Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP3675655B2 - Relocation and preservation of soil structures - Google Patents
[go: Go Back, main page]

JP3675655B2 - Relocation and preservation of soil structures - Google Patents

Relocation and preservation of soil structures Download PDF

Info

Publication number
JP3675655B2
JP3675655B2 JP32991198A JP32991198A JP3675655B2 JP 3675655 B2 JP3675655 B2 JP 3675655B2 JP 32991198 A JP32991198 A JP 32991198A JP 32991198 A JP32991198 A JP 32991198A JP 3675655 B2 JP3675655 B2 JP 3675655B2
Authority
JP
Japan
Prior art keywords
soil
soil block
block
peg
preservation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP32991198A
Other languages
Japanese (ja)
Other versions
JP2000154522A (en
Inventor
正博 住野
武 川地
道彦 石田
健司 柴田
雅彦 荻野
博健 今本
善通 工楽
正昭 沢田
隆久 北田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP32991198A priority Critical patent/JP3675655B2/en
Publication of JP2000154522A publication Critical patent/JP2000154522A/en
Application granted granted Critical
Publication of JP3675655B2 publication Critical patent/JP3675655B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、土工事中などに発見される遺跡、遺構等を移設して保存展示する技術に関する。
【0002】
【従来の技術】
縄文及び弥生時代のいわゆる古代、あるいはより以前の旧石器時代より近代に至る長年月にわたって、我々祖先の人類が営々と築き上げた墳墓、灌漑水路、堤体、住居等の遺跡や遺構などは、現代における考古学や人類学など学問上の貴重な文化財であるだけでなく、原型を保って維持しながら将来に向けて保存活用し、多くの人々に展示開放するべき性質のものである。
【0003】
これらの遺跡や遺構などを展示保存する場合、従来では、それら遺跡や遺構の表面にウレタン樹脂などを吹き付けて表層のみを採取する剥ぎ取り法を実施したり、単に遺跡表面の型をとってレプリカを制作するかして、その結果得られた標本を展示するか、あるいは、遺跡や遺構はそのままに、それらをガラス板で囲って保護し、さらにその周囲に建屋を建造したいわゆる遺跡展示館を設けるなどの方法をとることが多かった。
【0004】
【発明が解決しようとする課題】
しかしながら、上記のごとく従来の保存展示方法によれば、例えば、剥ぎ取り法の実施やレプリカ制作により採取可能な遺跡や遺構の表面形状の範囲は小さく、もし対象となる遺跡や遺構の大きさが数十メートル単位の規模ともなると、よほどのコストと期間とを費やせないかぎり、その一部分のみしか表面形状を採取し展示用の標本を作成することが困難な上に、できあがった標本と実際の遺跡や遺構表面とは左右逆のいわゆる鏡の虚像と実像の関係でしかない。
【0005】
また、標本を形成するエポキシ樹脂やFRP等の材料表面に擬土を装着させるか、着色するなどして土の持つ自然な風合いを演出するといった手法が試みられることもあるが、結局は見る者に不自然な感を与えやすい。
【0006】
つまり標本を作成して展示する方法では、遺跡や遺構のいわゆる模型を作成しただけであり、遺跡や遺構が本来持っているはずの自然な臨場感や迫力といったものに欠けることとなりやすい。
【0007】
一方、従来の、遺跡や遺構そのものの周囲を囲って保護し、建屋を建造する保存展示方法では、特別に綿密な温湿度管理を行って保存処理を施さない限り、土構築物である遺跡や遺構の急激な乾燥が進行して収縮やひび割れを生じるおそれがあるとともに、カビやコケ類または植物などが遺跡表面に繁茂したり、あるいはアリなどの昆虫が地下巣を形成して遺跡の崩壊を助長する可能性もありうる。
【0008】
その上、元々の遺跡や遺構の存在位置でしか保存展示を行うことが出来ず、都市部からかなり遠い遠隔地や、人家が周辺に存在せず、交通手段に乏しい地域に遺跡や遺構が存在する場合には、展示館建造の意味合いが薄れ、展示の実施自体が困難となってしまう。
【0009】
そこで、この発明は、このような従来の課題に着目してなされたもので、保存展示対象となる遺跡や遺構が、その規模や存在地域にかかわらず臨場感を持って展示可能で、かつその展示にともなう遺跡や遺構の運搬時の衝撃等やその後の経時変化に対し十分な補強処理を施して、長期にわたる良好な保存状態の維持を簡便かつ効率的に図ることが可能な土構築物の移設及び保存展示方法を提供することを目的とするものである。
【0010】
【課題を解決するための手段】
この発明は、上記目的を達成するためになされたもので、埋蔵遺跡及び遺構などの土構築物の移設及び保存展示方法が、ブロック状をなす1または複数の土ブロックとして切り出す切り出し工程と、切り出された前記土ブロックを、移設及び保存の為に、その外周面に弾性繊維を貼付して拘束するとともに、前記土ブロックを樹脂液に浸漬させることで補強する補強工程と、補強された前記土ブロックを運搬する運搬工程と、前記土ブロックを、切り出し前の土構築物原型に即して多段式の架台に載置し積み上げ、前記土構築物の復元体を構築する積み上げ工程と、前記復元体の展示表面の表面仕上げを行う表面仕上げ工程とからなることを特徴とする。なお、前記土ブロックを架台に載置し積み上げた後、土ブロック飛び出し防止用のアンカーを土ブロック裏面に取り付けて架台と固定することがより好ましい。前記補強工程は、樹脂液含浸中の前記土ブロックに電極を打ち込み、前記土ブロックの比伝導度を測定することにより含浸された樹脂液の量を管理するとともに、前記樹脂液に浸漬されている前記土ブロックの重量を測定して前記土ブロック全体の樹脂液含浸量を管理し、前記樹脂液の含浸が十分に行われた前記土プロックを乾燥することを含むこととしてもよいし、前記土ブロックに含浸させる含浸槽中の樹脂液の液温及び濃度を管理し、前記含浸槽中の樹脂液の液面を管理し、前記土ブロック中の樹脂液含浸量を管理することを含むこととしてもよい。
【0011】
【発明の実施の形態】
この発明の実施例の一例を流れ図のなかで手順1〜手順6として図1に示している。
以下、かかる流れ図に沿って本発明の土構築物の移設及び保存展示方法について詳細に説明する。
本実施例では、本発明の適用対象として、例えば溜め池の周縁に設けられた堤体を挙げることとする。
【0012】
<<手順1>>
まず最初の作業として、移設及び保存展示対象となる土構築物Sを土ブロック20として切り出すことになる。
かかる土ブロック20の切り出し手順としては、図2に示すごとく、堤体Tの形状を測量しそれに沿って土ブロック20として切り出す区画を予め策定し、さらにブロック毎にナンバリングを施して堤体形状図面21に重ねて記すことで、後々参照して復元作業に供することができるようにしておく。なお、本実施例の堤体Tとしては、堤体Tの断面幅が約60m、堤体高さが15m程度の大きさのものとしており、切り取られる土ブロック20は、縦横3m×1.5mで厚みが例えば40〜50cm程度の大きさのものであるとする。
【0013】
次に図3(d)に示すような枠形状となるように、拘束枠材としてのH鋼31(例えば、H−100×100)と底部鋼板材32(例えば鋼板t:6mm 0.1m×3.0m)を各種重機等で堤体土中に圧入し、その後、切り出される土ブロック側面の垂直レベルを各種計測器などで正確に指示しながら重機アームに把持された鋼板や、もしくはチェーンソーなどの機器を用いて、挿入されているH鋼31や底部鋼板材32の外縁側部にそったブロック状に堤体Tの切り出し作業を行う。
【0014】
上記の土ブロック20の切り出しを行うにあたり、底部鋼板材32を土構築物Sに圧入すると、反作用として底部鋼板材32上部の土構築物Sが前面にせり出すことになりやすく、そのまま土ブロック20の崩壊につながりかねないため、切り出される土ブロック前面部を適宜拘束する必要が生じる。
また、切り出された土ブロック20を運搬する際にも、かかる土ブロック20の全周側面が適宜拘束されていなければ運搬時の振動その他で土ブロック20の崩壊が生じるおそれがある。
【0015】
そこで、切り出した直後の土ブロック表面にまず、ガーゼ33、スパイラル状弾性繊維34(フィルター材)、エキスパンドメタル35を順に重ねて貼付し(図3(a)参照)、さらにその外周にH鋼31を配置してこれと緊結拘束する(図3(a)、(b)、(c)、(d)参照)。ただし、これらは後述する樹脂液中に土ブロック20を浸漬しておく際に、土ブロック表面から土粒子が溶出することを防ぎ、土ブロック崩壊防止を図るためのものでもある。
【0016】
その後、土ブロック側面部に関してもガーゼ33、スパイラル状弾性繊維34(フィルター材)、エキスパンドメタル35を順に重ねて貼付し、L型チャネル材などを適宜加工して制作した側部拘束枠材36((c)参照)を嵌めつけて緊結拘束する。
【0017】
<<手順2>>
土ブロック20の切り出しとその外周面の拘束とが上記のように完了したら、次に土ブロック20に樹脂液を含浸させることで土ブロック20の補強を行う。含浸させる樹脂液として、ここでは例えば常温、常圧で飽和濃度(38〜40%)のPEG(ポリエチレングリコール)水溶液40を使用することとする。
【0018】
このPEG水溶液40の土ブロック20への含浸処理として、図4(a)に示すような適宜深さと幅とを有した含浸槽41に、土ブロック20の上端部20aを、満たされたPEG水溶液40液面上に出しつつ浸漬を行う部分含浸と呼ばれる方法を実施する。
なお、かかる土ブロック20は、含浸槽41に備えられた門型支持枠42に、ロードセル43を介して吊下されるものとする。
【0019】
この方法は、液面上に位置してPEG水溶液40に浸漬されていない土ブロック上端部20aから土中水分が蒸発することによって、一種のサクション効果が働き、液中部土ブロック20b表面からのPEG水溶液40の土ブロック20への含浸が促進されるといった特徴を有しており、また一方、土ブロック20中に含浸されたPEG水溶液40の水分は、前記と同様のサクション効果により土ブロック上端部20aから蒸発し、結局土ブロック20中から放出されることとなるために、土ブロック20中のPEG水溶液40は次第に濃縮されることになる。
【0020】
ただし、この部分含浸を行った後に、土ブロック中水分の蒸発にともなうPEG水溶液40の濃縮という現象によって、液面より上の土ブロック上端部20aのPEG水溶液濃度が高まり、土ブロック中のPEG水溶液濃度が液中部20bと液上部20aではばらつきを生じてしまうことがある。
その場合は、図4(b)に示す様に、上記土ブロック20全体を含浸槽41中に浸す全面浸漬を行って、土ブロック中のPEG水溶液濃度を均一化すればよい。
【0021】
上記のような土ブロック20へのPEG水溶液40の含浸を、円滑にしかも適切に行うためには、以下の(1)〜(4)に述べる適切な含浸管理を実施することが好ましい。
【0022】
(1)含浸槽中におけるPEG水溶液の液温管理
含浸槽41中のPEG水溶液温の管理は、図5(a)に示すようにクロメル・アルメル熱電対51を用いて液温を自動計測することで行われるものであり、その測定結果は、PEG水溶液温度変化で生じる液の粘性および比重の変化を把握補正し、部分浸漬時の土ブロック重量を常温時の重量に補正することに供されることとなる。
対象となるPEG水溶液40は、液温が高まるほど飽和濃度も高まり(60℃で約100%)、その結果、土ブロック20への含浸もより促進される傾向を有しており、設定値と状況とに応じ、ヒータ等で液温を加減管理される。
【0023】
(2)含浸槽中におけるPEG水溶液濃度の管理
PEG水溶液濃度の管理は、図5(b)に示すようにロードセル52(10kg測定用)の下につるしたステンレス製おもり53(15kg、比重1.2)を液中に入れ、液濃度変化で生じるおもり53の比重変化を計測し、当初設定した比重正常値との差を把握することで行い、濃度の過不足が生じないよう適宜手段にてPEG水溶液40の注入を実施する。
【0024】
(3)液面位置管理
図5(c)の様に、超音波センサー54を含浸槽41中のPEG水溶液面から20cm程度の高さ位置に固定し、液面からの超音波の反射を捉え、液面と超音波センサー54との間の距離を測定することで、液面位置の測定を行う。
この液面位置測定により、土ブロック部分浸漬時の液面位置変動で生じる浮力変化(土ブロック20の液中重量変化)を把握し、初期液面位置での土ブロック重量と比較することで含浸された液量を把握して、PEG水溶液不足分は適宜注入管理する。
【0025】
(4)土ブロック中PEG水溶液含浸量の管理
図6(a)に示すように、例えば3本の電極60(例えば長さ75cm)をPEG水溶液含浸中の土ブロック20に打ち込み、リード線61を通して土ブロック20の比電導度を測定することで電極位置での含浸PEG濃度を測定し、含浸されたPEG量を把握することと、(c)のごとくPEG水溶液中での土ブロック重量を測定して土ブロック20全体のPEG含浸量を把握することとを併用し、土ブロック20中のPEG含浸量の管理を行う。
【0026】
土ブロック20に打ち込まれる前記電極60は、(b)に示すようにドリルなどで削孔された例えば深さ65cm、直径15〜20mm程度の挿入孔62に挿入され、それよりさらに10cm程度土ブロック内部に打ち込まれるものであり、その先端部63の10cm程度以外は絶縁シール64が施されるものとする。
【0027】
なお、上記のように土ブロック20に打ち込まれた電極60によってPEG含浸量を測定するには、事前に別途試料について比電導度とPEG含浸量との関係を求めてグラフ化するなどしておく必要がある。
【0028】
以上のようなPEG液含浸が十分に行われ含浸完了した土ブロック20は、乾燥させることで、土ブロック中のPEG液が土中で固結し、土粒子同士の接着および土粒子間隙の充填固化が行われることとなって初めて補強効果が得られるのである。
また、土ブロック20中の水分とPEG液とが大部分置換されることとなるから、乾燥による土ブロック20の収縮や、それにともなうひび割れの発生なども大幅に抑制することが可能となる。
【0029】
含浸終了後の土ブロック乾燥方法としては、エアコンおよび換気の設備を備えた簡易テント小屋内などで外気と大差ない温湿度条件下にて乾燥を進めるといった簡易設備による乾燥を行い、重量(土ブロック全体の重量減少により蒸発水分量及び土中含水比の把握)と弾性波の伝搬速度(伝搬速度の違いによる土中水分量、含水比の把握)の計測を併用して乾燥状況を管理するといった手法などがある。
【0030】
<<手順3>>
以上のように補強された土ブロック20は、振動などにより損壊しないよう緩衝材などで梱包し、十分注意を払ってトラック等で移送し復元場所まで運搬することとなる。
【0031】
<<手順4>>
復元場所まで運搬された土ブロック20は、予め組み立て設置された図7に示す多段のカイコ棚式架台70に、土ブロック20の切取り前に描いた堤体形状図面21とそれに記された各土ブロック20のナンバーに従って載置し積み上げられる。
【0032】
このカイコ棚式架台70は、土ブロック20を積み上げた時に、各ブロック重量をその下の土ブロックに伝えることのないように、各ブロック毎に閉じられた枠形状をなしており、また、積み上げた土ブロック20が地震の振動により損壊しないよう、図7(b)に示すように架台下部に免震化構造71を取り入れることが望ましい。
【0033】
さらに、土ブロック飛びだし防止用のアンカーを土ブロック裏面に取付けて架台と固定し、加えて、土ブロックを水平方向に適宜滑動可能にする金具を取り付けるなどの各種振動への対処を施しても好適である。
【0034】
また、カイコ棚70aに土ブロック20を載置する際に、土ブロック背面に設けられた上記アンカーの設置位置と、架台のアンカー受け入れ位置とが円滑かつ正確に合致するよう、位置調整用の治具を双方に設けるとよい。
【0035】
