JP3686386B2 - Panel for floating pier, steel shell for floating pier, and method for manufacturing floating pier - Google Patents

Panel for floating pier, steel shell for floating pier, and method for manufacturing floating pier Download PDF

Info

Publication number
JP3686386B2
JP3686386B2 JP2002085579A JP2002085579A JP3686386B2 JP 3686386 B2 JP3686386 B2 JP 3686386B2 JP 2002085579 A JP2002085579 A JP 2002085579A JP 2002085579 A JP2002085579 A JP 2002085579A JP 3686386 B2 JP3686386 B2 JP 3686386B2
Authority
JP
Japan
Prior art keywords
floating pier
steel
panel
steel shell
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2002085579A
Other languages
Japanese (ja)
Other versions
JP2003278111A (en
Inventor
伊知郎 増田
一美 田村
一禎 木原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Heavy Industries Ltd
Original Assignee
Mitsubishi Heavy Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Heavy Industries Ltd filed Critical Mitsubishi Heavy Industries Ltd
Priority to JP2002085579A priority Critical patent/JP3686386B2/en
Publication of JP2003278111A publication Critical patent/JP2003278111A/en
Application granted granted Critical
Publication of JP3686386B2 publication Critical patent/JP3686386B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Description

【0001】
本発明は、浮桟橋用パネル、浮桟橋用鋼殻及び浮桟橋の製造方法に関し、特に鋼とコンクリートとの合成構造から成る浮桟橋を構成するためのパネル、浮桟橋用鋼殻及び浮桟橋の製造方法に関する。
【0002】
【従来の技術】
図5は、船舶の着岸及び乗客の通行、積荷の荷役に利用される一般的な浮桟橋を示したものである。この浮桟橋1は、岸壁3に近接した海面に係留索(図示せず)により係留された浮体である。岸壁3と浮桟橋1との間には、乗客の通行や積荷の荷役を可能にすべく連絡橋2が掛け渡されている。
【0003】
図6は、鋼とコンクリートとの合成構造から成る浮桟橋1の構造を示す断面図である。図からも明らかなように、浮桟橋1は、鋼殻31と、スタッド32と、鉄筋33と、コンクリート層34とから構成されている。より具体的には、複数の鋼製パネルを適宜接合することによって所望形状を成す中空の鋼殻31を形成した後、該鋼殻31の外表面にコンクリート材を打設することによって浮桟橋1を構成するようにしている。鋼殻31の外表面に設けたスタッド32及び鉄筋33は、打設されたコンクリート材の位置ずれを防止するためのものである。
【0004】
【発明が解決しようとする課題】
ところで、上記のような鋼とコンクリートとの合成構造から成る浮桟橋1では、鋼殻31に対してコンクリート材を打設する前の死荷重、並びにコンクリート材を打設する際の死荷重を支持できるだけの剛性を確保する必要がある。
【0005】
このため従来においては、図7に示すように、鋼殻31の内表面に補剛リブ35を溶接し、上述したコンクリート材を打設する前の死荷重、並びにコンクリート材を打設する際の死荷重を支持できるだけの剛性を確保するようにしている。
【0006】
しかしながら、上記のように鋼殻31の内表面に鋼製の補剛リブ35を溶接した場合には、溶接作業の分だけ製造コストが嵩むことになるとともに、補剛リブ35の重量分だけ鋼材の重量が増加する。さらに、補剛リブ35を溶接する際の溶接歪みを防止するために、鋼殻31の板厚を大きくしなければならず、浮桟橋1において鋼材重量が一層増加することになる。
【0007】
本発明は、上記実情に鑑みて、製造コストを低廉に抑えるとともに、鋼材重量の増加を抑制することのできる浮桟橋用パネル、浮桟橋用鋼殻及び浮桟橋の製造方法を提供することを目的とする。
【0008】
【課題を解決するための手段】
上記の目的を達成するために請求項1に係る浮桟橋用パネルは、浮桟橋の鋼殻を構成し、外表面にコンクリート材が打設される浮桟橋用パネルにおいて、前記鋼殻を構成する鋼板の外表面に配設したスタッド及び鉄筋の一部を内包した鋼板・コンクリート合成梁予め設けたことを特徴とする。
【0009】
この発明によれば、鋼殻を構成する鋼板の外表面に配設したスタッド及び鉄筋の一部を内包した鋼板・コンクリート合成梁によって鋼殻の剛性を向上させることができるため、内表面に鋼製の補剛リブを溶接することなくコンクリート材打設前後の死荷重を支持することができるようになる。
【0010】
また、請求項2に係る浮桟橋用鋼殻は、外表面にコンクリート層を打設する浮桟橋用鋼殻において、外表面に配設したスタッド及び鉄筋の一部を内包した鋼板・コンクリート合成梁を予め設けた鋼板パネルによって構成したことを特徴とする。
【0011】
この発明によれば、鋼板パネルの外表面に配設したスタッド及び鉄筋の一部を内包した鋼板・コンクリート合成梁によって浮桟橋用鋼殻の剛性を向上させることができるため、内表面に鋼製の補剛リブを溶接することなくコンクリート材打設前後の死荷重を支持することができるようになる。
【0012】
また、請求項3に係る浮桟橋の製造方法は、外表面に配設したスタッド及び鉄筋の一部を内包した鋼板・コンクリート合成梁予め設けた鋼板パネルによって水密性を確保した鋼殻を構成した後、該鋼殻の外表面にコンクリート材を打設することを特徴とする。
【0013】
この発明によれば、鋼板パネルの外表面に配設したスタッド及び鉄筋の一部を内包した鋼板・コンクリート合成梁によって鋼殻の剛性を向上させることができるため、内表面に鋼製の補剛リブを溶接することなくコンクリート材打設前後の死荷重を支持することができるようになる。
【0014】
以下に添付図面を参照して、本発明に係る浮桟橋用パネル、浮桟橋用鋼殻及び浮桟橋の製造方法の好適な実施の形態を詳細に説明する。
【0015】
図1は、本発明の実施の形態である浮桟橋の鋼殻を概念的に示した斜視図、図2は、図1におけるA−A線断面図、図3は、図2に示した浮桟橋用パネルの斜視図、図4は、図2に示した浮桟橋用パネルの製造工程を順に示した概念図である。
【0016】
まず、これら図1乃至図3に基づいて浮桟橋の構成について説明する。ここで例示する浮桟橋1は、図5に示したものと同様に、船舶の着岸及び乗客の通行、積荷の荷役に利用されるもので、鉄骨フレーム11と、鉄骨フレーム11に貼設したパネル12と、パネル12の外表面に打設したコンクリート層13とを備えている。
【0017】
鉄骨フレーム11は、図1に示すように、浮桟橋1の骨格を形成するものである。本実施の形態では、3種類の構造部材11a,11b,11cを相互に溶接することによって直方体の枠形状を成す鉄骨フレーム11を構成するようにしている。
【0018】
