completed in this way, the turntable 29 is lowered to transfer the building frame onto the lower chain conveyor 3 and to the transfer device 6. . Then, the transfer device 6 raises the roller 7 to lift the building frame, rotates it by 90 degrees, and drives the roller 7 to transfer the building frame onto the building frame feeding conveyor 2.
[0045]
The building frame transferred to the building frame input conveyor 2 is fed into the main body of the polisher 1, and the adhering material on the surface of the building frame is removed by the main body of the polisher 1. It is transported, where it is sequentially stacked and packed.
[0046]
In addition, the building frame that does not require blasting is transferred by the transfer device 6 ′ to the bypass conveyor 9 disposed in front of the blasting machine main body 1 while being transferred by the chain conveyor 3, and the blasting machine main body 1 is moved. Are sent to the palletizer 62 without passing through and are stacked.
[0047]
【The invention's effect】
As described above, in the polishing apparatus according to claim 1 according to the present invention, the construction frame transfer device 3 that carries in and out the construction frame to and from the polisher main body is moved from the reference dimension of the frame width of the construction frame. And a frame width correcting device 31 for correcting the frame width to a reference size, and the frame width of the building frame transferred by the building frame transfer device 3. Is detected by the frame width deviation detecting device 30, and if the detected frame width deviates from the reference dimension by a predetermined size or more, the frame width correcting device 31 is operated to correct the frame width. As a result, the inspection and correction work of the frame width, which had been done manually as a pre-process of the conventional cleaning work, can now be performed automatically at the same time as the cleaning work, reducing the burden on the operator and improving the work efficiency. Can be improved.
[Brief description of the drawings]
FIG. 1 is a plan view of a polishing apparatus according to the present invention.
FIG. 2 is an enlarged view of a main part of FIG.
FIG. 3 is a view taken in the direction of arrows AA in which a part of FIG. 2 is omitted, and shows a state in which a turntable 29 is raised.
FIG. 4 is a view in the direction of arrows BB in which a part of FIG. 2 is omitted.
FIG. 5 is a view in the direction of arrows CC in which a part of FIG. 3 is omitted.
FIG. 6 is an explanatory diagram showing an arrangement of a building frame leg and a photoelectric sensor.
FIG. 7 is an enlarged view taken in the direction of the arrow D-D in which a part of FIG. 4 is omitted.
FIG. 8 is an enlarged view of a main part of FIG. 2;
FIG. 9 is an enlarged view of a main part of FIG. 8;
FIG. 10 is a perspective view showing a building frame with deformed legs.
FIG. 11 is an explanatory diagram showing an example in which building frames arranged vertically are connected by a connecting pipe.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 ... Polisher main body 2 ... Construction frame input conveyor 3 ... Chain conveyor (construction frame transfer device) 6, 6 '... Transfer device 6, 6' ... Transfer device 9 ... Bypass conveyor 10 ... Turntable 16 ... Stock conveyor Reference Signs List 22: frame holding device 26: frame receiving roller 29: turntable 30: frame width deviation detecting device 31: frame width correcting device 32: punching device 62: palletizer

Claims (1)

建枠表面の付着物を除去する研掃機本体への建枠の搬入、搬出を行う建枠移送装置に建枠の枠幅の基準寸法からの偏位を検出する枠幅偏位検出装置と、枠幅を基準寸法に矯正する枠幅矯正装置とを配設すると共に、前記建枠移送装置によって移送される建枠の枠幅を前記枠幅偏位検出装置によって検出し、該検出した枠幅が基準寸法から所定寸法以上偏位しておれば前記枠幅矯正装置を作動して枠幅を矯正するように構成したことを特徴とする仮設足場用建枠の研掃装置。A frame width deviation detecting device that detects deviation of the frame width of the frame from a reference dimension to a frame transfer device that carries the frame into and out of the main body of the polisher for removing deposits on the surface of the frame; And a frame width correcting device for correcting the frame width to the reference size, and detecting the frame width of the building frame transferred by the building frame transfer device by the frame width deviation detecting device, and detecting the detected frame. A scaffolding frame for a temporary scaffolding frame, wherein the frame width is corrected by activating the frame width correcting device if the width deviates from the reference size by a predetermined size or more.
JP22531495A 1995-09-01 1995-09-01 Cleaning equipment for temporary scaffolding frames Expired - Fee Related JP3602895B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP22531495A JP3602895B2 (en) 1995-09-01 1995-09-01 Cleaning equipment for temporary scaffolding frames

