Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP3605791B2 - Shield connection method to existing tunnel - Google Patents
[go: Go Back, main page]

JP3605791B2 - Shield connection method to existing tunnel - Google Patents

Shield connection method to existing tunnel Download PDF

Info

Publication number
JP3605791B2
JP3605791B2 JP16987999A JP16987999A JP3605791B2 JP 3605791 B2 JP3605791 B2 JP 3605791B2 JP 16987999 A JP16987999 A JP 16987999A JP 16987999 A JP16987999 A JP 16987999A JP 3605791 B2 JP3605791 B2 JP 3605791B2
Authority
JP
Japan
Prior art keywords
cutter ring
existing tunnel
tunnel
cutting
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP16987999A
Other languages
Japanese (ja)
Other versions
JP2000356092A (en
Inventor
勝紀 植田
幹男 平井
春夫 高橋
哲男 古田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Penta Ocean Construction Co Ltd
Original Assignee
Penta Ocean Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Penta Ocean Construction Co Ltd filed Critical Penta Ocean Construction Co Ltd
Priority to JP16987999A priority Critical patent/JP3605791B2/en
Publication of JP2000356092A publication Critical patent/JP2000356092A/en
Application granted granted Critical
Publication of JP3605791B2 publication Critical patent/JP3605791B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、既設トンネルに対し、これと交差する方向に新設のシールドトンネルをドッキングさせるための既設トンネルへのシールド接合工法に関する。
【0002】
【従来の技術】
従来、既設のトンネルに対し、これより小径の新設トンネルをドッキングさせる工法として、図8〜図10に示すように新設トンネル1のシールド掘進機2のスキンプレート2aの内周位置に、先端に切削用ビット3を固定したカッターリング4を旋回させつつ前進できるように設置しておき、既設トンネル5に接近した位置で、シールド掘進機2を停止させた状態で、カッターリング4を回転させつつ前進させ、既設トンネルの覆工5aを円形に切断し、然る後、カッターリング4内を既設トンネル5側から撤去し、カッターリング4及びスキンプレート2aを残してシールド掘進機内部を解体し、内周面に覆工1aを形成する方法がある。(特開平10−280867号公報)。
【0003】
【発明が解決しようとする課題】
上述の如き従来の工法においては、既設トンネルに土圧や水圧が半径方向に作用してバランスを保っているものであるため、新設トンネルの接合に際する覆工切削によってこのバランスが崩れ、危険な状態に至る場合がある。
【0004】
また、カッターリングを回転させ、その先端の切削用ビットにより切削しつつ前進させる場合、切削溝とカッターリングの競り合いを防止するとともに、切削屑を流し出す必要から、カッターリングの厚さより大きい幅となるように、切削溝をオーバーカットする必要がある。このためカッターリング外周面と切削溝内面との間に隙間ができ、切削完了時に、この隙間を地下水が走りトンネル内に出水を生じさせることとなり、その出水の処理及び止水に多くの労力を要するという問題が発生する。
【0005】
本発明はこのような従来の問題に鑑み、既設トンネルの覆工を、そのバランスを崩さずに安定した状態を維持させつつ切削でき、また、切削完了後の止水が、トンネル内に出水させることなく、容易にかつ完全に行うことができる既設トンネルへのシールド接続工法の提供を目的としてなされたものである。
【0006】
【課題を解決するための手段】
上述の如き従来の問題を解決し、所期の目的を達成するための本発明の特徴は、先端に切削用ビットを備えた回転自在なカッターリングを有するシールド掘進機を使用し、既設トンネルと交差する方向の新設トンネルを掘削し、前記既設トンネルに接近した位置で前記カッターリングを前進させて既設トンネルの覆工を切削することにより貫通孔を形成する既設トンネルへのシールド接続工法において、
前記既設トンネルの新設トンネル接続位置内面に、該既設トンネル覆工の前記カッターリングによる切削が完了した状態時に該カッターリングの先端が既設トンネル内に突出しない厚さのコンクリート等による盛り付け材層を予め形成しておくとともに該盛り付け材層のカッターリング前進位置内に、少なくとも一端を既設トンネル内に導出させた止水材注入用のパイプを埋設しておき、前記カッターリングによって既設トンネルの覆工及び盛り付け材層の途中までを切削させて前記パイプを切断させた後、該パイプを通して止水材を注入し、前記カッターリングと該カッターリングによる切削溝内面間に止水材を充填させ、然る後、前記既設トンネルの覆工及び盛り付け材層のカッターリング内側を撤去して貫通孔を開口させることにある。
【0007】
尚、止水材注入用パイプは、カッターリングによって形成される切削溝に対し、カッターリング半径方向に交差する位置に埋設し、該パイプの両端を既設トンネル内に導出させることが好ましい。
【0008】
また、止水材注入用パイプは、カッターリングによって形成される切削溝に対し、カッターリング半径方向に交差する位置に埋設し、該パイプの一端側を埋め殺し他端側を既設トンネル内に導出させてもよい。
【0009】
【発明の実施の形態】
次に本発明の実施の形態を図1〜図7について説明する。
【0010】
図において、10は既設トンネルであり、11は既設トンネルに対してドッキングさせようとする新設トンネル、12は新設トンネル掘進用のシールド掘進機である。
【0011】
シールド掘進機12は、スキンプレート12aの内側に、前方に押し出すことができるカッターリング14を備えている。このカッターリング14の先端には該カッターリングの厚さより内側及び外側をオーバーカットする切削用のビット15が固定されているとともに、図示してないが、先端より切削時の冷却及び切削屑を排出させるための水を噴射できるようになっている。
【0012】
カッターリング14は図には示していないがカッターヘッド13とともに回転され、押し出し手段によってスキンプレート12aの前方側に押し出し動作可能に組み込まれている。
【0013】
次に、上記シールド掘進機を使用したシールド接続工法について説明する。
【0014】
カッターリングによる切削に先立ち、図1、図2に示すように、既設トンネル10の接続位置内面に、コンクリートによる盛り付け材層16を設置する。この盛り付け材層16はカッターリング14の前進によって既設トンネル10の覆工10a部分の切断が完了した状態のとき、該カッターリング14の先端側に一定以上の厚さが残る厚さ及び広さに成形する。
【0015】
また、盛り付け材層16の打設に際し、その内部に止水材注入用のパイプ17を切断予定位置に、一定間隔毎に埋設する。このパイプ17は、図4に示すように、U字状の折り返し部分17aがカッターリング14によって切断され、その切断部分がカッターリング14の前進によって形成される円形の切削溝18の半径方向の内外面に開口されるように埋設しておく。このパイプ17には、両端のトンネル内導出部17b,17bにバルブ19、19を設けておく。
【0016】
