Construction method of waste disposal site Download PDFInfo
- Publication number
- JP3663945B2 JP3663945B2 JP34995398A JP34995398A JP3663945B2 JP 3663945 B2 JP3663945 B2 JP 3663945B2 JP 34995398 A JP34995398 A JP 34995398A JP 34995398 A JP34995398 A JP 34995398A JP 3663945 B2 JP3663945 B2 JP 3663945B2
- Authority
- JP
- Japan
- Prior art keywords
- tunnel
- waste disposal
- disposal site
- tunnels
- guide
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02W—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
- Y02W30/00—Technologies for solid waste management
- Y02W30/30—Landfill technologies aiming to mitigate methane emissions
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
- Processing Of Solid Wastes (AREA)
Description
【0001】
【発明の属する技術分野】
この発明は、廃棄物処分場の構築工法に関し、特に、既設廃棄物処分場の補修などに適した構築工法に関するものである。
【0002】
【従来の技術】
原子力発電所,大学や企業の実験室,医療施設などで使用した作業着や手袋などの低レベル放射性廃棄物の処分方法として、先端が不透水地盤に到達する閉止した断面を有する遮水壁を構築し、この遮水壁の内部を掘削して、低レベル放射性廃棄物を収納した鉄筋コンクリート製や鋼板製の密閉容器を埋設する方法がある。
【0003】
ところが、このような廃棄物処分場の構築工法には、以下に説明する技術的な課題があった。
【0004】
【発明が解決しようとする課題】
すなわち、放射性廃棄物は、半減期が非常に長く、放射線が半減する期間中に、鉄筋コンクリート製や鋼板製の密閉容器が劣化して、内部の汚染物が拡散する恐れがある。
【0005】
一方、この種の放射性廃棄物を収納する処分場は、通常、不透水性の岩盤中に構築されるが、岩盤構造は、非常に複雑であって、性状を広範囲に亙り正確に把握することが難しく、亀裂などが存在している可能性があり、このような亀裂から放射線が場外に漏出すると、社会,環境に悪影響を与える。
【0006】
このような不都合が発生する恐れがある場合には、一般的には、埋設されている廃棄物を掘り出して、他の処分場に移設することになるが、移設する際には、人手を介在させた掘削作業などが行われることになり、このような廃棄物処分場が、通常、放射線管理区域内であるので、立ち入りに制約を受けて、移設作業に長い時間がかかるという問題がある。
【0007】
なお、このような問題は、低レベルの放射性廃棄物の処分場だけのものでなく、例えば、重金属などの有害汚染物質を投棄した廃棄物処分場においても同様な不都合が発生する恐れがあり、不都合を解消する際には、低レベルの放射性廃棄物の処分場と同様な技術的な課題があった。
【0008】
本発明は、このような従来の問題点に鑑みてなされたものであって、その目的とするところは、既設廃棄物処分場において汚染物の漏出ないしは漏出可能性などの不都合がある場合に、迅速にその不都合を解決することができる廃棄物処分場の構築工法を提供することにある。
【0009】
【課題を解決するための手段】
上記目的を達成するために、本発明は、岩盤中に構築された既設廃棄物処分場の側面側の地盤中に、当該廃棄物処分場の側面を覆うようにして、一対の止水性垂直壁を対向するように構築するとともに、前記既設廃棄物処分場の下面側の岩盤地盤中に、当該廃棄物処分場の底面を覆うようにして、両端が前記止水性垂直壁に連結した水平遮水体を構築する廃棄物処分場の構築工法であって、前記水平遮水体は、多数のトンネルを水平方向に連結した形態で形成され、当該水平遮水体は、複数のトンネルを水平方向に連結した状態での掘進が可能なトンネルボーリングマシンにより構築し、前記複数のトンネルは、形成が終了した先行トンネル内にガイド部を挿入して、当該先行トンネルをガイド用トンネルとして順次水平方向に連結形成するようにした。
