Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP3728652B2 - How to build a base-isolated building - Google Patents
[go: Go Back, main page]

JP3728652B2 - How to build a base-isolated building - Google Patents

How to build a base-isolated building Download PDF

Info

Publication number
JP3728652B2
JP3728652B2 JP34260299A JP34260299A JP3728652B2 JP 3728652 B2 JP3728652 B2 JP 3728652B2 JP 34260299 A JP34260299 A JP 34260299A JP 34260299 A JP34260299 A JP 34260299A JP 3728652 B2 JP3728652 B2 JP 3728652B2
Authority
JP
Japan
Prior art keywords
seismic isolation
base
resin material
building
lower layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP34260299A
Other languages
Japanese (ja)
Other versions
JP2001159258A (en
Inventor
守 吉田
秀実 小林
英雄 内本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Corp
Original Assignee
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Corp filed Critical Shimizu Corp
Priority to JP34260299A priority Critical patent/JP3728652B2/en
Publication of JP2001159258A publication Critical patent/JP2001159258A/en
Application granted granted Critical
Publication of JP3728652B2 publication Critical patent/JP3728652B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、免震建物を構築するための方法に関するものである。
【0002】
【従来の技術】
周知のように、建物の基礎や下層部と上層部との間に免震装置を介装することにより免震層を形成し、この免震層により、上層部と地盤とを絶縁して、建物の振動応答の低減を図る免震建物が各種実現している。
このような免震建物は、建物の振動応答を大幅に低減することのできる優れた効果を有するために、その適用範囲も徐々に広がりつつあり、近年においては、地下階の免震化を図るために、建物の地下に免震装置を配置する例も見られるようになっている。
【0003】
ところで、上述のように、免震建物は、基礎または下層部上に免震層を介して上層部が支持された構成となっていることから、その構築にあたっては、基礎または下層部を先行して構築し、その後に、基礎または下層部上に免震装置を配置し、この免震装置上に上層部を構築する手法が採用されてきた。
【0004】
しかしながら、上記の手法においては、基礎または下層部を上層部に先行して構築し、順次、施工を行っていくことが必要であった。したがって、特に免震装置が地下階に配置される場合においては、地下に位置する躯体の工事を、免震装置より下方の部分と、免震装置より上方の部分とに分割して行わなければならず、一般の建物に比較して工期が長期化するとともに、施工コストも嵩むものとなっていた。
【0005】
そこで、免震層が地下にある場合でも、山留め等のコスト削減および工期の短縮化に効果的な逆打ち工法を適用して免震建物の構築を行うことが提案されている。
この場合、具体的な施工方法としては、例えば、以下のようなものが考えられている。すなわち、建物躯体の地上部を、基礎杭から構真柱により直接支持しつつ構築し、同時に、地下部を逆打ち工法で構築し、さらに、免震層では、下層部側から上層部を仮受けしつつ、免震層内に位置する構真柱を撤去し、しかる後に、上層部と下層部との間に免震装置を介装して免震層を形成するとともに、仮受け治具を撤去する。
【0006】
このような工法を採用した場合、地上部を構築しつつ、地下部および免震層を構築することができるため、工期を大幅に短縮することができる。また、従来、根切りを行うにあたって設けられていた切り梁等の支保工を削減することができるため、コストダウンを図ることができる。
【0007】
【発明が解決しようとする課題】
しかしながら、上述の工法においては、上層部が先行構築されるために、下層部側から上層部を仮受けする際に、上層部の荷重が非常に大きくなり、したがって、免震層において免震装置を後から設置する際仮受けのために使用する治具を大がかりなものとする必要があった。このような大がかりな仮受け治具は、コストアップ要因となるばかりでなく、上層部と下層部との間の狭い空間への設置性に問題があった。
さらに、上層部の荷重が非常に大きいために、仮受け時に発生する地震力の処理についても問題があった。
【0008】
本発明は、このような事情に鑑みてなされたものであり、特に、逆打ち工法を採用した建物の地下に免震層を構築する場合に、コストや地震力対応の面で有利な免震建物の構築方法を提供することを課題とする。
【0009】
【課題を解決するための手段】
上記課題を解決するために本発明においては以下の手段を採用した。
請求項1記載の免震建物の構築方法は、免震層を挟んで上下に位置する下層部および上層部を備えた免震建物の構築方法であって、
前記免震建物の設置対象位置の地盤中に、該免震建物を支持するための基礎構造を設け、
前記下層部を構成する柱を、前記基礎構造に連続させて設けるとともに、該柱を、その少なくとも上端が前記上層部にまで到達するように形成し、
前記下層部および上層部を、前記柱により支持させた状態に構築し、
前記下層部および上層部の少なくとも一方には、同他方に向けて突出する着座柱を、前記免震層の設置対象位置内に位置させた状態で設けておき、
前記着座柱と、前記下層部および前記上層部のうちの他方との間に、樹脂材を充填することにより、該樹脂材を介して、前記下層部側から前記上層部を支持し、
前記柱のうち、前記免震層内に位置する部分を撤去して、そこに、免震装置を介装し、しかる後に、前記樹脂材を撤去することを特徴としている。
【0010】
このような構成とされるために、この免震建物の構築方法においては、免震装置の積層ゴム等が劣化した際に上層部の荷重を下層部に受け替えるための着座柱を用いて、免震装置設置時における上層部の仮受けを行うことができ、従来と異なり、仮受け治具が不要となる。
【0011】
請求項2記載の免震建物の構築方法は、請求項1記載の免震建物の構築方法であって、
前記樹脂材を充填する際には、前記樹脂材の内部に電熱線を配置しておくことを特徴としている。
【0012】
この免震建物の構築方法においては、樹脂材を撤去する際に、電熱線に通電を行うことにより、樹脂材に熱塑性を発生させ、樹脂材を劣化させることができる。
【0013】
請求項3記載の免震建物の構築方法は、請求項1または2記載の免震建物の構築方法であって、
前記樹脂材として、超早強性エポキシ樹脂を用いることを特徴としている。
【0014】
このような構成とされるために、この免震建物の構築方法においては、樹脂材に短時間で高度の圧縮強度を発揮させることができる。
【0015】
【発明の実施の形態】
以下、本発明の実施の形態を、図面に基づいて説明する。
図1は、本実施の形態における構築方法を適用することにより構築される免震建物1の概略構成を示す図である。この免震建物1は、免震装置2を有する免震層3を挟んで、上下に上層部4および下層部5が位置する構成とされている。免震層3および下層部5はともに、地盤G内に位置する構成とされている。
また、上層部4および下層部5を構成する柱としては、下端6aが基礎杭(基礎構造)7と一体化された構真柱(柱)6が用いられている。
【0016】
図2は、図1に示した免震建物1のうち、免震層3の部分を拡大して示した図である。図中に示すように、免震装置2は、上層部4および下層部5にそれぞれ固定された上下のベースプレート8,8の間に高減衰積層ゴム9が介装された構成となっている。また、免震装置2の周囲には、着座柱10,10,…が設けられている。これら着座柱10は、上層部4のスラブ11の下面11aおよび下層部5の上面5aからそれぞれ鉛直方向に突出してその先端10aが互いに対向配置されたものを一組として、複数組設けられている。このような着座柱10は、火災時等において、高減衰積層ゴム9が劣化した際に、上層部4に過大な変形(沈下)が生じることを防ぐものであり、着座柱10により、劣化した免震装置2の軸力を受け替えることができる。
【0017】
次に、この免震建物1の構築方法について説明する。
まず、地盤G内における免震建物1の設置対象位置を囲むように山止め壁(図示略)を設け、山止め壁の内側の地盤G中に基礎杭7を設置する。さらに、基礎杭7の上部に連続させて構真柱6を形成する。この場合、構真柱6を、その上端が上層部4の設置対象位置にまで到達するように形成しておく。
【0018】
続いて、地盤Gの表面と略同一位置に上層部4のスラブ11を形成する。この際、スラブ11は、構真柱6と一体化された状態で形成される。これにより、スラブ11および上層部4が、構真柱6を介して基礎杭7側から支持される。
【0019】
次に、スラブ11の下方の地盤Gを根切りする。この場合、スラブ11を山止め壁を保持するための土圧に対する支保工として利用する。さらに、スラブ11の下方の空間を一定の深さ掘削したら、下層部5の上面5aを形成し、さらに、その下方を掘削しつつ、下層部5を地盤G中に形成していく。この場合、下層部5の上面5aは、構真柱6と一体化された状態で形成される。また、これと同時に、図3に示すように、下層部5の上面5aとスラブ11の下面11aとの間に、着座柱10を、構真柱6の周囲に位置させて形成する。
【0020】
さらに、形成された下層部5の上面5aとスラブ11との間に、免震装置2を介装する。これには、まず、図4に示すように、着座柱10の周囲のスラブ11の下面11aおよび下層部5の上面5aを、ジャッキ装置13により、着座柱10,10同士が離間する方向に加圧するとともに、互いに対向する着座柱10,10の先端面10a,10aにそれぞれライナープレート14,14を設け、これらライナープレート14,14間に、超早強性エポキシ樹脂からなる樹脂材15を充填する。
【0021】
この場合、ライナープレート14には、図5に示すように、ニクロム線(電熱線)16を固定しておき、これにより、樹脂材15が硬化した際に、樹脂材15の内部にニクロム線16が配置されるようにしておく。
【0022】
樹脂材15が硬化したら、図6に示すように、ジャッキ装置13をいったん撤去するとともに、構真柱6のうち、下層部5の上面5aとスラブ11の下面11aとの間に位置する部分(すなわち、免震層3内に位置する部分)を切断撤去する。
【0023】
そして、図7に示すように、下層部5の上面5aのうち、構真柱6が設置されていた部分に対応する箇所に、コンクリート基台18を構築し、このコンクリート基台18の上面に、ベースプレート8を固定する。
【0024】
さらに、図8に示すように、スラブ11の下面11aのうち、構真柱6が設置されていた部分に対応する箇所に、鉄筋カゴ19を設置し、鉄筋カゴ19の下面に、上側のベースプレート8を吊り込み配置する。そして、高減衰積層ゴム9を上下のベースプレート8,8間に設置し、さらに、高減衰積層ゴム9を上下のベースプレート8,8に固定するとともに、鉄筋カゴ19にコンクリートを打設することにより、図9に示すように免震装置2の設置が完了される。
【0025】
そして、図10に示すように、再びジャッキ装置13を着座柱10の周囲に配置して、スラブ11の下面11aおよび下層部5の下面5aを互いに離間する方向に加圧し、この状態で、ニクロム線16に通電を行う。これにより、ニクロム線16から発生される熱により、樹脂材15に熱塑性が発生し、樹脂材15に劣化が生じる。そして、このように劣化を生じさせた樹脂材15を撤去することにより、図2に示したような構造を得る。
【0026】
さらに、下層部5および上層部4の構築を継続してこれらを完成させるとともに、前記山止め壁を撤去することにより、図1に示したような免震建物1が構築される。
【0027】
上述の免震建物1の構築方法においては、上層部4および下層部5から突出状態に設けられた着座柱10,10同士の間に、樹脂材15を充填し、これら着座柱10,10および樹脂材15を介して、下層部5側から上層部4を支持させ、さらに、構真柱6のうち、免震層3内に位置する部分を撤去して、そこに免震装置2を介装し、しかる後に樹脂材15を撤去する構成となっているために、従来と異なり、下層部5から上層部4を仮受けするにあたって、免震装置2の据え付け期間中に亘って、大がかりな仮受け治具等が必要とならず、施工性およびコストの面で有利である。また、下層部5から上層部4を仮受けする際に、着座柱10および樹脂材15を介して下層部5と上層部4とを固定することとなるために、免震装置2据え付け工事期間中に地震が発生した場合に、これら着座柱10および樹脂材15により、仮設的地震力処理を行うことができ、安全性が高い。
【0028】
また、上述の免震建物1の構築方法においては、樹脂材15を充填する際に、樹脂材15の内部にニクロム線16を配置するようにしたために、樹脂材15を撤去する際に、樹脂材15に熱塑性を発生させ劣化させることができ、これにより樹脂材15の撤去作業の短期化、容易化を図ることができる。
【0029】
さらに、上述の免震建物1の構築方法においては、樹脂材15として超早強性エポキシ樹脂を用いたため、樹脂材15を早期に硬化させて所望の強度を発揮させることができ(例えば、樹脂材15注入後3時間で約30N/mm2)、施工効率を確保することができる。
【0030】
なお、上記実施の形態において、本発明の趣旨を逸脱しない範囲内で、他の構成を採用するようにしてもよい。
例えば、上記実施の形態においては、着座柱10が、上層部4および下層部5の双方から突出する構成となっていたが、これに限らず、上層部4または下層部5の一方から他方に向けて着座柱10が突出する構成を採用するようにしてもよい。
【0031】
また、上記実施の形態においては、免震層3が地下1階に構築される例を説明したが、これに限らず、免震層3が地下2階以深に設置される場合にも、同様の構築方法を採用することができる。
【0032】
また、上記実施の形態においては、免震建物1を逆打ち工法により構築する場合の例を示したが、これ以外にも、免震建物1を順打ち工法により構築する場合に、上記実施の形態のような施工方法を採用するようにしてもよい。
【0033】
【発明の効果】
以上説明したように、請求項1に係る免震建物の構築方法においては、上層部および下層部のうち少なくとも一方から同他方に向けて突出状態に設けられた着座柱と前記他方との間に樹脂材を充填し、着座柱および樹脂材を介して、下層部側から上層部を支持しておき、さらに、柱のうち、免震層内に位置する部分を撤去して、そこに免震装置を介装し、しかる後に樹脂材を撤去する構成となっているために、従来と異なり、下層部から上層部を仮受けするにあたって、大がかりな仮受け治具等が必要とならず、したがって、施工性およびコストの面で有利である。また、下層部から上層部を仮受けする際に、着座柱および樹脂材を介して下層部および上層部を固定することとなるために、免震装置の据え付け工事期間中に地震が発生した場合に、これら着座柱および樹脂材により、仮設的地震力処理を行うことができ、安全性が高い。
【0034】
請求項2に係る免震建物の構築方法においては、樹脂材を充填する際に、樹脂材の内部に電熱線を配置するようにしたために、樹脂材を撤去する際に、樹脂材に熱塑性を発生させ劣化させることができ、これにより樹脂材の撤去作業の短期化・容易化を図ることができる。
【0035】
請求項3に係る免震建物の構築方法においては、樹脂材として超早強性エポキシ樹脂を用いたため、樹脂材を早期に硬化させて所望の強度を発揮させることができ、施工効率を確保することができる。
【図面の簡単な説明】
【図1】 本発明の構築方法が適用された免震建物の断面図である。
【図2】 図1に示した免震建物の免震層の拡大立断面図である。
【図3】 本発明の構築方法の一工程を示す免震建物における免震層の拡大立断面図である。
【図4】 図3の次工程を示す免震建物における免震層の拡大立断面図である。
【図5】 図4に示した工程に用いるライナープレートの平面図である。
【図6】 図4の次工程を示す免震建物における免震層の拡大立断面図である。
【図7】 図6の次工程を示す免震建物における免震層の拡大立断面図である。
【図8】 図7の次工程を示す免震建物における免震層の拡大立断面図である。
【図9】 図8の次工程を示す免震建物における免震層の拡大立断面図である。
【図10】 図9の次工程を示す免震建物における免震層の拡大立断面図である。
【符号の説明】
1 免震建物
2 免震装置
3 免震層
4 上層部
5 下層部
6 構真柱(柱)
6a 下端
7 基礎杭(基礎構造)
8 ベースプレート
9 高減衰積層ゴム
10 着座柱
15 樹脂材
16 ニクロム線(電熱線)
G 地盤
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a method for constructing a base-isolated building.
[0002]
[Prior art]
As is well known, a base isolation layer is formed by interposing a base isolation device between the foundation of the building or the lower layer and the upper layer, and the upper layer and the ground are insulated by this base isolation layer, Various seismic isolation buildings that reduce the vibration response of buildings have been realized.
Such base-isolated buildings have an excellent effect that can greatly reduce the vibration response of the building, so the range of application is gradually expanding. For this reason, an example in which a seismic isolation device is arranged in the basement of a building can be seen.
[0003]
By the way, as described above, the base-isolated building has a structure in which the upper layer is supported on the foundation or the lower layer via the seismic isolation layer. After that, a method has been adopted in which a seismic isolation device is arranged on the foundation or lower layer and the upper layer is constructed on this seismic isolation device.
[0004]
However, in the above-described method, it is necessary to construct the foundation or lower layer part in advance of the upper layer part and sequentially perform the construction. Therefore, especially when the seismic isolation device is located on the basement floor, the construction of the underground frame must be divided into a part below the base isolation device and a part above the base isolation device. In addition, the construction period is longer than that of ordinary buildings, and the construction cost is increased.
[0005]
Therefore, even when the seismic isolation layer is in the basement, it has been proposed to construct a seismic isolation building by applying a backlash method that is effective in reducing costs such as mountain retaining and shortening the construction period.
In this case, as a concrete construction method, for example, the following is considered. In other words, the ground part of the building frame is constructed with direct support from the foundation pile by the structural pillars, and at the same time, the underground part is constructed by the reverse striking method, and in the seismic isolation layer, the upper part is temporarily constructed from the lower part side. While receiving, the structural pillar located in the seismic isolation layer is removed, and then the seismic isolation device is formed between the upper layer and the lower layer, and the temporary receiving jig To remove.
[0006]
When such a construction method is adopted, the construction period can be greatly shortened because the underground part and the seismic isolation layer can be constructed while the ground part is constructed. In addition, since it is possible to reduce support work such as a cutting beam that has been provided in the past when performing root cutting, it is possible to reduce costs.
[0007]
[Problems to be solved by the invention]
However, in the above construction method, since the upper layer portion is constructed in advance, when the upper layer portion is provisionally received from the lower layer portion side, the load on the upper layer portion becomes very large. It was necessary to make a large-scale jig to be used for provisional reception when installing the device later. Such a large provisional receiving jig not only causes an increase in cost, but also has a problem in installation in a narrow space between the upper layer portion and the lower layer portion.
In addition, since the load on the upper layer is very large, there is a problem with the treatment of the seismic force generated during temporary reception.
[0008]
The present invention has been made in view of such circumstances, and in particular, when a seismic isolation layer is constructed in the basement of a building adopting the reverse driving method, seismic isolation is advantageous in terms of cost and seismic force response. An object is to provide a building construction method.
[0009]
[Means for Solving the Problems]
In order to solve the above problems, the present invention employs the following means.
The construction method of the seismic isolation building according to claim 1 is a construction method of a seismic isolation building having a lower layer portion and an upper layer portion located above and below with the seismic isolation layer interposed therebetween,
A foundation structure for supporting the base isolation building is provided in the ground at the installation target position of the base isolation building,
The pillar constituting the lower layer part is provided continuously with the foundation structure, and the pillar is formed such that at least the upper end reaches the upper layer part,
Build the lower layer and upper layer in a state supported by the pillars,
At least one of the lower layer portion and the upper layer portion is provided with a seating pillar protruding toward the other in a state where it is located within the installation target position of the seismic isolation layer,
Between the seating column and the other of the lower layer part and the upper layer part, by filling a resin material, the upper layer part is supported from the lower layer part side through the resin material,
A part of the column located in the seismic isolation layer is removed, and a seismic isolation device is interposed therein, and then the resin material is removed.
[0010]
In order to have such a configuration, in this method of building a base-isolated building, using a seating pillar for transferring the load of the upper layer to the lower layer when the laminated rubber of the base isolation device deteriorates, The upper layer portion can be temporarily received when the seismic isolation device is installed, and unlike the conventional case, a temporary receiving jig is not required.
[0011]
The construction method of the base isolation building according to claim 2 is the construction method of the base isolation building according to claim 1,
When filling the resin material, a heating wire is arranged inside the resin material.
[0012]
In this method of building a base-isolated building, when the resin material is removed, the resin material can be made to be thermoplastic by causing the heating wire to be energized, thereby deteriorating the resin material.
[0013]
The construction method of the base isolation building according to claim 3 is the construction method of the base isolation building according to claim 1 or 2,
As the resin material, an ultra-early strong epoxy resin is used.
[0014]
Since it is set as such a structure, in this construction method of a base-isolated building, a resin material can be made to exhibit high compression strength in a short time.
[0015]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described with reference to the drawings.
FIG. 1 is a diagram showing a schematic configuration of a seismic isolation building 1 constructed by applying the construction method in the present embodiment. The seismic isolation building 1 has a structure in which an upper layer portion 4 and a lower layer portion 5 are positioned above and below a seismic isolation layer 3 having a seismic isolation device 2. Both the seismic isolation layer 3 and the lower layer part 5 are configured to be located in the ground G.
Further, as the pillars constituting the upper layer part 4 and the lower layer part 5, a structural pillar (column) 6 in which a lower end 6a is integrated with a foundation pile (foundation structure) 7 is used.
[0016]
FIG. 2 is an enlarged view of the seismic isolation layer 3 in the base isolation building 1 shown in FIG. As shown in the figure, the seismic isolation device 2 has a configuration in which a high-damping laminated rubber 9 is interposed between upper and lower base plates 8 and 8 fixed to an upper layer portion 4 and a lower layer portion 5 respectively. Further, seating columns 10, 10,... Are provided around the seismic isolation device 2. A plurality of sets of these seating columns 10 are provided, one set of which protrudes vertically from the lower surface 11a of the slab 11 of the upper layer portion 4 and the upper surface 5a of the lower layer portion 5 and whose tips 10a are arranged to face each other. . Such a seating column 10 prevents excessive deformation (sinking) from occurring in the upper layer portion 4 when the high-damping laminated rubber 9 is deteriorated in a fire or the like, and is deteriorated by the seating column 10. The axial force of the seismic isolation device 2 can be changed.
[0017]
Next, the construction method of this seismic isolation building 1 is demonstrated.
First, a mountain retaining wall (not shown) is provided so as to surround the installation target position of the seismic isolation building 1 in the ground G, and the foundation pile 7 is installed in the ground G inside the mountain retaining wall. Further, the frame pillar 6 is formed continuously with the upper portion of the foundation pile 7. In this case, the true pillar 6 is formed so that the upper end reaches the installation target position of the upper layer part 4.
[0018]
Subsequently, the slab 11 of the upper layer part 4 is formed at substantially the same position as the surface of the ground G. At this time, the slab 11 is formed in an integrated state with the structural pillar 6. As a result, the slab 11 and the upper layer part 4 are supported from the foundation pile 7 side via the structural pillar 6.
[0019]
Next, the ground G below the slab 11 is rooted. In this case, the slab 11 is used as a support for the earth pressure for holding the mountain retaining wall. Further, after excavating the space below the slab 11 to a certain depth, the upper surface 5a of the lower layer portion 5 is formed, and further, the lower layer portion 5 is formed in the ground G while excavating the lower portion. In this case, the upper surface 5 a of the lower layer part 5 is formed in a state of being integrated with the construction pillar 6. At the same time, as shown in FIG. 3, the seating column 10 is formed between the upper surface 5 a of the lower layer portion 5 and the lower surface 11 a of the slab 11 so as to be positioned around the construction column 6.
[0020]
Further, the seismic isolation device 2 is interposed between the upper surface 5 a of the formed lower layer portion 5 and the slab 11. For this purpose, first, as shown in FIG. 4, the lower surface 11a of the slab 11 and the upper surface 5a of the lower layer part 5 around the seating column 10 are added in the direction in which the seating columns 10 and 10 are separated from each other by the jack device 13. Liner plates 14 and 14 are respectively provided on the front end surfaces 10a and 10a of the seating columns 10 and 10 facing each other, and a resin material 15 made of an ultra-fast-strength epoxy resin is filled between the liner plates 14 and 14. .
[0021]
In this case, as shown in FIG. 5, a nichrome wire (heating wire) 16 is fixed to the liner plate 14, so that when the resin material 15 is cured, the nichrome wire 16 is placed inside the resin material 15. To be placed.
[0022]
When the resin material 15 is cured, as shown in FIG. 6, the jack device 13 is once removed, and a portion of the construction pillar 6 positioned between the upper surface 5 a of the lower layer portion 5 and the lower surface 11 a of the slab 11 ( That is, the part located in the seismic isolation layer 3 is cut and removed.
[0023]
Then, as shown in FIG. 7, a concrete base 18 is constructed at a location corresponding to a portion where the structural pillar 6 is installed in the upper surface 5 a of the lower layer portion 5. The base plate 8 is fixed.
[0024]
Further, as shown in FIG. 8, a reinforcing bar cage 19 is installed at a location corresponding to a portion of the lower surface 11 a of the slab 11 where the frame pillar 6 is installed, and the upper base plate is placed on the lower surface of the reinforcing bar cage 19. 8 is suspended and arranged. Then, the high damping laminated rubber 9 is installed between the upper and lower base plates 8, 8, and the high damping laminated rubber 9 is fixed to the upper and lower base plates 8, 8, and concrete is placed in the rebar cage 19, The installation of the seismic isolation device 2 is completed as shown in FIG.
[0025]
Then, as shown in FIG. 10, the jack device 13 is again arranged around the seating column 10, and the lower surface 11 a of the slab 11 and the lower surface 5 a of the lower layer part 5 are pressed away from each other. The line 16 is energized. Thereby, the heat generated from the nichrome wire 16 causes thermoplasticity in the resin material 15, and the resin material 15 is deteriorated. And the structure as shown in FIG. 2 is obtained by removing the resin material 15 which caused degradation in this way.
[0026]
Furthermore, the construction of the base layer 5 and the top layer part 4 is continued and completed, and the seismic isolation building 1 as shown in FIG. 1 is constructed by removing the retaining wall.
[0027]
In the construction method for the base-isolated building 1 described above, the resin material 15 is filled between the seating columns 10 and 10 provided in a protruding state from the upper layer portion 4 and the lower layer portion 5, and these seating columns 10 and 10 and The upper layer portion 4 is supported from the lower layer portion 5 side through the resin material 15, and further, the portion located in the seismic isolation layer 3 of the structural pillar 6 is removed, and the seismic isolation device 2 is interposed there. Since the structure is such that the resin material 15 is removed afterwards, unlike the conventional case, when temporarily receiving the upper layer portion 4 from the lower layer portion 5, there is a large-scale over the installation period of the seismic isolation device 2. A temporary receiving jig or the like is not required, which is advantageous in terms of workability and cost. Further, when temporarily receiving the upper layer portion 4 from the lower layer portion 5, the lower layer portion 5 and the upper layer portion 4 are fixed via the seating column 10 and the resin material 15. When an earthquake occurs, temporary seismic force treatment can be performed by the seating pillars 10 and the resin material 15, and safety is high.
[0028]
Moreover, in the construction method of the seismic isolation building 1 described above, since the nichrome wire 16 is disposed inside the resin material 15 when the resin material 15 is filled, the resin material 15 is removed when the resin material 15 is removed. Thermoplasticity can be generated and deteriorated in the material 15, thereby shortening and facilitating the removal work of the resin material 15.
[0029]
Furthermore, in the construction method of the seismic isolation building 1 described above, since the ultra-high-strength epoxy resin is used as the resin material 15, the resin material 15 can be cured at an early stage to exhibit a desired strength (for example, resin 3 hours after the injection of the material 15, about 30 N / mm 2 ), it is possible to ensure the construction efficiency.
[0030]
In the above embodiment, other configurations may be adopted without departing from the spirit of the present invention.
For example, in the above-described embodiment, the seating column 10 is configured to protrude from both the upper layer portion 4 and the lower layer portion 5, but is not limited to this, and from one of the upper layer portion 4 or the lower layer portion 5 to the other. You may make it employ | adopt the structure from which the seating pillar 10 protrudes.
[0031]
Moreover, in the said embodiment, although the example in which the seismic isolation layer 3 was constructed | assembled in the 1st basement was demonstrated, it is the same also when not only this but the seismic isolation 3 is installed in the 2nd basement or more deeply. The construction method can be adopted.
[0032]
Moreover, in the said embodiment, although the example in the case of constructing the base-isolated building 1 by the reverse construction method was shown, in addition to this, when constructing the base-isolated building 1 by the forward construction method, You may make it employ | adopt the construction method like a form.
[0033]
【The invention's effect】
As explained above, in the construction method of the seismic isolation building according to claim 1, between the seating column provided in a protruding state from at least one of the upper layer portion and the lower layer portion toward the other and the other. Fill with resin material, support the upper layer part from the lower layer part side through the seating pillar and resin material, and then remove the part located in the seismic isolation layer of the column and seismic isolation there Because it is configured to interpose the device and then remove the resin material, unlike the conventional case, when temporarily receiving the upper layer portion from the lower layer portion, a large-scale temporary receiving jig or the like is not required. It is advantageous in terms of workability and cost. In addition, when temporarily receiving the upper layer from the lower layer, the lower layer and the upper layer are fixed via the seating pillar and the resin material, so that an earthquake occurs during the seismic isolation device installation work In addition, temporary seismic force treatment can be performed with these seating columns and resin material, and safety is high.
[0034]
In the construction method of the seismic isolation building according to claim 2, since the heating wire is arranged inside the resin material when the resin material is filled, the resin material is made thermoplastic when the resin material is removed. It can be generated and deteriorated, thereby shortening and facilitating the removal work of the resin material.
[0035]
In the construction method of the base-isolated building according to claim 3, since the ultra-high-strength epoxy resin is used as the resin material, the resin material can be cured at an early stage to exhibit a desired strength, and the construction efficiency is ensured. be able to.
[Brief description of the drawings]
FIG. 1 is a cross-sectional view of a base-isolated building to which a construction method of the present invention is applied.
FIG. 2 is an enlarged vertical sectional view of a base isolation layer of the base isolation building shown in FIG.
FIG. 3 is an enlarged vertical sectional view of a base isolation layer in a base isolation building showing one step of the construction method of the present invention.
4 is an enlarged vertical sectional view of the seismic isolation layer in the base isolation building showing the next step of FIG. 3. FIG.
FIG. 5 is a plan view of a liner plate used in the step shown in FIG.
6 is an enlarged vertical sectional view of the base isolation layer in the base isolation building showing the next step of FIG. 4;
7 is an enlarged vertical sectional view of the seismic isolation layer in the base isolation building showing the next step of FIG. 6. FIG.
FIG. 8 is an enlarged vertical sectional view of the seismic isolation layer in the base isolation building showing the next step of FIG. 7;
FIG. 9 is an enlarged vertical sectional view of the seismic isolation layer in the base isolation building showing the next step of FIG. 8;
10 is an enlarged vertical sectional view of the seismic isolation layer in the base isolation building showing the next step of FIG. 9. FIG.
[Explanation of symbols]
1 Seismic isolation building 2 Seismic isolation device 3 Seismic isolation layer 4 Upper layer 5 Lower layer 6 Construction pillar (pillar)
6a Lower end 7 Foundation pile (foundation structure)
8 Base plate 9 High damping laminated rubber 10 Seating column 15 Resin material 16 Nichrome wire (heat wire)
G ground

Claims (3)

免震層を挟んで上下に位置する下層部および上層部を備えた免震建物の構築方法であって、
前記免震建物の設置対象位置の地盤中に、該免震建物を支持するための基礎構造を設け、
前記下層部を構成する柱を、前記基礎構造に連続させて設けるとともに、該柱を、その少なくとも上端が前記上層部にまで到達するように形成し、
前記下層部および上層部を、前記柱により支持させた状態に構築し、
前記下層部および上層部の少なくとも一方には、同他方に向けて突出する着座柱を、前記免震層の設置対象位置内に位置させた状態で設けておき、
前記着座柱と、前記下層部および前記上層部のうちの他方との間に、樹脂材を充填することにより、該樹脂材を介して、前記下層部側から前記上層部を支持し、
前記柱のうち、前記免震層内に位置する部分を撤去して、そこに、免震装置を介装し、しかる後に、前記樹脂材を撤去することを特徴とする免震建物の構築方法。
A method for constructing a base-isolated building having a lower layer and an upper layer located above and below the base isolation layer,
In the ground at the position where the seismic isolation building is to be installed, a foundation structure for supporting the seismic isolation building is provided,
The pillar constituting the lower layer part is provided continuously with the foundation structure, and the pillar is formed so that at least the upper end thereof reaches the upper layer part,
Build the lower layer and upper layer in a state supported by the pillars,
At least one of the lower layer part and the upper layer part is provided with a seating pillar protruding toward the other in a state where it is located within the installation target position of the seismic isolation layer,
Between the seating column and the other of the lower layer part and the upper layer part, by filling a resin material, the upper layer part is supported from the lower layer part side via the resin material,
A method for constructing a seismic isolation building, comprising: removing a portion of the pillar located in the seismic isolation layer, interposing a seismic isolation device therein, and then removing the resin material. .
請求項1記載の免震建物の構築方法であって、
前記樹脂材を充填する際には、前記樹脂材の内部に電熱線を配置しておくことを特徴とする免震建物の構築方法。
A method for constructing a base-isolated building according to claim 1,
When filling the resin material, a heating wire is arranged inside the resin material, and the method for constructing a base-isolated building is characterized in that
請求項1または2記載の免震建物の構築方法であって、
前記樹脂材として、超早強性エポキシ樹脂を用いることを特徴とする免震建物の構築方法。
A construction method for a base-isolated building according to claim 1 or 2,
A method for constructing a base-isolated building, characterized in that an ultra-fast strength epoxy resin is used as the resin material.
JP34260299A 1999-12-01 1999-12-01 How to build a base-isolated building Expired - Fee Related JP3728652B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP34260299A JP3728652B2 (en) 1999-12-01 1999-12-01 How to build a base-isolated building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP34260299A JP3728652B2 (en) 1999-12-01 1999-12-01 How to build a base-isolated building

Publications (2)

Publication Number Publication Date
JP2001159258A JP2001159258A (en) 2001-06-12
JP3728652B2 true JP3728652B2 (en) 2005-12-21

Family

ID=18355047

Family Applications (1)

Application Number Title Priority Date Filing Date
JP34260299A Expired - Fee Related JP3728652B2 (en) 1999-12-01 1999-12-01 How to build a base-isolated building

Country Status (1)

Country Link
JP (1) JP3728652B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5234406B2 (en) * 2008-04-25 2013-07-10 清水建設株式会社 Seismic isolation device safety device and laminated rubber type seismic isolation device having the safety device
JP5234407B2 (en) * 2008-04-30 2013-07-10 清水建設株式会社 Seismic isolation system
JP5316887B2 (en) * 2009-12-09 2013-10-16 清水建設株式会社 Construction method of seismic isolation building

Also Published As

Publication number Publication date
JP2001159258A (en) 2001-06-12

Similar Documents

Publication Publication Date Title
JP3855198B2 (en) Seismic reinforcement structure for pile foundation structures
JP3799036B2 (en) Building basic structure and construction method
JP3677715B2 (en) Seismic isolation method for masonry buildings
JP5854506B2 (en) How to change the basic form of an existing building
JP3703204B2 (en) Seismic reinforcement method for existing buildings
KR101054696B1 (en) Top-down construction method for underground structure with slurry wall retained by slab diaphragm effect
JP3728652B2 (en) How to build a base-isolated building
JP2001311314A (en) Existing building seismic isolation method
JP6208090B2 (en) Temporary support structure for seismic isolation work and seismic isolation method for existing buildings
JP7028728B2 (en) Joint structure of foundation pile and foundation slab
JP4067688B2 (en) Construction method of seismic isolation structure
JP2003129676A (en) Method of reinforcing concrete frame
JP6031626B1 (en) Replacing the seismic isolation device in the pile head seismic isolation structure
JP2016079651A (en) Support structure
JP2013181322A (en) Reconstruction method of pile foundation and pile foundation structure
JPH1018322A (en) Construction method for base isolation building by reverse driving construction method
JPH09170340A (en) Seismic isolation method for existing building and seismic isolation device for existing building
JP2001271499A (en) Temporary receiving method of existing building with steel beam
JP5980697B2 (en) Reinforcement structure of existing pile foundation and reinforcement method of existing pile foundation
JP3656452B2 (en) Seismic isolation method for existing buildings
KR20040051182A (en) Temporary soil sheathing using prestress and pile thereof
JP2005002703A (en) Support structure of seismic isolation device to existing pillar and installation method of seismic isolation device
JP6000414B2 (en) Pile foundation reconstruction method and pile foundation structure
JP2916674B2 (en) Seismic isolation repair method for existing buildings
JP2001173269A (en) Construction method of seismic isolation building

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20050627

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20050830

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20050920

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111014

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111014

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121014

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121014

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131014

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131014

Year of fee payment: 8

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131014

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20141014

Year of fee payment: 9