JP3614803B2 - Building pillar installation structure - Google Patents
Building pillar installation structure Download PDFInfo
- Publication number
- JP3614803B2 JP3614803B2 JP2001260169A JP2001260169A JP3614803B2 JP 3614803 B2 JP3614803 B2 JP 3614803B2 JP 2001260169 A JP2001260169 A JP 2001260169A JP 2001260169 A JP2001260169 A JP 2001260169A JP 3614803 B2 JP3614803 B2 JP 3614803B2
- Authority
- JP
- Japan
- Prior art keywords
- column
- foundation
- plate
- building
- base
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009434 installation Methods 0.000 title claims description 143
- 238000003780 insertion Methods 0.000 claims description 50
- 230000037431 insertion Effects 0.000 claims description 50
- 239000002184 metal Substances 0.000 claims description 19
- 229910052751 metal Inorganic materials 0.000 claims description 19
- 230000003014 reinforcing effect Effects 0.000 claims description 19
- 239000000758 substrate Substances 0.000 claims description 15
- 239000000463 material Substances 0.000 claims description 10
- 239000010953 base metal Substances 0.000 claims description 8
- 238000012856 packing Methods 0.000 description 11
- 238000005266 casting Methods 0.000 description 9
- 238000010586 diagram Methods 0.000 description 7
- 238000012986 modification Methods 0.000 description 6
- 230000004048 modification Effects 0.000 description 6
- 125000006850 spacer group Chemical group 0.000 description 6
- 239000004744 fabric Substances 0.000 description 5
- 238000005452 bending Methods 0.000 description 4
- 238000010276 construction Methods 0.000 description 4
- 229910000831 Steel Inorganic materials 0.000 description 3
- 238000005260 corrosion Methods 0.000 description 3
- 230000007797 corrosion Effects 0.000 description 3
- 230000002787 reinforcement Effects 0.000 description 3
- 239000011347 resin Substances 0.000 description 3
- 229920005989 resin Polymers 0.000 description 3
- 239000010959 steel Substances 0.000 description 3
- 229910010293 ceramic material Inorganic materials 0.000 description 2
- 238000013461 design Methods 0.000 description 2
- 239000007769 metal material Substances 0.000 description 2
- 239000004033 plastic Substances 0.000 description 2
- 239000002990 reinforced plastic Substances 0.000 description 2
- 238000009423 ventilation Methods 0.000 description 2
- 239000002023 wood Substances 0.000 description 2
- 229910000838 Al alloy Inorganic materials 0.000 description 1
- 229910001335 Galvanized steel Inorganic materials 0.000 description 1
- 239000004677 Nylon Substances 0.000 description 1
- 239000004743 Polypropylene Substances 0.000 description 1
- 241000736892 Thujopsis dolabrata Species 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 230000002079 cooperative effect Effects 0.000 description 1
- 230000000875 corresponding effect Effects 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000008397 galvanized steel Substances 0.000 description 1
- 238000007531 graphite casting Methods 0.000 description 1
- 210000002837 heart atrium Anatomy 0.000 description 1
- 238000002513 implantation Methods 0.000 description 1
- 238000001746 injection moulding Methods 0.000 description 1
- 239000000314 lubricant Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 229920001778 nylon Polymers 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- -1 polypropylene Polymers 0.000 description 1
- 229920001155 polypropylene Polymers 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 241000894007 species Species 0.000 description 1
- 239000007921 spray Substances 0.000 description 1
- 239000010935 stainless steel Substances 0.000 description 1
- 229910001220 stainless steel Inorganic materials 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Landscapes
- Joining Of Building Structures In Genera (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は木造建築の柱を建物基礎に締着させる建物の柱の据付構造に関する。
【0002】
【従来の技術】
木造建築の住宅は、設計プランの自由度が高いという特徴がある。しかし、大きなリビングや吹抜けを持つような木造住宅になると、建物強度上の問題から構造計画が基本的に必要となる。
【0003】
木造建築は各種の継手、仕口を加工した木材を組み合せてつくる架構体のために、木材自体が充分な断面強度を持っていなければならないが、接合部も、この接合部に作用する応力に耐えるだけの強度が必要となる。
【0004】
加えて、我国は、地震国であり、しかも、需要者のニーズは多様化かつ高度化していることから、建築される木造建築は充分な耐震性を有し、施工が容易で構造安全性に富む建築物が望まれている。
【0005】
また、建築基準法が改正され、木造建築の構造安全性を向上させるために、ホールダウン金物を使用して柱を土台に据え付ける機会が増加している。
【0006】
ホールダウン金物は、通り柱等の柱の側面に取り付けられる一方、このホールダウン金物を土台に座付きボルト等の締付ボルトを用いて締着(緊結)させ、地震等に対する柱の引抜き耐力を向上させている。
【0007】
しかし、木造建築の柱と土台との締着では、土台自体の強度が必ずしも充分でないため、建物自体が壊れるより前に土台の剪断破壊が先に生じて壊れてしまい、木造建築では大地震にも耐える引抜き耐力を充分にかつ余裕をもって確保することは困難であった。
【0008】
このため、木造建築の柱を建物基礎に据え付けることが考慮されている。この場合には、建物基礎に植設されたアンカーボルトに柱の側面に取り付けられたホールダウン金物を直接緊結させて、柱を土台に接合させ、柱の引抜き耐力を向上させる方策が講じられる。
【0009】
【発明が解決しようとする課題】
従来の木造建築において、ホールダウン金物を利用して柱を土台に据え付け、柱の引抜き耐力を向上させている。しかし、柱を土台にホールダウン金物を利用して緊結させ、接合させる柱と土台の接合構造では、柱に大地震に耐え得る充分な引抜耐力を与えることが困難であった。
【0010】
また、木造建築の柱を建物基礎に土台を介して締着させ、接合させるために、アンカーボルトとホールダウン金物を用いて柱と土台を接合させる建物の柱の据付構造が考えられている。
【0011】
