Electa device and tunnel excavator Download PDFInfo
- Publication number
- JP3611287B2 JP3611287B2 JP19021999A JP19021999A JP3611287B2 JP 3611287 B2 JP3611287 B2 JP 3611287B2 JP 19021999 A JP19021999 A JP 19021999A JP 19021999 A JP19021999 A JP 19021999A JP 3611287 B2 JP3611287 B2 JP 3611287B2
- Authority
- JP
- Japan
- Prior art keywords
- support
- tunnel
- support frame
- jack
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
- Lining And Supports For Tunnels (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、地盤を掘削してトンネルを構築するトンネルボーリングマシンやシールド掘削機などのトンネル掘削機、並びにこのトンネル掘削機に搭載されて支保を組立てるエレクタ装置に関する。
【0002】
【従来の技術】
従来のトンネルボーリングマシンは、円筒形状をなす前胴と後胴とから胴体が構成されており、前胴の前部にローラカッタを有するカッタヘッドが回転自在に装着され、カッタ旋回モータによって駆動回転可能となっている。そして、前胴には掘削して発生したずりが内部に侵入しないようにバルクヘッドが形成されることで、チャンバが形成されており、このチャンバにはずりを外部に排出するベルトコンベヤの前端部が位置している。
【0003】
また、この前胴と後胴との間には複数のスラストジャッキが架設されており、このスラストジャッキへの油圧の給排により伸縮させることで、前胴と後胴との相対位置を変更することができる。また、前胴にはフロントグリッパが装着されており、油圧ジャッキによってグリッパシューを径方向に張り出すことで、前胴を位置保持することができる。一方、後胴にはリヤグリッパが装着されており、油圧ジャッキによってグリッパシューを径方向に張り出すことで、後胴を位置保持することができる。
【0004】
更に、後胴の後部にはトンネルの内壁面に支保を組付けるエレクタ装置が装着されている。
【0005】
従って、リヤグリッパによって後胴移動不能に保持した状態で、カッタ旋回モータを駆動してカッタヘッドを回転駆動させながら、各スラストジャッキを伸長して前胴と共にカッタヘッドを前方へ移動させると、旋回するカッタヘッドのローラカッタが前方の岩盤をせん断破壊し、この岩盤を掘削する。そして、各スラストジャッキを所定ストローク伸長すると、フロントグリッパによって前胴を位置保持する一方、リヤグリッパによる後胴の位置保持を解除した後、スラストジャッキを収縮して前胴に対して後胴を引き寄せる。そして、再び、リヤグリッパによって後胴を位置保持にする一方、フロントグリッパによる前胴の位置保持を解除した後、各スラストジャッキを伸長して前胴と共にカッタヘッドを前方へ移動させ、ローラカッタによって岩盤を掘削する。この作動の繰り返しによって連続してトンネルを掘削していく。
【0006】
そして、岩盤掘削によって生じたずりはチャンバ内に取り込まれ、ベルトコンベヤによって外部に排出される。また、岩盤を掘削してトンネルを掘削形成していく過程で、この掘削形成されたトンネルの壁面が安定している場合は支保は不要であるが、若干不安定である場合には、エレクタ装置によってリング状に形成したH形鋼や木製の板等を支保として用い、壁面から岩片が剥がれ落ちないようにトンネルを保護する。
【0007】
【発明が解決しようとする課題】
上述した従来のトンネルボーリングマシンでは、リヤグリッパによって後胴を位置保持した状態で、各スラストジャッキを伸長することで、この後胴に対して前胴とカッタヘッドを前進させ、この旋回するカッタヘッドによって前方の岩盤を掘削しながら、後胴の後方で、掘削形成したトンネルの壁面に応じて、エレクタ装置によってH形鋼などをリング状に形成して支保としてトンネル壁面に組付けてトンネルを保護している。
【0008】
ところで、崩落性の高い地盤を掘削する場合には、トンネルボーリングマシンの切羽から極力近い箇所で山留補助工事(強化薬注入、コンクリート吹き付け、支保組み立てあるいはセグメント組み立て)を施工するのが、有効的である。ところが、前述した従来のトンネルボーリングマシンにあっては、胴体の内部にこのような支保組み立てを行う作業空間がなく、後胴の後方に設けられたエレクタ装置により支保の組み立て作業を行っており、各種の補助工事の施工が遅れてしまうという問題がある。
【0009】
本発明はこのような問題を解決するものであって、切羽から近い箇所での支保の組み立て作業を可能としてトンネル施工性の向上を図ると共に支保の組み立て作業を容易とすることでトンネル構築作業の作業性の向上を図ったエレクタ装置及びトンネル掘削機を提供することを目的とする。
【0010】
【課題を解決するための手段】
上述の目的を達成するための請求項1の発明のエレクタ装置は、トンネル内に搬入された支保を組立てるエレクタ装置において、トンネル掘削機の中心部で長手方向後方に延設された支持フレームと、該支持フレームに支持された複数の旋回ローラにより旋回自在に支持されて該支持フレームに環装される旋回リングと、該旋回リングを旋回させる旋回手段と、前記支持フレームに装着されて支保を支持する複数の固定式支保支持手段と、前記旋回リングに装着されて支保を保持してトンネルの径方向に移動可能な可動式支保支持手段と、を具えたことを特徴とするものである。