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP22531495A JP3602895B2 (en) 1995-09-01 1995-09-01 Cleaning equipment for temporary scaffolding frames

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2004211255A Division JP3796504B2 (en) 2004-07-20 2004-07-20 Construction equipment for temporary scaffolding frame

Publications (2)

Publication Number Publication Date
JPH0967931A JPH0967931A (en) 1997-03-11
JP3602895B2 true JP3602895B2 (en) 2004-12-15

Family

ID=16827418

Family Applications (1)

Application Number Title Priority Date Filing Date
JP22531495A Expired - Fee Related JP3602895B2 (en) 1995-09-01 1995-09-01 Cleaning equipment for temporary scaffolding frames

Country Status (1)

Country Link
JP (1) JP3602895B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111421427A (en) * 2020-04-26 2020-07-17 广州思天汽车用品有限公司 Automobile appearance stamping workpiece surface oilstone grinding detection device

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109272908B (en) * 2018-09-20 2021-12-21 合肥合大精睿科技有限公司 Full-automatic display screen sensor performance detection device
CN117260476A (en) * 2023-09-28 2023-12-22 中建八局(甘肃)建设有限公司 Building template surface repairing device and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111421427A (en) * 2020-04-26 2020-07-17 广州思天汽车用品有限公司 Automobile appearance stamping workpiece surface oilstone grinding detection device
CN111421427B (en) * 2020-04-26 2020-11-17 山东聊城富锋汽车部件有限公司 Automobile appearance stamping workpiece surface oilstone grinding detection device

Also Published As

Publication number Publication date
JPH0967931A (en) 1997-03-11

Similar Documents

Publication Publication Date Title
CN109319203B (en) Steel pipe stacking winding packaging production line
CN110814774B (en) A fully automatic angle steel processing device and processing method
US5096369A (en) Pallet inspection and stacking apparatus
CN112139826A (en) An automatic production line of civil air defense door frame
CN111908027A (en) Workpiece conveying control method for preventing movement deviation
JP3602895B2 (en) Cleaning equipment for temporary scaffolding frames
JP2755088B2 (en) Transfer method and transfer device for reinforced mat
JP3796504B2 (en) Construction equipment for temporary scaffolding frame
CN219585303U (en) Transfer apparatus
CN106946031A (en) A kind of end plate automatic charging device
JPH08252639A (en) Work reversing device
CN216459865U (en) Upper and lower layer track structure of dispenser
JP2952338B2 (en) Scaffold cleaning equipment
CN117361109A (en) Automatic steel pipe feeding equipment
CN116394003A (en) Bar-like automatic processing equipment and processing method thereof
CN116511742A (en) Automatic conveying device and conveying method
KR100627869B1 (en) Formwork automatic loading device
CN112896915A (en) Online automatic collection device of steel pipe
JPH0569923A (en) Centering device for pallet
CN223950186U (en) A cage-type flipping device
JP2003053640A (en) Steel product carrying device and method
CN116238901B (en) Transfer equipment
CN222312053U (en) Automatic pile up neatly equipment of pipe fitting
CN220592462U (en) Automatic cleaning equipment for shaft parts
KR200368309Y1 (en) Apparatus for automatically loading concrete forms

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20040512

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20040525

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20040720

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20040913

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20040927

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081001

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081001

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091001

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101001

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111001

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121001

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131001

Year of fee payment: 9

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees