Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP3741785B2 - Lifting platform - Google Patents
[go: Go Back, main page]

JP3741785B2 - Lifting platform - Google Patents

Lifting platform Download PDF

Info

Publication number
JP3741785B2
JP3741785B2 JP19239896A JP19239896A JP3741785B2 JP 3741785 B2 JP3741785 B2 JP 3741785B2 JP 19239896 A JP19239896 A JP 19239896A JP 19239896 A JP19239896 A JP 19239896A JP 3741785 B2 JP3741785 B2 JP 3741785B2
Authority
JP
Japan
Prior art keywords
floor
lifting
elevating
lifting platform
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP19239896A
Other languages
Japanese (ja)
Other versions
JPH1037664A (en
Inventor
明彦 美浦
宏泰 八木
Original Assignee
石川島建材工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 石川島建材工業株式会社 filed Critical 石川島建材工業株式会社
Priority to JP19239896A priority Critical patent/JP3741785B2/en
Publication of JPH1037664A publication Critical patent/JPH1037664A/en
Application granted granted Critical
Publication of JP3741785B2 publication Critical patent/JP3741785B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Description

【0001】
【発明の属する技術分野】
この発明は、線路と道路の立体交差あるいは線路、道路の下方に上下水道、電力、ガス等の地下洞道等のトンネルを新設する場合等に用いられる昇降架台に関するものである。
【0002】
【従来の技術】
鉄道や道路の下に立体交差するトンネルを構築する方法として、長尺な管状のエレメントを用いて施工するURT(Under Railway Tunnel)工法が知られている。
この工法は、まず、発進立坑にて、地山に向けてエレメントをセットし、このエレメントを、エレメント後方に配した掘進装置の推力によって地山へ水平に推進させながら、エレメントの先端に配設したカッタにより地山の土砂を掘削することにより、エレメントを掘進させてトンネルの覆工断面に沿って地山中に貫通・埋設し、エレメント内及びエレメント間にコンクリートを充填して硬化させてトンネル覆工体を構築した後、このトンネル覆工体の内側の土砂を掘削除去してトンネルを構築するものである。
ところで、このURT工法には、掘進装置をエレメントの打ち込み高さに合わせて昇降させる昇降架台が用いられている。
この昇降架台は、図9に示すように、発進立坑に立設された複数の柱1と、これら柱1に支持された昇降床2とを有するもので、この昇降床2上に前記掘進装置が設置されるようになっている。
また、それぞれの柱1には、図10に示すような昇降機構3が設けられており、これら昇降機構3によって昇降床2が昇降され、エレメントの打ち込み高さに合わせて掘進装置が昇降されるようになっている。
【0003】
次に、この昇降機構3について説明する。
昇降床2を構成する主桁4の一部には、一対のロッド5が固着されており、これらロッド5は、その上端が前記柱1の上端部に固定ナット6によって固定されている。
また、柱1には、その上端近傍に油圧ジャッキ7と、この油圧ジャッキ7によって押し上げられる吊りフレーム8が設けられており、この吊りフレーム8にも前記ロッド5が固定ナット9によって固着されている。
そして、上記構成の昇降機構3を備えた昇降床2を上昇させる場合は、まず、油圧ジャッキ7によって吊りフレーム8を上方へ押し上げる。このようにすると、柱1の上端からロッド5が上方へ突出され、このロッド5の固定ナット6と柱1の上端との間に間隔が設けられる。
次いで、この固定ナット6をねじ込んで柱1の上端に移動させ、その後油圧ジャッキ7を収縮させる。このようにすると、吊りフレーム8と固定ナット9との間に間隔が設けられ、この固定ナット9をねじ込んで吊りフレーム8の上部に移動させる。
そして、上記作業を繰り返し行うことにより昇降床2が油圧ジャッキ7のストローク分ずつ上昇される。
また、柱1には、その側部に長手方向へ間隔をあけて複数の孔部12が形成されており、これら孔部12からピン13を差し込んで昇降床2を構成する主桁4に設けられた保持部材14に保持させることにより、昇降床2がその位置に固定されるようになっている。
なお、図10中符号10は油圧ジャッキ7へ油圧を供給する油圧装置であり、符号11は、油圧装置10を制御して油圧ジャッキ7を駆動させるコントローラである。また、図9中符号2aは、主桁4に設けられた柵である。
【0004】
【発明が解決しようとする課題】
しかしながら、上記保持部材14とピン13とからなるロック機構は、昇降床2を孔部12の間隔毎に段階的に柱1へロックするものであるので、昇降床2の高さを微妙に調整することが困難であり、推進装置の高さ位置を正確に位置決めすることが難しいという問題があった。
【0005】
この発明は、上記事情に鑑みてなされたもので、昇降床の高さを微妙に調整することが可能な昇降架台を提供することを目的としている。
【0006】
【課題を解決するための手段】
上記目的を達成するために、請求項1記載の昇降架台は、立設された複数の柱と、該柱に摺動可能に支持された昇降床と、該昇降床を昇降させる昇降機構と、前記昇降床を柱に支持させるロック機構とを有する昇降架台であって、前記ロック機構は、前記昇降床に上下方向へ摺動可能に支持されて、前記柱にその長手方向へ間隔をあけて形成された複数の孔部から差し込まれて前記柱に水平に支持されるピンにその上方から載置される支持ブロックと、該支持ブロックを前記孔部の間隔よりも大きく上下方向へ移動させる移動機構部とを有することを特徴としている。
【0007】
請求項2記載の昇降架台は、請求項1記載の昇降架台において、前記移動機構部が、前記昇降床に設けられためねじ部と、該めねじ部に螺合されてそのねじ込み量を調整することにより、前記支持ブロックを上下方向へ変位させるボルト部とから構成されていることを特徴としている。
請求項3記載の昇降架台は、請求項1または請求項2記載の昇降架台において、前記支持ブロックに、前記ピンが嵌合可能な溝が形成されていることを特徴としている。
【0008】
【発明の実施の形態】
以下、本発明の昇降架台の実施の形態を図によって説明する。
図1から図3において、符号21は、柱1に設けられて昇降床2を昇降させる昇降機構である。
次に、この昇降機構21について説明する。
柱1の上端近傍には、柱1に固定された固定フレーム22に油圧ジャッキ23が立設されており、この油圧ジャッキ23を伸長させることにより、この油圧ジャッキ23のピストン24に固定された吊りフレーム25が上方へ押し上げられるようになっている。
また、吊りフレーム25には、一対の駆動ロッド26の一端がナット27によって固着されており、これら駆動ロッド26の他端は、油圧ジャッキ23を柱1に支持している固定フレーム22及びこの固定フレーム22の下方側に設けられた後述するロッド固定板28に形成された孔部に挿通されて下方へ導かれ、さらに、昇降床2の主桁4に設けられたねじボックス部31を構成する駆動ナット支持板部32、固定ナット支持板部33及び主桁4に形成された孔部を通され下方へ導かれている。
【0009】
また、油圧ジャッキ23の下方側のロッド固定板28には、一対の固定ロッド34の一端がナット35によってそれぞれ固着されており、これら固定ロッド34の他端は、下方へ導かれ、さらに、駆動ロッド26と同様に、昇降床2の主桁4に設けられたねじボックス部31を構成する駆動ナット支持板部32、固定ナット支持板部33及び主桁4に形成された孔部を通され下方へ導かれている。
昇降床2の主桁4に設けられたねじボックス部31は、主桁4の両端部にそれぞれ設けられたもので、上方へ立設された側板41と、これら側板41の上端に設けられた前記駆動ナット支持板部32と、この駆動ナット支持板部32の下方側に設けられた固定ナット支持板部33とを有するもので、駆動ナット支持板部32と固定ナット支持板部33との間が駆動ねじボックス42とされ、固定ナット支持板部33と主桁4の上面との間が固定ねじボックス43とされている。