さらに、カイコ棚70aに載置する土ブロック20の側面および背面の補強をFRPにより、ないしはレジンモルタルを施工した後にFRPにより行えば、運搬中や積み上げ作業中などに生じる土ブロック同士の接触や、土ブロック20とカイコ棚70aとの接触により、土ブロック20が損傷を受けてしまうことを防ぐことができる。
【0036】
かかるFRPによる補強は、まず、土ブロック20表面を適宜削りだして表面を平滑化した後、例えばエポキシ樹脂とガラスクロスとを交互に積層するか、または、エポキシ樹脂を吹付けた直後にチョップド繊維を吹付けたり、あるいは両者を同時に吹き付けるなどといった手法によりFRPの吹付け施工を行う。
【0037】
なお、土ブロック表面に断面欠損及び不陸が存在する場合には、表面の平滑化を図るため、エポキシ樹脂モルタルとガラスクロスなどを断面欠損部また不陸部分に重ねて充填施工し、その後FRPを施工する。また、FRPの厚みが大きい場合などは必要に応じて土ブロックにピン留めし十分に固定する。
【0038】
以上の作業を各土ブロック毎に行って、土ブロック20全てが土構築物原型に即してカイコ棚70a に載置され積み上げられることになる。
【0039】
<<手順5>>
カイコ棚70aに上記土ブロック20が適切に固定された後、土ブロック20の展示表面Eの表面仕上げを行う必要があり、まず、積み上げられた土ブロック20周縁を囲むカイコ棚枠材70bは、復元体の展示表面Eに縦横に存在する目地Mとなって、その鋼材表面を露出するため、次のような目地処理を施す。
目地処理のうち、横目地80は、上記のカイコ棚枠材70bの鋼材表面が露出するだけでなく、土ブロック20と比較してカイコ棚70a内空の寸法は大きいために、かかるカイコ棚枠材70bと土ブロック20の間に間隙が生じている(図8(a)参照)。
【0040】
したがって、まず、目地処理の前準備として、積み重ねられた上下土ブロック間の間隔とほぼ等しい幅寸法を有しスタッド81a付きの目地下地用枠材81((c)参照。例えばステンレス製)を、図8(b)の様にカイコ棚枠材70b表面にボルト締結固定し、それでもなお残存する間隙についてはバックアップ材82を充填して閉塞する。
【0041】
なお、目地下地用枠材81の表面には、エポキシ樹脂が塗布されて、後に充填される目地材83との接着性向上を図るものとし、さらに、かかるエポキシ樹脂固化前には砂粒子を表面に散布するか、もしくは表面に凹凸を有する繊維等を貼付するなどして摩擦抵抗を高めておく。
【0042】
次に、処理対象となる目地上下の土ブロック20に関し、目地に接する端面84については38%PEG液ないしはエポキシ樹脂などを塗布し、土ブロック20と、後に充填される目地材83との接着性を向上させる。
【0043】
最後に、バサモル状の38%PEG混合土を目地材83として、目地下地用枠材81と、バックアップ材82、及び、38%PEG液が塗布された上下土ブロック端面84とに囲まれた横目地80に叩き込み充填する。なお、必要に応じてかかるPEG混合土を叩き込む土ブロック端面84にアンカーピンを打って目地材83との接着性やズリ落ち防止効果を高めても良い。
【0044】
また、縦目地90は、横目地80と比較して下方に目地材が流出落下してしまいやすいから、そのため、まず、図9に示すように、例えば断面台形状に土ブロック20の縦目地90を予め整形し、アンカー91(例えばステンレス釘:長さ50mm程度)を適宜間隔(例えば100mm間隔)で目地内面の土ブロック端面92に打ち込み、さらに、縦目地90に接する土ブロック表面に38%PEG水溶液を塗布するなどして、目地材93と土ブロック20との接着性を高める。
【0045】
また、縦目地最奥部には、目地材93が土ブロック20背面に流出しないようバックアップ材94(例えば、スポンジ状の発泡ゴム弾性体成形品および弾性シーリング材)が充填される。
その後、縦目地90に目地材93としてバサモル状PEG混合土を叩き込み充填する。
【0046】
横目地80および縦目地90の目地材の充填が終了後は、十分な養生期間(2ヶ月程度)を経てひび割れの防止を図るとともに、強度の発現性を高める。その際、強制乾燥は行わず、自然乾燥で行うことが好ましい。
【0047】
なお、上記の目地処理で使用する目地材としては、38%PEG混合土を示したが、混合する土としては、予め土構築物Sと同じ土を採取粉砕して使用するものとする。
【0048】
以上のように、目地処理を行うとともに、土ブロック20の展示表面E側に、土の剥落などの欠損部Dが生じている場合(図10(a)参照)、(b)の様にかかる欠損部Dの内表面に38%PEG液Pもしくはエポキシ樹脂などを塗布し表面処理を施すか、または、その後さらに(c)の様に、後に充填される補修材Rと欠損部D表面との界面剥離防止を図ってアンカーピンN(例えばステンレス釘)を打ち込むかしてから、補修材Rとしてバサモル状PEG混合土の叩き込み充填を欠損部D周囲とほぼ同じ表面高まで実施し補修を行う。
【0049】
また、土ブロック展示表面Eにヘヤークラックなどのひび割れが生じている場合は、土粒子の結合を破壊しないよう適宜低圧にて樹脂を注入して、ひび割れを樹脂で充填した後、その表面にPEG混合土を塗布して仕上げる。
【0050】
実質的な補修が終了したら、最終的にいわゆる土らしさを表現すべく、土ブロック展示表面Eについて、これを完全な平滑面にすることなく適宜角度と深さにて凹凸を設けて、自然な雰囲気に近づける。
【0051】
必要とあれば、上記に加えて、土ブロック展示表面Eの補修部分に、紫外線で劣化しない着色剤として無機顔料による着色を、補修部分周囲の土の色に合わせた配色にて行う。
【0052】
土ブロック展示表面Eの目地処理および各種補修作業が終了した後、土本来の色を損なわないよう、塗布量を最小限に抑えてクリヤー樹脂の塗布を行って、表面土粒子の剥離落下等を防止し、最終的な土ブロック展示表面Eの補強を完了する。
【0053】
なお、本実施例においては、本発明の適用対象を、断面幅が約60m、堤体高さが15m程度の規模の堤体としたが、それに限定されず、対象となる土構築物は、墳墓、灌漑水路、住居等でもよく、その規模も本実施例のものより大きなものでもよいし、また反対に小さなものでも問題なく適用可能である。
【0054】
また、土構築物より切り取られる土ブロックは、本実施例のごとく縦横3m×1.5mで厚みが40〜50cm程度の大きさで外形が立方形のものに限らず、土ブロックを運搬する手段や、復元するための架台のサイズや形状に応じて自在に変更可能である。
【0055】
さらに、土ブロックの補強を行うにあたり、PEG(ポリエチレングリコール)液だけでなく、同様の効果を示すものであればいずれも採用することができ、例えばアクリル樹脂、酢酸ビニル樹脂、エチレン酢酸ビニル樹脂、エチレンブタジエンゴム樹脂、ポリビニルアルコール樹脂などを採用可能であり、その処理法も、含浸槽に浸漬する処理だけでなく、十分な含浸が行えれば種々の処理法を適用可能である。
【0056】
上記の含浸処理の管理に関して、本実施例中では、熱電対を用いた液温管理と、比重測定による濃度管理と、超音波センサーを用いた液面位置管理と、電極を土ブロックに打ち込んで比電導度を測定するPEG液含浸量管理とを実施することとしたが、それぞれの管理に関し、その他の機器や手法を用いても同様の管理を行うことが可能であればよい。
【0057】
含浸処理された土ブロックを載置する架台は、カイコ棚式のものだけでなく、土ブロックの重量が相互に影響を及ぼさないものであれば採用できる。
【0058】
上述の土ブロックを補強する際に用いた38%PEG水溶液は、その濃度だけに限定されず、補強後に求める強度や、土ブロック表面の損傷の程度など、状況に応じて適宜変更した濃度に設定するものとする。
【0059】
本実施例の手順の順序通りに、土構築物の移設及び保存展示を行うと好適であるが、土構築物の状態や、保存展示を行う施設や建屋の進行状況に応じて、上記各手順を、可能であれば別個に平行して行うといったことになってもよい。
【0060】
【発明の効果】
以上詳細に説明したように、本発明の土構造物の移設及び保存展示方法によれば、存在する土構築物をレプリカ等を使って復元することなく、かかる土構築物をブロック状にそのまま切り出した後、適切な管理の下、適宜補強を施して土構築物原型に沿って復元することになるため、従来では、困難であった大型土構築物の移設及び保存展示が、土構築物の存在場所や規模にかかわらず可能となり、さらに、切り出しから運搬、そして保存展示に至る一連の工程中に土構築物が損壊するおそれも低減され、加えて、本物の土構築物を積み上げて復元することにより、遺跡や遺構が本来持つ臨場感を十分に再現することが可能となる。
【0061】
加えて、土ブロックに分割され、積み上げられて復元された土構築物は、土ブロック単位で個別に補修や点検等を行ったり、さらに、土ブロックが載置された架台全体を管理して、復元体全部の展示表面を点検して適宜修復や補強を行ったりと、求められる状況に応じて適切かつ柔軟に保守点検を実施することが出来る。
【0062】
さらに、本発明によると、土構築物からの土ブロックの切り出し、補強、運搬、積み上げ、表面仕上げといった工程が、明確な手順と手法とをもって系統的に策定されているため、一連の流れ作業としてすべての作業を効率よく、しかも確実に実施することができ、従来の手法を用いて逐一実施する場合と比較して、土構築物の移設及び保存展示に費やすコスト及び時間を大幅に低減することが可能となる。
【図面の簡単な説明】
【図1】本発明の土構造物の移設及び保存展示方法を示した流れ図である。
【図2】本発明の切り出し工程において切り出される堤体の土ブロック配置を示した説明図である。
【図3】本発明の切り出し工程において、切り出す土ブロックの拘束例を示す説明図であり、(a)は側面図、(b)は側面図A部の拡大図、(c)は土ブロック側面に嵌めつける枠材の概略図、(d)は拘束された土ブロック正面図である。
【図4】本発明の土ブロックの補強工程において行われるPEG水溶液への土ブロックの部分浸漬について(a)図、および全面浸漬について(b)図をもって示す説明断面図である。
【図5】図3に示した土ブロックのPEG水溶液への浸漬中に行われるPEG水溶液の液温、液濃度、液面位置の計測管理法をそれぞれ(a)、(b)、(c)に示す概念図である。
【図6】図3に示した土ブロックのPEG水溶液への浸漬中に行われる土ブロックの比電導度の計測法を示す概念図であり、(a)は電極が打ち込まれ土ブロックの説明図、(b)は打ち込まれた電極付近の拡大断面図、(c)は部分浸漬中土ブロックの液中重量計測を示す概念図である。
【図7】(a)、(b)は本発明の積み上げ工程において使用する展示架台を示す平面図及び側面図である。
【図8】本発明の表面仕上げ工程における横目地処理を示す説明図であり、(a)は側面概略図、(b)は側面図A部の拡大図、(c)は目地下地用枠材の側面図である。
【図9】本発明の表面仕上げ工程における縦目地処理を示す説明図である。
【図10】本発明の表面仕上げ工程における土ブロック断面欠損部の修復法を示す説明図であり、(a)は欠損部を生じた土ブロックの平面図、(b)は比較的小さな欠損部が生じた土ブロックの説明断面図、(c)は比較的大きな欠損部が生じた土ブロックの説明断面図である。
【符号の説明】
S 土構築物
20 土ブロック
21 堤体形状図面
40 PEG水溶液
41 含浸槽
70 カイコ棚式架台
E 展示表面
80 横目地
82、94 バックアップ材
90 縦目地
D 欠損部
R 補修材
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a technique for moving and storing and displaying remains, remains, etc. found during earthwork.
[0002]
[Prior art]
The so-called ancient times of the Jomon and Yayoi eras, or the archaeological tombs, irrigation waterways, levee bodies, residences, etc., which were erected by the ancestors of mankind over many years from the former Paleolithic to the modern, It is not only a valuable cultural asset such as archaeology and anthropology in Japan, but also has the property that it should be preserved and used for the future while maintaining its original form and opened to many people.
[0003]
When these ruins and remains are displayed and stored, conventionally, the surface of these remains and remains is sprayed with urethane resin, and only the surface layer is removed, or the surface of the remains is simply replicated. Or display the specimens obtained as a result, or protect the ruins and remains by enclosing them with glass plates and building a building around them. In many cases, such methods were provided.
[0004]
[Problems to be solved by the invention]
However, according to the conventional preservation display method as described above, for example, the range of the surface shape of the ruins and remains that can be collected by carrying out the stripping method or replica production is small, and the size of the target remains and remains is small. When the scale is several tens of meters, it is difficult to collect only a part of the surface shape and create a specimen for display unless a considerable amount of cost and time can be spent. It is only the relationship between the so-called mirror virtual image and the real image, which is opposite to the ruins and the remains surface.
[0005]
In addition, there are cases where methods such as attaching pseudo-soil to the surface of materials such as epoxy resin and FRP that form specimens or coloring them to produce the natural texture of the soil are tried, but in the end the viewer It is easy to give an unnatural feeling.
[0006]
In other words, in the method of creating and displaying specimens, only so-called models of the ruins and remains are created, and the natural presence and power that the ruins and remains should have originally tend to be lacking.
[0007]
On the other hand, in the conventional preservation display method that surrounds and protects the ruins and the remains themselves and builds the buildings, the ruins and remains that are earthen structures, unless they are specially meticulously controlled by temperature and humidity control. There is a risk that shrinkage and cracking may occur due to rapid drying of the soil, and mold, moss or plants grow on the surface of the ruins, or insects such as ants form an underground nest to promote the collapse of the ruins There is also the possibility of doing.
[0008]
In addition, preservation and display can only be performed at the location of the original ruins and ruins, and there are ruins and remains in areas that are far from the urban area and where there are no people in the surrounding area and transportation is poor. In such a case, the meaning of building the exhibition hall is weakened, and the implementation of the exhibition itself becomes difficult.
[0009]
Therefore, the present invention has been made paying attention to such a conventional problem, and the remains and remains to be preserved and displayed can be exhibited with a sense of reality regardless of the scale and the existing area, and the Relocation of soil structures that can easily and efficiently maintain good preservation over a long period of time by providing sufficient reinforcement treatment against impacts during transportation of the ruins and remains of the exhibition and subsequent changes over time It is intended to provide a preservation display method.
[0010]
[Means for Solving the Problems]
The present invention has been made to achieve the above object, and a method for transferring and storing soil structures such as buried remains and remains is cut out as one or more soil blocks forming a block shape. In addition, for transfer and storage, the soil block is restrained by attaching elastic fibers to the outer peripheral surface thereof, and the soil block is reinforced by immersing the soil block in a resin solution , and the reinforced soil block A transporting process for transporting the soil structure, a stacking process for constructing a restored structure of the soil structure by placing the soil block on a multi-stage frame in accordance with the soil structure prototype before cutting, and display of the restored structure from a surface finishing step for surface finishing of the surface, wherein the Nalco. More preferably, after the soil block is placed on the gantry and stacked, an anchor for preventing the soil block from popping out is attached to the back of the soil block and fixed to the gantry. In the reinforcing step, an electrode is driven into the soil block being impregnated with the resin solution, and the amount of the impregnated resin solution is controlled by measuring the specific conductivity of the soil block, and the resin solution is immersed in the resin solution. The method may include measuring the weight of the soil block to control the amount of resin liquid impregnated in the entire soil block, and drying the soil block that has been sufficiently impregnated with the resin liquid. Managing the liquid temperature and concentration of the resin liquid in the impregnation tank to be impregnated into the block, managing the liquid level of the resin liquid in the impregnation tank, and managing the amount of resin liquid impregnated in the soil block Also good.
[0011]
DETAILED DESCRIPTION OF THE INVENTION
An example of the embodiment of the present invention is shown in FIG. 1 as Procedure 1 to Procedure 6 in the flowchart.
Hereinafter, the method for transferring and storing the soil structure according to the present invention will be described in detail with reference to the flowchart.
In the present embodiment, as an application target of the present invention, for example, a bank body provided at the periphery of a reservoir is cited.
[0012]
<< Procedure 1 >>
First, as a first work, the soil structure S to be transferred and stored is cut out as a soil block 20.
As shown in FIG. 2, the soil block 20 is cut out by surveying the shape of the levee body T, preliminarily demarcating sections to be cut out as the soil block 20, and further numbering each block for drawing the levee body shape. By being overwritten on 21, it can be referred to later and used for restoration work. In addition, as the bank body T of this embodiment, the section width of the bank body T is about 60 m and the height of the bank body is about 15 m, and the soil block 20 to be cut out is 3 m × 1.5 m in length and width. The thickness is assumed to be about 40 to 50 cm, for example.
[0013]
Next, H steel 31 (for example, H-100 × 100) and a bottom steel plate material 32 (for example, steel plate t: 6 mm 0.1 m ×) as a constraining frame material so as to have a frame shape as shown in FIG. 3.0m) is press-fitted into the levee soil with various heavy machinery, etc., and then the vertical level of the side of the soil block to be cut out is accurately indicated by various measuring instruments, etc. Using this equipment, the cutting work of the dam body T is performed in a block shape along the outer edge side portion of the inserted H steel 31 and bottom steel plate material 32.
[0014]
When the bottom steel plate material 32 is press-fitted into the soil structure S when the soil block 20 is cut out, the soil structure S above the bottom steel plate material 32 tends to protrude to the front as a reaction, and the soil block 20 collapses as it is. Since it may be connected, it will be necessary to restrain the cut-out soil block front part suitably.
Further, when the cut soil block 20 is transported, if the entire circumferential side surface of the soil block 20 is not appropriately restrained, the soil block 20 may be collapsed due to vibration during transport or the like.
[0015]
Therefore, the gauze 33, the spiral elastic fiber 34 (filter material), and the expanded metal 35 are first laminated in order on the surface of the soil block immediately after cutting (see FIG. 3A), and further, the H steel 31 is attached to the outer periphery thereof. Is placed and tightly bound to this (see FIGS. 3A, 3B, 3C and 3D). However, these are also for preventing soil particles from eluting from the surface of the soil block and preventing the soil block from collapsing when the soil block 20 is immersed in a resin liquid described later.
[0016]
Thereafter, the gland 33, spiral elastic fiber 34 (filter material), and expanded metal 35 are sequentially stacked on the side surface of the soil block, and an L-shaped channel material or the like is appropriately processed to produce a side constraining frame material 36 ( (See (c)) and tighten and restrain.
[0017]
<< Procedure 2 >>
When the cutting out of the soil block 20 and the restraining of the outer peripheral surface thereof are completed as described above, the soil block 20 is then reinforced by impregnating the soil block 20 with a resin liquid. As the resin liquid to be impregnated, here, for example, a PEG (polyethylene glycol) aqueous solution 40 having a saturated concentration (38 to 40%) at normal temperature and normal pressure is used.
[0018]
As an impregnation treatment for the soil block 20 with this PEG aqueous solution 40, the upper end portion 20a of the soil block 20 is filled in an impregnation tank 41 having an appropriate depth and width as shown in FIG. A method called partial impregnation is performed, in which immersion is performed while taking out onto the 40 liquid surface.
The soil block 20 is suspended from a gate-type support frame 42 provided in the impregnation tank 41 via a load cell 43.
[0019]
This method has a kind of suction effect by evaporating the moisture in the soil from the soil block upper end portion 20a that is located on the liquid surface and not immersed in the PEG aqueous solution 40, and the PEG from the surface of the submerged soil block 20b works. The water block 40 has a feature that the impregnation of the aqueous solution 40 into the soil block 20 is promoted. On the other hand, the moisture of the aqueous PEG solution 40 impregnated in the soil block 20 is caused by the suction effect similar to the above. Since it evaporates from 20a and is eventually discharged from the soil block 20, the PEG aqueous solution 40 in the soil block 20 is gradually concentrated.
[0020]
However, after this partial impregnation, the concentration of the PEG aqueous solution 40 at the top end 20a of the soil block above the liquid level increases due to the phenomenon of concentration of the PEG aqueous solution 40 accompanying the evaporation of moisture in the soil block, and the PEG aqueous solution in the soil block The concentration may vary between the liquid middle portion 20b and the liquid upper portion 20a.
In that case, as shown in FIG.4 (b), the whole soil block 20 should just be immersed in the impregnation tank 41, and what is necessary is just to make uniform the PEG aqueous solution density | concentration in a soil block.
[0021]
In order to smoothly and appropriately impregnate the soil block 20 with the PEG aqueous solution 40, it is preferable to perform appropriate impregnation management described in the following (1) to (4).
[0022]
(1) Liquid temperature management of PEG aqueous solution in the impregnation tank The PEG aqueous solution temperature in the impregnation tank 41 is managed by automatically measuring the liquid temperature using a chromel-alumel thermocouple 51 as shown in FIG. The measurement results are used for grasping and correcting changes in the viscosity and specific gravity of the liquid caused by the temperature change of the PEG aqueous solution, and correcting the weight of the soil block during partial immersion to the weight at normal temperature. It will be.
The target aqueous PEG solution 40 increases in saturation concentration as the liquid temperature increases (about 100% at 60 ° C.). As a result, the impregnation into the soil block 20 tends to be further promoted. Depending on the situation, the liquid temperature is controlled by a heater or the like.
[0023]
(2) Management of PEG aqueous solution concentration in impregnation tank As shown in FIG. 5 (b), the PEG aqueous solution concentration is controlled by a stainless steel weight 53 (15 kg, specific gravity of 1.kg) hung under a load cell 52 (for 10 kg measurement). 2) is put into the liquid, the change in the specific gravity of the weight 53 caused by the change in the liquid concentration is measured, and the difference from the normal value of the specific gravity set initially is grasped. Injection of the PEG aqueous solution 40 is performed.
[0024]
(3) Liquid surface position management As shown in FIG. 5C, the ultrasonic sensor 54 is fixed at a height of about 20 cm from the surface of the PEG aqueous solution in the impregnation tank 41, and the reflection of ultrasonic waves from the liquid surface is captured. The liquid surface position is measured by measuring the distance between the liquid surface and the ultrasonic sensor 54.
By this liquid surface position measurement, the buoyancy change (change in the weight of the soil block 20 in the liquid) caused by the liquid surface position fluctuation during the soil block partial immersion is grasped, and impregnation is performed by comparing with the soil block weight at the initial liquid surface position. By grasping the amount of the solution, the insufficient amount of the PEG aqueous solution is appropriately injected and managed.
[0025]
(4) Management of amount of PEG aqueous solution impregnated in soil block As shown in FIG. 6A, for example, three electrodes 60 (for example, 75 cm in length) are driven into the soil block 20 impregnated with PEG aqueous solution and passed through the lead wire 61. Measure the specific conductivity of the soil block 20 to measure the impregnated PEG concentration at the electrode position, grasp the amount of impregnated PEG, and measure the soil block weight in the PEG aqueous solution as shown in (c). Thus, the amount of PEG impregnation in the soil block 20 is managed together with grasping the amount of PEG impregnation of the entire soil block 20.
[0026]
The electrode 60 driven into the earth block 20 is inserted into an insertion hole 62 having a depth of about 65 cm and a diameter of about 15 to 20 mm, as shown in FIG. An insulating seal 64 is applied to the inside of the tip portion 63 except for about 10 cm.
[0027]
In addition, in order to measure the PEG impregnation amount with the electrode 60 driven into the soil block 20 as described above, the relationship between the specific conductivity and the PEG impregnation amount is separately obtained for a sample and graphed in advance. There is a need.
[0028]
The soil block 20 that has been sufficiently impregnated with the PEG solution as described above is dried, so that the PEG solution in the soil block is solidified in the soil, and adhesion between the soil particles and filling of the soil particle gaps is performed. A reinforcing effect can be obtained only after solidification.
In addition, since the water in the soil block 20 and the PEG solution are largely replaced, it is possible to greatly suppress the shrinkage of the soil block 20 due to drying and the occurrence of cracks associated therewith.
[0029]
After the impregnation, the soil block is dried by using simple equipment such as drying in a simple tent room equipped with air conditioning and ventilation equipment under temperature and humidity conditions that are not significantly different from the outside air. The dry weight is managed by using both the measurement of the evaporative water content and the soil water content ratio due to the overall weight reduction) and the measurement of elastic wave propagation speed (the soil water content and water content ratio based on the difference in propagation speed). There are methods.
[0030]
<< Procedure 3 >>
The soil block 20 reinforced as described above is packed with a cushioning material or the like so as not to be damaged by vibration, and is transported by a truck or the like with sufficient care and transported to a restoration place.
[0031]
<< Procedure 4 >>
The soil block 20 that has been transported to the restoration site is placed on a multi-stage silkworm shelf 70 shown in FIG. 7 that is assembled and installed in advance, and the levee body shape drawing 21 drawn before the soil block 20 is cut and each soil described therein. It is placed and stacked according to the block 20 number.
[0032]
The silk rack type pedestal 70 has a closed frame shape so that when the soil blocks 20 are stacked, the weight of each block is not transmitted to the underlying soil block. In order to prevent the soil block 20 from being damaged by the vibration of the earthquake, it is desirable to incorporate a seismic isolation structure 71 in the lower part of the gantry as shown in FIG.
[0033]
Furthermore, it is also suitable to take measures against various vibrations, such as attaching an anchor to prevent the soil block from popping out and fixing it to the back of the soil block and attaching a bracket that allows the soil block to slide appropriately in the horizontal direction. It is.
[0034]
Further, when the soil block 20 is placed on the silkworm shelf 70a, the position adjustment is adjusted so that the installation position of the anchor provided on the back surface of the soil block and the anchor receiving position of the gantry are smoothly and accurately matched. Goods should be provided on both sides.
[0035]
Furthermore, if the reinforcement of the side surface and the back surface of the soil block 20 placed on the silkworm shelf 70a is performed by FRP or FRP after constructing the resin mortar, contact between the soil blocks generated during transportation or stacking work, It is possible to prevent the soil block 20 from being damaged by the contact between the soil block 20 and the silkworm shelf 70a.
[0036]
For the reinforcement by FRP, first, the surface of the soil block 20 is appropriately scraped to smooth the surface, and then, for example, an epoxy resin and a glass cloth are laminated alternately, or immediately after the epoxy resin is sprayed, chopped fibers The FRP is sprayed by a method such as spraying or spraying both at the same time.
[0037]
If there are cross-sectional defects and unevenness on the surface of the soil block, the epoxy resin mortar and glass cloth, etc. are overlaid on the cross-sectional defect part or uneven part to smooth the surface, and then FRP is applied. Install. In addition, when the thickness of the FRP is large, it is pinned to the soil block as necessary and sufficiently fixed.
[0038]
The above operation is performed for each soil block, and all the soil blocks 20 are placed and stacked on the silkworm shelf 70a in accordance with the soil structure prototype.
[0039]
<< Procedure 5 >>
After the soil block 20 is appropriately fixed to the silkworm shelf 70a, it is necessary to finish the surface of the display surface E of the soil block 20. First, the silkworm shelf frame material 70b surrounding the periphery of the stacked soil block 20 is: In order to become the joint M which exists vertically and horizontally on the display surface E of the restored body and to expose the steel material surface, the following joint treatment is performed.
Of the joint processing, the horizontal joint 80 not only exposes the steel material surface of the silkworm shelf frame material 70b described above, but also has a larger dimension in the silkworm shelf 70a than the soil block 20, and therefore, There is a gap between the material 70b and the soil block 20 (see FIG. 8A).
[0040]
Therefore, first, as a preparation for joint processing, a joint base material frame 81 (see (c), for example, made of stainless steel) having a width dimension substantially equal to the interval between the stacked upper and lower soil blocks and having the stud 81a is used. As shown in FIG. 8B, bolts are fastened and fixed to the surface of the silkworm shelf frame material 70b, and the remaining gap is filled with the backup material 82 and closed.
[0041]
The surface of the joint base material 81 is coated with an epoxy resin to improve adhesion with the joint material 83 to be filled later, and further, sand particles are set before the epoxy resin is solidified. The frictional resistance is increased by spraying on the surface or attaching a fiber having irregularities on the surface.
[0042]
Next, regarding the soil block 20 above and below the joint to be treated, 38% PEG solution or epoxy resin is applied to the end face 84 in contact with the joint, and the adhesion between the soil block 20 and the joint material 83 to be filled later is applied. To improve.
[0043]
Finally, a 38% PEG mixed soil in the form of basamol was used as a joint material 83, and surrounded by a frame material 81 for the joint basement, a backup material 82, and upper and lower soil block end faces 84 coated with a 38% PEG solution. Strike into the filling 80 and fill. If necessary, an anchor pin may be hit on the soil block end face 84 into which the PEG mixed soil is struck to enhance the adhesion to the joint material 83 and the effect of preventing slippage.
[0044]
Further, since the joint material is likely to flow out and fall downward in the vertical joint 90 as compared with the horizontal joint 80, first, as shown in FIG. 9, for example, the vertical joint 90 of the soil block 20 has a trapezoidal cross section. , And anchors 91 (for example, stainless nails: about 50 mm in length) are driven into the soil block end surface 92 on the joint inner surface at appropriate intervals (for example, 100 mm intervals), and 38% PEG is applied to the soil block surface in contact with the vertical joint 90. The adhesion between the joint material 93 and the soil block 20 is enhanced by applying an aqueous solution.
[0045]
Further, the backmost portion of the vertical joint is filled with a backup material 94 (for example, a sponge-like foamed rubber elastic molded product and an elastic sealing material) so that the joint material 93 does not flow out to the back of the soil block 20.
After that, the vertical joint 90 is struck and filled with the basamol-like PEG mixed soil as the joint material 93.
[0046]
After the filling of the joint material of the horizontal joint 80 and the vertical joint 90 is completed, cracks are prevented through a sufficient curing period (about two months), and strength development is enhanced. In that case, it is preferable to carry out by natural drying without performing forced drying.
[0047]
In addition, although the 38% PEG mixed soil was shown as the joint material used in the joint processing, the same soil as the soil construction S is collected and ground in advance as the soil to be mixed.
[0048]
As described above, joint processing is performed, and when a defective portion D such as soil peeling occurs on the display surface E side of the soil block 20 (see FIG. 10A), it is applied as shown in FIG. Apply 38% PEG solution P or epoxy resin on the inner surface of the defect part D and perform surface treatment, or after that, as shown in (c), the repair material R to be filled later and the surface of the defect part D After the anchor pin N (for example, a stainless steel nail) is driven in order to prevent the interfacial peeling, the repairing material R is filled with basamole-shaped PEG mixed soil to the same surface height as the periphery of the defect portion D for repair.
[0049]
Also, if cracks such as hair cracks have occurred on the soil block display surface E, a resin is injected at an appropriate low pressure so as not to break the bond of the soil particles, and the cracks are filled with the resin, and then the PEG is applied to the surface. Apply mixed soil and finish.
[0050]
When the substantial repair is completed, in order to finally express the so-called earthiness, the soil block display surface E is provided with irregularities at appropriate angles and depths without making it a completely smooth surface, so that natural Get closer to the atmosphere.
[0051]
If necessary, in addition to the above, the repair portion of the soil block display surface E is colored with an inorganic pigment as a colorant that is not deteriorated by ultraviolet rays in a color scheme that matches the soil color around the repair portion.
