JP3605791B2 - Shield connection method to existing tunnel - Google Patents
Shield connection method to existing tunnel Download PDFInfo
- Publication number
- JP3605791B2 JP3605791B2 JP16987999A JP16987999A JP3605791B2 JP 3605791 B2 JP3605791 B2 JP 3605791B2 JP 16987999 A JP16987999 A JP 16987999A JP 16987999 A JP16987999 A JP 16987999A JP 3605791 B2 JP3605791 B2 JP 3605791B2
- Authority
- JP
- Japan
- Prior art keywords
- cutter ring
- existing tunnel
- tunnel
- cutting
- pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、既設トンネルに対し、これと交差する方向に新設のシールドトンネルをドッキングさせるための既設トンネルへのシールド接合工法に関する。
【0002】
【従来の技術】
従来、既設のトンネルに対し、これより小径の新設トンネルをドッキングさせる工法として、図8〜図10に示すように新設トンネル1のシールド掘進機2のスキンプレート2aの内周位置に、先端に切削用ビット3を固定したカッターリング4を旋回させつつ前進できるように設置しておき、既設トンネル5に接近した位置で、シールド掘進機2を停止させた状態で、カッターリング4を回転させつつ前進させ、既設トンネルの覆工5aを円形に切断し、然る後、カッターリング4内を既設トンネル5側から撤去し、カッターリング4及びスキンプレート2aを残してシールド掘進機内部を解体し、内周面に覆工1aを形成する方法がある。(特開平10−280867号公報)。
【0003】
【発明が解決しようとする課題】
上述の如き従来の工法においては、既設トンネルに土圧や水圧が半径方向に作用してバランスを保っているものであるため、新設トンネルの接合に際する覆工切削によってこのバランスが崩れ、危険な状態に至る場合がある。
【0004】
また、カッターリングを回転させ、その先端の切削用ビットにより切削しつつ前進させる場合、切削溝とカッターリングの競り合いを防止するとともに、切削屑を流し出す必要から、カッターリングの厚さより大きい幅となるように、切削溝をオーバーカットする必要がある。このためカッターリング外周面と切削溝内面との間に隙間ができ、切削完了時に、この隙間を地下水が走りトンネル内に出水を生じさせることとなり、その出水の処理及び止水に多くの労力を要するという問題が発生する。
【0005】
本発明はこのような従来の問題に鑑み、既設トンネルの覆工を、そのバランスを崩さずに安定した状態を維持させつつ切削でき、また、切削完了後の止水が、トンネル内に出水させることなく、容易にかつ完全に行うことができる既設トンネルへのシールド接続工法の提供を目的としてなされたものである。
【0006】
【課題を解決するための手段】
上述の如き従来の問題を解決し、所期の目的を達成するための本発明の特徴は、先端に切削用ビットを備えた回転自在なカッターリングを有するシールド掘進機を使用し、既設トンネルと交差する方向の新設トンネルを掘削し、前記既設トンネルに接近した位置で前記カッターリングを前進させて既設トンネルの覆工を切削することにより貫通孔を形成する既設トンネルへのシールド接続工法において、
前記既設トンネルの新設トンネル接続位置内面に、該既設トンネル覆工の前記カッターリングによる切削が完了した状態時に該カッターリングの先端が既設トンネル内に突出しない厚さのコンクリート等による盛り付け材層を予め形成しておくとともに該盛り付け材層のカッターリング前進位置内に、少なくとも一端を既設トンネル内に導出させた止水材注入用のパイプを埋設しておき、前記カッターリングによって既設トンネルの覆工及び盛り付け材層の途中までを切削させて前記パイプを切断させた後、該パイプを通して止水材を注入し、前記カッターリングと該カッターリングによる切削溝内面間に止水材を充填させ、然る後、前記既設トンネルの覆工及び盛り付け材層のカッターリング内側を撤去して貫通孔を開口させることにある。
【0007】
