Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP3607488B2 - Screw pre-plastic injection molding machine - Google Patents
[go: Go Back, main page]

JP3607488B2 - Screw pre-plastic injection molding machine - Google Patents

Screw pre-plastic injection molding machine Download PDF

Info

Publication number
JP3607488B2
JP3607488B2 JP01259198A JP1259198A JP3607488B2 JP 3607488 B2 JP3607488 B2 JP 3607488B2 JP 01259198 A JP01259198 A JP 01259198A JP 1259198 A JP1259198 A JP 1259198A JP 3607488 B2 JP3607488 B2 JP 3607488B2
Authority
JP
Japan
Prior art keywords
screw
plunger
heating cylinder
molten resin
check valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP01259198A
Other languages
Japanese (ja)
Other versions
JPH11207795A (en
Inventor
吉哉 谷口
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toyo Innovex Co Ltd
Original Assignee
Toyo Machinery and Metal Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toyo Machinery and Metal Co Ltd filed Critical Toyo Machinery and Metal Co Ltd
Priority to JP01259198A priority Critical patent/JP3607488B2/en
Publication of JPH11207795A publication Critical patent/JPH11207795A/en
Application granted granted Critical
Publication of JP3607488B2 publication Critical patent/JP3607488B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/17Component parts, details or accessories; Auxiliary operations
    • B29C45/46Means for plasticising or homogenising the moulding material or forcing it into the mould
    • B29C45/53Means for plasticising or homogenising the moulding material or forcing it into the mould using injection ram or piston
    • B29C45/54Means for plasticising or homogenising the moulding material or forcing it into the mould using injection ram or piston and plasticising screw
    • B29C45/544Means for plasticising or homogenising the moulding material or forcing it into the mould using injection ram or piston and plasticising screw the plasticising unit being connected to a transfer chamber in the injection unit at the upstream side of the injection piston

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Mechanical Engineering (AREA)
  • Injection Moulding Of Plastics Or The Like (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、原料樹脂の可塑化をスクリュで行い、このスクリュで可塑化した溶融樹脂の金型内への射出をプランジャで行うようにしたスクリュプリプラ式射出成形機に関する。
【0002】
【従来の技術】
スクリュプリプラ式射出成形機においては、原料樹脂の可塑化をスクリュで行い、溶融樹脂の射出をプランジャで行うようになっており、従来の構成では、スクリュは回転のみ可能であるように配設されて、スクリュによって可塑化された溶融樹脂は、プランジャ先端に設けたプランジャ逆止弁の逆流不能側に送り込まれるようになっていた。
【0003】
図5は、かような従来のスクリュプリプラ式射出成形機の構成を示す要部断面図である。なお、図5において、ハッチングは総べての断面にこれを施すと図面が却って錯綜するので、一部の断面にのみハッチングを施してある(これは、後述する図1〜図4においても同様である)。
【0004】
図5において、101は第1の加熱シリンダ、102は、第1の加熱シリンダ101内に回転可能であるように配設されたスクリュ、103はスクリュ102の先端寄りに設けられたスクリュ逆止弁、104はスクリュ102と一体回転するプーリ、105はプーリ104を回転駆動するスクリュ用サーボモータ、106は第2の加熱シリンダ、107は、第2の加熱シリンダ106内に前後進可能であるように配設されたプランジャ(射出プランジャ)、108はプランジャ107の先端寄りに設けられたプランジャ逆止弁、109は、プランジャ107の後端に結合され、案内バー110に沿って前後に摺動可能であるように配設された移動ブロック、111は、ロードセル112を介して移動ブロック109に結合されたナット体、113は、ナット体111に螺合され、回転可能に保持されたボールネジ軸、114はボールネジ軸113と一体回転するプーリ、115はプーリ114を回転駆動するプランジャ用サーボモータ、116は、第1の加熱シリンダ101の先端側と第2の加熱シリンダ106の先端側とを連通する樹脂通路を形成する連結管、117は、第2の加熱シリンダ106と同軸となるように連結管116に取り付けられ、連結管116の樹脂通路や第2の加熱シリンダ106の内部と連通するノズル、118は、第1の加熱シリンダ101,第2の加熱シリンダ106,連結管116,ノズル117の外周に巻装されたバンドヒータである。
【0005】
図5に示す構成において、射出完了後にはプランジャ107は図5に示す略前進限位置にあり、この状態において計量開始タイミングに到ると、スクリュ102がスクリュ用サーボモータ105によって回転駆動されて、これによって原料樹脂がスクリュ102によって混練・可塑化され、溶融樹脂がスクリュ102の先端から連結管116を介して第2の加熱シリンダ106内に送り込まれる。第2の加熱シリンダ106内に溶融樹脂が送り込まれると、プランジャ107は、プランジャ用サーボモータ115による回転力を直線運動に変換する、ボールネジ軸113とナット体111とによる回転→直線運動変換メカニズムによる軸方向駆動力を受け、これによって、プランジャ逆止弁108より先の樹脂圧が設定値を保つようにコントロールされつつ、プランジャ107が後退駆動される。そして、第2の加熱シリンダ106内に所定量の溶融樹脂が貯えられた時点で、スクリュ102の回転が停止されると共に、プランジャ107の軸方向移動が停止される。
【0006】
この後、射出開始タイミングに到ると、プランジャ用サーボモータ115の回転によって回転→直線運動変換メカニズム(ボールネジ軸113とナット体111)を介してプランジャ107が前進駆動されて、溶融樹脂がノズル117の先端から図示せぬ金型内に射出され、続いて、保圧力が一定期間付与される。図5は、この射出行程の完了状態を示しており、プランジャ107は略前進限位置にある。
【0007】
【発明が解決しようとする課題】
ところで、上記したような構成・動作をとる従来のスクリュプリプラ式射出成形機は、インラインスクリュ式射出成形機にはない利点がある反面、次のような問題があった。
【0008】
すなわち、プランジャ107の先端側(プランジャ逆止弁108の逆流不能側)にスクリュ102によって可塑化された溶融樹脂を送り込むようになっており、この送り込まれる溶融樹脂は高い圧力を保つようにコントロールされるので、樹脂もれが発生し易いという問題がある。また、連結管116を介してノズル117を取り付けているので、金型の樹脂注入部にノズル117の先端を押し付けるためにはノズル117が長尺のものとならざるを得ず(連結管116がぶつかるのを避けるため、どうしてもノズル117が長尺となる)、ノズル部の樹脂滞留量が多くなってヤケ等の不良が発生し易いという問題もある。さらに、樹脂替えが面倒で、時間がかかるという問題もある。
【0009】
本発明は上記の点に鑑みなされたもので、その目的とするところは、スクリュプリプラ式射出成形機において、樹脂もれの発生が可及的に抑止でき、また、ノズル部の樹脂滞留量を大幅に低減できるようにすることにある。また、本発明の他の目的とするところは、樹脂替えが容易で、樹脂替え時間が短縮できるようにすることにある。また、本発明の他の目的とするところは、可塑化樹脂量能力を低下させずにスクリュ径を細くできるようにし、以って、スクリュ駆動系のイナーシャを小さくできるようにすることにある。
【0010】
【課題を解決するための手段】
上記した目的を達成するため、本発明によるスクリュプリプラ式射出成形機は、原料樹脂の可塑化をスクリュの回転運動と直線運動とによって行い、このスクリュで可塑化した溶融樹脂の金型内への射出をプランジャで行い、
その内部に前記スクリュが配設された第1の加熱シリンダの先端側と、その内部に前記プランジャが前後進可能であるように配設された第2の加熱シリンダの後部とを常時連通させる樹脂通路を形成する連結管をもち、この連結管を通じて前記プランジャに設けたプランジャ逆止弁における送り込み可能側に、前記スクリュによって可塑化された溶融樹脂の供給を行う構造をとり、
1次射出動作による前記プランジャの急速前進によって、前記プランジャの先端側(前記プランジャ逆止弁の逆流不能側)に貯えられた溶融樹脂を金型内に射出・充填すると共に、このプランジャの急速前進により前記プランジャ逆止弁の送り込み可能側に生じる圧力降下に伴って、前記第2の加熱シリンダ内における前記プランジャ逆止弁の送り込み可能側に、前記第1の加熱シリンダ内および前記連結管内に所定圧力値で満たされた溶融樹脂を送り込み、この溶融樹脂の送り込みに伴った圧力制御された前記スクリュの前進により、さらに溶融樹脂を前記第2の加熱シリンダ内の前記プランジャ逆止弁の送り込み可能側に送り込むように、構成される。
【0011】
【発明の実施の形態】
以下、本発明の実施の形態を、図面を用いて説明する。
図1〜図4は、本発明の1実施形態によるスクリュプリプラ式射出成形機に係り、図1は1次射出完了直後の状態を示す要部断面図、図2は図1の一部拡大図、図3は1次射出完了直後にスクリュを前進させた状態を示す要部断面図、図4は射出動作前の状態を示す要部断面図である。
【0012】
図1〜図4において、1は、支持ブロック2にその後端部を保持された可塑化シリンダたる第1の加熱シリンダ、3は、第1の加熱シリンダ1内に回転並びに前後進可能であるように配設されたスクリュ、4はスクリュ3の先端寄りに設けられたスクリュ逆止弁、5は、支持ブロック2と支持ブロック6との間に架設された案内バー、7は、スクリュ3の後端部を回転可能に保持し、案内バー5に沿って前後に移動可能な第1の移動ブロック、8は、第1の移動ブロック7に回転可能に保持され、スクリュ3と一体回転するプーリ、9はプーリ8を回転駆動するスクリュ回転用サーボモータ、10は、ロードセル11を介して第1の移動ブロック7に固定されたナット体、12は、支持ブロック6に回転可能に保持され、ナット体10に螺合されたボールネジ軸、13はボールネジ軸12の端部に固定されたプーリ、14はプーリ13を回転駆動するスクリュ前後進用サーボモータである。
【0013】
また、15は、支持ブロック16にその後端部を保持された射出シリンダたる第2の加熱シリンダ、17は第2の加熱シリンダ15の先端に取り付けられた短尺のノズル、18は、第2の加熱シリンダ15内に前後進可能であるように配設されたプランジャ(射出プランジャ)、19はプランジャ8の先端寄りに設けられたプランジャ逆止弁、20は、第1の加熱シリンダ1の先端側と第2の加熱シリンダ15の後部とを連通する樹脂通路を形成する連結管、21は、支持ブロック16と支持ブロック6との間に架設された案内バー、22は、連結スリーブ23を介してプランジャ8の後端部が結合され、案内バー21に沿って前後に移動可能な第2の移動ブロック、24は、ロードセル25を介して第2の移動ブロック22に固定されたナット体、26は、支持ブロック6に回転可能に保持され、ナット体24に螺合されたボールネジ軸、27はボールネジ軸26の端部に固定されたプーリ、28はプーリ27を回転駆動するプランジャ用サーボモータである。なお、29は、第1の加熱シリンダ1,第2の加熱シリンダ15,連結管20の外周に巻装されたバンドヒータである。
【0014】
上記した構成において、スクリュ回転用サーボモータ9の回転は、プーリ8を介してスクリュ3に伝達され、これによってスクリュ3が回転する。また、スクリュ前後進用サーボモータ14の回転は、プーリ13を介してボールネジ軸12に伝達され、ボールネジ軸12とナット体10からなる回転→直線運動変換メカニズムによって回転運動が直線運動に変換されて、第1の移動ブロック7が軸方向に駆動され、これによってスクリュ3が軸方向に移動する。なお、スクリュ回転用サーボモータ9は、第1の移動ブロック7と一体となって移動する。
【0015】
本実施形態においては、スクリュ3の回転によって原料樹脂が混練・可塑化されて、溶融樹脂がスクリュ3の前方側に移送され、スクリュ3の前方側に溶融樹脂が溜るにしたがって、スクリュ前方側の溶融樹脂の圧力が設定値と一致するようにコントロールされつつ、スクリュ3が後退駆動される。また、或る時点では、スクリュ3は前進駆動される。
【0016】
また、プランジャ用サーボモータ28の回転は、プーリ27を介してボールネジ軸26に伝達され、ボールネジ軸26とナット体24からなる回転→直線運動変換メカニズムによって回転運動が直線運動に変換されて、第2の移動ブロック22が軸方向に駆動され、これによって、連結スリーブ23を介してプランジャ18が軸方向に移動する。本実施形態においては、プランジャ18は、溶融樹脂を金型内に射出する時には前進駆動され、プランジャ18の先端側(プランジャ逆止弁19の逆流不能側)に溶融樹脂を送り込む時には後退駆動される。
【0017】
本実施形態においては、第2の加熱シリンダ15の先端にノズル17が直接取り付けられており、かつ、連結管20が第2の加熱シリンダ15の後部に接続されているので、第2の加熱シリンダ15の一部を、図示せぬ固定ダイプレートの中心穴に位置付けることによって、短尺のノズル17の先端を図示せぬ金型の樹脂注入穴に押し付けることが可能となっている。したがって、プランジャ18が略前進限位置まで前進した際のノズル部の樹脂滞留量を可及的に少なくできるようになっており、これによって、成形品品質の向上に大いに寄与できるようになっている。
【0018】
次に、本実施形態の動作を説明する。
図1に示す1次射出完了直後の状態においては、プランジャ18は概略前進限位置にあり、プランジャ18の先端側には僅かなクッション量の溶融樹脂のみが存在する状態となっていて、プランジャ18には保圧力に相当する前進圧力がプランジャ用サーボモータ28によって付与されている。また、1次射出の直前には、スクリュ3は所定量後退した位置にあって、第1の加熱シリンダ1内および連結管20内には、所定の圧力値に圧力制御された溶融樹脂が満たされた状態にある。
【0019】
図1に示すように、1次射出動作によってプランジャ18が急速前進駆動されると、プランジャ18の先端側(プランジャ逆止弁19の逆流不能側)に貯えられた溶融樹脂が、図示せぬ金型内に射出・充填される。このプランジャ18の急速前進によって、プランジャ逆止弁19の後側(プランジャ逆止弁19の送り込み可能側)においては、プランジャ18の外周面と第2の加熱シリンダ15の内周面との間の空間が急激に圧力降下し、このプランジャ18の外周面と第2の加熱シリンダ15の内周面との間の空間に、第2の加熱シリンダ15の後部から、第1の加熱シリンダ1内および連結管20内の溶融樹脂が送り込まれる。第1の加熱シリンダ1内の溶融樹脂が第2の加熱シリンダ15内に送り込まれると、スクリュ3はスクリュ前後進用サーボモータ14によって圧力フィードバック制御されているため、スクリュ3は前進して、更に溶融樹脂が第2の加熱シリンダ15内に送り込まれる。図3は、このスクリュ3が前進した状態を示している。
【0020】