[0052]
After finishing the joint processing and various repair work on the soil block display surface E, the clear resin is applied with a minimum amount of application so that the original color of the soil is not damaged. Prevent and complete reinforcement of the final soil block display surface E.
[0053]
In this embodiment, the application target of the present invention is a bank body having a cross-sectional width of about 60 m and a bank body height of about 15 m. However, the present invention is not limited thereto, and the target soil structure is a tomb, An irrigation channel, a residence, etc. may be used, and the scale thereof may be larger than that of the present embodiment.
[0054]
In addition, the soil block cut out from the soil structure is not limited to the one having a size of 3 m × 1.5 m in length and width of about 40 to 50 cm and having a cubic shape as in the present embodiment. It can be freely changed according to the size and shape of the gantry for restoration.
[0055]
Furthermore, in reinforcing the soil block, not only PEG (polyethylene glycol) liquid but also any one showing the same effect can be adopted, for example, acrylic resin, vinyl acetate resin, ethylene vinyl acetate resin, An ethylene butadiene rubber resin, a polyvinyl alcohol resin, or the like can be used. The treatment method is not limited to the treatment of immersing in an impregnation tank, and various treatment methods can be applied as long as sufficient impregnation can be performed.
[0056]
Regarding the management of the above impregnation treatment, in this embodiment, liquid temperature management using a thermocouple, concentration management by specific gravity measurement, liquid surface position management using an ultrasonic sensor, and electrodes are driven into a soil block. Although the PEG liquid impregnation amount management for measuring the specific conductivity is performed, it is only necessary that the same management can be performed using other devices and methods for each management.
[0057]
The platform on which the impregnated soil block is placed is not limited to a silkworm shelf type, but can be employed as long as the weight of the soil block does not affect each other.
[0058]
The 38% PEG aqueous solution used to reinforce the soil block described above is not limited to its concentration, but is set to a concentration that is appropriately changed depending on the situation, such as the strength required after reinforcement and the degree of damage to the soil block surface. It shall be.
[0059]
According to the sequence of the procedure of the present embodiment, it is preferable to perform the transfer and preservation exhibition of the earth structure, but depending on the state of the earth structure, the progress of the facility and building where the preservation display is performed, If possible, it may be performed separately in parallel.
[0060]
【The invention's effect】
As described above in detail, according to the method for transferring and storing a soil structure according to the present invention, after the soil structure is cut out as it is in a block shape without restoring the existing soil structure using a replica or the like. Therefore, under appropriate management, it will be properly reinforced and restored along with the original structure of the soil structure. In addition, the possibility of damaging the soil structure during the series of processes from cutting, transportation, and preservation exhibition is reduced, and in addition, the real soil structure is piled up and restored to restore the remains and remains. It is possible to fully reproduce the original presence.
[0061]
In addition, soil structures that have been divided into soil blocks, stacked, and restored are repaired and inspected individually for each soil block, and the entire platform on which the soil blocks are placed is managed and restored. Maintenance inspections can be carried out appropriately and flexibly according to the required conditions, such as inspecting the display surface of the entire body and performing appropriate repairs and reinforcements.
[0062]
Furthermore, according to the present invention, processes such as cutting out, reinforcing, transporting, stacking, and surface finishing of soil blocks from soil structures are systematically formulated with clear procedures and methods, so that all of the series of flow operations Can be carried out efficiently and reliably, and the cost and time spent for transferring and storing soil structures can be drastically reduced compared to the case where the conventional method is used step by step. It becomes.
[Brief description of the drawings]
FIG. 1 is a flowchart showing a method for transferring and storing a soil structure according to the present invention.
FIG. 2 is an explanatory view showing a soil block arrangement of a bank body cut out in the cutting step of the present invention.
FIGS. 3A and 3B are explanatory views showing a restriction example of a soil block to be cut out in the cutting step of the present invention, wherein FIG. 3A is a side view, FIG. 3B is an enlarged view of a side view A, and FIG. FIG. 4D is a schematic view of a frame member to be fitted on the front, and FIG.
FIG. 4 is an explanatory cross-sectional view showing a partial immersion of the soil block in a PEG aqueous solution performed in the reinforcing step of the soil block according to the present invention, and FIG.
FIGS. 5A and 5B are measurement management methods for the liquid temperature, liquid concentration, and liquid surface position of the PEG aqueous solution performed during the immersion of the soil block shown in FIG. 3 into the PEG aqueous solution, respectively. It is a conceptual diagram shown in FIG.
6 is a conceptual diagram showing a method of measuring the specific conductivity of the soil block performed during the immersion of the soil block shown in FIG. 3 in an aqueous PEG solution. FIG. 6 (a) is an explanatory diagram of the soil block when electrodes are implanted. (B) is an expanded sectional view of the vicinity of the driven electrode, and (c) is a conceptual diagram showing submerged weight measurement of the partially immersed soil block.
FIGS. 7A and 7B are a plan view and a side view showing an exhibition stand used in the stacking process of the present invention.
FIGS. 8A and 8B are explanatory views showing the horizontal joint processing in the surface finishing process of the present invention, wherein FIG. 8A is a schematic side view, FIG. 8B is an enlarged view of a side view A, and FIG. It is a side view of material.
FIG. 9 is an explanatory view showing vertical joint processing in the surface finishing step of the present invention.
10A and 10B are explanatory views showing a method for repairing a soil block cross-sectional defect in the surface finishing process of the present invention, wherein FIG. 10A is a plan view of the soil block in which the defect is generated, and FIG. 10B is a relatively small defect. (C) is an explanatory cross-sectional view of a soil block having a relatively large defect.
[Explanation of symbols]
S soil structure 20 soil block 21 levee body shape drawing 40 PEG aqueous solution 41 impregnation tank 70 silkworm shelf-type pedestal E display surface 80 horizontal joints 82, 94 backup material 90 vertical joint D missing part R repair material

