JP3705481B2 - Track maintenance work support system - Google Patents
Track maintenance work support system Download PDFInfo
- Publication number
- JP3705481B2 JP3705481B2 JP2000328243A JP2000328243A JP3705481B2 JP 3705481 B2 JP3705481 B2 JP 3705481B2 JP 2000328243 A JP2000328243 A JP 2000328243A JP 2000328243 A JP2000328243 A JP 2000328243A JP 3705481 B2 JP3705481 B2 JP 3705481B2
- Authority
- JP
- Japan
- Prior art keywords
- work
- maintenance
- train
- maintenance work
- plan
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は鉄道の線路保守作業計画の作成、計画の自動チェック、作業の着手、終了等の手続きを自動化する線路保守作業支援システムに関する。
【0002】
【従来の技術】
現在、鉄道の線路保守作業の計画から実施にいたるプロセスは、紙に印刷された列車ダイヤから作業を行う停車場間で作業に必要な時間が確保できる列車間合いを抽出し、その間合いを線路保守作業に使用するための手続きとして、定められた様式(線路閉鎖申込み・承認簿と呼ばれている)に記入し、列車運行を管理する部署に提出して列車ダイヤと競合するか否かのチェックを受けた後に承認を受け、作業を実施するという流れになっている。
【0003】
また、作業の着手・終了にあたっては、作業当日、作業申込み時に作成した線路閉鎖申込み・承認簿を使用して作業区間に列車を進入させない措置(臨時列車等を入れないように信号を赤にする等)を講じた上で作業を実施し、作業終了を確認後にその区間への列車運行を開始する仕組みによっている。
【0004】
【発明が解決しようとする課題】
これらの作業のプロセスは全て従事員間の連絡打合せと注意力に依存して実施されており、その際に使用されるのは、「定められた様式の記録紙」と「電話」であり、システム化が遅れているばかりでなく、ヒューマンエラーの萌芽を内包し、さらに手続きに時間がかかってしまうという問題もあった。
【0005】
本発明は上記課題を解決するためのもので、線路保守作業の計画から実施までのプロセスをシステム化することにより、線路保守作業の手続きに要する時間を短縮して業務の効率化を図ると共に、ヒューマンエラーを排除して安全性を向上することを目的とする。
【0006】
本発明の線路保守作業支援システムは、要求に応じて列車ダイヤデータを回線を通して提供し、入力された保守作業計画を一括管理する保守作業計画ダイヤサーバーと、
回線を通して保守作業計画ダイヤサーバーから列車データを受信し、画面に列車ダイヤを表示して保守作業計画を作成し入力すると共に、保守作業計画ダイヤサーバーから受信した確定列車ダイヤデータと入力した保守作業計画とを照合し、保守作業計画の正否についてのチェックを行う機能を有する保守区端末と、
ダイヤチェック終了後の保守作業計画を回線を通して受信し表示するとともに、作業現場のモバイル端末からの作業着手申込み/終了報告に対して承認の情報を入力し、承認された保守作業計画の実施状況を表示するダイヤ表示装置と、
専用回線を通して前記モバイル端末に列車運行状況を提供すると共に、モバイル端末から伝送される保守作業についての情報を前記ダイヤ表示装置へ回線を通して中継する運行状況表示サーバーとを備え、
前記保守区端末は、作業開始予定時刻、作業終了予定時刻、列車線の時刻を画面上の座標値に変換し、各座標値の比較により列車間合い、競合をチェックすることを特徴とする。
【0007】
【発明の実施の形態】
以下、本発明の実施の形態を図面を参照しつつ説明する。
図1は本発明のシステム構成を説明する図である。
線路保守作業支援システム10は、保守作業計画ダイヤサーバー11、ダイヤ表示装置12、運行状況表示サーバー13を有する中央装置と、中央装置と電話回線14を介して接続されている保守区端末15と、専用回線16を介して運行状況表示サーバー13に接続されたモバイル端末17等からなっており、各装置はLANおよびISDN回線によりネットワーク接続されている。また、運行状況表示サーバー13からモバイル端末17への情報伝送はパケット通信による携帯電話回線を使用し、インターネットで広く用いられているHTMLで作成されたウェブページをモバイル端末のブラウザー機能により端末の画面に表示する方式によっている。
【0008】
中央装置の保守作業計画ダイヤサーバー11は、列車ダイヤの基になる全てのデータを有している輸送総合システム20から列車ダイヤデータを実施ダイヤ(基本ダイヤ+臨時ダイヤ)状態で受信し、保守区端末15からの要求に応じてダイヤデータを供給し、保守区端末で入力された保守作業計画を一括管理する機能を有している。
【0009】
保守区端末15は輸送総合システム20の列車データを保守作業計画ダイヤサーバー11から受信し、CRT画面にダイヤを表示させて作業計画を登録すると共に、作業実施の2日前に輸送総合システムの確定列車ダイヤデータと照合して、保守作業の実施の是非について最終チェックする機能を有している。
【0010】
ダイヤ表示装置12は、運行管理を行う指令室等に設置され、入力された保守作業計画や保守作業の実施状態を表示するとともに、現地の線閉責任者からの要求に基いて、指令(運行管理者)に対して信号機の操作スイッチである「線閉てこ」の扱い時期を表示するとともに、指令が承認情報を入力するためのものである。