【0011】
また、請求項2の発明のエレクタ装置では、前記固定式支保支持手段は前記支持フレームの外周辺に複数位置しており、前記支持フレームに固定された支持アームと、該支持アームの先端部に装着された支持ローラとを有することを特徴としている。
【0012】
また、請求項3の発明のエレクタ装置では、前記可動式支保支持手段は、前記旋回リングに固定された拡張ジャッキと、該拡張ジャッキによってトンネルの径方向に移動可能な支保把持部とを有することを特徴としている。
【0013】
また、請求項4の発明のエレクタ装置では、前記固定式支保支持手段は、前記支持フレームに固定された拡張ジャッキと、該拡張ジャッキによってトンネルの径方向に移動可能な支持ローラとを有することを特徴としている。
【0014】
また、請求項5の発明のエレクタ装置では、前記固定式支保支持手段は、前記支持フレームに固定された油圧ジャッキと、該油圧ジャッキによってトンネルの長手方向に移動可能な支持ローラとを有することを特徴としている。
【0015】
また、請求項6の発明のトンネル掘削機は、筒状の胴体と、該胴体の前部に回転自在に装着されたカッタヘッドと、該カッタヘッドを駆動回転するカッタヘッド駆動手段と、トンネルの内壁面から掘削反力を受けて前記胴体を推進させる胴体推進ジャッキと、前記胴体から掘進方向後方に延設された支持フレームと、該支持フレームに支持された複数の旋回ローラにより旋回自在に支持されて該支持フレームに環装される旋回リングと、該旋回リングを旋回させる旋回手段と、前記支持フレームに装着されて支保を支持する複数の固定式支保支持手段と、前記旋回リングに装着されて支保を保持してトンネルの径方向に移動可能な可動式支保支持手段と、を具えたことを特徴とするものである。
【0016】
【発明の実施の形態】
以下、図面に基づいて本発明の実施の形態を詳細に説明する。
【0017】
図1に本発明の第1実施形態に係るエレクタ装置を搭載したトンネル掘削機としてのトンネルボーリングマシンの概略断面、図2にリヤグリッパを表す図1のII−II断面、図3にエレクタ装置を表す図1のIII−III断面、図4に旋回リングの支持構造を表す図3のIV−IV断面、図5にエレクタ装置による支保の組立工程を表す断面を示す。
【0018】
本実施形態のトンネルボーリングマシン(以下、TBMと称する。)10において、図1及び図2に示すように、円筒状の胴体11の前部には軸受12によってカッタヘッド13が回転自在に装着されている。このカッタヘッド13は前面部に岩盤をせん断破壊するローラカッタ14が多数枢着されると共に、破砕した岩片や土砂などのずりを取り込む開口15が形成されている。そして、カッタヘッド13の後部には内歯を有するリングギア16が一体に固定される一方、胴体11には電動式あるいは油圧式のカッタ旋回モータ17が固定されており、このカッタ旋回モータ17の駆動ギヤ18がリングギヤ16に噛み合っている。
【0019】
従って、カッタ旋回モータ17を駆動して駆動ギヤ18を回転駆動すると、この駆動ギヤ18が噛み合うリングギヤ16が回転し、リングギヤ16と一体のカッタヘッド13を旋回し、ローラカッタ14が岩盤をせん断破壊して掘削し、発生したずりを開口15から胴体11の内部に取り込むことができる。
【0020】
また、胴体11の後部には角筒形状の支持フレーム19の前端部が固定され、この支持フレーム19はトンネルの中心部を後方に延出されており、この支持フレーム19の後端部には、この支持フレーム19を水平状態に維持するシュージャッキ20が装着され、下端部にシュー21が連結されている。そして、胴体11には図示しないフロントグリッパが複数装着されており、掘削時には内部に収納することで胴体11を移動自在とし、盛り替え時には外方に張り出すことでトンネルの壁面に圧接し、胴体11を位置保持することができる。
【0021】
更に、胴体11の後方にはリヤグリッパ22が支持フレーム19に対して前後移動自在に設けられている。このリヤグリッパ22は、支持フレーム19の外周部に移動自在に支持されたグリッパ箱23の上下にグリッパジャッキ24が配設され、このグリッパジャッキ24が左右の支持ジャッキ25によって上下移動自在に支持されると共に左右端部にグリッパシュー26が連結されて構成されている。従って、グリッパジャッキ24を収縮することでリヤグリッパ22を移動自在とし、グリッパジャッキ24を伸長して外方に張り出すことでトンネルの壁面に圧接し、リヤグリッパ22を位置保持することができる。
【0022】
そして、胴体11とこのリヤグリッパ22のグリッパシュー26との間には胴体推進ジャッキとしての複数本(ここでは4本)のスラストジャッキ27が架設されている。このスラストジャッキ27は油圧の給排によって伸縮作動するものであって、スラストジャッキ27の前後端部が水平揺動自在に支持されている。従って、この各スラストジャッキ27の各駆動ロッドを伸縮することで、胴体11とリヤグリッパ22との相対位置を変更することができる。また、左右のスラストジャッキ27の各作動ストロークを変えることで、カッタヘッド13を有する胴体11を左右に屈曲してその掘進方向を変更することができる。
【0023】
カッタヘッド13と胴体11で形成されるチャンバ28にはローラカッタ14が破砕したずりを集積するホッパ29が固定されている。そして、支持フレーム19の内部には掘削したずりを搬出するベルトコンベヤ30が配設され、このベルトコンベヤ30の前端部がホッパ29の下部に連結され、後端部はトンネル後方に延設されている。
【0024】
また、本実施形態のTBMにあっては、切羽から近い箇所で支保の組み立て作業ができるように、胴体11の後部に支保組立用のエレクタ装置31が設けられている。即ち、このエレクタ装置31において、図1、図3、図4に示すように、胴体11の後部に連結された支持フレーム19の前端部には、4本の支持アーム32が放射状をなして固定され、各支持アーム32の中間部にはそれぞれ旋回ローラ33が装着されており、各旋回ローラ33によって旋回リング34が回転自在に支持されている。そして、この旋回リング34には内歯を有するリングギヤ35が固定される一方、支持フレーム19にはブラケット36によって旋回手段としての油圧モータ37が取付けられ、油圧モータ37の駆動ギヤ38がリングギヤ35に噛み合っている。従って、油圧モータ37によって旋回リング34を旋回することができる。
【0025】
そして、各支持アーム32の先端部には固定式支保支持手段としての支持ローラ39が回転自在に装着されている。一方、旋回リング34には、支保Tを保持可能であって、この旋回リング34と共に周方向移動可能な可動式支保支持機構40が装着されている。
【0026】
この可動式支保支持機構40において、旋回リング34の外周部に拡張ジャッキ41が固定され、この拡張ジャッキ41の駆動ロッドの先端部には支持ローラ39と干渉しないようにコ字形状をなす支保把持部42が連結されており、この支保把持部42には把持ジャッキ43によって支保Tの図示しない孔に嵌脱自在な把持ピン44が装着されている。従って、把持ピン44が支保Tに嵌入して支保把持部42が支保Tを把持した状態で、旋回リング34によって支保Tをトンネルの周方向に移動することができると共に、拡張ジャッキ41によって支保Tをトンネルの径方向に移動することができる。
【0027】
なお、支保把持部42による支保Tの把持方法としては、把持ピン44の他に吸着したり、ハンドによって挾持したりするものがあり、支保Tの重量や形状等に応じて使い分ければ良いものである。また、図1に示すように、支持フレーム19の下部にはエレクタ装置31に隣接して垂下ブラケット45が固定されており、この垂下ブラケット45には3つの支保Tを仮置きする支保仮置き台46が掘進方向に移動自在に支持されている。そして、図示しないが、トンネル内には支保供給台車が移動自在に支持されると共に、ホイストが移動自在に支持されており、支保Tが支保供給台車によってトンネル内に搬入されると、ホイストはこの支保供給台車上の支保Tを前方に移動し、支保仮置き台46に載置するようになっている。
【0028】
ここで、上述した本実施形態のTBM10を用いたトンネル掘削作業及び支保組立作業について説明する。
【0029】
図1に示すように、リヤグリッパ22の各グリッパジャッキ24によってグリッパシュー26をトンネルの内壁面に圧接して位置保持する。この状態で、カッタ旋回モータ17によってカッタヘッド13を回転駆動しながら、各スラストジャッキ27を伸長してリヤグリッパ22から掘削反力を得て胴体11を前進させることで、カッタヘッド13の各ローラカッタ14が前方の地盤を破砕して前進する。
【0030】
このようにして各スラストジャッキ27が所定のストローク伸長してカッタヘッド13が所定長さのトンネルを掘削すると、シュージャッキ20を下方に伸長し、シュー21によって支持フレーム19を支持する。これと同時にリヤグリッパ22による位置保持を解除する一方、フロントグリッパによって胴体11を掘削地盤に位置保持する。そして、各スラストジャッキ27を収縮して胴体11に対してリヤグリッパ22を前方に引き寄せる。そして、前述と同様に、リヤグリッパ22をトンネルの内壁面に位置保持すると共に、シュージャッキ20を収縮してシュー21による支持フレーム19の支持を解除し、カッタヘッド13を回転駆動しながら、各スラストジャッキ27を伸長して胴体11を前進させることで、各ローラカッタ14が前方の地盤を掘削する。
【0031】
そして、カッタヘッド13によって掘削されたずりはチャンバ28内に取り込まれ、ホッパ29に集積され、ベルトコンベヤ30によって外部に排出される。この作業の繰り返しによってトンネル掘削作業を連続して行う。
【0032】
また、本実施形態では、掘進中、あるいは掘削作業の終了と同時に、エレクタ装置31が支保Tをリング状に仮組みし、この仮組支保Tを拡張してトンネルの内壁面に密着して組立てる。以下、この支保Tの組立作業について説明する。
【0033】
図1に示すように、3つの支保TA ,TB ,TC は支保供給台車によってトンネル内に搬入され、ホイストによってこの支保供給台車上の支保TA ,TB ,TC を前方に移動し、支保仮置き台46に載置する。そして、まず、図3に示すように、油圧モータ37(図1参照)によって旋回リング34を旋回して可動式支保支持機構40を下方に位置し、拡張ジャッキ41を伸長して支保把持部42を支保TA と対向し、把持ジャッキ43により支保TA に把持ピン44を嵌入して把持してから拡張ジャッキ41を収縮し、支保TA を持ち上げ保持する。次に、旋回リング34を図3にて反時計回り方向にほぼ90度旋回し、支保TA と支保TB との連結の位置合わせ作業に自由度をもたせた状態で、両者の端部同志をボルトB(図5参照)によって連結する。そして、旋回リング34を再び図3にて反時計回り方向にほぼ90度旋回し、支保TB と支保TC との連結の位置合わせ作業に自由度をもたせた状態で、両者の端部をボルトBによって連結する。
【0034】
このように可動式支保支持機構40が支保TA のみを保持し、且つ、ボルトBによって支保TA ,TB ,TC を互いに仮連結すると、旋回リング34を図3にて反時計回り方向にほぼ90度旋回し、図5に示すように、間に連結された支保TB が上部に位置する状態とする。この状態で、可動式支保支持機構40による支保TA の保持を解除した後、旋回リング34を図5にて時計回り方向に旋回して支保TB を保持し、拡張ジャッキ41を伸長して支保TB をトンネルの内壁面に圧接する。そして、図示しない支保拡張装置によって支保TA ,TC をトンネルの内壁面に圧接する。その後、支保TA ,TC の間に図示しない支保を組み付け、支保TA ,TC と連結することで円形状の支保を形成し、各ボルトBを締結して固定する。
【0035】
このように本実施形態のTBMにあっては、支持フレーム19に4本の支持アーム32によって支持ローラ39を装着する一方、支持フレーム19に旋回自在に支持された旋回リング34と一体に支保Tを保持して周方向移動自在な可動式支保支持機構40を装着してエレクタ装置31を構成したことで、4分割した支保Tを胴体11の後部に設けたエレクタ装置31によって切羽から近い位置で掘削工程中に仮組み作業を行い、所定位置に組み立てることでトンネル施工性の向上を図ることができると共に、複数の支保Tを順次連結して短時間で容易に仮組みすることができ、作業性の向上を図ることでトンネルの掘削、支保の組立の作業時間を大幅に短縮することができる。
【0036】
図6に本発明の第2実施形態に係るエレクタ装置を搭載したトンネルボーリングマシンの要部断面、図7にエレクタ装置を表す図6のVII−VII断面、図8及び図9にエレクタ装置による支保の組立工程を表す断面を示す。なお、前述した実施形態で説明したものと同様の機能を有する部材には同一の符号を付して重複する説明は省略する。
【0037】
本実施形態のTBMに装着されたエレクタ装置61において、図6及び図7に示すように、胴体11の後部に連結された支持フレーム19の前端部には、複数のブラケット62に固定された複数の旋回ローラ63によって旋回リング64が回転自在に支持されており、図示しない油圧モータによって旋回可能となっている。また、胴体11の後端部には旋回リング64に隣接して4本の支持アーム65が上方に放射状をなして固定され、各支持アーム65の先端部にはトンネルの後方に向く油圧ジャッキ66がそれぞれ取付けられている。そして、この各油圧ジャッキ66には拡張ジャッキ67がそれぞれ取付けられ、この拡張ジャッキ67の先端部には固定式支保支持手段としての支持ローラ68が回転自在に装着されている。
【0038】
一方、旋回リング64には、支保Tを保持可能であってこの旋回リング64と共に周方向移動可能な可動式支保支持機構69が装着されている。この可動式支保支持機構69は、旋回リング64の外周部に拡張ジャッキ70が固定され、この拡張ジャッキ70の駆動ロッドの先端部にピン連結式の支保把持部71が連結されて構成されている。
【0039】
従って、3つの支保TA ,TB ,TC がトンネル内に搬入され、エレクタ装置61の下方に載置されると、まず、図7に示すように、旋回リング64を旋回して可動式支保支持機構69を下方に位置し、拡張ジャッキ70を伸長して支保把持部70が支保TA を把持してからこの拡張ジャッキ41を収縮し、支保TA を持ち上げ保持する。次に、旋回リング64を図7にて反時計回り方向にほぼ90度旋回し、図8(a)に示すように、支保TA と支保TB との連結の位置合わせ作業に自由度をもたせた状態で、両者の端部同志をボルトBによって連結する。このとき、端部の支持ローラ68は可動式支保支持機構69が保持した支保TA の支持を開始するが、支持ローラ68と可動式支保支持機構69とのトンネルの長手方向で同位置にあるため、油圧ジャッキ36を伸縮することで支持ローラ68を移動し、この支持ローラ68と可動式支保支持機構69との干渉を防止する。そして、旋回リング64を再び図8(a)にて反時計回り方向にほぼ90度旋回し、図8(b)に示すように、支保TB と支保TC との連結の位置合わせ作業に自由度をもたせた状態で、両者の端部をボルトBによって連結する。
【0040】
このように可動式支保支持機構69が支保TA のみを保持し、且つ、ボルトBによって支保TA ,TB ,TC を互いに仮連結すると、旋回リング64を図8(b)にて反時計回り方向にほぼ90度旋回し、図9(a)に示すように、間に連結された支保TB が上部に位置する状態とする。この状態で、可動式支保支持機構69の拡張ジャッキ70と各支持アーム65に装着された拡張ジャッキ67を同時に伸長し、支保TA ,TB ,TC をトンネルの内壁面に圧接する。その後、支保TA ,TC の間に図示しない支保を組み付け、支保TA ,TC と連結することで円形状の支保を形成し、各ボルトBを締結して固定する。
【0041】
このように本実施形態のTBMにあっては、胴体11に4本の支持アーム65によって油圧ジャッキ66及び拡張ジャッキ67を介して支持ローラ68を装着する一方、支持フレーム19に旋回自在に支持された旋回リング64と一体に支保Tを保持して周方向移動自在な可動式支保支持機構69を装着してエレクタ装置61を構成したことで、4分割した支保Tを胴体11の後部に設けたエレクタ装置61によって切羽から近い位置で掘削工程中に仮組み作業を行い、所定位置に組み立てることでトンネル施工性の向上を図ることができると共に、複数の支保Tを順次連結して短時間で容易に仮組み及び拡張して組立てることができ、作業性の向上を図ることでトンネルの掘削、支保の組立の作業時間を大幅に短縮することができる。
【0042】
なお、上述の各実施形態では、エレクタ装置31,61は1リングを4分割した支保Tを用いたが、その分割個数は4つに限定されず、3つでも5つでもよい。また、このエレクタ装置31,61の装着位置を胴体11の後部に連結された支持フレーム19の前端部としたが、リヤグリッパ22の後方に位置する支持フレーム19の後端部でもよい。更に、トンネル掘削機をオープンタイプのTBMとしたが、フルシールドタイプの掘削機でもよい。