Claims (4)

埋蔵遺跡及び遺構などの土構築物を、ブロック状をなす1または複数の土ブロックとして切り出す切り出し工程と、切り出された前記土ブロックを、移設及び保存の為に、その外周面に弾性繊維を貼付して拘束するとともに、前記土ブロックを樹脂液に浸漬させることで補強する補強工程と、補強された前記土ブロックを運搬する運搬工程と、前記土ブロックを、切り出し前の土構築物原型に即して多段式の架台に載置し積み上げ、前記土構築物の復元体を構築する積み上げ工程と、前記復元体の展示表面の表面仕上げを行う表面仕上げ工程とからなることを特徴とする土構築物の移設及び保存展示方法。Cutting out the soil structure such as buried remains and remains as one or more soil blocks in the form of a block, and attaching the elastic fiber to the outer peripheral surface of the cut out soil block for transfer and preservation The soil block is reinforced by immersing the soil block in a resin solution , the transporting step of transporting the reinforced soil block, and the soil block according to the soil structure prototype before cutting. stacked placed in multistage cradle, relocation of the soil and stacked constructing a restoration of constructs, soil constructs wherein the Nalco and a surface finishing step for surface finishing of display surface of the restoration member And preservation display method. 請求項1に記載の土構築物の移設及び保存展示方法において、前記土ブロックを架台に載置し積み上げた後、土ブロック飛び出し防止用のアンカーを土ブロック裏面に取り付けて架台と固定することを特徴とする土構築物の移設及び保存展示方法。The method for transferring and storing a soil structure according to claim 1, wherein after mounting the soil block on the gantry and stacking, the anchor for preventing the soil block from popping out is attached to the back of the soil block and fixed to the gantry. Relocation and preservation display method of the characteristic soil structure. 請求項1又2に記載の土構築物の移設及び保存展示方法において、前記補強工程において、樹脂液含浸中の前記土ブロックに電極を打ち込み、前記土ブロックの比伝導度を測定することにより含浸された樹脂液の量を管理するとともに、前記樹脂液に浸漬されている前記土ブロックの重量を測定して前記土ブロック全体の樹脂液含浸量を管理し、前記樹脂液の含浸が十分に行われた前記土プロックを乾燥することを特徴とする土構築物の移設及び保存展示方法。  3. The method for transferring and storing a soil structure according to claim 1 or 2, wherein, in the reinforcing step, an electrode is driven into the soil block being impregnated with a resin liquid, and the soil block is impregnated by measuring a specific conductivity. In addition, the amount of the resin solution is controlled, and the weight of the soil block immersed in the resin solution is measured to control the amount of resin solution impregnated in the entire soil block, so that the resin solution is sufficiently impregnated. A method for transferring and storing a soil structure, wherein the soil block is dried. 請求項3に記載の土構築物の移設及び保存展示方法において、前記補強工程において、さらに前記土ブロックを浸す含浸槽中の樹脂液の液温、濃度、及び液面を管理することを特徴とする土構築物の移設及び保存展示方法。  4. The method for transferring and storing a soil structure according to claim 3, wherein in the reinforcing step, the liquid temperature, concentration, and liquid level of a resin liquid in an impregnation tank in which the soil block is immersed are further controlled. Relocation and preservation of soil structures.
JP32991198A 1998-11-19 1998-11-19 Relocation and preservation of soil structures Expired - Fee Related JP3675655B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP32991198A JP3675655B2 (en) 1998-11-19 1998-11-19 Relocation and preservation of soil structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP32991198A JP3675655B2 (en) 1998-11-19 1998-11-19 Relocation and preservation of soil structures