本実施形態においては、連続成形運転中には、スクリュ3は1サイクル中の大部分の期間(もしくは、場合によっては1サイクル中の全期間)において原料樹脂を可塑化するように回転駆動されるようになっていて、1次射出行程が終了した後の保圧期間においても回転が行われるようになっており、上記したスクリュ3の前進は回転を伴ったものとなっている。保圧期間において、スクリュ3が回転されると、第2の加熱シリンダ15内への送り込み樹脂量が足りない場合には、スクリュ3の略前進限位置での回転によって、更に溶融樹脂が第2の加熱シリンダ15内に送り込まれ、第2の加熱シリンダ15内への送り込み樹脂量が所定量に達すると、スクリュ3の前方側に溶融樹脂が溜るにしたがって、スクリュ3は圧力フィードバック制御で後退駆動され、スクリュ3が所定位置まで後退するとスクリュ3の回転は停止される。
【0021】
そして、射出開始タイミングの手前の所定時点でプランジャ18が後退駆動されて、プランジャ逆止弁19の後側(プランジャ逆止弁19の送り込み可能側)に満たされた溶融樹脂が、プランジャ18の先端側(プランジャ逆止弁19の逆流不能側)にプランジャ逆止弁19を経由して送り込まれ、プランジャ18の先端側に所定圧力の所定量の溶融樹脂が貯えられるように、プランジャ用サーボモータ28が圧力フィードバック制御されて、溶融樹脂の圧力とプランジャ18の後退位置とが制御される。これによって、図4に示す射出スタンバイ状態となり、射出開始タイミングに到ると、1次射出動作によってプランジャ18が急速前進駆動されて、プランジャ18の先端側(プランジャ逆止弁19の逆流不能側)に貯えられた溶融樹脂が、図示せぬ金型内に射出・充填される。
【0022】
なお、本発明においては、樹脂替え時には、スクリュ3を回転させてスクリュ3を後退させ、然る後、スクリュ3を、プランジャ18による最大射出速度の約2倍程度の速度(600mm/sec程度)で急速前進させる動作を、複数回繰り返すことによって、樹脂替えが迅速・容易に行えるようになっている。
【0023】
かような構成・動作をとる本実施形態においては、スクリュ3で可塑化された溶融樹脂を、プランジャ逆止弁19の後側(プランジャ逆止弁19の送り込み可能側)、換言するなら低圧側に送り込むので、樹脂もれが可及的に少なくなる。また、ノズル17を短尺に構成できるので、ノズル部の樹脂滞留量を可及的に少なくでき、成形品品質を向上させることができる。また、1成形サイクル中の大部分の期間(もしくは、場合によっては1サイクル中の全期間)でスクリュ3を回転させて樹脂の可塑化を行うので、1成形サイクルでみれば可塑化樹脂量能力が大幅に向上するので、スクリュ径を細くしても可塑化樹脂量能力を損なわず、したがって、スクリュ駆動系のイナーシャを小さくできて、小型で安価な電動サーボモータを用いることが可能となる。さらに、樹脂替えが容易となって、樹脂替え時間が短縮できる。
【0024】
なお、上述した実施形態においては、プランジャ18の直線駆動を、単一の電動サーボモータと単一の回転→直線運動変換メカニズムとによって行うようにしているが、プランジャ18の直線駆動を、複数の電動サーボモータと、この各電動サーボモータの回転を直線運動に変換する複数の回転→直線運動変換メカニズムとによって行うようにしてもよく、このようにすれば、プランジャ18の駆動系のイナーシャも小さくすることができ、小型で安価な電動サーボモータを用いることが可能となる。
【0025】
【発明の効果】
以上のように本発明によれば、スクリュプリプラ式射出成形機において、樹脂もれの発生が可及的に抑止でき、また、ノズル部の樹脂滞留量が大幅に低減できる。また、樹脂替えが容易で、樹脂替え時間が短縮できる。また、可塑化樹脂量能力を低下させずにスクリュ径を細くできるので、スクリュ駆動系のイナーシャを小さくできる。
【図面の簡単な説明】
【図1】本発明の1実施形態に係るスクリュプリプラ式射出成形機における、1次射出完了直後の状態を示す要部断面図である。
【図2】図1の一部拡大図である。
【図3】本発明の1実施形態に係るスクリュプリプラ式射出成形機における、1次射出完了直後にスクリュを前進させた状態を示す要部断面図である。
【図4】本発明の1実施形態に係るスクリュプリプラ式射出成形機における、射出動作前の状態を示す要部断面図である。
【図5】従来のスクリュプリプラ式射出成形機を示す要部断面図である。
【符号の説明】
1 第1の加熱シリンダ
2 支持ブロック
3 スクリュ
4 スクリュ逆止弁
5 案内バー
6 支持ブロック
7 第1の移動ブロック
8 プーリ
9 スクリュ回転用サーボモータ
10 ナット体
11 ロードセル
12 ボールネジ軸
13 プーリ
14 スクリュ前後進用サーボモータ
15 第2の加熱シリンダ
16 支持ブロック
17 ノズル
18 プランジャ
19 プランジャ逆止弁
20 連結管
21 案内バー
22 第2の移動ブロック
23 連結スリーブ
24 ナット体
25 ロードセル
26 ボールネジ軸
27 プーリ
28 プランジャ用サーボモータ
29 バンドヒータ
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a screw pre-plastic injection molding machine in which a raw material resin is plasticized with a screw, and a molten resin plasticized with the screw is injected into a mold.
[0002]
[Prior art]
In a screw pre-plastic injection molding machine, plasticization of the raw material resin is performed with a screw, and injection of molten resin is performed with a plunger. In the conventional configuration, the screw is arranged so that it can only rotate. Thus, the molten resin plasticized by the screw has been sent to the non-returnable side of the plunger check valve provided at the plunger tip.
[0003]
FIG. 5 is a cross-sectional view of an essential part showing the configuration of such a conventional screw prep plastic type injection molding machine. In FIG. 5, hatching is applied to all of the cross sections, and the drawing is complicated, so only a part of the cross sections is hatched (this applies to FIGS. 1 to 4 described later). Is).
[0004]
In FIG. 5, 101 is a first heating cylinder, 102 is a screw arranged so as to be rotatable in the first heating cylinder 101, and 103 is a screw check valve provided near the tip of the screw 102. , 104 is a pulley that rotates integrally with the screw 102, 105 is a screw servomotor that drives the pulley 104 to rotate, 106 is a second heating cylinder, and 107 is capable of moving back and forth in the second heating cylinder 106. The arranged plunger (injection plunger), 108 is a plunger check valve provided near the tip of the plunger 107, and 109 is coupled to the rear end of the plunger 107 and can slide back and forth along the guide bar 110. A moving block 111 arranged in such a manner includes a nut body coupled to the moving block 109 via a load cell 112, 1 3 is a ball screw shaft threadably engaged with the nut body 111, 114 is a pulley that rotates integrally with the ball screw shaft 113, 115 is a plunger servomotor that rotationally drives the pulley 114, and 116 is a first A connecting pipe 117 that forms a resin passage that connects the front end side of the heating cylinder 101 and the front end side of the second heating cylinder 106 is attached to the connecting pipe 116 so as to be coaxial with the second heating cylinder 106. The nozzle 118 that communicates with the resin passage of the connecting pipe 116 and the inside of the second heating cylinder 106 is wound around the outer periphery of the first heating cylinder 101, the second heating cylinder 106, the connecting pipe 116, and the nozzle 117. It is a band heater.
[0005]
In the configuration shown in FIG. 5, after completion of injection, the plunger 107 is at the substantially forward limit position shown in FIG. 5. When the metering start timing is reached in this state, the screw 102 is rotationally driven by the screw servo motor 105, As a result, the raw material resin is kneaded and plasticized by the screw 102, and the molten resin is fed into the second heating cylinder 106 from the tip of the screw 102 through the connecting pipe 116. When the molten resin is fed into the second heating cylinder 106, the plunger 107 converts the rotational force of the plunger servo motor 115 into linear motion, which is a rotation by the ball screw shaft 113 and the nut body 111, and a linear motion conversion mechanism. In response to the axial driving force, the plunger 107 is driven backward while the resin pressure ahead of the plunger check valve 108 is controlled to maintain the set value. When a predetermined amount of molten resin is stored in the second heating cylinder 106, the rotation of the screw 102 is stopped and the movement of the plunger 107 in the axial direction is stopped.
