JP3700030B2 - Propulsion method to wellhead and support structure of entrance packing - Google Patents
Propulsion method to wellhead and support structure of entrance packing Download PDFInfo
- Publication number
- JP3700030B2 JP3700030B2 JP2000330351A JP2000330351A JP3700030B2 JP 3700030 B2 JP3700030 B2 JP 3700030B2 JP 2000330351 A JP2000330351 A JP 2000330351A JP 2000330351 A JP2000330351 A JP 2000330351A JP 3700030 B2 JP3700030 B2 JP 3700030B2
- Authority
- JP
- Japan
- Prior art keywords
- cover ring
- entrance packing
- entrance
- packing
- excavator
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、坑口への推進工法およびエントランスパッキンの支持構造に係り、特に到達坑口に掘削装置が達した際に、前記到達坑口と前記掘削装置との隙間を封止し、泥水が流出するのを防止することができる坑口への推進工法およびエントランスパッキンの支持構造に関する。
【0002】
【従来の技術】
近年、通信ケーブルや光ケーブルに代表されるケーブル類は、地中に形成されたトンネルを介して延長される場合がある。そして、新たにトンネルを構築する場合には、一般的に地中推進をなす掘削装置が使用される。
【0003】
掘削装置によってトンネルを構築する場合、まず当該トンネル形成予定の両側に立坑を任意の深さまで掘削し、片側の立坑を発進側、他方側の立坑を到達側とする。そして発進側の立坑から掘削装置を到達側に向かって送り出すとともに、発進側よりヒューム管を継ぎ足し挿入し、送り出した前記ヒューム管にてトンネルを形成するようにしている。
【0004】
ところで立坑における壁面の外部には大きな土圧や水圧が作用している。このため立坑に設けられた発進坑口や到達坑口では、その開口付近にエントランスパッキンを設けるようにし、このエントランスパッキンを掘削装置あるいはヒューム管に接触させることで、立坑内に泥水等が流入するのを防止するようにしている。
【0005】
図9は、到達坑口におけるエントランスパッキンの支持構造を示す説明図である。
すなわち同図(1)に示すように、到達坑口1では、エントランスパッキン2に掘削装置3が達すると、前記エントランスパッキン2は立坑4側に変形する。このため土圧や水圧がエントランスパッキン2の変形力を超えると、泥水等が立坑4内に流入するおそれがあった。
【0006】
このため到達坑口においては、同図(2)に示すようにその開口部にあらかじめ掘削装置を内包可能とするカバーリング5を挿入しておき、エントランスパッキン2の先端を掘削装置3の推進方向と逆向き(坑奥側)に設定しておく。さらにエントランスパッキン2のめくれ防止をなす押さえ板6をカバーリング5に押し当てて、当該カバーリング5の保持を行うようにしておく。
【0007】
そして坑奥側から推進してくる掘削装置3にてカバーリング5を押圧すれば、エントランスパッキン2は、推進方向と逆向きに変形した状態で掘削装置3あるいはヒューム管(図示せず)に乗り移るので、土圧や水圧の変化に応じたシールを確保することができる。
【0008】
なお押さえ板を設けずエントランスパッキンのみでカバーリングを支持したり、あるいは同図(3)に示すように、エントランスパッキン2に可倒式の押さえ板6(規制片)を取り付けたものも知られている。
【0009】
【発明が解決しようとする課題】
しかし上述した到達坑口におけるエントランスパッキンの支持構造では、以下に示すような問題点があった。
すなわち同図(2)に示すような支持構造では、押さえ板がカバーリングを押圧した形態となっている。このためカバーリングは、押さえ板に対して前記カバーリングの差し込み量分だけ摺動することが必要となり、その間、摺動方向に傾きが生じてしまうと、押さえ板がカバーリングの表面に食い込んでカバーリングが到達坑口から抜けでなくなるというおそれがあった。
【0010】
また、図示しないが、エントランスパッキンだけでカバーリングを支持すれば、当該カバーリングが到達坑口より抜けでなくなるという問題は回避できるものの、カバーリングや掘削装置の移動とともに、エントランスパッキンがめくれてしまい、このめくれ箇所から立坑側に泥水が流入してしまうという恐れがあった。
【0011】
なお同図(3)におけるエントランスパッキンに可倒式の押さえ板を取り付ければ、エントランスパッキンのめくれを防止することはできるものの、カバーリングや掘削装置の移動の際に押さえ板がこれらカバーリングや掘削装置の表面に食い込んでしまい、カバーリングや掘削装置が到達坑口から抜けでなくなるというおそれがあった。
【0012】
本発明は、上記従来の問題点に着目し、カバーリングを確実に到達坑口より引き出せるとともに、押さえ板がカバーリングや掘削装置の表面に食い込むことを防止することができる坑口への推進工法およびエントランスパッキンの支持構造を提供することを目的とする。
【0013】
【課題を解決するための手段】
本発明は、エントランスパッキンのめくれ防止をなす押さえ板が、カバーリングや掘削装置の表面に接触するのを防止すれば、押さえ板による食い込み防止を図ることができるという知見に基づいてなされたものである。
【0014】