パネル12は、矩形の平板状を成す鋼板である。このパネル12には、図3に示すように、その外表面にスタッド22及び鉄筋23が配設してあるとともに、鉄筋コンクリート製の梁24を二条設けてある。これらの梁24は、上述したスタッド22及び鉄筋23の一部を内包するように設けたもので、パネル12の一辺に沿う態様で相互に平行に配設してある。より詳細には、図4に示すように、パネル12の外表面にスタッド22及び鉄筋23を配設した後、型枠25を設置してコンクリート材を打設することによって当該パネル12の外表面に梁24を設けるようにしている。パネル12にスタッド22、鉄筋23および梁24を設ける作業に関しては、予め工場で行うようにしても良いし、現地の組立ヤードで行うようにしても構わない。なお、梁24が固化した後においてパネル12の外表面から型枠25を取り外すのはいうまでもない。
【0019】
図2に示すように、固化した後の各梁24は、それぞれ同一の横断面積を有した直方体状を成しており、個々の高さが、パネル12の外表面に構成すべきコンクリート層13の厚さよりも小さくなるように形成してある。
【0020】
以下、これら鉄骨フレーム11及びパネル12を用いて浮桟橋1を製造する方法について説明する。
【0021】
まず、鉄骨フレーム11の外表面に複数のパネル12を順次貼設することによって浮桟橋1の鋼殻10を構成する。すなわち、鉄骨フレーム11とパネル12との間、並びに隣接するパネル12の相互間をそれぞれ溶接することにより、外表面のすべてをパネル12によって覆った中空の鋼殻10を構成する。この場合、パネル12としては、一辺が構造部材11aの長さとほぼ同一の長さであって他辺が構造部材11cを適宜に分割した長さとほぼ同一の長さの長方形状のもの、一辺が構造部材11bの長さとほぼ同一の長さであって他辺が構造部材11cを適宜に分割した長さとほぼ同一の長さの長方形状のもの、一辺が構造部材11aの長さとほぼ同一の長さであって他辺が構造部材11bの長さとほぼ同一の長さの長方形状のものを用意する必要がある。鉄骨フレーム11とパネル12との間、並びに隣接するパネル12の相互間には、いずれも水密性を確保するようにシール溶接を施すことが好ましい。
【0022】
ここで、上記鋼殻10によれば、当該鋼殻10を構成するそれぞれのパネル12に鉄筋23コンクリートの梁24を設けてあるため、その剛性が著しく向上するようになる。従って、パネル12の内表面に鋼製の補剛リブを設けることなくコンクリート材を打設する前の死荷重はもちろん、コンクリート材を打設する際の死荷重をも確実に支持することが可能となる。これにより、鋼殻10の周囲に適宜型枠を設置してコンクリート材を打設しさえすれば、当該鋼殻10の外表面にコンクリート層13を備えた所望形状の浮桟橋1を構成することができるようになる。完成した浮桟橋1は、タグボートなどで設置場所まで曳航され、係留索などによって係留された後、図5に示すように、岸壁3との間に連絡橋2を掛け渡すことによって使用に供される。
【0023】
上記のように構成した浮桟橋1によれば、鋼製の補剛リブを溶接する作業が不要になるため、製造コストを低廉に抑えることが可能となる。しかも、補剛リブが不要となる結果、補剛リブの溶接に伴う溶接歪みを考慮する必要がないため、パネル12として板厚の小さいものを適用することが可能となり、浮桟橋1の鋼材重量が増加する事態を招来する虞れもない。
【0024】
さらに、パネル12に設けた梁24は、いわばコンクリート層13の一部を先行打設することによって構成したものであるため、浮桟橋1の重量や外観形状に何等影響を与えることもない。
【0025】
また、鉄骨フレーム11とパネル12との間、並びに隣接するパネル12の相互間をそれぞれシール溶接することによって鋼殻10の水密性を確保してあるため、仮にコンクリート層13に亀裂等の損傷を来した場合であっても、浸水に至る虞れがない。
【0026】
なお、上述の実施の形態では、鋼殻10を構成する場合に、鉄骨フレーム11とパネル12との間、並びに隣接するパネル12の相互間をそれぞれシール溶接することとしたが、例えば、接合部分にシール剤を充填した後、ボルト接合することによって鋼殻を構成するようにしてもよい。
【0027】
また、上述の実施の形態では、相互に平行となるように梁24を二条設けるようにしているが、梁の数や形状、形成方向は浮桟橋1の鋼殻10に要求される剛性に応じて適宜変更してもよい。
【0028】
【発明の効果】
以上説明したように、この発明に係る浮桟橋用パネル(請求項1)は、鋼殻を構成する鋼板の外表面に配設したスタッド及び鉄筋の一部を内包した鋼板・コンクリート合成梁予め設けた。この発明によれば、スタッド及び鉄筋の一部を内包した鋼板・コンクリート合成梁によって鋼殻の剛性を向上させることができるため、内表面に鋼製の補剛リブを溶接することなくコンクリート材打設前後の死荷重を支持することができるようになる。これにより、製造コストを低廉に抑えるとともに、鋼材重量の増加を抑制することが可能となる。
【0029】
また、この発明に係る浮桟橋(請求項2)は、外表面に配設したスタッド及び鉄筋の一部を内包した鋼板・コンクリート合成梁を予め設けた鋼板パネルによって浮桟橋用鋼殻を構成した。この発明によれば、鋼板パネルの外表面に配設したスタッド及び鉄筋の一部を内包した鋼板・コンクリート合成梁によって浮桟橋用鋼殻の剛性を向上させることができるため、内表面に鋼製の補剛リブを溶接することなくコンクリート材打設前後の死荷重を支持することができるようになる。これにより、製造コストを低廉に抑えるとともに、鋼材重量の増加を抑制することが可能となる。
【0030】
また、この発明に係る浮桟橋の製造方法(請求項3)は、外表面に配設したスタッド及び鉄筋の一部を内包した鋼板・コンクリート合成梁を設けた鋼板パネルによって水密性を確保した鋼殻を構成した後、該鋼殻の外表面にコンクリート材を打設するようにした。この発明によれば、鋼板パネルの外表面に配設したスタッド及び鉄筋の一部を内包した鋼板・コンクリート合成梁によって鋼殻の剛性を向上させることができるため、内表面に鋼製の補剛リブを溶接することなくコンクリート材打設前後の死荷重を支持することができるようになる。これにより、製造コストを低廉に抑えるとともに、鋼材重量の増加を抑制することが可能となる。
【図面の簡単な説明】
【図1】本発明の実施の形態である浮桟橋の鋼殻を概念的に示した斜視図である。
【図2】図1におけるA−A線断面図である。
【図3】図2に示した浮桟橋用パネルの斜視図である。
【図4】図2に示した浮桟橋用パネルの製造工程を順に示した概念図である。
【図5】設置された浮桟橋の概念図である。
【図6】従来の浮桟橋の断面図である。
【図7】従来の浮桟橋の細部を示した図である。
【符号の説明】
1 浮桟橋
2 連絡橋
3 岸壁
10 鋼殻
11 鉄骨フレーム
11a,11b,11c 構造部材
12 パネル
13 コンクリート層
22 スタッド
23 鉄筋
24 梁
25 型枠
[0001]
TECHNICAL FIELD The present invention relates to a floating pier panel, a floating pier steel shell, and a method of manufacturing a floating pier , and in particular, a panel for forming a floating pier composed of a composite structure of steel and concrete, a floating pier steel shell, and a floating pier bridge . It relates to a manufacturing method.
[0002]
[Prior art]
FIG. 5 shows a general floating pier used for berthing of ships, passage of passengers, and cargo handling. The floating pier 1 is a floating body moored by a mooring line (not shown) on the sea surface near the quay 3. A connecting bridge 2 is bridged between the quay 3 and the floating pier 1 in order to allow passengers to pass and load handling.
[0003]
FIG. 6 is a sectional view showing the structure of the floating pier 1 composed of a composite structure of steel and concrete. As is apparent from the figure, the floating pier 1 is composed of a steel shell 31, a stud 32, a reinforcing bar 33, and a concrete layer 34. More specifically, after a hollow steel shell 31 having a desired shape is formed by appropriately joining a plurality of steel panels, a floating material 1 is cast by placing a concrete material on the outer surface of the steel shell 31. To make up. The stud 32 and the reinforcing bar 33 provided on the outer surface of the steel shell 31 are for preventing the displacement of the placed concrete material.
[0004]
[Problems to be solved by the invention]
By the way, in the floating pier 1 which consists of a composite structure of steel and concrete as described above, the dead load before placing the concrete material on the steel shell 31 and the dead load when placing the concrete material are supported. It is necessary to ensure as much rigidity as possible.
[0005]
For this reason, conventionally, as shown in FIG. 7, the stiffening ribs 35 are welded to the inner surface of the steel shell 31, and the dead load before placing the above-described concrete material and the concrete material are placed. Stiff enough to support dead loads.
[0006]
However, when the steel stiffening rib 35 is welded to the inner surface of the steel shell 31 as described above, the manufacturing cost increases as much as the welding work, and the steel material corresponds to the weight of the stiffening rib 35. Increases in weight. Furthermore, in order to prevent welding distortion at the time of welding the stiffening rib 35, the thickness of the steel shell 31 must be increased, and the steel material weight in the floating pier 1 is further increased.
[0007]
In view of the above circumstances, an object of the present invention is to provide a floating pier panel, a steel shell for a floating pier, and a method for manufacturing a floating pier that can suppress the manufacturing cost at a low cost and suppress an increase in the weight of the steel material. And
[0008]
[Means for Solving the Problems]
In order to achieve the above object, a floating pier panel according to claim 1 constitutes a steel shell of the floating pier, and the steel shell is constituted in a floating pier panel in which a concrete material is cast on an outer surface. A steel plate / concrete composite beam including a part of a reinforcing bar and a stud disposed on the outer surface of the steel plate is provided in advance .
[0009]
According to this invention, the rigidity of the steel shell can be improved by the steel plate / concrete composite beam including a part of the reinforcing bar and the stud disposed on the outer surface of the steel plate constituting the steel shell. It becomes possible to support the dead load before and after placing the concrete material without welding the stiffening ribs made of metal.
[0010]
Further, the steel shell for a floating pier according to claim 2 is a steel slab / concrete composite beam including a stud and a part of a reinforcing bar arranged on the outer surface in a steel pier for a floating pier in which a concrete layer is cast on the outer surface. It is characterized by comprising a steel plate panel provided in advance.
[0011]
According to the present invention, the rigidity of the steel shell for the floating pier can be improved by the steel plate / concrete composite beam including a part of the reinforcing bar and the stud disposed on the outer surface of the steel plate panel. It is possible to support the dead load before and after the concrete material is cast without welding the stiffening ribs.
[0012]
Moreover, the manufacturing method of the floating pier according to claim 3 comprises a steel shell that secures water tightness by a steel plate panel preliminarily provided with a steel plate / concrete composite beam containing a part of a reinforcing bar and a stud arranged on the outer surface. Then, a concrete material is placed on the outer surface of the steel shell.
[0013]
According to the present invention, the rigidity of the steel shell can be improved by the steel plate / concrete composite beam including a part of the reinforcing bar and the stud disposed on the outer surface of the steel plate panel. It becomes possible to support the dead load before and after placing the concrete material without welding the rib.
[0014]
Exemplary embodiments of a floating pier panel, a floating pier steel shell, and a method of manufacturing a floating pier according to the present invention will be described below in detail with reference to the accompanying drawings.
[0015]
1 is a perspective view conceptually showing a steel shell of a floating pier that is an embodiment of the present invention, FIG. 2 is a cross-sectional view taken along line AA in FIG. 1, and FIG. 3 is a floating view shown in FIG. FIG. 4 is a conceptual diagram sequentially illustrating the manufacturing process of the floating pier panel shown in FIG. 2.
[0016]
First, the structure of the floating pier will be described based on FIGS. 1 to 3. The floating pier 1 illustrated here is used for berthing of a ship, passage of passengers, and cargo handling like the one shown in FIG. 5. A steel frame 11 and a panel attached to the steel frame 11 12 and a concrete layer 13 placed on the outer surface of the panel 12.
[0017]
The steel frame 11 forms the skeleton of the floating pier 1 as shown in FIG. In the present embodiment, a steel frame 11 having a rectangular parallelepiped frame shape is formed by welding three types of structural members 11a, 11b, and 11c to each other.
[0018]
The panel 12 is a steel plate having a rectangular flat plate shape. As shown in FIG. 3, the panel 12 is provided with a stud 22 and a reinforcing bar 23 on its outer surface, and two reinforced concrete beams 24 are provided. These beams 24 are provided so as to include a part of the stud 22 and the reinforcing bar 23 described above, and are arranged in parallel to each other in a manner along one side of the panel 12. More specifically, as shown in FIG. 4, after the stud 22 and the reinforcing bar 23 are arranged on the outer surface of the panel 12, the outer surface of the panel 12 is installed by placing a mold 25 and placing a concrete material. The beam 24 is provided on the surface. The operation of providing the studs 22, the reinforcing bars 23 and the beams 24 on the panel 12 may be performed in advance in a factory or may be performed in a local assembly yard. Needless to say, the mold 25 is removed from the outer surface of the panel 12 after the beam 24 is solidified.
[0019]
As shown in FIG. 2, each beam 24 after solidification has a rectangular parallelepiped shape having the same cross-sectional area, and the individual heights of the concrete layers 13 to be formed on the outer surface of the panel 12. It is formed to be smaller than the thickness.
[0020]
Hereinafter, a method for manufacturing the floating pier 1 using the steel frame 11 and the panel 12 will be described.
[0021]
First, the steel shell 10 of the floating pier 1 is configured by sequentially pasting a plurality of panels 12 on the outer surface of the steel frame 11. That is, the hollow steel shell 10 in which the entire outer surface is covered with the panel 12 is formed by welding the steel frame 11 and the panel 12 and between the adjacent panels 12 respectively. In this case, the panel 12 has a rectangular shape in which one side is substantially the same length as the length of the structural member 11a and the other side is substantially the same length as the length obtained by appropriately dividing the structural member 11c. A rectangular shape having a length substantially the same as the length of the structural member 11b, the other side being substantially the same length as the length obtained by appropriately dividing the structural member 11c, and a side having a length substantially the same as the length of the structural member 11a Then, it is necessary to prepare a rectangular shape having the other side substantially the same length as the length of the structural member 11b. Seal welding is preferably performed between the steel frame 11 and the panel 12 and between adjacent panels 12 so as to ensure watertightness.
[0022]
Here, according to the steel shell 10 described above, since the beams 24 of the rebar 23 concrete are provided on the respective panels 12 constituting the steel shell 10, the rigidity thereof is remarkably improved. Therefore, it is possible to reliably support the dead load when placing the concrete material as well as the dead load before placing the concrete material without providing steel stiffening ribs on the inner surface of the panel 12. It becomes. Thereby, as long as a formwork is appropriately installed around the steel shell 10 and a concrete material is placed, the floating pier 1 having a desired shape including the concrete layer 13 on the outer surface of the steel shell 10 is configured. Will be able to. The completed floating pier 1 is towed to the installation site by a tug boat, moored by a mooring line, etc., and then used by linking the connecting bridge 2 to the quay 3 as shown in FIG. The
[0023]
According to the floating pier 1 configured as described above, the work of welding the steel stiffening ribs is not necessary, so that the manufacturing cost can be reduced. In addition, as a result of eliminating the need for the stiffening ribs, it is not necessary to take into account the welding distortion associated with the stiffening rib welding. There is no fear of increasing the number of people.
[0024]
Furthermore, since the beam 24 provided on the panel 12 is formed by placing a part of the concrete layer 13 in advance, it does not affect the weight or appearance of the floating pier 1 in any way.
[0025]
Moreover, since the watertightness of the steel shell 10 is ensured by seal welding between the steel frame 11 and the panel 12 and between the adjacent panels 12, the concrete layer 13 is temporarily damaged. Even if it comes, there is no risk of flooding.
[0026]
In the above-described embodiment, when the steel shell 10 is configured, seal welding is performed between the steel frame 11 and the panel 12 and between the adjacent panels 12. The steel shell may be configured by bolting after filling a sealant.
[0027]
In the above-described embodiment, two beams 24 are provided so as to be parallel to each other. However, the number, shape, and forming direction of the beams depend on the rigidity required for the steel shell 10 of the floating pier 1. May be changed as appropriate.
[0028]
【The invention's effect】
As described above, the floating pier panel according to the present invention (Claim 1) is provided with a steel plate / concrete composite beam including a stud and a part of a reinforcing bar that are provided on the outer surface of the steel plate constituting the steel shell in advance. Provided. According to the present invention, the rigidity of the steel shell can be improved by the steel plate / concrete composite beam including the stud and a part of the reinforcing bar, so that the concrete material is hit without welding the steel stiffening rib to the inner surface. The dead load before and after installation can be supported. As a result, it is possible to keep the manufacturing cost low and suppress the increase in the weight of the steel material.
[0029]
In the floating pier according to the present invention (Claim 2), the steel shell for the floating pier is constituted by a steel plate panel preliminarily provided with a steel plate and a concrete composite beam including a part of a reinforcing bar and a stud arranged on the outer surface. . According to the present invention, the rigidity of the steel shell for the floating pier can be improved by the steel plate / concrete composite beam including a part of the reinforcing bar and the stud disposed on the outer surface of the steel plate panel. It is possible to support the dead load before and after the concrete material is cast without welding the stiffening ribs. As a result, it is possible to keep the manufacturing cost low and suppress the increase in the weight of the steel material.
[0030]
Moreover, the manufacturing method of the floating pier according to the present invention (Claim 3) is a steel in which watertightness is secured by a steel plate panel provided with a steel plate / concrete composite beam including a stud and a part of a reinforcing bar provided on the outer surface. After the shell was constructed, a concrete material was placed on the outer surface of the steel shell. According to the present invention, the rigidity of the steel shell can be improved by the steel plate / concrete composite beam including a part of the reinforcing bar and the stud disposed on the outer surface of the steel plate panel. It becomes possible to support the dead load before and after placing the concrete material without welding the rib. As a result, it is possible to keep the manufacturing cost low and suppress the increase in the weight of the steel material.
[Brief description of the drawings]
FIG. 1 is a perspective view conceptually showing a steel shell of a floating jetty according to an embodiment of the present invention.
FIG. 2 is a cross-sectional view taken along line AA in FIG.
FIG. 3 is a perspective view of the floating pier panel shown in FIG. 2;
4 is a conceptual diagram sequentially showing a manufacturing process of the floating pier panel shown in FIG. 2. FIG.
FIG. 5 is a conceptual diagram of an installed floating pier.
FIG. 6 is a cross-sectional view of a conventional floating pier.
FIG. 7 is a view showing details of a conventional floating pier.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 Floating pier 2 Connecting bridge 3 Quay wall 10 Steel shell 11 Steel frame 11a, 11b, 11c Structural member 12 Panel 13 Concrete layer 22 Stud 23 Reinforcement 24 Beam 25 Formwork

Claims (3)

浮桟橋の鋼殻を構成し、外表面にコンクリート材が打設される浮桟橋用パネルにおいて、
前記鋼殻を構成する鋼板の外表面に配設したスタッド及び鉄筋の一部を内包した鋼板・コンクリート合成梁を予め設けたことを特徴とする浮桟橋用パネル。
In the floating pier panel where the steel shell of the floating pier is constructed and concrete material is cast on the outer surface,
A floating pier panel characterized in that a steel plate / concrete composite beam containing a part of a reinforcing bar and a stud disposed on an outer surface of a steel plate constituting the steel shell is provided in advance.
外表面にコンクリート層を打設する浮桟橋用鋼殻において、
外表面に配設したスタッド及び鉄筋の一部を内包した鋼板・コンクリート合成梁を予め設けた鋼板パネルによって構成したことを特徴とする浮桟橋用鋼殻
In the steel shell for floating piers where a concrete layer is placed on the outer surface ,
A steel shell for a floating pier , comprising a steel plate / concrete composite beam preliminarily provided with a stud and a part of a reinforcing bar arranged on the outer surface.
外表面に配設したスタッド及び鉄筋の一部を内包した鋼板・コンクリート合成梁を予め設けた鋼板パネルによって水密性を確保した鋼殻を構成した後、該鋼殻の外表面にコンクリート材を打設することを特徴とする浮桟橋の製造方法。  After forming a steel shell with watertightness secured by a steel plate panel preliminarily provided with a steel plate and concrete composite beam including a stud and a part of the reinforcing bar arranged on the outer surface, a concrete material is applied to the outer surface of the steel shell. A method for manufacturing a floating pier, characterized by comprising:
JP2002085579A 2002-03-26 2002-03-26 Panel for floating pier, steel shell for floating pier, and method for manufacturing floating pier Expired - Fee Related JP3686386B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002085579A JP3686386B2 (en) 2002-03-26 2002-03-26 Panel for floating pier, steel shell for floating pier, and method for manufacturing floating pier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002085579A JP3686386B2 (en) 2002-03-26 2002-03-26 Panel for floating pier, steel shell for floating pier, and method for manufacturing floating pier

Publications (2)

Publication Number Publication Date
JP2003278111A JP2003278111A (en) 2003-10-02
JP3686386B2 true JP3686386B2 (en) 2005-08-24

Family

ID=29232495

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002085579A Expired - Fee Related JP3686386B2 (en) 2002-03-26 2002-03-26 Panel for floating pier, steel shell for floating pier, and method for manufacturing floating pier

Country Status (1)

Country Link
JP (1) JP3686386B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104594208A (en) * 2014-12-18 2015-05-06 西南科技大学 Seismic hardening device for bending-shear-torsion RC component

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104594208A (en) * 2014-12-18 2015-05-06 西南科技大学 Seismic hardening device for bending-shear-torsion RC component

Also Published As

Publication number Publication date
JP2003278111A (en) 2003-10-02

Similar Documents

Publication Publication Date Title
CN211849244U (en) Novel assembled high-pile beam-slab wharf structure
FI80747C (en) SJOEBUREN PLATTFORM AV ARMERAD BETONG.
JP7452745B2 (en) Jackets, jacket structures and methods of constructing jacket structures
JP3686386B2 (en) Panel for floating pier, steel shell for floating pier, and method for manufacturing floating pier
JP2571418B2 (en) Relocation method of masonry wall of existing structure
JPH09287157A (en) Steel shell structure of composite structure submerged box and its construction method
JPH07323884A (en) Floating structure and construction method thereof
JPH07207641A (en) Pier
US20250109561A1 (en) Method for fabricating a gravity-based structure (gbs) at a specialized fabrication site
JPH03275809A (en) Caisson structure
US1489967A (en) Reenforced concrete and steel ship construction and method of making the same
KR102828533B1 (en) Floating body having concrete and FRP bonded structure and construction method thereof
JPH08269912A (en) Fastening method of steel bridge pier to footing
JP2001182032A (en) Floating box body
CN223937664U (en) Outer wall post-pouring zone mould reinforcing system
KR20130143224A (en) Precast structure for pier of harbors and constructing method using it
US1353880A (en) Cement ship construction
JP6641873B2 (en) Reinforcement structure of quay and revetment and reinforcement construction method of quay and revetment
JP2003313879A (en) Caisson and submersible structure using the caisson
JPH0841893A (en) Manufacture of caisson bottom slab section and bottom slab section structure of caisson
JPH08109646A (en) Steel frame for composite structure submerged box and composite structure submerged box using the same
JP2000212969A (en) Caisson footing of honeycomb structure
JP2000144674A (en) Built-up wave-suppressing caisson and its construction method
KR101083038B1 (en) Offshore structures and construction methods using precast blocks
US1510163A (en) Reenforced concrete and steel construction

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20040301

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20040309

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20040507

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20041026

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20041119

A911 Transfer of reconsideration by examiner before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20050210

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050329

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050404

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20050510

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20050602

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

LAPS Cancellation because of no payment of annual fees