【0011】
運行状況表示サーバー13は中央装置から列車運行状況データを受信し、携帯電話回線を介して、モバイル端末からの要求に応じて列車運行状況を提供する。また、モバイル端末からの線路閉鎖工事の着手申込み・終了報告時にダイヤ表示装置への情報伝送を中継する。
【0012】
図2は保守区端末での保守作業計画の作成を説明する図である。
保守作業計画は、保守作業計画ダイヤサーバー11を通して輸送総合システム10が有している作業計画に必要な列車ダイヤデータをダウンロードし、そのデータを基に、汎用パソコンからなる保守区端末のCRT画面上に列車ダイヤ形式で表示する。図において横軸は時間、縦軸は列車通過位置を示しており、右下がりが下り列車、右上がりが上り列車で、保守作業計画入力時はこのCRT画面上で保守作業計画を行おうとする停車場構内または停車場間(図ではB駅)、および列車間合い(図ではT1〜T2)をマウスで指定する。マウスで指定すると、計画入力画面に自動的に停車場構内または停車場間、および列車間合いが表示され、必要項目を入力すると作業計画が自動的に作成される。この場合、開始列車および終了列車を自動的に認識し、列車間合いの正否を自動的にチェックする。図の例の列車間合いでは下り車線を通過する列車がないので、下り車線については列車との競合が発生しない。
【0013】
図3は本システムにおける列車間合いチェック方法を説明する図である。
このチェック方法では、保守作業計画の作業開始予定時刻、作業終了予定時刻と列車線の時刻とを突き合わせる方法を採用している。即ち、図中の停車場構内(駅2)の保守作業計画▲1▼と停車場間(図では駅5)の保守作業計画▲2▼について見ると、作業着手前列車(Aレ)の存在チェックは計画作業の予定開始時刻を保守区端末の画面上のa点、b点の座標に変換し、そのピクセル値(座標値)から左方向に列車線があるか、またその列車線は指定された間合い列車かのチェックを行う。計画作業の終了列車についても同様で、予定作業終了時刻を画面上にc点、d点の座標に変換し、その各点から右方向に列車線を探索することにより列車間合いの正否に対するチェックを自動的に行う。
【0014】
なお、マウスにより自動的に選択した保守作業の開始列車(Aレ)および終了列車(Bレ)が作成者の意図したものと異なる時は、手動により選択することが可能であり、その場合にも上記した方法により列車ダイヤと保守作業計画との間に列車競合の矛盾がないことを自動的にチェックする。さらに列車が保守作業箇所に進入することを防ぐため、保守作業計画と列車運行の競合の有無もチェックするが、その方法は列車間合いチェックと同様にグラフィックデータ上で行っている。
【0015】
図4は本システムにおける列車競合チェックの方法を説明する図である。
停車場間(図の駅2)にある保守作業計画▲1▼の最中に運転される列車(Cレ)の存在の有無は作業開始予定時刻をグラフィック上の座標a点、b点から、右方向にc点、d点までの列車線を探索(列車線の時刻を画面上の座標に変換してその座標値がa点、b点とc点、d点間にあるか探索)することにより確認する。
【0016】
こうして開始列車、終了列車を自動的に認識して列車間合いの正否をチェックし、さちに列車競合のチェックを行って保守作業計画が入力される。さらに保守作業計画の入力が完了した時点で計画した保守作業が他保守区の保守作業と競合するか否かのチェックを行い、競合している場合にはアラームおよび競合作業一覧が表示される。競合作業がある場合は、その内容を同じ画面上で確認することができ、責任者間で調整を行った上登録可能となる。
【0017】
作業競合のチェックは、作業計画入力時に「作業場所・施工日時」を指定することにより、保守作業計画ダイヤサーバー11から実施ダイヤ、他保守区の作業計画データを受信し、受信したデータを自保守区端末内のメモリやデータベースに書き込んで展開しておき、入力した保守作業計画を自端末に書き込む際に、作業箇所、列車間合いをチェックしてそれが重なっている場合には競合作業と自動的に判定して表示される。なお、保守作業は一般的に同一箇所での作業が継続して行われるので、複数日にわたる同一箇所、同一間合いの保守作業計画についてはパソコンのコピー機能を活用して作業月日を指定するだけで当該日の予定列車ダイヤとのチェックを行い、一括して作業計画が登録できる機能も有している。
【0018】
こうして作業計画が登録された後、確定ダイヤによる自動ダイヤチェックと承認が行われるが、これについて説明する。
図5は確定ダイヤによる自動ダイヤチェックを説明する図である。
従来、指令員の読み合わせによっていた列車ダイヤと作業計画の競合チェックは、保守区端末において輸送総合システムの確定ダイヤ(列車情報)と、登録された作業計画を重ね合わせてシステム上でチェックされる。すなわち、列車ダイヤが確定する施工日(列車運転日)の2日前に、作業計画と確定したダイヤとの最終的なチェックを行い、列車間合いと保守作業の競合がない場合に作業計画が承認され、実作業として実行される。
【0019】
保守作業計画ダイヤサーバー11から受信した確定列車ダイヤと、登録された保守作業計画の列車間合いとの関係をデータの重ね合わせによりチェックし、列車の運転と保守作業が競合してない場合には自動的に承認され、保守区端末の画面上に保守作業計画が緑色表示され、作成者に承認されたことを通知する。また、図5の破線で示すように、作業計画登録以降にそれと競合する臨時列車(図の破線)が設定された場合は、その作業が自動的に抽出され、作業計画は未承認とされ、保守区端末のCRT画面上に作業計画が赤色表示され、作成者に計画が不承認であったことが通知される。なお、未承認となった保守作業計画については時間を短縮する等、変更入力ができるようになっている。