このように構成した廃棄物処分場の構築工法によれば、既設廃棄物処分場の側面側の地盤中に止水性垂直壁を構築し、既設廃棄物処分場の下面側の地盤中に、当該廃棄物処分場の底面を覆うようにして、両端が止水性垂直壁に連結した水平遮水体を構築するので、既設廃棄物処分場から汚染物の漏出ないしはその可能性を排除することができる。
この場合、本発明の構築工法では、水平遮水体は、複数のトンネルを水平方向に連結した状態での掘進が可能なトンネルボーリングマシンにより構築するので、既設廃棄物処分場に投棄されている低レベル放射線廃棄物や有害物質を含む廃棄物を別の場所に移設する必要がない。
また、複数のトンネルは、形成が終了した先行トンネルの側方からガイド部を挿入して、当該先行トンネルをガイド用トンネルとして順次水平方向に連結形成するので、多数のトンネルを確実に水平方向に連結することができる。
前記トンネルボーリングマシンは、相互に水平方向に連結された一対のトンネル掘進部と、いずれか一方のトンネル掘進部の側方に着脱自在に装着され、前記ガイド用トンネル内に挿入設置されるガイド部とで構成することができる。
この構成によれば、一対のトンネル掘進部で地山を掘進する際に、ガイド用トンネル内に挿入設置されるガイド部によりその方向が規制,案内されるので、多数のトンネルを精度よく形成することができる。
前記トンネルは、前記トンネルボーリングマシンで掘進形成する際に、前記ガイド用トンネルとなる部分以外に、掘進の進行に伴って順次コンクリートまたはベントナイトを充填することができる。
この構成によれば、掘進の進行に伴って、ガイド用トンネル以外の部分に順次コンクリートまたはベントナイトを充填するので、水平遮水体の形成能率が向上する。
【0010】
【発明の実施の形態】
以下、本発明の好適な実施の形態について、添付図面に基づいて詳細に説明する。図1から図6は、本発明にかかる廃棄物処分場の構築工法の一実施例を示している。
【0011】
同図に示した廃棄物処分場の構築工法では、図1に示すように、既設廃棄物処分場10の側面側の地盤12中に、この既設廃棄物処分場10の側面を覆うようにして、一対の止水性垂直壁14が対向するように構築される。
【0012】
既設廃棄物処分場10には、既に低レベル放射性廃棄物や有害金属を含む廃棄物が投棄されている。この止水性垂直壁14は、地中連続壁工法やグラウチング壁工法などにより形成される。
【0013】
止水性垂直壁14が形成されると、既設廃棄物処分場10の下面側の地盤12中に、既設廃棄物処分場10の底面を覆うようにして、両端が止水性垂直壁14に連結された水平遮水体16が構築される。
【0014】
この水平遮水体16は、多数のトンネル18を水平方向で相互に連結したものであって、このトンネル18は、後述するトンネルボーリングマシン20を用いて形成される。
【0015】
図2には、トンネル18の形成方法の一例が示されている。図2に示した例では、既設廃棄物処分場10の一端側(止水性垂直壁14が形成されていない方向の端部)に、発進立坑22が所定深度まで形成される。
【0016】
トンネルボーリングマシン20は、この発進立坑22の下端側からほぼ水平に発進され、既設廃棄物処分場10の下方を水平に掘進した後に、上り勾配、例えば、45%程度を経て地上に到達する。
【0017】
地上側に到達したトンネルボーリングマシン20は、発進立坑22の側に移送され、同じように掘進させることで、水平方向に相互に連結した複数のトンネル18が形成される。
【0018】
なお、この場合、発進立坑22の対向位置に到達立坑24を形成することもでき、発進および到達立坑22,24の双方を形成すると、水平方向に掘進させてトンネル18を形成して到達した側のいずれか一方の立坑内で、トンネルボーリングマシン20の方向転換を行わせると、1台のマシンを効率良く稼動させて、水平遮水体16を形成することができる。
【0019】
また、図2に示した例では、発進ないしは到達立坑22,24は、個別のものではなく、例えば、構築しようとする水平遮水体16の幅に合せた溝状に形成することもできる。
【0020】
水平遮水体16の両端側に位置する一対のトンネル18は、止水性垂直壁14と連結するように形成される。この連結手段としては、例えば、トンネルボーリングマシン20で掘進する際に、止水性垂直壁14の一部を削り採るようにして掘削し、コンクリートやモルタルを掘削されたトンネル18内に充填することにより、両者を一体化させる。
【0021】
一方、水平遮水体16の両端側以外の部分に位置する複数のトンネル18は、外周側の一部同士が相互に連結するように形成される。本実施例の場合には、トンネルボーリングマシン20は、複数のトンネル18を水平方向に連結した状態での掘進が可能に構成されている。
【0022】
すなわち、水平遮水体16を形成するためのボーリングマシン20は、図4,5に示すように、一対のトンネル掘進部26,28と、ガイド部30とを備えている。
【0023】
各トンネル掘進部26,28は、先端側に回転駆動されるカッターディスク26a,28aが回転自在に設けられた円筒状のスキンプレート26b,28bを有している。
【0024】
カッターディスク26a,28aは、掘削可能な範囲が外周で一部重複するようになっていて、これらのディスク26a,28aの掘削断面は、円形断面の外周を相互に重複した状態に掘削される。
【0025】
スキンプレート26b,28b同士は、図5に示すように、外周側の一部が連結されている。各スキンプレート26b,28b内には、マシン20を前進させる図示省略のスラストジャッキなどが設けられ、
また、各スキンプレート26b,28bの外周側には、マシン20を掘進進させる際に、地山側に突出して、掘進反力を採る図示省略のグリッパが配置されている。
【0026】
本実施例のトンネルボーリングマシン20では、各スキンプレート26b,28b内に設けられている排土用配管26c,28cおよび電力線26d,28dは、スキンプレート26b,28b間の連結部分の後部側で一方に集められ、一方のスキンプレート26b側にのみ設けられた後方台車26eに結合されている。
【0027】
また、後方台車26eの後方側には、スキンプレート26b,28b間の連結部分を塞ぐ移動式型枠32が設置され、型枠32内にコンクリートないしはベントナイトを充填する配管34が設けられている。
【0028】
一方、ガイド部30は、円弧状のガイドプレート30aと、ガイドプレート30aの外周面に設けられ、掘削されたトンネル18の内壁面に沿って転動する複数のガイドローラ30bとを備え、ガイドプレート30aが一方のトンネル掘進部28のスキンプレート28bの側方に着脱自在に結合されている。
【0029】
このガイド部30は、後述するように、先行トンネル18内に挿入設置されて、トンネル掘進部26,28の掘進方向を位置決め規制する。水平遮水部16のトンネル18を連結形成する際には、まず、図3(A)に示すように、トンネルボーリングマシン20のガイド部30を除去した状態で、2連状態の先行トンネル18a,18bが形成される。
【0030】
このとき、一方のトンネル18a内には、移動式型枠32を用いて、トンネル18a,18bを掘進形成しながら、後部側で順次トンネル18a内にコンクリートないしはベントナイトを充填する作業が行われる(図3(B)参照)。
【0031】
そして、先行トンネル18a,18bの形成が終了すると、今度は、図3(C)に示すように、トンネルボーリングマシン20のガイド部30をスキンプレート28bに連結した状態で掘進が行われる。
【0032】
このとき、ガイド部30は、先行トンネル18bをガイド用トンネルとして、その内部に挿入設置され、トンネル18bの側方側において、水平方向に相互に連結したトンネル18c,18dを形成する。
【0033】
トンネル18c,18dを形成する際には、トンネル18c,18dを掘進形成しながら、後部側で順次トンネル18b,18c内にコンクリートないしはベントナイトを充填する作業が行われる(図3(D)参照)。
【0034】
以後は、コンクリートないしはベントナイトを充填していない端部側のトンネルをガイド用トンネルとして、その内部にガイド部30を挿入設置して同様の工程を繰り返すことにより、水平遮水体16を形成するトンネル18が形成される。
【0035】
全てのトンネル18内にコンクリートないしはベントナイトを充填して、水平遮水体16の構築が完了すると、発進立坑22(到達立坑24)内に同様にコンクリートないしはベントナイトを充填することにより廃棄物処分場の構築が完了する。
【0036】
さて、以上のように構成した廃棄物処分場の構築工法によれば、既設廃棄物処分場10の側面側の地盤12中に止水性垂直壁14を構築し、既設廃棄物処分場10の下面側の地盤12中に、当該廃棄物処分場10の底面を覆うようにして、両端が止水性垂直壁14に連結した水平遮水体16を構築するので、既設廃棄物処分場10をこの止水性垂直壁14と水平遮水体16とで囲むことになり、既設廃棄物処分場10から汚染物の漏出ないしはその可能性を排除することができる。
【0037】
この場合、本発明の構築工法では、水平遮水体16は、複数のトンネル18を水平方向に連結した状態での掘進が可能なトンネルボーリングマシン20により構築するので、既設廃棄物処分場10に投棄されている低レベル放射線廃棄物や有害物質を含む廃棄物を別の場所に移設する必要がない。
【0038】
また、このようにして水平遮水体16を構築すると、管理区域内での作業を行う必要がなく、施工能率も大幅に向上する。
【0039】
さらに、本実施例では、多数のトンネル18は、先行トンネルをガイド用トンネルとして順次水平方向に連結形成するので、多数のトンネル18を確実に水平方向に連結することができる。
【0040】
また、本実施例の場合には、トンネルボーリングマシン20は、相互に水平方向に連結された一対のトンネル掘進部26,28と、トンネル掘進部28の側方に着脱自在に装着され、ガイド用トンネル内に挿入設置されるガイド部30とで構成しており、この構成によれば、一対のトンネル掘進部26,28で地山を掘進する際に、ガイド用トンネル内に挿入設置されるガイド部30によりその掘進方向が規制,案内されるので、複数のトンネル18を精度よく且つ効率良く連結形成することができる。
【0041】
またさらに、本実施例の場合には、トンネル18は、トンネルボーリングマシン20で掘進形成する際に、ガイド用トンネルとなる部分以外に、掘進の進行に伴って順次コンクリートまたはベントナイトを充填するようにしているので、水平遮水体16の形成能率が向上する。
【0042】
【発明の効果】
以上、実施例で詳細に説明したように、本発明にかかる廃棄物処分場の構築工法よれば、既設廃棄物処分場において汚染物の漏出ないしは漏出可能性などの不都合がある場合に、迅速にその不都合を解決することができる。
【図面の簡単な説明】
【図1】本発明にかかる廃棄物処分場の構築工法の第1実施例を示す構築完了状態の断面説明図である。
【図2】図1の廃棄物処分場でトンネルによる水平遮水体を形成する際の説明図である。
【図3】図2のトンネルを相互に連結させる方法の説明図である。
【図4】本発明の構築工法に用いるトンネルボーリングマシンでトンネルを掘進する際の説明図である。
【図5】図4のA線断面本図である。
【図6】図4のB線断面図である。
【符号の説明】
10 既設廃棄物処分場
12 地盤
14 止水性垂直壁
16 水平遮水体
18,18a〜d トンネル
20 トンネルボーリングマシン
22 発進立坑
24 到達立坑
26,28 トンネル掘進部
26a,28a カッターディスク
26b,28b スキンプレート
30 ガイド部[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a construction method for a waste disposal site, and more particularly to a construction method suitable for repairing an existing waste disposal site.
[0002]
[Prior art]
As a method of disposing of low-level radioactive waste such as work clothes and gloves used in nuclear power plants, universities and corporate laboratories, medical facilities, etc., a water-blocking wall with a closed cross-section whose tip reaches the impermeable ground There is a method of constructing and excavating the inside of the impermeable wall and burying a sealed container made of reinforced concrete or steel plate containing low-level radioactive waste.
[0003]
However, the construction method of such a waste disposal site has the following technical problems.
[0004]
[Problems to be solved by the invention]
That is, radioactive waste has a very long half-life, and there is a risk that internal fil- ters and steel plates will deteriorate during the period in which radiation is halved, and internal contaminants may diffuse.
[0005]
On the other hand, disposal sites that store this kind of radioactive waste are usually built in impervious rock masses, but the rock mass structure is very complex and must be accurately grasped over a wide range of properties. However, there is a possibility that cracks exist, and if radiation leaks out of the cracks from these cracks, it will have a negative impact on society and the environment.
[0006]
When there is a possibility that such inconvenience may occur, in general, the buried waste will be dug out and transferred to another disposal site. Such a waste disposal site is usually located in a radiation control area, so that there is a problem that it takes a long time to move due to restrictions on access.
[0007]
Such problems are not limited to low-level radioactive waste disposal sites. For example, similar inconveniences may occur in waste disposal sites where hazardous metals such as heavy metals are dumped. When solving the inconvenience, there was a technical problem similar to the disposal site of low-level radioactive waste.
[0008]
The present invention has been made in view of such conventional problems, and the object of the present invention is when there is a disadvantage such as leakage or possibility of leakage of existing contaminants at an existing waste disposal site. An object of the present invention is to provide a construction method for a waste disposal site that can quickly solve the inconvenience.
[0009]
[Means for Solving the Problems]
In order to achieve the above object, the present invention provides a pair of water-stopping vertical walls in the ground on the side of an existing waste disposal site constructed in a rock so as to cover the side of the waste disposal site. A horizontal impermeable body with both ends connected to the water-stop vertical wall so as to cover the bottom surface of the waste disposal site in the bedrock ground on the lower surface side of the existing waste disposal site The horizontal impervious body is formed in a form in which a large number of tunnels are connected in the horizontal direction, and the horizontal impervious object is a state in which a plurality of tunnels are connected in the horizontal direction. constructed by excavation capable tunnel boring machine in the plurality of tunnels formed by inserting the guide portion into the preceding tunnel ended and ligated formed sequentially horizontally the prior tunnel as a guide tunnel Was Unishi.
According to the construction method of the waste disposal site constructed in this way, a water blocking vertical wall is constructed in the ground on the side of the existing waste disposal site, and the ground on the lower surface side of the existing waste disposal site Since a horizontal impermeable body with both ends connected to a water-stop vertical wall is constructed so as to cover the bottom surface of the waste disposal site, it is possible to eliminate leakage or possibility of contamination from the existing waste disposal site.
In this case, in the construction method of the present invention, the horizontal impermeable body is constructed by a tunnel boring machine capable of excavation in a state where a plurality of tunnels are connected in the horizontal direction. There is no need to relocate waste containing level radiation waste or hazardous substances to another location.
In addition, since a plurality of tunnels are inserted in the horizontal direction sequentially as guide tunnels by inserting guide portions from the side of the preceding tunnels that have been formed , a large number of tunnels can be surely arranged in the horizontal direction. Can be linked.
The tunnel boring machine includes a pair of tunnel excavating portions connected in a horizontal direction to each other, and a guide portion that is detachably attached to a side of one of the tunnel excavating portions and is inserted into the guide tunnel. And can be configured.
According to this configuration, when excavating a natural mountain with a pair of tunnel excavation parts, the direction is regulated and guided by the guide part inserted and installed in the guide tunnel , so that a large number of tunnels can be formed with high accuracy. be able to.
When the tunnel is dug by the tunnel boring machine, concrete or bentonite can be sequentially filled with the progress of excavation in addition to the portion serving as the guide tunnel.
According to this configuration, as the excavation progresses, the portion other than the guide tunnel is sequentially filled with concrete or bentonite, so that the formation efficiency of the horizontal water shield is improved.