すなわち、本発明に係る坑口への推進工法は、到達坑口に位置するエントランスパッキンに開口側からカバーリングを差し込み、前記エントランスパッキンの先端を坑奥側に向かわせ、前記エントランスパッキンの弾性力にて前記カバーリングを保持させた後に、当該カバーリング内に掘削装置を導入し、前記エントランスパッキンを前記カバーリングから離れた押さえ板にて受け止めることで前記カバーリングをエントランスパッキンの弾性力にて前記カバーリングを保持させた状態を保ちながら、前記エントランスパッキンを前記カバーリングから前記掘削装置に乗り移らせ、前記エントランスパッキンにより前記掘削装置外周の止水させつつ推進させるようにした。
【0015】
また本発明に係るエントランスパッキンの支持構造は、到達坑口の坑奥側から開口側に向かって環状のエントランスパッキンと、このエントランスパッキンのめくれ防止をなす押さえ板とを順に配置し、前記エントランスパッキンの先端が坑奥側に向かうよう前記エントランスパッキンの内側にカバーリングを差し込んだエントランスパッキンの支持構造であって、前記カバーリングをエントランスパッキンの弾性力にて保持させて位置変位可能とさせ、前記カバーリングの外周と前記押さえ板との間に位置変位用の隙間を形成するとともに、前記カバーリングにフランジ部を設け、当該フランジ部に前記到達坑口の開口端面との固定をなす掛止部を設けるよう構成した。なお前記カバーリングは、複数のブロックからなり、これを前記到達坑口に沿って周回状に配置するようにしてもよい。
【0016】
そして到達坑口の坑奥側から開口側に向かって環状のエントランスパッキンと、このエントランスパッキンのめくれ防止をなす押さえ板とを順に配置し、前記エントランスパッキンの先端が坑奥側に向かうよう前記エントランスパッキンの内側にカバーリングを差し込んだエントランスパッキンの支持構造であって、前記カバーリングをエントランスパッキンの弾性力にて保持させて位置変位可能とさせ、前記カバーリングの外周と前記押さえ板との間に位置変位用の隙間を形成するよう構成した。
なお前記カバーリングの内側にブラシを配置することが好ましく、さらに前記カバーリングの開口側端面を封止するようにしてもよい。
【0017】
【作用】
上記構成によれば、坑口にエントランスパッキンを配置し、このエントランスパッキンの中央部に立坑内側よりカバーリングを差し込み挿入すれば、エントランスパッキンの先端は、カバーリングの表面に沿って坑奥側へと倣い、この状態でカバーリングを保持することができる。なお坑口におけるエントランスパッキンより開口側には当該エントランスパッキンのめくれ防止をなす押さえ板を設けておき、さらにこの押さえ板の先端とカバーリングとの間に隙間が形成されるよう前記押さえ板の長さを設定しておく。
【0018】
なおカバーリングの固定は、当該カバーリングにフランジ部を設けておき、このフランジ部に形成した掛止部にて坑口の開口端面に固定すればよく、具体的にはカバーリングにおけるフランジ部に貫通穴を形成しておき、この貫通穴に坑口の開口端面から突出させたボルトを挿通させるようにすればよい。このようにフランジ部に形成された掛止部にてカバーリングを固定すれば、当該カバーリングを坑口から引き出す際、開口端面からのカバーリングの解除は、ボルトを掛止部となる(フランジ部肉厚の)貫通穴から抜き出すだけでよく、このためカバーリングの傾きによって当該カバーリングが到達坑口から抜けでなくなるのを防止することができる。
【0019】
またカバーリングを複数のブロックで構成すれば、ここのブロックを坑口に沿って取り付けることが可能になり、人手による取り付けも容易に行うことができる。
ところで坑口にエントランスパッキンを配置するとともに、このエントランスパッキンよりも開口寄りに押さえ板を配置する。そしてカバーリングの外周と押さえ板との間に隙間を形成し、カバーリングをエントランスパッキンのみで支持すれば、カバーリングは、弾性体であるパッキンの弾性力に支持され中央部に位置して中空に浮いたようないわばフローティング状態に保持される。このため、掘削装置の推進方向にずれが生じても、このずれをエントランスパッキンの弾性変形にて吸収させ、カバーリングの軸芯を掘削装置の軸芯方向に合わせ、かつ半径方向の変位にも合わせることができる。
【0020】
さらにカバーリングは、掘削装置によって立坑の内側へと押し出されるが、掘削装置の推進方向が傾いていたり、あるいは推進抵抗が均一で無い場合、カバーリングに傾きが生じる可能性がある。しかしカバーリングはエントランスパッキンのみで支持されているので、カバーリングの表面に剛体による食い込みが生じるのを防止することができ、前記カバーリングを確実に坑口から取り出すことが可能になる。またカバーリングから掘削装置にエントランスパッキンが乗り移っても、同様に掘削装置の支持はエントランスパッキンだけで行うことから、掘削装置の表面に食い込みが生じるのを防止することができる。
【0021】
さらにカバーリングに隣接する押さえ板によって、エントランスパッキンの摺動抵抗を受け止め、めくれ防止を行うことから、先端を坑奥側に向かわせたエントランスパッキンの姿勢を保持することが可能になる。
【0022】
そしてカバーリングの内側にブラシを配置し、このブラシを掘削装置へと押し当てれば、カバーリングの内周と掘削装置の外周との間の隙間から泥水が立坑側に流出するのを防止することができる。また前記ブラシに代えて、カバーリングの形状を茶筒状とし、片側端面を封止すれば、泥水が立坑側に流出するのを確実に防止することができる。
【0023】
【発明の実施の形態】
以下に本発明に係る坑口への推進工法およびエントランスパッキンの支持構造に好適な具体的実施の形態を図面を参照して詳細に説明する。
図1は、第1の実施の形態に係るエントランスパッキンの支持構造を示した説明図であり、図2は、同実施の形態に用いられるカバーリングを示した斜視図である。
【0024】
通信ケーブルや光ケーブルに代表されるケーブル類を挿通させるためのトンネルを新たに設ける際には、まずトンネル予定地の両端に立坑を形成する。そして立坑における片側を発進立坑とし、他方を到達立坑10と設定し、前記発進立坑より掘削装置12を推進させるとともに前記発進立坑よりヒューム管を継ぎ足し挿入してトンネルを形成していく。