このようにして盛り付け材層16を形成し、既設トンネル10を内部から補強した状態で、図3に示すように、カッターリング14を旋回させつつ前進させて、残りの地山及び既設トンネル10の覆工10aを切断し、盛り付け材層16に円形の切削溝18を形成する。このようにして既設トンネル10の覆工10aが完全に切断された後、盛り付け材層16を更に切り進めることにより、止水材注入用のパイプ17の折り返し部分17aが切断される。
【0017】
尚、このパイプ17の切断は、該パイプの一端のバルブ19を開くことにより、該パイプ17がカッターリング14によって切断されると切削用の冷却水が噴出し、切断を確認することができ、確認後バルブを閉じる。
【0018】
このようにしてパイプ17が切断されるのを確認してカッターリング14による切削を停止させる。このときカッターリング14は既設トンネル10内の盛り付け材層16を円形に切削した切削溝18内に先端が挿入された状態で既設トンネル10とスキンプレート12aとの間に掛け渡された状態となる。
【0019】
然る後、図4に示すように、カッターリング14の外周面側に開口されたパイプ17より止水材21を注入する。これによって、止水材20がカッターリング14の外面側と切削溝18との隙間に充填され、既設トンネル覆工10aとカッターリング外周面間が止水される。
【0020】
この止水作業が完了した後、図5に示すように、盛り付け材層16のカッターリング内側部分を、既設トンネル10内から、人力又は掘削機を使用して破壊し、該カッターリング内の既設トンネル覆工10a及び地山土砂を除去し、カッターリング14及びスキンプレート12aを残してシールド掘進機12を解体して搬出する。尚、上述した盛り付け材層16カッターリング内側部分の除去前に、シールド掘進機12を解体し、新設トンネル11内側から既設トンネル覆工10a及び前記盛り付け材層16を除去してもよい。
【0021】
然る後、図6に示すように、スキンプレート12a及びカッターリング14内に必要な覆工11aを形成して既設、新設の両トンネル10,11の接続を完了する。
【0022】
前述の例では、止水材注入用のパイプ17をU字状に折り返して埋設しているが、図7に示すように、カッターリングの内周面側になるよう切削溝18に交差させる位置に埋設し、その一端側を盛り付け材層1内に埋め殺し、他端側を既設トンネル10内に導出させてもよい。
【0023】
また、盛り付け材層16は既設トンネルの補強の役目が必要な場合には、コンクリートの他、これと同等程度の強度を有する合成樹脂材料等が使用でき、また既設トンネルの補強を要しない場合には、ウレタンやスチロール等の合成樹脂発泡材が使用できる。
【0024】
【発明の効果】
上述のように、本発明に係る既設トンネルへのシールド接続工法においては、既設トンネルの新設トンネル接続位置内面に、該既設トンネル覆工のカッターリングによる切削が完了した状態時に、該カッターリングの先端が既設トンネル内に突出しない厚さのコンクリート等による盛り付け材層を予め形成しておき、これを前記カッターリングによって切削するようにしたことにより、新設トンネル接続位置の覆工を盛り付け材層にて補強し、安定化させた状態で切削がなされることとなり、安全に切削作業がなされる。
【0025】
また、本発明では、盛り付け材層のカッターリング前進位置内に、少なくとも一端を既設トンネル内に開口させた止水材注入用のパイプを埋設しておき、前記カッターリングの前進によって該パイプを切断した後、該パイプを通して止水材を注入し、前記カッターリングと該カッターリングによる切削溝内面との間を止水させるようにしたことにより、カッターリングが既設トンネル内に露出する以前に止水が完全になされることとなり、トンネル内への出水がなくなる。
【0026】
更に、本発明では、カッターリングによる既設トンネル覆工切削後においても、盛り付け材層が止水壁の役割を果たすため、盛り付け材層の形成後、既設トンネルの(下水道等としての)供用を再開させ、新設トンネル側からシールド掘進機の除去作業等、当該接続部以外の新設トンネル側の工事が行え、既設トンネルの供用停止時間を短縮できる。
【図面の簡単な説明】
【図1】本発明に係るシールド接続工法におけるカッターリングによる切削前の状態を示す断面図である。
【図2】同上の盛り付け材層部分を示す正面図である。
【図3】同上のカッターリングによる切削状態を示す断面図である。
【図4】同上の止水材注入状態を示す拡大断面図である。
【図5】同上の止水材層除去工程を示す断面図である。
【図6】同上の新設トンネル接続完了状態を示す断面図である。
【図7】本発明方法に使用する止水材注入用パイプの他の例を示す断面図である。
【図8】従来方法の接続前の状態を示す断面図である。
【図9】同上のカッターリングによる切削状態を示す断面図である。
【図10】同上の接続完了状態の断面図である。
【符号の説明】
10 既設トンネル
10a 覆工
11 新設トンネル
11a 覆工
12 シールド掘進機
12a スキンプレート
13 カッターヘッド
14 カッターリング
15 ビット
16 盛り付け材層
17 パイプ
17a 折り返し部
17b トンネル内導出部
18 切削溝
19 バルブ
20 止水材
[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to a shield joining method for an existing tunnel to dock a new shield tunnel in a direction intersecting the tunnel.
[0002]
[Prior art]
Conventionally, as a method of docking a new tunnel having a smaller diameter than an existing tunnel, as shown in FIGS. 8 to 10, a tip is cut at the inner peripheral position of the skin plate 2 a of the shield machine 2 of the new tunnel 1. The cutter ring 4 to which the tool bit 3 is fixed is installed so as to be able to move forward while rotating, and at a position close to the existing tunnel 5, the shield ring excavator 2 is stopped and the cutter ring 4 is moved forward while rotating. Then, the lining 5a of the existing tunnel is cut into a circle, and then the inside of the cutter ring 4 is removed from the existing tunnel 5 side, and the inside of the shield machine is dismantled while leaving the cutter ring 4 and the skin plate 2a. There is a method of forming the lining 1a on the peripheral surface. (JP-A-10-280867).
[0003]
[Problems to be solved by the invention]
In the conventional method as described above, since earth pressure and water pressure act on the existing tunnel in the radial direction to maintain the balance, the balance is broken by the lining cutting when joining the new tunnel, which is dangerous. In some cases.
[0004]