そして、駆動ねじボックス42内に、駆動ロッド26にねじ込まれた駆動ロッド支持ナット44が設けられ、固定ねじボックス43内に、固定ロッド34にねじ込まれた固定ロッド支持ナット45が設けられている。そして、上記固定ロッド34と固定ロッド支持ナット45とによって昇降床2を柱1に保持させる保持手段が構成されている。
【0010】
また、この昇降床2を構成する主桁4の両端部には、前記ねじボックス部31の下方側に、昇降床2を柱1に支持するロック機構51が設けられている。
図4及び図5に示すように、このロック機構51は、主桁4の上面板4aに固定されためねじ部52と、このめねじ部52に上方からねじ込まれたボルト部53と、このボルト部53の先端部に長ねじ54によって取り付けられた支持ブロック55とを有するものである。支持ブロック55は、その両端部がそれぞれねじブロック部31を構成する側板41に形成された長孔56の両側部に沿って設けられた一対のレール57に嵌め込まれて上下方向へ摺動可能とされている。また、このロック機構51の支持ブロック55の下端には、長手方向へわたって円弧状の溝55aが形成されている。なお、側板41に形成された長孔56は、柱1のウエブ1aに長手方向へ沿って間隔をあけて形成された複数の孔部60のいずれかと連通するようになっている。
【0011】
そして、上記ロック機構51によって昇降床2を柱1へ支持する場合は、側板41に形成された長孔56と連通した、柱1のウエブ1aの孔部60へピン58を挿通させることによりこのピン58を柱1のウエブ1a間に掛け渡らせて係止ピン59によって係止させ、この状態にて、このピン58にその上方から支持ブロック55を載置させることにより、昇降床2がロック機構51を介して柱1に支持される。
そして、このとき、ボルト部53のねめじ部52へのねじ込み量を調整することにより、支持ブロック55が上下に摺動され、昇降床2の支持高さが調整される。
なお、このロック機構51によって調整可能な高さ寸法は、柱1のウエブ1aに形成された孔部60同士の間隔よりも大きくされている。
【0012】
次に、上記構成の昇降架台の昇降床2を昇降させる場合について説明する。
(1)昇降床2を上昇させる場合は、まず、油圧ジャッキ23を作動させてピストン24を伸長させる。このようにすると、図6に示すように、吊りフレーム25が上方へ押し上げられ、これにともない、吊りフレーム25に固着されている駆動ロッド26が引き上げられ、この駆動ロッド26によって昇降床2が吊り上げられる。
これにより、固定ねじボックス43における固定ナット支持板部33と固定ロッド支持ナット45とが油圧ジャッキ23のストローク分だけ間隔があいた状態となる。
(2)次に、図7に示すように、この固定ロッド支持ナット45の固定位置を固定ナット支持板部33の下部位置に移動させる。
(3)次いで、油圧ジャッキ23を収縮させる。このようにすると、図8に示すように、吊りフレーム25が下方へ下げられ、これにともない、昇降床2が固定ロッド34によって支持され、吊りフレーム25に固着されている駆動ロッド26が下げられる。
これにより、駆動ねじボックス42における駆動ナット支持板部32と駆動ロッド支持ナット44とが油圧ジャッキ23のストローク分だけ間隔があいた状態となる。
【0013】
(4)次に、この駆動ロッド支持ナット44の固定位置を駆動ナット支持板部32の下部位置に移動させる(図3参照)。
そして、上記(1)〜(4)の作業を繰り返し行うことにより、昇降床2が油圧ジャッキ23のストローク分ずつ上昇される。
そして、昇降床2の高さ位置が所定位置に到達したら、この昇降床2をロック機構51によって柱1に確実にロックして支持させ、後の作業、つまり推進装置によるエレメントの推進作業を行う。
また、昇降床2を下降させる場合は、上記作業と逆の作業を行うことにより、昇降床2が油圧ジャッキ23のストローク分ずつ下降される。
【0014】
このように、上記の昇降架台によれば、昇降床2を昇降させる際に、駆動ロッド26を上下に移動させることにより行うもの、つまり、昇降床2を上昇させる際に、柱1の上端からロッドを出っ張らせることなく、昇降床2を上昇させることができるので、例えば、上方に構造物やケーブル等が存在するような場所であっても、極めて好適に用いることができる。
また、ロック機構51によって昇降床2の高さを調整することができるので、昇降床2の高さ位置を、要求高さに極めて正確に位置決めすることができる。
しかも、このロック機構51による昇降床2の高さの調整可能な寸法が、柱1のウエブ1aに形成されて、昇降床2を支持するピン58が差し込まれる孔部60の間隔よりも大きくされているので、昇降床2の高さを無段階にて調整することができる。
【0015】
【発明の効果】
以上、説明したように、本発明の昇降架台によれば、下記の効果を得ることができる。
請求項1記載の昇降架台によれば、移動機構部によって支持ブロックを上下方向へ移動させることにより、昇降床の柱への支持高さを容易に調整することができる。
また、移動機構部による支持ブロックの移動距離が昇降床を柱へ支持させるピンが挿通される孔部の間隔よりも大きくされているので、昇降床の柱への支持高さを無段階に調整することができる。
これにより、この昇降架台を、エレメントを打ち込んでトンネルを構築するURT工法にて用いた場合、エレメントの打ち込み高さに合わせてその掘進装置を正確な高さ位置に位置決めして良好な推進作業を行うことができる。
請求項2記載の昇降架台によれば、めねじ部へのボルト部のねじ込み量を調整することにより、極めて容易に昇降床の柱への支持高さを調整することができる。
請求項3記載の昇降架台によれば、支持ブロックに形成された溝にピンが嵌合することにより、支持ブロックのピンへの確実な支持状態を確保することができる。
【図面の簡単な説明】
【図1】 本発明の実施の形態の昇降架台の構成及び構造を説明する昇降架台の側面図である。
【図2】 本発明の実施の形態の昇降架台を構成する昇降機構の構成及び構造を説明する昇降機構部分の斜視図である。
【図3】 本発明の実施の形態の昇降架台を構成する昇降機構の構成及び構造を説明する昇降機構部分の断面図である。
【図4】 本発明の実施の形態の昇降架台を構成するロック機構の構成及び構造を説明するロック機構部分の断面図である。
【図5】 本発明の実施の形態の昇降架台を構成するロック機構の構成及び構造を説明するロック機構部分の分解斜視図である。
【図6】 本発明の実施の形態の昇降架台を構成する昇降機構の動きを説明する昇降機構の断面図である。
【図7】 本発明の実施の形態の昇降架台を構成する昇降機構の動きを説明する昇降機構の断面図である。
【図8】 本発明の実施の形態の昇降架台を構成する昇降機構の動きを説明する昇降機構の断面図である。
【図9】 エレメント推進装置が設置される昇降架台の構成を説明する昇降架台の概略側面図である。
【図10】 従来の昇降架台を構成する昇降機構の構成及び構造を説明する昇降機構の斜視図である。
【符号の説明】
1 柱
2 昇降床
21 昇降機構
51 ロック機構
52 めねじ部(移動機構部)
53 ボルト部(移動機構部)
55 支持ブロック
55a 溝
60 孔部
[0001]
BACKGROUND OF THE INVENTION
TECHNICAL FIELD The present invention relates to a lifting platform used when a tunnel such as an underground cave such as a water supply / sewerage system, electric power, gas, etc. is newly installed at a three-dimensional intersection of a track and a road or below the track.
[0002]
[Prior art]
A URT (Under Railway Tunnel) method of construction using a long tubular element is known as a method of constructing a tunnel that intersects three-dimensionally under a railway or road.
In this construction method, first, an element is set at the starting shaft toward the natural ground, and this element is placed at the tip of the element while being propelled horizontally to the natural ground by the thrust of the excavating device placed behind the element. By excavating the earth and sand of the natural ground with the cut cutter, the element is excavated and penetrated and buried in the natural ground along the tunnel lining section, and the concrete is filled and cured in the element and between the elements to cover the tunnel After constructing the construction body, the tunnel is constructed by excavating and removing the earth and sand inside the tunnel lining body.
By the way, in this URT method, an elevating platform for elevating and lowering the excavating device according to the driving height of the element is used.
As shown in FIG. 9, the lifting platform includes a plurality of pillars 1 erected on the start shaft and a lifting floor 2 supported by the pillars 1, and the excavation device is provided on the lifting floor 2. Is to be installed.
Further, each column 1 is provided with an elevating mechanism 3 as shown in FIG. 10, and the elevating floor 2 is raised and lowered by these elevating mechanisms 3, and the excavating apparatus is raised and lowered according to the driving height of the element. It is like that.
[0003]
Next, the lifting mechanism 3 will be described.
A pair of rods 5 are fixed to a part of the main girder 4 constituting the elevating floor 2, and the upper ends of these rods 5 are fixed to the upper end portion of the column 1 by a fixing nut 6.
Further, the column 1 is provided with a hydraulic jack 7 and a suspension frame 8 pushed up by the hydraulic jack 7 in the vicinity of the upper end thereof, and the rod 5 is fixed to the suspension frame 8 by a fixing nut 9. .
And when raising the raising / lowering floor 2 provided with the raising / lowering mechanism 3 of the said structure, the suspension frame 8 is first pushed up with the hydraulic jack 7. FIG. In this way, the rod 5 protrudes upward from the upper end of the column 1, and a gap is provided between the fixing nut 6 of the rod 5 and the upper end of the column 1.
Next, the fixing nut 6 is screwed and moved to the upper end of the column 1, and then the hydraulic jack 7 is contracted. If it does in this way, a space | interval will be provided between the suspension frame 8 and the fixed nut 9, and this fixed nut 9 will be screwed and moved to the upper part of the suspension frame 8. FIG.
And the raising / lowering floor | bed 2 is raised for every stroke of the hydraulic jack 7 by repeating the said operation | work.
Further, the pillar 1 is formed with a plurality of holes 12 at intervals in the longitudinal direction on the side thereof, and is provided in the main girder 4 constituting the elevating floor 2 by inserting pins 13 from the holes 12. By being held by the holding member 14, the elevating floor 2 is fixed at that position.
In FIG. 10, reference numeral 10 denotes a hydraulic apparatus that supplies hydraulic pressure to the hydraulic jack 7, and reference numeral 11 denotes a controller that controls the hydraulic apparatus 10 to drive the hydraulic jack 7. Further, reference numeral 2 a in FIG. 9 is a fence provided on the main beam 4.
[0004]
[Problems to be solved by the invention]
However, the locking mechanism composed of the holding member 14 and the pin 13 locks the elevating floor 2 to the column 1 step by step at intervals of the holes 12, so that the height of the elevating floor 2 is finely adjusted. There is a problem that it is difficult to accurately position the height position of the propulsion device.
[0005]
The present invention has been made in view of the above circumstances, and an object of the present invention is to provide a lifting platform that can finely adjust the height of the lifting floor.
[0006]
[Means for Solving the Problems]
In order to achieve the above object, the lifting platform according to claim 1 includes a plurality of standing columns, a lifting floor supported slidably on the columns, a lifting mechanism for lifting and lowering the lifting floor, A lifting mechanism having a locking mechanism for supporting the lifting floor to a pillar, the locking mechanism being supported by the lifting floor so as to be slidable in the vertical direction, and spaced apart from the pillar in the longitudinal direction. A support block that is inserted from a plurality of formed holes and is placed from above on a pin that is horizontally supported by the pillar, and a movement that moves the support block in a vertical direction larger than the interval between the holes. And a mechanism portion.
[0007]
The lifting platform according to claim 2 is the lifting platform according to claim 1, wherein the moving mechanism portion is provided on the lifting floor and is screwed to the female screw portion to adjust the screwing amount. By this, it is comprised from the volt | bolt part which displaces the said support block to an up-down direction, It is characterized by the above-mentioned.
The lifting platform according to claim 3 is the lifting platform according to claim 1 or 2, wherein the support block is provided with a groove into which the pin can be fitted.
[0008]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the lifting platform of the present invention will be described with reference to the drawings.
1 to 3, reference numeral 21 denotes an elevating mechanism that is provided on the pillar 1 and elevates the elevating floor 2.
Next, the lifting mechanism 21 will be described.
In the vicinity of the upper end of the column 1, a hydraulic jack 23 is erected on a fixed frame 22 fixed to the column 1. By extending the hydraulic jack 23, a suspension fixed to the piston 24 of the hydraulic jack 23 is provided. The frame 25 is pushed upward.
In addition, one end of a pair of drive rods 26 is fixed to the suspension frame 25 by nuts 27, and the other end of these drive rods 26 is a fixed frame 22 that supports the hydraulic jack 23 on the pillar 1 and the fixing frame 22. It is inserted into a hole formed in a rod fixing plate 28 described later provided on the lower side of the frame 22 and guided downward, and further constitutes a screw box portion 31 provided in the main girder 4 of the elevating floor 2. The drive nut support plate portion 32, the fixed nut support plate portion 33, and the hole formed in the main girder 4 are guided downward.
[0009]
Further, one end of a pair of fixed rods 34 is fixed to the rod fixing plate 28 on the lower side of the hydraulic jack 23 by a nut 35, and the other ends of the fixed rods 34 are guided downward to be further driven. Similarly to the rod 26, the drive nut support plate portion 32, the fixed nut support plate portion 33, and the hole portion formed in the main girder 4 that constitute the screw box portion 31 provided in the main girder 4 of the elevating floor 2 are passed through. Guided downward.
The screw box portions 31 provided on the main girder 4 of the elevating floor 2 are respectively provided at both ends of the main girder 4, and are provided on the side plates 41 erected upward and on the upper ends of these side plates 41. The drive nut support plate portion 32 and a fixed nut support plate portion 33 provided on the lower side of the drive nut support plate portion 32, and the drive nut support plate portion 32 and the fixed nut support plate portion 33 A space between the fixed nut support plate 33 and the upper surface of the main beam 4 is a fixed screw box 43.
A drive rod support nut 44 screwed into the drive rod 26 is provided in the drive screw box 42, and a fixed rod support nut 45 screwed into the fixed rod 34 is provided in the fixed screw box 43. The fixing rod 34 and the fixing rod support nut 45 constitute holding means for holding the elevating floor 2 on the column 1.
[0010]
Further, at both ends of the main girder 4 constituting the elevating floor 2, lock mechanisms 51 for supporting the elevating floor 2 to the pillar 1 are provided below the screw box portion 31.
As shown in FIGS. 4 and 5, the lock mechanism 51 is fixed to the upper surface plate 4 a of the main girder 4, so that a screw portion 52, a bolt portion 53 screwed into the female screw portion 52 from above, and the bolt It has a support block 55 attached to the tip of the portion 53 by a long screw 54. Both ends of the support block 55 are fitted in a pair of rails 57 provided along both side portions of the long hole 56 formed in the side plate 41 constituting the screw block portion 31, and can be slid in the vertical direction. Has been. Further, an arc-shaped groove 55a is formed at the lower end of the support block 55 of the lock mechanism 51 in the longitudinal direction. The long hole 56 formed in the side plate 41 communicates with any one of the plurality of hole portions 60 formed in the web 1a of the column 1 at intervals along the longitudinal direction.
[0011]
And when supporting the raising / lowering floor 2 to the pillar 1 by the said locking mechanism 51, this is achieved by inserting the pin 58 into the hole portion 60 of the web 1a of the pillar 1 communicating with the long hole 56 formed in the side plate 41. The pin 58 is spanned between the webs 1a of the pillar 1 and locked by the locking pin 59. In this state, the support block 55 is placed on the pin 58 from above, so that the elevator floor 2 is locked. It is supported by the pillar 1 through the mechanism 51.
At this time, the support block 55 is slid up and down by adjusting the screwing amount of the bolt portion 53 into the screwing portion 52, and the support height of the lift floor 2 is adjusted.
The height dimension that can be adjusted by the lock mechanism 51 is made larger than the interval between the hole portions 60 formed in the web 1 a of the column 1.
[0012]
Next, the case where the raising / lowering floor 2 of the lifting stand of the said structure is raised / lowered is demonstrated.
(1) When raising the raising / lowering floor 2, first, the hydraulic jack 23 is operated and the piston 24 is extended. In this way, as shown in FIG. 6, the suspension frame 25 is pushed upward, and accordingly, the drive rod 26 fixed to the suspension frame 25 is pulled up, and the lift floor 2 is lifted by the drive rod 26. It is done.
As a result, the fixed nut support plate portion 33 and the fixed rod support nut 45 in the fixed screw box 43 are spaced from each other by the stroke of the hydraulic jack 23.
(2) Next, as shown in FIG. 7, the fixed position of the fixed rod support nut 45 is moved to the lower position of the fixed nut support plate 33.
(3) Next, the hydraulic jack 23 is contracted. In this manner, as shown in FIG. 8, the suspension frame 25 is lowered downward, and accordingly, the lifting floor 2 is supported by the fixed rod 34 and the drive rod 26 fixed to the suspension frame 25 is lowered. .
As a result, the drive nut support plate portion 32 and the drive rod support nut 44 in the drive screw box 42 are spaced apart by the stroke of the hydraulic jack 23.
[0013]
(4) Next, the fixed position of the drive rod support nut 44 is moved to the lower position of the drive nut support plate 32 (see FIG. 3).
And the raising / lowering floor | bed 2 is raised for every stroke of the hydraulic jack 23 by repeating the operation | work of said (1)-(4).
When the height of the lift floor 2 reaches a predetermined position, the lift floor 2 is securely locked and supported by the pillar 1 by the lock mechanism 51, and the subsequent work, that is, the element propulsion work by the propulsion device is performed. .
Further, when the elevator floor 2 is lowered, the elevator floor 2 is lowered by the stroke of the hydraulic jack 23 by performing an operation reverse to the above operation.
[0014]
Thus, according to the above-described lifting platform, when the lifting floor 2 is moved up and down, the drive rod 26 is moved up and down, that is, when the lifting floor 2 is lifted, from the upper end of the column 1. Since the elevating floor 2 can be raised without protruding the rod, for example, it can be used very suitably even in a place where a structure, a cable or the like exists above.
Moreover, since the height of the raising / lowering floor 2 can be adjusted with the lock mechanism 51, the height position of the raising / lowering floor 2 can be positioned very precisely to the required height.
In addition, the height of the lifting / lowering floor 2 that can be adjusted by the lock mechanism 51 is made larger than the interval between the holes 60 formed in the web 1a of the pillar 1 and the pins 58 that support the lifting / lowering floor 2 are inserted. Therefore, the height of the lifting floor 2 can be adjusted steplessly.
[0015]
【The invention's effect】
As described above, according to the lifting platform of the present invention, the following effects can be obtained.
According to the lifting platform according to the first aspect, the supporting height of the lifting floor to the pillar can be easily adjusted by moving the supporting block in the vertical direction by the moving mechanism.
In addition, since the moving distance of the support block by the moving mechanism is larger than the interval between the holes through which the pins that support the lift floor to the pillar are inserted, the support height of the lift floor to the pillar is adjusted steplessly can do.
As a result, when this lifting platform is used in the URT method of constructing a tunnel by driving in the element, the excavating device is positioned at an accurate height position according to the driving height of the element, and good propulsion work is performed. It can be carried out.
According to the lifting platform according to the second aspect, the height of support of the lifting floor to the pillar can be very easily adjusted by adjusting the screwing amount of the bolt portion into the female thread portion.
According to the lifting frame of the third aspect, the pin is fitted into the groove formed in the support block, so that a reliable support state to the pin of the support block can be ensured.
[Brief description of the drawings]
BRIEF DESCRIPTION OF DRAWINGS FIG. 1 is a side view of a lifting platform for explaining the configuration and structure of a lifting platform according to an embodiment of the present invention.
FIG. 2 is a perspective view of an elevating mechanism part for explaining the configuration and structure of the elevating mechanism that constitutes the elevating frame according to the embodiment of the present invention.
FIG. 3 is a cross-sectional view of a lifting mechanism portion for explaining the configuration and structure of a lifting mechanism that constitutes a lifting platform according to an embodiment of the present invention.
FIG. 4 is a cross-sectional view of the lock mechanism portion for explaining the configuration and structure of the lock mechanism that constitutes the lifting platform of the embodiment of the present invention.
FIG. 5 is an exploded perspective view of a lock mechanism portion for explaining the configuration and structure of a lock mechanism that constitutes the lifting platform according to the embodiment of the present invention.
FIG. 6 is a cross-sectional view of the lifting mechanism for explaining the movement of the lifting mechanism constituting the lifting platform according to the embodiment of the present invention.
FIG. 7 is a cross-sectional view of the elevating mechanism for explaining the movement of the elevating mechanism that constitutes the elevating platform according to the embodiment of the present invention.
FIG. 8 is a cross-sectional view of the lifting mechanism for explaining the movement of the lifting mechanism constituting the lifting platform according to the embodiment of the present invention.
FIG. 9 is a schematic side view of the lifting platform for explaining the configuration of the lifting platform on which the element propulsion device is installed.
FIG. 10 is a perspective view of a lifting mechanism for explaining the configuration and structure of a lifting mechanism that constitutes a conventional lifting platform.
[Explanation of symbols]
1 Pillar 2 Elevating Floor 21 Elevating Mechanism 51 Locking Mechanism 52 Female Screw (Moving Mechanism)
53 Bolt part (movement mechanism part)
55 Support Block 55a Groove 60 Hole

Claims (3)

立設された複数の柱と、該柱に摺動可能に支持された昇降床と、該昇降床を昇降させる昇降機構と、前記昇降床を柱に支持させるロック機構とを有する昇降架台であって、
前記ロック機構は、前記昇降床に上下方向へ摺動可能に支持されて、前記柱にその長手方向へ間隔をあけて形成された複数の孔部から差し込まれて前記柱に水平に支持されるピンにその上方から載置される支持ブロックと、該支持ブロックを前記孔部の間隔よりも大きく上下方向へ移動させる移動機構部とを有することを特徴とする昇降架台。
A lifting platform having a plurality of standing columns, a lifting floor supported slidably on the columns, a lifting mechanism for lifting the lifting floor, and a lock mechanism for supporting the lifting floor to the columns. And
The lock mechanism is supported by the elevating floor so as to be slidable in the vertical direction, and is inserted into a plurality of holes formed at intervals in the longitudinal direction of the pillar and horizontally supported by the pillar. A lifting platform comprising: a support block placed on the pin from above; and a moving mechanism that moves the support block in a vertical direction that is larger than the interval between the holes.
前記移動機構部は、前記昇降床に設けられためねじ部と、該めねじ部に螺合されてそのねじ込み量を調整することにより、前記支持ブロックを上下方向へ変位させるボルト部とから構成されていることを特徴とする請求項1記載の昇降架台。The moving mechanism portion includes a screw portion provided on the elevating floor, and a bolt portion that is screwed into the female screw portion and adjusts the screwing amount to displace the support block in the vertical direction. The lifting platform according to claim 1. 前記支持ブロックには、前記ピンが嵌合可能な溝が形成されていることを特徴とする請求項1または請求項2記載の昇降架台。The elevating base according to claim 1 or 2, wherein a groove in which the pin can be fitted is formed in the support block.
JP19239896A 1996-07-22 1996-07-22 Lifting platform Expired - Lifetime JP3741785B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP19239896A JP3741785B2 (en) 1996-07-22 1996-07-22 Lifting platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP19239896A JP3741785B2 (en) 1996-07-22 1996-07-22 Lifting platform

Publications (2)

Publication Number Publication Date
JPH1037664A JPH1037664A (en) 1998-02-10
JP3741785B2 true JP3741785B2 (en) 2006-02-01

Family

ID=16290653

Family Applications (1)

Application Number Title Priority Date Filing Date
JP19239896A Expired - Lifetime JP3741785B2 (en) 1996-07-22 1996-07-22 Lifting platform

Country Status (1)

Country Link
JP (1) JP3741785B2 (en)

Also Published As

Publication number Publication date
JPH1037664A (en) 1998-02-10

Similar Documents

Publication Publication Date Title
US5660504A (en) Metal foundation push-it and installation apparatus and method
CN109252533B (en) Open caisson sinking control system and construction method thereof
WO1985002435A1 (en) Method and apparatus for installing an in-ground support footing around an upstanding elongate object
JP4317322B2 (en) Arch support structure
CN110578476B (en) Slope drilling construction platform
JP2684155B2 (en) Excavation method used for construction of underground structures
CN113356077B (en) Construction method of reinforced concrete frame bridge with lift beam overhead line jacking in and down
CN106284333B (en) A kind of fast positioning pile extension platform and pile extension method
JP3741784B2 (en) Lifting platform
JP3741785B2 (en) Lifting platform
US6354769B1 (en) Apparatus and method for replacing in-ground elevator cylinder casings
CN119041459B (en) A construction device and method for assembling cast-in-place lattice beams for slope rescue
CN216950416U (en) Construction device for jacking box culvert
JP2004270304A (en) Earth auger excavator and drilling method
CN113309145B (en) Method for dismantling through-floor tower crane for large building construction
JP5865760B2 (en) Steel pipe press-fitting device moving device and steel pipe press-fitting device installation method
CN116380512A (en) A wall fixing device and method for indoor shield cutting ground connection wall experiment
CN220704323U (en) Integrated bridging equipment
JP5365852B2 (en) Element launch stand
RU2783828C1 (en) Device for strengthening earth structures
JPH0957661A (en) Scaffold device for wall surface work
EP1792019B1 (en) Method of raising a building structure, in particular a building structure subject to flooding
CN112922644B (en) A guide hole arch frame erection device for initial support of tunnel and construction method thereof
CN119411616B (en) Anti-seepage curtain construction trench section isolation system and waterproof curtain construction method
JP2009203750A (en) Excavating machine and excavation method

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20051021

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20051101

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20051109

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091118

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091118

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101118

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111118

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121118

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131118

Year of fee payment: 8

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

EXPY Cancellation because of completion of term