【0025】
一方、到達立抗10には、図1に示すように、その側面に掘削装置12を受け入れるための到達坑口14が設けられている。
当該到達坑口14の開口周縁には、フランジ付きの取付用リング16が装着されており、この取付用リング16のフランジ18に環状のエントランスパッキン20と、スペーサ22および押さえ板24とが順に積層されている。そしてこれらを貫通するようボルト25が挿通され、前述のパッキン類をフランジ18に装着するようにしている。なお押さえ板24には、その長手方向に一致するよう長穴が形成されており、押さえ板24を到達坑口14の半径方向に沿って出し入れ可能にしている。
【0026】
ところでこうした到達坑口14には、立坑内側よりカバーリング26が差し込まれている。当該カバーリング26は、図2(1)に示すように筒状の本体28を有しており、その内径は掘削装置12をその内部に取り込むだけの寸法に設定されている。なお掘削装置12の先端に形成されるカッタービットと、本体28における内壁とのクリアランスは、掘削装置12の到達位置精度によって設定すればよい。そして到達位置精度を考慮して設定されたクリアランスにより、本体28の内部に前記掘削装置12を取り込む際のマージンを確保するようにしている。
【0027】
一方、本体28における外径は、エントランスパッキン20の内径以上で且つ押さえ板24先端同士を結んだ円の直径よりも小さくなるように設定される。このように本体28の内外径寸法を設定すれば、押さえ板24との接触を防止しつつエントランスパッキン20を坑奥側に変形させ、さらに本体28の内側に掘削装置12を取り込むことが可能になる。
【0028】
ところで本体28における片側端面からは、前記本体28の半径方向に向かって外方フランジ30と内方フランジ32とがそれぞれ形成されている。そして外方フランジ30は、前述した取付用リング16のフランジ18と同径に設定され、さらにボルト25を挿通可能とするように貫通穴34が複数形成されている。このように貫通穴34をボルト25の設置半径に一致させるよう形成すれば、前記貫通穴34にボルト25を挿通し、このボルト25にナット(図示せず)を螺合させるようにすれば、フランジ18にカバーリング26を固定することが可能になる。
【0029】
一方、外方フランジ30と反対方向に延設される内方フランジ32は、本体28の内部に掘削装置12を進入させた際、前記掘削装置12の先端が内方フランジ32に接触できるだけの寸法に設定されればよい。このような寸法に内方フランジ32を設定すれば、掘削装置12を内方フランジ32に押し当てることで、カバーリング26を到達坑口14から取り外すことができる。
【0030】
このように到達坑口14にカバーリング26を差し込み挿入し、このカバーリング26によってエントランスパッキン20を支持するようにした支持構造に掘削装置12を導入する手順を説明する。
【0031】
図4は、掘削装置が到達坑口に達する状態を示した断面説明図である。
同図(1)に示すように、発進坑口より送り出された掘削装置12を、カバーリング26の内部に取り込む際には、まずボルト25に螺合されていたナット(図示せず)を取り外し、カバーリング26をボルト25の延長方向に沿って引き抜けるようにしておく。またこのような状態ではエントランスパッキン20の先端が坑奥側に向かうよう本体28に密着しているとともに、このエントランスパッキン20より開口側に設けられた押さえ板24は、カバーリング26の本体28に対して、引っかかりが生じないだけの隙間が形成されるよう、その繰り出し量が設定されている。
【0032】
ところで押さえ板24の先端には、坑奥側に向かうように曲げ部24Aが形成されているが、これは坑奥側から水圧等の力加わったエントランスパッキン20の変形を受け止めるためのものである。すなわち押さえ板24の先端に曲げ部24Aを形成しておけば、この曲げ部24Aの円弧に沿って圧力の加わったエントランスパッキン20は倣うので、当該エントランスパッキン20には、集中応力が加わることがない。このようにエントランスパッキン20には、曲げ部24Aにそった円弧が形成され、集中応力が加わることがないので、押さえ板24とカバーリング26(あるいは掘削装置12やヒューム管36)とのクリアランスを大きくとることができ、押し出しを容易にすることができる(押さえ板24の先端に曲げ部24Aが無く、真っ直ぐな形状であれば、エントランスパッキン20は、カバーリング26と押さえ板24との隙間に入り込むような形態となり、その部分が集中応力を受けてしまう。このため押さえ板24とカバーリング26とのクリアランスを狭めて、エントランスパッキン20がカバーリング26と押さえ板24との隙間に入り込むのを防止しなければならなくなる。)。
【0033】
そしてこのような設定が終了した後、カバーリング26における本体28の内部に掘削装置12を取り込み、当該掘削装置12の先端を内方フランジ32に接触させる。
掘削装置12の先端を内方フランジ32に接触させ、そのまま前記掘削装置12を前進させると、同図(2)に示すようにカバーリング26は、到達坑口14から到達立坑10の内側へと押し出される。そしてこのカバーリング26の移動とともに、エントランスパッキン20は、到達坑口14の開口側へと移動するが、前記エントランスパッキン20は、スペーサ22の厚み分だけ移動した後、押さえ板24によって支持され、同状態を保持する。このためカバーリング26の移動によってパッキン自体にめくれが生じるのを防止することができる。
【0034】