しかし、この建物の柱の据付構造では、アンカーボルトはせいぜい数mm(5mm)程度の精度で植設され、アンカーボルト据付(植込み)位置の位置精度が悪い。一方、通し柱等の柱は、建物基礎上に敷設される土台に例えば1mm程度以下の高精度に立設されることが要求され、アンカーボルトと柱の据付位置精度上の違いから、柱を建物基礎にアンカーボルトを利用して精度よく据え付けることが困難であった。柱を建物基礎にアンカーボルトを利用して据え付けると、柱の据付位置精度が悪化し、柱の据付精度がアンカーボルトの取付精度に左右される問題点があった。
【0012】
本発明は、上述した事情を考慮してなされたもので、木造建築の柱を建物基礎に締着させ、大きな引抜き耐力を柱に付与することができ、高い構造安全性を有する建物の柱の据付構造を提供することを目的とする。
【0013】
本発明の他の目的は、木造建築の柱をアンカーボルトおよび基礎プレートを用いて建物基礎に緊結させることができ、柱に大きな引抜き耐力を付与して構造安全性の高い建物の柱の据付構造を提供するにある。
【0014】
本発明のさらに他の目的は、木造建築の施工を簡単かつ容易にする一方、アンカーボルトの据付に伴なう位置精度誤差を吸収し、高い据付精度で柱を土台上に立設できる建物の柱の据付構造を提供するにある。
【0015】
【課題を解決するための手段】
本発明に係る建物の柱の据付構造は、上述した課題を解決するために、請求項1記載に記載したように、建物基礎上に土台を設置し、この土台に柱を立設した建物の柱の据付構造において、前記建物基礎に植設されたアンカーボルトに据付ナットで、据付位置が調節可能に固定される平盤状の基礎プレートと、この基礎プレート上に前記土台を介して柱を締着させる柱締着手段とを備え、前記基礎プレートは、プレート表面または裏面に開口する据付用凹部とこの据付用凹部の側方で反対側のプレート面に開口する取付用凹部とを有し、上記据付用凹部および取付用凹部にボルト径より大きな径を有するボルト挿通口が形成される一方、前記柱締着手段は、柱の下端部に一体的に設けられる柱脚金具と、この柱脚金具を基礎プレートに取り付ける締付ボルトとを組み立てて構成され、上記締付ボルトは、そのボルトヘッドが基礎プレートの取付凹部に廻り止めされて収納され、上記取付凹部のボルト挿通口に遊びをもって緩く挿通されて前記土台の貫通穴を通り、前記柱脚金具に締着され、前記柱締着手段により柱の脚部を基礎プレート側に緊結させ、据え付けたものである。
【0016】
また、上述した課題を解決するために、本発明に係る建物の柱の据付構造は、請求項2に記載したように、前記柱脚金具は柱の下端部に一体的に締着される接合金具であり、上記柱脚金具の基板が柱の下端面に接合される一方、上記基板に柱側に向って盛り上がる盛上り部を形成し、この盛上り部に締付ボルトとねじ結合可能なねじ部が形成されたものである。
【0017】
さらに、上述した課題を解決するために、本発明に係る建物の柱の据付構造は、請求項3に記載したように、前記柱脚金具の基板に座付き締付ボルトがねじ結合されて装着され、柱脚金具の基板と基礎プレートとの間に土台が挟持されたものであり、請求項4に記載したように、前記基礎プレートは鋳造材料でI型形状あるいはL型形状の平盤状に形成される一方、上記基礎プレートは中央部にプレート表面または裏面に開口する取付用あるいは据付用凹部が形成され、この凹部の両側で反対側のプレート面に開口する据付用あるいは取付用凹部が形成され、前記基礎プレートは取付用凹部および据付用凹部により断面凹凸構造の補強構造に形成されたものである。
【0018】
さらにまた、上述した課題を解決するために、本発明に係る建物の柱の据付構造は、請求項5に記載したように、前記柱の側方に引寄せ締付手段が設けられ、この引寄せ締付手段は上記柱を基礎プレートあるいは建物基礎に締着させたものであり、さらに、請求項6に記載したように、前記引寄せ締付手段は、柱の側面に取り付けられるホールダウン金具と、このホールダウン金具を土台側に引き寄せるアンカーボルトとを組み合せて構成されたものである。
【0019】
さらに、上述した課題を解決するために、本発明に係る建物の柱の据付構造は、請求項7に記載したように、前記ホールダウン金具に締付ナットにて締着されるアンカーボルトは、途中に据付ナットが設けられ、この据付ナットで基礎プレートを建物基礎上に据え付け、前記アンカーボルトは途中と先端部が基礎プレートとホールダウン金具に2段で締着されたものである。
【0027】
本発明に係る建物の柱の据付構造の実施の形態について添付図面を参照して説明する。
【0028】
図1および図2は本発明に係る建物の柱の据付構造の第1実施形態を示す図であり、図1は木造建築物10に用いられる柱11を建物基礎12に締着させ、緊結させる建物の柱11の据付構造を示し、図2は図1に示された建物の柱11の据付構造の平面図である。
【0029】
木造建築物10では、地盤上に布基礎としての建物基礎12がコンクリートの打設により構築される。建物基礎12にはコンクリート打設時に複数のアンカーボルト13が所要位置に植設される。アンカーボルト13にはボルト径12mm〜20mm、好ましくは16mm程度のボルトが使用される。
【0030】
建物基礎12上に土台14が横架材として敷設される。土台14は地盤に近いところに位置する部材であるため、耐腐朽性の大きな樹種部材、例えば桧、ヒバ等で作られ、柱11と同寸あるいは若干太めのものが用いられる。土台14相互は、腰掛け蟻継ぎや腰掛け鎌継ぎ、追い掛け大栓継ぎ等の継手手段で連結される一方、土台14と建物基礎11との間に基礎プレート15および基礎パッキン(図示せず)が詰物として介装される。基礎パッキンは間隔保持スペーサを兼ね、所要間隔、例えば土台14の長手方向に900mmの間隔をおいて配設され、建物基礎12と土台14との間に間隙16を形成している。この間隙16は木造建築物10の床下換気用の通風口を構成している。通し柱等の柱11の下方には基礎プレート15が設けられる。基礎プレート15は、図2に破線で示すように、I型平盤形状に鋳造等で成形され、建物基礎12上にアンカーボルト13を利用して据え付けられる。
【0031】
また、通し柱等の柱11の下端部に接合金具として柱脚金具17が固定される。この柱脚金具17は座付き締付ボルト18を介して基礎プレート15に締着され、緊結される。上記柱脚金具17および座付き締付ボルト18により柱11は土台14を介して基礎プレート15に柱締着機構19により締着され、緊結される。柱締着機構19は柱緊結手段あるいは柱締着手段として構成される。
【0032】
この柱締着機構19により、柱11は柱脚金具17を介して土台14に強固に接合され、柱11に作用する荷重は柱脚金具17から土台14で分散されて基礎プレート15や基礎パッキンを介して建物基礎12に作用する一方、荷重の一部は柱締着機構19を介して建物基礎12に伝達される。したがって、柱11に作用する荷重は分散されて建物基礎12に伝達される。
【0033】
また、木造建築物10の柱11に地震等の影響により、引抜き荷重が作用したとき、この引抜き荷重は柱脚金具17から座付き締付ボルト18を介して基礎プレート15に伝達され、この基礎プレート15で引抜荷重が分散され、アンカーボルト13,13を介して建物基礎12に伝達される。このように、柱11の引抜き荷重を分散させて建物基礎12に作用させることができるので、大きな引抜き耐力を得ることができる。
【0034】
ところで、基礎プレート15は、図3および図4に示すように、例えば鋳物の鋳造により、I型平盤状に形成される。基礎プレート15は強度や耐食性に優れた球状黒鉛鋳等の鋳物だけでなく、耐食性に優れた強化ナイロンやポリプロピレン樹脂等の強化ブラスチック樹脂材料あるいは硬質プラスチック材料の型成形で構成してもよい。さらに、基礎プレート15は、溶融亜鉛メッキ鋼板等の鉄鋼材料や鉄鋼材料より強いアルミ合金の金属材料で成形しても、さらに耐食性や耐荷重強度に優れたセラミック材料で成形してもよい。
【0035】
基礎プレート15は、全体として矩形形状のプレート本体16を有し、このプレート本体16の長手(縦)方向は柱11の幅の2倍以上の長さ、例えば2倍ないし3倍の長さを有し、短手(横)方向は土台14の幅寸法以下に形成される。一例として、柱11が120mmの角材、土台14が120mmの角材を用いたとき、基礎プレート15は長手方向に例えば240〜300mm、短手方向に100〜120mm、好ましくは縦・横寸法が270mm×105mmに成形され、基礎プレート15の厚さ(プレート高さ)は例えば15〜25mm程度、好ましくは20mm程度に構成される。
【0036】
また、基礎プレート15のプレート本体16中央部には、プレート一面(プレート片面)側に開口する矩形形状の取付用凹部21が形成され、この取付用凹部21の両側にプレート他面(反対のプレート片面)側に開口するほぼ同形状の据付用凹部22,22がそれぞれ形成される。各凹部21,22は鋳造時あるいは型成形時に一体成形される。各凹部の形状は矩形形状の例を示したが、種々の形状が考えられる。
【0037】
基礎プレート15の据付用凹部22,22には、アンカーボルト13を遊びをもって挿通させるボルト挿通口23が形成される。ボルト挿通口23の口径は建物基礎12に植設されるアンカーボルト13の据付位置(植込み位置)精度を考慮して決定される。アンカーボルト13の据付位置精度は、現在の建物施工技術では、せいぜい±5mm程度であり、高精度にアンカーボルト13を据え付けることは難しい。この据付位置誤差を解消することは困難であるので、ボルト挿通口23に遊びをもたせている。例えば、16mmφのアンカーボルト13を用いる場合、ボルト挿通口23は26mm〜34mm、好ましくは30mm程度に形成される。
【0038】
また、基礎プレート15の中央凹部である取付用凹部21にも同様なボルト挿通口24が形成され、このボルト挿通口24に柱締着機構19の座付き締付ボルト18が遊びをもって緩く挿通される。座付き締付ボルト18のボルト径が例えば16mmφ程度であるとき、ボルト挿通口24の口径は30mm〜45mm、例えば40mm程度に形成される。座付き締付ボルト18の矩形形状の座であるボルトヘッドとボルトとの溶接接合を考慮したものである。
【0039】
このように基礎プレート15のボルト挿通口23,24にアンカーボルト13や座付き締付ボルト18が挿通されると、このボルト挿通口23,24の口径をアンカーボルト13や座付き締付ボルト18のボルト径より大きくすることにより、アンカーボルト13の据付位置精度の据付誤差を吸収することができる。
【0040】
アンカーボルト13が建物基礎12に正しく埋設されず、所要の据付誤差をもって植設されても、建物基礎12上に基礎プレート15を正確に精度よく、例えば1mm以内の精度で設置し、据え付けることができる。
【0041】
その際、基礎プレート15は、プレート表面側および裏面側の各プレート片面にそれぞれ開口する取付用凹部21および据付用凹部22をそれぞれ形成したので、基礎プレート15の周辺部分に少なくとも補強リブが形成された凹凸構造の補強構造となり、機械的・物理的強度を単純な平板状プレートに較べ向上させることができる。
【0042】
また、建物基礎12上に設置される基礎プレート15には据付用凹部22,22の底部に据付座26,26が形成され、この据付座26,26に座金27が設置される。据付用凹部22,22内にボルト挿通口23,23から突入されるアンカーボルト13は座金27,27を介して据付ナット28,28で締め付けられ、基礎プレート15を所要位置に高い据付精度をもって設置させることができる。その際、アンカーボルト13および据付ナット28に対応する土台14には凹部29が形成され、アンカーボルト13および据付ナット28と土台14との干渉を防止している。
【0043】
一方、木造建築物10の柱11は、柱締着手段としての柱締着機構19により建物基礎12上の基礎プレート15に土台14を介して締着され、緊結される。その際、土台14には柱締着機構19の座付き締付ボルト18を挿通させる貫通穴31が形成され、この貫通穴31を通して座付き締付ボルト18が案内され、この締付ボルト18の先端部が柱脚金具17の基板35にねじ結合により締着される。
【0044】
柱締着機構19は図5に示すように構成され、通し柱等の柱11を基礎プレート15ひいては建物基礎12に接合させる柱接合手段を構成している。柱締着機構19は柱11の下端部に固着される柱脚金具17と基礎プレート15の取付用凹部21に収納される座付き締付ボルト18を組み合わせて構成している。
【0045】
座付き締付ボルト18はフランジ状あるいは鍔状をなす矩形形状のボルトヘッド33を有する。このボルトヘッド33は図1に示すように、基礎プレート15の取付用凹部21に収納されて、その取付座34に当接せしめられる一方、取付用凹部21にボルトヘッド33を収納することにより座付き締付ボルト18は廻り止めされる。
【0046】
座付き締付ボルト18の先端部は図5に示すように柱脚金具17の基板35に直接ねじ結合により締着される。基板35の中央部に柱11側に向って膨出する盛上り部38が形成され、この盛上り部38に座付き締付ボルト18にねじ結合される雌ねじ部が形成される。また、柱状金具17の基板35のガイド孔を貫いて突出し、図示しない座金および締付ナットでねじ結合させて、柱状金具17に締着させてもよい。
【0047】
柱締着機構19の柱脚金具17は、一般的には鋳物材料を用いて鋳造により一体に型成形される。柱脚金具17はいわゆるロケット金物といわれる接合金具であり、通し柱等の柱11の下端部を補強する一方、柱11の下端部に強固にかつ一体的に固定される。
【0048】
柱脚金具17は、図5に示すように、取付板としての基板35と、基準板36と、挿入板としての補強板37を相互に直交する方向に一体に結合して組み立てたものであり、三次元ブロックを構成している。柱脚金具17の基板35は通し柱等の柱11の下端面に密接するように取り付けられ、基板35の中央部には座付き締付ボルト18をねじ結合させる盛上げ部38が形成される。盛上り部38に雌ねじを形成する代りにボルト挿通口を形成し、このボルト挿通口から突出する締付ボルト18の突出部分に図示しない座金を介して締付ナットがねじ結合され、柱脚金具17を座付き締付ボルト18で締着させてもよい。
【0049】
また、基板35の中央部分から補強板37が立設され、この補強板37に座付き締付ボルト18の締付を許容する開口窓40と抜止防止用ピンであるドリフトピン41(図6参照)を案内するピン孔42が形成される。開口窓40は座付き締付ボルト18の突出を許容する一方、この開口窓40を通して締付ボルト18に締付ナットをねじ結合させて締め付けることができる。また、柱脚金具17の基板35には基板35を土台14に廻り止め固定させるビス穴39が設けられ、このビス穴39を介して柱客金具17をビス等の取付手段で土台14に固定させ、廻り止めを行なっている。
【0050】
柱脚金具17には、基板35および補強板37と互いにそれぞれ直交するように基準板36が設けられ、この基準板36にロケットピンとしてのガイドメンバ43が突設される。基準板36から突出するガイドメンバ43は補強板37の両側に一体接合されても、また補強板37の板表面から離間させて設けてもよい。ガイドメンバ43は柱状金具17を柱11の下端部に位置決め固定可能に取り付けられ、柱状金具17が柱11からその軸方向(Z方向)に抜け落ちるのを防止している。
【0051】
一方、通し柱等の柱11の下端部には、柱脚金具17を側方から挿入自在に取り付ける取付溝45が形成される。取付溝45は基準板36、補強板37およびガイドメンバ44を密に嵌挿させる溝形状に形成される一方、取付溝45は座付き締付ボルト18の先端部および座金やナットを収容可能な溝形状に形成される。
【0052】
しかして、柱脚金具17は柱11の側方からX方向に挿入されて柱11の取付溝45にスライド挿入され、きつく嵌合せしめられる。その際、柱脚金具17が柱11の取付溝45に滑らかに挿入できるように、潤滑剤が必要に応じスプレ等で塗布される。
【0053】
柱11の取付溝45に柱脚金具17をスライド挿入して装着した後、柱11のピン孔46からドリフトピン41をY方向に挿入させる。ドリフトピン41,41は柱11に挿入された柱脚金具17のピン穴42に挿通されて、柱脚金具17が固定される。ドリフトピン41,41の挿入により、柱脚金具17は柱11の下端部に一体的に装着され、装着された柱脚金具17のX,Y,Z方向の抜け落ちを確実にかつ未然に防止している。
【0054】
次に、通し柱等の柱11を土台14に接合させ、建物基礎12に据え付ける手順を説明する。
【0055】
柱11を建物基礎12に据え付けるために、建物基礎12のコンクリート打設時に、アンカーボルト13,13を所要位置に植設する。打設されたコンクリートの養生後に、建物基礎12上に基礎プレート15および基礎パッキンを設置する。設置された基礎プレート15には柱脚金具17の座付き締付ボルト18を収容させ、この座付き締付ボルト18を位置調整自在に立設させる。
【0056】
その後、基礎プレート15を建物基礎12上の所要位置に正確に位置合せして位置決めし、この位置決め位置で据付ナット28を締め付けて固定させる。基礎プレート15の位置決め固定時に、座付き締付ボルト18も位置合せされて固定される。その際、基礎プレート15のボルト挿通口23,24はアンカーボルト13や座付き締付ボルト18のボルト径より大きく形成されているので、基礎プレート15はアンカーボルト13の据付け上の精度誤差を吸収し、正確な位置に例えば1mm程度以下の精度で精度よく、設置することができる。
【0057】
建物基礎12上に基礎プレート15および基礎パッキンを設置し、据付た後、土台14を基礎プレート15および基礎パッキン上に載置させ、敷設させる。その際、基礎プレート15から立ち上がる座付き締付ボルト18を土台14の貫通穴31に挿通させ、その先端部を土台14から上方に突出させる。
【0058】
その後、土台14から上方に突出した座付き締付ボルト18の突出部に柱脚金具17を装着する。この柱脚金具17の取付は、座付き締付ボルト18の先端部に座金を介して締付ナットで締め付けることにより行なわれ、柱脚金具17が土台14上にセットされる。
【0059】
続いて、土台14上にセットされ、固定された柱脚金具17に通し柱等の柱11の下端部を側方から移動させ、柱脚金具17に柱11の取付溝45を案内し、嵌挿させる。柱11の取付溝45を柱脚金具17に押し込んでスライド挿入させた後、ドリフトピン41を打設して柱11を土台14上に固定し、据え付ける。ドリフトピン41の打設により、柱11は例えば1mm以内の精度で精度よく、土台14上に立設され、しかも、柱11の下端部は柱脚金具17で強度的に補強されて据え付けられる。
【0060】
また、柱11を土台14上に立設することにより、柱11に作用する圧縮荷重や曲げモーメントは、土台14および柱締着機構19で分散されて基礎プレート15および基礎パッキンから建物基礎12に伝達される。地震時の引抜き荷重は柱脚金具17および座付き締付ボルト18を経て基礎プレート15で受け、この基礎プレート15からアンカーボルト13,13に分散して伝達せしめられる。そして、柱11に作用する引抜き荷重は基礎プレート15からアンカーボルト13,13を経て建物基礎12に伝送され、この建物基礎12で受ける。
【0061】
このため、通し柱等の柱11は、土台14上に据え付けられて接合され、この土台14で支持される一方、柱締着機構19を介して基礎プレート15に支持させることができる。結果的に、柱11は柱締着機構19により基礎プレート15を介して建物基礎12に強固に、精度よく据え付けることができ、建物の据付強度や耐久性、構造安全性を大幅に向上させることができる。
【0062】
図7および図8は本発明に係る建物の柱の据付構造の第2実施形態を示す図である。
【0063】
この実施形態に示された木造建築物10Aにおける柱の据付構造は、土台14上に立設される通し柱等の柱11を柱締着機構としての柱締着手段19と引寄せ締付手段50を用いて建物基礎12に締着させ、緊結させた例を示すものである。第1実施形態と異ならない部材には同一符号を付して説明を省略する。
【0064】
この実施形態に示された例では、建物基礎12に埋設される対のアンカーボルト51,52のうち一方を土台14のボルト貫通穴53を貫いて上方に大きく突出させ、この上端部を引寄せ締付手段50のホールダウン金具54に締着させて締め付ける。
【0065】
ホールダウン金具54はその金具基部である取付板55が柱11の側面に複数の釘あるいは取付ねじ等の取付手段で固定される。ホールダウン金具54には取付板55から側方に突出する取付ブラケット56が一体に設けられ、この取付ブラケット56は補強リブ57で補強され、物理的強度を向上させている。取付ブラケット56にはアンカーボルト52より大きな口径のボルト挿通孔58が形成され、このボルト挿通孔58にアンカーボルト52が挿通され、このアンカーボルト52の先端部は座金59を介して締付ナット60で締着される。
【0066】
ホールダウン金具54に形成されるボルト挿通孔58の孔径をアンカーボルト52のボルト径より大きく形成することにより、アンカーボルト52植設上の避けることのできない据付精度誤差を吸収させることができる。この場合、この据付誤差を吸収するため、土台14に形成されるボルト貫通穴53もアンカーボルト52のボルト径より大きく形成される。
【0067】
また、他方のアンカーボルト51は基礎プレート15の据付凹部22に収納されて、座金兼用の据付ナット62により締着される。この据付ナット62は据付凹部22の深さと略同じナット高さを有し、据付ナット62のねじ結合により、基礎プレート15が建物基礎12上に締着され、据え付けられる。
【0068】
この場合、アンカーボルト51が図9に示すように、所定位置より、例えば右側にα、例えば8mmシフト状態で埋設されても、ボルト挿通口23にもたせた遊びによりアンカーボルト51の埋設位置の誤差分を吸収することができ、建物基礎12上に据え付けられる基礎プレート15は所定位置に正確に精度よく固定させることができる。
【0069】
柱11を基礎プレート15に締着させる柱締着手段19は第1実施形態に示された柱締着機構19と異ならない。この場合にも、土台14上に立設される柱11は、柱締着手段19と引寄せ締付手段54の協働作用により土台14上に接合せしめられる。
【0070】
また、柱11は柱締着手段19および引寄せ締付手段54により基礎プレート15、ひいてはアンカーボルト51,52を介して建物基礎12に据え付けられる。木造建築物10Aの柱11は柱締着手段19および引寄せ締付手段54と基礎プレート15とを組み合せて用いることにより、柱11を建物基礎12に直接あるいは間接的に締着し、緊結させることができる。柱11に大きな引抜き耐力を付与することができ、木造建築物10Aに高い構造安全性を持たせることができる。
【0071】
図10および図11は第2実施形態に示された建物の柱の据付構造の変形例を示すものである。
【0072】
この変形例に示された木造建築物10Aにおいては、引寄せ締付手段54に用いられるアンカーボルト52を多段構成とし、アンカーボルト52Aの途中を基礎プレート15に収納された座金兼用の据付ナット62で締め付け、基礎プレート15を締着させる一方、アンカーボルト52Aの上端部をホールダウン金具54の取付ブラケット56に座金59および締付ナット60でねじ結合させて2段締着させたものである。
【0073】
この場合には、引寄せ締付手段54に用いられるアンカーボルト52Aの上半部はその下半部より例えば小径に形成され、例えばアンカーボルト52Aの下半部が16mmφのボルト径の場合、その上半部は12mmφ〜14mmφ程度に構成される。
【0074】
また、アンカーボルト52Aの上半部全体に雄ねじを刻設することで、アンカーボルト52Aは必ずしも多段構造とする必要はない。この場合には、アンカーボルト52Aは例えば16mmφのボルト径を用いればよい。
【0075】
アンカーボルト52Aの途中を据付ボルト62で基礎プレート15に締着させることで、建物基礎12上に固定される基礎プレート15は両アンカーボルト51,52Aを利用し、据付ボルト62,62で強固に締着させることができる。このため、木造建築物10Aの柱11の引抜き耐力をより向上させることができ、木造建築物10Aの構造安全性をより一層高めることができる。
【0076】
図12および図13は本発明に係る建物の柱の据付構造の第3実施形態を示す図である。
【0077】
図12および図13に示された木造建築物10Bにおいても、通し柱等の柱11を土台14に接合させ、据え付けるのに基礎プレートが用いられているので、第1実施形態で示された部材と異ならない部材には同一符号を付して説明を省略する。
【0078】
この木造建築物10Bにおいても、布基礎である建物基礎12と土台14との間に基礎プレート15Aや基礎パッキン(図示せず)が介装される。基礎プレート15Aは、第1実施形態で示された基礎プレート15を反転して使用するもので、基礎プレート15とプレート構造、形状を同じくする。
【0079】
しかし、この場合には、基礎プレート15Aの中央凹部は据付円凹部21aとして、この据付用凹部21aの両側に形成される凹部は取付用凹部22a,22bとして形成される。据付用凹部21aにはアンカーボルト65がボルト挿通口23を介して突入されており、このアンカーボルト65は座金27を介して据付ナット28にねじ結合されて基礎プレート15Aが建物基礎12に締着される。その際、アンカーボルト65の埋設上の位置誤差に伴う不具合は、基礎プレート15Aのボルト挿通口24の遊びにより吸収することができ、アンカーボルト65に設計上許容できる埋設位置誤差があっても、基礎プレート15Aを正確に精度よく据え付けることができる。
【0080】
アンカーボルト65は建物基礎12のコンクリート打設時に埋設される配筋に接合させて植設してもよいが、図14(A)および(B)に示すようなアンカーボルト65を用いてもよい。このアンカーボルト65はボルトヘッド65aが笠形形状をなし、このボルトヘッド65aが建物基礎12に埋設される。このアンカーボルト65は建物基礎12に基礎プレート15Aを据え付けるために用いられる。
【0081】
また、木造建築物10Bの柱11は土台14に平ほぞ差し、長ほぞ差し、重ねほぞ差し、短ほぞ差し等の公知の柱継手手段67で接合される。土台14に接合された柱11は、引寄せ締付手段70により基礎プレート15Aに締着させ、柱11を土台14側に引き寄せて締着している。
【0082】
引寄せ締付手段70は、柱11の両側に対向して一対設けられる。引寄せ締付手段70は引寄せ金具としてのホールダウン金具71と座付き締付ボルト72とを組み合せて構成される。座付き締付ボルト72の座部を形成するボルトヘッド73は矩形状に形成され、基礎プレート15Aの取付用凹部22a,22b内で廻り止めされる構造となっている。
【0083】
座付き締付ボルト72のボルトヘッド73は矩形形状に代えて多角形、長円形あるいは円形をなすものでもよく、通常の頭付きの締付ボルトであってもよい。
【0084】
また、ホールダウン金具71は、図15に示すように、柱11に取り付けられる取付基板としての取付板74と取付板74から側方に突出する取付ブラケット75とこの取付ブラケット75を補強する一対の補強リブ76を一体に接合して組み立てたものであり、ホールダウン金具71には取付ブラケット75に締付ボルト72を挿通させるボルト挿通孔77が形成される。締付ボルト72はボルト挿通孔77を貫いて上方に突出し、この突出部が締付ナット78にねじ結合して締め付けられる。
【0085】
ホールダウン金具71は柱11に複数のラグスクリューとしての取付ねじあるいは取付ボルト等の取付手段により取り付けられる。取付ボルトを用いた場合、柱11の両側に装着される対をなすホールダウン金具71,71を共締めするようにしてもよい。ホールダウン金具71の下端は土台14の表面から50mm〜1000mm程度、好ましくは100mm以上離間させて取り付けられる。柱11を土台14側に安定的に効率よく、引き寄せるために、ある程度の距離が必要となるためである。
【0086】
柱11は屋根、横架材、壁、床などからの圧縮力と風や地震などの水平加力による曲げモーメントを受けるので、これらの圧縮荷重や曲げモーメントに耐える強さが必要となる。この場合には、柱11は一対の引寄せ締付手段70,70で柱11の途中が補強されるので、柱11の強度、耐久性を向上させることができる。
【0087】
図12および図13に示された木造建築物10Bにおいては、柱11の下端部は柱継手手段67で土台14に組み付けられて接合される一方、柱11は一対の引寄せ締付手段70,70を介して基礎プレート15Aに締着され、柱11を土台14側に引き寄せて据え付けることができる。
【0088】
また、風や地震時に木造建築物10Bの柱11に作用する引抜き力は、一対の引寄せ締付手段70,70で受けて基礎プレート15Aに伝達され、この基礎プレート15Aで受け、ひいてはアンカーボルト65を介して建物基礎12で受けるので、大きな引抜き耐力を柱11に付与することができる。
【0089】
さらに、木造建築物10Bの柱11に作用する通常の圧縮荷重や曲げモーメントは柱継手手段67を介して土台14に伝達されるが、この荷重に対する耐力の一部を引寄せ締付手段70,70にも持たせるために、図12に鎖線で示すように荷重受けナット79を締付ボルト72にねじ結合させ、柱11に作用する圧縮荷重を引寄せ締付手段70,70の座付き締付ボルト18を経て建物基礎12に受けるようにすると、圧縮荷重が分散され、柱11の耐荷重強度を大幅に向上させることができる。
【0090】
また、引寄せ締付手段70に用いられるホールダウン金具71は図15に示すように、取付ブラケット75の下側に補強リブ76を設けたものを示したが、補強リブ76は取付ブラケット75の上側に設けてもよい。図16および図17に示されるホールダウン金具71A,71Bは取付ブラケット75より上方に一対の補強リブ76,76を設けた例をそれぞれ示す。図16に示されるホールダウン金具71Aは取付ボルトあるいは取付ねじで柱11の側面に取り付けられるタイプの引寄せ金物の例であり、図17に示すホールダウン金具71Bは釘等の取付手段で柱11の側面に取り付ける引寄せ金物の例である。ホールダウン金具71は取付ブラケット75の上方および下方の双方に補強リブ76を立てるようにしてもよい。
【0091】
図18および図19は本発明に係る建物の柱の据付構造の第4実施形態を示すものである。
【0092】
この実施形態に示された木造建築物10Cは、通し柱等の柱11の下端部に柱脚金具17を一体に装着し、この柱脚金具17を土台14から突出するアンカーボルト80にねじ結合させて締着したものである。第3実施形態に示された建物の柱の据付構造に用いられる部材と同じ部材には同一符号を付して説明を省略する。
【0093】
柱11の下端部に設けられる柱脚金具17は図5および図6に示されるものと異ならないので同じ符号を付して詳細な説明を省略する。この柱脚金具17とアンカーボルト80により柱締着手段81が構成される。
【0094】
アンカーボルト80は建物基礎12の所要位置に埋設されて植設される。建物基礎12に植設されたアンカーボルト80は基礎プレート15Aのボルト挿通口25および土台14の貫通穴82を貫いて土台14の上方に突出し、その突出部は柱脚金具17の取付板としての基板35にねじ結合されて締着されたり、また基板35を貫いて上方に延び、座金および据付ナットでねじ結合され、柱脚金具17に連結される。
【0095】
基礎プレート15Aのボルト挿通口25の口径および土台14の貫通穴82の孔径はアンカーボルト80の据付位置誤差を考慮してアンカーボルト80のボルト径より大径に形成される。アンカーボルト80に例えば16mmφのボルト径が用いられる場合、ボルト挿通口25および貫通穴82は28mm〜32mm程度の口径に形成される。ただ、土台14に形成されるボルト貫通穴82は、建築現場で穴加工する場合には、アンカーボルト80を挿通させ得る穴径であればよく、アンカーボルト80の据付位置精度誤差を考慮した大きさに形成する必要はない。
【0096】
また、柱脚金具17の基板35に形成される穴径もアンカーボルト80の据付位置誤差を考慮してボルト挿通口38(図6参照)がアンカーボルト80のボルト径より大径に形成される。このボルト挿通口38をアンカーボルト80のボルト径より所要の大きさに形成することにより、アンカーボルト80の据付位置誤差を吸収することができる。このため、アンカーボルト80の据付上の問題から据付精度が悪い場合にも、この据付誤差を基礎プレート15Aおよび柱脚金具17のボルト挿通口25,38で吸収することができ、基礎プレート15Aおよび柱脚金具17を所定位置に精度よく正確に設けることができる。
【0097】
この建物の柱の据付構造では、柱11に作用する荷重が、土台14と柱締着手段81を介して建物基礎12に分散して伝達されるので、荷重負担の軽減化が図れる一方、柱11に作用する引抜き荷重は、柱脚金具17とアンカーボルト80を組み合せた柱締着手段81および引寄せ締付手段70で分散して受ける。柱締着手段81はアンカーボルト80を介して建物基礎12に直接に、また、引き寄せ締付手段70は基礎プレート15Aを介して建物基礎12に間接的に伝達され、しかも、基礎プレート15Aは比較的大きな面積を有するので、柱11の引抜き耐力を大きくすることができる。
【0098】
また、図18および図19では、引寄せ締付手段70を柱11の側面に1つ設けた例を図示したが、引寄せ締付手段70は、図12に示すような柱11の両側に左右バランスするように設けてもよい。
【0099】
さらに、柱締着手段81はアンカーボルト80と柱脚金具17を連結させ、締着した例を示したが、基礎プレート15Aの据付用凹部21a内に座金兼用据付ナットを収納し、この据付ナットでアンカーボルト80の途中をねじ結合させて締め付けてもよい。この場合、アンカーボルト80は建物基礎12側が太径に、土台14側が細径をなすように2段構造に形成される。建物基礎12側がアンカーボルト80のボルト径が例えば16mm〜18mmである場合、土台14側は12mm〜14mmに形成される。
【0100】
ただ、アンカーボルト80の上半部全体、例えば建物基礎12上方に位置する部分全体に雄ねじを刻設することもできる。この場合には、アンカーボルト80を多段構造とする必要がない。この場合にも、アンカーボルト80を基礎プレート15Aおよび柱脚金具17にそれぞれ締め付け、締着させることができる。
【0101】
図20および図21は本発明に係る建物の柱の据付構造の第5実施形態を示すものである。
【0102】
この実施形態に示された木造建築物10Dは、建物のコーナ部に立設させる通し柱等の柱11を建物基礎12に据え付ける柱11の据付構造に適用される。この柱11の据付構造では、L型形状の基礎プレート85が用いられる。第1実施形態で示された建物の柱の据付構造と同じ部材には同一符号を付して説明を省略する。
【0103】
木造建築物10Dの布基礎としての建物基礎12はコンクリート打設時にアンカーボルト86,86がコンクリート打設位置に埋設され、このアンカーボルト86,86に基礎プレート85が据え付けられる。
【0104】
一方、通し柱等の柱11の下端部には、柱脚金具17が取り付けられ、一体的に固定される。柱脚金具17は図5および図6に示されるものと異ならない。柱脚金具17の基板(取付板)35にはボルト挿通口38に座付き締付ボルト18が挿通される。座付き締付ボルト18は補強板37に設けられた開口窓40により座金87および締付ナット88にねじ結合されて締着される。座付き締付ボルト18を柱脚金具17の基板35上に直接ねじ結合させて締着させてもよい。
【0105】
座付き締付ボルト18は座を構成する矩形形状のボルトヘッド33が基礎プレート85の取付用凹部91に収納される。座付き締付ボルト18は基礎プレート85のボルト挿通口92から土台14に形成された貫通穴93を貫いて上方に延設される。土台14上に突出する座付き締付ボルト18は柱脚金具17の取付板35を貫いて突出し、その突出部が座金87を介して締付ナット88で締着され、基礎プレート85と柱脚金具17との間に土台14を挟持するようになっている。
【0106】
一方、基礎プレート85は取付用凹部91の両側に据付用凹部95,95が形成され、この据付用凹部95,95に収容された座金兼用の据付ナット96,96により基礎プレート85は布基礎としての建物基礎12の所要位置に精度よく正確に据え付けられ、固定される。
【0107】
また、前記柱脚金具17および座付き締付ボルト18により柱締着手段100が構成され、この柱締着手段100により、柱11は土台14を介して基礎プレート85に締着され、さらに基礎プレート85からアンカーボルト86,86を介して建物基礎12に堅固に据え付けられる。
【0108】
この柱11の据付構造に用いられる基礎プレート85は、図22〜図24に示されるように構成され、プレート本体84が鋳造により形成される。基礎プレート85は硬質プラスチック等の強化樹脂材料をインジェクション成形により型成形しても、またステンレス鋼等の鋼材を用いてもよい。
【0109】
基礎プレート85は図22に示すように、L型形状をなし、プレート本体84の中央角部に一面(プレート片面)側に開口する取付用凹部91が形成され、この取付用凹部91の両側に他面(反対のプレート片面)側に開口する据付用凹部95,95がそれぞれ形成される。基礎プレート85は互いに反対方向に開口する取付用凹部91と据付用凹部95,95により、周辺にリブが形成された凹凸構造の平盤状の補強構造に形成され、機械的・物理的強度が向上せしめられる。基礎プレート85のプレート厚は、例えば20mm程度で、プレート幅は建物基礎12や土台14の幅と同等以下、好ましくは若干小さな幅寸法に形成される。
【0110】
取付用凹部91および据付用凹部95にはボルト挿通口92および97がそれぞれ形成される。このうち、据付用凹部95に形成されるボルト挿通口97はアンカーボルト86,86が例えば16mmφのボルト径が用いられた場合には、アンカーボルト86,86の据付精度を考慮して28mmφ〜32mmφ程度の口径に形成される。
【0111】
基礎プレート85に形成されるボルト挿通口97をアンカーボルト86のボルト径より大きく形成することにより、アンカーボルト86の据付精度誤差を吸収することができ、アンカーボルト86に据付上の誤差が生じても、ボルト挿通口97で据え付け上の誤差を吸収し、基礎プレート85を建物基礎12のコーナ部に精度よく、正確に、例えば1mm以下の精度で設置することができる。
【0112】
なお、この場合において、基礎プレート85は、取付用凹部91側の肉厚を据付用凹部95側の肉厚より若干大き目に形成することが望ましい。基礎プレート85のプレート厚が例えば20mmであるとき、取付用凹部91は9mm〜11mm程度、据付用凹部97は8mm〜10mm程度に形成される。
【0113】
この建物の柱11の据付構造においても、柱11に作用する荷重(圧縮荷重)は柱脚金具17から土台14に伝達される一方、柱11の引抜き荷重は柱脚金具17から座付き締付ボルト18を経て基礎プレート85に伝達され、この基礎プレート85からアンカーボルト86,86を経て建物基礎12に伝達される。柱11の引抜き荷重を基礎プレート85で受け、さらにこの基礎プレート85を介して建物基礎12で受けるので、大きな引抜耐力を柱11に付与することができる。
【0114】
なお、第5実施形態においては、通し柱等の柱11を柱締着手段100により基礎プレート85に、あるいはこの基礎プレート85を介して建物基礎12に直接的あるいは間接的に据え付けた例を示したが、柱11の建物基礎12への据付力を向上させるために、図7および図8に示す引寄せ締付手段50と柱締着手段100を併用させてもよい。
【0115】
また、基礎プレート85は表裏面を反転させて使用してもよい。この場合、基礎プレート85のコーナ側中央部が据付用凹部として、また、その両側が取付用凹部としてそれぞれ形成される。この基礎プレート85のプレート構造により、基礎プレート85の中央側を建物基礎12にアンカーボルトを利用して据え付け、基礎プレート85の両側を図12および図13に示すように、対をなす引寄せ締付手段70を用いて柱11に締着させ、柱11を土台14側に引き寄せて据え付けるようにしてもよい。
【0116】
さらに、基礎プレート85は、図18および図19に示すように用いてもよい。
【0117】
図25、図26および図27は本発明に係る建物の柱の据付構造の第6実施形態を示すものである。
【0118】
この実施形態では、L型形状の平板状の基礎プレート105を用いたものである。基礎プレート105には平板のプレート本体104に座付き締付ボルト18を挿通させるボルト挿通口106とアンカーボルト86,86を挿通させるボルト挿通口107,107とが形成される。ボルト挿通口107は例えば長円形あるいは楕円形の形状に形成され、しかも、建物基礎12に植設されたアンカーボルト86の据付位置誤差を収納できるように、アンカーボルト86のボルト径より大きく形成される。
【0119】
また、座付き締付ボルト18を基礎プレート105の中央部に挿通させて基礎プレート105を建物基礎口上に装着させたとき、基礎プレート105を建物基礎12上に安定的に据え付けるために、基礎プレートスペーサ108が介装される。基礎プレートスペーサ108の肉厚は座付き締付ボルト18のボルトヘッド33の高さを等しく設定させる。基礎プレートスペーサ108に金属材料、強化プラスチック等の樹脂系材料、セラミック材料、木材を用いて形成すればよい。
【0120】
図27に示される建物の柱11の据付構造では、基礎プレート105上に土台14が載置される。座付き締付ボルト18の上端は柱11の下端部に一体に装着された柱脚金具17に連結され、締付ボルト88等で締着され、柱締着機構である柱締着手段19が構成される。また、アンカーボルト86,86も土台14のボルト貫通穴107を貫いて上方に延び、土台14の上面側で座金および締付ナット109により締着される。
【0121】
なお、符号110は建物基礎12と土台14との間に介装される基礎パッキンであり、この基礎パッキン110は土台14と建物基礎12との間の間隔を保持する間隔保持スペーサとして機能する。土台14と建物基礎12との間に間隙111が形成され、この間隙により建物の床下換気が行なわれる。
【0122】
また、図28は、第6実施形態に示される建物の柱の据付構造の変形例を示すものである。
【0123】
この変形例に示された木造建築物10Eは、図27に示された木造建築物に引寄せ締付手段113を付加し、柱継手手段19と引寄せ締付手段113を併用したものである。この引寄せ締付手段113は、通し柱等の柱11の側面に引寄せ金物として取り付けられたホールダウン金具114とアンカーボルト115とを組み合せて構成される。ホールダウン金具114は柱11に取付ボルト等の取付手段116で取り付けられ、このホールダウン金具114の取付ブラケット117にアンカーボルト115の頂部が締付ナット118でねじ結合され、締着される。
【0124】
図28に示される柱の据付構造においても、柱11が基礎プレート105に据え付けられ、この基礎プレート105によりアンカーボルト86を介して建物基礎12に据え付けることができ、土台14上に立設される柱11に大きな引抜き耐力を付与することができる。この場合、アンカーボルト86の途中に座金兼用の据付ナット119を設け、アンカーボルト86の途中を基礎プレート105に締着させてもよい。
【0125】
図29および図30は、本発明に係る建物の柱の据付構造に用いられるI型形状の基礎プレート120を示すものである。
【0126】
この基礎プレート120も矩形の平板状をなすI型のプレート本体121を平板で構成したものである。この平板状の基礎プレート120を用いる場合にも、図25および図26で示されたものと同様の基礎プレートスペーサ108を備える。
【0127】
この基礎プレート120を用いた柱の据付構造においても、土台14に立設される柱に大きな引抜き耐力を付与することができる。
【0128】
なお、本発明の建物の柱の据付構造の各実施形態に示された基礎プレートにおいては、基礎プレート上に形成されるボルト挿通口をアンカーボルトや座付き締付ボルトのボルト径より大きな円形孔で形成した例を示したが、ボルト挿通口は円形孔に限定されない。ボルト挿通口は長孔であっても、長円孔であっても、あるいは楕円孔、矩形孔であってもよい。ただ、ボルト挿通口はアンカーボルトの据付位置誤差を吸収するに必要な大きさを有する。
【0129】
また、本発明に係る建物の柱の据付構造では、基礎プレートはI型形状およびL型形状に形成した例を示したが、このI型およびL型形状以外にT型形状あるいは十字型形状に形成してもよい。
【0130】
【発明の効果】
本発明に係る建物の柱の据付構造においては、土台上に立設させる通し柱等の柱を基礎プレートに締着させ、この基礎プレートを介して建物基礎に据え付けて締着させ、柱を建物基礎側から引き寄せるようにしたので、柱に大きな引抜き耐力を持たせて建物基礎に緊結させることができ、柱の耐荷重を向上させ、木造建築物に高い構造安全性を持たせることができる。
【0131】
また、本発明に係る建物の柱の据付構造においては、建物基礎に植設されるアンカーボルトの据付精度を吸収して基礎プレートを建物基礎に精度よく正確に据え付けることができ、この基礎プレートにより土台上に通し柱等を精度よく安定的に建て込むことができ、柱に大きな耐荷重や引抜き耐力を付与して土台上に据え付けることができる。
【0132】
さらに、本発明に係る建物の柱の据付構造では、基礎プレートの使用により、柱を土台上に精度よく正確に補強して建て込み、建物基礎に締着させることができ、アンカーボルトの据付位置精度誤差を吸収し、高い据付精度で柱を土台上に立設でき、木造建築物の施工を簡単かつ容易に行なうことができる。
【図面の簡単な説明】
【図1】本発明に係る建物の柱の据付構造の第1実施形態を示す図。
【図2】図1を上方から見た平面図。
【図3】本発明に係る建物の柱の据付構造に用いられる基礎プレートの平面図。
【図4】図3のIV−IV線に沿う基礎プレートの側断面図。
【図5】本発明に係る建物の柱の据付構造に用いられる柱締着機構(柱緊結手段)を示す斜視図。
【図6】柱締着機構の柱脚金具と柱への取付関係を示す斜視図。
【図7】本発明に係る建物の柱の据付構造の第2実施形態を示す図。
【図8】図7に示された柱の据付構造の平面図。
【図9】建物基礎に植設されるアンカーボルトの据付位置精度誤差を吸収可能な基礎プレートを示す部分的平面図。
【図10】第2実施形態に示された建物の柱の据付構造の変形例を示す図。
【図11】図10に示された柱の据付構造の平面図。
【図12】本発明に係る建物の柱の据付構造の第3実施形態を示す図。
【図13】図12に示された柱の据付構造を上方から見た平面図。
【図14】(A)は建物基礎に植設されるアンカーボルトを示す図、(B)はアンカーボルトのボルトヘッド側から見た図。
【図15】木造建築物の通し柱等に取り付けられる引寄せ金具としてのホールダウン金具を示す斜視図。
【図16】ホールダウン金具の第1変形例を示す斜視図。
【図17】ホールダウン金具の第2変形例を示す斜視図。
【図18】本発明に係る建物の柱の据付構造の第4実施形態を示す図。
【図19】図18に示された柱の据付構造を上方から見た平面図。
【図20】本発明に係る建物の柱の据付構造の第5実施形態を示す図。
【図21】第5実施形態の柱の据付構造を示す分解斜視図。
【図22】第5実施形態の柱の据付構造に用いられる基礎プレートの平面図。
【図23】図22のXXIII−XIII線に沿う側断面図。
【図24】図22のXXIV−XIV線に沿う側断面図。
【図25】本発明に係る建物の柱の据付構造の第6実施形態を示す斜視図。
【図26】第6実施形態に示された柱の据付構造の分解斜視図。
【図27】第6実施形態の柱の据付構造を示す組付け状態図。
【図28】第6実施形態に示された柱の据付構造の変形例を示す組付け状態図。
【図29】本発明の建物の柱の据付構造で用いられるI型形状の平盤状基礎プレートを示す平面図。
【図30】図29に示された基礎プレートの側面図。
【符号の説明】
10 木造建築物
11 柱
12 建物基礎(布基礎)
13 アンカーボルト
14 土台
15,15A 基礎プレート
17 柱脚金具(接合金具)
18 座付き締付ボルト
19 柱締着機構(柱締着手段、柱緊結手段)
21 取付用凹部
22 据付用凹部
23,24 ボルト挿通口
28 据付ナット
33 ボルトヘッド
35 基板(取付板)
36 基準板
37 補強板
43 ガイドメンバ(ロケットピン)
50 引寄せ締付手段
51,52,52A アンカーボルト
53 ボルト貫通穴
54 ホールダウン金具
55 取付板
56 取付ブラケット
57 補強リブ
58 ボルト挿通孔
60 締付ナット
62 据付ナット
65 アンカーボルト
67 柱継手手段
70 引寄せ締付手段
71 ホールダウン金具(引寄せ金具)
72 座付き締付ボルト
73 ボルトヘッド
74 取付板
75 取付ブラケット
76 補強リブ
77 ボルト挿通孔
78 締付ナット
80 アンカーボルト
81 柱締着手段(柱締着機構)
82 貫通穴
84 プレート本体
85 基礎プレート
86 アンカーボルト
87 座金
88 締付ナット
91 取付用凹部
92 ボルト挿通孔
93 貫通穴
95 据付用凹部
96 据付ナット
100 柱締着手段(柱締着機構)
104 プレート本体
105 基礎プレート
106,107 ボルト挿通口
108 基礎プレートスペーサ
109 締付ナット
110 基礎パッキン
111 間隙
113 引寄せ締付手段
114 ホールダウン金具
115 アンカーボルト
116 締付手段
117 取付ブラケット[0001]
BACKGROUND OF THE INVENTION
The present invention secures a wooden building pillar to a building foundation. For installation structure of building pillars Related.
[0002]
[Prior art]
Wooden houses are characterized by a high degree of freedom in design plans. However, when it comes to a wooden house with a large living room or atrium, a structural plan is fundamentally needed due to problems with building strength.
[0003]
A wooden structure is a frame made of a combination of various joints and processed lumber, so the wood itself must have sufficient cross-sectional strength, but the joints are also subject to the stress acting on these joints. It needs to be strong enough to withstand.
[0004]
In addition, because Japan is an earthquake-prone country and the needs of consumers are diversified and sophisticated, the wooden structures that are built have sufficient earthquake resistance, are easy to construct, and are structurally safe. A rich building is desired.
[0005]
In addition, the Building Standard Law has been revised, and the opportunity to install pillars on the foundation using hole-down hardware is increasing in order to improve the structural safety of wooden buildings.
[0006]
Hole-down hardware is attached to the side of a pillar such as a street pillar, while the hole-down hardware is fastened (tightened) to the base with a fastening bolt such as a seat bolt to improve the pull-out strength of the pillar against earthquakes. I am letting.
[0007]
However, the strength of the foundation itself is not necessarily sufficient in the fastening between the pillars and the foundation of the wooden architecture, so the shear failure of the foundation occurs before the building itself breaks down, and the wooden construction is subject to a major earthquake. However, it was difficult to ensure sufficient pulling strength withstandability.
[0008]
For this reason, it is considered to install wooden architectural pillars on the building foundation. In this case, measures are taken to improve the pull-out strength of the column by directly fastening the hole-down hardware attached to the side of the column to the anchor bolts planted on the building foundation to join the column to the base.
[0009]
[Problems to be solved by the invention]
In conventional wooden buildings, the pillars are installed on the base using hole-down hardware to improve the pull-out strength of the pillars. However, it is difficult to provide sufficient pulling strength that can withstand a large earthquake in a pillar-base joint structure in which a pillar is fastened to a base using a hole-down hardware and joined.
[0010]
In addition, in order to fasten and join wooden architectural pillars to the foundation of a building via a base, an installation structure of the pillar of the building in which the pillar and the base are joined using anchor bolts and hole-down hardware is considered.
[0011]
However, in this building column installation structure, the anchor bolt is planted with an accuracy of about several mm (5 mm) at most, and the position accuracy of the anchor bolt installation (planting) position is poor. On the other hand, pillars such as through pillars are required to be erected with high accuracy of, for example, about 1 mm or less on a foundation laid on the foundation of the building. It was difficult to install anchor bolts on the foundation with high accuracy. When the column was installed on the foundation of the building using anchor bolts, the accuracy of the column installation position deteriorated, and the column installation accuracy was affected by the anchor bolt installation accuracy.
[0012]
The present invention has been made in consideration of the above-described circumstances, and can secure a wooden building pillar to a building foundation and can impart a large pulling strength to the pillar, and has high structural safety. The installation structure of the pillars of the building The purpose is to provide.
[0013]
Another object of the present invention is to fix a pillar of a wooden building to a building foundation by using anchor bolts and a foundation plate, and to provide a large pulling strength to the pillar and to provide a high structural safety for the pillar of the building. To provide.
[0014]
Still another object of the present invention is to simplify and facilitate the construction of a wooden building, while absorbing the positional accuracy error associated with the installation of anchor bolts and allowing the column to stand on the foundation with high installation accuracy. The installation structure of the pillars of the building In offer.
[0015]
[Means for Solving the Problems]
In order to solve the above-described problem, the building pillar installation structure according to the present invention is a building installed on a foundation of a building, and a column is erected on the foundation, as described in claim 1. In the pillar installation structure, a flat plate-like foundation plate, the installation position of which is fixed by an installation nut to an anchor bolt planted on the foundation of the building, and a pillar on the foundation plate via the foundation. Column fastening means for fastening, and the foundation plate has a plate surface Or on the back At the side of the mounting recess that opens and the side of this mounting recess On the opposite plate surface A bolt insertion opening having a diameter larger than the bolt diameter is formed in the mounting recess and the mounting recess, and the column fastening means is integrated with the lower end of the column. It is constructed by assembling a column base bracket provided and a fastening bolt for attaching this column base bracket to the foundation plate, and the bolt head is stored with its bolt head being prevented from rotating in a mounting recess of the foundation plate. It was inserted loosely into the bolt insertion port of the mounting recess with play, passed through the through hole of the base, fastened to the column base metal fitting, and the column leg was fastened to the base plate side by the column fastening means and installed. Is.
[0016]
Moreover, in order to solve the above-mentioned problem, the building column installation structure according to the present invention is described in
[0017]
Furthermore, in order to solve the above-described problems, a structure for installing a pillar of a building according to the present invention is mounted by attaching a seating bolt to a base plate of the column base metal fitting, as described in
[0018]
Furthermore, in order to solve the above-described problems, the installation structure of a building pillar according to the present invention is: Claim 5 As described in the above, a drawing tightening means is provided on the side of the pillar, and the drawing tightening means is a structure in which the pillar is fastened to a foundation plate or a building foundation, Claim 6 As described above, the draw tightening means is configured by combining a hole-down fitting attached to the side surface of the column and an anchor bolt for drawing the hole-down fitting to the base side.
[0019]
Furthermore, in order to solve the above-described problems, the building pillar installation structure according to the present invention includes: Claim 7 As described above, anchor bolts that are fastened to the hole-down fittings with fastening nuts are provided with installation nuts in the middle, and the foundation plate is installed on the building foundation with the installation nuts, and the anchor bolts are in the middle. The tip is fastened in two steps to the base plate and hole-down fitting.
[0027]
According to the present invention Of building pillar installation structure Embodiments will be described with reference to the accompanying drawings.
[0028]
FIG. 1 and FIG. 2 are views showing a first embodiment of a building pillar installation structure according to the present invention, and FIG. 1 fastens a
[0029]
In the
[0030]
Building foundation 12
[0031]
A
[0032]
By this
[0033]
Further, when a pulling load is applied to the
[0034]
Incidentally, as shown in FIGS. 3 and 4, the
[0035]
The
[0036]
Further, a
[0037]
[0038]
Also, a similar
[0039]
When the
[0040]
Even if the
[0041]
At that time, the
[0042]
The
[0043]
On the other hand, the
[0044]
The
[0045]
The
[0046]
As shown in FIG. 5, the front end of the
[0047]
The
[0048]
As shown in FIG. 5, the
[0049]
In addition, a reinforcing
[0050]
The
[0051]
On the other hand, a mounting
[0052]
Thus, the
[0053]
After the
[0054]
Next, the procedure of joining the
[0055]
In order to install the
[0056]
After that, the
[0057]
After the
[0058]
Thereafter, the
[0059]
Subsequently, the lower end portion of the
[0060]
Further, by standing the
[0061]
For this reason, the
[0062]
7 and 8 are views showing a second embodiment of a building column installation structure according to the present invention.
[0063]
The column installation structure in the
[0064]
In the example shown in this embodiment, one of the pair of
[0065]
In the hole-down metal fitting 54, an
[0066]
By forming the hole diameter of the
[0067]
The
[0068]
In this case, as shown in FIG. 9, even if the
[0069]
The column fastening means 19 for fastening the
[0070]
Further, the
[0071]
10 and 11 show a modification of the building column installation structure shown in the second embodiment.
[0072]
In the
[0073]
In this case, the upper half portion of the
[0074]
In addition, the
[0075]
By fixing the
[0076]
12 and 13 are views showing a third embodiment of a building column installation structure according to the present invention.
[0077]
Also in the
[0078]
Also in this
[0079]
However, in this case, the central recess of the
[0080]
The
[0081]
Further, the
[0082]
A pair of pulling and tightening means 70 are provided facing both sides of the
[0083]
The
[0084]
Further, as shown in FIG. 15, the hole-
[0085]
The hole-down
[0086]
Since the
[0087]
In the
[0088]
Further, the pulling force acting on the
[0089]
Further, a normal compressive load and bending moment acting on the
[0090]
Further, as shown in FIG. 15, the hole-down metal fitting 71 used for the pulling and tightening means 70 is provided with the reinforcing
[0091]
18 and 19 show a fourth embodiment of a building column installation structure according to the present invention.
[0092]
In the
[0093]
Since the
[0094]
The
[0095]
The diameter of the
[0096]
In addition, the hole diameter formed in the
[0097]
In this building column installation structure, the load acting on the
[0098]
18 and 19 show an example in which one drawing tightening means 70 is provided on the side surface of the
[0099]
Further, the column fastening means 81 has shown an example in which the
[0100]
However, a male screw can be engraved on the entire upper half of the
[0101]
20 and 21 show a fifth embodiment of a building column installation structure according to the present invention.
[0102]
The
[0103]
In the
[0104]
On the other hand, a
[0105]
In the seated tightening
[0106]
On the other hand, the
[0107]
Further, a column fastening means 100 is constituted by the
[0108]
The
[0109]
As shown in FIG. 22, the
[0110]
[0111]
By forming the
[0112]
In this case, it is desirable that the
[0113]
Also in the installation structure of the
[0114]
In the fifth embodiment, the
[0115]
Further, the
[0116]
Further, the
[0117]
25, 26, and 27 show a sixth embodiment of a building column installation structure according to the present invention.
[0118]
In this embodiment, an L-shaped
[0119]
Further, in order to stably install the
[0120]
In the installation structure of the
[0121]
Reference numeral 110 denotes a foundation packing interposed between the
[0122]
FIG. 28 shows a modification of the building column installation structure shown in the sixth embodiment.
[0123]
The
[0124]
Also in the column installation structure shown in FIG. 28, the
[0125]
29 and 30 show an I-shaped
[0126]
This
[0127]
Also in the column installation structure using the
[0128]
In the foundation plate shown in each embodiment of the building pillar installation structure of the present invention, the bolt insertion hole formed on the foundation plate is a circular hole larger than the bolt diameter of the anchor bolt or the fastening bolt with a seat. Although the formed example was shown, the bolt insertion port is not limited to the circular hole. The bolt insertion hole may be a long hole, a long circular hole, an elliptical hole, or a rectangular hole. However, the bolt insertion opening has a size necessary to absorb the installation position error of the anchor bolt.
[0129]
Further, in the building column installation structure according to the present invention, the example in which the base plate is formed in the I shape and the L shape has been shown. However, in addition to the I shape and the L shape, the foundation plate has a T shape or a cross shape. It may be formed.
[0130]
【The invention's effect】
According to the present invention For installation structure of building pillars In this case, a pillar such as a through pillar that is erected on the foundation is fastened to the foundation plate, and it is installed and fastened to the building foundation via this foundation plate, so that the pillar is drawn from the building foundation side. It can be attached to the building foundation with a large pulling strength, improving the load-bearing capacity of the pillar and giving the wooden structure high structural safety.
[0131]
Further, according to the present invention For installation structure of building pillars The foundation plate can be accurately and accurately installed on the building foundation by absorbing the installation accuracy of the anchor bolts that are planted on the building foundation. It can be built, and can be installed on the foundation with a large load resistance and pulling strength.
[0132]
Furthermore, in the building column installation structure according to the present invention, the use of the foundation plate enables the pillar to be reinforced and built on the foundation accurately and accurately, and fastened to the building foundation. The accuracy error is absorbed, and the column can be erected on the base with high installation accuracy, so that the construction of the wooden building can be performed easily and easily.
[Brief description of the drawings]
FIG. 1 is a diagram showing a first embodiment of a building column installation structure according to the present invention.
FIG. 2 is a plan view of FIG. 1 viewed from above.
FIG. 3 is a plan view of a foundation plate used in a building column installation structure according to the present invention.
4 is a side sectional view of the base plate taken along line IV-IV in FIG. 3;
FIG. 5 is a perspective view showing a column fastening mechanism (column fastening means) used in a building column installation structure according to the present invention.
FIG. 6 is a perspective view showing a mounting relationship between a column base bracket and a column of a column fastening mechanism.
FIG. 7 is a diagram showing a second embodiment of a building column installation structure according to the present invention.
8 is a plan view of the column installation structure shown in FIG. 7. FIG.
FIG. 9 is a partial plan view showing a foundation plate capable of absorbing an installation position accuracy error of an anchor bolt installed in a building foundation.
FIG. 10 is a view showing a modification of the building column installation structure shown in the second embodiment.
11 is a plan view of the column installation structure shown in FIG. 10. FIG.
FIG. 12 is a diagram showing a third embodiment of a building column installation structure according to the present invention.
13 is a plan view of the pillar installation structure shown in FIG. 12 as viewed from above.
14A is a view showing an anchor bolt to be planted on a building foundation, and FIG. 14B is a view of the anchor bolt as viewed from the bolt head side.
FIG. 15 is a perspective view showing a hole-down fitting as a drawing fitting attached to a through pillar or the like of a wooden building.
FIG. 16 is a perspective view showing a first modification of the hole-down fitting.
FIG. 17 is a perspective view showing a second modification of the hole-down fitting.
FIG. 18 is a diagram showing a fourth embodiment of a building column installation structure according to the present invention.
FIG. 19 is a plan view of the pillar installation structure shown in FIG. 18 as viewed from above.
FIG. 20 is a diagram showing a fifth embodiment of a building pillar installation structure according to the present invention.
FIG. 21 is an exploded perspective view showing the pillar installation structure of the fifth embodiment.
FIG. 22 is a plan view of a base plate used in the column installation structure of the fifth embodiment.
23 is a side sectional view taken along line XXIII-XIII in FIG.
24 is a side sectional view taken along line XXIV-XIV in FIG.
FIG. 25 is a perspective view showing a sixth embodiment of a building column installation structure according to the present invention.
FIG. 26 is an exploded perspective view of the column installation structure shown in the sixth embodiment.
FIG. 27 is an assembled state diagram showing the column installation structure of the sixth embodiment.
FIG. 28 is an assembled state diagram showing a modification of the column installation structure shown in the sixth embodiment.
FIG. 29 is a plan view showing an I-shaped flat plate-like foundation plate used in the building column installation structure of the present invention.
30 is a side view of the foundation plate shown in FIG. 29. FIG.
[Explanation of symbols]
10 Wooden buildings
11 pillars
12 Building foundation (cloth foundation)
13 Anchor bolt
14 Foundation
15,15A foundation plate
17 Column base bracket (joint bracket)
18 Clamping bolt with seat
19 Column fastening mechanism (column fastening means, column fastening means)
21 Mounting recess
22 Recess for installation
23, 24 Bolt insertion port
28 Installation nut
33 Bolt head
35 Substrate (mounting plate)
36 Reference plate
37 Reinforcing plate
43 Guide member (rocket pin)
50 Pulling and tightening means
51, 52, 52A Anchor bolt
53 Bolt through hole
54 hole down metal fittings
55 Mounting plate
56 Mounting bracket
57 Reinforcement rib
58 Bolt insertion hole
60 Tightening nut
62 Installation nut
65 Anchor bolt
67 Column joint means
70 Pulling tightening means
71 Hole-down bracket (drawer bracket)
72 Clamping bolt with seat
73 Bolt head
74 Mounting plate
75 Mounting bracket
76 Reinforcement rib
77 Bolt insertion hole
78 Tightening nut
80 Anchor bolt
81 Column fastening means (column fastening mechanism)
82 Through hole
84 Plate body
85 foundation plate
86 Anchor bolt
87 Washer
88 Tightening nut
91 Mounting recess
92 Bolt insertion hole
93 Through hole
95 Recess for installation
96 Installation nut
100 Column fastening means (column fastening mechanism)
104 Plate body
105 foundation plate
106,107 Bolt insertion hole
108 Foundation plate spacer
109 Tightening nut
110 Foundation packing
111 gap
113 Tightening means
114 hole down metal fittings
115 anchor bolt
116 Tightening means
117 Mounting bracket
Claims (7)
前記建物基礎に植設されたアンカーボルトに据付ナットで、据付位置が調節可能に固定される平盤状の基礎プレートと、
この基礎プレート上に前記土台を介して柱を締着させる柱締着手段とを備え、
前記基礎プレートは、プレート表面または裏面に開口する据付用凹部とこの据付用凹部の側方で反対側のプレート面に開口する取付用凹部とを有し、上記据付用凹部および取付用凹部にボルト径より大きな径を有するボルト挿通口が形成される一方、
前記柱締着手段は、柱の下端部に一体的に設けられる柱脚金具と、この柱脚金具を基礎プレートに取り付ける締付ボルトとを組み立てて構成され、上記締付ボルトは、そのボルトヘッドが基礎プレートの取付凹部に廻り止めされて収納され、上記取付凹部のボルト挿通口に遊びをもって緩く挿通されて前記土台の貫通穴を通り、前記柱脚金具に締着され、前記柱締着手段により柱の脚部を基礎プレート側に緊結させ、据え付けたことを特徴とする建物の柱の据付構造。In the installation structure of the pillar of the building where the foundation is installed on the foundation of the building and the pillar is erected on this foundation,
A flat plate-like foundation plate, the installation position of which is fixed by an installation nut to an anchor bolt planted in the building foundation; and
Column fastening means for fastening the column on the foundation plate via the foundation,
The base plate has a mounting recess that opens on the front or back surface of the plate and a mounting recess that opens on the opposite side of the plate on the side of the mounting recess. Bolts are mounted on the mounting recess and the mounting recess. While a bolt insertion opening having a diameter larger than the diameter is formed,
The column fastening means is constructed by assembling a column base metal fitting integrally provided at the lower end portion of the column and a fastening bolt for attaching the column base metal fitting to the foundation plate, and the fastening bolt is a bolt head thereof. Is secured to the mounting recess of the foundation plate, is loosely inserted into the bolt insertion port of the mounting recess with play, and passes through the through hole of the base, and is fastened to the column base metal fitting, and the column fastening means The building column installation structure is characterized in that the column legs are fastened to the foundation plate side and installed.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2001260169A JP3614803B2 (en) | 2001-08-29 | 2001-08-29 | Building pillar installation structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2001260169A JP3614803B2 (en) | 2001-08-29 | 2001-08-29 | Building pillar installation structure |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2003064770A JP2003064770A (en) | 2003-03-05 |
| JP3614803B2 true JP3614803B2 (en) | 2005-01-26 |
Family
ID=19087411
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2001260169A Expired - Fee Related JP3614803B2 (en) | 2001-08-29 | 2001-08-29 | Building pillar installation structure |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3614803B2 (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2007262800A (en) * | 2006-03-29 | 2007-10-11 | Nice Corp | Portal rigid-frame structure member and portal rigid-frame structure using this member |
| JP5385314B2 (en) * | 2011-01-26 | 2014-01-08 | 義邦 大倉 | Connected structure |
| JP7228259B2 (en) * | 2020-03-27 | 2023-02-24 | 株式会社ストローグ | Column base hardware |
-
2001
- 2001-08-29 JP JP2001260169A patent/JP3614803B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JP2003064770A (en) | 2003-03-05 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US20170058505A1 (en) | Moment Resisting Kneewall Connector | |
| JP3614803B2 (en) | Building pillar installation structure | |
| JP3488870B2 (en) | Pillar bracket | |
| ES2224145T3 (en) | ELEMENT FOR MOUNTING BEFORE A WALL. | |
| JP2002227301A (en) | Framework structure for wooden building | |
| JP3022169U (en) | Joining hardware for wooden construction | |
| JPS5844167Y2 (en) | Connection member for fastening frame fittings in wooden buildings | |
| JPH0743287Y2 (en) | Supporting structure of columns in wooden buildings | |
| JP2003278281A (en) | Setting structure of column of building | |
| JP2005344492A (en) | Earthquake resistance reinforcing method for wooden house, metal fitting used for the same and device for preventing pillar from falling out | |
| JP2013002171A (en) | Reinforcement hardware for construction | |
| JPH0235142A (en) | Metal member for structure of building | |
| JPH0354521Y2 (en) | ||
| CA2939792C (en) | Moment resisting kneewall connector | |
| JP2022041223A (en) | Column base hardware | |
| JP2008014123A (en) | Vertical lumber member installation hardware | |
| JP3597981B2 (en) | Connection structure of assembly foundation | |
| JPS5937382B2 (en) | building handrail | |
| JP4837393B2 (en) | Column and foundation joining device | |
| KR200402300Y1 (en) | Connecting structure of sectional partition | |
| JPS6324734Y2 (en) | ||
| JP2642839B2 (en) | Column fixed structure in wooden prefabricated building | |
| JPH02296942A (en) | Fixing device for column leg portion of wood column | |
| JP2003096921A (en) | Column base fixture | |
| JP3406969B2 (en) | Seismic reinforcement structure and its construction method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20040226 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20040309 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20040510 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20040713 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20040805 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20041026 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20041027 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20081112 Year of fee payment: 4 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20091112 Year of fee payment: 5 |
|
| S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
| S533 | Written request for registration of change of name |
Free format text: JAPANESE INTERMEDIATE CODE: R313533 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20091112 Year of fee payment: 5 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20101112 Year of fee payment: 6 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20101112 Year of fee payment: 6 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111112 Year of fee payment: 7 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20121112 Year of fee payment: 8 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20121112 Year of fee payment: 8 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20131112 Year of fee payment: 9 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| LAPS | Cancellation because of no payment of annual fees |