尚、止水材注入用パイプは、カッターリングによって形成される切削溝に対し、カッターリング半径方向に交差する位置に埋設し、該パイプの両端を既設トンネル内に導出させることが好ましい。
【0008】
また、止水材注入用パイプは、カッターリングによって形成される切削溝に対し、カッターリング半径方向に交差する位置に埋設し、該パイプの一端側を埋め殺し他端側を既設トンネル内に導出させてもよい。
【0009】
【発明の実施の形態】
次に本発明の実施の形態を図1〜図7について説明する。
【0010】
図において、10は既設トンネルであり、11は既設トンネルに対してドッキングさせようとする新設トンネル、12は新設トンネル掘進用のシールド掘進機である。
【0011】
シールド掘進機12は、スキンプレート12aの内側に、前方に押し出すことができるカッターリング14を備えている。このカッターリング14の先端には該カッターリングの厚さより内側及び外側をオーバーカットする切削用のビット15が固定されているとともに、図示してないが、先端より切削時の冷却及び切削屑を排出させるための水を噴射できるようになっている。
【0012】
カッターリング14は図には示していないがカッターヘッド13とともに回転され、押し出し手段によってスキンプレート12aの前方側に押し出し動作可能に組み込まれている。
【0013】
次に、上記シールド掘進機を使用したシールド接続工法について説明する。
【0014】
カッターリングによる切削に先立ち、図1、図2に示すように、既設トンネル10の接続位置内面に、コンクリートによる盛り付け材層16を設置する。この盛り付け材層16はカッターリング14の前進によって既設トンネル10の覆工10a部分の切断が完了した状態のとき、該カッターリング14の先端側に一定以上の厚さが残る厚さ及び広さに成形する。
【0015】
また、盛り付け材層16の打設に際し、その内部に止水材注入用のパイプ17を切断予定位置に、一定間隔毎に埋設する。このパイプ17は、図4に示すように、U字状の折り返し部分17aがカッターリング14によって切断され、その切断部分がカッターリング14の前進によって形成される円形の切削溝18の半径方向の内外面に開口されるように埋設しておく。このパイプ17には、両端のトンネル内導出部17b,17bにバルブ19、19を設けておく。
【0016】
このようにして盛り付け材層16を形成し、既設トンネル10を内部から補強した状態で、図3に示すように、カッターリング14を旋回させつつ前進させて、残りの地山及び既設トンネル10の覆工10aを切断し、盛り付け材層16に円形の切削溝18を形成する。このようにして既設トンネル10の覆工10aが完全に切断された後、盛り付け材層16を更に切り進めることにより、止水材注入用のパイプ17の折り返し部分17aが切断される。
【0017】
尚、このパイプ17の切断は、該パイプの一端のバルブ19を開くことにより、該パイプ17がカッターリング14によって切断されると切削用の冷却水が噴出し、切断を確認することができ、確認後バルブを閉じる。
【0018】
このようにしてパイプ17が切断されるのを確認してカッターリング14による切削を停止させる。このときカッターリング14は既設トンネル10内の盛り付け材層16を円形に切削した切削溝18内に先端が挿入された状態で既設トンネル10とスキンプレート12aとの間に掛け渡された状態となる。
【0019】
然る後、図4に示すように、カッターリング14の外周面側に開口されたパイプ17より止水材21を注入する。これによって、止水材20がカッターリング14の外面側と切削溝18との隙間に充填され、既設トンネル覆工10aとカッターリング外周面間が止水される。
【0020】
この止水作業が完了した後、図5に示すように、盛り付け材層16のカッターリング内側部分を、既設トンネル10内から、人力又は掘削機を使用して破壊し、該カッターリング内の既設トンネル覆工10a及び地山土砂を除去し、カッターリング14及びスキンプレート12aを残してシールド掘進機12を解体して搬出する。尚、上述した盛り付け材層16カッターリング内側部分の除去前に、シールド掘進機12を解体し、新設トンネル11内側から既設トンネル覆工10a及び前記盛り付け材層16を除去してもよい。
【0021】
然る後、図6に示すように、スキンプレート12a及びカッターリング14内に必要な覆工11aを形成して既設、新設の両トンネル10,11の接続を完了する。
【0022】
前述の例では、止水材注入用のパイプ17をU字状に折り返して埋設しているが、図7に示すように、カッターリングの内周面側になるよう切削溝18に交差させる位置に埋設し、その一端側を盛り付け材層1内に埋め殺し、他端側を既設トンネル10内に導出させてもよい。