そしてカバーリング26が移動する際、当該カバーリング26の外方フランジ30には、フランジ18に取り付けられたボルト25が挿通されており、このボルト25と貫通穴34の内壁とで摺動が生じるが、この摺動は外方フランジ30の肉厚に加え、ボルト25におけるナットの締め代だけとなっている。このためカバーリング26が僅かに移動するだけでボルト25は貫通穴34から抜け出し、その後はカバーリング26はエントランスパッキン20のみに支持されたフローティング構造となる。ゆえに掘削装置12の推進方向に傾きが生じたり、あるいはカバーリング26の周囲の摩擦抵抗の差によってたとえカバーリング26に傾きが生じたとしても、カバーリング26の表面に対して剛体が食い込むようなことがなく、このため掘削装置12でカバーリング26を押し出すことにより、確実に当該カバーリング26を到達立坑10側から取り出すことができる。
【0035】
そして同図(3)に示すように、カバーリング26を到達立坑10側に取り出す際には、押さえ板24を掘削装置12側に繰り出して、カバーリング26の場合と同様、前記押さえ板24の先端と前記掘削装置12の外表面との間を狭めるようにすればよい。このように押さえ板24との隙間をカバーリング26と同様にすれば(引っかかりが生じないだけの隙間を形成するよう、その繰り出し量を設定する)、エントランスパッキン20は押さえ板24に支持され、その姿勢を保つので、土圧や水圧がエントランスパッキン20に加わっても、これら圧力の増大によって立坑側に泥水が流れ出るのを防止することができる。
【0036】
そしてエントランスパッキン20の先端を掘削装置12に密着させつつ、当該掘削装置12を移動させ、エントランスパッキン20の先端が掘削装置12の後に続くヒューム管38に達すると、当該ヒューム管38は、掘削装置12よりも小径であることから、このヒューム管38の外径に見合うよう、再び押さえ板24をエントランスパッキン20の中央部分に向かって繰り出すようにすればよい(引っかかりが生じないだけの隙間を形成するよう、その繰り出し量を設定する)。このように押さえ板24の繰り出し量をヒューム管38の外径に対応させれば、エントランスパッキン20がヒューム管38に乗り移っても、当該エントランスパッキン20にめくれが生じることなく、止水を確実に行うことができる。
【0037】
ところで押さえ板24の繰り出し量は、エントランスパッキン20の中央部分を進行する部材の外径によって個別に設定することが必要である。このため図1に示すように上部に配置される押さえ板24を除いて、それぞれの押さえ板24にフック35を設けるとともに、当該フック35にワイヤ36を挿通させておく。そしてこのワイヤ36を牽引することで、カバーリング26における本体28の外周、掘削装置12の外周、掘削装置12に連続するヒューム管38の外周のそれぞれに合わせて押さえ板24の絞り位置を調整するようにすれば容易にその設定が可能になる。なお上部に配置される押さえ板24は、その自重により、エントランスパッキン20の中央部に接近させることができるので、ワイヤ36の挿通は不要となる。
【0038】
図3は、第1の実施の形態に用いられるカバーリングの応用例を示した斜視図である。
同図に示すように、リング状のカバーリング26を個々のブロック体27で構成すれば、前記ブロック体27を個々に到達坑口14に取り付けることができるので、取り付けが容易にでき、大がかりな揚重設備などを用意する必要を無くすことができる。
【0039】
図5は、第2の実施の形態に係るエントランスパッキンの支持構造を示した説明図であり、図6は、同実施の形態に用いられるカバーリングを示した斜視図である。
これらの図に示すように第2の実施の形態では、第1の実施の形態に対してカバーリング26の形状が異なっているだけである。このため本実施の形態については、カバーリング26の説明だけを行い、他部材については説明を省略するとともに、第1の実施の形態と同一の部材については、同様の番号を付与する。
【0040】
第2の実施の形態に用いられるカバーリング40は、筒状の本体42を有しており、その内径は掘削装置12をその内部に取り込むだけの寸法に設定されている。なお掘削装置12の先端に形成されるカッタービットと、本体42における内壁とのクリアランスは、掘削装置12の到達位置精度によって設定すればよい。そして本実施の形態(第2の実施の形態)においては、カバーリング40をゴムパッキンで支持したフローティング構造を用いているため、カバーリング40の位置を柔軟に設定することが可能である。このため第1の実施の形態に対して第2の実施の形態では、前記クリアランスを狭めることができる。具体的には、掘削装置12の先端に形成されるカッタービットと、本体28における内壁とのクリアランスは、掘削装置12の到達位置精度、およびフローティング状態にあるカバーリング40の調整余裕代によって設定すればよい。そして到達位置精度および調整余裕代を考慮して設定されたクリアランスにより、本体28の内部に前記掘削装置12を取り込む際のマージンを確保するようにしている。
【0041】
一方、本体42における外径は、エントランスパッキン20の内径以上で且つ押さえ板24先端同士を結んだ円の直径よりも小さくなるように設定される。このように本体42の内外径寸法を設定すれば、エントランスパッキン20を坑奥側に変形させ、さらに本体28の内側に掘削装置12を取り込むことが可能になる。
【0042】
ところで本体42における片側端面からは、前記本体42の半径方向に向かって内方フランジ44が形成されている。当該内方フランジ32は、本体42の内部に掘削装置12を進入させた際、前記掘削装置12の先端が内方フランジ44に接触できるだけの寸法に設定されればよい。このような寸法に内方フランジ44を設定すれば、掘削装置12を内方フランジ44に押し当てることで、カバーリング40を到達坑口14から取り外すことができる。また本体42内側において内方フランジ44が形成される端面の反対側には、本体42の管奥側に伸びるワイヤーブラシ46が周回状に設けられており、このワイヤーブラシ46の先端を掘削装置12や、これに続くヒューム管38に接触させることでカバーリング40と掘削装置12との間から土砂が立坑側に入り込むのを防止することができるようになっている。
【0043】
図8は、掘削装置が到達坑口に達する状態を示した断面説明図である。
同図(1)に示すように、カバーリング40は、弾性を有したエントランスパッキン20にて支持されていることから、たとえ掘削装置12が到達坑口14に対してずれたとしても、このずれをエントランスパッキン20の弾性にて吸収し、前記掘削装置12をカバーリング40内に取り込むことが可能になる。
【0044】
そしてカバーリング40内に掘削装置14を取り込み、当該掘削装置14にてカバーリング40を押し出していけば、同図(2)に示すように前記カバーリング40は、到達坑口14から到達立坑10の内側へと押し出される。そしてこのカバーリング40の移動とともに、エントランスパッキン20は、到達坑口14の開口側へと移動するが、前記エントランスパッキン20は、スペーサ22の厚み分だけ移動した後、押さえ板24によって支持され、同状態を保持する。このためカバーリング26の移動によってパッキン自体にめくれが生じるのを防止することができる。
【0045】
なおエントランスパッキン20の支持をなす押さえ板24は、カバーリング40に対してクリアランスが確保されているので、カバーリング40に接触することがない。このためカバーリング40の表面に押さえ板24が食い込むのを防止することができ、カバーリング40を確実に取り出すことが可能になる。
【0046】
そして同図(3)に示すように、エントランスパッキン20がカバーリング40から掘削装置14に乗り移る際には、押さえ板24を繰り出して、カバーリング40のときと同様のクリアランスを掘削装置14との間に形成すればよい。このように押さえ板24と掘削装置14との間にクリアランスを設定すれば、エントランスパッキン20が掘削装置14に接した場合でも前記押さえ板24が掘削装置14に食い込むことがなく、掘削装置14の推進を確実に行わせることができる。また掘削装置14の後段に配置されるヒューム管38についても押さえ板24との間に適切なクリアランスを設定すれば、同様の効果を得ることができることはいうまでもない。
【0047】
図7は、第2の実施の形態に用いられるカバーリングの応用例を示した斜視図である。
同図に示すように、カバーリング40の内側に形成されたワイヤーブラシ46を廃止するとともに、内方フランジ44の中央部を封止し、カバーリング40を茶筒の形態とすれば、カバーリング40と掘削装置12との間から土砂が立坑側に入り込むのを確実に防止することができる。
【0048】
【発明の効果】
以上説明したように本発明によれば、到達坑口の坑奥側から開口側に向かって環状のエントランスパッキンと、このエントランスパッキンのめくれ防止をなす押さえ板とを順に配置し、前記エントランスパッキンの先端が坑奥側に向かうよう前記エントランスパッキンの内側にカバーリングを差し込んだエントランスパッキンの支持構造であって、前記カバーリングの外周と前記押さえ板との間にフローティング用の隙間を形成するとともに、前記カバーリングにフランジ部を設け、当該フランジ部に前記到達坑口の開口端面との固定をなす掛止部を設けたり、
【0049】
あるいは、到達坑口の坑奥側から開口側に向かって環状のエントランスパッキンと、このエントランスパッキンのめくれ防止をなす押さえ板とを順に配置し、前記エントランスパッキンの先端が坑奥側に向かうよう前記エントランスパッキンの内側にカバーリングを差し込んだエントランスパッキンの支持構造であって、前記カバーリングの外周と前記押さえ板との間にフローティング用の隙間を形成し、前記カバーリングを前記エントランスパッキンのみで支持したことから、カバーリングを確実に到達坑口より引き出せるとともに、押さえ板がカバーリングや掘削装置の表面に食い込むことを防止することが可能になる。
【図面の簡単な説明】
【図1】第1の実施の形態に係るエントランスパッキンの支持構造を示した説明図である。
【図2】同実施の形態に用いられるカバーリングを示した斜視図である。
【図3】第1の実施の形態に用いられるカバーリングの応用例を示した斜視図である。
【図4】掘削装置が到達坑口に達する状態を示した断面説明図である。
【図5】第2の実施の形態に係るエントランスパッキンの支持構造を示した説明図である。
【図6】同実施の形態に用いられるカバーリングを示した斜視図である。
【図7】第2の実施の形態に用いられるカバーリングの応用例を示した斜視図である。
【図8】掘削装置が到達坑口に達する状態を示した断面説明図である。
【図9】到達坑口におけるエントランスパッキンの支持構造を示す説明図である。
【符号の説明】
1………到達坑口、2………エントランスパッキン、3………掘削装置、
4………立坑、5………カバーリング、6………押さえ板、
10………到達立坑、12………掘削装置、14………到達坑口、
16………取付用リング、18………フランジ、
20………エントランスパッキン、22………スペーサ、
24………押さえ板、25………ボルト、26………カバーリング、
27………ブロック体、28………本体、30………外方フランジ、
32………内方フランジ、34………貫通穴、35………フック、
36………ワイヤ、38………ヒューム管、40………カバーリング、
42………本体、44………内方フランジ、46………ワイヤーブラシ[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a propulsion method for a wellhead and a support structure for an entrance packing, and in particular, when a drilling device reaches the reaching wellhead, the gap between the reaching wellhead and the drilling device is sealed, and muddy water flows out. The present invention relates to a propulsion method to a wellhead and a support structure for an entrance packing.
[0002]
[Prior art]
In recent years, cables represented by communication cables and optical cables are sometimes extended through tunnels formed in the ground. And when constructing a new tunnel, an excavating apparatus that performs underground propulsion is generally used.
[0003]
When constructing a tunnel with a drilling device, first, a shaft is excavated to an arbitrary depth on both sides where the tunnel is to be formed, and one shaft is set as a start side and the other shaft is set as an arrival side. Then, the excavator is sent out from the start side shaft toward the arrival side, and a fume pipe is added and inserted from the start side, and a tunnel is formed by the sent out fume pipe.
[0004]
By the way, large earth pressure and water pressure act on the outside of the wall surface in the shaft. For this reason, at the start pit and the arrival pit provided in the vertical shaft, an entrance packing is provided in the vicinity of the opening, and the entrance packing is brought into contact with a drilling device or a fume pipe so that muddy water or the like flows into the vertical shaft. I try to prevent it.
[0005]
FIG. 9 is an explanatory view showing a support structure of the entrance packing at the arrival wellhead.
That is, as shown in FIG. 1A, when the
[0006]
For this reason, as shown in FIG. 2 (2), a
[0007]
When the
[0008]
Note that the cover ring is supported only by the entrance packing without the holding plate, or as shown in (3) in the figure.In entrance packing 2There is also known one that is provided with a retractable pressing plate 6 (regulating piece).
[0009]
[Problems to be solved by the invention]
However, the above-described support structure for the entrance packing at the arrival tunnel has the following problems.
That is, in the support structure as shown in FIG. 2 (2), the pressing plate presses the cover ring. For this reason, it is necessary for the cover ring to slide with respect to the press plate by the amount of insertion of the cover ring, and during that time, if the tilt occurs in the sliding direction, the press plate bites into the surface of the cover ring. There was a risk that the cover ring could not be removed from the reaching wellhead.
[0010]
Although not shown,If the cover ring is supported only by the entrance packing, the problem that the cover ring cannot be removed from the arrival tunnel can be avoided. However, as the cover ring and excavation equipment move, the entrance packing turns up, and the shaft side from this turn-up location There was a risk that the muddy water would flow into.
[0011]
In addition, if a retractable presser plate is attached to the entrance packing in Fig. 3 (3), it is possible to prevent the entrance packing from being turned up, but the cover plate and the excavator move when the cover ring and excavator are moved. There was a risk that the surface of the device would bite and the cover ring or excavator would not be able to escape from the arrival wellhead.
[0012]
The present invention pays attention to the above-mentioned conventional problems, and the propulsion method and entrance to the wellhead that can reliably pull out the cover ring from the arrival wellhead and prevent the pressing plate from biting into the surface of the cover ring or the excavator. An object of the present invention is to provide a packing support structure.
[0013]
[Means for Solving the Problems]
The present invention has been made based on the knowledge that if the pressing plate that prevents the entrance packing from turning over is prevented from coming into contact with the cover ring or the surface of the excavator, the pressing plate can prevent biting. is there.
[0014]
That is,The propulsion method to the wellhead according to the present invention isReach pitInsert the cover ring from the opening side into the entrance packing located at, and make the tip of the entrance packing face the back side of the well,After holding the cover ring with the elastic force of the entrance packing,Introducing an excavator into the cover ring and receiving the entrance packing with a holding plate away from the cover ring.While maintaining the state where the cover ring is held by the elastic force of the entrance packing, Transfer the entrance packing from the cover ring to the excavator,It is propelled while the outer periphery of the excavator is stopped by the entrance packing.I did it.
[0015]
In addition, the support structure for the entrance packing according to the present invention includes an annular entrance packing and a pressing plate for preventing the entrance packing from being turned in order from the depth side of the arrival tunnel to the opening side. A support structure for the entrance packing in which a cover ring is inserted inside the entrance packing so that the tip is directed to the back side of the well,The cover ring is held by the elastic force of the entrance packing and can be displaced.Between the outer periphery of the cover ring and the pressing plateClearance for position displacementIn addition, the cover ring is provided with a flange portion, and the flange portion is provided with a latching portion that fixes the opening end surface of the arrival wellhead. In addition, the said cover ring consists of a some block, and you may make it arrange | position this in the shape of a circle along the said arrival tunnel.
[0016]
Then, an annular entrance packing and a pressing plate for preventing the entrance packing from being turned up are arranged in this order from the depth side of the arrival tunnel to the opening side, and the entrance packing is arranged so that the front end of the entrance packing is directed to the depth side. The support structure of the entrance packing with the cover ring inserted inside,The cover ring is held by the elastic force of the entrance packing and can be displaced.Between the outer periphery of the cover ring and the pressing plateForm a gap for position displacementConfigured to do.
In addition, it is preferable to arrange | position a brush inside the said cover ring, and you may make it seal the opening side end surface of the said cover ring further.
[0017]
[Action]
According to the above configuration, when the entrance packing is arranged at the wellhead, and the cover ring is inserted and inserted into the center of the entrance packing from the inside of the shaft, the front end of the entrance packing extends to the back of the well along the surface of the cover ring. In this state, the cover ring can be held. A holding plate for preventing the entrance packing from being turned up is provided on the opening side of the entrance packing at the wellhead, and the length of the holding plate is set so that a gap is formed between the tip of the holding plate and the cover ring. Is set in advance.
[0018]
The cover ring may be fixed by providing a flange portion on the cover ring and fixing it to the opening end surface of the wellhead by a latching portion formed on the flange portion. Specifically, the cover ring penetrates the flange portion of the cover ring. A hole may be formed and a bolt protruding from the opening end face of the wellhead may be inserted into the through hole. If the cover ring is fixed by the latching portion formed in the flange portion in this way, when the cover ring is pulled out from the wellhead, the cover ring is released from the opening end surface, and the bolt becomes the latching portion (the flange portion). It is only necessary to pull out from the through-hole (thick), and therefore it is possible to prevent the cover ring from coming out of the reaching wellhead due to the inclination of the cover ring.
[0019]
Moreover, if a cover ring is comprised with a some block, it will become possible to attach here a block along a wellhead and can also perform attachment manually.
By the way, the entrance packing is disposed at the wellhead, and the pressing plate is disposed closer to the opening than the entrance packing. If a gap is formed between the outer periphery of the cover ring and the holding plate, and the cover ring is supported only by the entrance packing, the cover ringIt is supported by the elastic force of the packing, which is an elastic body, and is held in a floating state so as not to float in the center.For this reason, even if a deviation occurs in the propulsion direction of the excavator, this deviation is caused by elastic deformation of the entrance packing.It is possible to absorb and match the axial center of the cover ring with the axial direction of the excavator and also with the radial displacement.
[0020]
Further, the cover ring is pushed out to the inside of the shaft by the excavator, but if the propulsion direction of the excavator is inclined or the propulsion resistance is not uniform, the cover ring may be inclined. However, since the cover ring is supported only by the entrance packing, it is possible to prevent the surface of the cover ring from being bitten by a rigid body, and the cover ring can be reliably taken out from the wellhead. Further, even if the entrance packing is transferred from the cover ring to the excavator, the excavator is supported by the entrance packing only, so that it is possible to prevent biting on the surface of the excavator.
[0021]
In addition, the pressing plate adjacent to the cover ring receives the sliding resistance of the entrance packing and prevents turning-up, so that it is possible to maintain the orientation of the entrance packing with the tip directed toward the back of the shaft.
[0022]
And if a brush is arranged inside the cover ring and this brush is pressed against the excavator, mud water is prevented from flowing out from the gap between the inner periphery of the cover ring and the outer periphery of the excavator. Can do. Moreover, it can replace with the said brush, and it can prevent reliably that muddy water flows out to a shaft side if the shape of a cover ring is made into a brown cylinder shape and the one-side end surface is sealed.
[0023]
DETAILED DESCRIPTION OF THE INVENTION
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Specific embodiments suitable for a wellhead propulsion method and an entrance packing support structure according to the present invention will be described below in detail with reference to the drawings.
FIG. 1 is an explanatory view showing a support structure for an entrance packing according to the first embodiment, and FIG. 2 is a perspective view showing a cover ring used in the embodiment.
[0024]
When newly establishing a tunnel for inserting cables represented by communication cables and optical cables, first, shafts are formed at both ends of the planned tunnel site. Then, one side of the shaft is set as a starting shaft, and the other is set as a reaching
[0025]
On the other hand, as shown in FIG. 1, the reaching
An
[0026]
By the way, a
[0027]
On the other hand, the outer diameter of the
[0028]
Incidentally, an
[0029]
On the other hand, the
[0030]
A procedure for introducing the
[0031]
FIG. 4 is a cross-sectional explanatory view showing a state in which the excavator reaches the arrival wellhead.
As shown in the figure (1), when the
[0032]
By the way, a
[0033]
After such setting is completed, the
When the tip of the
[0034]
When the
[0035]
Then, as shown in FIG. 3 (3), when the
[0036]
Then, the
[0037]
By the way, the feeding amount of the
[0038]
FIG. 3 is a perspective view showing an application example of the cover ring used in the first embodiment.
As shown in the figure, if the ring-shaped
[0039]
FIG. 5 is an explanatory view showing a support structure of the entrance packing according to the second embodiment, and FIG. 6 is a perspective view showing a cover ring used in the embodiment.
As shown in these drawings, in the second embodiment, only the shape of the
[0040]
The
[0041]
On the other hand, the outer diameter of the
[0042]
Incidentally, an
[0043]
FIG. 8 is a cross-sectional explanatory view showing a state where the excavator reaches the reaching pit.
As shown in FIG. 1A, the
[0044]
Then, when the
[0045]
In addition, since the clearance with respect to the
[0046]
Then, as shown in FIG. 3 (3), when the entrance packing 20 is transferred from the
[0047]
FIG. 7 is a perspective view showing an application example of the cover ring used in the second embodiment.
As shown in the figure, if the
[0048]
【The invention's effect】
As described above, according to the present invention, the annular entrance packing and the pressing plate for preventing the entrance packing from being turned up are arranged in order from the back side of the arrival well to the opening side, and the tip of the entrance packing is arranged. Is a support structure of the entrance packing in which a cover ring is inserted inside the entrance packing so as to go to the inner side of the pit, and a floating gap is formed between the outer periphery of the cover ring and the pressing plate, and A flange is provided on the cover ring, and a hooking portion for fixing the opening end surface of the reaching pit is provided on the flange.
[0049]
Alternatively, an annular entrance packing and a pressing plate for preventing the entrance packing from turning toward the opening side are arranged in order from the back side to the opening side of the arrival wellhead, and the front end of the entrance packing faces the back side An entrance packing support structure in which a cover ring is inserted inside the packing, wherein a floating gap is formed between the outer periphery of the cover ring and the pressing plate, and the cover ring is supported only by the entrance packing. As a result, the cover ring can be reliably pulled out from the arrival wellhead, and the pressing plate can be prevented from biting into the surface of the cover ring or the excavator.
[Brief description of the drawings]
FIG. 1 is an explanatory view showing a support structure for an entrance packing according to a first embodiment.
FIG. 2 is a perspective view showing a cover ring used in the embodiment.
FIG. 3 is a perspective view showing an application example of a cover ring used in the first embodiment.
FIG. 4 is an explanatory cross-sectional view showing a state where the excavator reaches a reaching pit.
FIG. 5 is an explanatory view showing a support structure for an entrance packing according to a second embodiment.
FIG. 6 is a perspective view showing a cover ring used in the embodiment.
FIG. 7 is a perspective view showing an application example of a cover ring used in the second embodiment.
FIG. 8 is an explanatory cross-sectional view showing a state where the excavator reaches a reaching pit.
FIG. 9 is an explanatory view showing a support structure for the entrance packing at the arrival shaft.
[Explanation of symbols]
1 ... reach hole, 2 ... entrance packing, 3 ... excavator,
4 ......... Vertical shaft, 5 ... …… Covering, 6 ......... Presser plate,
10 ......... Drilling shaft, 12 ......... Drilling device, 14 ......... Drilling pit,
16 ......... Ring for mounting, 18 ......... Flange,
20 ……… Entrance packing, 22 ……… Spacer,
24 ......... Presser plate, 25 ... …… Bolt, 26 ... …… Covering,
27 ......... Block body, 28 ......... Main body, 30 ......... Outer flange,
32 ......... inner flange, 34 ......... through hole, 35 ...... hook,
36 ……… Wire, 38 ……… Hume tube, 40 ……… Covering,
42 ......... Main body, 44 ......... Inner flange, 46 ......... Wire brush
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2000330351A JP3700030B2 (en) | 2000-10-30 | 2000-10-30 | Propulsion method to wellhead and support structure of entrance packing |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2000330351A JP3700030B2 (en) | 2000-10-30 | 2000-10-30 | Propulsion method to wellhead and support structure of entrance packing |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2002138791A JP2002138791A (en) | 2002-05-17 |
| JP3700030B2 true JP3700030B2 (en) | 2005-09-28 |
Family
ID=18806888
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2000330351A Expired - Fee Related JP3700030B2 (en) | 2000-10-30 | 2000-10-30 | Propulsion method to wellhead and support structure of entrance packing |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3700030B2 (en) |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR200464580Y1 (en) | 2010-09-27 | 2013-01-10 | 신한산기(주) | Entrance packing adapter |
| JP6302285B2 (en) * | 2014-03-04 | 2018-03-28 | 機動建設工業株式会社 | Wellhead structure of the reach wall in the propulsion method |
| JP6397542B1 (en) * | 2017-06-16 | 2018-09-26 | 株式会社アルファシビルエンジニアリング | Sealing structure for water stop at tunnel wellhead |
| JP7774385B2 (en) | 2021-02-09 | 2025-11-21 | 株式会社安藤・間 | Foreign object protection device and foreign object protection method |
-
2000
- 2000-10-30 JP JP2000330351A patent/JP3700030B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JP2002138791A (en) | 2002-05-17 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR100497814B1 (en) | Boring Device And Boring Method | |
| CN104532836A (en) | Anchor cable construction device combining hole forming, mounting and grouting into one | |
| JP3700030B2 (en) | Propulsion method to wellhead and support structure of entrance packing | |
| CN216305926U (en) | Pipeline normal position replacement tunneling device | |
| JP2016196911A (en) | Sheath pipe jacking method | |
| JP4752015B2 (en) | Tunnel construction method and removal shield used in this method | |
| JPH0547830Y2 (en) | ||
| JPH04130395U (en) | Thrust dispersion device for small diameter pipes | |
| US3986568A (en) | Apparatus for making underground passages | |
| JPH0332621Y2 (en) | ||
| JPH0510073Y2 (en) | ||
| JP4368534B2 (en) | Tunnel excavator | |
| JPH06100062B2 (en) | Propulsion method and joints for propulsion method | |
| JP2628084B2 (en) | Segment assembly method in shield method | |
| JP4133898B2 (en) | How to reach the excavator | |
| JP2535618Y2 (en) | Drill tube coupling device | |
| JPH0220303Y2 (en) | ||
| JP3819600B2 (en) | Piping laying method | |
| JPH116391A (en) | Equipment for internal push method | |
| JPH01121423A (en) | How to bury branch pipes | |
| JPH0321790A (en) | Pipe backback prevention device | |
| JP2630330B2 (en) | Shrinkable segment and shrinkable segment ring | |
| JPH0527755B2 (en) | ||
| JPH0640713Y2 (en) | Perforated propulsion tube | |
| JPH0868297A (en) | Connection structure of propulsion pipes for tunnel excavation |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20050310 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20050315 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20050406 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20050530 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20050624 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080722 Year of fee payment: 3 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110722 Year of fee payment: 6 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120722 Year of fee payment: 7 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120722 Year of fee payment: 7 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130722 Year of fee payment: 8 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| LAPS | Cancellation because of no payment of annual fees |