【0043】
【発明の効果】
以上、実施形態によって説明したように請求項1の発明のエレクタ装置によれば、トンネル内に搬入された支保を組立てるエレクタ装置において、トンネル掘削機の中心部で長手方向後方に延設された支持フレームと、該支持フレームに支持された複数の旋回ローラにより旋回自在に支持されて該支持フレームに環装される旋回リングと、該旋回リングを旋回させる旋回手段と、前記支持フレームに装着されて支保を支持する複数の固定式支保支持手段と、前記旋回リングに装着されて支保を保持してトンネルの径方向に移動可能な可動式支保支持手段と、を具えたので、複数の支保を順次連結して短時間で容易に仮組みすることができ、作業性の向上を図ることができると共に、切羽から近い箇所で支保の組み立て作業を行うことで、トンネル施工性の向上を図ることができる。
【0044】
また、請求項2の発明のエレクタ装置によれば、固定式支保支持手段を支持フレームの外周辺に複数配設し、支持フレームに固定された支持アームと、この支持アームの先端部に装着された支持ローラとで構成したので、簡単な構造で支保を確実に支持することができる。
【0045】
また、請求項3の発明のエレクタ装置によれば、可動式支保支持手段を、旋回リングに固定された拡張ジャッキと、この拡張ジャッキによってトンネルの径方向に移動可能な支保把持部とで構成したので、支保を仮組みした後にこの支保を拡張してトンネルの内壁面に密着することができ、作業性の向上をはかることができる。
【0046】
また、請求項4の発明のエレクタ装置によれば、固定式支保支持手段を、支持フレームに固定された拡張ジャッキと、この拡張ジャッキによってトンネルの径方向に移動可能な支持ローラとで構成したので、支保を仮組みした後に全ての支保を拡張してトンネルの内壁面に密着することができ、作業性の向上をはかることができる。
【0047】
また、請求項5の発明のエレクタ装置によれば、固定式支保支持手段を、支持フレームに固定された油圧ジャッキと、この油圧ジャッキによってトンネルの長手方向に移動可能な支持ローラとで構成したので、支保把持部が把持した支保を移動して各支持ローラに順に支持させるとき、この支保把持部と支持ローラとの干渉を阻止して作業性を向上することができる。
【0048】
更に、請求項6の発明のトンネル掘削機によれば、筒状の胴体と、該胴体の前部に回転自在に装着されたカッタヘッドと、該カッタヘッドを駆動回転するカッタヘッド駆動手段と、トンネルの内壁面から掘削反力を受けて前記胴体を推進させる胴体推進ジャッキと、前記胴体から掘進方向後方に延設された支持フレームと、該支持フレームに支持された複数の旋回ローラにより旋回自在に支持されて該支持フレームに環装される旋回リングと、該旋回リングを旋回させる旋回手段と、前記支持フレームに装着されて支保を支持する複数の固定式支保支持手段と、前記旋回リングに装着されて支保を保持してトンネルの径方向に移動可能な可動式支保支持手段と、を具えたので、複数の支保を順次連結して短時間で容易に仮組みすることができ、作業性の向上を図ることができると共に、切羽から近い箇所で支保の組み立て作業を行うことで、トンネル施工性の向上を図ることができ、トンネル構築作業の作業性の向上を図ることができる。
【図面の簡単な説明】
【図1】本発明の第1実施形態に係るエレクタ装置を搭載したトンネル掘削機としてのトンネルボーリングマシンの概略断面図である。
【図2】リヤグリッパを表す図1のII−II断面図である。
【図3】エレクタ装置を表す図1のIII−III断面図である。
【図4】旋回リングの支持構造を表す図3のIV−IV断面図である。
【図5】エレクタ装置による支保の組立工程を表す断面図である。
【図6】本発明の第2実施形態に係るエレクタ装置を搭載したトンネルボーリングマシンの要部断面図である。
【図7】エレクタ装置を表す図6のVII−VII断面図である。
【図8】エレクタ装置による支保の組立工程を表す断面図である。
【図9】エレクタ装置による支保の組立工程を表す断面図である。
【符号の説明】
10 トンネルボーリングマシン(TBM)
11 胴体
13 カッタヘッド
17 カッタ旋回モータ(カッタヘッド駆動手段)
19 支持フレーム
22 リヤグリッパ
24 グリッパジャッキ
26 グリッパシュー
27 スラストジャッキ(胴体推進ジャッキ)
30 ベルトコンベヤ
31 エレクタ装置
32 支持アーム
33 旋回ローラ
34 旋回リング
37 油圧モータ(旋回手段)
39 支持ローラ(固定式支保支持機構)
40 可動式支保支持機構
41 拡張ジャッキ
42 支保把持部
61 エレクタ装置
63 旋回ローラ
64 旋回リング
65 支持アーム
66 油圧ジャッキ
67 拡張ジャッキ
68 支持ローラ(固定式支保支持機構)
69 可動式支保支持機構
70 拡張ジャッキ
71 支保把持部
T,TA ,TB ,TC 支保[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a tunnel excavator such as a tunnel boring machine or a shield excavator that excavates the ground to construct a tunnel, and an erector apparatus that is mounted on the tunnel excavator and assembles a support.