【0023】
また、盛り付け材層16は既設トンネルの補強の役目が必要な場合には、コンクリートの他、これと同等程度の強度を有する合成樹脂材料等が使用でき、また既設トンネルの補強を要しない場合には、ウレタンやスチロール等の合成樹脂発泡材が使用できる。
【0024】
【発明の効果】
上述のように、本発明に係る既設トンネルへのシールド接続工法においては、既設トンネルの新設トンネル接続位置内面に、該既設トンネル覆工のカッターリングによる切削が完了した状態時に、該カッターリングの先端が既設トンネル内に突出しない厚さのコンクリート等による盛り付け材層を予め形成しておき、これを前記カッターリングによって切削するようにしたことにより、新設トンネル接続位置の覆工を盛り付け材層にて補強し、安定化させた状態で切削がなされることとなり、安全に切削作業がなされる。
【0025】
また、本発明では、盛り付け材層のカッターリング前進位置内に、少なくとも一端を既設トンネル内に開口させた止水材注入用のパイプを埋設しておき、前記カッターリングの前進によって該パイプを切断した後、該パイプを通して止水材を注入し、前記カッターリングと該カッターリングによる切削溝内面との間を止水させるようにしたことにより、カッターリングが既設トンネル内に露出する以前に止水が完全になされることとなり、トンネル内への出水がなくなる。
【0026】
更に、本発明では、カッターリングによる既設トンネル覆工切削後においても、盛り付け材層が止水壁の役割を果たすため、盛り付け材層の形成後、既設トンネルの(下水道等としての)供用を再開させ、新設トンネル側からシールド掘進機の除去作業等、当該接続部以外の新設トンネル側の工事が行え、既設トンネルの供用停止時間を短縮できる。
【図面の簡単な説明】
【図1】本発明に係るシールド接続工法におけるカッターリングによる切削前の状態を示す断面図である。
【図2】同上の盛り付け材層部分を示す正面図である。
【図3】同上のカッターリングによる切削状態を示す断面図である。
【図4】同上の止水材注入状態を示す拡大断面図である。
【図5】同上の止水材層除去工程を示す断面図である。
【図6】同上の新設トンネル接続完了状態を示す断面図である。
【図7】本発明方法に使用する止水材注入用パイプの他の例を示す断面図である。
【図8】従来方法の接続前の状態を示す断面図である。
【図9】同上のカッターリングによる切削状態を示す断面図である。
【図10】同上の接続完了状態の断面図である。
【符号の説明】
10 既設トンネル
10a 覆工
11 新設トンネル
11a 覆工
12 シールド掘進機
12a スキンプレート
13 カッターヘッド
14 カッターリング
15 ビット
16 盛り付け材層
17 パイプ
17a 折り返し部
17b トンネル内導出部
18 切削溝
19 バルブ
20 止水材[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to a shield joining method for an existing tunnel to dock a new shield tunnel in a direction intersecting the tunnel.
[0002]
[Prior art]
Conventionally, as a method of docking a new tunnel having a smaller diameter than an existing tunnel, as shown in FIGS. 8 to 10, a tip is cut at the inner peripheral position of the skin plate 2 a of the
[0003]
[Problems to be solved by the invention]
In the conventional method as described above, since earth pressure and water pressure act on the existing tunnel in the radial direction to maintain the balance, the balance is broken by the lining cutting when joining the new tunnel, which is dangerous. In some cases.
[0004]
In addition, when rotating the cutter ring and moving it forward while cutting with the cutting bit at the tip, it is necessary to prevent the competition between the cutting groove and the cutter ring and to flush out the cutting waste. In order to achieve this, it is necessary to overcut the cutting groove. For this reason, a gap is formed between the outer peripheral surface of the cutter ring and the inner surface of the cutting groove, and when cutting is completed, groundwater runs through the gap to cause water to flow into the tunnel, and much labor is required for the processing of the water and for stopping the water. The problem of costing arises.
[0005]
In view of such a conventional problem, the present invention can cut a lining of an existing tunnel while maintaining a stable state without losing its balance, and the water stoppage after the completion of the cutting causes water to flow into the tunnel. The purpose of the present invention is to provide a shield connection method to an existing tunnel that can be easily and completely performed without any problem.
[0006]
[Means for Solving the Problems]
The feature of the present invention to solve the conventional problems as described above and achieve the intended purpose is to use a shield excavator having a rotatable cutter ring with a cutting bit at the tip, and use the existing tunnel and In a shield connection method to an existing tunnel that excavates a new tunnel in a crossing direction, advances the cutter ring at a position close to the existing tunnel and cuts a lining of the existing tunnel to form a through hole,
On the inner surface of the new tunnel connection position of the existing tunnel, an embedding material layer made of concrete or the like having a thickness such that the tip of the cutter ring does not protrude into the existing tunnel when the cutting of the existing tunnel lining is completed by the cutter ring is completed. formed in advance in the cutter ring forward position of the dished member layer with it, at least one end of the advance buried pipe for water blocking material injection which has led to the existing tunnel, lining of the existing tunnel by said cutter ring and After cutting the pipe by cutting halfway through the embedding material layer, a water-stopping material is injected through the pipe, and the water-stopping material is filled between the cutter ring and the inner surface of the cutting groove formed by the cutter ring. after is to be opened through holes by removing the cutter ring inner lining and dishing material layer of the existing tunnel
[0007]
In addition, it is preferable that the water-stopping material injection pipe is buried at a position intersecting the cutting groove formed by the cutter ring in the cutter ring radial direction, and both ends of the pipe are preferably led into an existing tunnel .
[0008]
In addition, the water-stopping material injection pipe is buried at a position intersecting the cutting groove formed by the cutter ring in the radial direction of the cutter ring, filling one end of the pipe and leading the other end into the existing tunnel. You may let it.
[0009]
BEST MODE FOR CARRYING OUT THE INVENTION
Next, an embodiment of the present invention will be described with reference to FIGS.
[0010]
In the figure, 10 is an existing tunnel, 11 is a new tunnel to be docked to the existing tunnel, and 12 is a shield excavator for excavating the new tunnel.
[0011]
The
[0012]
Although not shown, the
[0013]
Next, a shield connection method using the shield machine will be described.
[0014]
Prior to cutting by the cutter ring, as shown in FIGS. 1 and 2, a
[0015]
Further, at the time of placing the
[0016]
In the state where the
[0017]
The
[0018]
After confirming that the
[0019]
Thereafter, as shown in FIG. 4, the water-stopping material 21 is injected from a
[0020]
After completion of this water stopping work, as shown in FIG. 5, the inside of the cutter ring of the filling
[0021]
Thereafter, as shown in FIG. 6, the necessary lining 11a is formed in the
[0022]
Position In the previous example, but the water stopping
[0023]
In addition, when the role of reinforcing the existing tunnel is required, the filling
[0024]
【The invention's effect】
As described above, in the shield connection method to the existing tunnel according to the present invention, when cutting by the cutter ring of the existing tunnel lining is completed on the inner surface of the new tunnel connection position of the existing tunnel, Is formed in advance by a concrete layer of concrete or the like having a thickness that does not protrude into the existing tunnel, and is cut by the cutter ring. Cutting is performed in a reinforced and stabilized state, and the cutting operation is performed safely.
