Bridge girder movement restriction device and bridge girder movement restriction method Download PDF

Info

Publication number
JP3717481B2
JP3717481B2 JP2003034236A JP2003034236A JP3717481B2 JP 3717481 B2 JP3717481 B2 JP 3717481B2 JP 2003034236 A JP2003034236 A JP 2003034236A JP 2003034236 A JP2003034236 A JP 2003034236A JP 3717481 B2 JP3717481 B2 JP 3717481B2
Authority
JP
Japan
Prior art keywords
bridge girder
movement restriction
restriction device
winding member
linear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2003034236A
Other languages
Japanese (ja)
Other versions
JP2004244868A (en
Inventor
薫 小林
八重子 竹市
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
East Japan Railway Co
Original Assignee
East Japan Railway Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by East Japan Railway Co filed Critical East Japan Railway Co
Priority to JP2003034236A priority Critical patent/JP3717481B2/en
Publication of JP2004244868A publication Critical patent/JP2004244868A/en
Application granted granted Critical
Publication of JP3717481B2 publication Critical patent/JP3717481B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、橋桁と支持構造物との間に設けられ橋桁の移動を制限する橋桁移動制限装置、及びこの装置を用いて橋桁の移動を制限する橋桁移動制限方法に関するものである。
【0002】
【従来の技術】
従来、図8(A)に示すように、橋桁305と、この橋桁305を支持する橋台301、302や橋脚303、304等の支持構造物との間に設けられ、橋桁305の移動を制限する装置201、202、203、204としては、橋桁ストッパーと呼ばれるものが知られている。この橋桁ストッパーには、鋼棒ストッパー、鋼角ストッパー、ダンパー式ストッパー等が条件に応じて用いられている。これらの橋桁ストッパーのうち、中規模以上の橋梁では、鋼角ストッパーが用いられている(例えば、特許文献1参照)。
【0003】
この鋼角ストッパーは、図8(B)に示すように、例えば、橋脚303に鋼板等からなる埋設型枠222を設置しておき、橋脚303のコンクリート打設後に、埋設型枠222の内部が箱状の凹部となるようにしておく。次に、この凹部内に、鋼板を四角柱状に組み合わせて形成した鋼角ストッパー223を設置する。その後、鋼角ストッパー223が橋桁305に埋め込まれた状態となるように橋桁305を施工する。
【0004】
【特許文献1】
特開2002−167711号公報(第1−6頁、図6)
【0005】
【発明が解決しようとする課題】
しかしながら、上記した従来の鋼角ストッパー等においては、大規模な地震時に作用する力を考慮した現在の耐震設計では、その形状が大きくなり、施工が困難になり、さらに鋼角ストッパーの製作費用、設置の施工費用ともに高額となる、という問題があった。
【0006】
本発明は上記の問題を解決するためになされたものであり、本発明の解決しようとする課題は、コストが低廉で、かつ十分な耐震性能を有する橋桁移動制限装置、及び橋桁移動制限方法を提供することにある。
【0007】
【課題を解決するための手段】
上記課題を解決するため、本発明の請求項1に係る橋桁移動制限装置は、
橋桁と前記橋桁を支持する支持構造物との間に設けられ、前記橋桁の移動を制限する装置であって、
平面配置状態が略円状又は略多角形状となるように並設されるとともに長手方向が鉛直上下方向となるように配置された複数の線状部材と、
前記複数の線状部材のなす領域の外周又は内周に沿って螺旋状に巻回された巻回部材を備え、
前記複数の線状部材の下端は前記支持構造物の上部に固定されるとともに、前記複数の線状部材の上端は前記橋桁の下部に直接に又は介在部材を介して間接的に取り付けられ、
前記巻回部材の下端は前記支持構造物の上部に固定されるとともに、前記巻回部材の上端は前記橋桁の下部に固定されること
を特徴とする。
【0008】
また、本発明の請求項2に係る橋桁移動制限装置は、
請求項1記載の橋桁移動制限装置において、
前記巻回部材は、
前記複数の線状部材のなす領域の周に沿って螺旋状に巻回される側巻回部材を有すること
を特徴とする。
【0009】
また、本発明の請求項3に係る橋桁移動制限装置は、
請求項1記載の橋桁移動制限装置において、
前記複数の線状部材の内部に、袋状部材が配置され、前記袋状部材の内部に自硬性の充填材が充填されること
を特徴とする
【0010】
また、本発明の請求項4に係る橋桁移動制限装置は、
請求項3記載の橋桁移動制限装置において、
前記充填材には、コンクリート、又はモルタル、若しくは樹脂材料が用いられること
を特徴とする
【0011】
また、本発明の請求項5に係る橋桁移動制限装置は、
請求項1記載の橋桁移動制限装置において、
前記複数の線状部材と前記巻回部材を組み立てた後に、前記支持構造物のコンクリートが打設されること
を特徴とする
【0012】
また、本発明の請求項6に係る橋桁移動制限装置は、
請求項1記載の橋桁移動制限装置において、
前記複数の線状部材と前記巻回部材を収容する箱抜き凹部を前記橋桁にあらかじめ形成しておき、前記橋桁の設置後に前記複数の線状部材と前記巻回部材を設置すること
を特徴とする
【0013】
また、本発明の請求項7に係る橋桁移動制限装置は、
請求項1記載の橋桁移動制限装置において、
前記線状部材は、鉄筋、又はPC鋼材により形成されること
を特徴とする
【0014】
また、本発明の請求項8に係る橋桁移動制限装置は、
請求項1記載の橋桁移動制限装置において、
前記巻回部材は、鉄筋、又はPC鋼材により形成されること
を特徴とする
【0015】
また、本発明の請求項9に係る橋桁移動制限装置は、
請求項1記載の橋桁移動制限装置において、
前記巻回部材には、ガラス繊維、又は金属繊維、又は炭素繊維、又は合成繊維、又はセラミックス系複合材料からなる繊維、若しくはこれらの適宜の組み合わせにより補強された線材、又は棒状部材、若しくはヒモ状部材が用いられること
を特徴とする
【0016】
また、本発明の請求項10に係る橋桁移動制限装置は、
請求項1記載の橋桁移動制限装置において、
前記線状部材又は前記巻回部材は、表面にあらかじめ防錆層が形成されること
を特徴とする
【0017】
また、本発明の請求項11に係る橋桁移動制限装置は、
請求項10記載の橋桁移動制限装置において、
前記防錆層は、溶融亜鉛メッキ、又は合成樹脂コーティング、若しくは塗装により形成されること
を特徴とする
【0018】
また、本発明の請求項12に係る橋桁移動制限装置は、
請求項1記載の橋桁移動制限装置において、
前記線状部材と、前記支持構造物又は前記橋桁の表面付近との付着を切るための付着遮断手段が設けられること
を特徴とする
【0019】
また、本発明の請求項13に係る橋桁移動制限装置は、
請求項12記載の橋桁移動制限装置において、
前記付着遮断手段は、前記支持構造物又は前記橋桁の表面付近の位置の前記線状部材を間隙を配して包囲するように配置される鞘管であること
を特徴とする
【0020】
また、本発明の請求項14に係る橋桁移動制限装置は、
請求項13記載の橋桁移動制限装置において、
前記鞘管の内部の前記線状部材との間の間隙には、潤滑材が充填されること
を特徴とする
【0021】
また、本発明の請求項15に係る橋桁移動制限装置は、
請求項1記載の橋桁移動制限装置において、
前記橋桁と前記支持構造物との間で外部に露出する前記複数の線状部材は、外側に向かって膨満した略樽状となるように形成されること
を特徴とする
【0022】
また、本発明の請求項16に係る橋桁移動制限装置は、
請求項1記載の橋桁移動制限装置において、
前記線状部材と、前記支持構造物又は前記橋桁との定着部に、アンカー部材を設け、前記アンカー部材に前記線状部材を固定すること
を特徴とする
【0023】
また、本発明の請求項17に係る橋桁移動制限装置は、
請求項1記載の橋桁移動制限装置において、
前記線状部材と前記橋桁との定着部に、前記支持構造物の沈下を吸収する沈下吸収手段を設けること
を特徴とする
【0024】
また、本発明の請求項18に係る橋桁移動制限装置は、
請求項17記載の橋桁移動制限装置において、
前記沈下吸収手段は、
前記橋桁との定着部に設けられるアンカー部材と、
前記橋桁の定着部付近の前記線状部材を間隙を配して包囲するように配置され前記アンカー部材に取り付けられる鞘管と、
前記鞘管の内部の線状部材に取り付けられ前記アンカー部材により係止される係止部材を有すること
を特徴とする
【0025】
また、本発明の請求項19に係る橋桁移動制限方法は、
橋桁と前記橋桁を支持する支持構造物との間において前記橋桁の移動を制限する方法であって、
複数の線状部材を、平面配置状態が略円状又は略多角形状となるように並設するとともに長手方向が鉛直上下方向となるように配置し、
前記複数の線状部材のなす領域の外周に沿って外側巻回部材を螺旋状に巻回して巻回部材とし、
前記複数の線状部材の下端を前記支持構造物の上部に固定するとともに、前記複数の線状部材の上端を前記橋桁の下部に直接に又は介在部材を介して間接的に取り付け、
前記巻回部材の下端を前記支持構造物の上部に固定するとともに、前記巻回部材の上端を前記橋桁の下部に固定すること
を特徴とする。
【0026】
また、本発明の請求項20に係る橋桁移動制限方法は、
請求項19記載の橋桁移動制限方法において、
前記巻回部材として、さらに前記複数の線状部材のなす領域の内周に沿って内側巻回部材を螺旋状に巻回すること
を特徴とする。
【0027】
【発明の実施の形態】
以下、本発明の実施形態について、図面を参照しながら詳細に説明する。
【0028】
(1)第1実施形態
まず、本発明の第1実施形態である橋桁移動制限装置について説明する。図1は、本発明の第1実施形態である橋桁移動制限装置の全体構成を示す側断面図である。
【0029】
図1に示すように、本発明の第1実施形態の橋桁移動制限装置11は、橋桁82と、支持構造物である橋脚81との間に設けられ、橋桁移動制限装置11の下端は、橋脚81の上部に固定され、かつ、橋桁移動制限装置11の上端は、橋桁82の下部に取り付けられている。
【0030】
次に、図2を参照しつつ、本発明の第1実施形態である橋桁移動制限装置11のさらに詳細な構成を説明する。図2は、橋桁移動制限装置11の斜視図である。
【0031】
図2に示すように、第1実施形態である橋桁移動制限装置11は、複数の鉄筋21と、外側巻回部材22と、内側巻回部材23と、充填材24を備えて構成されている。
【0032】
これらの構成要素のうち、複数の鉄筋21は、その長手方向が鉛直上下方向となるように配置されている。また、複数の鉄筋21は、その平面配置状態が略円状となるように並設されている。したがって、複数の鉄筋21は、略円筒状の領域を形成している。
【0033】
上記した複数の鉄筋21としては、JIS G 3112に定められる丸棒状の鉄筋(熱間圧延棒鋼)、異形鉄筋(熱間圧延異形棒鋼)、JIS G 3117に定められる再生異形棒鋼等が使用可能である。また、最近、提供されてきた「高強度鉄筋」として、SD345、SD390、SD490、SD590、及びSD685等も使用可能である。
【0034】
また、外側巻回部材22は、複数の鉄筋21のなす円筒状の領域の外周に沿い、周囲を取り巻くように、螺旋状に巻回されている。この外側巻回部材22は、鉄筋を加工して作製することができる。また、外側巻回部材22には、上記した各種の鉄筋(丸棒状鉄筋、異形鉄筋、高強度鉄筋)を用いることができる。
【0035】
また、外側巻回部材22としては、JIS G 3109、JIS G 3137に定められるPC鋼棒が使用可能である。また、外側巻回部材22としては、JIS G 3502、JIS G 3536に定められるPC鋼線、及びPC鋼より線が使用可能である。以下、上記のPC鋼棒、PC鋼線、PC鋼より線を、「PC鋼材」という。
【0036】
また、外側巻回部材22としては、ガラス繊維で補強された線材、又は棒状部材、若しくはヒモ状部材等を用いることができる。また、外側巻回部材22としては、金属繊維で補強された線材、又は棒状部材、若しくはヒモ状部材等を用いることができる。この金属繊維に用いる金属としては、鋼、ステンレス、タングステン(W)、モリブデン(Mo)等が用いられる。外側巻回部材22としては、炭素繊維で補強された線材、又は棒状部材、若しくはヒモ状部材等を用いることができる。
【0037】
また、外側巻回部材22としては、合成樹脂からなる繊維(以下、「合成繊維」という。)で補強された線材、又は棒状部材、若しくはヒモ状部材等を用いることができる。この場合の合成繊維としては、アラミド繊維(芳香族ポリアミド繊維。いわゆるケブラー繊維。)、ポリエステル繊維、ポリプロピレン繊維、ポリエチレン繊維、セルロース系繊維(セルロースアセテート繊維など)、ビニロン繊維(ポリビニルアルコール繊維)、ポリアミド繊維(いわゆるナイロン繊維)、アクリロニトリル系繊維、芳香族ポリエーテルイミド繊維とポリビニルアルコール繊維との混繊糸などが、使用可能である。
【0038】
さらに、外側巻回部材22としては、セラミックス系複合材料からなる繊維(以下、「セラミックス系複合材料繊維」という。)で補強された線材、又は棒状部材、若しくはヒモ状部材等を用いることができる。この複合材料からなる繊維しては、ボロン繊維が使用可能である。ボロン繊維は、タングステン繊維やカーボン(炭素)繊維の表面にボロン(ホウ素:B)を蒸着等により付着させたものである。また、セラミックス系複合材料繊維としては、ボルシック繊維も使用可能である。ボルシック繊維は、ボロン繊維の表面に、シリコンカーバイド(SiC:炭化ケイ素)、ボロンカーバイド(炭化ホウ素:B4C)などを蒸着等によって付着させたものである。
【0039】
外側巻回部材22と鉄筋21とが接触又は近接する箇所では、軟鉄線材によって両者を結束するようにしてもよいし、溶接や接着剤による接着等によって両者を接合するようにしてもよい。また、外側巻回部材22と鉄筋21は、上端部付近と下端部付近のみを、上記と同様にして、結束又は溶接若しくは接着等を行うようにしてもよい。
【0040】
また、内側巻回部材23は、複数の鉄筋21のなす円筒状の領域の内周に沿うように、螺旋状に巻回されている。この内側巻回部材23としては、上記した外側巻回部材22と全く同様の材質の部材を用いることができる。
【0041】
内側巻回部材23と鉄筋21とが接触又は近接する箇所では、軟鉄線材によって両者を結束するようにしてもよいし、溶接や接着剤による接着等によって両者を接合するようにしてもよい。また、内側巻回部材23と鉄筋21は、上端部付近と下端部付近のみを、上記と同様にして、結束又は溶接若しくは接着等を行うようにしてもよい。
【0042】
また、内側巻回部材23の内部には、充填材24が充填されている。充填材24としては、当初は流動体状で、時間の経過によって硬化する性質(以下、「自硬性」という。)を有する材料が用いられ、コンクリート系材料、モルタル系材料、樹脂材料などが使用可能である。
【0043】
充填材24としてのコンクリート系材料としては、セメントと水と粗骨材と細骨材を混合・練り混ぜたもの(以下、「セメントコンクリート」という。)が使用可能である。セメントとしては、普通ポルトランドセメント、早強ポルトランドセメント、超早強ポルトランドセメント、中庸熱ポルトランドセメント、耐硫酸塩ポルトランドセメント、高炉セメント、フライアッシュセメント、シリカセメント、超速硬セメント、アルミナセメント、膨張セメント、コロイドセメント等が使用可能である。また、粗骨材及び細骨材としては、天然骨材である砂、又は砂利、人工骨材である砕砂、砕石、高炉スラグ砕石、高炉スラグ砕砂、人工軽量骨材等が使用可能である。また、コンクリート系材料には、上記した原料のほか、混和材、又は混和剤を添加することも可能である。混和材としては、スラグ、フライアッシュ、ポゾラン、シリカヒューム、火山灰、CSA(カルシウムサルフォアルミネート)系膨張材、石灰系膨張材、アルミニウム系膨張材、鉄粉系膨張材などが使用可能である。また、混和剤としては、AE剤、減水剤、AE減水剤、高性能減水剤、流動化剤、凝結調整剤、増粘剤、保水剤、遅延剤、超遅延剤、収縮低減剤、耐寒剤、急結剤、発泡剤、防水剤、鉄筋防錆剤等が使用可能である。
【0044】
また、充填材24としてのコンクリート系材料としては、繊維補強コンクリート(Fiber Reinforced Concrete:FRC)も使用可能である。繊維補強コンクリートは、上記したようなコンクリート中に、直径が0.01〜2ミリメートル程度で長さが0.1〜10センチメートル程度の繊維をランダムな方向に向くようにして分散させ、コンクリートの強度を増加させるようにしたものである。FRCに使用する繊維としては、ガラス繊維、金属繊維、炭素繊維、合成繊維、セラミックス系複合材料繊維などが使用可能である。
【0045】
また、充填材24としてのコンクリート系統料としては、コンクリート・ポリマー複合体が使用可能である。コンクリート・ポリマー複合体としては、ポリマーセメントコンクリート(Polymer−Cement Concrete:PCC)が使用可能である。ポリマーセメントコンクリート(PCC)は、上記したようなセメントと、下記のようなポリマーを用いて、上記したような粗骨材及び細骨材を結合させたものである。この場合に用いられるポリマーとしては、スチレンブタジエンゴム(SBR)、ラテックス、エチレン酢酸ビニル(EVA)、ポリアクリル酸エステル(PAE)エマルジョンなどであり、JIS A 6203に規格化されている。
【0046】
また、コンクリート・ポリマー複合体としては、ポリマーを用いて粗骨材及び細骨材を結合させたポリマーコンクリート(Polymer Concrete:PC)も使用可能である。これは、レジンコンクリートとも呼ばれる。ポリマーコンクリートは、ポリマーして、不飽和ポリエステル樹脂、エポキシ樹脂、フラン樹脂、ポリウレタン、メタクリル酸メチルなどの液状レジンを用い、炭酸カルシウム、シリカなどの充填材を加え、砂、砂利、採石、ケイ砂等の骨材を練り混ぜて生成するものである。
【0047】
また、コンクリート・ポリマー複合体としては、ポリマー含浸コンクリート(Polymer−Impregnated Concrete:PIC)も使用可能である。ポリマー含浸コンクリートは、硬化したセメントコンクリートのような多孔質無機材料を基材(被含浸材)として用い、この中にモノマー、プレポリマー、ポリマーなどからなる含浸材を含浸させた後、重合などの操作を経て、基材とポリマーを一体化させたものである。この場合に使用される含浸材としては、メタクリル酸メチル、スチレンなどのビニルモノマーに、橋かけ剤、触媒などを添加したものである。基材としては、既設の硬化後コンクリート、セメントコンクリート成型品、フェロセメント成型品、セッコウ製品などが使用可能である。
【0048】
充填材24としてのモルタル系材料としては、セメントと水と細骨材を混合・練り混ぜたもの(以下、「セメントモルタル」という。)が使用可能である。セメントとしては、上記のセメントコンクリートで説明したものと同様のものが使用可能である。また、細骨材としては、上記のセメントコンクリートで説明したものと同様のものが使用可能である。また、モルタル系材料には、上記した原料のほか、混和材、又は混和剤を添加することも可能である。混和材、又は混和剤としては、上記のセメントコンクリートで説明したものと同様のものが使用可能である。
【0049】
また、充填材24としてのモルタル系材料としては、繊維補強コンクリート(FRC)と同様に、繊維によって補強したもの繊維補強モルタル(FRM)も使用可能である。この場合に使用する繊維としては、上記のFRCで説明したものと同様のものが使用可能である。
【0050】
また、充填材24としてのモルタル系統料としては、モルタル・ポリマー複合体が使用可能である。モルタル・ポリマー複合体としては、ポリマーセメントモルタル(Polymer−Cement Mortar:PCM)が使用可能である。ポリマーセメントモルタル(PCM)は、上記したようなセメントと、ポリマーを用いて、上記したような細骨材を結合させたものである。この場合に用いられるポリマーとしては、上記のポリマーセメントコンクリートPCCで説明したものと同様のものが使用可能である。
【0051】
また、モルタル・ポリマー複合体としては、ポリマーを用いて細骨材を結合させたポリマーモルタル(Polymer Mortar:PM)も使用可能である。ポリマーモルタルは、ポリマーして、上記のポリマーコンクリートPCで説明したものと同様のものを用い、炭酸カルシウム、シリカなどの充填材を加え、砂、砂利、採石、ケイ砂等の骨材を練り混ぜて生成するものである。
【0052】
また、モルタル・ポリマー複合体としては、ポリマー含浸モルタル(Polymer−Impregnated Mortar:PIM)も使用可能である。ポリマー含浸モルタルは、硬化したセメントモルタルのような多孔質無機材料を基材(被含浸材)として用い、この中にモノマー、プレポリマー、ポリマーなどからなる含浸材を含浸させた後、重合などの操作を経て、基材とポリマーを一体化させたものである。この場合に使用される含浸材としては、上記したポリマー含浸コンクリートPICで説明したものと同様のものが使用可能である。また、基材としては、既設の硬化後モルタル、モルタル成型品、フェロセメント成型品、セッコウ製品などが使用可能である。
【0053】
充填材24としての樹脂材料としては、エポキシ樹脂、アクリル樹脂、ウレタン樹脂、ポリエステル樹脂、フェノール樹脂、メラミン樹脂、ポリイミド樹脂等が使用可能である。
【0054】
また、複数の鉄筋21と外側巻回部材22と内側巻回部材23の下端は、橋脚81(図1参照)がコンクリート構造の場合には、橋脚81の上部のコンクリート(図1における箇所P1を参照)の中に埋め込まれて固定される。この場合には、橋脚81の鉄筋等を組み立てる際に、橋桁移動制限装置11の鉛直方向鉄筋21と外側巻回部材22と内側巻回部材23も組み立てるようにする。その後、橋脚81のコンクリートを打設することにより、複数の鉄筋21と外側巻回部材22と内側巻回部材23の下端は、橋脚81の上部のコンクリートの内部に埋設される。
【0055】
また、その後、複数の鉄筋21と外側巻回部材22と内側巻回部材23の上端は、橋桁82(図1参照)がコンクリート構造の場合で、橋桁82が現場打ちコンクリートで施工される場合には、橋桁82のコンクリート打設時に、橋桁82の下部のコンクリート(図1における箇所P4を参照)の中に埋め込まれて固定される。
【0056】
あるいは、橋桁82(図1参照)がコンクリート構造の場合で、橋桁82の全体、又は橋桁82の一部をなす橋桁ブロック(図示せず)が、設置位置以外の箇所であらかじめ製作され、その後に橋桁設置箇所へ運搬又は移動されて設置される工法(プレファブ工法)の場合には、橋桁82の全体、又は橋桁ブロックが製作される際に、その下部に、箱状の凹部(図1における箇所V1を参照。以下、「箱抜き凹部」という。)をあらかじめ形成しておく。この箱抜き凹部V1は、コンクリート内部に向かって箱状に凹むような形状となる型枠を設置した後に、橋桁82の全体、又は橋桁ブロックのコンクリート打設を行うことにより形成する。
【0057】
上記のようにして、下部に箱抜き凹部V1が形成された橋桁82又は橋桁ブロックが作製された後、橋脚81(図1参照)の上部に設置された橋桁移動制限装置11(図1参照)の複数の鉄筋21と外側巻回部材22と内側巻回部材23の上端が、橋桁82又は橋桁ブロックの下部の箱抜き凹部V1の中に収容されるようにして、橋桁82又は橋桁ブロックを設置する。
【0058】
その後、箱抜き凹部V1の下部(図1における箇所P2及びP3を参照。)に型枠を設置し、箱抜き凹部V1の内部(図1における箇所P4を参照)に中詰めコンクリートを打設する。これにより、橋桁移動制限装置11の複数の鉄筋21と外側巻回部材22と内側巻回部材23の上端は、橋桁82又は橋桁ブロックの下部の中詰めコンクリートの中に埋め込まれて固定される。
【0059】
図3は、本発明の第1実施形態である橋桁移動制限装置の施工方法を説明する図である。なお、図3(A)及び図3(B)においては、内側巻回部材23の図示を省略している。図3(A)に示すように、複数の鉄筋21の内部には、袋状部材25が配置される。袋状部材25は、柔軟性を有する合成樹脂材料の薄いシート等により作製されており、充填材24を注入するための注入口(図示せず)を有し、その他の部分は閉塞され、充填材24が漏出しないように構成されている。
【0060】
次に、図3(B)に示すように、注入口(図示せず)から充填材24を充填する。これにより、袋状部材25が膨張し鉄筋21に押し付けられる。また、図示はしていないが、袋状部材25の膨張に伴い、内側巻回部材23も鉄筋21に押し付けられる。この状態で、所定の時間が経過することにより、充填材24は硬化する。
【0061】
上記したような構成により、第1実施形態の橋桁移動制限装置11は、下記のような作用・効果を有している。
【0062】
1)図1において、橋桁82が地震等の作用により水平方向D1又はD2に移動しようとする場合には、鉛直上下方向に配置されている複数の鉄筋21に引張力が作用する。一般に、鉄筋は、降伏した後の伸び能力が高い。このため、大きな地震力などが作用した場合であっても、鉄筋21が降伏し伸び変形することにより、鉄筋の履歴吸収エネルギーを利用することができ、地震等のエネルギーを吸収するダンパーとしての役目を果たすことができる、という利点がある。また、橋桁移動制限装置11は、鉄筋21を主たる構成要素の一つとして用いており、従来の鋼角ストッパー等に比べて、製作費用及び施工費用を大幅に削減することができる、という利点を有している。
【0063】
2)鉛直方向鉄筋21に対して略螺旋状となるように、外側巻回部材22と内側巻回部材23を配置しているため、鉄筋21の座屈変形などを防止することができる、という利点がある。
【0064】
3)膨張して硬化した充填材24により、内側巻回部材23が鉛直方向鉄筋21に押し付けられ、内側巻回部材23が鉄筋の補強機能を発揮することを補助する、という利点がある。あるいは、膨張して硬化した充填材24により、鉛直方向鉄筋21が外側巻回部材22に押し付けられ、外側巻回部材22が鉄筋の補強機能を発揮することを補助する、という利点もある。
【0065】
4)橋桁移動制限装置11は、全体としての剛性が小さい。このため、図1において橋桁82が温度変化によって伸縮した場合に、図1における水平方向D1又はD2へ橋桁82が移動しようとするが、この際に橋桁移動制限装置11が橋桁82の動きを拘束することが少なく、橋脚81又は橋桁82と橋桁移動制限装置11の接合箇所のコンクリート等に過大な力が作用することがない、という利点がある。
【0066】
なお、鉛直方向鉄筋21のうち、橋脚コンクリートや橋桁コンクリートの内部に埋設されずに外部に露出する部分については、その表面にあらかじめ防錆層を形成しておき、腐蝕することを防止するようにしてもよい。この防錆層は、鉄筋21の表面に溶融亜鉛メッキを施すことによって形成するようにしてもよい。また、防錆層は、合成樹脂を鉄筋21の表面にコーティングことにより、合成樹脂の薄膜を鉄筋21の表面に形成するようにしてもよい。さらに、防錆層は、鉄筋21の表面に塗装を施すことによって形成するようにしてもよい。外側巻回部材22、内側巻回部材23についても、鉄筋等の腐蝕しやすい材料で形成する場合には、上記と同様の防錆層を形成することが好ましい。
【0067】
(2)第2実施形態
本発明は、上記した第1実施形態以外の構成によっても、実現可能である。次に、本発明の第2実施形態である橋桁移動制限装置について説明する。図4は、本発明の第2実施形態である橋桁移動制限装置の構成を説明する図であり、図4(A)は、本発明の第2実施形態である橋桁移動制限装置12における橋脚81Aの側の鉛直方向鉄筋21Aの定着部の構成を示す断面図を、図4(B)は、本発明の第1実施形態である橋桁移動制限装置11における橋脚81の側の鉛直方向鉄筋21の定着部の構成を示す断面図を、それぞれ示している。なお、図4(A)及び図4(B)においては、外側巻回部材及び内側巻回部材の図示を省略している。
【0068】
図4(A)に示すように、本発明の第2実施形態である橋桁移動制限装置12においては、鉛直方向に配置される複数の鉄筋21Aの、橋脚81Aのコンクリートの上端の表面付近の内部となる位置に、鞘管27が配置されている。鞘管27は、鋼管などから作製される。この鞘管27の内部空洞の径(内径)は、鉄筋21Aの外径よりもやや大きな値に設定されている。したがって、鞘管27は、この部分の鉄筋21Aを、ある間隙を配して包囲している。
【0069】
また、鞘管27の内部の鉄筋21Aとの間の間隙には、潤滑材28が充填されている。潤滑材28としては、グリースなどが用いられる。第2実施形態の橋桁移動制限装置12は、鞘管27と潤滑材28以外の構成、及び鉄筋や巻回部材あるいは充填材等の材質については、上記した第1実施形態の場合と同様である。
【0070】
上記のように構成するためには、あらかじめ潤滑材28を内部に充填した鞘管27の内部空洞に鉄筋21Aを挿通させておく。次に、橋脚81Aの鉄筋等を組み立てる際に、橋桁移動制限装置12の鉛直方向鉄筋21Aと外側巻回部材(図示せず)と内側巻回部材(図示せず)も組み立てるようにする。その後、橋脚81Aのコンクリートを打設する。
【0071】
これにより、図4(A)に示すように、鉛直方向鉄筋21Aの下端部(図4(A)におけるZ1の範囲)は、橋脚81Aの上部のコンクリートの内部に直接埋設される。したがって、鉛直方向鉄筋21Aの下端部(図4(A)におけるZ1の範囲)はコンクリートに定着され、この範囲Z1における鉄筋表面とコンクリートは付着した状態となっている。
【0072】
一方、鉛直方向鉄筋21Aの下端部Z1の上方のZ2の範囲においては、鉛直方向鉄筋21Aの周囲に潤滑材28と鞘管27が装着されている。このため、鉛直方向鉄筋21AのZ2の範囲では、鉄筋表面とコンクリートの付着は切れた状態となっている。
【0073】
なお、鉛直方向鉄筋21Aが施工される際、図示はしていないが、外側巻回部材と内側巻回部材の下端も、同様にして橋脚81Aの上部のコンクリートの内部に埋設される。