[0006]
Thereafter, when the injection start timing is reached, the plunger 107 is driven forward by the rotation of the plunger servo motor 115 via the rotation → linear motion conversion mechanism (the ball screw shaft 113 and the nut body 111), and the molten resin is discharged from the nozzle 117. Is injected into a mold (not shown) from the tip of the sheet, and then a holding pressure is applied for a certain period. FIG. 5 shows the completed state of the injection stroke, and the plunger 107 is substantially in the forward limit position.
[0007]
[Problems to be solved by the invention]
By the way, the conventional screw prep plastic type injection molding machine having the above-described configuration and operation has advantages that the inline screw type injection molding machine does not have, but has the following problems.
[0008]
That is, the molten resin plasticized by the screw 102 is sent to the distal end side of the plunger 107 (the non-back flowable side of the plunger check valve 108), and this molten resin is controlled so as to maintain a high pressure. Therefore, there is a problem that resin leakage is likely to occur. Further, since the nozzle 117 is attached via the connecting pipe 116, the nozzle 117 must be long in order to press the tip of the nozzle 117 against the resin injection portion of the mold (the connecting pipe 116 is In order to avoid a collision, the nozzle 117 is inevitably long), and there is also a problem that the amount of resin staying in the nozzle portion increases and defects such as burns tend to occur. Furthermore, there is a problem that resin replacement is troublesome and takes time.
[0009]
The present invention has been made in view of the above points. The object of the present invention is to prevent the occurrence of resin leakage as much as possible in a screw pre-plastic injection molding machine, and to reduce the resin retention amount in the nozzle portion. It is to be able to greatly reduce. Another object of the present invention is to allow easy resin replacement and shorten the resin replacement time. Another object of the present invention is to make it possible to reduce the screw diameter without lowering the plasticizing resin amount capacity, thereby reducing the inertia of the screw drive system.
[0010]
[Means for Solving the Problems]
In order to achieve the above-described object, the screw pre-plastic injection molding machine according to the present invention performs plasticization of the raw material resin by rotational and linear motions of the screw, and the molten resin plasticized by this screw is injected into the mold . Injection with the plunger,
Resin that always communicates the front end side of the first heating cylinder, in which the screw is disposed, and the rear portion of the second heating cylinder, in which the plunger is movable forward and backward. Having a connecting pipe that forms a passage, and through this connecting pipe to the feedable side of the plunger check valve provided on the plunger, takes a structure for supplying the molten resin plasticized by the screw,
The rapid advance of the plunger by the primary injection operation causes the molten resin stored on the distal end side of the plunger (the non-back flowable side of the plunger check valve) to be injected and filled into the mold, and the plunger rapidly advances. As a result of the pressure drop that occurs on the feedable side of the plunger check valve, the plunger check valve is fed to the feedable side of the second check cylinder, and the predetermined value is set in the first heating cylinder and the connecting pipe. The molten resin filled with the pressure value is fed, and the molten resin is further fed by the pressure-controlled advance of the screw as the molten resin is fed, so that the molten resin can be fed to the plunger check valve in the second heating cylinder. Configured to send in.
[0011]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described with reference to the drawings.
1 to 4 relate to a screw pre-plastic injection molding machine according to an embodiment of the present invention. FIG. 1 is a cross-sectional view of a main part showing a state immediately after completion of primary injection, and FIG. 2 is a partially enlarged view of FIG. 3 is a cross-sectional view of a main part showing a state in which the screw is advanced immediately after completion of the primary injection, and FIG. 4 is a cross-sectional view of a main part showing a state before the injection operation.
[0012]
1 to 4, reference numeral 1 denotes a first heating cylinder which is a plasticizing cylinder whose rear end is held by the support block 2, and 3 can rotate and move forward and backward in the first heating cylinder 1. , 4 is a screw check valve provided near the tip of the screw 3, 5 is a guide bar installed between the support block 2 and the support block 6, and 7 is a back of the screw 3. A first moving block that holds the end rotatably and can move back and forth along the guide bar 5, a pulley that is rotatably held by the first moving block 7 and rotates integrally with the screw 3, Reference numeral 9 denotes a screw rotation servomotor that rotationally drives the pulley 8, 10 denotes a nut body fixed to the first moving block 7 via the load cell 11, and 12 denotes a nut body that is rotatably held by the support block 6. 10 screwed Ball screw shaft which, 13 pulley fixed to an end portion of the ball screw shaft 12, 14 is a screw advancing and retreating servomotor for rotating the pulley 13.
[0013]
Reference numeral 15 denotes a second heating cylinder which is an injection cylinder whose rear end is held by the support block 16, reference numeral 17 denotes a short nozzle attached to the tip of the second heating cylinder 15, and reference numeral 18 denotes a second heating cylinder. A plunger (injection plunger) disposed so as to be capable of moving back and forth in the cylinder 15, 19 is a plunger check valve provided near the tip of the plunger 8, and 20 is a tip side of the first heating cylinder 1. A connecting pipe that forms a resin passage that communicates with the rear portion of the second heating cylinder 15, 21 is a guide bar that is laid between the support block 16 and the support block 6, and 22 is a plunger via a connection sleeve 23. 8 is coupled to the rear end of the second moving block 24, which is movable back and forth along the guide bar 21, and is connected to the second moving block 22 via the load cell 25. 26, a ball screw shaft that is rotatably held by the support block 6 and screwed to the nut body 24, 27 is a pulley fixed to the end of the ball screw shaft 26, and 28 is a plunger that rotationally drives the pulley 27. Servo motor. Reference numeral 29 denotes a band heater wound around the outer periphery of the first heating cylinder 1, the second heating cylinder 15, and the connecting pipe 20.
[0014]
In the above-described configuration, the rotation of the screw rotation servomotor 9 is transmitted to the screw 3 via the pulley 8, whereby the screw 3 rotates. The rotation of the screw forward / reverse servomotor 14 is transmitted to the ball screw shaft 12 via the pulley 13, and the rotational motion is converted into linear motion by the rotation → linear motion conversion mechanism including the ball screw shaft 12 and the nut body 10. The first moving block 7 is driven in the axial direction, whereby the screw 3 moves in the axial direction. The screw rotation servomotor 9 moves together with the first moving block 7.
[0015]
In this embodiment, the raw material resin is kneaded and plasticized by the rotation of the screw 3, the molten resin is transferred to the front side of the screw 3, and the molten resin accumulates on the front side of the screw 3. The screw 3 is driven backward while being controlled so that the pressure of the molten resin matches the set value. At a certain time, the screw 3 is driven forward.
[0016]
The rotation of the plunger servomotor 28 is transmitted to the ball screw shaft 26 via the pulley 27, and the rotation motion is converted into a linear motion by the rotation → linear motion conversion mechanism including the ball screw shaft 26 and the nut body 24. The two moving blocks 22 are driven in the axial direction, whereby the plunger 18 moves in the axial direction via the connecting sleeve 23. In this embodiment, the plunger 18 is driven forward when the molten resin is injected into the mold, and is driven backward when the molten resin is fed to the distal end side of the plunger 18 (the non-backflow side of the plunger check valve 19). .
[0017]
In the present embodiment, since the nozzle 17 is directly attached to the tip of the second heating cylinder 15 and the connecting pipe 20 is connected to the rear part of the second heating cylinder 15, the second heating cylinder By positioning a part of 15 in the center hole of the fixed die plate (not shown), the tip of the short nozzle 17 can be pressed against the resin injection hole of the mold (not shown). Therefore, the amount of resin staying in the nozzle portion when the plunger 18 moves forward to the substantially forward limit position can be reduced as much as possible, thereby greatly contributing to the improvement of the quality of the molded product. .
[0018]
Next, the operation of this embodiment will be described.
In the state immediately after the completion of the primary injection shown in FIG. 1, the plunger 18 is substantially in the forward limit position, and only a small amount of the molten resin is present on the distal end side of the plunger 18. A forward pressure corresponding to the holding pressure is applied to the servomotor 28 for the plunger. Further, immediately before the primary injection, the screw 3 is in a position retracted by a predetermined amount, and the first heating cylinder 1 and the connecting pipe 20 are filled with a molten resin whose pressure is controlled to a predetermined pressure value. Is in a state of being
[0019]
As shown in FIG. 1, when the plunger 18 is rapidly moved forward by the primary injection operation, the molten resin stored on the distal end side of the plunger 18 (the non-reverse flow side of the plunger check valve 19) is not shown in FIG. Injection and filling into the mold. Due to the rapid advancement of the plunger 18, the rear side of the plunger check valve 19 (the side where the plunger check valve 19 can be fed) is located between the outer peripheral surface of the plunger 18 and the inner peripheral surface of the second heating cylinder 15. The space suddenly drops in pressure, and the space between the outer peripheral surface of the plunger 18 and the inner peripheral surface of the second heating cylinder 15 is inserted into the first heating cylinder 1 and from the rear of the second heating cylinder 15. The molten resin in the connecting pipe 20 is fed. When the molten resin in the first heating cylinder 1 is fed into the second heating cylinder 15, the screw 3 is pressure feedback controlled by the screw forward / reverse servomotor 14, so that the screw 3 moves forward. Molten resin is fed into the second heating cylinder 15. FIG. 3 shows a state in which the screw 3 has advanced.
[0020]