[0002]
[Prior art]
A conventional tunnel boring machine is composed of a cylindrical front and rear cylinders, and a cutter head having a roller cutter is rotatably mounted at the front of the front cylinder, and is driven and rotated by a cutter turning motor. It is possible. A bulkhead is formed in the front barrel so that the shear generated by excavation does not enter the interior, and a chamber is formed, and the front end portion of the belt conveyor that discharges the shear to the outside in this chamber Is located.
[0003]
In addition, a plurality of thrust jacks are installed between the front and rear cylinders, and the relative positions of the front and rear cylinders are changed by expanding and contracting by supplying and discharging hydraulic pressure to and from the thrust jacks. be able to. A front gripper is attached to the front cylinder, and the front cylinder can be held in position by projecting the gripper shoe in the radial direction by a hydraulic jack. On the other hand, a rear gripper is attached to the rear cylinder, and the rear cylinder can be held in position by projecting the gripper shoe in the radial direction by a hydraulic jack.
[0004]
Furthermore, in the rear part of the back trunk tunnel An erector device for assembling the support to the inner wall surface is mounted.
[0005]
Therefore, when the cutter gripping motor is driven to rotate the cutter head while the rear gripper is held unmovable by the rear gripper, each thrust jack is extended and the cutter head is moved forward together with the front drum to turn. The roller cutter of the cutter head shears and breaks the rock in front and excavates this rock. When each thrust jack is extended by a predetermined stroke, the front cylinder is held in position by the front gripper, while the rear cylinder is held in position by the rear gripper, and then the thrust jack is contracted to draw the rear cylinder toward the front cylinder. Then, while the rear cylinder is held in position again by the rear gripper, the position holding of the front cylinder by the front gripper is released, and then each thrust jack is extended to move the cutter head forward together with the front cylinder. Drilling. The tunnel is continuously excavated by repeating this operation.
[0006]
The shear generated by rock excavation is taken into the chamber and discharged to the outside by a belt conveyor. In the process of excavating and forming the tunnel by excavating the rock mass, if the wall of this excavated tunnel is stable, no support is required, but if it is slightly unstable, The tunnel is protected so that rock pieces do not peel off from the wall surface using a ring-shaped H-shaped steel or wooden plate as a support.
[0007]
[Problems to be solved by the invention]
In the conventional tunnel boring machine described above, each thrust jack is extended with the rear cylinder held in position by the rear gripper, so that the front cylinder and the cutter head are advanced with respect to the rear cylinder, and the rotating cutter head is used. While excavating the front rock, behind the rear trunk, according to the wall surface of the tunnel that has been excavated, an H-shaped steel or the like is formed into a ring shape by an erector device and attached to the tunnel wall surface as a support to protect the tunnel ing.
[0008]
By the way, when excavating highly collapsible ground, it is effective to construct a mountain retaining work (injection of reinforcing agent, spraying concrete, support assembly or segment assembly) as close as possible to the face of the tunnel boring machine. It is. However, in the conventional tunnel boring machine described above, there is no work space for performing such support assembly inside the fuselage, and the assembly work of the support is performed by an erector device provided at the rear of the rear cylinder, There is a problem that the construction of various auxiliary works is delayed.
[0009]
The present invention solves such a problem, and it is possible to improve the tunnel workability by enabling the assembling work of the support near the face and to facilitate the assembling work of the tunnel. It is an object of the present invention to provide an erector apparatus and a tunnel excavator with improved workability.
[0010]
[Means for Solving the Problems]
In order to achieve the above object, an erector apparatus according to claim 1 is an erector apparatus for assembling a support carried into a tunnel. Excavator of In the center Longitudinal direction Extend backward Supported frame and the support frame Supported Supported by multiple swivel rollers And mounted on the support frame A turning ring, turning means for turning the turning ring, a plurality of fixed supporting support means attached to the support frame to support the support, and a radial direction of the tunnel attached to the turning ring to hold the support Movable support support means movable to , It is characterized by comprising.
[0011]
In the erector apparatus according to the second aspect of the present invention, a plurality of the fixed supporting and supporting means are located on the outer periphery of the support frame, and a support arm fixed to the support frame and a distal end portion of the support arm. And an attached support roller.
[0012]
In the erector apparatus according to the third aspect of the present invention, the movable support support means includes an expansion jack fixed to the swivel ring and the expansion jack. tunnel And a support gripper that is movable in the radial direction.
[0013]
According to a fourth aspect of the present invention, the fixed support support means includes an extension jack fixed to the support frame, and the extension jack. tunnel And a support roller movable in the radial direction.
[0014]
In the erector apparatus according to the fifth aspect of the present invention, the fixed support support means includes a hydraulic jack fixed to the support frame, and the hydraulic jack. tunnel And a support roller movable in the longitudinal direction.
[0015]
According to a sixth aspect of the present invention, there is provided a tunnel excavator, a cylindrical body, a cutter head rotatably attached to a front portion of the body, a cutter head driving means for driving and rotating the cutter head, A trunk propulsion jack that receives a digging reaction force from an inner wall surface to propel the trunk, a support frame that extends rearward in the digging direction from the trunk, and a support frame Supported Supported by multiple swivel rollers And mounted on the support frame A turning ring, turning means for turning the turning ring, a plurality of fixed supporting support means attached to the support frame to support the support, and a radial direction of the tunnel attached to the turning ring to hold the support Movable support support means movable to , It is characterized by comprising.
[0016]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.