【0020】
この自動ダイヤチェックは、1日1回の頻度で確定ダイヤと保守作業計画とのチェックが行われるが、そのタイミングは、保守区端末電源が投入された時点で自動的に実施される。保守区端末の電源が継続して投入されている場合には、定時刻に自動ダイヤチェックが実行される。また、確定ダイヤとの自動ダイヤチェックが終了した保守作業計画と終了していない保守作業計画を区別するため、システム内でフラグを持たせて保守区端末及び保守作業計画ダイヤサーバーで両者の識別を行っている。
【0021】
図6は作業現場のモバイル端末による作業の着手申込み/終了報告を説明する図である。
保守区端末により計画された線路保守作業は、確定ダイヤとのダイヤチェックが終了した後、指令室に設備されたダイヤ表示装置12のCRT画面上にダイヤ形式で表示される。例えば、作業着手の申込みは、モバイル端末の画面上に表示された保守作業計画をタッチして線閉着手を送信すると、作業の内容がダイヤ表示装置に表示されて警報を発生し、中央の指令員が当該作業区間の線閉てこの取扱等必要な列車抑止手配を行った後に、ダイヤ表示装置の画面上で承認番号を入力して、作業承認を行うことにより作業着手手続きが実行される。モバイル端末の画面上では、線閉着手を送信した後、作業承認が行われるまで、てこ扱い中が表示され、作業承認が行われると、モバイル端末の画面上に着手承認の内容が表示され、作業着手の手続きが完結する。なお、作業終了についても手続きは全く同様である。
【0022】
指令室のダイヤ表示装置のCRT画面上では作業の着手前、作業中、終了に応じて作業のマークは黄色、赤色、緑色と変色し、図6の計画P1は緑色で終了、計画P2は黄色で作業着手前、計画P3は赤色で作業中を表している。このように作業の着手前、作業中,終了に応じて作業のマークを色分け表示することにより、線路保守作業の実施状態が指令室においてリアルタイムに把握することができ、列車の運行と保守作業の一元管理が可能となる。
【0023】
【発明の効果】
以上のように本発明によれば、線路保守作業の計画から実施までのプロセスをシステム化することにより、線路保守作業の手続きに要する時間を大幅に短縮して業務の効率化が図れると共に、ヒューマンエラーを排除して線路保守の安全性を格段に向上させることが可能となる。
【図面の簡単な説明】
【図1】 本発明のシステム構成を説明する図である。
【図2】 保守区端末での作業計画の作成を説明する図である。
【図3】 本システムにおける列車間合いチェック方法を説明する図である。
【図4】 列車競合チェックの方法を説明する図である。
【図5】 確定ダイヤによる自動ダイヤチェックを説明する図である。
【図6】 作業現場のモバイル端末による作業の着手申込み/終了報告を説明する図である。
【符号の説明】
10…線路保守作業支援システム、11…保守作業計画ダイヤサーバー、12…ダイヤ表示装置、13…運行状況表示サーバー、14…電話回線、15…保守区端末15、16…専用回線、17…モバイル端末。[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a track maintenance work support system that automates procedures such as creation of railway track maintenance work plans, automatic check of plans, start of work, and completion of work.
[0002]
[Prior art]
Currently, the process from planning to implementation of railroad track maintenance work involves extracting train intervals that can secure the time required for work between train stops that are printed from train schedules printed on paper, and using those intervals as track maintenance operations. As a procedure to use for the train, fill in the prescribed form (called the track closing application / approval book), submit it to the department that manages the train operation and check whether it conflicts with the train schedule After receiving it, it is approved and the work is carried out.
[0003]
In addition, when starting and ending work, on the day of the work, use the track closure application / approval book created at the time of application for work to prevent trains from entering the work section (the signal will be red so that no temporary trains will enter) Etc.), and after confirming the completion of the work, train operation to that section is started.