In the present embodiment, during the continuous molding operation, the screw 3 is rotationally driven so as to plasticize the raw material resin during most of the period in one cycle (or in some cases, the entire period in one cycle). Thus, the rotation is also performed in the pressure holding period after the completion of the primary injection stroke, and the advancement of the screw 3 described above is accompanied by the rotation. When the screw 3 is rotated during the pressure holding period, if the amount of resin fed into the second heating cylinder 15 is insufficient, the molten resin is further supplied by the rotation of the screw 3 at the substantially forward limit position. When the amount of resin fed into the second heating cylinder 15 reaches a predetermined amount, the screw 3 is driven backward by pressure feedback control as molten resin accumulates on the front side of the screw 3. Then, when the screw 3 is retracted to a predetermined position, the rotation of the screw 3 is stopped.
[0021]
Then, the plunger 18 is driven backward at a predetermined time before the injection start timing, and the molten resin filled on the rear side of the plunger check valve 19 (the side on which the plunger check valve 19 can be fed) fills the tip of the plunger 18. The plunger servomotor 28 is fed to the side (a non-backflowable side of the plunger check valve 19) via the plunger check valve 19 so that a predetermined amount of molten resin of a predetermined pressure is stored on the tip end side of the plunger 18. Is feedback controlled to control the pressure of the molten resin and the retracted position of the plunger 18. As a result, when the injection standby state shown in FIG. 4 is reached and the injection start timing is reached, the plunger 18 is rapidly driven forward by the primary injection operation, and the distal end side of the plunger 18 (the non-backflow side of the plunger check valve 19). The molten resin stored in is injected and filled into a mold (not shown).
[0022]
In the present invention, when the resin is changed, the screw 3 is rotated to retract the screw 3, and then the screw 3 is moved at a speed (about 600 mm / sec) about twice the maximum injection speed by the plunger 18. The resin can be changed quickly and easily by repeating the rapid advance operation multiple times.
[0023]
In the present embodiment having such a configuration and operation, the molten resin plasticized by the screw 3 is placed on the rear side of the plunger check valve 19 (the feedable side of the plunger check valve 19), in other words, on the low pressure side. The resin leakage is reduced as much as possible. Further, since the nozzle 17 can be configured to be short, the amount of resin staying in the nozzle portion can be reduced as much as possible, and the quality of the molded product can be improved. In addition, since the resin is plasticized by rotating the screw 3 during most of the period in one molding cycle (or in some cases, the entire period in one cycle), the amount of plasticized resin can be obtained in one molding cycle. Therefore, even if the screw diameter is reduced, the plasticizing resin amount capability is not impaired. Therefore, the inertia of the screw drive system can be reduced, and a small and inexpensive electric servo motor can be used. Furthermore, resin change becomes easy and the resin change time can be shortened.
[0024]
In the above-described embodiment, the plunger 18 is linearly driven by a single electric servo motor and a single rotation → linear motion conversion mechanism. An electric servo motor and a plurality of rotation → linear motion conversion mechanisms that convert the rotation of each electric servo motor into a linear motion may be used. In this way, the inertia of the drive system of the plunger 18 is also reduced. Thus, it is possible to use a small and inexpensive electric servo motor.
[0025]
【The invention's effect】
As described above, according to the present invention, the occurrence of resin leakage can be suppressed as much as possible in the screw pre-plastic injection molding machine, and the amount of resin staying in the nozzle portion can be greatly reduced. Moreover, resin change is easy and the resin change time can be shortened. Moreover, since the screw diameter can be reduced without reducing the plasticizing resin amount capacity, the inertia of the screw drive system can be reduced.
[Brief description of the drawings]
FIG. 1 is a cross-sectional view of a main part showing a state immediately after completion of primary injection in a screw pre-plastic injection molding machine according to an embodiment of the present invention.
FIG. 2 is a partially enlarged view of FIG.
FIG. 3 is a cross-sectional view of the main part showing a state in which the screw is advanced immediately after completion of the primary injection in the screw pre-plastic injection molding machine according to one embodiment of the present invention.
FIG. 4 is a cross-sectional view of a main part showing a state before an injection operation in a screw pre-plastic injection molding machine according to one embodiment of the present invention.
FIG. 5 is a cross-sectional view of a main part showing a conventional screw pre-plastic injection molding machine.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 1st heating cylinder 2 Support block 3 Screw 4 Screw check valve 5 Guide bar 6 Support block 7 1st moving block 8 Pulley 9 Servomotor 10 for screw rotation Nut body 11 Load cell 12 Ball screw shaft 13 Pulley 14 Screw forward and backward movement Servo motor 15 second heating cylinder 16 support block 17 nozzle 18 plunger 19 plunger check valve 20 connecting pipe 21 guide bar 22 second moving block 23 connecting sleeve 24 nut body 25 load cell 26 ball screw shaft 27 pulley 28 servo for plunger Motor 29 Band heater