【0074】
上記したような構成により、第2実施形態の橋桁移動制限装置12は、下記のような作用・効果を有している。
【0075】
5)第1実施形態の橋桁移動制限装置11の橋脚81の側の鉛直方向鉄筋21の定着部においては、図4(B)に示すように、鉛直方向鉄筋21の下端部は、橋脚81の上部のコンクリートの内部に直接埋設される。したがって、鉛直方向鉄筋21のコンクリート埋設部はコンクリートに定着され、この範囲における鉄筋表面とコンクリートは付着した状態となっている。このため、図4(B)において、D3で示す方向に鉄筋21が引張られると、鉄筋とコンクリートとの付着によって鉄筋周囲のコンクリートに応力が伝達され、図4(B)においてS1で示す円錐面を破断面とするようにしてコンクリートが破壊(以下、「せん断破壊」という。)する場合がある。あるいは、せん断破壊は生じなくても、コンクリートに「ひび割れ」が生じることがある。このような破壊やひび割れは、コンクリート自体を損傷するうえ、内部の鉄筋の腐蝕の原因となり好ましくない。しかし、第2実施形態の第1実施形態の橋桁移動制限装置12の場合には、橋脚コンクリートの表面付近となる位置(Z2の範囲)の鉄筋21Aでは、鞘管27と潤滑材28により、周囲のコンクリートとの付着は切断又は絶縁されている。これにより、第2実施形態の橋桁移動制限装置12の場合には、コンクリートのせん断破壊やひび割れを防止することができる、という利点を有している。
【0076】
6)潤滑材として、グリースのような撥水性の物質を用いることにより、鞘管27と鉄筋21Aの間から雨水等が侵入し、橋脚81Aのコンクリート内部の鉄筋21A(範囲Z1及び範囲Z2)に錆が生じて腐蝕することを防止することができる、という利点を有している。
【0077】
なお、鞘管27の上端部に蓋状の部材を取り付けたり、鞘管27の上端部のみに部材を詰めて栓をするような構成をとることも可能である。このような構成の場合には、充填材28を設けなくてもよい。
【0078】
上記した鞘管27は、特許請求の範囲における付着遮断手段に相当している。また、付着遮断手段は、橋脚81Aなどの支持構造物の側だけでなく、橋桁の側にも同様にして設けてもよい。また、第2実施形態において、橋脚81Aは、特許請求の範囲における支持構造物に相当している。
【0079】
(3)第3実施形態
本発明は、上記した第1、第2実施形態以外の構成によっても、実現可能である。次に、本発明の第3実施形態である橋桁移動制限装置について説明する。図5は、本発明の第3実施形態である橋桁移動制限装置の構成を示す断面図である。なお、図5においては、外側巻回部材及び内側巻回部材の図示を省略している。
【0080】
図5に示すように、本発明の第3実施形態である橋桁移動制限装置13においては、鉛直方向に配置される複数の鉄筋21Bのうち、橋桁82Bと橋脚81Bとの間で外部に露出する箇所(範囲Z3)は、外側に向かって膨満した略樽状となるように形成されている。第3実施形態の橋桁移動制限装置13は、鉛直方向鉄筋21Bの範囲Z3の形状以外の構成、及び鉄筋や巻回部材あるいは充填材等の材質については、上記した第1実施形態の場合と同様である。
【0081】
上記のように構成するためには、あらかじめ中央部付近を曲線状に曲げ加工した鉄筋21Bを作製しておく。次に、橋脚81Bの鉄筋等を組み立てる際に、橋桁移動制限装置13の鉛直方向鉄筋21Bと外側巻回部材(図示せず)と内側巻回部材(図示せず)も組み立てるようにする。その後、橋脚81Bのコンクリートを打設する。さらに、現場打ち施工、又は上記したような箱抜き凹部を用いたプレファブ工法により、橋桁82Bを施工する。
【0082】
これにより、図5に示すように、鉛直方向鉄筋21Bの下端部(図5におけるZ4の範囲)は、橋脚81Bの上部のコンクリートの内部に直接埋設される。また、鉛直方向鉄筋21Bの上端部(図5におけるZ5の範囲)は、橋桁82Bの下部のコンクリートの内部に直接埋設される。また、鉛直方向鉄筋21Bの中央部付近(図5におけるZ3の範囲)は、橋脚81Bと橋桁82Bとの間で外部に露出した状態となる。
【0083】
上記したような構成により、第3実施形態の橋桁移動制限装置13は、下記のような作用・効果を有している。
【0084】
7)橋桁82Bが温度変化によって伸縮したような場合には、図5における水平方向D4又はD5へ橋桁82Bが移動しようとする。この際、鉄筋の露出部(範囲Z3)が直線状の場合には、橋桁の水平移動に伴い、鉄筋の長手方向に引張力が直接作用し、降伏して伸びてしまうことがある。しかし、第3実施形態の橋桁移動制限装置13のように、露出部の鉄筋を略樽状にしておけば、橋桁82Bが水平移動しても、水平方向の変形を略樽状の鉄筋部分が吸収するため、直線状の場合に比べ、鉄筋21Bの軸方向の伸びを低減することができる、という利点がある。また、このことは、橋桁82Bの水平方向D4又はD5への移動を拘束することが少ないということになり、橋脚81B又は橋桁82Bと橋桁移動制限装置13の接合箇所のコンクリート等に過大な力が作用することがない、という利点も有している。
【0085】
上記した第3実施形態において、橋脚81Bは、特許請求の範囲における支持構造物に相当している。
【0086】
(4)第4実施形態
本発明は、上記した第1〜第3実施形態以外の構成によっても、実現可能である。次に、本発明の第4実施形態である橋桁移動制限装置について説明する。図6は、本発明の第4実施形態である橋桁移動制限装置の構成及び施工方法を説明する図であり、図6(A)は、橋脚付近の断面図を、図6(B)は、橋桁付近の断面図を、図6(C)は、アンカープレートの斜視図を、図6(D)は、橋桁移動制限装置が取り付けられた状態の断面図を、をそれぞれ示している。
【0087】
図5に示すように、本発明の第4実施形態である橋桁移動制限装置14においては、鉛直方向鉄筋21Cと橋桁82Cとの定着部に、アンカープレート30を設け、このアンカープレート30に鉄筋21Cをナット31等により固定している。第4実施形態の橋桁移動制限装置14は、橋桁82Cの定着部以外の構成、及び鉄筋や巻回部材あるいは充填材等の材質については、上記した第1実施形態の場合と同様である。
【0088】
上記のように構成するためには、あらかじめ鉄筋21Cの一端部付近に雄ネジ部(図示せず)を形成しておく。また、鋼板等により、図6(C)に示すように、鉄筋21Cを挿通するための孔H1を形成したアンカープレート30を作製しておく。
【0089】
次に、橋脚81Cの鉄筋等を組み立てる際に、橋桁移動制限装置14の鉛直方向鉄筋21Cと外側巻回部材(図示せず)と内側巻回部材(図示せず)も組み立てるようにし、鉄筋21Cの雄ネジ部が露出部の上端となるように配置する。その後、橋脚81Cのコンクリートを打設する。
【0090】
次に、橋桁82Cの鉄筋等を組み立てる際に、橋桁下部にアンカープレート30を配置し、さらに、型枠により上記したような箱抜き凹部V2を形成するようにし、箱抜き凹部V2にアンカープレート30の鉄筋挿通孔H1の部分が露出するようにして、橋桁82Cのコンクリートを打設し、橋桁82Cの全体又は一部の橋桁ブロックを作製する。
【0091】
上記のようにして、下部に箱抜き凹部V2及びアンカープレート30が形成された橋桁82C又は橋桁ブロックが作製された後、橋脚81Cの上部に設置された橋桁移動制限装置14の複数の鉄筋21Cと外側巻回部材(図示せず)と内側巻回部材(図示せず)の上端が、橋桁82C又は橋桁ブロックの下部の箱抜き凹部V2の中のアンカープレート30の鉄筋挿通孔H1に挿入されるようにして、橋桁82C又は橋桁ブロックを設置する。
【0092】
次に、鉄筋21Cの上端の雄ネジ部に螺合する雌ネジ部を有するナット31により、鉄筋21Cをアンカープレート30に固定する。この際、ナット31の取付作業を容易にするため、開口であるハンドホール(例えば、図6(C)に示すH2)を、アンカープレート30の中央部付近などに設けておくとよい。
【0093】
その後、箱抜き凹部V2の下部(図6(D)における箇所P5を参照。)に型枠を設置し、箱抜き凹部V2の内部に中詰めコンクリート32を打設する。これにより、橋桁移動制限装置14の複数の鉄筋21Cと外側巻回部材(図示せず)と内側巻回部材(図示せず)の上端は、橋桁82C又は橋桁ブロックの下部の中詰めコンクリートの中に埋め込まれて固定される。
【0094】
上記したような構成により、第4実施形態の橋桁移動制限装置14は、下記のような作用・効果を有している。
【0095】
8)鉄筋とコンクリートとの付着により定着させる形式に比べ、コンクリート中に埋設する鉄筋の長さ(鉄筋定着長)を短くすることができ、橋桁移動制限装置全体の製作費を低減することができる、という利点を有している。
【0096】
上記したアンカープレート30は、特許請求の範囲におけるアンカー部材に相当している。また、アンカープレート30とナット31は、特許請求の範囲における介在部材を構成している。また、アンカー部材は、橋桁82Cの側だけでなく、橋脚の側にも同様にして設けてもよい。また、第4実施形態において、橋脚81Cは、特許請求の範囲における支持構造物に相当している。
【0097】
(5)第5実施形態
本発明は、上記した第1〜第4実施形態以外の構成によっても、実現可能である。次に、本発明の第5実施形態である橋桁移動制限装置について説明する。図7は、本発明の第5実施形態である橋桁移動制限装置の構成及び作用を説明する図である。
【0098】
図7に示すように、本発明の第5実施形態である橋桁移動制限装置15においては、アンカープレート30Aと、鞘管33及び34と、ナット31Aからなる構造が形成されている。この場合、アンカープレート30Aは、橋桁82Dとの定着部に設けられている。また、鞘管33は、橋桁82Dの定着部付近の箇所の鉄筋21Dを間隙を配して包囲するように配置され、アンカープレート30Aの上部に取り付けられている。また、鞘管34は、橋桁82Dの定着部付近の箇所の鉄筋21Dを間隙を配して包囲するように配置され、アンカープレート30Aの下部に取り付けられている。また、ナット31Aは、鞘管33の内部の鉄筋21Dに取り付けられ、アンカープレート30Aにより係止可能な構成となっている。第5実施形態の橋桁移動制限装置15は、橋桁82Cの定着部以外の構成、及び鉄筋や巻回部材あるいは充填材等の材質については、上記した第1実施形態の場合と同様である。
【0099】
上記のように構成するためには、あらかじめ鉄筋21Dの一端部付近に雄ネジ部(図示せず)を形成しておく。また、鋼板等により、鉄筋21Dを挿通するための孔H3を形成したアンカープレート30Aを作製しておく。また、鋼管などにより、両端が開放された鞘管34を作製し、鋼管等の一端に鋼板等を溶接するなどして、一端が開放され他端が閉塞された鞘管33を作製しておく。また、アンカープレート30Aの下部に、溶接等によって鞘管34を接合しておく。
【0100】
次に、橋脚81Dの鉄筋等を組み立てる際に、橋桁移動制限装置15の鉛直方向鉄筋21Dと外側巻回部材(図示せず)と内側巻回部材(図示せず)も組み立てるようにし、鉄筋21Dの雄ネジ部が露出部の上端となるように配置する。その後、橋脚81Dのコンクリートを打設する。
【0101】
次に、橋桁82Dの鉄筋等を組み立てる際に、橋桁下部にアンカープレート30Aを配置して鉄筋21Dの上端部を鞘管34に挿通させ、さらに鉄筋挿通孔H3に挿通させる。次に、鉄筋21Dの上端の雄ネジ部に螺合する雌ネジ部を有するナット31Aを、鉄筋21Dの上部の適宜位置に取り付ける。この場合、ナット31Aの外径は、鉄筋挿通孔H3の内径よりも大きな値に設定されている。
【0102】
この際、ナット31Aがその後に移動しないように、他のナット、又は溶接等により、鉄筋21Dに固定する。この状態で、鞘管33を、鉄筋21Dの上端とナット31Aを収容するようにして被せ、鞘管33の下端をアンカープレート30Aに溶接、又は取付ボルト等によって固定する。
【0103】
この状態で現場打ちコンクリートを打設し、図7の状態となるようにして、橋桁82Dのコンクリートを打設し、橋桁82Dの全体又は一部の橋桁ブロックを施工する。
【0104】
上記したような構成により、第5実施形態の橋桁移動制限装置15は、下記のような作用・効果を有している。
【0105】
9)橋脚81Dが図7における下方(D6の方向)に不等沈下した場合であっても、ある程度以上(例えば、図7におけるδ)の沈下が生じると、ナット31Aがアンカープレート30Aによって係止される。これにより、支持構造物の沈下量をある程度吸収し、橋桁や橋脚への悪影響を抑制することができる、という利点を有している。
【0106】
上記したアンカープレート30Aは、特許請求の範囲におけるアンカー部材に相当している。また、ナット31Aは、特許請求の範囲における係止部材に相当している。また、アンカープレート30Aとナット31Aと鞘管33及び34は、特許請求の範囲における沈下吸収手段、及び介在部材を構成している。また、第5実施形態において、橋脚81Dは、特許請求の範囲における支持構造物に相当している。また、上記した各実施形態において、鉄筋21、21A、21B、21C、及び21Dは、特許請求の範囲における線状部材に相当している。
【0107】
なお、本発明は、上記各実施形態に限定されるものではない。上記各実施形態は、例示であり、本発明の特許請求の範囲に記載された技術的思想と実質的に同一な構成を有し、同様な作用効果を奏するものは、いかなるものであっても本発明の技術的範囲に包含される。
【0108】
例えば、上記各実施形態においては、橋桁がコンクリート構造である例について説明したが、本発明はこの例には限定されず、本発明は、他の構成の橋桁、例えば、鋼構造の橋桁、鋼・コンクリート合成構造の橋桁についても適用可能である。
【0109】
また、支持構造物としては、橋脚81〜81Dのほか、橋台(図8(A)における301及び302を参照)であってもよい。
【0110】
また、線状部材としては、上記した鉄筋、高強度鉄筋のほか、上記したPC鋼棒、PC鋼線、PC鋼より線等のPC鋼材を使用してもよい。
【0111】
また、巻回部材は、外側巻回部材のみが配置される構造であってもよい。あるいは内側巻回部材のみが配置される構造であってもよい。
【0112】
また、充填材の配置箇所は、複数の線状部材(例えば、鉄筋21等)の内部であればよい。また、充填材は、必須の構成要素ではなく、配置しなくてもよい。
【0113】
また、線状部材(例えば、鉄筋21等)の平面配置状態は、略四角形状でもよい、あるいは、鉄筋の平面配置状態は、五角形以上の略多角形でもよい。
【0114】
巻回部材は、相互間に隙間のあいた略螺旋状だけに限定はされない。隙間ができないように巻回部材どうしを密接させて、あるいは互いに少し重複するようにして略螺旋状に巻き付けてもよい。
【0115】
【発明の効果】
以上説明したように、本発明によれば、平面配置状態が略円状又は略多角形状となるように並設されるとともに長手方向が鉛直上下方向となるように配置された複数の線状部材と、複数の線状部材のなす領域の外周に沿って螺旋状に巻回された外側巻回部材を少なくとも有する巻回部材を備え、複数の線上部材の下端が支持構造物の上部に固定されるとともに、複数の線状部材の上端が橋桁の下部に直接に又は介在部材を介して間接的に取り付けられ、巻回部材の下端が支持構造物の上部に固定されるとともに、巻回部材の上端が橋桁の下部に固定されるように構成したので、以下のような利点を有している。
【0116】
橋桁が地震等の作用により水平方向に移動しようとする場合には、鉛直上下方向に配置されている複数の線状部材に引張力が作用するが、線状部材、例えば鉄筋等を用いた場合は、降伏した後の伸び能力が高いため、大きな地震力などが作用した場合であっても、線状部材が降伏し伸び変形することにより、線状部材の履歴吸収エネルギーを利用することができ、地震等のエネルギーを吸収するダンパーとしての役目を果たすことができる。また、本発明の橋桁移動制限装置は、鉄筋等の線状部材を主たる構成要素の一つとして用いており、従来の鋼角ストッパー等に比べて、製作費用及び施工費用を大幅に削減することができる。
【0117】
鉛直方向の線状部材に対して略螺旋状となるように外側巻回部材を配置するようにすれば、線状部材の座屈変形などを防止することができる。
【0118】
線状部材の内部に充填材を充填するようにすれば、膨張して硬化した充填材により、巻回部材が線状部材の補強機能を発揮することを補助する。
【0119】
橋桁移動制限装置は、全体としての剛性が小さいため、橋桁が温度変化によって伸縮したような場合に、水平方向へ橋桁が移動しようとするが、この際に橋桁移動制限装置が橋桁の動きを拘束することが少なく、支持構造物又は橋桁と橋桁移動制限装置の接合箇所のコンクリート等に過大な力が作用することがない。
【0120】
橋桁移動制限装置に、支持構造物又は橋桁の表面付近との付着を切るための付着遮断手段が設けるようにすれば、コンクリートのせん断破壊やひび割れを防止することができる。
【0121】
付着遮断手段に加えて潤滑材を用い、潤滑材として、グリースのような撥水性の物質を用いることにより、雨水等が侵入し支持構造物のコンクリート内部の線状部材に錆が生じて腐蝕することを防止することができる。
【0122】
橋桁と支持構造物との間で外部に露出する複数の線状部材を、外側に向かって膨満した略樽状となるように形成しておけば、橋桁が温度変化によって伸縮したような場合であっても、橋桁の水平方向の変形を略樽状の線状部材の部分が吸収するため、直線状の線状部材の場合に比べ、線状部材の軸方向の伸びを低減することができる。また、このことは、橋桁の水平方向への移動を拘束することが少ないということになり、支持構造物又は橋桁と橋桁移動制限装置の接合箇所のコンクリート等に過大な力が作用することがない。
【0123】
線状部材と、支持構造物又は橋桁との定着部にアンカー部材を設け、アンカー部材に線状部材を固定するようにすれば、線状部材とコンクリートとの付着により定着させる形式に比べ、コンクリート中に埋設する線状部材の長さ(定着長)を短くすることができ、橋桁移動制限装置全体の製作費を低減することができる。
【0124】
橋桁との定着部に設けられるアンカー部材と、橋桁の定着部付近の線状部材を間隙を配して包囲するように配置されアンカー部材に取り付けられる鞘管と、鞘管の内部の線状部材に取り付けられアンカー部材により係止される係止部材を有する沈下吸収手段を設けるようにすれば、支持構造物が下方に不等沈下した場合であっても、ある程度以上の沈下が生じると、係止部材がアンカー部材によって係止される。これにより、支持構造物の沈下量をある程度吸収し、橋桁や支持構造物への悪影響を抑制することができる。
【図面の簡単な説明】
【図1】 本発明の第1実施形態である橋桁移動制限装置の全体構成を示す側断面図である。
【図2】 本発明の第1実施形態である橋桁移動制限装置のさらに詳細な構成を示す斜視図である。
【図3】 本発明の第1実施形態である橋桁移動制限装置の施工方法を説明する図である。
【図4】 本発明の第2実施形態である橋桁移動制限装置の構成を説明する図である。
【図5】 本発明の第3実施形態である橋桁移動制限装置の構成を示す断面図である。
【図6】 本発明の第4実施形態である橋桁移動制限装置の構成及び施工方法を説明する図である。
【図7】 本発明の第5実施形態である橋桁移動制限装置の構成及び作用を説明する図である。
【図8】 従来の橋桁移動制限装置の一例の構成を示す図である。
【符号の説明】
11〜15 橋桁移動制限装置
21〜21D 鉄筋
22 外側巻回部材
23 内側巻回部材
24 充填材
25 袋状部材
27 鞘管
28 グリース
30、30A アンカープレート
31、31A ナット
32 中詰めコンクリート
33、34 鞘管
81〜81D 橋脚
82〜82D 橋桁
201〜204 橋桁移動制限装置
222 埋設型枠
223 鋼角ストッパー
301、302 橋台
303、304 橋脚
305 橋桁
401 支承
H1 鉄筋挿通孔
H2 ハンドホール
H3 鉄筋挿通孔
V1、V2 箱抜き凹部
[0001]
BACKGROUND OF THE INVENTION
  The present invention relates to a bridge girder movement restriction device that is provided between a bridge girder and a support structure and restricts the movement of the bridge girder, and a bridge girder movement restriction method that restricts the movement of the bridge girder using this device.
[0002]
[Prior art]
  Conventionally, as shown in FIG. 8A, the bridge girder 305 is provided between the bridge girder 305 and supporting structures such as the abutments 301 and 302 and the bridge piers 303 and 304 that support the bridge girder 305, and restricts the movement of the bridge girder 305. As the devices 201, 202, 203, and 204, what are called bridge girder stoppers are known. As this bridge girder stopper, a steel bar stopper, a steel square stopper, a damper type stopper, or the like is used depending on conditions. Among these bridge girder stoppers, steel angle stoppers are used for medium-sized or larger bridges (see, for example, Patent Document 1).
[0003]
  As shown in FIG. 8B, this steel corner stopper has, for example, an embedded form 222 made of steel plate or the like installed on a pier 303, and after the concrete is placed on the pier 303, the interior of the embedded form 222 is It should be a box-shaped recess. Next, a steel corner stopper 223 formed by combining steel plates into a quadrangular prism shape is installed in the recess. Thereafter, the bridge girder 305 is constructed so that the steel angle stopper 223 is embedded in the bridge girder 305.
[0004]
[Patent Document 1]
          JP 2002-167711 A (page 1-6, FIG. 6)
[0005]
[Problems to be solved by the invention]
  However, in the above conventional steel angle stopper, etc., the current seismic design considering the force acting at the time of a large-scale earthquake, the shape becomes large, the construction becomes difficult, and the production cost of the steel angle stopper, There was a problem that the construction cost of the installation was high.
[0006]
  The present invention has been made to solve the above problems, and the problem to be solved by the present invention is to provide a bridge girder movement restriction device and a bridge girder movement restriction method that are low in cost and have sufficient seismic performance. It is to provide.
[0007]
[Means for Solving the Problems]
  In order to solve the above problems, the present inventionClaim 1Bridge girder movement restriction device related to
  A device that is provided between a bridge girder and a support structure that supports the bridge girder and restricts movement of the bridge girder,
  A plurality of linear members arranged in parallel so that the planar arrangement state is substantially circular or substantially polygonal, and the longitudinal direction is vertically up and down;
  A winding member wound spirally along the outer periphery or inner periphery of the region formed by the plurality of linear members;
  The lower ends of the plurality of linear members are fixed to the upper portion of the support structure, and the upper ends of the plurality of linear members are attached directly to the lower portion of the bridge girder or indirectly via an interposed member,
  The lower end of the winding member is fixed to the upper part of the support structure, and the upper end of the winding member is fixed to the lower part of the bridge girder.
  It is characterized by.
[0008]
  The bridge girder movement restriction device according to claim 2 of the present invention is
In the bridge girder movement restriction device according to claim 1,
  The winding member is
Of the region formed by the plurality of linear membersInsideSpirally wound around the circumferenceInsideSide winding partMaterialHaving
  It is characterized by.
[0009]
  Also,Bridge girder movement restriction device according to claim 3 of the present invention,
In the bridge girder movement restriction device according to claim 1,
  A bag-like member is disposed inside the plurality of linear members, and a self-hardening filler is filled in the bag-like member.about
Characterized by.
[0010]
  Also,Bridge girder movement restriction device according to claim 4 of the present invention,
In the bridge girder movement restriction device according to claim 3,
  Concrete, mortar, or resin material is used for the filler.about
Characterized by.
[0011]
  Also,Bridge girder movement restriction device according to claim 5 of the present invention,
In the bridge girder movement restriction device according to claim 1,
  After assembling the plurality of linear members and the winding member, concrete of the support structure is placed.about
Characterized by.
[0012]
  Also,The bridge girder movement restriction device according to claim 6 of the present invention is
In the bridge girder movement restriction device according to claim 1,
  A box opening recess for accommodating the plurality of linear members and the winding member is formed in the bridge girder in advance, and the plurality of linear members and the winding member are installed after the bridge girder is installed.about