In addition, when rotating the cutter ring and moving it forward while cutting with the cutting bit at the tip, it is necessary to prevent the competition between the cutting groove and the cutter ring and to flush out the cutting waste. In order to achieve this, it is necessary to overcut the cutting groove. For this reason, a gap is formed between the outer peripheral surface of the cutter ring and the inner surface of the cutting groove, and when cutting is completed, groundwater runs through the gap to cause water to flow into the tunnel, and much labor is required for the processing of the water and for stopping the water. The problem of costing arises.
[0005]
In view of such a conventional problem, the present invention can cut a lining of an existing tunnel while maintaining a stable state without losing its balance, and the water stoppage after the completion of the cutting causes water to flow into the tunnel. The purpose of the present invention is to provide a shield connection method to an existing tunnel that can be easily and completely performed without any problem.
[0006]
[Means for Solving the Problems]
The feature of the present invention to solve the conventional problems as described above and achieve the intended purpose is to use a shield excavator having a rotatable cutter ring with a cutting bit at the tip, and use the existing tunnel and In a shield connection method to an existing tunnel that excavates a new tunnel in a crossing direction, advances the cutter ring at a position close to the existing tunnel and cuts a lining of the existing tunnel to form a through hole,
On the inner surface of the new tunnel connection position of the existing tunnel, an embedding material layer made of concrete or the like having a thickness such that the tip of the cutter ring does not protrude into the existing tunnel when the cutting of the existing tunnel lining is completed by the cutter ring is completed. formed in advance in the cutter ring forward position of the dished member layer with it, at least one end of the advance buried pipe for water blocking material injection which has led to the existing tunnel, lining of the existing tunnel by said cutter ring and After cutting the pipe by cutting halfway through the embedding material layer, a water-stopping material is injected through the pipe, and the water-stopping material is filled between the cutter ring and the inner surface of the cutting groove formed by the cutter ring. after is to be opened through holes by removing the cutter ring inner lining and dishing material layer of the existing tunnel
[0007]
In addition, it is preferable that the water-stopping material injection pipe is buried at a position intersecting the cutting groove formed by the cutter ring in the cutter ring radial direction, and both ends of the pipe are preferably led into an existing tunnel .
[0008]
In addition, the water-stopping material injection pipe is buried at a position intersecting the cutting groove formed by the cutter ring in the radial direction of the cutter ring, filling one end of the pipe and leading the other end into the existing tunnel. You may let it.
[0009]
BEST MODE FOR CARRYING OUT THE INVENTION
Next, an embodiment of the present invention will be described with reference to FIGS.
[0010]
In the figure, 10 is an existing tunnel, 11 is a new tunnel to be docked to the existing tunnel, and 12 is a shield excavator for excavating the new tunnel.
[0011]
The shield machine 12 includes a cutter ring 14 that can be pushed forward inside the skin plate 12a. A cutting bit 15 for overcutting the inside and outside of the thickness of the cutter ring 14 is fixed to the tip of the cutter ring 14, and although not shown, cooling at the time of cutting and discharging cutting chips are performed from the tip. Water can be injected to make it work.
[0012]