Claims (2)

原料樹脂の可塑化をスクリュの回転運動と直線運動とによって行い、このスクリュで可塑化した溶融樹脂の金型内への射出をプランジャで行うようにしたスクリュプリプラ式射出成形機であって、A screw pre-plastic injection molding machine that performs plasticization of a raw material resin by rotational movement and linear movement of a screw, and performs injection of a molten resin plasticized by this screw into a mold with a plunger,
その内部に前記スクリュが配設された第1の加熱シリンダの先端側と、その内部に前記プランジャが前後進可能であるように配設された第2の加熱シリンダの後部とを常時連通させる樹脂通路を形成する連結管をもち、この連結管を通じて前記プランジャに設けたプランジャ逆止弁における送り込み可能側に、前記スクリュによって可塑化された溶融樹脂の供給を行う構造をとり、Resin that always communicates the front end side of the first heating cylinder in which the screw is disposed therein and the rear portion of the second heating cylinder in which the plunger is capable of moving forward and backward. Having a connecting pipe that forms a passage, and through this connecting pipe to the feedable side of the plunger check valve provided on the plunger, takes a structure for supplying the molten resin plasticized by the screw,
1次射出動作による前記プランジャの急速前進によって、前記プランジャの先端側(前記プランジャ逆止弁の逆流不能側)に貯えられた溶融樹脂を金型内に射出・充填すると共に、このプランジャの急速前進により前記プランジャ逆止弁の送り込み可能側に生じる圧力降下に伴って、前記第2の加熱シリンダ内における前記プランジャ逆止弁の送り込み可能側に、前記第1の加熱シリンダ内および前記連結管内に所定圧力値で満たされた溶融樹脂を送り込み、この溶融樹脂の送り込みに伴った圧力制御された前記スクリュの前進により、さらに溶融樹脂を前記第2の加熱シリンダ内の前記プランジャ逆止弁の送り込み可能側に送り込むように、構成したことを特徴とするスクリュプリプラ式射出成形機。The rapid advance of the plunger by the primary injection operation causes the molten resin stored on the distal end side of the plunger (the non-returnable side of the plunger check valve) to be injected and filled into the mold, and the plunger rapidly advances. As a result of the pressure drop that occurs on the feedable side of the plunger check valve, a predetermined value is set in the first heating cylinder and in the connecting pipe on the feedable side of the plunger check valve in the second heating cylinder. The molten resin filled with the pressure value is fed in, and the pressure-controlled advancement of the screw accompanying the molten resin feeding further feeds the molten resin into the plunger check valve in the second heating cylinder. A screw pre-plastic injection molding machine characterized in that it is configured to be fed into the machine.
請求項1記載において、
前記した前記スクリュの前進は回転を伴ったものであり、また、前記スクリュは保圧期間においても引続き回転駆動されることを特徴とするスクリュプリプラ式射出成形機。
In claim 1,
The screw pre-pull type injection molding machine characterized in that the advance of the screw is accompanied by rotation, and the screw is continuously driven to rotate even during the pressure holding period.
JP01259198A 1998-01-26 1998-01-26 Screw pre-plastic injection molding machine Expired - Fee Related JP3607488B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP01259198A JP3607488B2 (en) 1998-01-26 1998-01-26 Screw pre-plastic injection molding machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP01259198A JP3607488B2 (en) 1998-01-26 1998-01-26 Screw pre-plastic injection molding machine