[0004]
[Problems to be solved by the invention]
All of these work processes are carried out depending on the communication arrangements and attention between the workers, and what is used at that time is “record paper in a prescribed format” and “phone”. Not only was systemization delayed, but there was also a problem that it encapsulated the sprouting of human error and that it took time to complete the procedure.
[0005]
The present invention is for solving the above-mentioned problems, and by systemizing the process from the planning to implementation of the track maintenance work, while shortening the time required for the procedure of the track maintenance work and improving the efficiency of the work, The goal is to improve safety by eliminating human errors.
[0006]
The track maintenance work support system of the present invention provides train schedule data through a line as required, a maintenance work plan diagram server that collectively manages the input maintenance work plan,
Train data is received from the maintenance work plan diagram server through the line, the train schedule is displayed on the screen, a maintenance work plan is created and entered, and the maintenance work plan entered with the confirmed train diagram data received from the maintenance work plan diagram server A maintenance area terminal having a function of checking whether the maintenance work plan is correct or not, and
The maintenance work plan after completion of the diamond check is received and displayed through the line, and the approval information is input to the work start application / completion report from the mobile terminal at the work site, and the implementation status of the approved maintenance work plan is displayed. A diamond display device for displaying;
The train operation status is provided to the mobile terminal through a dedicated line, and an operation status display server that relays information about maintenance work transmitted from the mobile terminal to the diagram display device through the line,
The maintenance area terminal converts the scheduled work start time, the scheduled work end time, and the train line time into coordinate values on the screen, and checks between trains and competition by comparing each coordinate value.
[0007]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described with reference to the drawings.
FIG. 1 is a diagram for explaining the system configuration of the present invention.