Although not shown, the cutter ring 14 is rotated together with the cutter head 13, and is incorporated so as to be able to be pushed forward by the pushing means on the front side of the skin plate 12a.
[0013]
Next, a shield connection method using the shield machine will be described.
[0014]
Prior to cutting by the cutter ring, as shown in FIGS. 1 and 2, a concrete material layer 16 is installed on the inner surface of the connection position of the existing tunnel 10. When the cutting of the lining 10 a of the existing tunnel 10 is completed by the advancement of the cutter ring 14, the laying material layer 16 has a thickness and a width in which a certain thickness or more remains on the tip side of the cutter ring 14. Mold.
[0015]
Further, at the time of placing the filling material layer 16, a pipe 17 for injecting a water-stopping material is buried therein at a predetermined cutting position at regular intervals. As shown in FIG. 4, the pipe 17 has a U-shaped folded portion 17 a cut by a cutter ring 14, and the cut portion is formed in a radial direction of a circular cutting groove 18 formed by advancement of the cutter ring 14. It is buried so that it is opened on the outer surface. The pipe 17 is provided with valves 19, 19 at outlets 17 b, 17 b in the tunnel at both ends.
[0016]
In the state where the laying material layer 16 is formed and the existing tunnel 10 is reinforced from the inside, as shown in FIG. 3, the cutter ring 14 is moved forward while turning, and the remaining ground and the existing tunnel 10 are removed. The lining 10 a is cut to form a circular cutting groove 18 in the filling material layer 16. After the lining 10a of the existing tunnel 10 is completely cut in this manner, the folded portion 17a of the pipe 17 for injecting the waterproof material is cut by further cutting the laying material layer 16.
[0017]
The pipe 17 is cut by opening a valve 19 at one end of the pipe, so that when the pipe 17 is cut by the cutter ring 14, cooling water for cutting is jetted, and the cut can be confirmed. After checking, close the valve.
[0018]
After confirming that the pipe 17 is cut in this way, the cutting by the cutter ring 14 is stopped. At this time, the cutter ring 14 is bridged between the existing tunnel 10 and the skin plate 12a with its tip inserted into a cutting groove 18 obtained by cutting the laying material layer 16 in the existing tunnel 10 into a circle. .
[0019]
Thereafter, as shown in FIG. 4, the water-stopping material 21 is injected from a pipe 17 opened on the outer peripheral surface side of the cutter ring 14. As a result, the water stopping material 20 is filled in the gap between the outer surface side of the cutter ring 14 and the cutting groove 18, and the water is stopped between the existing tunnel lining 10a and the outer surface of the cutter ring.
[0020]
After completion of this water stopping work, as shown in FIG. 5, the inside of the cutter ring of the filling material layer 16 is destroyed from inside the existing tunnel 10 using human power or an excavator. The tunnel lining 10a and the earth and sand are removed, and the shield machine 12 is disassembled and carried out leaving the cutter ring 14 and the skin plate 12a. In addition, before removing the above-mentioned inside of the serving material layer 16 cutter ring, the shield machine 12 may be dismantled and the existing tunnel lining 10a and the serving material layer 16 may be removed from the inside of the new tunnel 11.
[0021]
Thereafter, as shown in FIG. 6, the necessary lining 11a is formed in the skin plate 12a and the cutter ring 14, and the connection between the existing tunnel and the newly installed tunnel 10 is completed.
[0022]