Publications (2)

Publication Number Publication Date
JPH11207795A JPH11207795A (en) 1999-08-03
JP3607488B2 true JP3607488B2 (en) 2005-01-05

Family

ID=11809604

Family Applications (1)

Application Number Title Priority Date Filing Date
JP01259198A Expired - Fee Related JP3607488B2 (en) 1998-01-26 1998-01-26 Screw pre-plastic injection molding machine

Country Status (1)

Country Link
JP (1) JP3607488B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI243743B (en) * 2004-12-21 2005-11-21 Ind Tech Res Inst Material discharging device for a two-step injection molding machine
TW200722268A (en) 2005-12-05 2007-06-16 Ind Tech Res Inst Injection unit of two-step injection molding machine
CN1986193B (en) 2005-12-20 2010-05-12 财团法人工业技术研究院 Injection unit of two-section type injection molding machine
CN102350777B (en) * 2011-07-29 2014-01-15 厦门金刚利斯机械科技有限公司 Plunger type injection molding device

Also Published As

Publication number Publication date
JPH11207795A (en) 1999-08-03

Similar Documents

Publication Publication Date Title
US5454995A (en) Method for reducing cycle time in an injection molding machine
JP3620380B2 (en) Injection molding machine for thermoplastic resin
JPH0298421A (en) Injection control method for injection molding machine
JP3607488B2 (en) Screw pre-plastic injection molding machine
JP5601871B2 (en) Injection molding machine
JPH06339962A (en) Injection molding equipment
JP4628751B2 (en) Pre-plastic injection device and method for discharging leaked resin in this device
JP3839752B2 (en) Ejector device
JP3301742B2 (en) Injection equipment
JP3725802B2 (en) Injection device
JP3878936B2 (en) Injection device for electric injection molding machine
JP2007160792A (en) Screw, injection apparatus and pressure member
JPH0430896B2 (en)
JPH042416B2 (en)
JPH10202707A (en) Plasticizing screw in injection unit for injection molding machine
JP2001121577A (en) Injection device
JP2678565B2 (en) Injection equipment
JP2023148242A (en) Injection molding machine
JPH0623813A (en) Injection molding machine
JPH06126789A (en) Injection compression molding machine
CN119773166A (en) Injection molding machine
JP3247678B2 (en) Injection molding machine
JP3321438B2 (en) Injection equipment
JP3336301B2 (en) Injection device and control method thereof
JP2017225984A (en) Metal melting screw, screw type metal melting machine and screw type metal injection molding machine

Legal Events

Date Code Title Description
TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20040928

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20041007

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081015

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091015

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101015

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111015

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111015

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121015

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131015

Year of fee payment: 9

LAPS Cancellation because of no payment of annual fees