The track maintenance work support system 10 includes a maintenance work
[0008]
The maintenance
[0009]
The maintenance area terminal 15 receives the train data of the transport
[0010]
The
[0011]
The operation
[0012]
FIG. 2 is a diagram for explaining the creation of a maintenance work plan at the maintenance area terminal.
The maintenance work plan downloads the train schedule data necessary for the work plan possessed by the transportation system 10 through the maintenance work
[0013]
FIG. 3 is a diagram for explaining a train interval check method in the present system.
In this check method, a method of matching the scheduled work start time and scheduled work end time of the maintenance work plan with the time of the train line is employed. In other words, looking at the maintenance work plan (1) for the yard (station 2) in the figure and the maintenance work plan (2) between the stops (station 5 in the figure), the presence check of the train (A) before starting work is The planned start time of the planned work is converted to the coordinates of points a and b on the screen of the maintenance area terminal, and there is a train line to the left from the pixel value (coordinate value), and the train line is specified Check if it is a short train. The same applies to trains that have completed planned work. Check the correctness of the train interval by converting the scheduled work end time to the coordinates of point c and point d on the screen and searching for the train line to the right from each point. Do it automatically.
[0014]
If the start train (A) and end train (B) of the maintenance work automatically selected by the mouse are different from those intended by the creator, it can be selected manually. In addition, the above method automatically checks that there is no conflict of train competition between the train schedule and the maintenance work plan. In addition, in order to prevent the train from entering the maintenance work location, the maintenance work plan and the train operation are also checked for conflicts. This method is performed on graphic data in the same way as the train interval check.
[0015]
FIG. 4 is a diagram for explaining a train competition check method in this system.
The presence or absence of a train (C train) that is operated during the maintenance work plan (1) between the stops (
[0016]
In this way, the start train and the end train are automatically recognized to check whether the train is correct or not, and then the train conflict is checked to input the maintenance work plan. Further, it is checked whether or not the maintenance work planned when the maintenance work plan input is completed conflicts with the maintenance work in other maintenance districts. If there is a conflict, an alarm and a list of conflicting work are displayed. If there is competing work, the contents can be confirmed on the same screen, and it is possible to register after adjusting between the responsible persons.
[0017]
Check work conflicts by specifying the “work location / construction date” when entering the work plan, so that the work schedule data of the maintenance schedule and other maintenance districts will be received from the maintenance work
[0018]
After the work plan is registered in this way, automatic diamond check and approval are performed by a fixed diamond, which will be described.
FIG. 5 is a diagram for explaining automatic diamond check by a fixed diamond.
Conventionally, the competition check between the train schedule and the work plan based on the reading of the commander is checked on the system by superimposing the confirmed schedule (train information) of the integrated transportation system and the registered work plan at the maintenance area terminal. In other words, a final check is made between the work plan and the confirmed schedule two days before the construction date (train operation day) when the train schedule is confirmed, and the work plan is approved if there is no conflict between the train schedule and the maintenance work. Executed as a real work.
[0019]
The relationship between the confirmed train schedule received from the maintenance
[0020]
This automatic diamond check is performed once a day with a confirmation schedule and a maintenance work plan, and the timing is automatically performed when the maintenance area terminal power is turned on. When the power of the maintenance area terminal is continuously turned on, an automatic diamond check is executed at a fixed time. In addition, in order to distinguish between maintenance work plans that have completed automatic diamond check with the fixed schedule and maintenance work plans that have not been completed, a flag is set in the system, and both are identified by the maintenance zone terminal and the maintenance work plan diagram server. Is going.
[0021]
FIG. 6 is a diagram for explaining a work start application / end report by the mobile terminal at the work site.
The track maintenance work planned by the maintenance area terminal is displayed in a diamond format on the CRT screen of the
[0022]
On the CRT screen of the diamond display device in the command room, the work mark changes to yellow, red, and green depending on whether the work is started, during work, or finished, and the plan P1 in FIG. 6 is finished in green and the plan P2 is yellow. Thus, before starting work, the plan P3 indicates work in red. In this way, by displaying the work marks in different colors according to the start of work, during work, and at the end of work, the status of track maintenance work can be grasped in real time in the command room. Centralized management is possible.
[0023]
【The invention's effect】
As described above, according to the present invention, by systemizing the process from the planning to the implementation of the track maintenance work, the time required for the track maintenance work procedure can be greatly shortened and the work efficiency can be improved. It is possible to significantly improve the safety of track maintenance by eliminating errors.
[Brief description of the drawings]
FIG. 1 is a diagram illustrating a system configuration of the present invention.
FIG. 2 is a diagram illustrating creation of a work plan at a maintenance area terminal.
FIG. 3 is a diagram for explaining a train interval check method in the present system.
FIG. 4 is a diagram for explaining a train conflict check method;
FIG. 5 is a diagram for explaining automatic diamond check by a fixed diamond.
FIG. 6 is a diagram for explaining a work start application / end report by a mobile terminal at a work site;
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 10 ... Track maintenance work support system, 11 ... Maintenance work plan diagram server, 12 ... Diagram display device, 13 ... Operation status display server, 14 ... Telephone line, 15 ...
Claims (5)
回線を通して保守作業計画ダイヤサーバーから列車データを受信し、画面に列車ダイヤを表示して保守作業計画を作成し入力すると共に、保守作業計画ダイヤサーバーから受信した確定列車ダイヤデータと入力した保守作業計画とを照合し、保守作業計画の正否についてのチェックを行う機能を有する保守区端末と、
ダイヤチェック終了後の保守作業計画を回線を通して受信し表示するとともに、作業現場のモバイル端末からの作業着手申込み/終了報告に対して承認の情報を入力し、承認された保守作業計画の実施状況を表示するダイヤ表示装置と、
専用回線を通して前記モバイル端末に列車運行状況を提供すると共に、モバイル端末から伝送される保守作業についての情報を前記ダイヤ表示装置へ回線を通して中継する運行状況表示サーバーとを備え、
前記保守区端末は、作業開始予定時刻、作業終了予定時刻、列車線の時刻を画面上の座標値に変換し、各座標値の比較により列車間合い、競合をチェックすることを特徴とする線路保守作業支援システム。A maintenance work plan diagram server that provides train schedule data via a line upon request and manages the input maintenance work plan collectively,
Train data is received from the maintenance work plan diagram server through the line, the train schedule is displayed on the screen, a maintenance work plan is created and entered, and the maintenance work plan entered with the confirmed train diagram data received from the maintenance work plan diagram server A maintenance area terminal having a function of checking whether the maintenance work plan is correct or not, and
The maintenance work plan after completion of the diamond check is received and displayed through the line, and the approval information is input to the work start application / completion report from the mobile terminal at the work site, and the implementation status of the approved maintenance work plan is displayed. A diamond display device for displaying;
The train operation status is provided to the mobile terminal through a dedicated line, and an operation status display server that relays information about maintenance work transmitted from the mobile terminal to the diagram display device through the line ,
The maintenance area terminal converts the scheduled work start time, the scheduled work end time, and the train line time into coordinate values on the screen, and checks between trains and competition by comparing each coordinate value. Work support system.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2000328243A JP3705481B2 (en) | 2000-10-27 | 2000-10-27 | Track maintenance work support system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2000328243A JP3705481B2 (en) | 2000-10-27 | 2000-10-27 | Track maintenance work support system |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2002132881A JP2002132881A (en) | 2002-05-10 |
| JP3705481B2 true JP3705481B2 (en) | 2005-10-12 |
Family
ID=18805121
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2000328243A Expired - Fee Related JP3705481B2 (en) | 2000-10-27 | 2000-10-27 | Track maintenance work support system |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3705481B2 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107886141A (en) * | 2017-10-30 | 2018-04-06 | 北京建筑大学 | Support and guiding system and method a kind of upkeep operation distal end |
Families Citing this family (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2004196202A (en) * | 2002-12-20 | 2004-07-15 | Nec Corp | Working management system and working management method |
| JP4727484B2 (en) * | 2006-03-31 | 2011-07-20 | 公益財団法人鉄道総合技術研究所 | Program, train operation adaptive Petri net model generation device, train suppression arrangement support device, train operation adaptive Petri net model generation method and train suppression arrangement support method |