Publications (2)

Publication Number Publication Date
JP2000154522A JP2000154522A (en) 2000-06-06
JP3675655B2 true JP3675655B2 (en) 2005-07-27

Family

ID=18226648

Family Applications (1)

Application Number Title Priority Date Filing Date
JP32991198A Expired - Fee Related JP3675655B2 (en) 1998-11-19 1998-11-19 Relocation and preservation of soil structures

Country Status (1)

Country Link
JP (1) JP3675655B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012048062A (en) * 2010-08-27 2012-03-08 Studio 33 Co Ltd Method for preparing three-dimensional peeled sample

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU2003211309A1 (en) * 2003-02-17 2004-09-06 Chiko Co., Ltd. Ground surface recovering method, and recovered surface provided by the method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012048062A (en) * 2010-08-27 2012-03-08 Studio 33 Co Ltd Method for preparing three-dimensional peeled sample

Also Published As

Publication number Publication date
JP2000154522A (en) 2000-06-06

Similar Documents

Publication Publication Date Title
Debaiky et al. CFRP wraps for corrosion control and rehabilitation of reinforced concrete columns
CN102792084A (en) Cryogenic storage tank
CN101858161A (en) Construction method of low-temperature double-wall storage tanks
CN106596268A (en) Multi-soaking condition simulation test model box and test method thereof
JPH02287198A (en) Bolt apparatus for radioactive waste disposal and waste disposal method
CN216718072U (en) Testing device for shear stress-strain curve test sample under large-scale direct shearing of on-site coarse-grained soil
Bandurin et al. Mathematical modeling of the influence of defects in structures of an on-farm network of rice systems on their operational reliability
Perez‐Gracia et al. Combining ground penetrating radar and seismic surveys in the assessment of cultural heritage buildings: The study of roofs, columns, and ground of the gothic church S anta M aria del M ar, in B arcelona (S pain)
JP3675655B2 (en) Relocation and preservation of soil structures
Bergamo et al. Testing of “Global Young's Modulus E” on a rehabilitated masonry bell tower in Venice
CN102493429B (en) Curing protection method of archaeological excavation site
CN118756744A (en) LNG three-wall metal cryogenic storage tank foundation and its construction method
JP3633804B2 (en) Surface finishing method for soil block display surface
Matero Lessons from the Great House: Condition and treatment history as prologue to site conservation and management at Casa Grande Ruins National Monument
CN113970493B (en) Testing device and testing method for shear stress-strain curve test specimen of large-scale direct shear of coarse-grained soil in situ
CN214621610U (en) Testing arrangement of waterproof insulation system water-blocking performance of roofing
Hughes Ten myths about the preservation of historic sites in Antarctica and some implications for Mawson's huts at Cape Denison
JP3449241B2 (en) How to reinforce the soil block surface
CN108036914B (en) Testing device and method for liquefaction and floating of underground oil tank
Spriggs The recovery and storage of materials from waterlogged deposits at York
Schwartzbaum et al. Earthquake damage to works of art in the Friuli region of Italy
Stapf et al. Design Concept for Wooden Pile Foundation based on the Example of an 160SyearSold Stone Bridge in Southern Germany
Malliaros et al. The Barangaroo Boat: archaeology and conservation of an early colonial vessel
Verhulst et al. Evaluation and performance monitoring of corrosion protection by fiber-reinforced composite wrapping
Miltiadou-Fezans Design in process, multidisciplinarity and synergy: Key issues of the structural restoration of Daphni Monastery

Legal Events

Date Code Title Description
A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20040202

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20040316

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20040517

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20040712

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20040827

A911 Transfer of reconsideration by examiner before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20041014

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20041221

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050215

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20050329

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20050426

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees