Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP3713771B2 - Winding device - Google Patents
[go: Go Back, main page]

JP3713771B2 - Winding device - Google Patents

Winding device Download PDF

Info

Publication number
JP3713771B2
JP3713771B2 JP29479295A JP29479295A JP3713771B2 JP 3713771 B2 JP3713771 B2 JP 3713771B2 JP 29479295 A JP29479295 A JP 29479295A JP 29479295 A JP29479295 A JP 29479295A JP 3713771 B2 JP3713771 B2 JP 3713771B2
Authority
JP
Japan
Prior art keywords
winding
wire
workpiece
bobbin
supply
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP29479295A
Other languages
Japanese (ja)
Other versions
JPH09110304A (en
Inventor
長隆 早房
敏彦 平井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sony Corp
Original Assignee
Sony Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sony Corp filed Critical Sony Corp
Priority to JP29479295A priority Critical patent/JP3713771B2/en
Publication of JPH09110304A publication Critical patent/JPH09110304A/en
Application granted granted Critical
Publication of JP3713771B2 publication Critical patent/JP3713771B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Replacing, Conveying, And Pick-Finding For Filamentary Materials (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、ワークに線材を巻くための巻線装置に関するものである。
【0002】
【従来の技術】
ワークとして例えばテレビジョン受像機のような陰極線管に用いられる偏向ヨークは、電子線を偏向するための偏向コイルの巻線を必要とする。この種の偏向ヨーク(ボビン)には、巻線装置が線材を巻線するのであるが、従来の巻線装置は、1つのボビン保持部に対して空のボビンを装着し、そしてそのボビンに対して所定のパターンで線材を巻線した後に、巻線したボビンをそのボビン保持部から排出するようにしている。つまり同じ1つのボビン保持部においてボビンの給排出動作と線材の巻線動作を行っている。
【0003】
【発明が解決しようとする課題】
このように従来の巻線装置では1つのボビン保持部でボビンの給排出動作および線材の巻線動作を行うようにしているので、次のような問題がある。つまり、ボビン保持部に対してボビンを供給する時間と、ボビンに対して線材を巻線する巻線の時間と、そして巻き終わったボビンをボビン保持部から外部に排出する排出時間が必要であり、ボビンの給排出動作の間はボビンに対する線材の巻線動作を行えず待機時間となってしまう。従って、ボビンに対する巻線の生産効率が悪いという問題がある。
そこで本発明は上記課題を解消するためになされたものであり、ワークに対する線材の巻線の生産効率を向上することができる巻線装置を提供することを目的としている。
【0004】
【課題を解決するための手段】
上記目的は、本発明にあっては、線材供給源からの線材をワークに巻くための巻線装置において、ワークの搬送手段と、複数のワークを着脱自在に保持するインデックス手段であって、ワークへ線材を巻くための巻線位置と、これから線材を巻こうとするワークを供給し線材の巻き終わったワークを位置決めする給排出位置に、それぞれワークを位置決めするためのインデックス手段と、巻線位置に位置決めされたこれから線材を巻こうとするワークに対して線材を巻くための巻回手段と、搬送手段のこれから線材を巻こうとするワークをインデックス手段の給排出位置に移し、インデックス手段の給排出位置に位置決めされた線材の巻き終わったワークを搬送手段に移すための給排出手段と、を備え、巻回手段は、双腕型ロボットの第1アーム組立体に形成されると共に、アーム部内に設けたガイドローラ及び線材テンショナとアーム先端に設けたノズルユニットとを有し、給排出手段は、双腕型ロボットの第2アーム組立体に形成されることにより、達成される。
【0005】
本発明では、インデックス手段が、巻線位置と給排出位置にそれぞれワークを位置決めできるようになっている。この巻線位置は、ワークに対して線材を巻く位置である。給排出位置は、これから線材を巻こうとするワークを供給して線材の巻き終わったワークを位置決めする位置である。このインデックス手段は、複数のワークを着脱自在に保持可能であって、巻線位置と給排出位置にそれぞれワークを位置決めする。
【0006】
巻回手段は、双腕型ロボットの第 1 アーム組立体に形成されると共にガイドローラ及び線材テンショナとノズルユニットとを有しており、巻線位置に位置決めされたこれから巻こうとするワークに対して線材を巻くようになっている。
給排出手段は、双腕型ロボットの第2アーム組立体に形成され、搬送手段のこれから巻こうとするワークをインデックス手段の給排出位置に移して、インデックス手段の給排出位置に位置決めされた線材を巻き終わったワークを搬送手段側に移すようになっている。巻線位置にあるワークに対しては巻回手段が線材をワークに対して巻いていく。これと同時に給排出手段はインデックス手段の給排出位置にある既に巻き終わったワークを搬送手段側に移す。そして給排出手段は、空となったインデックス手段の給排出位置に対して新たなこれから線材を巻こうとするワークを、搬送手段から給排出位置に移すことができる。
従って、ワークに対する線材の巻線動作と、これから線材を巻こうとするワークおよび巻き終わったワークの給排出動作と、を同時に行うことができる。
【0007】
【発明の実施の形態】
以下、本発明の好適な実施の形態を添付図面に基づいて詳細に説明する。
なお、以下に述べる実施の形態は、本発明の好適な具体例であるから、技術的に好ましい種々の限定が付されているが、本発明の範囲は、以下の説明において特に本発明を限定する旨の記載がない限り、これらの形態に限られるものではない。
図1は、本発明の巻線装置の好ましい実施の形態を示す平面図である。この巻線装置は、ワークとして例えばテレビジョン受像機のような陰極線管に用いられる偏向ヨーク(ボビン)に対して線材を巻回し、かつ巻線の終わったボビンを排出し、新たなボビンを供給することができるものである。
【0008】
図1の巻線装置は、概略搬送手段としてのコンベア50、インデックス手段40、巻回手段100、そして給排出手段200等を備えている。まず搬送手段であるコンベア50は、プラテン51を順次所定間隔で矢印FD方向に送ることができる。これらのプラテン51は、ボビンBを着脱可能に保持できるようになっている。コンベア50は、ワーク供給位置Aとワーク排出位置Bにそれぞれ順次プラテン51が位置決めできる。ワーク供給位置Aとワーク排出位置Bは、後で述べる給排出手段200の近くに配置されている。
【0009】
次にインデックス手段40は、インデックステーブル41と、2つのワーク保持具43,43およびモータ42等を備えている。モータ42は、インデックステーブル41をR方向に沿って中心軸CLを中心として180゜毎にインデックス可能である。このモータ42は、例えばダイレクトドライブモータ(DDモータ)を用いることができる。
なおこのモータ42は、インデックステーブル41を正方向へ180゜回転してインデックスした後に、逆の負方向へ180゜回転してインデックスする。このようにするのは、インデックステーブル41およびワーク保持具43,43の周りに、エネルギー供給用の配線や配管が設けられているためである。
【0010】
ワーク保持具43,43は、ワークであるボビンNを着脱可能に水平に保持可能である。つまりボビンNの軸CL1は、インデックス用の中心軸CLと平行である。
インデックステーブル41には、図3に示すように軸CLを中心として回転するための回転装置40aが設けられている。回転装置40aのモータ40bは、プーリー40cを備えている。プーリー40cとボビンNの外周部を着脱可能に保持するプーリー40dの間にはベルト40eが設けられている。これによりモータ40bが作動すると、ボビンNは軸CLを中心にS方向に回転もしくはインデックス可能である。
【0011】
図1のインデックステーブル41は、一方のワーク保持具43を巻線位置Pに位置決めし、他方のワーク保持具43を給排出位置Qに位置決めできる。
なお、このインデックス手段40のインデックステーブル41は、2つのワーク保持具43,43を備えているが、更に3つ以上のワーク保持具を備えるようにしても勿論構わない。この場合には、巻線位置P、給排出位置Qおよび、検査ステーションや接着ステーション等に対応してインデックスすることもできる。この検査ステーションとは、カメラ等によるファンネル部とネック部の巻線状態のチェック及び絡げ部の線材の緩みチェックを画像処理と係合して行う機能を有し、接着ステーションとは、絡げ部線材に接着剤を塗付し、絡げ部の線材の緩み対策処理をし、端子ピンの半田付け等も行える機能を有している。
【0012】
次に、巻回手段100と給排出手段200について図1と図2により説明する。この巻回手段100は、線材供給ボビン7、ダンサーローラ15、ガイドローラ16,17,18、線材テンショナ25、ノズルユニット26、ガイドユニット30等を有している。
巻回手段100の一部、即ち巻回手段100のガイドローラ16,17,18および線材テンショナ25とノズルユニット26は、双腕型ロボット20の第1アーム組立体150側に設けられている。これに対して双腕型ロボット20の第2アーム組立体は、給排出手段200を構成している。
【0013】
双腕型ロボット20の第1アーム組立体150は、アーム部21a、アーム部21bを有している。
アーム部21aの一端側が図2の基台21cに回転可能に支持されている。このアーム部21aは、モータM1の作動により軸CL2を中心として回転する。アーム部21aの他端は、アーム部21bの一端に回転可能に連結されている。アーム部21bは、アーム部21aに対してモータM2の作動により中心軸CL3を中心に回転できるようになっている。アーム部21bの他端部には、モータM3が設けられており、このモータM3はノズルユニット26を中心軸CL4を中心に回転できるようになっている。このノズルユニット26は、モータM4の作動によりα方向に旋回可能である。
【0014】
ガイドローラ16は、アーム部21aに取付けられている。ガイドローラ17,18はアーム部21bに取付けられている。アーム部21bは、ガイドローラ17,18の間に線材テンショナ25を備えている。
この線材テンショナ25は、3つのプーリー21,22,24を有している。この3つのプーリーの内のプーリー22は、線材Wに加わるテンションを検出する可動プーリーである。プーリー22は、テンション検出用のヒステリシスモータMTの作動により、線材Wの張力の制御動作を行って、線材を適度な張力で線材Wをノズル26側に送れるようになっている。
【0015】
図1と図2に示すように、線材供給ボビン7の線材Wはダンサーローラ15、ガイドローラ16,17を経て線材テンショナ25のプーリー21、可動プーリー22およびプーリー24を通る。そして線材Wはガイドローラ18を経てガイドユニット26の中を通りガイドユニット26の先端から導き出されるようになっている。
ガイドユニット26から導き出された線材Wは、線材供給停止時においてはノズルユニット26内の線材クランプ(図示せず)により保持した状態で所定位置に停止させて、線材Wのテンションを維持できるようになっている。これにより線材Wの供給は即時可能な状態である。
【0016】
次に巻回手段100のガイドユニット30は、ノズルユニット26と協働することにより、図2と図5に示すボビンNの開口部溝N1とネック部溝N2にそれぞれ線材Wを巻き、かつボビンNの軸方向CLNに沿ってボビンNの内周側に線材Wを所定のパターンで巻いていくのに使われる。
【0017】
このガイドユニット30は、図1と図2に示すようにアクチュエータ33,34を有している。アクチュエータ33の作動により、移動体33aが矢印Y方向移動可能である。またアクチュエータ34を作動することにより、移動体33aに沿ってガイドユニット30のガイド31,32が矢印X方向に移動可能である。
【0018】
次に、図1の給排出手段200について説明する。
給排出手段200は、双腕型ロボット20の第2アーム組立体であり、アーム部22a、アーム部22bを有している。
アーム部22aの一端側は図2の基台21cに取付けられていて、モータM1の作動により中心軸CL2を中心に回転できる。アーム部22aの他端側がアーム部22bの一端側に連結されている。モータM5が作動すると、アーム部22bはアーム部22aに対して中心軸CL5を中心に回転できるようになっている。
このアーム部22bの他端側にはチャック部70が設けられている。このチャック部70は、ボビンNを図2と図4に示すように着脱可能に保持する部分である。チャック部70は、チャック用の爪70a,70aを有し、これらの爪70a,70aは取付板70bに対してアクチュエータ70c,70cによりボビンNの開口部溝N1側を着脱可能に保持できるようになっている。この取付板70bは、アクチュエータ70dにより矢印D1の方向に移動可能である。
【0019】
アクチュエータ70dの取付端はアーム部22bの他端部に取付けられていて、中心軸CL6を中心に回転できる。このアクチュエータ70dは、別のアクチュエータ70eにより中心軸CL6を中心として垂直下方に矢印T方向に沿って90゜下がるようになっている。
この給排出手段200のモータM1,M5およびアクチュエータ70c,70c,70dが作動することにより、給排出手段200は、コンベア50のワーク供給位置Aにあるこれから巻線しようとするボビンNを図1の給排出位置Qに対応するワーク保持具43に移して設定し、そして給排出位置Qに位置された既に巻線の終わったボビンNをコンベア50のワーク排出位置B側に排出する。
なお、上述したアクチュエータやモータは図示しない制御手段によりそれぞれ制御する。
【0020】
次に、上述した巻線装置の動作について説明する。
図1のコンベア50は、ボビンNを保持したプラテン51をワーク供給位置Aに搬送して位置決めする。
図1の給排出手段200のモータM1,M5が作動して、アーム部22bのチャック部70がそのワーク供給位置Aの真上に達する。図4のチャック部70のアクチュエータ70eが収縮してアクチュエータ70dおよび取付板70bが垂直下方に向く。そしてアクチュエータ70dが伸長して、取付板70の爪70a,70aが開いた状態で図1のワーク供給位置Aにあるこれから巻線しようとするボビンNの開口部溝N1側に近づく。
図4のアクチュエータ70c,70cが作動して爪70a,70aが図1のワーク供給位置AのボビンNをしっかりとつかむと、アクチュエータ70dが収縮作動してボビンNをワーク供給位置Aのプラテン51から引き抜く。
【0021】
その後図2の給排出手段200のモータM1,M5が作動して、アーム部22bがインデックス手段40の給排出位置Q側に向く。これによりチャック部70が図2と図4に示す状態で給排出位置Qに位置しているワーク保持具43に対面する。この状態で図4のアクチュエータ70dをD1の方向に伸長させるとノズルNのネック部溝N2側がワーク保持具43の穴に嵌まり込む。
その後再びアクチュエータ70c,70cを作動して爪70a,70aをボビンNから離してかつシリンダ70dを収縮作動することでチャック部70はボビンNから離れる。
【0022】
モータ42がインデックステーブル41を180゜回転して、ボビンを有するワーク保持具43が給排出位置Qから巻線位置Pにインデックスされる。巻線位置PのボビンNに対しては、巻回手段100が線材Wの所定の巻線パターンに従って巻線を施すことになる。
【0023】
巻線手段100の線材供給ボビン7から供給される線材Wは、ダンサーローラ15、ガイドローラ16,17、線材テンショナ25を通りガイドローラ18を経てノズルユニット26に至る。ノズルユニット26から出た線材Wは、ガイドユニットのガイド31,32との協働により、次のようにしてボビンNに対して所定のパターンで線材を巻いていく。
【0024】
つまり線材Wは線材テンショナ25で所定の張力が与えられた状態でノズルユニット26に至り、ノズルユニット26とガイドユニット30のガイド31との協働により、図5のボビンNの係止片N3の線材Wを絡げて図5のボビンNの開口部溝N1に対してボビンNの軸CLNに直交する方向に線材Wを巻いていく。そしてノズルユニット26はボビンNの中を通ってネック部溝N2側に達し、ボビンNのネック部溝N2の係止片N4に線材Wを絡げ、そしてノズルユニット26とガイドユニット30のガイド32との協働により、図5のボビンNのネック部溝N2に対して中心軸CLNと直交する方向に線材Wを巻いていく。
このような動作をボビンNの全周方向に沿って繰り返すことにより、ボビンNに対して所定の巻線パターンで線材Wを巻線することができる。
【0025】
一方、上述のような要領でボビンNに対して線材Wを巻線している間に、図1と図2の給排出手段200は、給排出位置Qに対応している空のワーク保持具43に対して、コンベア50のプラテン51から新たなこれから巻線しようとするボビンNを上述したのと同様の要領で供給する。これにより、巻線位置Pのワーク保持具43のボビンNは、線材Wが巻線されているとともに、給排出位置Qのワーク保持具43には、これから巻線しようとするボビンNが装着されていることになる。しかもコンベア50は、空となったプラテン51をワーク供給位置Aからワーク排出位置Bに位置決めする。
【0026】
巻線位置PにおけるボビンNに対する巻線が終了すると、ノズルユニット26はボビンNから退出し、かつガイドユニット30のボビンNから退出する。そしてインデックス手段40のモータ42が作動して、インデックステーブル41が180゜反転する。これにより巻線されたボビンNが給排出位置Qに位置するとともに、巻線位置Pにはこれから巻線しようとするボビンNが位置決めされる。そして給排出手段200が給排出位置Qに位置している既に巻線の終わったボビンNを上述したボビンの供給動作と逆の動作で行うことで、ワーク保持具43から巻線の終わったボビンNを抜き出して、そしてコンベア50のワーク排出位置にあるプラテン51に巻線の終わったボビンNを嵌め込む。
【0027】
このように本発明の実施の形態の巻線装置は、インデックス手段40を用いて、これから巻線しようとするボビンNの供給動作、巻線の終わったボビンNの排出動作と、ボビンに対する線材Wの巻線動作を同時に行うことができるので、巻線作業の効率化が図れる。しかも双腕型ロボット20を用いて、第1アーム組立体150側を巻回手段100の一部に採用し、かつ双腕型ロボット20の第2アーム組立体側を給排出手段200として機能させることにより、巻回手段と給排出手段をそれぞれ別個の水平多関節型ロボットを用いて機能させるのに比べて装置をコンパクト化することができる。
【0028】
本発明の実施の形態では双腕型ロボット20やインデックス手段40等の組合せ動作により、偏向ヨーク等のボビン形状のワークに対する線材Wの巻回作業や、ワークの搬入排出動作を平行して行うことができる。従って巻線作業のタクトタイムが短縮され、生産効率の飛躍的な向上を図ることができる。
また双腕型ロボットを用いて、ワークに対する線材の巻回動作とワークの給排出動作を同時に行うので、スペース、ワークに対する線材の巻回動作とワークの給排出動作を別々の多関節型ロボットで行うよりも小型化でき、スペース効率が良い。
【0029】
ところで本発明は上記実施の形態に限定されるものではない。
例えば、図1の実施の形態では、テンショナ25が第1アーム組立体150のアーム部21b側に設定されている。しかし図6に示すようにテンショナ25は、アーム部21a側に配置するようにしても勿論構わない。この場合にテンショナ25のプーリー24は、アーム部21a,21bの中心軸CL3に沿って位置している。
【0030】
また図7の実施の形態では、テンショナ25がアーム部21aの中央部に位置している。
また図示の実施の形態では、陰極線管に用いる偏向ヨークをワークとして、線材Wをこのワークに対して巻回するようにしている。しかしこれに限らず、他の分野のワークに対して線材を巻回する場合にも本発明は適用できるものである。
【0031】
【発明の効果】
以上説明したように、本発明によれば、ワークに対する線材の巻線の生産効率を向上することができる。
【図面の簡単な説明】
【図1】本発明の巻線装置の好ましい実施の形態を示す平面図。
【図2】図1の巻線装置の巻回手段と給排出手段を示す斜視図。
【図3】インデックス手段におけるボビンの回転用の回転装置を示す図。
【図4】図2の給排出手段のチャック部を示す斜視図。
【図5】ボビンに対して線材を巻いていく状態の一部を示す図。
【図6】本発明の他の実施の形態を示す図。
【図7】本発明の他の実施の形態を示す図。
【符号の説明】
20 双腕型ロボット
26 ノズルユニット
30 ガイドユニット
40 インデックス手段
41 インデックステーブル
43 ワーク保持具
50 コンベア(搬送手段)
70 チャック部
100 巻回手段
150 第1アーム組立体
200 給排出手段(第2アーム組立体)
N ボビン(ワーク)
W 線材
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a winding device for winding a wire around a workpiece.
[0002]
[Prior art]
For example, a deflection yoke used in a cathode ray tube such as a television receiver as a work requires a winding of a deflection coil for deflecting an electron beam. In this type of deflection yoke (bobbin), a winding device winds a wire, but in the conventional winding device, an empty bobbin is attached to one bobbin holding portion, and the bobbin is attached to the bobbin. On the other hand, after winding the wire in a predetermined pattern, the wound bobbin is discharged from the bobbin holding portion. That is, the bobbin supply / discharge operation and the wire winding operation are performed in the same one bobbin holding portion.
[0003]
[Problems to be solved by the invention]
As described above, in the conventional winding device, the bobbin supply / discharge operation and the wire winding operation are performed by one bobbin holding portion, and thus there are the following problems. In other words, a time for supplying the bobbin to the bobbin holding part, a time for winding the wire around the bobbin, and a discharging time for discharging the bobbin after winding from the bobbin holding part to the outside are required. During the bobbin feeding / discharging operation, the wire rod cannot be wound around the bobbin, resulting in a standby time. Therefore, there is a problem that the production efficiency of the winding for the bobbin is poor.
Therefore, the present invention has been made to solve the above-described problems, and an object of the present invention is to provide a winding device that can improve the production efficiency of winding of a wire rod on a workpiece.
[0004]
[Means for Solving the Problems]
In the present invention, the above object is a winding device for winding a wire from a wire supply source around a workpiece, the workpiece conveying means, and index means for detachably holding a plurality of workpieces. Winding position for winding the wire, and index means for positioning the workpiece respectively at the supply / discharge position for supplying the workpiece to be wound and positioning the workpiece after winding the wire, and the winding position The winding means for winding the wire to the workpiece to be wound from now on and the workpiece to be wound from now on the conveying means are moved to the feeding / discharging position of the index means, and the feeding of the index means is performed. and a sheet discharge means for transferring the finished winding work the positioned wire the discharge position to the conveying means, winding means, first a of the double-arm robot A guide roller and wire rod tensioner provided in the arm portion and a nozzle unit provided at the tip of the arm, and the supply / discharge means is formed in the second arm assembly of the double-arm robot. Is achieved.
[0005]
In the present invention, the index means can position the workpiece at the winding position and the supply / discharge position, respectively. This winding position is a position where the wire is wound around the workpiece. The supply / discharge position is a position where a work to be wound on the wire is supplied and the work on which the wire has been wound is positioned. The index means can removably hold a plurality of workpieces, and positions the workpieces at the winding position and the supply / discharge position, respectively.
[0006]
The winding means is formed in the first arm assembly of the double-arm robot and has a guide roller, a wire tensioner, and a nozzle unit. It is designed to wind wire.
The feeding / discharging means is formed in the second arm assembly of the double-armed robot, and moves the workpiece to be wound from the conveying means to the feeding / discharging position of the indexing means, and is positioned at the feeding / discharging position of the indexing means. The work which has finished winding is moved to the conveying means side. The winding means winds the wire around the workpiece for the workpiece at the winding position. At the same time, the feeding / discharging means moves the already wound work at the feeding / discharging position of the index means to the conveying means side. Then, the feeding / discharging means can move a new work to be wound on the wire from the feeding means to the feeding / discharging position from the feeding means to the new feeding / discharging position of the index means.
Therefore, the winding operation of the wire around the workpiece and the supply / discharge operation of the workpiece to be wound and the workpiece after winding can be performed simultaneously.
[0007]
DETAILED DESCRIPTION OF THE INVENTION
DESCRIPTION OF EXEMPLARY EMBODIMENTS Hereinafter, preferred embodiments of the invention will be described in detail with reference to the accompanying drawings.
The embodiment described below is a preferred specific example of the present invention, and thus various technically preferable limitations are given. However, the scope of the present invention is particularly limited in the following description. Unless otherwise stated, the present invention is not limited to these forms.
FIG. 1 is a plan view showing a preferred embodiment of the winding device of the present invention. This winding device winds a wire around a deflection yoke (bobbin) used for a cathode ray tube such as a television receiver as a workpiece, discharges the bobbin after winding, and supplies a new bobbin Is something that can be done.
[0008]
The winding apparatus of FIG. 1 includes a conveyor 50 as an approximate conveying means, an index means 40, a winding means 100, a supply / discharge means 200, and the like. First, the conveyor 50, which is a conveying means, can sequentially feed the platen 51 at a predetermined interval in the direction of the arrow FD. These platen 51 can hold | maintain the bobbin B so that attachment or detachment is possible. The conveyor 50 can sequentially position the platen 51 at the workpiece supply position A and the workpiece discharge position B, respectively. The workpiece supply position A and the workpiece discharge position B are arranged near the supply / discharge means 200 described later.
[0009]
Next, the index means 40 includes an index table 41, two workpiece holders 43 and 43, a motor 42, and the like. The motor 42 can index the index table 41 every 180 degrees about the central axis CL along the R direction. For example, a direct drive motor (DD motor) can be used as the motor 42.
The motor 42 indexes the index table 41 by rotating it 180 ° in the positive direction and then rotating it 180 ° in the opposite negative direction. This is because energy supply wiring and piping are provided around the index table 41 and the work holders 43 and 43.
[0010]
The work holders 43 and 43 can horizontally hold a bobbin N as a work so as to be detachable. That is, the axis CL1 of the bobbin N is parallel to the index center axis CL.
As shown in FIG. 3, the index table 41 is provided with a rotating device 40a for rotating around the axis CL. The motor 40b of the rotating device 40a includes a pulley 40c. A belt 40e is provided between the pulley 40c and a pulley 40d that detachably holds the outer periphery of the bobbin N. Thus, when the motor 40b is operated, the bobbin N can be rotated or indexed in the S direction around the axis CL.
[0011]
The index table 41 in FIG. 1 can position one work holder 43 at the winding position P and the other work holder 43 at the supply / discharge position Q.
The index table 41 of the index means 40 includes the two work holders 43, 43, but it may of course be provided with three or more work holders. In this case, it is possible to index corresponding to the winding position P, the supply / discharge position Q, the inspection station, the bonding station, and the like. This inspection station has a function to check the winding state of the funnel part and neck part by a camera or the like and to check the looseness of the wire of the binding part by engaging with image processing. It denoted coating an adhesive to the wire parts, and the loosening countermeasure processing of the wire of the tied part has a function that allows also soldering the terminal pin.
[0012]
Next, the winding means 100 and the supply / discharge means 200 will be described with reference to FIGS. The winding means 100 includes a wire rod supply bobbin 7, a dancer roller 15, guide rollers 16, 17, 18, a wire rod tensioner 25, a nozzle unit 26, a guide unit 30, and the like.
A part of the winding means 100, that is, the guide rollers 16, 17, 18, the wire rod tensioner 25 and the nozzle unit 26 of the winding means 100 are provided on the first arm assembly 150 side of the double-arm robot 20. On the other hand, the second arm assembly of the double-arm robot 20 constitutes the supply / discharge means 200.
[0013]
The first arm assembly 150 of the double-arm robot 20 includes an arm part 21a and an arm part 21b.
One end side of the arm portion 21a is rotatably supported by the base 21c in FIG. The arm portion 21a rotates around the axis CL2 by the operation of the motor M1. The other end of the arm portion 21a is rotatably connected to one end of the arm portion 21b. The arm portion 21b can rotate about the central axis CL3 by the operation of the motor M2 with respect to the arm portion 21a. A motor M3 is provided at the other end of the arm portion 21b. The motor M3 can rotate the nozzle unit 26 around the central axis CL4. The nozzle unit 26 can be turned in the α direction by the operation of the motor M4.
[0014]
The guide roller 16 is attached to the arm portion 21a. The guide rollers 17 and 18 are attached to the arm portion 21b. The arm portion 21 b includes a wire rod tensioner 25 between the guide rollers 17 and 18.
This wire rod tensioner 25 has three pulleys 21, 22 and 24. Of these three pulleys, the pulley 22 is a movable pulley that detects the tension applied to the wire W. The pulley 22 controls the tension of the wire W by the operation of the hysteresis motor MT for tension detection, and can feed the wire W to the nozzle 26 side with an appropriate tension.
[0015]
As shown in FIGS. 1 and 2, the wire W of the wire supply bobbin 7 passes through the dancer roller 15, the guide rollers 16, 17, and the pulley 21, the movable pulley 22, and the pulley 24 of the wire rod tensioner 25. Then, the wire W passes through the guide unit 26 through the guide roller 18 and is led out from the tip of the guide unit 26.
The wire W guided from the guide unit 26 is stopped at a predetermined position while being held by a wire clamp (not shown) in the nozzle unit 26 when the wire supply is stopped, so that the tension of the wire W can be maintained. It has become. As a result, the supply of the wire W is in an immediately possible state.
[0016]
Next, the guide unit 30 of the winding means 100 cooperates with the nozzle unit 26 to wind the wire W around the opening groove N1 and the neck groove N2 of the bobbin N shown in FIGS. 2 and 5, respectively. It is used for winding the wire W in a predetermined pattern on the inner peripheral side of the bobbin N along the N axial direction CLN.
[0017]
The guide unit 30 has actuators 33 and 34 as shown in FIGS. The operation of the actuator 33, mobile 33a can move in the arrow Y direction. Further, by operating the actuator 34, the guides 31 and 32 of the guide unit 30 can move in the arrow X direction along the moving body 33a.
[0018]
Next, the supply / discharge means 200 of FIG. 1 will be described.
The supply / discharge means 200 is a second arm assembly of the double-arm robot 20 and has an arm portion 22a and an arm portion 22b.
One end side of the arm portion 22a is attached to the base 21c in FIG. 2, and can be rotated around the central axis CL2 by the operation of the motor M1. The other end side of the arm portion 22a is connected to one end side of the arm portion 22b. When the motor M5 is operated, the arm portion 22b can rotate about the central axis CL5 with respect to the arm portion 22a.
A chuck portion 70 is provided on the other end side of the arm portion 22b. The chuck portion 70 is a portion that holds the bobbin N in a detachable manner as shown in FIGS. 2 and 4. The chuck portion 70 has chuck claws 70a and 70a, and these claws 70a and 70a can detachably hold the opening groove N1 side of the bobbin N with respect to the mounting plate 70b by the actuators 70c and 70c. It has become. The mounting plate 70b can be moved in the direction of the arrow D1 by an actuator 70d.
[0019]
The attachment end of the actuator 70d is attached to the other end of the arm portion 22b, and can be rotated about the central axis CL6. The actuator 70d is lowered 90 degrees vertically along the direction of the arrow T about the central axis CL6 by another actuator 70e.
When the motors M1 and M5 and the actuators 70c, 70c, and 70d of the supply / discharge means 200 are operated, the supply / discharge means 200 moves the bobbin N to be wound from the workpiece supply position A of the conveyor 50 from FIG. It moves to the work holder 43 corresponding to the supply / discharge position Q, and the bobbin N that has already been wound and is positioned at the supply / discharge position Q is discharged to the work discharge position B side of the conveyor 50.
The actuators and motors described above are controlled by control means (not shown).
[0020]
Next, the operation of the winding device described above will be described.
The conveyor 50 in FIG. 1 conveys and positions the platen 51 holding the bobbin N to the workpiece supply position A.
The motors M1 and M5 of the supply / discharge means 200 of FIG. 1 are operated, and the chuck portion 70 of the arm portion 22b reaches just above the workpiece supply position A. The actuator 70e of the chuck portion 70 in FIG. 4 contracts and the actuator 70d and the mounting plate 70b face vertically downward. The actuator 70d extends to approach the opening groove N1 side of the bobbin N to be wound in the workpiece supply position A in FIG. 1 with the claws 70a, 70a of the mounting plate 70 opened.
When the actuators 70c and 70c in FIG. 4 are operated and the claws 70a and 70a firmly hold the bobbin N at the workpiece supply position A in FIG. 1, the actuator 70d is contracted to move the bobbin N from the platen 51 at the workpiece supply position A. Pull out.
[0021]
Thereafter, the motors M1 and M5 of the supply / discharge means 200 of FIG. 2 are operated, and the arm portion 22b faces the supply / discharge position Q side of the index means 40. Thereby, the chuck | zipper part 70 faces the workpiece holder 43 located in the supply / discharge position Q in the state shown in FIG. 2 and FIG. 4 is extended in the direction D1, the neck portion groove N2 side of the nozzle N fits into the hole of the work holder 43.
Thereafter, the actuators 70c and 70c are operated again to separate the claws 70a and 70a from the bobbin N, and the cylinder 70d is contracted to move the chuck portion 70 away from the bobbin N.
[0022]
The motor 42 rotates the index table 41 by 180 °, and the work holder 43 having the bobbin is indexed from the supply / discharge position Q to the winding position P. For the bobbin N at the winding position P, the winding means 100 performs winding according to a predetermined winding pattern of the wire W.
[0023]
The wire W supplied from the wire supply bobbin 7 of the winding means 100 passes through the dancer roller 15, the guide rollers 16 and 17, the wire tensioner 25, and the guide roller 18 to the nozzle unit 26. The wire W coming out of the nozzle unit 26 winds the wire in a predetermined pattern around the bobbin N as follows in cooperation with the guides 31 and 32 of the guide unit.
[0024]
That is, the wire W reaches the nozzle unit 26 in a state where a predetermined tension is applied by the wire tensioner 25, and the cooperation of the nozzle unit 26 and the guide 31 of the guide unit 30 causes the locking piece N3 of the bobbin N of FIG. The wire W is wound around the opening groove N1 of the bobbin N shown in FIG. 5 in a direction perpendicular to the axis CLN of the bobbin N. The nozzle unit 26 passes through the bobbin N and reaches the neck groove N2 side. The wire W is wound around the locking piece N4 of the neck groove N2 of the bobbin N, and the guide 32 of the nozzle unit 26 and the guide unit 30 is connected. In cooperation with the wire rod W, the wire rod W is wound in a direction perpendicular to the central axis CLN with respect to the neck groove N2 of the bobbin N in FIG.
By repeating such an operation along the entire circumference of the bobbin N, the wire W can be wound around the bobbin N with a predetermined winding pattern.
[0025]
On the other hand, while the wire W is wound around the bobbin N as described above, the supply / discharge means 200 shown in FIGS. 1 and 2 is an empty workpiece holder corresponding to the supply / discharge position Q. 43, a new bobbin N to be wound from the platen 51 of the conveyor 50 is supplied in the same manner as described above. As a result, the bobbin N of the work holder 43 at the winding position P is wound with the wire W, and the bobbin N to be wound is mounted on the work holder 43 at the supply / discharge position Q. Will be. Moreover, the conveyor 50 positions the empty platen 51 from the workpiece supply position A to the workpiece discharge position B.
[0026]
When the winding of the bobbin N at the winding position P is completed, the nozzle unit 26 moves out of the bobbin N and moves out of the bobbin N of the guide unit 30. Then, the motor 42 of the index means 40 is operated, and the index table 41 is inverted by 180 °. Thus, the wound bobbin N is positioned at the supply / discharge position Q, and the bobbin N to be wound is positioned at the winding position P. Then, the bobbin N, which has already finished winding, in which the feeding / discharging means 200 is positioned at the feeding / discharging position Q is performed in the reverse operation to the above-described bobbin supply operation, so that the bobbin having winding finished from the workpiece holder 43. N is extracted, and the bobbin N that has been wound is fitted into the platen 51 at the work discharge position of the conveyor 50.
[0027]
As described above, the winding apparatus according to the embodiment of the present invention uses the index means 40 to supply the bobbin N to be wound from now on, discharge the bobbin N after winding, and the wire W to the bobbin. Since the winding operation can be performed simultaneously, the efficiency of the winding work can be improved. Moreover, by using the double arm robot 20, the first arm assembly 150 side is adopted as a part of the winding means 100, and the second arm assembly side of the double arm robot 20 is made to function as the supply / discharge means 200. Thus, the apparatus can be made compact as compared with the case where the winding means and the supply / discharge means function using separate horizontal articulated robots.
[0028]
In the embodiment of the present invention, the winding operation of the wire W around the bobbin-shaped workpiece such as the deflection yoke and the work loading / unloading operation are performed in parallel by the combined operation of the double-arm robot 20 and the index means 40. Can do. Accordingly, the tact time of the winding work is shortened, and the production efficiency can be dramatically improved.
In addition, using a double-arm robot, the wire winding and workpiece feeding and discharging operations are simultaneously performed on the workpiece, so the wire winding and workpiece feeding and discharging operations on the space and workpiece can be performed with separate articulated robots. It can be downsized and space efficient.
[0029]
By the way, the present invention is not limited to the above embodiment.
For example, in the embodiment of FIG. 1, the tensioner 25 is set on the arm portion 21 b side of the first arm assembly 150. However, as shown in FIG. 6, the tensioner 25 may of course be arranged on the arm portion 21a side. In this case, the pulley 24 of the tensioner 25 is located along the central axis CL3 of the arm portions 21a and 21b.
[0030]
In the embodiment shown in FIG. 7, the tensioner 25 is located at the center of the arm portion 21a.
In the illustrated embodiment, the deflection yoke used for the cathode ray tube is used as a workpiece, and the wire W is wound around the workpiece. However, the present invention is not limited to this, and the present invention can also be applied to a case where a wire is wound around a workpiece in another field.
[0031]
【The invention's effect】
As described above, according to the present invention, it is possible to improve the production efficiency of the winding of the wire material with respect to the workpiece.
[Brief description of the drawings]
FIG. 1 is a plan view showing a preferred embodiment of a winding device of the present invention.
2 is a perspective view showing winding means and supply / discharge means of the winding apparatus of FIG. 1; FIG.
FIG. 3 is a diagram showing a rotating device for rotating bobbins in index means.
4 is a perspective view showing a chuck portion of the supply / discharge means of FIG. 2. FIG.
FIG. 5 is a diagram showing a part of a state in which a wire is wound around a bobbin.
FIG. 6 is a diagram showing another embodiment of the present invention.
FIG. 7 is a diagram showing another embodiment of the present invention.
[Explanation of symbols]
20 Double-arm robot 26 Nozzle unit 30 Guide unit 40 Index means 41 Index table 43 Work holder 50 Conveyor (conveyance means)
70 Chuck part 100 Winding means 150 First arm assembly 200 Supply / discharge means (second arm assembly)
N bobbin (work)
W wire rod

Claims (2)

線材供給源からの線材をワークに巻くための巻線装置において、
前記ワークの搬送手段と、
複数のワークを着脱自在に保持するインデックス手段であって、ワークへ線材を巻くための巻線位置と、これから線材を巻こうとするワークを供給し線材の巻き終わったワークを位置決めする給排出位置に、それぞれワークを位置決めするためのインデックス手段と、
前記巻線位置に位置決めされたこれから線材を巻こうとするワークに対して線材を巻くための巻回手段と、
前記搬送手段のこれから線材を巻こうとするワークを前記インデックス手段の給排出位置に移し、当該インデックス手段の給排出位置に位置決めされた線材の巻き終わったワークを前記搬送手段に移すための給排出手段と、を備え
前記巻回手段は、双腕型ロボットの第1アーム組立体に形成されると共に、アーム部内に設けたガイドローラ及び線材テンショナとアーム先端に設けたノズルユニットとを有し、前記給排出手段は、双腕型ロボットの第2アーム組立体に形成されたことを特徴とする巻線装置。
In a winding device for winding a wire from a wire supply source around a workpiece,
Conveying means of said workpiece,
Indexing means for detachably holding a plurality of workpieces, a winding position for winding the wire around the workpiece, and a supply / discharge position for supplying the workpiece to be wound from now on and positioning the workpiece after winding the wire And index means for positioning each workpiece,
And winding means for winding the wire to the work to be MAKO from wire positioned in said winding position,
Wherein the workpiece to be now Mako the wire transport means and transferred to the sheet discharge position of the indexing means, the sheet discharging for transferring the winding finished workpiece in the positioned wire in the sheet discharge position of the indexing means to said conveyor means and means, the,
The winding means is formed in the first arm assembly of the double-arm robot, and has a guide roller and a wire tensioner provided in the arm portion, and a nozzle unit provided at the tip of the arm. A winding device formed on a second arm assembly of a double-arm robot .
前記インデックス手段は、複数のワーク保持具を備え、各ワーク保持具はワークを回転可能である請求項1に記載の巻線装置。The winding device according to claim 1, wherein the index means includes a plurality of workpiece holders, and each workpiece holder can rotate the workpiece.
JP29479295A 1995-10-18 1995-10-18 Winding device Expired - Fee Related JP3713771B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP29479295A JP3713771B2 (en) 1995-10-18 1995-10-18 Winding device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP29479295A JP3713771B2 (en) 1995-10-18 1995-10-18 Winding device

Publications (2)

Publication Number Publication Date
JPH09110304A JPH09110304A (en) 1997-04-28
JP3713771B2 true JP3713771B2 (en) 2005-11-09

Family

ID=17812340

Family Applications (1)

Application Number Title Priority Date Filing Date
JP29479295A Expired - Fee Related JP3713771B2 (en) 1995-10-18 1995-10-18 Winding device

Country Status (1)

Country Link
JP (1) JP3713771B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019198181A (en) * 2018-05-10 2019-11-14 Nittoku株式会社 Rotary table type manufacturing apparatus
CN113023485B (en) * 2021-04-20 2024-02-27 苏州江锦自动化科技有限公司 Spool loading and unloading system, loading and unloading method and winding system
CN120914023B (en) * 2025-09-04 2026-02-17 安徽盈硕电子科技有限公司 A bidirectional synchronous winding mechanism and winding machine

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5922860A (en) * 1982-07-28 1984-02-06 Daiichi Denko Kk Rewinding-up mechanism of electric-wire winding-up apparatus
JPS59227665A (en) * 1983-06-06 1984-12-20 Sanyo Electric Co Ltd Transportation of coil bobbin for fly-back transformer
JPH07223179A (en) * 1994-02-04 1995-08-22 Toshiba Corp Multi-arm robot

Also Published As

Publication number Publication date
JPH09110304A (en) 1997-04-28

Similar Documents

Publication Publication Date Title
TWI702151B (en) Printing apparatus, printing assembly, transfer apparatus for conveying workpiece and method thereof
CN110113705B (en) Speaker assembly system
TWI714790B (en) Resin supply device and resin molding device
JP5439576B2 (en) Workpiece feeding / unloading device and machine tool equipped with the workpiece feeding / unloading device
CN108715343A (en) A kind of full-automatic IC CD writers
CN110668260B (en) Guiding fusing device, automatic winding system and automatic winding method thereof
JP3713771B2 (en) Winding device
CN211470363U (en) Wire spool clamping jaw
JP2915263B2 (en) Coil winding machine
CN218182183U (en) Wafer processing equipment
CN112652483A (en) Hook needle type automatic winding machine for inductor
US5775626A (en) Apparatus and method for winding wire around a workpiece
CN118925968B (en) Automatic shield PCB board three proofings lacquer spraying device at exempting from lacquer position
CN101090087B (en) Clamping device for wafers
US20230329377A1 (en) Tape attachment systems and methods
JP2009094296A (en) Parts supply device
US7043820B2 (en) Electric-component mounting system
CN212463515U (en) Diaphragm assembling system and loudspeaker assembling system
JP3573183B2 (en) Winding device and winding method
JPH0567670A (en) Wafer ring feed method
JP6482623B2 (en) Electronic circuit component mounting machine
JP3517896B2 (en) Coil assembly equipment
JP4522694B2 (en) Winding machine, winding method and coil manufacturing apparatus
JP5184135B2 (en) manufacturing device
CN119747978A (en) A welding assembly workstation

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20041117

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20041124

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050120

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20050802

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20050815

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080902

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090902

Year of fee payment: 4

LAPS Cancellation because of no payment of annual fees