Characterized by.
[0013]
  Also,Bridge girder movement restriction device according to claim 7 of the present invention,
In the bridge girder movement restriction device according to claim 1,
  The linear member is formed of a reinforcing bar or a PC steel material.about
Characterized by.
[0014]
  Also,Bridge girder movement restriction device according to claim 8 of the present invention,
In the bridge girder movement restriction device according to claim 1,
  The winding member is formed of a reinforcing bar or a PC steel material.about
Characterized by.
[0015]
  Also,Bridge girder movement restriction device according to claim 9 of the present invention,
In the bridge girder movement restriction device according to claim 1,
  For the winding member, a glass fiber, a metal fiber, a carbon fiber, a synthetic fiber, a fiber made of a ceramic composite material, or a wire rod reinforced by an appropriate combination thereof, a rod-shaped member, or a string shape Material is usedabout
Characterized by.
[0016]
  Also,Bridge girder movement restriction device according to claim 10 of the present invention,
In the bridge girder movement restriction device according to claim 1,
  As for the said linear member or the said winding member, a rust prevention layer is previously formed in the surfaceabout
Characterized by.
[0017]
  Also,Bridge girder movement restriction device according to claim 11 of the present invention,
In the bridge girder movement restriction device according to claim 10,
  The rust preventive layer is formed by hot dip galvanizing, synthetic resin coating, or painting.about
Characterized by.
[0018]
  Also,A bridge girder movement restriction device according to claim 12 of the present invention is provided.
In the bridge girder movement restriction device according to claim 1,
  An adhesion blocking means for cutting adhesion between the linear member and the support structure or the vicinity of the surface of the bridge girder is provided.about
Characterized by.
[0019]
  Also,Bridge girder movement restriction device according to claim 13 of the present invention,
In the bridge girder movement restriction device according to claim 12,
  The adhesion blocking means is a sheath pipe arranged so as to surround the support member or the linear member at a position near the surface of the bridge girder with a gap therebetween.about
Characterized by.
[0020]
  Also,A bridge girder movement restriction device according to claim 14 of the present invention is provided.
In the bridge girder movement restriction device according to claim 13,
  A gap between the sheath member and the linear member is filled with a lubricant.about
Characterized by.
[0021]
  Also,Bridge girder movement restriction device according to claim 15 of the present invention,
In the bridge girder movement restriction device according to claim 1,
  The plurality of linear members exposed to the outside between the bridge girder and the support structure are formed to have a substantially barrel shape that swells outward.about
Characterized by.
[0022]
  Also,A bridge girder movement restriction device according to claim 16 of the present invention is provided.
In the bridge girder movement restriction device according to claim 1,
  An anchor member is provided at a fixing portion between the linear member and the support structure or the bridge girder, and the linear member is fixed to the anchor member.about
Characterized by.
[0023]
  Also,Bridge girder movement restriction device according to claim 17 of the present invention,
In the bridge girder movement restriction device according to claim 1,
  A settlement absorbing means for absorbing settlement of the support structure is provided at a fixing portion between the linear member and the bridge girder.about
Characterized by.
[0024]
  Also,A bridge girder movement restriction device according to claim 18 of the present invention is
The bridge girder movement restriction device according to claim 17,
  The sinking absorption means includes
  An anchor member provided at a fixing portion with the bridge girder,
  A sheath tube that is arranged so as to surround the linear member in the vicinity of the fixing portion of the bridge girder with a gap and is attached to the anchor member;
  A locking member attached to the linear member inside the sheath tube and locked by the anchor memberabout
Characterized by.
[0025]
  In addition, the present inventionClaim 19The bridge girder movement restriction method related to
  A method of restricting the movement of the bridge girder between a bridge girder and a support structure that supports the bridge girder,
  A plurality of linear members are arranged side by side so that the planar arrangement state is substantially circular or substantially polygonal, and the longitudinal direction is vertically vertical,
  The outer periphery of the region formed by the plurality of linear membersThe outer winding member is spirally wound along the winding member andAnd
  Fixing the lower ends of the plurality of linear members to the upper portion of the support structure, and attaching the upper ends of the plurality of linear members directly to the lower portion of the bridge girder or indirectly through interposition members,
  Fixing the lower end of the winding member to the upper part of the support structure and fixing the upper end of the winding member to the lower part of the bridge beam
  It is characterized by.
[0026]
  Moreover, the bridge girder movement restriction method according to claim 20 of the present invention includes:
The bridge girder movement restriction method according to claim 19,
As the winding member, the inner winding member is further spirally wound along the inner periphery of the region formed by the plurality of linear members.
It is characterized by.
[0027]
DETAILED DESCRIPTION OF THE INVENTION
  Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.
[0028]
(1) First embodiment
  First, the bridge girder movement restriction device according to the first embodiment of the present invention will be described. FIG. 1 is a side sectional view showing an overall configuration of a bridge girder movement restriction device according to a first embodiment of the present invention.
[0029]
  As shown in FIG. 1, the bridge girder movement restricting device 11 according to the first embodiment of the present invention is provided between a bridge girder 82 and a bridge pier 81 that is a support structure. The upper end of the bridge girder movement restriction device 11 is fixed to the upper part of the bridge 81 and attached to the lower part of the bridge girder 82.
[0030]
  Next, a more detailed configuration of the bridge girder movement restricting device 11 according to the first embodiment of the present invention will be described with reference to FIG. FIG. 2 is a perspective view of the bridge girder movement restriction device 11.
[0031]
  As shown in FIG. 2, the bridge girder movement restriction device 11 according to the first embodiment includes a plurality of reinforcing bars 21, an outer winding member 22, an inner winding member 23, and a filler 24. .
[0032]
  Among these components, the plurality of reinforcing bars 21 are arranged such that the longitudinal direction thereof is the vertical vertical direction. The plurality of reinforcing bars 21 are arranged side by side so that the planar arrangement state is substantially circular. Therefore, the plurality of reinforcing bars 21 form a substantially cylindrical region.
[0033]
  As the above-mentioned plurality of reinforcing bars 21, round bar-shaped reinforcing bars (hot rolled steel bars) defined in JIS G 3112, deformed reinforcing bars (hot rolled deformed steel bars), recycled deformed steel bars defined in JIS G 3117, etc. can be used. is there. Moreover, SD345, SD390, SD490, SD590, SD685, etc. can be used as “high-strength reinforcing bars” that have been provided recently.
[0034]
  The outer winding member 22 is spirally wound around the periphery of a cylindrical region formed by the plurality of reinforcing bars 21 so as to surround the periphery. The outer winding member 22 can be manufactured by processing a reinforcing bar. In addition, the outer winding member 22 can use the above-described various reinforcing bars (round bar-shaped reinforcing bars, deformed reinforcing bars, high-strength reinforcing bars).
[0035]
  Further, as the outer winding member 22, a PC steel rod defined in JIS G 3109 and JIS G 3137 can be used. Further, as the outer winding member 22, a PC steel wire defined by JIS G 3502 and JIS G 3536, and a PC steel strand can be used. Hereinafter, the above-mentioned PC steel bar, PC steel wire, and PC steel strand are referred to as “PC steel”.
[0036]
  Moreover, as the outer side winding member 22, a wire rod reinforced with glass fiber, a rod-like member, a string-like member, or the like can be used. Moreover, as the outer side winding member 22, a wire rod reinforced with a metal fiber, a rod-like member, a string-like member, or the like can be used. As the metal used for the metal fiber, steel, stainless steel, tungsten (W), molybdenum (Mo), or the like is used. As the outer winding member 22, a wire reinforced with carbon fiber, a rod-shaped member, a string-shaped member, or the like can be used.
[0037]
  As the outer winding member 22, a wire reinforced with a fiber made of synthetic resin (hereinafter referred to as “synthetic fiber”), a rod-shaped member, a string-shaped member, or the like can be used. Synthetic fibers in this case include aramid fibers (aromatic polyamide fibers, so-called Kevlar fibers), polyester fibers, polypropylene fibers, polyethylene fibers, cellulose fibers (cellulose acetate fibers, etc.), vinylon fibers (polyvinyl alcohol fibers), polyamides. Fibers (so-called nylon fibers), acrylonitrile fibers, blended yarns of aromatic polyetherimide fibers and polyvinyl alcohol fibers can be used.
[0038]
  Further, as the outer winding member 22, a wire rod reinforced with a fiber made of a ceramic composite material (hereinafter referred to as “ceramic composite fiber”), a rod-like member, a string-like member, or the like can be used. . Boron fibers can be used as the fibers made of this composite material. Boron fibers are obtained by depositing boron (boron: B) on the surface of tungsten fibers or carbon fibers by vapor deposition or the like. In addition, as the ceramic composite material fiber, a borastic fiber can also be used. Borustic fiber is made of silicon carbide (SiC: silicon carbide), boron carbide (boron carbide: B) on the surface of boron fiber.FourC) or the like is deposited by vapor deposition or the like.
[0039]
  In a place where the outer winding member 22 and the reinforcing bar 21 are in contact with each other or close to each other, the two may be bound by a soft iron wire, or both may be joined by welding, bonding with an adhesive, or the like. Further, the outer winding member 22 and the reinforcing bar 21 may be bound, welded, bonded, or the like only in the vicinity of the upper end portion and the lower end portion in the same manner as described above.
[0040]
  The inner winding member 23 is spirally wound along the inner periphery of a cylindrical region formed by the plurality of reinforcing bars 21. As the inner winding member 23, a member made of the same material as the outer winding member 22 described above can be used.
[0041]
  Where the inner winding member 23 and the reinforcing bar 21 are in contact with each other or close to each other, they may be bound together by a soft iron wire, or may be joined by welding, bonding with an adhesive, or the like. Further, the inner winding member 23 and the reinforcing bar 21 may be bound, welded, bonded, or the like only in the vicinity of the upper end portion and the lower end portion in the same manner as described above.
[0042]
  The inner winding member 23 is filled with a filler 24. As the filler 24, a material that is initially in a fluid form and has a property of hardening over time (hereinafter referred to as "self-hardening") is used, such as a concrete material, a mortar material, or a resin material. Is possible.
[0043]
  As the concrete-based material as the filler 24, a material obtained by mixing and kneading cement, water, coarse aggregate and fine aggregate (hereinafter referred to as “cement concrete”) can be used. As cement, ordinary Portland cement, early strong Portland cement, super early strong Portland cement, medium heat Portland cement, sulfate resistant Portland cement, blast furnace cement, fly ash cement, silica cement, super fast cement, alumina cement, expanded cement, Colloidal cement or the like can be used. As coarse aggregate and fine aggregate, natural aggregate sand or gravel, artificial aggregate crushed sand, crushed stone, blast furnace slag crushed stone, blast furnace slag crushed sand, artificial lightweight aggregate and the like can be used. In addition to the raw materials described above, an admixture or an admixture can be added to the concrete material. As the admixture, slag, fly ash, pozzolana, silica fume, volcanic ash, CSA (calcium sulfoaluminate) -based expansion material, lime-based expansion material, aluminum-based expansion material, iron powder-based expansion material, etc. can be used. . Admixtures include AE agent, water reducing agent, AE water reducing agent, high performance water reducing agent, fluidizing agent, setting modifier, thickener, water retention agent, retarder, super retarder, shrinkage reducing agent, cryogenic agent. , Quick setting agents, foaming agents, waterproofing agents, reinforced anticorrosive agents, etc. can be used.
[0044]
  Further, as the concrete material as the filler 24, fiber reinforced concrete (FRC) can also be used. The fiber reinforced concrete is made by dispersing fibers having a diameter of about 0.01 to 2 millimeters and a length of about 0.1 to 10 centimeters in the above-described concrete so as to face in a random direction. The strength is increased. As fibers used for FRC, glass fibers, metal fibers, carbon fibers, synthetic fibers, ceramic composite material fibers, and the like can be used.
[0045]
  In addition, as the concrete system charge as the filler 24, a concrete-polymer composite can be used. As the concrete-polymer composite, polymer-cement concrete (PCC) can be used. Polymer cement concrete (PCC) is obtained by combining the above-described cement and the following polymer with a coarse aggregate and a fine aggregate as described above. Examples of the polymer used in this case are styrene butadiene rubber (SBR), latex, ethylene vinyl acetate (EVA), polyacrylic ester (PAE) emulsion, and the like, which are standardized in JIS A 6203.
[0046]
  Further, as the concrete-polymer composite, polymer concrete (PC) in which coarse aggregate and fine aggregate are combined using a polymer can be used. This is also called resin concrete. Polymer concrete is polymerized, using liquid resin such as unsaturated polyester resin, epoxy resin, furan resin, polyurethane, methyl methacrylate, etc., adding filler such as calcium carbonate, silica, sand, gravel, quarrying, silica sand It is produced by kneading aggregates such as.
[0047]
  Further, as the concrete-polymer composite, polymer-impregnated concrete (PIC) can also be used. Polymer impregnated concrete uses a porous inorganic material such as hardened cement concrete as a base material (impregnated material), impregnated with an impregnating material composed of monomer, prepolymer, polymer, etc. Through operation, the base material and the polymer are integrated. As the impregnating material used in this case, a crosslinking agent, a catalyst, or the like is added to a vinyl monomer such as methyl methacrylate or styrene. As the substrate, existing hardened concrete, cement concrete molded product, ferrocement molded product, gypsum product and the like can be used.
[0048]
  As the mortar material as the filler 24, a material obtained by mixing and kneading cement, water and fine aggregate (hereinafter referred to as “cement mortar”) can be used. As cement, the thing similar to what was demonstrated by said cement concrete can be used. Moreover, as a fine aggregate, the thing similar to what was demonstrated by said cement concrete can be used. In addition to the raw materials described above, an admixture or an admixture can be added to the mortar material. As the admixture or the admixture, the same materials as those described for the cement concrete can be used.
[0049]
  As the mortar material as the filler 24, fiber reinforced mortar (FRM) reinforced with fibers can be used as well as fiber reinforced concrete (FRC). As the fiber used in this case, the same fibers as those described in the above FRC can be used.
[0050]
  Further, as the mortar system material as the filler 24, a mortar-polymer composite can be used. As the mortar-polymer composite, polymer cement mortar (PCM) can be used. The polymer cement mortar (PCM) is obtained by bonding the above-described cement and a fine aggregate as described above using a polymer. As the polymer used in this case, the same polymers as those described for the polymer cement concrete PCC can be used.
[0051]
  As the mortar-polymer composite, polymer mortar (PM) in which fine aggregates are bonded using a polymer can also be used. Polymer mortar is the same as that described for polymer concrete PC above, and fillers such as calcium carbonate and silica are added, and aggregates such as sand, gravel, quarrying and silica sand are mixed. Is generated.
[0052]
  In addition, as the mortar-polymer composite, polymer-impregnated mortar (PIM) can be used. Polymer impregnated mortar uses porous inorganic material such as hardened cement mortar as a base material (impregnated material), impregnated with impregnating material composed of monomer, prepolymer, polymer, etc. Through operation, the base material and the polymer are integrated. As the impregnating material used in this case, the same materials as those described for the polymer-impregnated concrete PIC can be used. Further, as the base material, existing mortar after curing, mortar molded product, ferrocement molded product, gypsum product and the like can be used.
[0053]
  As the resin material as the filler 24, epoxy resin, acrylic resin, urethane resin, polyester resin, phenol resin, melamine resin, polyimide resin, or the like can be used.
[0054]
  In addition, when the pier 81 (see FIG. 1) is a concrete structure, the lower ends of the plurality of reinforcing bars 21, the outer winding member 22, and the inner winding member 23 are made of concrete (location P1 in FIG. It is fixed by embedding in (see). In this case, when assembling the reinforcing bars of the bridge pier 81, the vertical reinforcing bars 21, the outer winding member 22, and the inner winding member 23 of the bridge girder movement restriction device 11 are also assembled. Thereafter, by placing concrete on the pier 81, the lower ends of the plurality of reinforcing bars 21, the outer winding member 22, and the inner winding member 23 are embedded in the concrete above the pier 81.
[0055]
  After that, the upper ends of the plurality of reinforcing bars 21, the outer winding member 22 and the inner winding member 23 are when the bridge girder 82 (see FIG. 1) has a concrete structure, and when the bridge girder 82 is constructed with cast-in-place concrete. Is embedded and fixed in the concrete below the bridge girder 82 (see the point P4 in FIG. 1) when the concrete of the bridge girder 82 is placed.
[0056]
  Alternatively, in the case where the bridge girder 82 (see FIG. 1) is a concrete structure, the bridge girder block (not shown) that forms the whole bridge girder 82 or a part of the bridge girder 82 is manufactured in advance at a place other than the installation position, and then In the case of a construction method (prefab construction method) that is transported or moved to the bridge girder installation location (prefab method), when the bridge girder 82 or the bridge girder block is manufactured, a box-shaped recess (location in FIG. 1) (See V1, hereinafter referred to as “box-opening recess”). This boxing recess V1 is formed by placing the formwork that is recessed in a box shape toward the inside of the concrete, and then placing the entire bridge girder 82 or the concrete of the bridge girder block.
[0057]
  As described above, after the bridge girder 82 or the bridge girder block having the boxed recess V1 formed in the lower part is manufactured, the bridge girder movement restriction device 11 (see FIG. 1) installed on the upper part of the bridge pier 81 (see FIG. 1). The bridge girder 82 or the bridge girder block is installed so that the upper ends of the plurality of reinforcing bars 21, the outer winding member 22 and the inner winding member 23 are accommodated in the box opening recess V1 at the bottom of the bridge girder 82 or the bridge girder block. To do.
[0058]
  After that, a mold is installed in the lower part of the box-opening recess V1 (see locations P2 and P3 in FIG. 1), and the inside-filled concrete is placed inside the box-opening recess V1 (see location P4 in FIG. 1). . Thereby, the upper ends of the plurality of reinforcing bars 21, the outer winding member 22, and the inner winding member 23 of the bridge girder movement restriction device 11 are embedded and fixed in the filling concrete at the lower part of the bridge girder 82 or the bridge girder block.
[0059]
  Drawing 3 is a figure explaining the construction method of the bridge girder movement restricting device which is the 1st embodiment of the present invention. In addition, illustration of the inner side winding member 23 is abbreviate | omitted in FIG. 3 (A) and FIG. 3 (B). As shown in FIG. 3A, a bag-like member 25 is disposed inside the plurality of reinforcing bars 21. The bag-like member 25 is made of a thin sheet of a synthetic resin material having flexibility, has an injection port (not shown) for injecting the filler 24, and other portions are closed and filled. The material 24 is configured not to leak.
[0060]
  Next, as shown in FIG. 3B, a filler 24 is filled from an inlet (not shown). Thereby, the bag-like member 25 is expanded and pressed against the reinforcing bar 21. Although not shown, the inner winding member 23 is also pressed against the reinforcing bar 21 as the bag-like member 25 expands. In this state, the filler 24 is cured by elapse of a predetermined time.
[0061]
  With the configuration as described above, the bridge girder movement restriction device 11 of the first embodiment has the following operations and effects.
[0062]
  1) In FIG. 1, when the bridge girder 82 tries to move in the horizontal direction D1 or D2 due to an action such as an earthquake, a tensile force acts on the plurality of reinforcing bars 21 arranged in the vertical vertical direction. In general, reinforcing bars have a high elongation capacity after yielding. For this reason, even when a large seismic force or the like is applied, when the reinforcing bar 21 yields and deforms by extension, the hysteretic absorption energy of the reinforcing bar can be used, and it functions as a damper that absorbs energy such as an earthquake. There is an advantage that can be fulfilled. In addition, the bridge girder movement restriction device 11 uses the rebar 21 as one of the main components, and has the advantage that production costs and construction costs can be greatly reduced compared to conventional steel angle stoppers and the like. Have.
[0063]
  2) Since the outer winding member 22 and the inner winding member 23 are arranged so as to be substantially spiral with respect to the vertical reinforcing bar 21, buckling deformation of the reinforcing bar 21 can be prevented. There are advantages.
[0064]
  3) There is an advantage that the inner winding member 23 is pressed against the vertical reinforcing bar 21 by the expanded and hardened filler 24, and the inner winding member 23 assists in exerting a reinforcing function of the reinforcing bar. Alternatively, there is also an advantage that the vertical reinforcing bar 21 is pressed against the outer winding member 22 by the expanded and hardened filler 24, and the outer winding member 22 assists in exerting a reinforcing function of the reinforcing bar.
[0065]
  4) The bridge girder movement restriction device 11 has a small overall rigidity. For this reason, when the bridge girder 82 in FIG. 1 expands and contracts due to a temperature change, the bridge girder 82 tries to move in the horizontal direction D1 or D2 in FIG. 1. At this time, the bridge girder movement restriction device 11 restrains the movement of the bridge girder 82. There is an advantage that excessive force does not act on the concrete or the like at the joint portion of the bridge pier 81 or the bridge girder 82 and the bridge girder movement restriction device 11.
[0066]
  In addition, a portion of the vertical rebar 21 that is not buried inside the pier concrete or bridge girder but exposed to the outside is formed with a rust prevention layer on the surface in advance so as to prevent corrosion. May be. The rust prevention layer may be formed by hot dip galvanizing the surface of the reinforcing bar 21. Further, the antirust layer may be formed by coating the surface of the reinforcing bar 21 with a synthetic resin to form a thin film of the synthetic resin on the surface of the reinforcing bar 21. Further, the rust prevention layer may be formed by painting the surface of the reinforcing bar 21. When the outer winding member 22 and the inner winding member 23 are also formed of a corrosive material such as a reinforcing bar, it is preferable to form a rust prevention layer similar to the above.
[0067]
(2) Second embodiment
  The present invention can also be realized by configurations other than the first embodiment described above. Next, a bridge girder movement restriction device according to a second embodiment of the present invention will be described. FIG. 4 is a diagram for explaining the configuration of a bridge girder movement restriction device according to the second embodiment of the present invention. FIG. 4A is a pier 81A in the bridge girder movement restriction device 12 according to the second embodiment of the present invention. FIG. 4B is a cross-sectional view showing the configuration of the fixing portion of the vertical rebar 21A on the side, and FIG. Cross-sectional views showing the configuration of the fixing unit are shown. In FIGS. 4A and 4B, illustration of the outer winding member and the inner winding member is omitted.
[0068]
  As shown in FIG. 4 (A), in the bridge girder movement restriction device 12 according to the second embodiment of the present invention, the interior of the plurality of reinforcing bars 21A arranged in the vertical direction near the top surface of the concrete of the pier 81A. The sheath tube 27 is arranged at a position where The sheath tube 27 is made from a steel tube or the like. The diameter (inner diameter) of the inner cavity of the sheath tube 27 is set to a value slightly larger than the outer diameter of the reinforcing bar 21A. Therefore, the sheath tube 27 surrounds this portion of the reinforcing bar 21A with a certain gap therebetween.
[0069]