| JP4863933B2 (en) * | 2007-06-08 | 2012-01-25 | 株式会社日立製作所 | Maintenance work planning system and maintenance work plan creation method |
| JP5102132B2 (en) * | 2008-07-16 | 2012-12-19 | 東日本電気エンジニアリング株式会社 | Track closure release support device |
| JP6227962B2 (en) * | 2013-10-04 | 2017-11-08 | 株式会社日立製作所 | Train operation management system |
| JP6259322B2 (en) * | 2014-03-06 | 2018-01-10 | 西日本旅客鉄道株式会社 | Maintenance work support system |
| CN110263049B (en) * | 2019-05-05 | 2022-10-04 | 柳州铁道职业技术学院 | General railway technical operation confirmation and information reporting display system and method |
| US11887028B2 (en) * | 2020-03-25 | 2024-01-30 | Bnsf Railway Company | Systems and methods for scheduling track maintenance |
| JP7409248B2 (en) * | 2020-07-15 | 2024-01-09 | Jfeスチール株式会社 | Railway vehicle operation management method and system |
| CN112849231B (en) * | 2021-01-07 | 2021-12-24 | 泰华智业(天津)科技有限责任公司 | A Construction Machinery Monitoring System Based on Operating Parameters |
| JP7696854B2 (en) * | 2022-03-24 | 2025-06-23 | 株式会社日立製作所 | Operation plan allocation device and operation plan allocation method |
-
2000
- 2000-10-27 JP JP2000328243A patent/JP3705481B2/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107886141A (en) * | 2017-10-30 | 2018-04-06 | 北京建筑大学 | Support and guiding system and method a kind of upkeep operation distal end |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2002132881A (en) | 2002-05-10 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP3705481B2 (en) | Track maintenance work support system | |
| CN106218671B (en) | The control method and device of station train travel operation | |
| CN109326034B (en) | An intelligent lock work ticket management system for electrical cabinets | |
| CN206265072U (en) | The control device of station train travel operation | |
| CN111091304A (en) | Digital work ticket management and control system and method for power industry | |
| JP5288762B2 (en) | Entrance / exit management system and entrance / exit management method | |
| CN108549963A (en) | Novel construction management method based on BIM information flow standardization | |
| CN102637027A (en) | Maintenance control system and method for railway signaling equipment | |
| CN111476330B (en) | Remote monitoring and installation guidance system and method for manufacturing of electrical equipment of transformer substation | |
| CN106297461A (en) | A kind of large-scale maintenance machinery emergency preplan simulative training system | |
| CN114291141B (en) | An operational behavior control and statistics system for a CTC system | |
| CN113780803A (en) | The whole process management method of critical and large-scale projects based on project management and control platform | |
| CN110136405B (en) | Safety protection system and method for upper operation | |
| CN100551757C (en) | Safety control method and device for receiving and dispatching trains at railway stations | |
| EP2785575A1 (en) | Railway maintenance management system | |
| CN107886247B (en) | Railway electronic operation system 46 system based on identity authentication | |
| JP7122107B2 (en) | TRAFFIC OPERATION INFORMATION INTEGRATED MANAGEMENT SYSTEM, TRAFFIC OPERATION INFORMATION INTEGRATED MANAGEMENT METHOD | |
| CN113569412A (en) | Railway vehicle service professional simulation system and simulation method | |
| CN110865976A (en) | Paperless intelligent SOP management platform | |
| JP2005041262A (en) | Arrival notification system | |
| CN115471118A (en) | Rail transit crew management system | |
| CN115146942A (en) | Electronic operation ticket system of hydraulic power plant and operation method | |
| JPH07117971B2 (en) | Maintenance work schedule creation system | |
| CN114595935A (en) | A management method and system based on a construction site laboratory | |
| JP2008250792A (en) | Work process management system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20050721 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090805 Year of fee payment: 4 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100805 Year of fee payment: 5 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110805 Year of fee payment: 6 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120805 Year of fee payment: 7 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130805 Year of fee payment: 8 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| LAPS | Cancellation because of no payment of annual fees |