[0025]
Further, in the present invention, a pipe for injecting a waterproof material having at least one end opened into the existing tunnel is buried in the cutter material advancing position of the filling material layer, and the pipe is cut by advancing the cutter ring. After that, a water-stopping material is injected through the pipe to stop water between the cutter ring and the inner surface of the cutting groove formed by the cutter ring, so that water is stopped before the cutter ring is exposed in the existing tunnel. Is completely completed, and there is no flood in the tunnel.
[0026]
Furthermore, according to the present invention, even after cutting the existing tunnel lining by the cutter ring, the serving material layer plays a role of a water blocking wall. Therefore, after forming the serving material layer, the existing tunnel is restarted (as a sewer). By doing so, the construction of the new tunnel side other than the connection portion can be performed, such as the work of removing the shield machine from the new tunnel side, and the operation stoppage time of the existing tunnel can be reduced.
[Brief description of the drawings]
FIG. 1 is a sectional view showing a state before cutting by a cutter ring in a shield connection method according to the present invention.
FIG. 2 is a front view showing a portion of a mounting material layer according to the first embodiment;
FIG. 3 is a cross-sectional view showing a cutting state of the cutter ring according to the first embodiment.
FIG. 4 is an enlarged cross-sectional view showing a water-stopping material injection state of the above.
FIG. 5 is a cross-sectional view showing a water-stopping material layer removing step of the above.
FIG. 6 is a cross-sectional view showing a state in which a new tunnel connection is completed in the first embodiment.
FIG. 7 is a cross-sectional view showing another example of a water-stopping material injection pipe used in the method of the present invention.
FIG. 8 is a sectional view showing a state before connection according to a conventional method.
FIG. 9 is a cross-sectional view showing a cutting state by the cutter ring of the above.
FIG. 10 is a cross-sectional view of the same connection completed state.
[Explanation of symbols]
Claims (3)
前記既設トンネルの新設トンネル接続位置内面に、該既設トンネル覆工の前記カッターリングによる切削が完了した状態時に該カッターリングの先端が既設トンネル内に突出しない厚さのコンクリート等による盛り付け材層を予め形成しておくとともに該盛り付け材層のカッターリング前進位置内に、少なくとも一端を既設トンネル内に導出させた止水材注入用のパイプを埋設しておき、前記カッターリングによって既設トンネルの覆工及び盛り付け材層の途中までを切削させて前記パイプを切断させた後、該パイプを通して止水材を注入し、前記カッターリングと該カッターリングによる切削溝内面間に止水材を充填させ、然る後、前記既設トンネルの覆工及び盛り付け材層のカッターリング内側を撤去して貫通孔を開口させることを特徴としてなる既設トンネルへのシールド接続工法。Using a shield machine having a rotatable cutter ring with a cutting bit at the tip, excavating a new tunnel in the direction intersecting with the existing tunnel, and moving the cutter ring forward at a position close to the existing tunnel In the shield connection method to the existing tunnel that forms a through hole by cutting the lining of the existing tunnel,
On the inner surface of the new tunnel connection position of the existing tunnel, an embedding material layer made of concrete or the like having a thickness such that the tip of the cutter ring does not protrude into the existing tunnel when the cutting of the existing tunnel lining is completed by the cutter ring is completed. formed in advance in the cutter ring forward position of the dished member layer with it, at least one end of the advance buried pipe for water blocking material injection which has led to the existing tunnel, lining of the existing tunnel by said cutter ring and After cutting the pipe by cutting halfway through the embedding material layer, a water-stopping material is injected through the pipe, and the water-stopping material is filled between the cutter ring and the inner surface of the cutting groove formed by the cutter ring. after, characterized in that to open the through-hole by removing the cutter ring inner lining and dishing material layer of the existing tunnel Shield connection method to existing tunnels formed by.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP16987999A JP3605791B2 (en) | 1999-06-16 | 1999-06-16 | Shield connection method to existing tunnel |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP16987999A JP3605791B2 (en) | 1999-06-16 | 1999-06-16 | Shield connection method to existing tunnel |
Related Child Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2004225785A Division JP3879105B2 (en) | 2004-08-02 | 2004-08-02 | Shield connection method to existing tunnel |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2000356092A JP2000356092A (en) | 2000-12-26 |
| JP3605791B2 true JP3605791B2 (en) | 2004-12-22 |
Family
ID=15894659
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP16987999A Expired - Lifetime JP3605791B2 (en) | 1999-06-16 | 1999-06-16 | Shield connection method to existing tunnel |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3605791B2 (en) |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111997629B (en) * | 2020-09-10 | 2022-12-13 | 中铁二十一局集团轨道交通工程有限公司 | Tunnel supporting structure |
| CN113685195B (en) * | 2021-08-25 | 2024-05-24 | 中国铁建重工集团股份有限公司 | Machine head shield body, communication channel construction system and method |
| CN115584997A (en) * | 2022-07-29 | 2023-01-10 | 中铁隧道局集团有限公司 | Construction method of shield tunneling under ultra-short distance in existing structures |
| CN115507808B (en) * | 2022-09-14 | 2024-06-28 | 中国地质大学(武汉) | Test device and method for simulating stress-deformation characteristics of existing tunnels under adjacent tunnel construction conditions |
-
1999
- 1999-06-16 JP JP16987999A patent/JP3605791B2/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| JP2000356092A (en) | 2000-12-26 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP3605791B2 (en) | Shield connection method to existing tunnel | |
| JP3879105B2 (en) | Shield connection method to existing tunnel | |
| JP3098208B2 (en) | Simultaneous backfilling device for shield machine | |
| JPH11200750A (en) | Excavation bit for winding hole and execution method using it | |
| JP4226433B2 (en) | Shield joining method and protective barrier structure | |
| JPH08210083A (en) | Cutoff method and device for pit mouth in underground piping work | |
| JPH09287147A (en) | Preventive method of water leakage against continuous cut-off wall | |
| JP3710991B2 (en) | Ground reinforcement method | |
| JP5495874B2 (en) | Removal method of shield excavator | |
| JP2020097892A (en) | Tunnel structure, manufacturing method of tunnel structure and water cut-off method | |
| JP2020200701A (en) | Underground joining method and excavator | |
| JP3640708B2 (en) | Cross-joining method for shield tunnel | |
| JP7308006B2 (en) | tunnel excavation method | |
| JPS5927830B2 (en) | Tunnel excavation method in soft ground | |
| JPH05118081A (en) | Soil pipe laying method and mounting socket used for method thereof | |
| JP2005350959A (en) | Method and device for damming up tunnel reinforcing material, and damming material injection pipe | |
| JP2000328560A (en) | Construction method of steel pipe column retaining wall | |
| JP2002242593A (en) | How to change the cutter bit of the shield machine | |
| JPS63125724A (en) | Construction method of underground continuous wall | |
| JPH0684713B2 (en) | How to reach a shield machine from a concrete shaft | |
| JP2003328695A (en) | Segment and tunnel construction method using the same | |
| JP2007332737A (en) | Water stoppage structure and reach method of shield excavator reaching shaft | |
| KR101501834B1 (en) | Underground excavation opening and closing devices | |
| KR101558871B1 (en) | Maintenance of concrete construction system | |
| JP4966713B2 (en) | New pipe connection method and closed pipe end cutting tool |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20040521 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20040601 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20040802 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20040907 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20040924 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 3605791 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20071015 Year of fee payment: 3 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20101015 Year of fee payment: 6 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111015 Year of fee payment: 7 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111015 Year of fee payment: 7 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20121015 Year of fee payment: 8 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20131015 Year of fee payment: 9 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| EXPY | Cancellation because of completion of term |