  Further, the gap between the inside of the sheath tube 27 and the reinforcing bar 21A is filled with a lubricant 28. As the lubricant 28, grease or the like is used. The bridge girder movement restriction device 12 of the second embodiment is the same as that of the above-described first embodiment with respect to the configuration other than the sheath tube 27 and the lubricant 28 and the material of the reinforcing bar, the winding member, or the filler. .
[0070]
  In order to configure as described above, the reinforcing bar 21A is inserted into the internal cavity of the sheath tube 27 filled with the lubricant 28 in advance. Next, when assembling the reinforcing bars of the bridge pier 81A, the vertical reinforcing bar 21A, the outer winding member (not shown) and the inner winding member (not shown) of the bridge girder movement restriction device 12 are also assembled. Thereafter, concrete for the pier 81A is placed.
[0071]
  Thereby, as shown to FIG. 4 (A), the lower end part (range of Z1 in FIG. 4 (A)) of the vertical direction reinforcement 21A is directly embed | buried under the concrete of the upper part of 81 A of bridge piers. Therefore, the lower end of the vertical reinforcing bar 21A (the range of Z1 in FIG. 4A) is fixed to the concrete, and the surface of the reinforcing bar and the concrete in this range Z1 are in an attached state.
[0072]
  On the other hand, in the range of Z2 above the lower end Z1 of the vertical reinforcing bar 21A, the lubricant 28 and the sheath tube 27 are mounted around the vertical reinforcing bar 21A. For this reason, in the range of Z2 of the vertical direction reinforcing bar 21A, the adhesion between the reinforcing bar surface and the concrete is cut off.
[0073]
  When the vertical reinforcing bar 21A is constructed, although not shown, the lower ends of the outer winding member and the inner winding member are similarly embedded in the concrete above the pier 81A.
[0074]
  With the configuration as described above, the bridge girder movement restriction device 12 of the second embodiment has the following operations and effects.
[0075]
  5) In the fixing portion of the vertical reinforcing bar 21 on the pier 81 side of the bridge girder movement restricting device 11 of the first embodiment, the lower end portion of the vertical reinforcing bar 21 is the bottom of the pier 81 as shown in FIG. It is buried directly inside the upper concrete. Therefore, the concrete burying part of the vertical reinforcing bar 21 is fixed to the concrete, and the reinforcing bar surface and the concrete in this range are in an attached state. Therefore, in FIG. 4B, when the reinforcing bar 21 is pulled in the direction indicated by D3, stress is transmitted to the concrete around the reinforcing bar due to adhesion between the reinforcing bar and the concrete, and the conical surface indicated by S1 in FIG. 4B. In some cases, the concrete breaks (hereinafter referred to as “shear fracture”). Alternatively, even if shear failure does not occur, “cracking” may occur in the concrete. Such destruction and cracking are not preferable because they damage the concrete itself and cause corrosion of the internal reinforcing bars. However, in the case of the bridge girder movement restricting device 12 of the first embodiment of the second embodiment, the rebar 21A at the position near the surface of the pier concrete (range Z2) is surrounded by the sheath tube 27 and the lubricant 28. The adhesion to the concrete is cut or insulated. Thereby, in the case of the bridge girder movement restricting device 12 of the second embodiment, there is an advantage that shear fracture and cracking of concrete can be prevented.
[0076]
  6) By using a water-repellent substance such as grease as a lubricant, rainwater or the like enters between the sheath tube 27 and the reinforcing bar 21A, and enters the reinforcing bar 21A (range Z1 and range Z2) inside the concrete of the pier 81A. It has the advantage that it can prevent rusting and corrosion.
[0077]
  It is also possible to attach a lid-like member to the upper end portion of the sheath tube 27, or to plug only the upper end portion of the sheath tube 27 and plug it. In such a configuration, the filler 28 may not be provided.
[0078]
  The above-described sheath tube 27 corresponds to the adhesion blocking means in the claims. Further, the adhesion blocking means may be provided not only on the support structure side such as the pier 81A but also on the bridge girder side. In the second embodiment, the pier 81A corresponds to the support structure in the claims.
[0079]
(3) Third embodiment
  The present invention can also be realized by configurations other than the first and second embodiments described above. Next, a bridge girder movement restriction device according to a third embodiment of the present invention will be described. FIG. 5 is a cross-sectional view showing a configuration of a bridge girder movement restriction device according to the third embodiment of the present invention. In FIG. 5, illustration of the outer winding member and the inner winding member is omitted.
[0080]
  As shown in FIG. 5, in the bridge girder movement restriction device 13 according to the third embodiment of the present invention, the plurality of reinforcing bars 21B arranged in the vertical direction are exposed to the outside between the bridge girder 82B and the pier 81B. The location (range Z3) is formed to have a substantially barrel shape that swells outward. The bridge girder movement restricting device 13 of the third embodiment is the same as that of the above-described first embodiment with respect to the configuration other than the shape of the range Z3 of the vertical reinforcing bar 21B and the material of the reinforcing bar, the winding member, or the filler. It is.
[0081]
  In order to configure as described above, a reinforcing bar 21B in which the vicinity of the center is bent into a curved shape is prepared in advance. Next, when assembling the reinforcing bars and the like of the bridge pier 81B, the vertical reinforcing bar 21B, the outer winding member (not shown), and the inner winding member (not shown) of the bridge girder movement restriction device 13 are also assembled. Thereafter, concrete for the pier 81B is placed. Furthermore, the bridge girder 82B is constructed by on-site construction or a prefabricated construction method using a box-shaped recess as described above.
[0082]
  Thereby, as shown in FIG. 5, the lower end part (the range of Z4 in FIG. 5) of the vertical rebar 21B is directly embedded in the concrete in the upper part of the pier 81B. Moreover, the upper end part (the range of Z5 in FIG. 5) of the vertical rebar 21B is directly embedded in the concrete below the bridge girder 82B. Further, the vicinity of the central portion of the vertical reinforcing bar 21B (range Z3 in FIG. 5) is exposed to the outside between the bridge pier 81B and the bridge girder 82B.
[0083]
  With the configuration as described above, the bridge girder movement restriction device 13 of the third embodiment has the following operations and effects.
[0084]
  7) When the bridge girder 82B expands and contracts due to temperature change, the bridge girder 82B tries to move in the horizontal direction D4 or D5 in FIG. At this time, if the exposed portion (range Z3) of the reinforcing bar is linear, a tensile force may act directly in the longitudinal direction of the reinforcing bar with the horizontal movement of the bridge girder, yielding and extending. However, as in the bridge girder movement restricting device 13 of the third embodiment, if the rebar of the exposed portion is made into a roughly barrel shape, even if the bridge girder 82B moves horizontally, the deformation in the horizontal direction causes the substantially barrel-like rebar portion to move. In order to absorb, there exists an advantage that the expansion | extension of the axial direction of the reinforcing bar 21B can be reduced compared with the linear case. In addition, this means that the movement of the bridge girder 82B in the horizontal direction D4 or D5 is rarely restricted, and an excessive force is applied to the concrete or the like at the junction between the bridge pier 81B or the bridge girder 82B and the bridge girder movement restriction device 13. It also has the advantage of not acting.
[0085]
  In the third embodiment described above, the pier 81B corresponds to the support structure in the claims.
[0086]
(4) Fourth embodiment
  The present invention can also be realized by configurations other than the first to third embodiments described above. Next, a bridge girder movement restriction device according to a fourth embodiment of the present invention will be described. FIG. 6 is a diagram for explaining the configuration and construction method of the bridge girder movement restriction device according to the fourth embodiment of the present invention. FIG. 6 (A) is a cross-sectional view of the vicinity of the pier, and FIG. FIG. 6C is a perspective view of the anchor plate, and FIG. 6D is a cross-sectional view of the state where the bridge girder movement restriction device is attached.
[0087]
  As shown in FIG. 5, in the bridge girder movement restriction device 14 according to the fourth embodiment of the present invention, an anchor plate 30 is provided at a fixing portion between the vertical reinforcing bar 21C and the bridge girder 82C, and the reinforcing bar 21C is provided on the anchor plate 30. Is fixed by a nut 31 or the like. The bridge girder movement restriction device 14 of the fourth embodiment is the same as that of the first embodiment described above, except for the fixing part of the bridge girder 82C, and the materials such as the reinforcing bars, the winding members, and the filler.
[0088]
  In order to configure as described above, a male screw portion (not shown) is formed in the vicinity of one end portion of the reinforcing bar 21C in advance. Moreover, as shown in FIG.6 (C), the anchor plate 30 in which the hole H1 for inserting the reinforcing bar 21C was formed with the steel plate etc. is produced.
[0089]
  Next, when assembling the reinforcing bar of the bridge pier 81C, the vertical reinforcing bar 21C, the outer winding member (not shown), and the inner winding member (not shown) of the bridge girder movement restriction device 14 are also assembled. It arrange | positions so that the external thread part may become the upper end of an exposed part. Thereafter, concrete for the pier 81C is placed.
[0090]
  Next, when assembling the reinforcing bars and the like of the bridge girder 82C, the anchor plate 30 is disposed at the lower part of the bridge girder, and the box-shaped recess V2 as described above is formed by the mold, and the anchor plate 30 is formed in the box-shaped recess V2. The concrete of the bridge girder 82C is cast so that the part of the reinforcing bar insertion hole H1 is exposed, and the whole or part of the bridge girder 82C is manufactured.
[0091]
  As described above, after the bridge girder 82C or the bridge girder block having the boxed recess V2 and the anchor plate 30 formed in the lower part is manufactured, the plurality of reinforcing bars 21C of the bridge girder movement restriction device 14 installed on the upper part of the bridge pier 81C The upper ends of the outer winding member (not shown) and the inner winding member (not shown) are inserted into the reinforcing bar insertion hole H1 of the anchor plate 30 in the box recess C2 at the lower part of the bridge girder 82C or the bridge girder block. In this way, the bridge girder 82C or the bridge girder block is installed.
[0092]
  Next, the reinforcing bar 21 </ b> C is fixed to the anchor plate 30 with a nut 31 having a female screw part that is screwed into the male screw part at the upper end of the reinforcing bar 21 </ b> C. At this time, in order to facilitate the attaching operation of the nut 31, a hand hole (for example, H <b> 2 shown in FIG. 6C) that is an opening may be provided near the center of the anchor plate 30.
[0093]
  Then, a mold is installed in the lower part of the box-opening recess V2 (see the point P5 in FIG. 6D), and the filling concrete 32 is placed inside the box-opening recess V2. Accordingly, the upper ends of the plurality of reinforcing bars 21C, the outer winding member (not shown), and the inner winding member (not shown) of the bridge girder movement restriction device 14 are placed in the inside concrete of the lower part of the bridge girder 82C or the bridge girder block. Embedded and fixed in.
[0094]
  With the configuration as described above, the bridge girder movement restricting device 14 of the fourth embodiment has the following operations and effects.
[0095]
  8) Compared with the type of fixing by adhesion between reinforcing bars and concrete, the length of reinforcing bars embedded in concrete (rebar fixing length) can be shortened, and the manufacturing cost of the bridge girder movement restriction device as a whole can be reduced. , Has the advantage of.
[0096]
  The anchor plate 30 described above corresponds to an anchor member in the claims. Further, the anchor plate 30 and the nut 31 constitute an interposition member in the claims. Further, the anchor member may be provided not only on the bridge girder 82C side but also on the pier side. In the fourth embodiment, the pier 81C corresponds to the support structure in the claims.
[0097]
(5) Fifth embodiment
  The present invention can also be realized by configurations other than the first to fourth embodiments described above. Next, a bridge girder movement restriction device according to a fifth embodiment of the present invention will be described. FIG. 7 is a diagram for explaining the configuration and operation of the bridge girder movement restriction device according to the fifth embodiment of the present invention.
[0098]