[0017]
FIG. 1 shows a schematic cross section of a tunnel boring machine as a tunnel excavator equipped with an erector apparatus according to the first embodiment of the present invention, FIG. 2 shows a rear gripper II-II cross section, and FIG. 3 shows an erector apparatus. FIG. 4 is a cross-sectional view taken along the line III-III in FIG. 1, FIG. 4 is a cross-sectional view taken along the line IV-IV in FIG. 3 representing the support structure of the swivel ring, and FIG.
[0018]
In the tunnel boring machine (hereinafter referred to as TBM) 10 of the present embodiment, as shown in FIGS. 1 and 2, a
[0019]
Accordingly, when the
[0020]
In addition, a front end portion of a rectangular tube-shaped
[0021]
Further, a
[0022]
Between the body 11 and the
[0023]
A
[0024]
In the TBM of the present embodiment, a support assembly erector device 31 is provided at the rear portion of the body 11 so that the support assembly operation can be performed at a location near the face. That is, in this erector device 31, as shown in FIGS. 1, 3, and 4, four
[0025]
A
[0026]
In this
[0027]
In addition, as a method of holding the support T by the support holding part 42, there are a method in which the support T is attracted or held by a hand in addition to the holding
[0028]
Here, tunnel excavation work and support assembly work using the
[0029]
As shown in FIG. 1, gripper shoes 26 are held by
[0030]
In this way, when each thrust
[0031]
The shear excavated by the
[0032]
In the present embodiment, during excavation or at the end of excavation work, the erector device 31 temporarily assembles the support T in a ring shape and expands this temporary assembly support T. tunnel Assemble it closely to the inner wall surface. Hereinafter, the assembling work of the support T will be described.
[0033]
As shown in FIG. 1, the three support TA, TB and TC are supported by a support supply cart. tunnel The support TA, TB, and TC on the support supply carriage are moved forward by the hoist and placed on the support
[0034]
In this way, when the
[0035]
As described above, in the TBM of the present embodiment, the
[0036]
FIG. 6 is a cross-sectional view of a main part of a tunnel boring machine equipped with an erector apparatus according to a second embodiment of the present invention, FIG. 7 is a cross-sectional view taken along the line VII-VII of FIG. The cross section showing the assembly process of is shown. In addition, the same code | symbol is attached | subjected to the member which has the same function as what was demonstrated in embodiment mentioned above, and the overlapping description is abbreviate | omitted.
[0037]
In the
[0038]
On the other hand, the
[0039]
Therefore, the three support TA, TB and TC are tunnel When it is carried in and placed under the
[0040]
Thus, when the
[0041]
As described above, in the TBM according to the present embodiment, the
[0042]
In each of the above-described embodiments, the support devices T obtained by dividing one ring into four are used for the
[0043]
【The invention's effect】
As described above, according to the erector apparatus of the invention of claim 1 as described in the embodiment, In an erector apparatus for assembling a support carried into a tunnel, the support frame is supported by a support frame extending rearward in the longitudinal direction at the center of the tunnel excavator and a plurality of swivel rollers supported by the support frame. A swiveling ring that is mounted on the support frame, swiveling means that swivels the swiveling ring, a plurality of fixed support supports that are attached to the support frame and support the support, and a support that is attached to and supports the swivel ring. Movable supporting support means that can move in the radial direction of the tunnel while holding Therefore, it is possible to connect multiple supports one after the other and tentatively assemble them easily in a short period of time, improving workability and carrying out the work of assembling the support close to the face. Can be improved.
[0044]
According to the erector apparatus of the second aspect of the present invention, a plurality of fixed supporting and supporting means are arranged on the outer periphery of the support frame, and the support arm is fixed to the support frame, and is attached to the tip of the support arm. Since the support roller is used, the support can be reliably supported with a simple structure.
[0045]
According to the erector apparatus of the invention of claim 3, the movable support support means is constituted by an extension jack fixed to the swivel ring and the extension jack. tunnel Since the support gripping part is movable in the radial direction, the support is expanded after the support is temporarily assembled. tunnel It is possible to make close contact with the inner wall surface and improve workability.
[0046]
According to the erector apparatus of the invention of claim 4, the fixed support support means is constituted by an extension jack fixed to the support frame and the extension jack. tunnel Since it is composed of support rollers that can move in the radial direction, all the supports are expanded after temporarily assembling the supports. tunnel It is possible to make close contact with the inner wall surface and improve workability.
[0047]
According to the erector device of the invention of claim 5, the fixed support support means is constituted by a hydraulic jack fixed to the support frame and the hydraulic jack. tunnel Since the support gripped by the support gripping portion is moved and supported by each support roller in order, the support gripping portion and the support roller are prevented from interfering with each other. Can be improved.
[0048]
Furthermore, according to the tunnel excavator of the invention of claim 6, A cylindrical fuselage, a cutter head rotatably mounted on the front of the fuselage, cutter head driving means for driving and rotating the cutter head, and excavating reaction force from the inner wall surface of the tunnel to propel the fuselage A trunk propelling jack to be supported, a support frame extending rearward in the digging direction from the trunk, and a swiveling ring that is rotatably supported by a plurality of swiveling rollers supported by the support frame and is mounted on the support frame. , A turning means for turning the turning ring, a plurality of fixed support supporting means attached to the support frame to support the support, and attached to the turning ring to hold the support and move in the radial direction of the tunnel Movable support and support means Therefore, it is possible to connect multiple supports in sequence and easily tentatively assemble them in a short time, improve workability, and perform assembling work of the support close to the face, making tunnel workability The improvement of workability of tunnel construction work can be aimed at.
