JP3732885B2 - Insulation device for drain neutralization container - Google Patents
[go: Go Back, main page]

JP3732885B2 - Insulation device for drain neutralization container - Google Patents

Insulation device for drain neutralization container Download PDF

Info

Publication number
JP3732885B2
JP3732885B2 JP10139996A JP10139996A JP3732885B2 JP 3732885 B2 JP3732885 B2 JP 3732885B2 JP 10139996 A JP10139996 A JP 10139996A JP 10139996 A JP10139996 A JP 10139996A JP 3732885 B2 JP3732885 B2 JP 3732885B2
Authority
JP
Japan
Prior art keywords
drain
water
heat
drain neutralization
container
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP10139996A
Other languages
Japanese (ja)
Other versions
JPH09287727A (en
Inventor
好孝 中村
和男 八木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tokyo Gas Co Ltd
Rinnai Corp
Original Assignee
Tokyo Gas Co Ltd
Rinnai Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyo Gas Co Ltd, Rinnai Corp filed Critical Tokyo Gas Co Ltd
Priority to JP10139996A priority Critical patent/JP3732885B2/en
Publication of JPH09287727A publication Critical patent/JPH09287727A/en
Application granted granted Critical
Publication of JP3732885B2 publication Critical patent/JP3732885B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Chimneys And Flues (AREA)

Description

【0001】
【発明の属する技術分野】
この発明は、ドレン中和容器の保温装置、特に、燃焼排気中の水蒸気の凝縮により生成されるドレンを中和する為のドレン中和容器を保温する装置に関するものである。
【0002】
【従来の技術】
図15は、従来の給湯器に於ける熱交換装置(1)とドレン中和容器(2)の説明図である。同図に示すように、熱交換装置(1)は、缶体(10)内に主熱交換器(12)及び副熱交換器(13)を収容した構成であり、缶体(10)の上端部には、主・副熱交換器(12)(13)に対して燃焼排気を供給するバーナ装置(40)が設けられている。
【0003】
この熱交換装置(1) では、前記燃焼排気の熱が主・副熱交換器(12)(13)の通水管により吸収される。主・副熱交換器(12)(13)では、前記燃焼排気に含まれる水蒸気が露点以下となるまで前記燃焼排気から吸熱される。従って、この熱交換装置(1) の熱交換効率が高いものとなっている。
一方、前記水蒸気が露点以下まで冷やされることから、前記水蒸気が凝縮されて、前記通水管の表面にドレンが付着する。このドレンは、缶体(10)に接続されたドレン排出経路(11)を介して熱交換装置(1) から排出される。
【0004】
そして、前記ドレンが生成されるときに、前記燃焼排気に含まれる窒素酸化物等の酸性成分が溶け込むものとなる。このドレンを中和する為の中和剤を内蔵したドレン中和容器(2) がドレン排出経路(11)に設けられている。
従って、熱交換装置(1) からドレン排出経路(11)に排出されたドレンは、ドレン中和容器(2) 内を通過する際、前記中和剤と接触するものとなる。これにより、前記ドレン中の酸性成分が中和される。
【0005】
【発明が解決しようとする課題】
ところが、この従来の技術では、冬期に気温が低くなると、ドレン中和容器(2) が冷やされてその内部が低温となる。ドレン中和容器(2) 内の中和剤は、その温度が所定温度以下になると、前記ドレンとの反応度合いが極端に低下するから、前記した低温条件下では、前記中和が十分に行われない。この場合、酸性の強い前記ドレンがそのまま下水管等に排出されるものとなる。
【0006】
請求項1の発明は、ドレン中和容器(2) 内の中和剤の反応を促進できる保温装置を提供することを課題とする。
【0007】
【課題を解決するための手段】
請求項1の発明の課題解決手段は、『燃焼排気に含まれる水蒸気の凝縮により生成されたドレンを通過させるように設けられ且つ内蔵した中和剤により前記ドレンを中和するドレン中和容器(2)と、このドレン中和容器(2)を前記燃焼排気の熱に基づいて加熱する加熱手段(4)とを具備し、
前記燃焼排気を生成するバーナ装置(40)と、前記燃焼排気からの吸熱により通水管内の水を昇温する熱交換器(1a)と、を内蔵した熱交換装置(1)が設けられ、前記ドレン中和容器(2)は、前記吸熱により前記熱交換器(1a)の表面に生じたドレンを前記熱交換装置(1)から排出するドレン排出経路(11)に設けられ、前記加熱手段(4)は、前記通水管を通過した温水によって前記ドレン中和容器(2)を加熱する構成であり、
前記中和剤の反応促進の必要性を検知する検知手段(5)と、この検知手段(5)の検知出力に応答して前記加熱手段(4)を能動化させ且つ前記加熱手段における温水の温度制御を行う制御手段(6)とを具備する』ことを特徴とする。
【0009】
このものでは、前記バーナ装置(40)により生成された燃焼排気の熱が前記熱交換器(1a)に吸収される。この吸熱によって、前記熱交換器(1a)の表面には、ドレンが生じる。このドレンは、前記ドレン排出経路(11)を介して排出され、前記ドレン中和容器(2)に流入する。
一方、前記中和剤の反応が低下する条件下にあるとき、前記検知手段(5)によって、中和剤の反応促進の必要性が検知される。この検知手段(5)からの検知出力に応答する前記制御手段(6)によって、前記加熱手段(4)が能動化され且つ前記温水の温度制御が行われる。これにより、前記吸熱によって、前記熱交換器(1a)の前記通水管内の水が昇温され、前記通水管を通過した温水によって、前記ドレン中和容器(2)が加熱され、そして、前記ドレン中和容器(2)が所定温度範囲の保温状態に維持される。
【0010】
従って、前記流入したドレンは、前記加熱により保温状態にある前記ドレン中和容器(2)内の中和剤により中和されるものとなる。
この請求項1の記載中、『前記加熱手段(4)は、前記通水管を通過した温水によって前記ドレン中和容器(2)を加熱する構成である』とは、具体的には、請求項2の発明のように、『前記温水は、前記ドレン中和容器(2)の外面に巻き付けられた加熱管部(31)を通過する』ものや、請求項3の発明のように、『前記温水は、前記ドレン中和容器(2)の構成壁の内面と外面との間に設けられる通水路(32)を通過する』ものや、請求項4の発明のように、『前記温水は、前記ドレン中和容器(2)の構成壁を貫通してその内部に挿通される加熱管部(31)を通過する』ものでもよい。
【0012】
【発明の効果】
以上説明したように、請求項1の発明では、前記中和剤の反応が低下する条件下にあるとき、前記ドレン中和容器(2)が所定温度範囲の保温状態に維持されるから、前記中和剤の中和反応が促進される。
よって、冬期等に於いて前記ドレン中和容器(2)が低温条件下にある場合でも、上記加熱手段(4)によって、ドレン中和容器(2)が保温状態に維持されるから、前記中和剤によるドレンの中和反応が促進される。
【0013】
又、前記加熱手段(4)は、前記ドレンを発生させる前記燃焼排気の熱に基づいて前記ドレン中和容器(2)を加熱するものであるから、前記加熱の為の手段を前記燃焼排気の生成源以外に別途設ける必要がない。従って、前記加熱の為の手段を別途設けたものに比べて、この保温装置の全体構成が簡単となる。
更に、上記温水により前記ドレン中和装置(2)を加熱する構成であるから、前記加熱の為の装置を容易に製作できる。尚、熱交換器(1a)の通水管の下流側に接続された出湯管により前記温水を導く構成としてもよく、この場合、前記構成がより一層簡素化される。
【0015】
【発明の実施の形態】
以下、本願発明の実施の形態を、図面に基づいて説明する。
[実施の形態1]
図1は、本願発明の実施の形態1の給湯器を構成する熱交換装置(1) 及びドレン中和容器(2) の保温装置の説明図であり、図2は、図1の熱交換装置(1) のドレン排出経路(11)に設けられるドレン中和容器(2) 及び貯留容器(2a)の断面図である。図3は、図2の貯留容器(2a)の動作説明図である。そして、図4は、図1及び図2のドレン中和容器(2) に巻き付けられた加熱管部(31)の拡大断面図である。
【0016】
*熱交換装置(1) *
図1に示すように、熱交換装置(1) は、缶体(10)内に主・副熱交換器(12)(13)を収容した構成であり、缶体(10)内に於ける主・副熱交換器(12)(13)の上方には、バーナ(14)が設けられている。又、缶体(10)の上端には、バーナ(14)に燃焼用の外気を供給するファン(15)が連設されている。これらバーナ(14)とファン(15)とにより既述請求項2に記載のバーナ装置(40)が構成され、このバーナ装置(40)により、燃焼排気が生成される。
【0017】
主熱交換器(12)は、副熱交換器(13)よりもバーナ(14)側(燃焼排気の流れの上流側)にあり、しかも、主熱交換器(12)の通水管は、副熱交換器(13)の通水管の下流側に接続されている。又、副熱交換器(13)の通水管の上流側には、副熱交換器(13)に水を送り込む給水経路(17)が接続され、主熱交換器(12)の通水管の下流側には、主・副熱交換器(12)(13)にて加熱された湯を送り出す出湯経路(18)が接続されている。
【0018】
このものでは、バーナ装置(40)からの燃焼排気は、まず主熱交換器(12)を通過し、このとき、主熱交換器(12)によって前記燃焼排気から顕熱が吸収される。この後、副熱交換器(13)を通過するときに、この副熱交換器(13)によって前記燃焼排気から潜熱が吸収される。この潜熱吸収によって、前記燃焼排気に含まれる水蒸気が露点以下に冷やされ、前記水蒸気が凝縮されることにより、主として副熱交換器(13)にドレンが生じる。前記凝縮に際して、前記燃焼排気中の窒素酸化物等の酸性の腐食成分が前記ドレンに溶け込む。
【0019】
又、缶体(10)には、バーナ(14)にガスを供給する為のガス供給経路(14a) と、前記燃焼排気を缶体(10)から排出する排気通路(16)と、前記ドレンを缶体(10)から排出するドレン排出経路(11)が接続されている。ドレン排出経路(11)には、後述の貯留容器(2a)及びドレン中和容器(2) が設けられている。
*貯留容器(2a)*
貯留容器(2a)は、図1及び図2に示すように、全体として、矩形箱状に形成されている。そして、この貯留容器(2a)は、ドレン排出経路(11)に接続したドレン流入管(210) が上方から挿入され且つ熱交換装置(1) からのドレンを貯める封水室(21)と、この封水室(21)に連設され且つ封水室(21)からオーバーフローした前記ドレンを貯める貯留室(22)と、この貯留室(22)に対して封水室(21)の反対側に連設されたサイフォン(23)と、からなる。
【0020】
サイフォン(23)は、貯留室(22)の下端に対して連通孔(240) を介して連通した空室(24)と、この空室(24)内に上下方向に設けられたドレン排出管(25)と、からなる。そして、ドレン排出管(25)(例えば、直径6mm)と空室(24)の天板(26)との間には、ドレン排出管(25)の径及びドレンの表面張力とドレンの水位上昇スピードを考慮して、水位上昇時に天板(26)の下方に空気溜りを生じさせない程度の間隙(例えば、5mm)が設けられている。尚、天板(26)は、封水室(21)のオーバーフロー水位よりも僅かに低位に設けられている。
【0021】
*ドレン中和容器(2) *
ドレン中和容器(2) は、ドレン排出管(25)の下端に接続された略鉛直姿勢の筒体であり、その内径は、ドレン排出管(25)の内径よりも大きく設定されている。このドレン中和容器(2) 内には、酸化マグネシウムや炭酸カルシウム等の粒体からなる中和剤(20)(20)が収容されている。そして、このドレン中和容器(2) の下端には、下流側のドレン排出経路(11)が接続されている。
【0022】
又、このドレン中和容器(2) の構成壁には、このドレン中和容器(2) の温度を検知する温度センサ(5a)が備えられている。この温度センサ(5a)から出力される検知信号が後述の制御回路(61)に印加される。
*温水経路(300) *
上記した出湯経路(18)には、この出湯経路(18)から分岐するように温水経路(300) が接続されている。この温水経路(300) の下流端は、上記した給水経路(17)に対して、この給水経路(17)に合流するように接続されている。又、この温水経路(300) には、出湯経路(18)の温水を吸引して給水経路(17)に送り出すポンプ(30)が設けられている。
【0023】
この温水経路(300) には、上記した貯留容器(2a)及びドレン中和容器(2) の外面に巻き付けられた加熱管部(31)が具備されている。この加熱管部(31)は、図4に示すように、円形断面であり、貯留容器(2a)及びドレン中和容器(2) の外面にロウ材(38)(38)により固着されている。
更に、この実施の形態1では、加熱管部(31)を流れる温水の温度を制御する構成となっている。
【0024】
具体的には、給水経路(17)に於ける温水経路(300) との接続部の上流側から、温水経路(300) に於ける加熱管部(31)より上流側に冷水を送る冷水経路(35)が設けられている。この冷水経路(35)には、前記冷水の流量を調節する為の第2流量調節弁(92)が設けられている。又、温水経路(300) に於ける冷水経路(35)との合流点の上流側には、出湯経路(18)から温水経路(300) に流れる温水の流量を調節する為の第1流量調節弁(91)が設けられている。
【0025】
又、第1・第2流量調節弁(91)(92)の動作を含め、熱交換装置(1) の出湯動作を制御する為の制御回路(61)が設けられている。この制御回路(61)のマイクロコンピュータに格納された制御プログラムに基づいて熱交換装置(1) 及び第1・第2流量調節弁(91)(92)の動作が制御される。
*給湯器の動作について*
図5は、図1の給湯器の制御回路(61)の制御プログラムを示すフローチャートである。尚、この制御プログラムは、前記給湯器への電源投入によりスタートする。
【0026】
以下に、図5に基づいて、前記給湯器の動作を具体的に説明する。
前記給湯器の運転スイッチ(図示せず)がオンとなると、この給湯器が運転状態となる(ステップ(70)、(73))。この運転状態では、給水経路(17)からの冷水は、上記したように、主・副熱交換器(12)(13)を通過する際に、バーナ(14)からの燃焼排気の熱により昇温され、温水となる。この温水は、出湯経路(18)を介して、台所や風呂に供給される。
【0027】
又、この運転状態では、主として副熱交換器(13)にて生じたドレンがドレン排出経路(11)及びドレン流入管(210) を介して、貯留容器(2a)の封水室(21)に流入する。このドレンは、図2に示すように、封水室(21)からオーバーフローして貯留室(22)に流入して貯められる。
この貯留室(22)内のドレンの水位は、前記流入により上昇するが、貯留室(22)と空室(24)とが連通孔(240) を介して連通されていることから、空室(24)の水位が貯留室(22)の水位と同様に上昇する。
【0028】
そして、空室(24)内のドレンは、その水位がドレン排出管(25)の上端を越えると、前記上端と天板(26)との間に表面張力により空気溜りのない状態で介在される。これにより、ドレン排出管(25)の上端開口がドレンにより塞がれる(図3ーaの状態)。この閉塞動作は、貯留室(22)のドレン水位の上昇よりも僅かに先行する。この後、貯留室(22)のドレン水位が天板(26)と同じ高さに達すると、空室(24)内の圧力が所定圧力に達して、ドレン排出管(25)の閉塞状態が破れる。これにより、空室(24)内のドレンがドレン排出管(26)に流入し、その吸引負圧によって、空室(24)及び貯留室(22)のドレンがドレン排出管(26)に流入し、ドレン中和容器(2) 内に流出する。そして、前記ドレン水位が連通孔(240) に一致した時点で空室(24)内に空気が入って前記吸引負圧が消失し、ドレン排出が終了する(図3ーbの状態)。
【0029】
このものでは、貯留室(22)へのドレン流入とサイフォン(23)による貯留室(22)からのドレン排出とが繰り返し実行される。
ドレン中和容器(2) 内に流入したドレンは、このドレン中和容器(2) 内を下方に通過する。このとき、前記ドレンは、中和剤(20)(20)と接触することによって中和される。この中和されたドレンは、ドレン中和容器(2) から下流側のドレン排出経路(11)に排出される。
【0030】
一方、この給湯器の上記運転スイッチがオンとなると、ステップ(74)にて、温水経路(300) のポンプ(30)がオンとなり、出湯経路(18)から温水経路(300) に温水が流れる。
又、前記運転スイッチがオンとなると、ステップ(71)にて、ドレン中和容器(2) に備えられた温度センサ(5a)の検知温度が第1設定温度(51)(例えば、25℃)以下か否かが判定される。
【0031】
外気温が低く、前記検知温度が第1設定温度(51)以下であった場合には、ステップ(72)に進み、このステップ(72)にて、第1流量調節弁(91)が全開に、第2流量調節弁(92)が全閉となる。これにより、加熱管部(31)に流れる前記温水の熱によって、貯留容器(2a)及びドレン中和容器(2) の温度が上昇する。そして、前記検知温度が第1設定温度(51)(例えば、25℃)となると、第1流量調節弁(91)の開度を小さくし、第2流量調節弁(92)の開度を大きくする(ステップ(75)、(76))。これにより、加熱管部(31)に流入する冷水経路(35)からの冷水の供給量が増加し、前記温水の温度が低下し、貯留容器(2a)及びドレン中和容器(2) の温度が低下する。更に、前記検知温度が第1設定温度(51)よりも低い第2設定温度(52)(例えば、20℃)以下になると、それまでとは逆に、第1流量調節弁(91)の開度を大きくし、第2流量調節弁(92)の開度を小さくする(ステップ(77)、(78))。これにより、前記冷水の供給量が減少し、前記温水の温度が上昇する。以後、上記運転スイッチがオフとなるまで、これらステップ(75)〜(78)が繰り返し実行される。
【0032】
外気温が高く、ステップ(71)にて、前記検知温度が第1設定温度(51)以上であると判定された場合には、上記したステップ(72)は、実行されずに、ステップ(76)にて、第1流量調節弁(91)の開度を小さくし、第2流量調節弁(92)の開度を大きくする動作が実行される。これにより、前記温水の温度が低下し、貯留容器(2a)及びドレン中和容器(2) の温度が低下する。この後、上記と同様のステップ(75)〜(78)が繰り返し実行される。
【0033】
以上の温度制御により、貯留容器(2a)及びドレン中和容器(2) が所定温度範囲(20〜25℃程度)内に維持される。
上記運転スイッチがオフとなると、給湯器及びポンプ(30)を停止させる(ステップ(79)、(80)、(81))。
このものでは、温水経路(300) の加熱管部(31)が貯留容器(2a)及びドレン中和容器(2) に巻き付けられた状態でロウ付けされているから、前記温水の熱が、加熱管部(31)から、貯留容器(2a)及びドレン中和容器(2) に、伝わる。これにより、貯留容器(2a)及びドレン中和容器(2) が保温状態に維持される。
【0034】
従って、ドレン中和容器(2) の構成壁を介して内部の中和剤(20)(20)に前記熱が伝わり、中和剤(20)(20)と、ドレン中和容器(2) に流入するドレンとの中和反応が促進される。加えて、貯留容器(2a)が前記保温状態に維持されることから、貯留容器(2a)からドレン中和容器(2) に流入するドレンも保温状態となる。これにより、前記中和反応の促進効果がより一層向上する。
【0035】
このものでは、主・副熱交換器(12)(13)〜温水経路(300)が既述請求項1に記載の加熱手段(4)である。又、主・副熱交換器(12)(13)が既述請求項1に記載の熱交換器(1a)である。尚、この実施の形態に於ける第1・第2流量調節弁(91)(92)の代わりに、電磁弁等の開閉弁を用いてもよい。
【0036】
又、第1・第2流量調節弁(91)(92)の内の一方の流量調節弁のみを備えるものでもよい。この場合、前記流量調節弁の開度を変化させることにより、加熱管部(31)へ流れる温水と冷水の混合割合が調節され、上記実施の形態と同様の作用を奏する。又、冷水経路(35)を設けず、温度センサ(5a)の検知温度に基づいて第1流量調節弁(91)の開度を設定する構成としてもよい。
【0037】
[実施の形態2]
図6は、実施の形態2の温水暖房システムの説明図である。
【0038】
同図に示すように、この温水暖房システムに用いられる熱交換装置(1)、貯留容器(2a)及びドレン中和容器(2)は、上記実施の形態1と同じ構成である。そして、この温水暖房システムでは、熱交換装置(1)の主熱交換器(12)の通水管の下流端と副熱交換器(13)の通水管の上流端とをつなぐように、循環経路(400)が設けられている。この循環経路(400)には、床暖房用放熱器等の放熱装置(37)、及び、ポンプ(30)が設けられている。又、この循環経路(400)に於ける放熱装置(37)より下流側の経路の一部が貯留容器(2a)及びドレン中和容器(2)に巻き付けられおり、この巻き付けられた部分が既述請求項2に記載の加熱管部(31)である。
【0039】
そして、この温水暖房システムには、上記実施の形態1と同様の制御回路(61)(図示せず)が具備されている。この制御回路(61)の制御プログラムによって、この温水暖房システムの運転が制御される。又、前記運転の停止状態にて、循環経路(400) 内の循環水、貯留容器(2a)内のドレン、及び、ドレン中和容器(2) 内のドレンの凍結を防止する為の制御が実行される。
【0040】
図7は、図6の温水暖房システムの制御回路(61)の制御プログラムを示すフローチャートである。図7に示すように、この温水暖房システムの運転スイッチ(図示せず)をオンとすると、この温水暖房システムが運転状態となる(ステップ(83)、(84))。つまり、熱交換装置(1)が動作状態となると共に、ポンプ(30)がオンとなり、循環経路(400)に温水が流れる。この温水の熱は、放熱装置(37)にて放熱され、前記温水の温度が低下する。この後、貯留容器(2a)及びドレン中和容器(2)に巻き付けられた加熱管部(31)を通過する際に、前記温水の余熱によって、貯留容器(2a)及びドレン中和容器(2)が保温状態に維持される。これにより、上記実施の形態1と同様に、ドレンの中和反応が促進される。
【0041】
前記温水は、加熱管部(31)を通過することによりその温度が更に低下するが、副・主熱交換器(13)(12)に戻り、再加熱される。このような温水の循環は、前記運転スイッチがオフとなるまで継続される(ステップ(84)、(85))。
前記運転スイッチがオフとなると、この温水暖房システムの運転が停止される(ステップ(85)、(86))。
【0042】
そして、この温水暖房システムの運転停止中、上記実施の形態1と同様に、ドレン中和容器(2) に設けられた温度センサ(5a)の検知温度が第3設定温度(53)(例えば、3℃)以下となると、この温水暖房システムを低出力運転する(ステップ(87)、(88))。この運転により、循環経路(400) 内の通水が加熱され、貯留容器(2a)及びドレン中和容器(2) が加熱される。
【0043】
前記検知温度が第4設定温度(54)(例えば、10℃)に達した時点で、この温水暖房システムの運転を停止する(ステップ(89)、(90))。これにより、貯留容器(2a)及びドレン中和容器(2) の加熱が終了する。従って、運転停止中でも、前記低出力運転により貯留容器(2a)及びドレン中和容器(2) が所定温度範囲(3℃〜10℃)に維持されるものとなり、循環経路(400) 内の循環水、貯留容器(2a)内の貯留ドレン、及び、ドレン中和容器(2) の内壁に付着したドレンの凍結が防止される。
【0044】
このものでは、温度センサ(5a)が既述請求項1に記載の検知手段(5)である。尚、検知手段(5)は、ドレン中和容器(2)の凍結防止の必要性を検知するものであるかぎり、温度センサ(5a)に限定されない。例えば、バイメタル式の温度スイッチにより検知するものでもよく、又、気温を検知したり、循環経路(400)内の水温を検知してもよい。
【0045】
尚、上記した実施の形態1に於いても、この実施の形態2のように、温度センサ(5a)の検知温度に基づいて温水経路(300)に温水を循環させる凍結防止運転を行う構成を採用できる。
[実施の形態3]
図8は、実施の形態3の温水暖房システムの説明図である。
【0046】
この実施の形態3は、上記した実施の形態2の温水暖房システムに於いて、循環経路(400)にバイパス接続した温水経路(300)を設け、この温水経路(300)に上記の加熱管部(31)を備えたものである。又、前記の温水経路(300)には、第1流量調節弁(91)が設けられており、ドレン中和容器(2)に備えられた温度センサ(5a)の検知温度に基づいて、加熱管部(31)を流れる温水の温度が制御される。
[他の実施の形態]
【0047】
1.図9に示すように、ドレン中和容器(2)とこれに巻き付けられた加熱管部(31)とを保温材(44)により被覆した構成としてもよい。このものでは、加熱管部(31)からドレン中和容器(2)への熱の伝導ロスが小さくなり、ドレン中和容器(2)の加熱効率が向上する。
2.図10に示すように、加熱管部(31)は、その断面の一部が直線状に形成された扁平部(311)を具備する構成とし、この扁平部(311)がドレン中和容器(2)の外面に接する構成としてもよい。この場合、加熱管部(31)とドレン中和容器(2)との接触面積が大きくなるから、加熱管部(31)からドレン中和容器(2)への熱伝導率が向上する。尚、この場合の加熱管部(31)をドレン中和容器(2)にロウ付けしてもよいことは言うまでもない。
【0048】
3.図11及び図12に示すように、ドレン中和容器(2)の胴部の構成壁の内面と外面との間に螺旋状に形成された通水路(32)に温水を流すものでもよい。又、図13に示すように、前記構成壁を、内筒(201)と外筒(202)とから構成し、その相互間の間隙部に前記温水を流すようにしてもよい。前記間隙部が前記通水路(32)として機能する。
【0049】
4.図14に示すように、ドレン中和容器(2)の構成壁を貫通してその内部に挿通される加熱管部(31)に前記温水を流すようにしてもよい。
【図面の簡単な説明】
【図1】 本願発明の実施の形態1の給湯器を構成する熱交換装置(1)及びドレン中和容器(2)の保温装置の説明図
【図2】 図1の熱交換装置(1)のドレン排出経路(11)に設けられるドレン中和容器(2)及び貯留容器(2a)の断面図
【図3】 図2の貯留容器(2a)の動作説明図
【図4】 図1及び図2のドレン中和容器(2)に巻き付けられた加熱管部(31)の拡大断面図
【図5】 図1の給湯器の制御回路(61)の制御プログラムを示すフローチャート
【図6】 実施の形態2の温水暖房システムの説明図
【図7】 図6の温水暖房システムの制御回路(61)の制御プログラムを示すフローチャート
【図8】 実施の形態3の温水暖房システムの説明図
【図9】 他の実施の形態のドレン中和容器(2)の保温装置の説明図
【図10】 他の実施の形態の加熱管部(31)の断面図
【図11】 他の実施の形態のドレン中和容器(2)の縦断面図
【図12】 図11のドレン中和容器(2)のVIII−VIII断面図
【図13】 他の実施の形態のドレン中和容器(2)の縦断面図
【図14】 他の実施の形態のドレン中和容器(2)の縦断面図
【図15】 従来の給湯器に於ける熱交換装置(1)とドレン中和容器(2)の説明図
【符号の説明】
(2) ・・・ドレン中和容器
(4) ・・・加熱手段
(1) ・・・熱交換装置
(1a)・・・熱交換器
(11)・・・ドレン排出経路
(5) ・・・検知手段
(6) ・・・制御手段
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a heat retaining device for a drain neutralization container, and more particularly to a device for retaining a drain neutralization container for neutralizing drain generated by condensation of water vapor in combustion exhaust gas.
[0002]
[Prior art]
FIG. 15 is an explanatory diagram of a heat exchange device (1) and a drain neutralization vessel (2) in a conventional water heater. As shown in the figure, the heat exchange device (1) has a configuration in which a main heat exchanger (12) and a sub heat exchanger (13) are accommodated in a can body (10). A burner device (40) for supplying combustion exhaust to the main / sub heat exchangers (12) (13) is provided at the upper end.
[0003]
In this heat exchange device (1), the heat of the combustion exhaust gas is absorbed by the water pipes of the main and auxiliary heat exchangers (12) and (13). In the main / sub heat exchangers (12) and (13), the water vapor contained in the combustion exhaust gas absorbs heat from the combustion exhaust gas until it becomes a dew point or less. Therefore, the heat exchange efficiency of the heat exchange device (1) is high.
On the other hand, since the water vapor is cooled to a dew point or lower, the water vapor is condensed, and drain adheres to the surface of the water pipe. This drain is discharged from the heat exchange device (1) via the drain discharge path (11) connected to the can (10).
[0004]
And when the said drain is produced | generated, acidic components, such as a nitrogen oxide contained in the said combustion exhaust, melt | dissolve. A drain neutralization vessel (2) containing a neutralizing agent for neutralizing the drain is provided in the drain discharge path (11).
Accordingly, the drain discharged from the heat exchange device (1) to the drain discharge path (11) comes into contact with the neutralizing agent when passing through the drain neutralizing vessel (2). Thereby, the acidic component in the drain is neutralized.
[0005]
[Problems to be solved by the invention]
However, in this conventional technique, when the temperature is lowered in winter, the drain neutralization vessel (2) is cooled and the inside of the vessel becomes low temperature. When the temperature of the neutralizing agent in the drain neutralization container (2) falls below a predetermined temperature, the degree of reaction with the drain is drastically reduced. Therefore, the neutralization is sufficiently performed under the low temperature conditions described above. I will not. In this case, the highly acidic drain is directly discharged to a sewer pipe or the like.
[0006]
An object of the invention of claim 1 is to provide a heat retaining device capable of promoting the reaction of the neutralizing agent in the drain neutralization vessel (2).
[0007]
[Means for Solving the Problems]
The problem-solving means of the invention of claim 1 is: a drain neutralization vessel provided so as to pass drain produced by condensation of water vapor contained in combustion exhaust gas and neutralizing the drain with a built-in neutralizer ( 2) and heating means (4) for heating the drain neutralization vessel (2) based on the heat of the combustion exhaust,
A heat exchange device (1) including a burner device (40) for generating the combustion exhaust and a heat exchanger (1a) for raising the temperature of the water in the water flow pipe by absorbing heat from the combustion exhaust is provided, The drain neutralization container (2) is provided in a drain discharge path (11) for discharging drain generated on the surface of the heat exchanger (1a) due to the endothermic heat from the heat exchange device (1), and the heating means (4) is a configuration in which the drain neutralization vessel (2) is heated by hot water that has passed through the water pipe,
Detection means (5) for detecting the necessity of promoting the reaction of the neutralizing agent, and activating the heating means (4) in response to the detection output of the detection means (5) and warm water in the heating means And control means (6) for performing temperature control ”.
[0009]
In this device, the heat of the combustion exhaust generated by the burner device (40) is absorbed by the heat exchanger (1a). Due to this heat absorption, drainage is generated on the surface of the heat exchanger (1a). The drain is discharged through the drain discharge path (11) and flows into the drain neutralization container (2).
On the other hand, when the reaction of the neutralizer is reduced, the detection means (5) detects the necessity of promoting the reaction of the neutralizer. The control means (6) responding to the detection output from the detection means (5) activates the heating means (4) and controls the temperature of the hot water. Thereby, due to the heat absorption, the water in the water pipe of the heat exchanger (1a) is heated, the drain neutralization vessel (2) is heated by the hot water that has passed through the water pipe, and The drain neutralization container (2) is maintained in a heat retaining state within a predetermined temperature range.
[0010]
Therefore, the drained inflow is neutralized by the neutralizing agent in the drain neutralization vessel (2) which is kept warm by the heating.
In the description of claim 1, specifically, “the heating means (4) is configured to heat the drain neutralization vessel (2) with warm water that has passed through the water pipe” specifically, As in the invention of claim 2, "the hot water passes through the heating pipe portion (31) wound around the outer surface of the drain neutralization vessel (2)", or as in the invention of claim 3, The hot water passes through a water passage (32) provided between the inner surface and the outer surface of the constituent wall of the drain neutralization vessel (2), and the invention according to claim 4, "the hot water is It may pass through the heating tube portion (31) inserted through the constituent wall of the drain neutralization vessel (2).
[0012]
【The invention's effect】
As described above, in the first aspect of the invention, the drain neutralization vessel (2) is maintained in a heat-retaining state within a predetermined temperature range when the reaction of the neutralizing agent is reduced. The neutralization reaction of the neutralizing agent is promoted.
Therefore, even when the drain neutralization container (2) is in a low temperature condition in winter or the like, the heating means (4) maintains the drain neutralization container (2) in a heat retaining state. The neutralization reaction of the drain by the summing agent is promoted.
[0013]
Further, the heating means (4) heats the drain neutralization vessel (2) based on the heat of the combustion exhaust that generates the drain. Therefore, the means for heating is used as the combustion exhaust. There is no need to provide a separate source other than the generation source. Therefore, the overall configuration of the heat retaining device is simplified as compared with the case where the means for heating is separately provided.
Further, since the drain neutralization device (2) is heated by the hot water, the heating device can be easily manufactured. In addition, it is good also as a structure which guides the said warm water with the hot water pipe connected to the downstream of the water flow pipe of the heat exchanger (1a), and the said structure is simplified further in this case.
[0015]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described with reference to the drawings.
[Embodiment 1]
FIG. 1 is an explanatory view of a heat exchanger (1) and a heat retaining device for a drain neutralization vessel (2) constituting the water heater of Embodiment 1 of the present invention, and FIG. 2 is a heat exchanger of FIG. FIG. 3 is a cross-sectional view of a drain neutralization container (2) and a storage container (2a) provided in the drain discharge path (11) of (1). FIG. 3 is an operation explanatory view of the storage container (2a) of FIG. FIG. 4 is an enlarged cross-sectional view of the heating tube portion (31) wound around the drain neutralization vessel (2) shown in FIGS.
[0016]
* Heat exchanger (1) *
As shown in FIG. 1, the heat exchanging device (1) has a configuration in which main and auxiliary heat exchangers (12) and (13) are accommodated in a can body (10). A burner (14) is provided above the main / sub heat exchangers (12) and (13). In addition, a fan (15) for supplying outside air for combustion to the burner (14) is connected to the upper end of the can body (10). These burner (14) and fan (15) constitute the burner device (40) described in claim 2 above, and combustion exhaust is generated by this burner device (40).
[0017]
The main heat exchanger (12) is on the burner (14) side (upstream side of the flow of combustion exhaust) from the sub heat exchanger (13), and the water pipe of the main heat exchanger (12) It is connected to the downstream side of the water pipe of the heat exchanger (13). A water supply path (17) for feeding water to the auxiliary heat exchanger (13) is connected to the upstream side of the water pipe of the auxiliary heat exchanger (13), and downstream of the water pipe of the main heat exchanger (12). The hot water outlet path (18) for feeding hot water heated by the main / sub heat exchangers (12) (13) is connected to the side.
[0018]
In this apparatus, the combustion exhaust from the burner device (40) first passes through the main heat exchanger (12), and at this time, the sensible heat is absorbed from the combustion exhaust by the main heat exchanger (12). Thereafter, when passing through the auxiliary heat exchanger (13), latent heat is absorbed from the combustion exhaust gas by the auxiliary heat exchanger (13). By this latent heat absorption, the water vapor contained in the combustion exhaust gas is cooled below the dew point, and the water vapor is condensed, whereby drainage is mainly generated in the auxiliary heat exchanger (13). During the condensation, acidic corrosive components such as nitrogen oxides in the combustion exhaust gas dissolve into the drain.
[0019]
The can body (10) includes a gas supply path (14a) for supplying gas to the burner (14), an exhaust passage (16) for discharging the combustion exhaust from the can body (10), and the drain. A drain discharge path (11) for discharging the water from the can body (10) is connected. The drain discharge path (11) is provided with a storage container (2a) and a drain neutralization container (2) which will be described later.
* Storage container (2a) *
As shown in FIGS. 1 and 2, the storage container (2a) is formed in a rectangular box shape as a whole. The storage container (2a) includes a sealed water chamber (21) in which a drain inflow pipe (210) connected to the drain discharge path (11) is inserted from above and stores drain from the heat exchange device (1), A storage chamber (22) connected to the sealed water chamber (21) and storing the drain overflowed from the sealed water chamber (21), and an opposite side of the sealed water chamber (21) to the storage chamber (22) And a siphon (23) connected in series.
[0020]
The siphon (23) includes a vacant chamber (24) communicating with the lower end of the storage chamber (22) via the communication hole (240), and a drain discharge pipe provided in the vacant chamber (24) in the vertical direction. (25). Between the drain discharge pipe (25) (for example, 6 mm in diameter) and the top plate (26) of the vacant room (24), the diameter of the drain discharge pipe (25), the surface tension of the drain, and the rise of the drain water level. In consideration of speed, a gap (for example, 5 mm) is provided below the top plate (26) so as not to cause air accumulation when the water level rises. The top plate (26) is provided slightly lower than the overflow water level of the sealed water chamber (21).
[0021]
* Drain neutralization container (2) *
The drain neutralization container (2) is a substantially vertical cylinder connected to the lower end of the drain discharge pipe (25), and the inner diameter thereof is set larger than the inner diameter of the drain discharge pipe (25). In this drain neutralization container (2), neutralizing agents (20) and (20) made of granules such as magnesium oxide and calcium carbonate are accommodated. A downstream drain discharge path (11) is connected to the lower end of the drain neutralization container (2).
[0022]
A temperature sensor (5a) for detecting the temperature of the drain neutralization container (2) is provided on the constituent wall of the drain neutralization container (2). A detection signal output from the temperature sensor (5a) is applied to a control circuit (61) described later.
* Warm water path (300) *
A hot water path (300) is connected to the hot water path (18) so as to branch from the hot water path (18). The downstream end of the hot water path (300) is connected to the water supply path (17) so as to join the water supply path (17). The hot water passage (300) is provided with a pump (30) that sucks hot water from the hot water supply passage (18) and sends it to the water supply passage (17).
[0023]
The warm water path (300) includes a heating pipe section (31) wound around the outer surfaces of the storage container (2a) and the drain neutralization container (2). As shown in FIG. 4, the heating pipe portion (31) has a circular cross section and is fixed to the outer surfaces of the storage container (2a) and the drain neutralization container (2) by brazing materials (38) (38). .
Furthermore, in this Embodiment 1, it has the structure which controls the temperature of the warm water which flows through a heating pipe part (31).
[0024]
Specifically, a chilled water path that sends chilled water from the upstream side of the connection with the hot water path (300) in the water supply path (17) to the upstream side from the heating pipe section (31) in the hot water path (300). (35) is provided. The cold water path (35) is provided with a second flow rate adjustment valve (92) for adjusting the flow rate of the cold water. In addition, the first flow rate adjustment for adjusting the flow rate of the hot water flowing from the hot water supply route (18) to the hot water route (300) is upstream of the junction with the cold water route (35) in the hot water route (300). A valve (91) is provided.
[0025]
Further, a control circuit (61) for controlling the hot water discharge operation of the heat exchange device (1) including the operation of the first and second flow rate control valves (91) and (92) is provided. Based on the control program stored in the microcomputer of the control circuit (61), the operations of the heat exchange device (1) and the first and second flow rate control valves (91) and (92) are controlled.
* About the operation of the water heater *
FIG. 5 is a flowchart showing a control program of the control circuit (61) of the water heater shown in FIG. This control program starts when the power supply to the water heater is turned on.
[0026]
Below, based on FIG. 5, operation | movement of the said water heater is demonstrated concretely.
When an operation switch (not shown) of the water heater is turned on, the water heater is in an operating state (steps (70), (73)). In this operating state, as described above, the cold water from the water supply path (17) rises due to the heat of the combustion exhaust from the burner (14) when passing through the main / sub heat exchanger (12) (13). It becomes warm and becomes warm water. This hot water is supplied to the kitchen and bath through the hot water supply route (18).
[0027]
Further, in this operation state, the drain mainly generated in the auxiliary heat exchanger (13) is discharged through the drain discharge path (11) and the drain inflow pipe (210) to the sealed chamber (21) of the storage container (2a). Flow into. As shown in FIG. 2, this drain overflows from the sealed water chamber (21), flows into the storage chamber (22), and is stored.
Although the drain water level in the storage chamber (22) rises due to the inflow, the storage chamber (22) and the vacant chamber (24) communicate with each other through the communication hole (240). The water level of (24) rises similarly to the water level of the storage chamber (22).
[0028]
Then, when the water level of the drain in the empty chamber (24) exceeds the upper end of the drain discharge pipe (25), there is no air accumulation between the upper end and the top plate (26) due to surface tension. The Thereby, the upper end opening of the drain discharge pipe (25) is closed by the drain (the state shown in FIG. 3A). This closing operation slightly precedes the rise of the drain water level in the storage chamber (22). After this, when the drain water level in the storage chamber (22) reaches the same height as the top plate (26), the pressure in the empty chamber (24) reaches a predetermined pressure, and the drain discharge pipe (25) is closed. Torn. As a result, the drain in the empty chamber (24) flows into the drain discharge pipe (26), and the suction negative pressure causes the drain in the empty chamber (24) and the storage chamber (22) to flow into the drain discharge pipe (26). And flows out into the drain neutralization container (2). Then, when the drain water level coincides with the communication hole (240), air enters the empty chamber (24), the suction negative pressure disappears, and the drain discharge ends (the state shown in FIG. 3B).
[0029]
In this case, the drain inflow into the storage chamber (22) and the drain discharge from the storage chamber (22) by the siphon (23) are repeatedly performed.
The drain that has flowed into the drain neutralization vessel (2) passes downward through the drain neutralization vessel (2). At this time, the drain is neutralized by contacting with the neutralizing agents (20) and (20). The neutralized drain is discharged from the drain neutralization vessel (2) to the drain discharge path (11) on the downstream side.
[0030]
On the other hand, when the operation switch of the water heater is turned on, the pump (30) of the hot water path (300) is turned on in step (74), and hot water flows from the hot water path (18) to the hot water path (300). .
When the operation switch is turned on, in step (71), the temperature detected by the temperature sensor (5a) provided in the drain neutralization vessel (2) is the first set temperature (51) (for example, 25 ° C.). It is determined whether or not:
[0031]
When the outside air temperature is low and the detected temperature is equal to or lower than the first set temperature (51), the process proceeds to step (72). In this step (72), the first flow rate control valve (91) is fully opened. The second flow rate adjustment valve (92) is fully closed. Thereby, the temperature of the storage container (2a) and the drain neutralization container (2) rises due to the heat of the hot water flowing through the heating pipe part (31). When the detected temperature reaches the first set temperature (51) (for example, 25 ° C.), the opening of the first flow control valve (91) is reduced and the opening of the second flow control valve (92) is increased. (Steps (75) and (76)). As a result, the amount of cold water supplied from the cold water passage (35) flowing into the heating pipe section (31) increases, the temperature of the hot water decreases, and the temperature of the storage container (2a) and the drain neutralization container (2) Decreases. Further, when the detected temperature falls below the second set temperature (52) (for example, 20 ° C.) lower than the first set temperature (51), the first flow rate adjusting valve (91) is opened contrary to the above. Increase the degree and decrease the opening of the second flow rate control valve (92) (steps (77), (78)). Thereby, the supply amount of the cold water decreases, and the temperature of the hot water rises. Thereafter, these steps (75) to (78) are repeatedly executed until the operation switch is turned off.
[0032]
If the outside air temperature is high and it is determined in step (71) that the detected temperature is equal to or higher than the first set temperature (51), step (72) described above is not executed and step (76) is performed. ), The operation of decreasing the opening of the first flow rate control valve (91) and increasing the opening of the second flow rate control valve (92) is performed. As a result, the temperature of the hot water decreases, and the temperatures of the storage container (2a) and the drain neutralization container (2) decrease. Thereafter, the same steps (75) to (78) as described above are repeatedly executed.
[0033]
By the above temperature control, the storage container (2a) and the drain neutralization container (2) are maintained within a predetermined temperature range (about 20 to 25 ° C.).
When the operation switch is turned off, the water heater and the pump (30) are stopped (steps (79), (80), (81)).
In this case, the heating pipe portion (31) of the hot water path (300) is brazed in a state of being wound around the storage container (2a) and the drain neutralization container (2), so that the heat of the hot water is heated. It is transmitted from the pipe section (31) to the storage container (2a) and the drain neutralization container (2). As a result, the storage container (2a) and the drain neutralization container (2) are maintained in a heat insulating state.
[0034]
Therefore, the heat is transferred to the internal neutralizing agent (20) (20) through the constituent wall of the drain neutralizing vessel (2), and the neutralizing agent (20) (20) and the drain neutralizing vessel (2) The neutralization reaction with the drain flowing into the water is promoted. In addition, since the storage container (2a) is maintained in the heat insulation state, the drain flowing from the storage container (2a) into the drain neutralization container (2) is also in the heat insulation state. Thereby, the effect of promoting the neutralization reaction is further improved.
[0035]
In this apparatus, the main / sub heat exchangers (12), (13) to the hot water path (300) are the heating means (4) according to claim 1 described above. The main / sub heat exchangers (12) and (13) are the heat exchanger (1a) described in claim 1. Note that an on-off valve such as a solenoid valve may be used instead of the first and second flow rate control valves 91 and 92 in this embodiment.
[0036]
Further, only one of the first and second flow rate control valves (91) and (92) may be provided. In this case, the mixing ratio of the hot water and the cold water flowing to the heating pipe section (31) is adjusted by changing the opening degree of the flow rate control valve, and the same effect as the above embodiment is achieved. Moreover, it is good also as a structure which sets the opening degree of a 1st flow control valve (91) based on the detected temperature of a temperature sensor (5a), without providing a cold water path | route (35).
[0037]
[Embodiment 2]
FIG. 6 is an explanatory diagram of the hot water heating system according to the second embodiment.
[0038]
As shown in the figure, the heat exchange device (1), the storage container (2a), and the drain neutralization container (2) used in this hot water heating system have the same configuration as in the first embodiment. In this hot water heating system, the circulation path is connected to connect the downstream end of the water pipe of the main heat exchanger (12) of the heat exchange device (1) and the upstream end of the water pipe of the auxiliary heat exchanger (13). (400) is provided. This circulation path (400) is provided with a heat radiating device (37) such as a floor heating radiator and a pump (30). In addition, a part of the path downstream of the heat dissipation device (37) in the circulation path (400) is wound around the storage container (2a) and the drain neutralization container (2), and the wound part is already existing. The heating pipe section (31) according to claim 2.
[0039]
The hot water heating system includes a control circuit (61) (not shown) similar to that of the first embodiment. The operation of the hot water heating system is controlled by the control program of the control circuit (61). Further, when the operation is stopped, the control for preventing freezing of the circulating water in the circulation path (400), the drain in the storage container (2a), and the drain in the drain neutralization container (2) is performed. Executed.
[0040]
FIG. 7 is a flowchart showing a control program of the control circuit (61) of the hot water heating system of FIG. As shown in FIG. 7, when an operation switch (not shown) of the hot water heating system is turned on, the hot water heating system is in an operating state (steps (83) and (84)). That is, the heat exchange device (1) is in an operating state, the pump (30) is turned on, and hot water flows through the circulation path (400). The heat of the warm water is radiated by the heat radiating device (37), and the temperature of the warm water decreases. After this, when passing through the heating pipe (31) wound around the storage container (2a) and the drain neutralization container (2), the storage container (2a) and the drain neutralization container (2 ) Is kept warm. Thereby, the neutralization reaction of a drain is accelerated | stimulated like the said Embodiment 1. FIG.
[0041]
Although the temperature of the hot water further decreases as it passes through the heating pipe section (31), it returns to the auxiliary / main heat exchangers (13) and (12) and is reheated. Such circulation of warm water is continued until the operation switch is turned off (steps (84) and (85)).
When the operation switch is turned off, the operation of the hot water heating system is stopped (steps (85) and (86)).
[0042]
While the operation of the hot water heating system is stopped, the temperature detected by the temperature sensor (5a) provided in the drain neutralization vessel (2) is the third set temperature (53) (for example, as in the first embodiment). When the temperature is 3 ° C. or lower, the hot water heating system is operated at a low output (steps (87) and (88)). By this operation, the water passing through the circulation path (400) is heated, and the storage container (2a) and the drain neutralization container (2) are heated.
[0043]
When the detected temperature reaches the fourth set temperature (54) (for example, 10 ° C.), the operation of the hot water heating system is stopped (steps (89) and (90)). Thereby, heating of the storage container (2a) and the drain neutralization container (2) is completed. Accordingly, even when the operation is stopped, the low output operation maintains the storage container (2a) and the drain neutralization container (2) within a predetermined temperature range (3 ° C. to 10 ° C.), and the circulation in the circulation path (400). Freezing of water, the stored drain in the storage container (2a), and the drain attached to the inner wall of the drain neutralization container (2) is prevented.
[0044]
In this device, the temperature sensor (5a) is the detection means (5) according to the first aspect. The detection means (5) is not limited to the temperature sensor (5a) as long as it detects the necessity of preventing the drain neutralization container (2) from freezing. For example, it may be detected by a bimetal temperature switch, or it may detect the air temperature or the water temperature in the circulation path (400).
[0045]
In the first embodiment described above, as in the second embodiment, the anti-freezing operation for circulating the hot water through the hot water path (300) based on the temperature detected by the temperature sensor (5a) is performed. Can be adopted.
[Embodiment 3]
FIG. 8 is an explanatory diagram of the hot water heating system according to the third embodiment.
[0046]
In this third embodiment, in the hot water heating system of the second embodiment described above, a hot water path (300) bypassed to the circulation path (400) is provided, and the heating pipe section is provided in the hot water path (300). (31). The warm water path (300) is provided with a first flow rate control valve (91), which is heated based on the temperature detected by the temperature sensor (5a) provided in the drain neutralization vessel (2). The temperature of the hot water flowing through the pipe part (31) is controlled.
[Other embodiments]
[0047]
1. As shown in FIG. 9, the drain neutralization vessel (2) and the heating tube portion (31) wound around the drain neutralization vessel (2) may be covered with a heat insulating material (44). In this case, the heat conduction loss from the heating tube (31) to the drain neutralization vessel (2) is reduced, and the heating efficiency of the drain neutralization vessel (2) is improved.
2. As shown in FIG. 10, the heating tube portion (31) is configured to include a flat portion (311) in which a part of the cross section is linearly formed, and the flat portion (311) is a drain neutralization container ( It is good also as a structure which touches the outer surface of 2). In this case, since the contact area between the heating pipe part (31) and the drain neutralization container (2) is increased, the thermal conductivity from the heating pipe part (31) to the drain neutralization container (2) is improved. Needless to say, the heating tube (31) in this case may be brazed to the drain neutralization vessel (2).
[0048]
3. As shown in FIGS. 11 and 12, warm water may be passed through a water passage (32) formed in a spiral shape between the inner surface and the outer surface of the constituent wall of the body portion of the drain neutralization container (2). Moreover, as shown in FIG. 13, the said structural wall may be comprised from an inner cylinder (201) and an outer cylinder (202), and you may make it flow the said warm water in the clearance gap between them. The gap functions as the water passage (32).
[0049]
4). As shown in FIG. 14, the hot water may be allowed to flow through the heating pipe portion (31) that passes through the constituent wall of the drain neutralization vessel (2) and is inserted into the inside.
[Brief description of the drawings]
FIG. 1 is an explanatory diagram of a heat exchanger (1) and a heat retaining device for a drain neutralization vessel (2) constituting the water heater according to Embodiment 1 of the present invention. FIG. 2 is a heat exchanger (1) in FIG. FIG. 3 is a sectional view of a drain neutralization container (2) and a storage container (2a) provided in the drain discharge path (11) of FIG. 3. FIG. 3 is an operation explanatory diagram of the storage container (2a) of FIG. Fig. 5 is an enlarged cross-sectional view of the heating pipe section (31) wound around the drain neutralization vessel (2) of Fig. 5. Fig. 5 is a flowchart showing a control program of the control circuit (61) of the water heater in Fig. 1. Explanatory drawing of the hot water heating system of Embodiment 2 [FIG. 7] A flowchart showing a control program of the control circuit (61) of the hot water heating system of FIG. 6 [FIG. Explanatory drawing of the heat retention apparatus of the drain neutralization container (2) of other embodiment. [FIG. 10] Sectional drawing of the heating pipe part (31) of other embodiment. Fig. 12 is a longitudinal sectional view of the drain neutralization vessel (2) of the embodiment of Fig. 12. Fig. 12 is a sectional view of VIII-VIII of the drain neutralization vessel (2) of Fig. 11. Fig. 13 is a drain neutralization vessel of another embodiment. Fig. 14 is a longitudinal sectional view of the drain neutralization vessel (2) of another embodiment. Fig. 15 is a heat exchange device (1) and a drain neutralization vessel in a conventional water heater. Illustration of (2) [Explanation of symbols]
(2) ... Drain neutralization container
(4) ... Heating means
(1) ・ ・ ・ Heat exchange device
(1a) ・ ・ ・ Heat exchanger
(11) ... Drain discharge route
(5) ... Detection means
(6) ... Control means

Claims (4)

燃焼排気に含まれる水蒸気の凝縮により生成されたドレンを通過させるように設けられ且つ内蔵した中和剤により前記ドレンを中和するドレン中和容器(2)と、このドレン中和容器(2)を前記燃焼排気の熱に基づいて加熱する加熱手段(4)とを具備し、
前記燃焼排気を生成するバーナ装置(40)と、前記燃焼排気からの吸熱により通水管内の水を昇温する熱交換器(1a)と、を内蔵した熱交換装置(1)が設けられ、前記ドレン中和容器(2)は、前記吸熱により前記熱交換器(1a)の表面に生じたドレンを前記熱交換装置(1)から排出するドレン排出経路(11)に設けられ、前記加熱手段(4)は、前記通水管を通過した温水によって前記ドレン中和容器(2)を加熱する構成であり、
前記中和剤の反応促進の必要性を検知する検知手段(5)と、この検知手段(5)の検知出力に応答して前記加熱手段(4)を能動化させ且つ前記加熱手段における温水の温度制御を行う制御手段(6)とを具備するドレン中和容器の保温装置。
A drain neutralization vessel (2) provided so as to pass drain generated by condensation of water vapor contained in combustion exhaust gas and neutralizing the drain with a built-in neutralizer, and this drain neutralization vessel (2) And heating means (4) for heating based on the heat of the combustion exhaust,
A heat exchange device (1) including a burner device (40) for generating the combustion exhaust and a heat exchanger (1a) for raising the temperature of water in the water flow pipe by absorbing heat from the combustion exhaust is provided, The drain neutralization vessel (2) is provided in a drain discharge path (11) for discharging drain generated on the surface of the heat exchanger (1a) by the endothermic heat from the heat exchange device (1), and the heating means (4) is a configuration in which the drain neutralization vessel (2) is heated by warm water that has passed through the water pipe,
Detection means (5) for detecting the necessity of promoting the reaction of the neutralizing agent, and activating the heating means (4) in response to the detection output of the detection means (5) and warm water in the heating means A heat retaining device for a drain neutralization container, comprising control means (6) for performing temperature control.
前記温水は、前記ドレン中和容器(2)の外面に巻き付けられた加熱管部(31)を通過する請求項1に記載のドレン中和容器の保温装置。  The said warm water is a heat retention apparatus of the drain neutralization container of Claim 1 which passes the heating pipe part (31) wound around the outer surface of the said drain neutralization container (2). 前記温水は、前記ドレン中和容器(2)の構成壁の内面と外面との間に設けられる通水路(32)を通過する請求項1に記載のドレン中和容器の保温装置。  The heat retaining device for a drain neutralization container according to claim 1, wherein the warm water passes through a water passage (32) provided between an inner surface and an outer surface of a constituent wall of the drain neutralization container (2). 前記温水は、前記ドレン中和容器(2)の構成壁を貫通してその内部に挿通される加熱管部(31)を通過する請求項1に記載のドレン中和容器の保温装置。  The said warm water is a heat retention apparatus of the drain neutralization container of Claim 1 which passes the heating pipe part (31) penetrated through the structural wall of the said drain neutralization container (2), and is penetrated in the inside.
JP10139996A 1996-04-23 1996-04-23 Insulation device for drain neutralization container Expired - Fee Related JP3732885B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP10139996A JP3732885B2 (en) 1996-04-23 1996-04-23 Insulation device for drain neutralization container

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP10139996A JP3732885B2 (en) 1996-04-23 1996-04-23 Insulation device for drain neutralization container

Publications (2)

Publication Number Publication Date
JPH09287727A JPH09287727A (en) 1997-11-04
JP3732885B2 true JP3732885B2 (en) 2006-01-11

Family

ID=14299665

Family Applications (1)

Application Number Title Priority Date Filing Date
JP10139996A Expired - Fee Related JP3732885B2 (en) 1996-04-23 1996-04-23 Insulation device for drain neutralization container

Country Status (1)

Country Link
JP (1) JP3732885B2 (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4700318B2 (en) * 2004-10-18 2011-06-15 高木産業株式会社 Drain discharge device for heat source machine
JP5262349B2 (en) * 2008-06-27 2013-08-14 株式会社ノーリツ Water heater
JP5196309B2 (en) * 2008-08-19 2013-05-15 株式会社ノーリツ Water heater
JP2010112659A (en) * 2008-11-07 2010-05-20 Noritz Corp Water heater
JP2010127585A (en) * 2008-11-28 2010-06-10 Noritz Corp Heat recovery device, cogeneration device and cogeneration system
JP5988704B2 (en) * 2012-06-01 2016-09-07 株式会社ガスター Heat source equipment
JP2016148494A (en) * 2015-02-13 2016-08-18 株式会社ノーリツ Neutralizing device and latent heat recovery type heat source machine
CN109506369A (en) * 2018-10-23 2019-03-22 珠海格力电器股份有限公司 Drainage device, control method thereof and wall-mounted boiler
CN111912094B (en) * 2020-07-29 2026-01-30 杭州佐帕斯工业有限公司 A flow-through water heater

Also Published As

Publication number Publication date
JPH09287727A (en) 1997-11-04

Similar Documents

Publication Publication Date Title
JP4023139B2 (en) Hybrid water heater
JP3732885B2 (en) Insulation device for drain neutralization container
CA2572421C (en) Method and apparatus for solar heating air in a forced draft heating system
JPH0926291A (en) Heat insulation device for drain container for heat exchanger
CA2499052A1 (en) Water heating apparatus
JP2964066B2 (en) Hot water heating system
JP3907032B2 (en) Water heater
JP2006090564A (en) Latent heat recovery type hot water heater
JPH085146A (en) Electricity economizing type and instantly heating type electric hot water vessel
JP3961144B2 (en) Water heater with other functions
JP3792637B2 (en) Water heater
JP6403630B2 (en) Hot water storage unit
JP6403631B2 (en) Hot water storage unit
JP6396833B2 (en) Heat source system
JP3801274B2 (en) Water heater
KR200210684Y1 (en) A tank that controls the temperature of heating medium
JP4842717B2 (en) Absorption chiller operation method and absorption chiller operation system
JPH1073263A (en) Operation control method of dual temperature type hot water circulating device
KR200215960Y1 (en) A hot water supplying apparatus keeping warm by using electricity boiler in the dead of night
KR200147551Y1 (en) Hot water supply device of gas boiler
JPS6365253A (en) Hot-water supplier
JPH078981Y2 (en) Water heater can body
JPS6011375Y2 (en) Freeze prevention device for hot water storage water heaters
KR20260021953A (en) Solar thermal hot water system
KR20240167551A (en) Exhaust gas heat recovery device and recovery method

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050208

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050330

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20051004

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20051014

R150 Certificate of patent (=grant) or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081021

Year of fee payment: 3

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091021

Year of fee payment: 4

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101021

Year of fee payment: 5

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111021

Year of fee payment: 6

LAPS Cancellation because of no payment of annual fees