  As shown in FIG. 7, in the bridge girder movement restriction device 15 according to the fifth embodiment of the present invention, a structure including an anchor plate 30A, sheath tubes 33 and 34, and a nut 31A is formed. In this case, the anchor plate 30A is provided at a fixing portion with the bridge beam 82D. The sheath tube 33 is disposed so as to surround the reinforcing bar 21D in the vicinity of the fixing portion of the bridge beam 82D with a gap, and is attached to the upper portion of the anchor plate 30A. The sheath tube 34 is disposed so as to surround the reinforcing bar 21D in the vicinity of the fixing portion of the bridge beam 82D with a gap, and is attached to the lower portion of the anchor plate 30A. Further, the nut 31A is attached to the reinforcing bar 21D inside the sheath tube 33, and can be locked by the anchor plate 30A. The bridge girder movement restriction device 15 of the fifth embodiment is the same as that of the first embodiment described above, except for the fixing part of the bridge girder 82C, and the material of the reinforcing bar, the winding member, or the filler.
[0099]
  In order to configure as described above, a male screw portion (not shown) is formed in the vicinity of one end portion of the reinforcing bar 21D in advance. Moreover, the anchor plate 30A in which the hole H3 for inserting the reinforcing bar 21D is formed using a steel plate or the like. Further, a sheath tube 34 having both ends opened by a steel pipe or the like is manufactured, and a steel plate or the like is welded to one end of the steel tube or the like, so that a sheath tube 33 having one end opened and the other end closed is prepared. . Further, the sheath tube 34 is joined to the lower portion of the anchor plate 30A by welding or the like.
[0100]
  Next, when assembling the reinforcing bars of the bridge pier 81D, the vertical reinforcing bar 21D, the outer winding member (not shown), and the inner winding member (not shown) of the bridge girder movement restriction device 15 are also assembled. It arrange | positions so that the external thread part may become the upper end of an exposed part. Thereafter, concrete for the pier 81D is placed.
[0101]
  Next, when assembling the reinforcing bar of the bridge girder 82D, the anchor plate 30A is arranged at the lower part of the bridge girder, the upper end of the reinforcing bar 21D is inserted into the sheath tube 34, and further inserted into the reinforcing bar insertion hole H3. Next, a nut 31A having a female thread portion that is screwed into the male thread portion at the upper end of the reinforcing bar 21D is attached to an appropriate position on the upper portion of the reinforcing bar 21D. In this case, the outer diameter of the nut 31A is set to a value larger than the inner diameter of the reinforcing bar insertion hole H3.
[0102]
  At this time, the nut 31 </ b> A is fixed to the reinforcing bar 21 </ b> D by another nut or welding so that the nut 31 </ b> A does not move thereafter. In this state, the sheath tube 33 is covered so as to accommodate the upper end of the reinforcing bar 21D and the nut 31A, and the lower end of the sheath tube 33 is fixed to the anchor plate 30A by welding or mounting bolts.
[0103]
  In this state, the cast-in-place concrete is cast, and the concrete of the bridge girder 82D is cast so as to be in the state of FIG. 7, and the bridge girder 82D is entirely or partially constructed.
[0104]
  With the configuration as described above, the bridge girder movement restriction device 15 of the fifth embodiment has the following operations and effects.
[0105]
  9) Even when the pier 81D sinks unequally downward (in the direction of D6) in FIG. 7, if more than a certain degree (for example, δ in FIG. 7) occurs, the nut 31A is locked by the anchor plate 30A. Is done. Thereby, it has the advantage that the amount of subsidence of a support structure can be absorbed to some extent, and the bad influence to a bridge girder and a bridge pier can be suppressed.
[0106]
  The anchor plate 30A described above corresponds to an anchor member in the claims. Further, the nut 31A corresponds to the locking member in the claims. Further, the anchor plate 30A, the nut 31A, and the sheath pipes 33 and 34 constitute a sinking absorption means and an interposed member in the claims. In the fifth embodiment, the pier 81D corresponds to the support structure in the claims. Moreover, in each above-mentioned embodiment, the reinforcing bars 21, 21A, 21B, 21C, and 21D are equivalent to the linear member in a claim.
[0107]
  The present invention is not limited to the above embodiments. Each of the embodiments described above is an exemplification, and any configuration that has substantially the same configuration as the technical idea described in the claims of the present invention and has the same operational effects can be used. It is included in the technical scope of the present invention.
[0108]
  For example, in each of the above-described embodiments, the example in which the bridge girder is a concrete structure has been described. However, the present invention is not limited to this example, and the present invention is not limited to this example. -It can also be applied to bridge girder with concrete composite structure.
[0109]
  In addition to the piers 81 to 81D, the support structure may be an abutment (see 301 and 302 in FIG. 8A).
[0110]
  Further, as the linear member, in addition to the above-described reinforcing bars and high-strength reinforcing bars, PC steel materials such as the above-described PC steel bars, PC steel wires, and PC steel wires may be used.
[0111]
  Further, the winding member may have a structure in which only the outer winding member is arranged. Or the structure where only an inner side winding member is arrange | positioned may be sufficient.
[0112]
  Moreover, the arrangement | positioning location of a filler should just be the inside of a some linear member (for example, reinforcing bar 21 grade | etc.,). Further, the filler is not an essential component and may not be arranged.
[0113]
  Further, the planar arrangement state of the linear members (for example, the reinforcing bars 21 and the like) may be a substantially rectangular shape, or the planar arrangement state of the reinforcing bars may be a substantially polygonal shape of a pentagon or more.
[0114]
  The winding member is not limited to a substantially spiral shape with a gap between them. The winding members may be wound in a substantially spiral shape so that the winding members are in close contact with each other so as not to form a gap or slightly overlap each other.
[0115]
【The invention's effect】
  As described above, according to the present invention, a plurality of linear members arranged in parallel so that the planar arrangement state is substantially circular or substantially polygonal, and the longitudinal direction is the vertical vertical direction. And the outer periphery of the area formed by a plurality of linear membersAt least an outer winding member spirally wound alongA winding member is provided, and the lower ends of the plurality of linear members are fixed to the upper portion of the support structure, and the upper ends of the plurality of linear members are attached directly to the lower portion of the bridge girder or indirectly via the interposition member, Since the lower end of the winding member is fixed to the upper portion of the support structure and the upper end of the winding member is fixed to the lower portion of the bridge beam, the following advantages are obtained.
[0116]
  When a bridge girder tries to move in the horizontal direction due to an action such as an earthquake, a tensile force acts on a plurality of linear members arranged in the vertical vertical direction, but when linear members such as reinforcing bars are used Since the elongation capacity after yielding is high, even if a large seismic force or the like is applied, the linear member yields and deforms, so that the hysteresis energy absorption of the linear member can be used. It can serve as a damper that absorbs energy such as earthquakes. Moreover, the bridge girder movement restriction device of the present invention uses a linear member such as a reinforcing bar as one of the main components, and greatly reduces the manufacturing cost and the construction cost compared to a conventional steel angle stopper or the like. Can do.
[0117]
  Outer winding member so as to be substantially spiral with respect to the linear member in the vertical directionetcIf it arrange | positions, buckling deformation etc. of a linear member can be prevented.
[0118]
  If the inside of the linear member is filled with the filler, the expanded and cured filler assists the winding member in exerting the reinforcing function of the linear member.
[0119]
  The bridge girder movement restriction device has low rigidity as a whole, so when the bridge girder expands or contracts due to temperature change, the bridge girder tries to move in the horizontal direction. At this time, the bridge girder movement restriction device restricts the movement of the bridge girder. Therefore, an excessive force does not act on the support structure or the concrete at the junction between the bridge girder and the bridge girder movement restriction device.
[0120]
  If the bridge girder movement restriction device is provided with an adhesion blocking means for cutting off adhesion to the support structure or the vicinity of the surface of the bridge girder, it is possible to prevent shear fracture and cracking of the concrete.
[0121]
  By using a lubricant in addition to the adhesion blocking means, and using a water-repellent material such as grease as the lubricant, rainwater or the like enters and rusts and corrodes the linear members inside the concrete of the support structure. This can be prevented.
[0122]
  If a plurality of linear members exposed to the outside between the bridge girder and the support structure are formed so as to have a substantially barrel shape bulging outward, the bridge girder may expand and contract due to temperature changes. Even if it exists, since the part of a substantially barrel-shaped linear member absorbs the deformation | transformation of the horizontal direction of a bridge girder, compared with the case of a linear linear member, the elongation of the axial direction of a linear member can be reduced. . In addition, this means that the movement of the bridge girder in the horizontal direction is rarely restricted, and excessive force does not act on the support structure or the concrete at the junction between the bridge girder and the bridge girder movement restriction device. .
[0123]
  If an anchor member is provided in the fixing part between the linear member and the support structure or the bridge girder, and the linear member is fixed to the anchor member, the concrete is fixed compared to the type in which the linear member and the concrete are fixed by adhesion. The length (fixed length) of the linear member embedded therein can be shortened, and the manufacturing cost of the bridge girder movement restriction device as a whole can be reduced.
[0124]
  An anchor member provided at a fixing portion with a bridge girder, a sheath pipe arranged to surround and surround a linear member near the fixing portion of the bridge girder with a gap, and a linear member inside the sheath pipe If a sinking absorption means having a locking member attached to the anchor member is provided, even if the support structure sinks unequally downward, if a certain amount of sinking occurs, The stop member is locked by the anchor member. Thereby, the amount of settlement of the support structure can be absorbed to some extent, and adverse effects on the bridge girder and the support structure can be suppressed.
[Brief description of the drawings]
FIG. 1 is a side sectional view showing an overall configuration of a bridge girder movement restriction device according to a first embodiment of the present invention.
FIG. 2 is a perspective view showing a more detailed configuration of the bridge girder movement restriction device according to the first embodiment of the present invention.
FIG. 3 is a diagram illustrating a construction method of the bridge girder movement restriction device according to the first embodiment of the present invention.
FIG. 4 is a diagram illustrating a configuration of a bridge girder movement restriction device according to a second embodiment of the present invention.
FIG. 5 is a cross-sectional view showing a configuration of a bridge girder movement restriction device according to a third embodiment of the present invention.
FIG. 6 is a diagram illustrating a configuration and construction method of a bridge girder movement restriction device according to a fourth embodiment of the present invention.
FIG. 7 is a diagram illustrating the configuration and operation of a bridge girder movement restriction device according to a fifth embodiment of the present invention.
FIG. 8 is a diagram showing a configuration of an example of a conventional bridge girder movement restriction device.
[Explanation of symbols]
    11-15 Bridge girder movement restriction device
    21-21D Rebar
    22 Outer winding member
    23 Inner winding member
    24 Filler
    25 Bag-shaped member
    27 sheath tube
    28 Grease
    30, 30A Anchor plate
    31, 31A Nut
    32 Filled concrete
    33, 34 sheath tube
    81-81D Pier
    82-82D Bridge girder
  201-204 Bridge girder movement restriction device
  222 Embedded formwork
  223 steel angle stopper
  301, 302 Abutment
  303, 304 Pier
  305 Bridge girder
  401 Support
      H1 rebar insertion hole
      H2 hand hole
      H3 rebar insertion hole
      V1, V2 Box opening recess