Position In the previous example, but the water stopping material injection pipe 17 is embedded folded in a U-shape, as shown in FIG. 7, to intersect the cutting groove 18 so that the inner peripheral surface side of the mosquito Ttaringu , One end of which may be buried in the embedding material layer 1 and the other end thereof may be led into the existing tunnel 10.
[0023]
In addition, when the role of reinforcing the existing tunnel is required, the filling material layer 16 can be made of a synthetic resin material or the like having the same strength as concrete, in addition to concrete, and when the reinforcing of the existing tunnel is not required. For example, a synthetic resin foam such as urethane or styrene can be used.
[0024]
【The invention's effect】
As described above, in the shield connection method to the existing tunnel according to the present invention, when cutting by the cutter ring of the existing tunnel lining is completed on the inner surface of the new tunnel connection position of the existing tunnel, Is formed in advance by a concrete layer of concrete or the like having a thickness that does not protrude into the existing tunnel, and is cut by the cutter ring. Cutting is performed in a reinforced and stabilized state, and the cutting operation is performed safely.
[0025]
Further, in the present invention, a pipe for injecting a waterproof material having at least one end opened into the existing tunnel is buried in the cutter material advancing position of the filling material layer, and the pipe is cut by advancing the cutter ring. After that, a water-stopping material is injected through the pipe to stop water between the cutter ring and the inner surface of the cutting groove formed by the cutter ring, so that water is stopped before the cutter ring is exposed in the existing tunnel. Is completely completed, and there is no flood in the tunnel.
[0026]
Furthermore, according to the present invention, even after cutting the existing tunnel lining by the cutter ring, the serving material layer plays a role of a water blocking wall. Therefore, after forming the serving material layer, the existing tunnel is restarted (as a sewer). By doing so, the construction of the new tunnel side other than the connection portion can be performed, such as the work of removing the shield machine from the new tunnel side, and the operation stoppage time of the existing tunnel can be reduced.
[Brief description of the drawings]
FIG. 1 is a sectional view showing a state before cutting by a cutter ring in a shield connection method according to the present invention.
FIG. 2 is a front view showing a portion of a mounting material layer according to the first embodiment;
FIG. 3 is a cross-sectional view showing a cutting state of the cutter ring according to the first embodiment.
FIG. 4 is an enlarged cross-sectional view showing a water-stopping material injection state of the above.
FIG. 5 is a cross-sectional view showing a water-stopping material layer removing step of the above.
FIG. 6 is a cross-sectional view showing a state in which a new tunnel connection is completed in the first embodiment.
FIG. 7 is a cross-sectional view showing another example of a water-stopping material injection pipe used in the method of the present invention.
FIG. 8 is a sectional view showing a state before connection according to a conventional method.
FIG. 9 is a cross-sectional view showing a cutting state by the cutter ring of the above.
FIG. 10 is a cross-sectional view of the same connection completed state.
[Explanation of symbols]
Reference Signs List 10 Existing tunnel 10a Lining 11 New tunnel 11a Lining 12 Shield excavator 12a Skin plate 13 Cutter head 14 Cutter ring 15 Bit 16 Placing material layer 17 Pipe 17a Folding portion 17b Tunnel outlet 18 Cutting groove 19 Valve 20 Water stop material