[Brief description of the drawings]
FIG. 1 is a schematic cross-sectional view of a tunnel boring machine as a tunnel excavator equipped with an erector apparatus according to a first embodiment of the present invention.
2 is a cross-sectional view taken along the line II-II of FIG. 1 showing a rear gripper.
3 is a cross-sectional view taken along the line III-III of FIG.
4 is a cross-sectional view taken along the line IV-IV in FIG. 3 showing the support structure of the swivel ring.
FIG. 5 is a cross-sectional view illustrating an assembling process of a support by an erector device.
FIG. 6 is a cross-sectional view of a main part of a tunnel boring machine equipped with an erector apparatus according to a second embodiment of the present invention.
7 is a cross-sectional view taken along the line VII-VII in FIG. 6 showing an erector device.
FIG. 8 is a cross-sectional view illustrating an assembling process of a support by an erector device.
FIG. 9 is a sectional view showing an assembling process of a support by an erector apparatus.
[Explanation of symbols]
10 Tunnel boring machine (TBM)
11 Torso
13 Cutter head
17 Cutter turning motor (Cutter head drive means)
19 Support frame
22 Rear gripper
24 Gripper jack
26 Gripper shoe
27 Thrust jack (torso propulsion jack)
30 belt conveyor
31 Electa device
32 Support arm
33 Rotating roller
34 Swivel ring
37 Hydraulic motor (turning means)
39 Support roller (fixed support mechanism)
40 Movable support mechanism
41 Expansion jack
42 Support grip
61 Electa device
63 Rotating roller
64 slewing ring
65 Support arm
66 Hydraulic jack
67 Expansion jack
68 Support roller (fixed support system)
69 Movable support mechanism
70 expansion jack
71 Support grip
T, TA, TB, TC support
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP19021999A JP3611287B2 (en) | 1999-07-05 | 1999-07-05 | Electa device and tunnel excavator |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP19021999A JP3611287B2 (en) | 1999-07-05 | 1999-07-05 | Electa device and tunnel excavator |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2001020679A JP2001020679A (en) | 2001-01-23 |
| JP3611287B2 true JP3611287B2 (en) | 2005-01-19 |
Family
ID=16254467
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP19021999A Expired - Lifetime JP3611287B2 (en) | 1999-07-05 | 1999-07-05 | Electa device and tunnel excavator |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3611287B2 (en) |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109441475B (en) * | 2018-12-25 | 2024-04-26 | 中铁隧道局集团有限公司 | Automatic processing device for skid resistance detection of supporting boots and detection processing method thereof |
| CN113074005B (en) * | 2021-04-19 | 2022-03-29 | 中铁工程装备集团有限公司 | A operation rack for tunnel supporting construction |
| CN115898426A (en) * | 2022-11-29 | 2023-04-04 | 中国铁建重工集团股份有限公司 | A kind of forming tunnel diameter expansion equipment and its construction method |
| CN120487171B (en) * | 2025-07-14 | 2025-09-19 | 山西省水利建筑工程局集团有限公司 | A tunnel cantilever tunnel boring machine excavation and support integrated structure |
-
1999
- 1999-07-05 JP JP19021999A patent/JP3611287B2/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| JP2001020679A (en) | 2001-01-23 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP2018053594A (en) | Tunnel boring method and tunnel boring machine | |
| JP3611286B2 (en) | Electa device and tunnel excavator | |
| JP3615965B2 (en) | Electa device | |
| JP2005171549A (en) | Tunnel construction method | |
| JP3611287B2 (en) | Electa device and tunnel excavator | |
| JP3611288B2 (en) | Electa device, support assembling method and tunnel excavator | |
| JP3605318B2 (en) | Tunnel excavator | |
| JP3785030B2 (en) | Tunnel excavator | |
| JP3626882B2 (en) | Electa device and tunnel excavator | |
| JP2003172100A (en) | Support assembling device, its method and tunnel excavator | |
| JPH09221983A (en) | Tunnel excavator and excavation method | |
| JP3219746B2 (en) | Existing tunnel removal method and shield tunneling machine for removal of existing tunnel | |
| JPH09273391A (en) | Tunnel excavator and excavation method | |
| JP5292246B2 (en) | Tunnel excavator with switching lining | |
| JP3389155B2 (en) | Tunnel excavator cutter replacement method, tunnel excavation method and tunnel excavator | |
| JP3649536B2 (en) | Cutter head and tunnel excavator | |
| JP3924197B2 (en) | Multistage tunnel excavator | |
| JP2004092104A (en) | Tunnel excavator | |
| JP3316373B2 (en) | Tunnel excavator and excavation method | |
| JP3891644B2 (en) | Embedded pipe dismantling method and equipment | |
| JP3576426B2 (en) | Tunnel excavator | |
| JP3468938B2 (en) | Tunnel excavator and excavation method | |
| JP3100126B2 (en) | Simple erector device for tunnel excavator | |
| JP3891645B2 (en) | Embedded pipe dismantling method and equipment | |
| JPH1018781A (en) | Tunnel excavator and excavating method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20040316 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20040323 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20040514 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20040622 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20040819 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20040921 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20041018 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 3611287 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313115 |
|
| R360 | Written notification for declining of transfer of rights |
Free format text: JAPANESE INTERMEDIATE CODE: R360 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20071029 Year of fee payment: 3 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20081029 Year of fee payment: 4 |
|
| S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20081029 Year of fee payment: 4 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313117 |
|
| S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20091029 Year of fee payment: 5 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20091029 Year of fee payment: 5 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20101029 Year of fee payment: 6 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20131029 Year of fee payment: 9 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| EXPY | Cancellation because of completion of term |