Claims (20)

橋桁と前記橋桁を支持する支持構造物との間に設けられ、前記橋桁の移動を制限する装置であって、
平面配置状態が略円状又は略多角形状となるように並設されるとともに長手方向が鉛直上下方向となるように配置された複数の線状部材と、
前記複数の線状部材のなす領域の外周に沿って螺旋状に巻回された外側巻回部材を少なくとも有する巻回部材を備え、
前記複数の線状部材の下端は前記支持構造物の上部に固定されるとともに、前記複数の線状部材の上端は前記橋桁の下部に直接に又は介在部材を介して間接的に取り付けられ、
前記巻回部材の下端は前記支持構造物の上部に固定されるとともに、前記巻回部材の上端は前記橋桁の下部に固定されること
を特徴とする橋桁移動制限装置。
A device that is provided between a bridge girder and a support structure that supports the bridge girder and restricts movement of the bridge girder,
A plurality of linear members arranged in parallel so that the planar arrangement state is substantially circular or substantially polygonal, and the longitudinal direction is the vertical vertical direction; and
A winding member having at least an outer winding member wound spirally along an outer periphery of a region formed by the plurality of linear members;
The lower ends of the plurality of linear members are fixed to the upper portion of the support structure, and the upper ends of the plurality of linear members are attached directly to the lower portion of the bridge girder or indirectly via an interposed member,
The bridge girder movement restriction device, wherein a lower end of the winding member is fixed to an upper portion of the support structure, and an upper end of the winding member is fixed to a lower portion of the bridge girder.
請求項1記載の橋桁移動制限装置において、
前記巻回部材は、前記複数の線状部材のなす領域の周に沿って螺旋状に巻回される側巻回部材を有すること
を特徴とする橋桁移動制限装置。
In the bridge girder movement restriction device according to claim 1,
The winding member, the bridge girder movement limiting apparatus characterized by having the side winding member that is spirally wound along the inner periphery of eggplant region of the plurality of linear members.
請求項1記載の橋桁移動制限装置において、
前記複数の線状部材の内部に、袋状部材が配置され、前記袋状部材の内部に自硬性の充填材が充填されること
を特徴とする橋桁移動制限装置。
In the bridge girder movement restriction device according to claim 1,
A bridge girder movement restriction device, wherein a bag-like member is disposed inside the plurality of linear members, and a self-hardening filler is filled in the bag-like member.
請求項3記載の橋桁移動制限装置において、
前記充填材には、コンクリート系材料、又はモルタル系材料、若しくは樹脂材料が用いられること
を特徴とする橋桁移動制限装置。
In the bridge girder movement restriction device according to claim 3,
The bridge girder movement restriction device, wherein the filler is made of a concrete material, a mortar material, or a resin material.
請求項1記載の橋桁移動制限装置において、
前記複数の線状部材と前記巻回部材を組み立てた後に、前記支持構造物のコンクリートが打設されること
を特徴とする橋桁移動制限装置。
In the bridge girder movement restriction device according to claim 1,
After assembling the plurality of linear members and the winding member, concrete of the support structure is placed.
請求項1記載の橋桁移動制限装置において、
前記複数の線状部材と前記巻回部材を収容する箱抜き凹部を前記橋桁にあらかじめ形成しておき、前記橋桁の設置後に前記複数の線状部材と前記巻回部材を設置すること
を特徴とする橋桁移動制限装置。
In the bridge girder movement restriction device according to claim 1,
Box opening recesses for accommodating the plurality of linear members and the winding member are formed in the bridge girder in advance, and the plurality of linear members and the winding member are installed after the bridge girder is installed. Bridge girder movement restriction device.
請求項1記載の橋桁移動制限装置において、
前記線状部材は、鉄筋、又はPC鋼材により形成されること
を特徴とする橋桁移動制限装置。
In the bridge girder movement restriction device according to claim 1,
The linear member is formed of a reinforcing bar or a PC steel material.
請求項1記載の橋桁移動制限装置において、
前記巻回部材は、鉄筋、又はPC鋼材により形成されること
を特徴とする橋桁移動制限装置。
In the bridge girder movement restriction device according to claim 1,
The winding girder movement limiting device, wherein the winding member is formed of a reinforcing bar or a PC steel material.
請求項1記載の橋桁移動制限装置において、
前記巻回部材には、ガラス繊維、又は金属繊維、又は炭素繊維、又は合成繊維、又はセラミックス系複合材料からなる繊維、若しくはこれらの適宜の組み合わせにより補強された線材、又は棒状部材、若しくはヒモ状部材が用いられること
を特徴とする橋桁移動制限装置。
In the bridge girder movement restriction device according to claim 1,
For the winding member, a glass fiber, a metal fiber, a carbon fiber, a synthetic fiber, a fiber made of a ceramic composite material, a wire reinforced by an appropriate combination thereof, a rod-shaped member, or a string-like shape Bridge girder movement limiting device characterized in that members are used.
請求項1記載の橋桁移動制限装置において、
前記線状部材又は前記巻回部材は、表面にあらかじめ防錆層が形成されること
を特徴とする橋桁移動制限装置。
In the bridge girder movement restriction device according to claim 1,
The linear member or the winding member has a rust prevention layer formed on a surface in advance.
請求項10記載の橋桁移動制限装置において、
前記防錆層は、溶融亜鉛メッキ、又は合成樹脂コーティング、若しくは塗装により形成されること
を特徴とする橋桁移動制限装置。
In the bridge girder movement restriction device according to claim 10,
The rust prevention layer is formed by hot dip galvanization, synthetic resin coating, or painting.
請求項1記載の橋桁移動制限装置において、
前記線状部材と、前記支持構造物又は前記橋桁の表面付近との付着を切るための付着遮断手段が設けられること
を特徴とする橋桁移動制限装置。
In the bridge girder movement restriction device according to claim 1,
A bridge girder movement restricting device, characterized in that an adhesion blocking means for cutting adhesion between the linear member and the support structure or the vicinity of the surface of the bridge girder is provided.
請求項12記載の橋桁移動制限装置において、
前記付着遮断手段は、前記支持構造物又は前記橋桁の表面付近の位置の前記線状部材を間隙を配して包囲するように配置される鞘管であること
を特徴とする橋桁移動制限装置。
In the bridge girder movement restriction device according to claim 12,
The bridge girder movement limiting device, wherein the adhesion blocking means is a sheath pipe arranged to surround and surround the linear member at a position near the surface of the support structure or the bridge girder.
請求項13記載の橋桁移動制限装置において、
前記鞘管の内部の前記線状部材との間の間隙には、潤滑材が充填されること
を特徴とする橋桁移動制限装置。
In the bridge girder movement restriction device according to claim 13,
A bridge girder movement restriction device, wherein a gap between the sheath member and the linear member is filled with a lubricant.
請求項1記載の橋桁移動制限装置において、
前記橋桁と前記支持構造物との間で外部に露出する前記複数の線状部材は、外側に向かって膨満した略樽状となるように形成されること
を特徴とする橋桁移動制限装置。
In the bridge girder movement restriction device according to claim 1,
The bridge girder movement restriction device, wherein the plurality of linear members exposed to the outside between the bridge girder and the support structure are formed to have a substantially barrel shape bulging outward.
請求項1記載の橋桁移動制限装置において、
前記線状部材と、前記支持構造物又は前記橋桁との定着部に、アンカー部材を設け、前記アンカー部材に前記線状部材を固定すること
を特徴とする橋桁移動制限装置。
In the bridge girder movement restriction device according to claim 1,
An anchor member is provided in a fixing portion between the linear member and the support structure or the bridge girder, and the linear member is fixed to the anchor member.
請求項1記載の橋桁移動制限装置において、
前記線状部材と前記橋桁との定着部に、前記支持構造物の沈下を吸収する沈下吸収手段を設けること
を特徴とする橋桁移動制限装置。
In the bridge girder movement restriction device according to claim 1,
A bridge girder movement restricting device characterized in that a settlement absorbing means for absorbing settlement of the support structure is provided at a fixing portion between the linear member and the bridge girder.
請求項17記載の橋桁移動制限装置において、
前記沈下吸収手段は、
前記橋桁との定着部に設けられるアンカー部材と、
前記橋桁の定着部付近の前記線状部材を間隙を配して包囲するように配置され前記アンカー部材に取り付けられる鞘管と、
前記鞘管の内部の線状部材に取り付けられ前記アンカー部材により係止される係止部材を有すること
を特徴とする橋桁移動制限装置。
The bridge girder movement restriction device according to claim 17,
The sinking absorption means includes
An anchor member provided at a fixing portion with the bridge girder,
A sheath tube that is arranged so as to surround the linear member in the vicinity of the fixing portion of the bridge girder with a gap and is attached to the anchor member;
A bridge girder movement restricting device comprising: a locking member attached to a linear member inside the sheath tube and locked by the anchor member.
橋桁と前記橋桁を支持する支持構造物との間において前記橋桁の移動を制限する方法であって、
複数の線状部材を、平面配置状態が略円状又は略多角形状となるように並設するとともに長手方向が鉛直上下方向となるように配置し、
前記複数の線状部材のなす領域の外周に沿って外側巻回部材を螺旋状に巻回して巻回部材とし、
前記複数の線状部材の下端を前記支持構造物の上部に固定するとともに、前記複数の線状部材の上端を前記橋桁の下部に直接に又は介在部材を介して間接的に取り付け、
前記巻回部材の下端を前記支持構造物の上部に固定するとともに、前記巻回部材の上端を前記橋桁の下部に固定すること
を特徴とする橋桁移動制限方法。
A method of restricting the movement of the bridge girder between a bridge girder and a support structure that supports the bridge girder,
A plurality of linear members are arranged side by side so that the planar arrangement state is substantially circular or substantially polygonal, and the longitudinal direction is vertically vertical,
The outer winding member is spirally wound along the outer periphery of the region formed by the plurality of linear members to form a winding member ,
Fixing the lower ends of the plurality of linear members to the upper portion of the support structure, and attaching the upper ends of the plurality of linear members directly to the lower portion of the bridge girder or indirectly through interposition members,
A bridge girder movement restriction method characterized in that the lower end of the winding member is fixed to the upper part of the support structure, and the upper end of the winding member is fixed to the lower part of the bridge girder.
請求項19記載の橋桁移動制限方法において、The bridge girder movement restriction method according to claim 19,
前記巻回部材として、さらに前記複数の線状部材のなす領域の内周に沿って内側巻回部材を螺旋状に巻回すること  As the winding member, the inner winding member is further spirally wound along the inner periphery of the region formed by the plurality of linear members.
を特徴とする橋桁移動制限方法。  Bridge girder movement restriction method characterized by
JP2003034236A 2003-02-12 2003-02-12 Bridge girder movement restriction device and bridge girder movement restriction method Expired - Fee Related JP3717481B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003034236A JP3717481B2 (en) 2003-02-12 2003-02-12 Bridge girder movement restriction device and bridge girder movement restriction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003034236A JP3717481B2 (en) 2003-02-12 2003-02-12 Bridge girder movement restriction device and bridge girder movement restriction method