[0010]
DETAILED DESCRIPTION OF THE INVENTION
DESCRIPTION OF EXEMPLARY EMBODIMENTS Hereinafter, preferred embodiments of the invention will be described in detail with reference to the accompanying drawings. 1 to 6 show an embodiment of a construction method for a waste disposal site according to the present invention.
[0011]
In the construction method of the waste disposal site shown in the figure, as shown in FIG. 1, the side surface of the existing
[0012]
The existing
[0013]
When the water-stopping
[0014]
The horizontal
[0015]
FIG. 2 shows an example of a method for forming the
[0016]
The tunnel
[0017]
The tunnel
[0018]
In this case, the reaching
[0019]
In the example shown in FIG. 2, the starting or reaching
[0020]
A pair of
[0021]
On the other hand, the plurality of
[0022]
That is, the
[0023]
Each of the
[0024]
The
[0025]
As shown in FIG. 5, the
In addition, on the outer peripheral side of each
[0026]
In the
[0027]
In addition, on the rear side of the
[0028]
On the other hand, the
[0029]
As will be described later, the
[0030]
At this time, one
[0031]
Then, when the formation of the preceding
[0032]
At this time, the
[0033]
When the
[0034]
Thereafter, the tunnel on the end side not filled with concrete or bentonite is used as a guide tunnel, the
[0035]
When all the
[0036]
Now, according to the construction method of the waste disposal site constructed as described above, the water blocking
[0037]
In this case, in the construction method of the present invention, the horizontal
[0038]
Moreover, when the horizontal
[0039]
Further, in the present embodiment, the
[0040]
Further, in the case of the present embodiment, the
[0041]
Furthermore, in the case of the present embodiment, when the
[0042]
【The invention's effect】
As described above in detail in the embodiment, according to the construction method of the waste disposal site according to the present invention, when there is inconvenience such as leakage or possibility of leakage in the existing waste disposal site, The inconvenience can be solved.
[Brief description of the drawings]
FIG. 1 is a cross-sectional explanatory view of a construction completion state showing a first embodiment of a construction method for a waste disposal site according to the present invention.
FIG. 2 is an explanatory diagram when forming a horizontal impermeable body by a tunnel in the waste disposal site of FIG. 1;
FIG. 3 is an explanatory diagram of a method for interconnecting the tunnels of FIG. 2;
FIG. 4 is an explanatory diagram when a tunnel is dug with a tunnel boring machine used in the construction method of the present invention.
FIG. 5 is a cross-sectional view taken along line A in FIG.
6 is a cross-sectional view taken along line B of FIG.
[Explanation of symbols]
DESCRIPTION OF
Claims (3)
前記既設廃棄物処分場の下面側の岩盤地盤中に、当該廃棄物処分場の底面を覆うようにして、両端が前記止水性垂直壁に連結した水平遮水体を構築する廃棄物処分場の構築工法であって、
前記水平遮水体は、多数のトンネルを水平方向に連結した形態で形成され、当該水平遮水体は、複数のトンネルを水平方向に連結した状態での掘進が可能なトンネルボーリングマシンにより構築し、前記複数のトンネルは、形成が終了した先行トンネル内にガイド部を挿入して、当該先行トンネルをガイド用トンネルとして順次水平方向に連結形成することを特徴とする廃棄物処分場の構築工法。 In the ground on the side of the side of the existing waste disposal site built in the bedrock, so as to cover the side of the waste disposal site, and to build a pair of water-stop vertical walls facing each other,
Construction of a waste disposal site that constructs a horizontal impermeable body with both ends connected to the water blocking vertical wall so as to cover the bottom surface of the waste disposal site in the bedrock ground on the lower surface side of the existing waste disposal site Construction method,
The horizontal Saegimizutai is formed a plurality of tunnels in a form linked to the horizontal direction, the horizontal Saegimizutai is constructed by excavation capable tunnel boring machine in a state in which a plurality of connected tunnels in the horizontal direction, the A construction method for a waste disposal site , wherein a plurality of tunnels are formed by inserting guide portions into a preceding tunnel that has been formed and sequentially connecting the preceding tunnels as guide tunnels in the horizontal direction .
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP34995398A JP3663945B2 (en) | 1998-12-09 | 1998-12-09 | Construction method of waste disposal site |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP34995398A JP3663945B2 (en) | 1998-12-09 | 1998-12-09 | Construction method of waste disposal site |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2000167505A JP2000167505A (en) | 2000-06-20 |
| JP3663945B2 true JP3663945B2 (en) | 2005-06-22 |
Family
ID=18407228
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP34995398A Expired - Fee Related JP3663945B2 (en) | 1998-12-09 | 1998-12-09 | Construction method of waste disposal site |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3663945B2 (en) |
Family Cites Families (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2899661B2 (en) * | 1990-06-29 | 1999-06-02 | 清水建設株式会社 | Large section tunnel and its construction method |
| DE4034180A1 (en) * | 1990-10-26 | 1992-04-30 | Kunz Alfred & Co | METHOD FOR MANUFACTURING AN UNDERGROUND GASKET SOLE UNDER AN EXISTING WASTE DEPOSIT AT NIGHT |
| JP3600379B2 (en) * | 1996-09-04 | 2004-12-15 | 三菱重工業株式会社 | Tunnel excavator and excavation method |
| JP3248437B2 (en) * | 1996-10-24 | 2002-01-21 | 株式会社大林組 | Waste disposal site and its construction method |
| JP2996628B2 (en) * | 1997-04-14 | 2000-01-11 | 川崎重工業株式会社 | Double-row shield machine |
-
1998
- 1998-12-09 JP JP34995398A patent/JP3663945B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JP2000167505A (en) | 2000-06-20 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP2003516219A (en) | Advanced containment system | |
| JP5740456B2 (en) | Radioactive waste underground storage facility and construction method thereof | |
| JPH07107359B2 (en) | Underground cavity construction method and tunnel excavator | |
| JP3663945B2 (en) | Construction method of waste disposal site | |
| JP6464469B2 (en) | Radioactive waste disposal tunnel | |
| JP3533963B2 (en) | Repair and construction method of waste disposal site | |
| CN103161469A (en) | Method for excavating vertical shaft to underground repair pipe-jacking tool pipe | |
| JP3426556B2 (en) | Ground improvement device and ground improvement method | |
| JP4225245B2 (en) | Underwater tunnel structure | |
| JP3803753B2 (en) | Tunnel construction method | |
| JPS62141260A (en) | Construction method for sinking existing structure | |
| CN114592892A (en) | Implementation method for pulling out anchor cable of shield tunnel in steel sleeve in soft soil area | |
| JP2004298822A (en) | Waste disposal method | |
| JPH0468188A (en) | Execution method of tunnel widening section | |
| JP2876274B2 (en) | Pipe burial method and apparatus | |
| JP3017241B2 (en) | Waste incineration residue disposal facility and its construction method | |
| JPS63223215A (en) | In-situ concrete piling work | |
| JPS6218718B2 (en) | ||
| JPH0317397A (en) | Method and apparatus for constructing space under ground | |
| JPH02229395A (en) | Ground improving method utilizing shield excavator | |
| JPH0468190A (en) | High water pressure pipe roof method | |
| JPS6411775B2 (en) | ||
| CN116044422A (en) | Open type pipe jacking machine and construction method thereof | |
| CN116240883A (en) | Stirring pile construction method for penetrating existing underground reinforced concrete structure | |
| JPH0631863B2 (en) | Nuclear reactor abolition treatment method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20041207 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20050207 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20050308 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20050321 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080408 Year of fee payment: 3 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090408 Year of fee payment: 4 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100408 Year of fee payment: 5 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100408 Year of fee payment: 5 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110408 Year of fee payment: 6 |
|
| S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110408 Year of fee payment: 6 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120408 Year of fee payment: 7 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130408 Year of fee payment: 8 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130408 Year of fee payment: 8 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140408 Year of fee payment: 9 |
|
| LAPS | Cancellation because of no payment of annual fees |