Claims (3)

先端に切削用ビットを備えた回転自在なカッターリングを有するシールド掘進機を使用し、既設トンネルと交差する方向の新設トンネルを掘削し、前記既設トンネルに接近した位置で前記カッターリングを前進させて既設トンネルの覆工を切削することにより貫通孔を形成する既設トンネルへのシールド接続工法において、
前記既設トンネルの新設トンネル接続位置内面に、該既設トンネル覆工の前記カッターリングによる切削が完了した状態時に該カッターリングの先端が既設トンネル内に突出しない厚さのコンクリート等による盛り付け材層を予め形成しておくとともに該盛り付け材層のカッターリング前進位置内に、少なくとも一端を既設トンネル内に導出させた止水材注入用のパイプを埋設しておき、前記カッターリングによって既設トンネルの覆工及び盛り付け材層の途中までを切削させて前記パイプを切断させた後、該パイプを通して止水材を注入し、前記カッターリングと該カッターリングによる切削溝内面間に止水材を充填させ、然る後、前記既設トンネルの覆工及び盛り付け材層のカッターリング内側を撤去して貫通孔を開口させることを特徴としてなる既設トンネルへのシールド接続工法。
Using a shield machine having a rotatable cutter ring with a cutting bit at the tip, excavating a new tunnel in the direction intersecting with the existing tunnel, and moving the cutter ring forward at a position close to the existing tunnel In the shield connection method to the existing tunnel that forms a through hole by cutting the lining of the existing tunnel,
On the inner surface of the new tunnel connection position of the existing tunnel, an embedding material layer made of concrete or the like having a thickness such that the tip of the cutter ring does not protrude into the existing tunnel when the cutting of the existing tunnel lining is completed by the cutter ring is completed. formed in advance in the cutter ring forward position of the dished member layer with it, at least one end of the advance buried pipe for water blocking material injection which has led to the existing tunnel, lining of the existing tunnel by said cutter ring and After cutting the pipe by cutting halfway through the embedding material layer, a water-stopping material is injected through the pipe, and the water-stopping material is filled between the cutter ring and the inner surface of the cutting groove formed by the cutter ring. after, characterized in that to open the through-hole by removing the cutter ring inner lining and dishing material layer of the existing tunnel Shield connection method to existing tunnels formed by.
止水材注入用パイプは、カッターリングによって形成される切削溝に対し、カッターリング半径方向に交差する位置に埋設し、該パイプの両端を既設トンネル内に導出させた請求項1に記載の既設トンネルへのシールド接続工法。 2. The existing pipe according to claim 1 , wherein the water-stopping material injection pipe is buried at a position intersecting the cutting groove formed by the cutter ring in a radial direction of the cutter ring, and both ends of the pipe are led into an existing tunnel. Shield connection method to tunnel. 止水材注入用パイプは、カッターリングによって形成される切削溝に対し、カッターリング半径方向に交差する位置に埋設し、該パイプの一端側を埋め殺し他端側を既設トンネル内に導出させた請求項1に記載の既設トンネルへのシールド接続工法。 The water-stopping material injection pipe was buried at a position intersecting the cutting groove formed by the cutter ring in the radial direction of the cutter ring, one end of the pipe was buried, and the other end was led out into the existing tunnel. The method for connecting a shield to an existing tunnel according to claim 1 .
JP16987999A 1999-06-16 1999-06-16 Shield connection method to existing tunnel Expired - Lifetime JP3605791B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP16987999A JP3605791B2 (en) 1999-06-16 1999-06-16 Shield connection method to existing tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP16987999A JP3605791B2 (en) 1999-06-16 1999-06-16 Shield connection method to existing tunnel

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2004225785A Division JP3879105B2 (en) 2004-08-02 2004-08-02 Shield connection method to existing tunnel

Publications (2)

Publication Number Publication Date
JP2000356092A JP2000356092A (en) 2000-12-26
JP3605791B2 true JP3605791B2 (en) 2004-12-22

Family

ID=15894659

Family Applications (1)

Application Number Title Priority Date Filing Date
JP16987999A Expired - Lifetime JP3605791B2 (en) 1999-06-16 1999-06-16 Shield connection method to existing tunnel

Country Status (1)

Country Link
JP (1) JP3605791B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111997629B (en) * 2020-09-10 2022-12-13 中铁二十一局集团轨道交通工程有限公司 Tunnel supporting structure
CN113685195B (en) * 2021-08-25 2024-05-24 中国铁建重工集团股份有限公司 Machine head shield body, communication channel construction system and method
CN115584997A (en) * 2022-07-29 2023-01-10 中铁隧道局集团有限公司 Construction method of shield tunneling under ultra-short distance in existing structures
CN115507808B (en) * 2022-09-14 2024-06-28 中国地质大学(武汉) Test device and method for simulating stress-deformation characteristics of existing tunnels under adjacent tunnel construction conditions

Also Published As

Publication number Publication date
JP2000356092A (en) 2000-12-26

Similar Documents

Publication Publication Date Title
JP3605791B2 (en) Shield connection method to existing tunnel
JP3879105B2 (en) Shield connection method to existing tunnel
JP3098208B2 (en) Simultaneous backfilling device for shield machine
JPH11200750A (en) Excavation bit for winding hole and execution method using it
JP4226433B2 (en) Shield joining method and protective barrier structure
JPH08210083A (en) Cutoff method and device for pit mouth in underground piping work
JPH09287147A (en) Preventive method of water leakage against continuous cut-off wall
JP3710991B2 (en) Ground reinforcement method
JP5495874B2 (en) Removal method of shield excavator
JP2020097892A (en) Tunnel structure, manufacturing method of tunnel structure and water cut-off method
JP2020200701A (en) Underground joining method and excavator
JP3640708B2 (en) Cross-joining method for shield tunnel
JP7308006B2 (en) tunnel excavation method
JPS5927830B2 (en) Tunnel excavation method in soft ground
JPH05118081A (en) Soil pipe laying method and mounting socket used for method thereof
JP2005350959A (en) Method and device for damming up tunnel reinforcing material, and damming material injection pipe
JP2000328560A (en) Construction method of steel pipe column retaining wall
JP2002242593A (en) How to change the cutter bit of the shield machine
JPS63125724A (en) Construction method of underground continuous wall
JPH0684713B2 (en) How to reach a shield machine from a concrete shaft
JP2003328695A (en) Segment and tunnel construction method using the same
JP2007332737A (en) Water stoppage structure and reach method of shield excavator reaching shaft
KR101501834B1 (en) Underground excavation opening and closing devices
KR101558871B1 (en) Maintenance of concrete construction system
JP4966713B2 (en) New pipe connection method and closed pipe end cutting tool

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20040521

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20040601

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20040802

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20040907

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20040924

R150 Certificate of patent or registration of utility model

Ref document number: 3605791

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20071015

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101015

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111015

Year of fee payment: 7

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111015

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121015

Year of fee payment: 8

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131015

Year of fee payment: 9

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term