Publications (2)

Publication Number Publication Date
JP2004244868A JP2004244868A (en) 2004-09-02
JP3717481B2 true JP3717481B2 (en) 2005-11-16

Family

ID=33019986

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003034236A Expired - Fee Related JP3717481B2 (en) 2003-02-12 2003-02-12 Bridge girder movement restriction device and bridge girder movement restriction method

Country Status (1)

Country Link
JP (1) JP3717481B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007039992A (en) * 2005-08-03 2007-02-15 East Japan Railway Co Bridge girder movement restriction device and manufacturing method of bridge girder movement restriction device
JP4735585B2 (en) * 2007-03-29 2011-07-27 鹿島建設株式会社 Concrete rod-shaped damper structure
JP5484825B2 (en) * 2009-08-24 2014-05-07 鹿島建設株式会社 Damper structure

Also Published As

Publication number Publication date
JP2004244868A (en) 2004-09-02

Similar Documents

Publication Publication Date Title
KR101570484B1 (en) Half-PC Column using lightweight Encased Inner Form And Manufacturing Method Thereof, And Construction Method Using The Same
RU2541002C2 (en) Hybrid composite beam and beam system
CN110541354B (en) A single-segment prefabricated seismic bridge pier and its construction method
KR102000104B1 (en) UNDERWATER STRUCTURE AND METHOD USING INTEGRAL MOLD MODULE OF FIBER Reinforced Composites
JP3174028U (en) Seismic reinforcement structure for tunnels
WO2006018908A1 (en) Shearing force reinforcing structure and shearing force reinforcing member
CN105064613A (en) Built-in FRP local restraint concrete composite member
JP5279356B2 (en) Plastic hinge structure of concrete member and concrete member
CN111608415A (en) A reinforcement method of square steel tube concrete column based on high ductility cement-based material
US8096732B2 (en) Methods and apparatus for foundation system
CN211113140U (en) Equal cast-in-place assembly type hollow pier system
JP3717481B2 (en) Bridge girder movement restriction device and bridge girder movement restriction method
JP6860381B2 (en) Reinforcement method and structure of steel pipe pile using multiple fine crack type fiber reinforced cement composite material
JP5660524B2 (en) Lining method and structure using multiple fine cracked fiber reinforced cement composites
CN113585361B (en) Horizontal sliding support, anti-floating anchor rod and construction method
KR100743419B1 (en) Internally Reinforced Hollow Reinforced Concrete Columns
JP5922993B2 (en) Structure and lining method using multiple fine crack type fiber reinforced cement composites
JPH09256390A (en) Vibration-isolation pile foundation
KR20130076088A (en) Mechanical anchorage for reinfoece member made from fiber reinforced polymer
KR102053112B1 (en) Method of structure aseismic reinforcement using reinforcing Fibers
JP2007039992A (en) Bridge girder movement restriction device and manufacturing method of bridge girder movement restriction device
CN108301562A (en) Assembly concrete-filled steel tube column-isolated footing-concrete collar tie beam cross connecting node
JP3799053B1 (en) Floor slab structure and method for reinforcing steel slab
KR102583163B1 (en) Seismic reinforcing apparatus of masonry wall using UHPC
JPH09310344A (en) Prestressed-concrete earthquake-resisting and vibration-isolating pile

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20050413

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050510

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050711

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20050823

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20050830

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080909

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090909

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090909

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100909

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110909

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110909

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120909

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120909

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130909

Year of fee payment: 8

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees