JP3678952B2 - Bridge structure with grid-like slab and its construction method - Google Patents
Bridge structure with grid-like slab and its construction method Download PDFInfo
- Publication number
- JP3678952B2 JP3678952B2 JP25696399A JP25696399A JP3678952B2 JP 3678952 B2 JP3678952 B2 JP 3678952B2 JP 25696399 A JP25696399 A JP 25696399A JP 25696399 A JP25696399 A JP 25696399A JP 3678952 B2 JP3678952 B2 JP 3678952B2
- Authority
- JP
- Japan
- Prior art keywords
- grid
- bridge structure
- floor slab
- steel girder
- lattice
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims description 31
- 229910000831 Steel Inorganic materials 0.000 claims description 48
- 239000010959 steel Substances 0.000 claims description 48
- 239000000945 filler Substances 0.000 claims description 34
- 239000000463 material Substances 0.000 claims description 30
- 230000008602 contraction Effects 0.000 claims description 25
- 239000003566 sealing material Substances 0.000 claims description 14
- 239000013013 elastic material Substances 0.000 claims description 10
- 238000000034 method Methods 0.000 claims description 6
- 230000008878 coupling Effects 0.000 claims 3
- 238000010168 coupling process Methods 0.000 claims 3
- 238000005859 coupling reaction Methods 0.000 claims 3
- 239000000428 dust Substances 0.000 description 12
- 238000005260 corrosion Methods 0.000 description 10
- 230000007797 corrosion Effects 0.000 description 10
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 9
- 230000003628 erosive effect Effects 0.000 description 8
- 239000010426 asphalt Substances 0.000 description 6
- 239000004567 concrete Substances 0.000 description 6
- 238000010586 diagram Methods 0.000 description 6
- 238000009825 accumulation Methods 0.000 description 5
- 230000000694 effects Effects 0.000 description 5
- 239000011150 reinforced concrete Substances 0.000 description 5
- 230000007423 decrease Effects 0.000 description 4
- 239000011347 resin Substances 0.000 description 4
- 229920005989 resin Polymers 0.000 description 4
- 241001391944 Commicarpus scandens Species 0.000 description 2
- 229910000746 Structural steel Inorganic materials 0.000 description 2
- -1 etc. Substances 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- JEIPFZHSYJVQDO-UHFFFAOYSA-N iron(III) oxide Inorganic materials O=[Fe]O[Fe]=O JEIPFZHSYJVQDO-UHFFFAOYSA-N 0.000 description 2
- 238000004904 shortening Methods 0.000 description 2
- 230000003466 anti-cipated effect Effects 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 239000003973 paint Substances 0.000 description 1
- 230000035699 permeability Effects 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 230000003449 preventive effect Effects 0.000 description 1
- 238000009418 renovation Methods 0.000 description 1
- 239000000565 sealant Substances 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
- 238000009423 ventilation Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Landscapes
- Bridges Or Land Bridges (AREA)
- Floor Finish (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、格子状床版が本来備える特性を損なうことなく、構造物が新設であるか既設であるかを問わずに適用可能な格子状床版を備えた橋梁構造物とその施工方法に関するものである。
【0002】
【従来の技術】
つり橋、一般橋、高架橋、桟橋、仮設橋などの構造物(以下、橋梁構造物あるいは単に構造物とも言う)の床版には、大きく分けて、鉄筋コンクリート床版(RC 床版、PC床版) 、底鋼板上にコンクリートを設けた合成床版、鋼床版が用いられる。この中でも、鉄筋コンクリート床版が、従来から、最も汎用されている。
【0003】
しかし、このような鉄筋コンクリート床版の場合、その床版全面をコンクリートやアスファルトで覆っているので、床版自体の重量が重くなる。このため、構造物の構造部材の強度が必要となり、構造物の重量も重くなる。また、その施工に時間がかかるため、施工期間が長くなり、コストが高くなる。更に、既設構造物の床版の架け替え (改修) 工事などで、周辺の交通規制をする必要がでてくるため、交通渋滞を招くなどの問題があった。そして、降雨時や降雪時の排水性も十分でないなどの問題もあった。
【0004】
これに対し、最近では、特開昭63-63801号公報や特開平07-189225 号公報などに開示されている鋼床版の中でも、特に格子状床版が、排水性などの面から注目されている。この格子状床版は、鉄筋コンクリート床版に比べて軽量であり、通気性、通風性、排水性等が良い等の特性を備えている。このため、施工期間が短くなり、コストも低下するなどの利点がある。
【0005】
【発明が解決しようとする課題】
ところが、これまでは、格子状床版を構造物の床版の一部に使った例はあるものの、あまりその使用例は多くなかった。これは、格子状床版を設置した場合、その上面に開空間を有するため、その下側に位置する桁等の構造部材が、雨水等により浸食されたり、ごみ等の堆積によって腐食されるという問題があり、これに対し、従来は単に格子状床版を構造部材 (主桁、横桁等の鋼桁、以下、鋼桁構造部材とも言う) 上に設置しているだけで、前記浸食や腐食に対し、格段の配慮がされなかったからである。
【0006】
また、同様に、橋台や橋脚近傍でも、コンクリートである橋台や橋脚そのものや、その支承部が雨水等により浸食されたり、ごみ等の堆積によって腐食されるという問題があるものの、この問題に対し、従来から格段の配慮がされなかったからである。
【0007】
そして、格子状床版自体は金属製であるため、格子状床版を複数並べて設置する際に、格子状床版同士の間隔が空いていると、車両通過時や構造物そのものの揺れなどによって、騒音が発生するという問題がある。この問題に対しても、これまでは、単に溶接やボルトナットで固定されているのみであった。更に、このように、格子状床版同士を互いに完全に固定してしまうと、構造物の揺れや車両通過などによるたわみによって、付加的応力が発生し、強度上の問題が生じることにもつながっていた。
【0008】
また、格子状床版そのものには、構造物の伸縮を吸収する機能がないため、従来の鉄筋コンクリート床板を使用したときと同様に、格子状床版を採用した高架橋などでは、橋台と橋梁あるいは橋梁と橋梁との間に、夏季と冬季との気温差による構造物全体の伸縮を吸収する伸縮部を設置する必要がある。しかし、この伸縮部は複雑な構造で高価な伸縮装置を使用せざるを得ないため、伸縮装置により車両走行中に騒音が発生したり、車両走行性の低下や、コストアップとなる等の問題を招来していた。
【0009】
以上は、主に、新設の構造物の問題として説明したが、これらの問題は、既設の構造物の床版を架け替える際に格子状床版を採用する場合でも同様である。
【0010】
本発明の目的は、上記の様な問題を解決し、格子状床版が本来備える特性を損なうことなく、新設のみではなく、既設の橋梁構造物にも適用可能な格子状床版を備えた橋梁構造物とその施工方法を提供しようとするものである。
【0011】
【課題を解決するための手段】
この目的を達成するために、本発明橋梁構造物の要旨は、橋梁構造物を構成する鋼桁構造部材に支持され、前記鋼桁構造部材に対しほぼ平行に配置される複数の主部材と、該主部材に対しほぼ直角に配置される複数の横部材と、最も外側に配置されている前記主部材と前記横部材とからなる格子状床版を備えた橋梁構造物であって、前記鋼桁構造部材上で相対する前記格子状床版が、前記鋼桁構造部材上で連結部材によって互いに連結する連結部を備え、該連結部が回動可能なピン結合で互いに連結されてなり、前記鋼桁構造部材上で相対する前記格子状床版の間に、充填材による充填層が形成されていることである。
【0012】
【0013】
本発明橋梁構造物の別の好ましい態様としては、前記格子状床版を支持する鋼桁構造部材の上側にシール材を配置するとともに、前記鋼桁構造部材上で相対する前記格子状床版の間で、且つ前記シール材の上に、前記充填材による充填層が形成されていることである (請求項2に対応) 。
【0014】
本発明橋梁構造物の更に別の好ましい態様としては、前記充填層の内部であって、前記鋼桁構造部材上で相対する前記格子状床版の相対する前記枠部材に面する部分に弾性材を配置したことである (請求項3に対応) 。
【0015】
本発明橋梁構造物の更に別の好ましい態様としては、前記橋梁構造物が該橋梁構造物の伸縮を吸収する伸縮部を備えるものであって、前記伸縮部において、前記橋梁構造物の長手方向に相対する前記格子状床版が互いに前記橋梁構造物の長手方向に重なり合うように配置されていることである (請求項4に対応) 。
【0016】
本発明橋梁構造物の更に別の好ましい態様としては、前記鋼桁構造部材の上部に位置する前記格子状床版の前記主部材と前記横部材からなる格子の開空間に、充填材を充填することである (請求項5に対応) 。
【0017】
本発明橋梁構造物の施工方法の要旨は、橋梁構造物を構成する鋼桁構造部材に支持され、前記鋼桁構造部材に対しほぼ平行に配置される複数の主部材と、該主部材に対しほぼ直角に配置される複数の横部材と、最も外側に配置されている前記主部材と前記横部材とからなる格子状床版を備えた橋梁構造物の施工方法であって、複数の前記格子状床版を橋梁構造物の鋼桁構造部材に設置した後、前記鋼桁構造部材上で前記橋梁構造物の幅方向に相対する前記格子状床版の互いの連結部材を、鋼桁構造部材の長手方向回りに回動可能なピン結合として連結した後で、前記橋梁構造物の幅方向に相対する前記格子状床版の間に充填材を充填することである (請求項6に対応) 。
【0018】
【0019】
また、本発明橋梁構造物の施工方法の好ましい態様として、前記格子状床版を橋梁構造物の鋼桁構造部材に設置する前に、前記鋼桁構造部材の上側にシール材を配置し、前記ピン結合による連結をした後で、前記構造物の幅方向に相対する前記格子状床版の間で、且 つ前記シール材の上に、充填材を充填することである (請求項7に対応) 。
【0020】
更に、本発明橋梁構造物の施工方法の好ましい態様として、前記充填材を充填する前に、前記鋼桁構造部材上で、かつ構造物の幅方向に相対する前記格子状床版の相対する前記枠部材に面する部分に、間に弾性材を配置し、その後充填材を充填することである (請求項8に対応) 。
【0021】
また、本発明橋梁構造物の施工方法の好ましい態様として、前記橋梁構造物が該橋梁構造物の伸縮を吸収する伸縮部を備えるものであって、前記伸縮部において、前記鋼桁構造部材上で前記橋梁構造物の幅方向に相対する前記格子状床版の前記連結部材を、前記鋼桁構造部材の長手方向回りに回動可能なピン結合として連結をした後に、新たな格子状床版を前記橋梁構造物の長手方向に配置する場合に、前記橋梁構造物の長手方向に相対する前記格子状床版の、前記橋梁構造物の長手方向に配置される前記主部材または横部材を、互いに前記橋梁構造物の長手方向に重なり合うように配置することである (請求項9に対応) 。
【0022】
またさらに、本発明橋梁構造物の施工方法の好ましい態様として、前記鋼桁構造部材の上部に位置する前記格子状床版の前記主部材や前記横部材からなる格子の開空間に、充填材を充填することである (請求項10に対応) 。
【0023】
上記請求項1または6に記載の発明によれば、格子状床版間に間隔が空くことがない。また、格子状床版が回動可能なピン結合で互いに連結されているので、構造物の揺れや車両通過などによるたわみによって、付加的応力が発生することもない。また、車両通過時や構造物そのものの揺れなどによって、騒音が発生するという問題がない。また、極めて容易に設置が可能であり、施工期間が短縮可能となり、周辺の交通規制を最小限に止めることができる。
【0024】
上記発明によれば、格子状床版を構造物に設置した場合に、格子状床版の開空間の下側に位置する桁等の鋼桁構造部材が、雨水等により浸食されたり、ごみ等の堆積によって腐食されるという問題がない。
【0025】
また、上記請求項2または7に記載の発明によれば、格子状床版の開空間の下側に位置する桁等の鋼桁構造部材の、雨水等による浸食やごみ等の堆積による腐食の問題がない。更に、主桁上に弾性シール材を敷いているため、格子状床版の取り替え工事の際に充填材を除去しやすいので、格子状床版の取り替えの (交換の) し易さという利点を生かせる。
【0026】
更に、上記請求項3または8に記載の発明によれば、前記充填層の内部に弾性材 (バックアップ材) を配置することで、格子状床版の取り替え工事の際に充填材を除去しやすさが向上する。また、路面が凍結した際に、車両がこの上を走行すると、内部の弾性材の作用により、充填層が弾性的に変形しやすく、これによって、凍結した氷が割れやすく、除去し易くなる。
【0027】
また、上記請求項4または9に記載の発明によれば、構造物全体の伸縮を吸収することができるとともに、伸縮部において過大な隙間ができることがないので、騒音の問題を減少することができる。また、構造が複雑で高価な伸縮装置を用いる必要がないので、施工期間の短縮や施工コストの低減が可能となる。
【0028】
またさらに、上記請求項5または10に記載の発明によれば、格子状床版の開空間の下側に位置する支承や桁等についても、雨水等による浸食や、ごみ等による腐食を防止できる。また、充填材を複数の層構造とすることで、耐久性を保ったまま、路面が凍結した際に、車両がこの上を走行すると、充填材部分が弾性的に変形しやすく、これによって、凍結した氷が割れやすく、除去し易くなる。
【0029】
【発明の実施の形態】
本発明の前提となる第1 の実施の形態を図1 に示す。
格子状床版1b、1cは、互いに平行に間隔を設けて配置された主部材2b、2cと、この主部材2b、2cに対して直角方向に、互いに平行に間隔を設けて配置された横部材3b、3cと、主部材2b、2c間に主部材2b、2cと平行でかつ複数設置されている補助部材4b、4cと、格子状床版の最も外側に配置されている主部材と横部材とからなる枠部材5b、5cとを備えた格子状構造をしている。そして、格子状床版1b、1cは、主部材2b、2cの方向が車両走行方向で、かつ構造物の主桁6 の長手方向に沿うように、構造物の主桁6 上に設置されている。
【0030】
横部材3b、3cの長手方向では、各枠部材5b、5cの両側より、横部材3b、3cの両端部が突出しており、この突出した部分が、連結部材9 となっている。この連結部材9 は格子状床版1b、1cを連結するための連結部20a となっており、図4(a)に示すように、それぞれ、その先端部に連結用の連結穴10があいており、この連結穴10が重ねられて、連結用のピン8 が装入され、格子状床版1b、1cを主桁6 上で連結する構造となっている。ここで、ピン8 による格子状床版1b、1cの連結は、完全に固定するものではなく、主桁6 の方向に設置されるピン8 を中心として、回動自由な連結となっている。
【0031】
このような構造とすることで、格子状床版1b、1cの間に間隔が空くこともなく、回動自由に連結しているので、構造物の揺れや車両通過などによるたわみによって、付加的応力が発生し、強度上の問題が生じることがない。また、車両通過時や構造物そのものの揺れなどによって、騒音が発生することもない。
【0032】
なお、連結部20a の構造は、上記に限らず、格子状床版1b、1cを完全に固定するものでなければよく、例えば、図2 の連結部20b および図4(b)に示すように、枠部材5b、5cから突出している連結部材9 を連結補助部材11を介して連結するものでもよい。この場合も、ピン8 による格子状床版1b、1cの連結は、完全に固定するものではなく、主桁6 の方向に設置されるピン8 を中心として、回動自由な連結となっている。
【0033】
また、連結部材9 が重なり合う連結部20a の連結部材9 は、端部に向かうに従って、徐々にその厚さ (高さ) が減少するものがよい。即ち、連結部材9 端部の上面は、図4(a)に示すような直線状に限らず、図4(b)に示すような曲線状であってもよい。そして、このように連結部材9 端部の厚さを減少させることによって、格子状床版1b、1cの連結部で段差が生じることなく、車両の走行性が向上する。
【0034】
さらに、上記では、主桁上で連結する例を説明したが、これに限らず、横桁上で連結する場合でも、同様な効果が期待できる。
【0035】
本発明の前提となる第 2の実施の形態を図3 に示す。
格子状床版1b、1cは、第 1の実施の形態と同様に、互いに平行に間隔を設けて配置された主部材2b、2cと、この主部材2b、2cに対してほぼ直角方向に、互いに平行に間隔を設けて配置された横部材3b、3cと、主部材2b、2c間に主部材2b、2cと平行でかつ複数設置されている補助部材4b、4cと、格子状床版の最も外側に配置されている主部材と横部材とからなる枠部材5b、5cとを備えた格子状構造をしている。そして、格子状床版1b、1cは、第 1の実施の形態と違い、横部材3b、3cの方向が車両走行方向であり、かつ構造物の主桁6 の長手方向に沿うように、構造物の主桁6 上に設置されている。
【0036】
主部材2b、2cの長手方向では、各枠部材5b、5cの両側より、補助部材4b、4cの両端部が突出しており、この突出した部分が、連結部材9 となっている。この連結部材9 は格子状床版1b、1cを連結するための連結部20c となっている。図4(b)に示す第 1の実施の形態と同様に、連結部材9 の先端部にそれぞれ連結用の連結穴10があいており、連結補助部材11を介して、この連結穴10が重ねられて、連結用のピン8 が装入され、格子状床版1b、1cを主桁6 上で連結する構造となっている。ここで、ピン8 による格子状床版1b、1cの連結は、完全に固定するものではなく、主桁6 の方向に設置されるピン8 を中心として、回動自由な連結となっている。なお、連結部材9 となるのは補助部材4b、4cに限らず、主部材2b、2cを用いてもよい。
【0037】
このような構造とすることで、格子状床版1b、1cの間に間隔が空くこともなく、回動自由に連結しているので、第1 の実施の形態と同様に、構造物の揺れや車両通過などによるたわみによって、付加的応力が発生し、強度上の問題が生じることがない。また、車両通過時や構造物そのものの揺れなどによって、騒音が発生することもない。
【0038】
また、連結部材9 と連結補助部材11との重なり合う部分の連結部材9 と連結補助部材11は、端部に向かうに従って、徐々にその厚さ (高さ) が減少するものがよい。即ち、連結部材9 端部の上面は、図4(a)に示すような直線状に限らず、図4(b)に示すような曲線状であってもよい。このような構成によって、格子状床版1b、1cの連結部で段差が生じることなく、車両の走行性が向上する。
【0039】
以上の前提に基づき、本発明の特徴的な実施の形態を図5 、図6 に示す。
図 5 に示すように、この実施の形態において、主桁6 上の格子状床版1b、1cの間の開空間には、雨水やごみ等が堆積することになるため、連結部のある主桁6 の上の部分は、下記のような充填構造とする。図5(a)に連結部の垂直断面、図5(b)にその連結部を上側からみた平面図を示すように、構造物の主桁6 の上に充填材12が、連結部材9 と同じ高さまで、つまり、連結部が充填材の中に埋もれるまで充填されている。
【0040】
このようにすることで、格子状床版1b、1cの間の開空間に位置する桁等の鋼桁構造部材の雨水等による浸食や、ごみ等による腐食の問題がない。
【0041】
更に、図6(a)、(b) に示すように、構造物の主桁6 の上面にはシール材13が敷かれている。なお、図6(b)に示すように、このシール材13の上、または、充填材12が枠部材5b、5cに面する部分に、弾性材としてバックアップ材14を設けることが好ましい。
【0042】
このシール材13によって、格子状床版の取り替え工事の際に充填材12が除去しやすくなり、格子状床版の取り替えのし易さという利点を生かせる。また、バックアップ材14を設けることにより、路面が凍結した際に、車両の走行で、充填材内部のバックアップ材の作用により、充填層が弾性的に変形しやすく、これによって、凍結した氷が割れやすく、除去し易くなる。
【0043】
本発明の別の実施の形態を図7 に示す。
構造物を支持する支持部( 例えば高架橋であれば橋台等) では、格子状床版の開空間の下方に位置する部分の、雨水等による浸食や、ごみ等による腐食の影響を考慮する必要がある。このため、この実施の形態は、構造物の伸縮部である橋台の部分に格子状床版を設置した場合の実施の形態である。
【0044】
図7(a)に示すように、橋台や支承の上方にある格子状床版1cの主部材2c間に充填材12を充填することが好ましい。この場合、図7 (b) に示すように、充填材12を主部材2cの走行面と同じ高さまで充填すればよい。あるいは、図7 (c) に示すように、充填材12の高さを主部材2cよりも低い高さまで充填してもよく、また、図7 (d) に示すように、充填材12を複数の層構造にしてもよい。この場合は、上側にはアスファルトなどの耐久性の高いものを設置し、下側には樹脂材料等の弾性変形しやすいものを配置することが好ましい。
【0045】
このようにすることで、格子状床版の開空間の下側に位置する橋台や支承についても、雨水等による浸食や、ごみ等による腐食を防止できる。また、充填材を複数の層構造とすることで耐久性を保ことができる。さらに、車両の走行で、充填材部分が弾性的に変形しやすく、これによって、凍結した氷が割れやすく、除去し易くなる。
【0046】
ここで、構造物の橋台部に設置した格子状床版1bは、必ずしも格子状床版である必要はないので、格子状床版の開空間に、コンクリートやアスファルトなどを充填することが望ましい。また、格子状床版1b、1cが重なり合っている部分の下側には、格子状床版1b、1cから通過した雨水等が橋台や支承に流れないように、例えば、樋16等を設置することが好ましい。さらに、充填材を充填していない部分から雨水等が流れてこないように、防錆、防食処理を施した板状部材からなる水抜きスカート17を設置することが好ましい。
【0047】
なお、上記の橋台部に限らず、他の伸縮部である橋脚の上部においても適用可能であり、充填材を充填することで、橋脚に対しても同様の効果が期待できる。
【0048】
本発明の別の実施の形態を図8 に示す。
この実施の形態は、本発明を高架橋の伸縮部分に格子状床版を設置した場合の実施の形態である。
【0049】
この実施の形態でも、図8(a)に示す通り、格子状床版1bは、互いに平行に間隔を設けて配置された主部材2b、2cと、この主部材2b、2cに対してほぼ直角方向に、互いに平行に間隔を設けて配置された横部材3b、3cとからなる格子状構造をしている。そして、格子状床版1b、1cは、主部材2b、2cの方向が車両走行方向であり、かつ構造物の主桁6 の長手方向に沿うように、構造物の主桁6 上に複数設置されている。また、主部材2b、2c間には補助部材4b、4cが主部材2b、2cと平行に複数設置されている。
【0050】
そして、車両走行方向であり、構造物の長手方向に相対する格子状床版1b、1c同士を、それぞれ横部材3b、3cの方向にずらすとともに、横部材3b、3cから主部材2b、2cと補助部材4b、4cとを外方に突出させることにより、格子状床版1b、1cが互いに重なり合うように配置されている。ここで、図8(b)に示すように、主部材2b、2cと補助部材4b、4cとの重なり合う部分は、端部に向かうに従って、徐々にその厚さ (高さ) が減少している。
【0051】
このような構成によって、構造物全体の伸縮を吸収することができるとともに、伸縮部において過大な隙間ができることがないので、騒音の問題を減少することができる。また、構造が複雑で高価な伸縮装置を用いる必要がないので、施工期間が短縮や施工コストの低減が可能となる。
【0052】
なお、このような配置としては、上記に限らず、図9 に示すように、横部材3b方向にずらさずとも、相対する格子状床版1b、1cの主部材2b、2cや補助部材4b、4cを交互に横部材3b、3cから突出させることによって、重なり合うようにしてもよい。
【0053】
また、格子状床版1b、1c同士の重なり合う部分の主部材2b、2cや補助部材4bは、端部に向かうに従って、徐々にその厚さ (高さ) が減少しているのがよく、上記の実施の形態に示すような直線状に限らず、曲線状であってもよい。そして、このような構成によって、格子状床版1b、1cの間で段差が生じることなく、車両の走行性が向上する。
【0054】
次に、本発明施工方法の実施の形態について説明する。本発明橋梁構造物を施工する場合には、以下のような手順で施工する。
(1) まず、構造物の主桁6 および横桁を設置する。
(2) 主桁6 および横桁の上にシール材12を敷く。
(3) 次に、主部材2bと横部材3bと補助部材4bとからなる格子状床版1bを主桁6 に載置する。
(4) そして、引き続き、次の格子状床版1cを、前の格子状床版1bの隣の主桁6 に載置する。
(5) 格子状床版1b、1cを互いの連結部材9 の連結穴10に、連結用のピン8 を装入し、または連結部材9 と補助部材11との連結穴10に、連結用のピン8 を装入することによって、格子状床版1b、1cを主桁6 上で連結する。
(6) 格子状床版を、構造物の長手方向及び幅方向に、主桁6 上に順次載置していき、順次連結していく。
(7) 格子状床版1b、1cの間にバックアップ材14を設置する。
(8) 格子状床版1b、1cの間に充填材12を充填する。
【0055】
このような施工方法とすることで、極めて容易に設置が可能であり、施工期間が短縮可能となる。格子状床版1b、1cの間に間隔が空くことがない。さらに、回動自由に連結しているので、構造物の揺れや車両通過などによるたわみによって、付加的応力が発生することがない。また、車両通過時や構造物そのものの揺れなどによって、騒音が発生することもない。更に、格子状床版の下側に位置する桁等の鋼桁構造部材が、雨水等により浸食されたり、ごみ等の堆積によって腐食されるという問題がない。
【0056】
そして、主桁6 上にシール材13を敷いているため、格子状床版の取り替え工事の際等に充填材12を除去しやすく、格子状床版の取り替えのし易さという利点を生かせる。また、バックアップ材14を設けることにより、路面が凍結した際に、車両の走行で、充填材内部のバックアップ材の作用により、充填層が弾性的に変形しやすく、これによって、凍結した氷が割れやすく、除去し易くなる効果が得られる。
【0057】
なお、バックアップ材14は予め格子状床版の側面に設置しておいてもよい。また、シール材13と、その上に設置されるバックアップ材14が予め一体的になったものを主桁6 又は横桁上に敷いても良い。
【0058】
次に、高架橋の伸縮部分に格子状床版を設置した場合の施工方法について説明する。本発明を施工する場合には、以下のような手順で施工する。
(1) まず、構造物の主桁6 および横桁を設置する。
(2) 次に、主部材2bと横部材3bと補助部材4bとからなる格子状床版1bを用意する。
(3) そして、格子状床版1bを主桁6 に載置する。
(4) 引き続き、次の格子状床版1cを構造物に載置していく際、既に載置されている格子状床版1bと次に載置する他方の格子状床版1cとの主部材方向の端部が重なり合うように、構造物の橋台部に載置していく。
【0059】
このような施工方法とすることで、格子状床版で、構造物全体の伸縮を吸収することができるとともに、伸縮部において過大な隙間ができることがないので、騒音の問題を減少することができる。また、構造が複雑で高価な伸縮装置を用いる必要がないので、極めて容易に設置が可能であり、施工期間が短縮や施工コストの低減が可能となる。
【0060】
ここで、構造物の橋台部に設置した格子状床版は、必ずしも格子状床版である必要はないので、格子状床版の開空間に、コンクリートやアスファルトなどを充填することが望ましい。
【0061】
また、構造物の橋台部に設置した格子状床版と、構造物の主桁に設置した格子状床版の設置順序は、必ずしも上記である必要はなく、構造物の伸縮部 (橋台上や橋脚上) に格子状床版を設置した後、格子状床版を主桁に設置しても良い。
さらに、上記実施の形態では、橋梁と橋台との間の伸縮部へ設置した例を示したが、橋梁と橋梁との間の伸縮部に設置する場合も同様であり、始めに設置した格子状床版に引き続き、隣り合う橋梁の主桁に設置すればよい。
【0062】
なお、上記1 、2 の実施の形態では、格子状床版の格子形状は、四角形のものを説明したが、これに限らず、その他の形状をもつ格子であっても良い。また、格子状床版の補助部材は必須ではなく、必要に応じて、主部材間または横部材間に設置すれば良い。
【0063】
なお、本発明における充填材12としては、コンクリート、アスファルト、樹脂材料などが使用されるが、耐久性、除去しやすさからアスファルトが好ましい。また、弾性材であるバックアップ材14としては、ゴムやスポンジのような弾性のある樹脂材料が好ましい。さらにシール材13としては、樹脂材料、防錆用塗料などが使用できる。
【0063】
【発明の効果】
本発明によれば、格子状床版間に間隔が空くことがない。また、回動自由に連結しているので、構造物の揺れや車両通過などによるたわみによって、付加的応力が発生し、強度上の問題が生じることがない。また、車両通過時や構造物そのものの揺れなどによって、騒音が発生することもない。また、極めて容易に設置が可能であり、施工期間が短縮可能となり、周辺の交通規制を最小限に止めることができる。また、本発明によれば、格子状床版の開空間の下側に位置する桁等の鋼桁構造部材の、雨水等による浸食、ごみ等による腐食の問題がない。
更に、請求項2 または 7 に記載の本発明によれば、格子状床版の開空間の下側に位置する桁等の鋼桁構造部材の、雨水等による浸食、ごみ等による腐食の問題がない。また、主桁上に弾性シール材を敷いているため、格子状床版の取り替え工事の際に充填材を除去しやすく、格子状床版の取り替えのし易さという利点を生かせる。
またさらに、請求項3 または 8 に記載の発明によれば、弾性材としてバックアップ材を設置することで、格子状床版の取り替え工事の際に充填材の除去しやすさが向上するとともに、路面が凍結した際に、車両がこの上を走行すると、内部の弾性材の作用により、充填層が弾性的に変形しやすく、これによって、凍結した氷が割れやすく、除去し易くなる。
そして、請求項4 または 9 に記載の発明によれば、構造物全体の伸縮を吸収することができるとともに、伸縮部において過大な隙間ができることがないので、騒音の問題を減少することができる。また、構造が複雑で高価な伸縮装置を用いる必要がないので、施工期間の短縮や施工コストの低減が可能となる。
またさらに、請求項5 または 10に記載の発明によれば、格子状床版の開空間の下側に位置する支承や桁等についても、雨水等による浸食、ごみ等による腐食を防止できる。また、充填材を複数の層構造とすることで、耐久性を保ったまま、路面が凍結した際に、車両がこの上を走行すると、充填層が弾性的に変形しやすく、これによって、凍結した氷が割れやすく、除去し易くなる。
【図面の簡単な説明】
【図1】 本発明の第1 の実施形態を示す図であり、本発明の格子状床版を備えた構造物を上側からみた平面図である。
【図2】 本発明の第1 の実施形態の別の例を示す図であり、本発明の格子状床版を備えた構造物を上側からみた平面図である。
【図3】 本発明の第2 の実施形態を示す図であり、本発明の格子状床版を備えた構造物を上側からみた平面図である。
【図4】 本発明の第1 、2 の実施の形態の連結部を示す図であり、(a) は連結部材を直接連結する例を示した図であり、(b) は連結部材を連結補助部材を介して連結する例を示した図である。
【図5】 本発明の特徴的な実施の形態を示す図であり、(a) は連結部の垂直断面を示した図であり、(b) は上側からみた平面図である。
【図6】 本発明の特徴的な実施の形態を示す図であり、(a) はバックアップ材を枠部材に接して設置した例を示した連結部の垂直断面図であり、(b) はバックアップ材をシール材の上部に設置した例を示した連結部の垂直断面図である。
【図7】 本発明の特徴的な別の実施の形態を示す図であり、(a) は本発明の格子状床版を備えた構造物を上側からみた平面図であり、(b) は本発明の格子状床版を備えた構造物の上下方向の断面図であり、(c) と(d) は充填材充填部分の断面図である。
【図8】 本発明の特徴的な別の実施の形態を示す図であり、(a) は本発明の格子状床版を備えた構造物の幅方向の断面図であり、(b) は本発明の格子状床版を備えた構造物を上側からみた平面図である。
【図9】 本発明の実施の形態の別の例を示す図である。
【符号の説明】
1b、1c: 格子状床版、2b、2c: 主部材、3b、3c: 横部材、4b、4c: 補助部材、 5b 、5c: 枠部材、6:主桁、8:ピン、9:連結部材、10: 連結穴、11: 連結補助部材、12: 充填材、13: シール材、14: バックアップ材、15: 車両走行面、16: 樋、17: 水抜きスカート、18: 橋台、19: 支承、20a 、20b 、20c:連結部[0001]
BACKGROUND OF THE INVENTION
The present invention includes a grid-like floor slab that can be applied regardless of whether the structure is newly installed or existing without impairing the inherent properties of the grid-like floor slab.BridgeThe present invention relates to a structure and its construction method.
[0002]
[Prior art]
Structures such as suspension bridges, general bridges, viaducts, piers, and temporary bridges(Hereafter referred to as bridge structure or simply structure)The slabs are roughly divided into reinforced concrete slabs (RC slabs and PC slabs), synthetic slabs with concrete on the bottom steel plate, and steel slabs. Among these, reinforced concrete slabs have been most widely used.
[0003]
However, in the case of such a reinforced concrete floor slab, since the entire surface of the floor slab is covered with concrete or asphalt, the weight of the floor slab itself becomes heavy. For this reason, the strength of the structural member of the structure is required, and the weight of the structure also increases. Moreover, since the construction takes time, the construction period becomes long and the cost becomes high. In addition, there is a problem that traffic congestion is caused because it is necessary to regulate the surrounding traffic in the construction (renovation) of the floor slab of the existing structure. And there was also a problem that drainage was not sufficient when it was raining or snowing.
[0004]
On the other hand, recently, among steel floor slabs disclosed in Japanese Patent Laid-Open Nos. 63-63801 and 07-189225, lattice-type floor slabs have attracted attention in terms of drainage. ing. The grid-like slab is lighter than the reinforced concrete slab and has characteristics such as good air permeability, ventilation, drainage, and the like. For this reason, there exists an advantage that a construction period becomes short and cost also falls.
[0005]
[Problems to be solved by the invention]
However, until now there have been examples of using a grid-type floor slab as part of the floor slab of a structure, but there have not been many examples of its use. This is because, when a grid-like floor slab is installed, it has an open space on its upper surface, so that structural members such as girders located below it are eroded by rainwater, etc., or corroded by the accumulation of dust etc. In contrast, there is a problem in the past.Hereafter referred to as steel girder structural membersThis is because no particular consideration was given to the erosion and corrosion just by being installed above.
[0006]
Similarly, there is a problem that the concrete abutment and the pier itself and the support part thereof are eroded by rainwater etc. or corroded by the accumulation of dust etc. This is because there has been no particular consideration.
[0007]
And since the grid-like floor slab itself is made of metal, when installing a plurality of grid-like floor slabs, if the space between the grid-like floor slabs is wide, it may be caused by the movement of the vehicle or the shaking of the structure itself. There is a problem that noise is generated. Until now, this problem has been simply fixed by welding or bolts and nuts. Furthermore, if the grid-like floor slabs are completely fixed to each other in this way, additional stress is generated due to deflection caused by shaking of the structure or passing through the vehicle, leading to a problem in strength. It was.
[0008]
In addition, because the lattice floor slab itself does not have the function of absorbing the expansion and contraction of the structure, as with conventional reinforced concrete slabs, abutments and bridges or bridges are used in viaducts that employ lattice slabs. It is necessary to install an expansion / contraction section that absorbs the expansion and contraction of the entire structure due to the temperature difference between summer and winter. However, since this stretchable part has to use an expensive stretcher with a complicated structure, there are problems such as noise generated during the vehicle running by the stretcher, a decrease in vehicle running performance, and an increase in cost. Had been invited.
[0009]
Although the above has been mainly described as problems of a newly-installed structure, these problems are the same even when a grid-like floor slab is adopted when replacing the floor slab of an existing structure.
[0010]
The object of the present invention is to solve the above-mentioned problems and not to impair the characteristics inherent to the lattice floor slab,BridgeEquipped with a grid-like floor slab that can also be applied to structuresBridgeIt is intended to provide a structure and its construction method.
[0011]
[Means for Solving the Problems]
To achieve this object, the present inventionBridgeThe gist of the structure isBridgeConfigure the structureSteel girderSupported by a structural member,Steel girderA plurality of main members disposed substantially parallel to the structural member; and a plurality of transverse members disposed substantially perpendicular to the main member;The main member and the transverse member arranged on the outermost sideEquipped with a grid-like floor slab consisting ofBridgeA structure, saidSteel girderThe grid-like floor slab facing on the structural member isSteel girderA connecting portion connected to each other by a connecting member on the structural member, the connecting portions being connected to each other by a rotatable pin connection;In addition, a packed layer of a filler is formed between the lattice-like floor slabs facing each other on the steel girder structural member.Is Rukoto.
[0012]
[0013]
The present inventionBridgeAs another preferred embodiment of the structure, the lattice-like floor slab is supported.Steel girderWhile arranging a sealing material on the upper side of the structural member,Steel girderBetween the lattice-like floor slabs facing each other on the structural memberAnd a filling layer of the filler is formed on the sealing material.(Claims2Corresponding).
[0014]
The present inventionBridgeIn another preferred embodiment of the structure, the inside of the packed bedAnd on the part facing the frame member of the grid-like floor slab opposed on the steel girder structural memberThe elastic material is arranged (claim)3Corresponding).
[0015]
The present inventionBridgeAs another preferred embodiment of the structure,The bridge structure includes an expansion / contraction portion that absorbs expansion / contraction of the bridge structure,In the telescopic part,BridgeThe lattice-like floor slabs facing the longitudinal direction of the structureBridgeIt is arranged so as to overlap in the longitudinal direction of the structure.4Corresponding).
[0016]
The present inventionBridgeAs another preferred embodiment of the structure,Of the steel girder structural memberFilling an open space of a lattice formed by the main member and the transverse member of the lattice-shaped floor slab located at the upper part (claim).5Corresponding).
[0017]
The present inventionBridgeThe gist of the construction method of the structure isBridgeConfigure the structureSteel girderSupported by a structural member,Steel girderA plurality of main members disposed substantially parallel to the structural member; and a plurality of transverse members disposed substantially perpendicular to the main member;The main member and the transverse member arranged on the outermost sideEquipped with a grid-like floor slab consisting ofBridgeA construction method for a structure, wherein a plurality of the grid-like floor slabs areBridgeStructuralSteel girderAfter installing on the structural member,Steel girderOn the structural memberBridgeThe connecting members of the lattice-like floor slabs facing the width direction of the structure,Steel girderConnected as a pin connection that can rotate around the longitudinal direction of the structural memberAfter that, a filler is filled between the lattice-like floor slabs facing the width direction of the bridge structure.(Claims6Corresponding).
[0018]
[0019]
In addition, the present inventionBridgeAs a preferred embodiment of the construction method of the structure, the grid-like floor slab isBridgeStructuralSteel girderBefore installing on structural members,Steel girderAfter a sealing material is arranged on the upper side of the structural member and connected by the pin connection, the space between the lattice-like floor slabs facing the width direction of the structureAnd On the sealing material,Filling with filler (claim)7Corresponding).
[0020]
Furthermore, the present inventionBridgeAs a preferred embodiment of the construction method of the structure, before filling the filler, theSteel girderThe lattice-like floor slab on the structural member and facing the width direction of the structureIn the part facing the frame member facing,Placing an elastic material between them and then filling with a filler.8Corresponding).
[0021]
In addition, the present inventionBridgeAs a preferable aspect of the construction method of the structure,The bridge structure includes an expansion / contraction portion that absorbs expansion / contraction of the bridge structure,In the telescopic part,Steel girderOn the structural memberBridgeThe connection member of the lattice-like floor slab facing the width direction of the structure,Steel girderAfter connecting as a pin connection rotatable around the longitudinal direction of the structural member, a new grid-like floor slab isBridgeWhen arranged in the longitudinal direction of the structure,BridgeThe grid-like floor slab facing the longitudinal direction of the structure,BridgeThe main member or the transverse member arranged in the longitudinal direction of the structure is mutually connectedBridgeIt is arranged so as to overlap in the longitudinal direction of the structure.9Corresponding).
[0022]
Still further, the present inventionBridgeAs a preferable aspect of the construction method of the structure,The upper part of the steel girder structural memberFilling the open space of the lattice formed of the main member and the transverse member of the lattice-like floor slab located at10Corresponding).
[0023]
Claim 1 or above6According to the invention described in (1), there is no space between the grid-like slabs. Further, since the lattice-like floor slabs are connected to each other by a rotatable pin connection, no additional stress is generated due to the deflection caused by the shaking of the structure or passing through the vehicle. Further, there is no problem that noise is generated when the vehicle passes or the structure itself shakes. Moreover, it can be installed very easily, the construction period can be shortened, and traffic restrictions in the surrounding area can be minimized.
[0024]
UpMemorandumAccording to Ming, when a grid-like floor slab is installed in a structure, a girder located below the open space of the grid-like floor slab, etc.Steel girderThere is no problem that the structural member is corroded by rain water or the like, or corroded by accumulation of dust or the like.
[0025]
In addition, the above claims2Or7According to the invention described in the above, such as a girder located below the open space of the grid-like floor slabSteel girderThere is no problem of corrosion caused by erosion due to rain water or accumulation of dust on structural members. In addition, since the elastic sealant is laid on the main girder, it is easy to remove the filler when replacing the grid floor slab. Make use of it.
[0026]
Furthermore, the claim3Or8According to the invention described in (3), by arranging an elastic material (backup material) inside the packed bed, it is possible to improve the ease of removing the filler at the time of replacement work of the lattice-like floor slab. Further, when the vehicle travels on the road surface when the road surface is frozen, the packed bed is easily elastically deformed by the action of the internal elastic material, whereby the frozen ice is easily broken and easily removed.
[0027]
In addition, the above claims4Or9According to the invention described in (1), the expansion and contraction of the entire structure can be absorbed, and an excessive gap is not formed in the expansion and contraction part, so that the problem of noise can be reduced. Also, it is not necessary to use an expensive expansion / contraction device with a complicated structure.ofShortening and reduction of construction costs are possible.
[0028]
Still further, the above claims5Or10According to the invention described in (4), it is possible to prevent erosion due to rain water, etc., and corrosion due to dust, etc., also on the bearings, girders and the like located below the open space of the grid-like floor slab. Moreover, when the road surface freezes while maintaining durability by making the filler into a plurality of layer structures, when the vehicle travels on this, the filler part is easily elastically deformed. Frozen ice is easy to break and easy to remove.
[0029]
DETAILED DESCRIPTION OF THE INVENTION
Of the present inventionPremiseA first embodiment is shown in FIG.
The lattice-
[0030]
In the longitudinal direction of the
[0031]
By adopting such a structure, there is no space between the lattice-
[0032]
Note that the structure of the connecting
[0033]
Further, it is preferable that the connecting
[0034]
Furthermore, although the example which connects on a main beam was demonstrated above, the same effect can be anticipated also when connecting not only to this but on a horizontal beam.
[0035]
Of the present inventionPremiseA second embodiment is shown in FIG.
As in the first embodiment, the lattice-
[0036]
In the longitudinal direction of the
[0037]
By adopting such a structure, the lattice-
[0038]
Further, it is preferable that the thickness (height) of the connecting
[0039]
Based on the above assumptions,Of the present inventionCharacteristic fruitEmbodiments are shown in FIGS. 5 and 6. FIG.
Figure Five As shown in thisIn the embodiment, rainwater, dust, etc. accumulate in the open space between the grid-
[0040]
By doing in this way, such as girders located in the open space between the grid-
[0041]
Further, as shown in FIGS. 6 (a) and 6 (b), a sealing
[0042]
This sealing
[0043]
Of the present inventionanotherAn embodiment is shown in FIG.
In the support part that supports the structure (for example, abutment in the case of a viaduct), it is necessary to consider the effects of erosion due to rainwater, etc., and corrosion due to dust, etc., in the area below the open space of the grid slab. is there. For this reason,thisThe embodiment is an embodiment in the case where a grid-like floor slab is installed in a part of an abutment that is an expansion / contraction part of a structure.
[0044]
As shown in FIG. 7 (a), it is preferable to fill the
[0045]
By doing in this way, also about the abutment and the support located under the open space of a grid | lattice-like floor slab, corrosion by rain water etc., and corrosion by refuse etc. can be prevented. Moreover, durability can be maintained by making a filler into a several layer structure. Furthermore, the filler portion is easily elastically deformed when the vehicle is traveling, and thus the frozen ice is easily broken and removed.
[0046]
Here, the
[0047]
In addition, it is applicable not only to the above-mentioned abutment part but also to the upper part of the pier which is another stretchable part, and by filling the filler, the same effect can be expected for the pier.
[0048]
Of the present inventionanotherAn embodiment is shown in FIG.
thisIn the embodiment, the present invention is an embodiment in which a grid-like floor slab is installed at a stretchable portion of a viaduct.
[0049]
thisAlso in the embodiment, as shown in FIG. 8 (a), the grid-
[0050]
The
[0051]
With such a configuration, the expansion and contraction of the entire structure can be absorbed, and an excessive gap is not formed in the expansion and contraction part, so that the problem of noise can be reduced. Moreover, since it is not necessary to use an expensive telescopic device having a complicated structure, the construction period can be shortened and the construction cost can be reduced.
[0052]
Note that such an arrangement is not limited to the above, and as shown in FIG. 9, the
[0053]
In addition, the
[0054]
next,Embodiment of the construction method of the present inventionWill be described. The present inventionBridge structureIn the case of construction, the following procedure is used.
(1) First, install the
(2) Place the
(3) Next, the grid-
(4) Then, the next
(5) The grid-
(6) The lattice floor slabs are sequentially placed on the
(7) The
(8) The
[0055]
By setting it as such a construction method, installation can be performed very easily and the construction period can be shortened. There is no space between the
[0056]
Since the sealing
[0057]
The
[0058]
nextHighA grid-like floor slab was installed on the stretchable part of the bridgeApplication of caseThe construction method will be described. When constructing the present invention, construction is performed in the following procedure.
(1) First, install the
(2) Next, a grid-
(3) Then, the grid-
(4) When the next
[0059]
By adopting such a construction method, the lattice-like floor slab can absorb the expansion and contraction of the entire structure, and since there is no excessive gap in the expansion and contraction part, the problem of noise can be reduced. . Further, since it is not necessary to use an expensive telescopic device having a complicated structure, it can be installed very easily, and the construction period can be shortened and the construction cost can be reduced.
[0060]
Here, since the lattice-like floor slab installed on the abutment portion of the structure does not necessarily need to be a lattice-like floor slab, it is desirable to fill the open space of the lattice-like floor slab with concrete or asphalt.
[0061]
In addition, the installation order of the lattice floor slabs installed on the abutment part of the structure and the lattice floor slabs installed on the main girder of the structure is not necessarily the above, and the expansion / contraction part of the structure (on the abutment or After installing the grid floor slab on the pier), the grid floor slab may be installed on the main girder.
Furthermore, in the above-described embodiment, an example is shown in which it is installed in the stretchable part between the bridge and the abutment, but the same applies to the case where it is installed in the stretchable part between the bridge and the bridge. It can be installed in the main girder of the adjacent bridge following the floor slab.
[0062]
In the first and second embodiments, the lattice shape of the lattice-shaped floor slab has been described as a square shape. However, the present invention is not limited to this and may be a lattice having other shapes. Moreover, the auxiliary member of the lattice-like floor slab is not essential, and may be installed between the main members or between the lateral members as necessary.
[0063]
As the
[0063]
【The invention's effect】
Main departureAccording to Ming, there is no space between the grid slabs. In addition, since they are connected in a freely rotating manner, additional stress is not generated due to deflection caused by shaking of the structure or passing through the vehicle, and there is no problem in strength. Further, no noise is generated when the vehicle passes or the structure itself shakes. Moreover, it can be installed very easily, the construction period can be shortened, and traffic restrictions in the surrounding area can be minimized. Also,Main departureAccording to Ming, girder etc. located below the open space of the grid-like floor slabSteel girderThere is no problem of corrosion of structural members due to erosion due to rain water, etc., or dust.
Further claims2 Or 7Described inMain departureAccording to Ming, girder etc. located below the open space of the grid-like floor slabSteel girderThere is no problem of corrosion of structural members due to erosion due to rain water, etc., or dust. In addition, since the elastic sealing material is laid on the main girder, it is easy to remove the filler during the replacement work of the lattice-like floor slab, and the advantage of easy replacement of the lattice-like floor slab can be utilized.
Furthermore, the claimThree Or 8According to the invention described in the above, by installing the backup material as the elastic material, the ease of removing the filler is improved during the replacement work of the lattice floor slab, and when the road surface freezes, When traveling on this, the packed bed is easily elastically deformed by the action of the internal elastic material, whereby the frozen ice is easily broken and easily removed.
And claimsFour Or 9According to the invention described in (1), the expansion and contraction of the entire structure can be absorbed, and an excessive gap is not formed in the expansion and contraction part, so that the problem of noise can be reduced. Also, it is not necessary to use an expensive expansion / contraction device with a complicated structure.ofShortening and reduction of construction costs are possible.
Furthermore, the claimFive Or TenAccording to the invention described in (3), it is possible to prevent erosion due to rain water, etc., and corrosion due to dust, etc., on the bearings, girders and the like located below the open space of the grid-like floor slab. In addition, since the filler has a multi-layer structure, when the road surface freezes while maintaining durability, the vehicle is likely to be elastically deformed when the vehicle travels on the road surface. Ice is easy to break and easy to remove.
[Brief description of the drawings]
FIG. 1 is a diagram showing a first embodiment of the present invention, and is a plan view of a structure provided with a grid floor slab of the present invention as viewed from above.
FIG. 2 is a diagram showing another example of the first embodiment of the present invention, and is a plan view of a structure provided with a grid-like floor slab of the present invention as viewed from above.
FIG. 3 is a diagram showing a second embodiment of the present invention, and is a plan view of a structure provided with a grid floor slab of the present invention as viewed from above.
FIG. 4 is a view showing a connecting portion of the first and second embodiments of the present invention, (a) is a view showing an example of directly connecting a connecting member, and (b) is a connecting member. It is the figure which showed the example connected via an auxiliary member.
FIG. 5 shows the present invention.CharacteristicIt is a figure which shows embodiment, (a) is the figure which showed the vertical cross section of the connection part, (b) is the top view seen from the upper side.
FIG. 6 of the present inventionCharacteristicIt is a diagram showing an embodiment, (a) is a vertical sectional view of a connecting portion showing an example in which a backup material is installed in contact with a frame member, (b) is a backup material is installed on the upper part of the seal material It is the vertical sectional view of the connection part which showed the example.
[Fig. 7] of the present invention.Another distinctiveBRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a diagram showing an embodiment, (a) is a plan view of a structure provided with a grid floor slab of the present invention as viewed from above, and (b) is a structure provided with a grid floor slab of the present invention. FIG. 4C is a cross-sectional view of the filler-filled portion. FIG.
[Fig. 8] of the present inventionAnother distinctiveBRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a diagram showing an embodiment, (a) is a cross-sectional view in the width direction of a structure provided with a grid floor slab of the present invention, and (b) is a structure provided with a grid floor slab of the present invention. It is the top view which looked at from the upper side.
FIG. 9The fruitIt is a figure which shows another example of embodiment.
[Explanation of symbols]
1b, 1c: Lattice slab, 2b, 2c: Main member, 3b, 3c: Horizontal member, 4b, 4c: Auxiliary member, 5b, 5c: Frame member, 6: Main beam, 8: Pin, 9: Connecting member , 10: Connecting hole, 11: Connecting auxiliary member, 12: Filling material, 13: Sealing material, 14: Back-up material, 15: Vehicle running surface, 16: Fence, 17: Drain skirt, 18: Abutment, 19: Bearing , 20a, 20b, 20c: Connection part
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP25696399A JP3678952B2 (en) | 1999-09-10 | 1999-09-10 | Bridge structure with grid-like slab and its construction method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP25696399A JP3678952B2 (en) | 1999-09-10 | 1999-09-10 | Bridge structure with grid-like slab and its construction method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2001081728A JP2001081728A (en) | 2001-03-27 |
| JP3678952B2 true JP3678952B2 (en) | 2005-08-03 |
Family
ID=17299812
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP25696399A Expired - Fee Related JP3678952B2 (en) | 1999-09-10 | 1999-09-10 | Bridge structure with grid-like slab and its construction method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3678952B2 (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP7203679B2 (en) * | 2019-04-19 | 2023-01-13 | 日本製鉄株式会社 | Structure for road and construction method of floor slab |
| JP7515334B2 (en) | 2020-07-27 | 2024-07-12 | 株式会社竹中工務店 | Floor structure in which steel floor plates are engaged |
| CN114482372B (en) * | 2022-03-22 | 2023-06-02 | 福建西海岸建筑设计院有限公司 | Mounting structure of concrete honeycomb hollow sandwich floor slab |
-
1999
- 1999-09-10 JP JP25696399A patent/JP3678952B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JP2001081728A (en) | 2001-03-27 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103518019B (en) | rail track sleeper support body | |
| CN104594191B (en) | Seamless expansion-contraction devices and construction method thereof between the girder of built-in corrugated steel plate and abutment | |
| CN110685217B (en) | Seamless telescoping device of bridge | |
| CN107435547B (en) | Corrugated sheet assembly for support and tunnel support method | |
| CN104594190B (en) | A kind of bridge seamless process stretching device and construction method thereof | |
| CN104674650A (en) | Stiffened joint-crossing plate based bridge deck jointless expansion device and construction method thereof | |
| JP3671165B2 (en) | Underground telescopic device for elevated road and its construction method | |
| JP3678952B2 (en) | Bridge structure with grid-like slab and its construction method | |
| CN204475161U (en) | Arch reinforcing bar between beam-ends and abutment is put more energy into type seamless process stretching device | |
| KR102321972B1 (en) | Construction method of expansion joint using induction drainage pipe | |
| JP3678951B2 (en) | Structure with lattice-like floor slab and its construction method | |
| JP3499843B2 (en) | Construction method of road bridge expansion joint | |
| JP2014134060A (en) | Floor slab replacement method | |
| CN115897380B (en) | Quick assembly type telescopic device and installation and construction method thereof | |
| JP5738819B2 (en) | Water stop structure | |
| CN217810490U (en) | Urban pedestrian bridge expansion device | |
| KR100214431B1 (en) | Bridge construction structure and construction method | |
| KR102186237B1 (en) | Expansion joint using induction pipe | |
| KR100622008B1 (en) | Composite structure of integral shift bridge | |
| CN220246597U (en) | Temporary bridge crossing device for maintaining tunnel transverse ditch | |
| CN111519524A (en) | Paving structure for bridge expansion joint | |
| CN216838956U (en) | Low-noise profile steel telescopic system for bridge construction | |
| CN218147780U (en) | Sealing protection structure for road and bridge expansion device | |
| CN222100608U (en) | Viaduct expansion joint node | |
| JPH0240081Y2 (en) |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20041115 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20050104 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20050304 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20050426 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20050511 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080520 Year of fee payment: 3 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090520 Year of fee payment: 4 |
|
| LAPS | Cancellation because of no payment of annual fees |