JP3741785B2 - Lifting platform - Google Patents
Lifting platform Download PDFInfo
- Publication number
- JP3741785B2 JP3741785B2 JP19239896A JP19239896A JP3741785B2 JP 3741785 B2 JP3741785 B2 JP 3741785B2 JP 19239896 A JP19239896 A JP 19239896A JP 19239896 A JP19239896 A JP 19239896A JP 3741785 B2 JP3741785 B2 JP 3741785B2
- Authority
- JP
- Japan
- Prior art keywords
- floor
- lifting
- elevating
- lifting platform
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 230000007246 mechanism Effects 0.000 claims description 49
- 230000003028 elevating effect Effects 0.000 claims description 30
- 239000000725 suspension Substances 0.000 description 11
- 238000000034 method Methods 0.000 description 4
- 238000010276 construction Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 239000004576 sand Substances 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Description
【0001】
【発明の属する技術分野】
この発明は、線路と道路の立体交差あるいは線路、道路の下方に上下水道、電力、ガス等の地下洞道等のトンネルを新設する場合等に用いられる昇降架台に関するものである。
【0002】
【従来の技術】
鉄道や道路の下に立体交差するトンネルを構築する方法として、長尺な管状のエレメントを用いて施工するURT(Under Railway Tunnel)工法が知られている。
この工法は、まず、発進立坑にて、地山に向けてエレメントをセットし、このエレメントを、エレメント後方に配した掘進装置の推力によって地山へ水平に推進させながら、エレメントの先端に配設したカッタにより地山の土砂を掘削することにより、エレメントを掘進させてトンネルの覆工断面に沿って地山中に貫通・埋設し、エレメント内及びエレメント間にコンクリートを充填して硬化させてトンネル覆工体を構築した後、このトンネル覆工体の内側の土砂を掘削除去してトンネルを構築するものである。
ところで、このURT工法には、掘進装置をエレメントの打ち込み高さに合わせて昇降させる昇降架台が用いられている。
この昇降架台は、図9に示すように、発進立坑に立設された複数の柱1と、これら柱1に支持された昇降床2とを有するもので、この昇降床2上に前記掘進装置が設置されるようになっている。
また、それぞれの柱1には、図10に示すような昇降機構3が設けられており、これら昇降機構3によって昇降床2が昇降され、エレメントの打ち込み高さに合わせて掘進装置が昇降されるようになっている。
【0003】
次に、この昇降機構3について説明する。
昇降床2を構成する主桁4の一部には、一対のロッド5が固着されており、これらロッド5は、その上端が前記柱1の上端部に固定ナット6によって固定されている。
また、柱1には、その上端近傍に油圧ジャッキ7と、この油圧ジャッキ7によって押し上げられる吊りフレーム8が設けられており、この吊りフレーム8にも前記ロッド5が固定ナット9によって固着されている。
そして、上記構成の昇降機構3を備えた昇降床2を上昇させる場合は、まず、油圧ジャッキ7によって吊りフレーム8を上方へ押し上げる。このようにすると、柱1の上端からロッド5が上方へ突出され、このロッド5の固定ナット6と柱1の上端との間に間隔が設けられる。
次いで、この固定ナット6をねじ込んで柱1の上端に移動させ、その後油圧ジャッキ7を収縮させる。このようにすると、吊りフレーム8と固定ナット9との間に間隔が設けられ、この固定ナット9をねじ込んで吊りフレーム8の上部に移動させる。
そして、上記作業を繰り返し行うことにより昇降床2が油圧ジャッキ7のストローク分ずつ上昇される。
また、柱1には、その側部に長手方向へ間隔をあけて複数の孔部12が形成されており、これら孔部12からピン13を差し込んで昇降床2を構成する主桁4に設けられた保持部材14に保持させることにより、昇降床2がその位置に固定されるようになっている。
なお、図10中符号10は油圧ジャッキ7へ油圧を供給する油圧装置であり、符号11は、油圧装置10を制御して油圧ジャッキ7を駆動させるコントローラである。また、図9中符号2aは、主桁4に設けられた柵である。
【0004】
【発明が解決しようとする課題】
しかしながら、上記保持部材14とピン13とからなるロック機構は、昇降床2を孔部12の間隔毎に段階的に柱1へロックするものであるので、昇降床2の高さを微妙に調整することが困難であり、推進装置の高さ位置を正確に位置決めすることが難しいという問題があった。
【0005】
この発明は、上記事情に鑑みてなされたもので、昇降床の高さを微妙に調整することが可能な昇降架台を提供することを目的としている。
【0006】
【課題を解決するための手段】
上記目的を達成するために、請求項1記載の昇降架台は、立設された複数の柱と、該柱に摺動可能に支持された昇降床と、該昇降床を昇降させる昇降機構と、前記昇降床を柱に支持させるロック機構とを有する昇降架台であって、前記ロック機構は、前記昇降床に上下方向へ摺動可能に支持されて、前記柱にその長手方向へ間隔をあけて形成された複数の孔部から差し込まれて前記柱に水平に支持されるピンにその上方から載置される支持ブロックと、該支持ブロックを前記孔部の間隔よりも大きく上下方向へ移動させる移動機構部とを有することを特徴としている。
【0007】
請求項2記載の昇降架台は、請求項1記載の昇降架台において、前記移動機構部が、前記昇降床に設けられためねじ部と、該めねじ部に螺合されてそのねじ込み量を調整することにより、前記支持ブロックを上下方向へ変位させるボルト部とから構成されていることを特徴としている。
請求項3記載の昇降架台は、請求項1または請求項2記載の昇降架台において、前記支持ブロックに、前記ピンが嵌合可能な溝が形成されていることを特徴としている。
【0008】
【発明の実施の形態】
以下、本発明の昇降架台の実施の形態を図によって説明する。
図1から図3において、符号21は、柱1に設けられて昇降床2を昇降させる昇降機構である。
次に、この昇降機構21について説明する。
柱1の上端近傍には、柱1に固定された固定フレーム22に油圧ジャッキ23が立設されており、この油圧ジャッキ23を伸長させることにより、この油圧ジャッキ23のピストン24に固定された吊りフレーム25が上方へ押し上げられるようになっている。
また、吊りフレーム25には、一対の駆動ロッド26の一端がナット27によって固着されており、これら駆動ロッド26の他端は、油圧ジャッキ23を柱1に支持している固定フレーム22及びこの固定フレーム22の下方側に設けられた後述するロッド固定板28に形成された孔部に挿通されて下方へ導かれ、さらに、昇降床2の主桁4に設けられたねじボックス部31を構成する駆動ナット支持板部32、固定ナット支持板部33及び主桁4に形成された孔部を通され下方へ導かれている。
【0009】
また、油圧ジャッキ23の下方側のロッド固定板28には、一対の固定ロッド34の一端がナット35によってそれぞれ固着されており、これら固定ロッド34の他端は、下方へ導かれ、さらに、駆動ロッド26と同様に、昇降床2の主桁4に設けられたねじボックス部31を構成する駆動ナット支持板部32、固定ナット支持板部33及び主桁4に形成された孔部を通され下方へ導かれている。
昇降床2の主桁4に設けられたねじボックス部31は、主桁4の両端部にそれぞれ設けられたもので、上方へ立設された側板41と、これら側板41の上端に設けられた前記駆動ナット支持板部32と、この駆動ナット支持板部32の下方側に設けられた固定ナット支持板部33とを有するもので、駆動ナット支持板部32と固定ナット支持板部33との間が駆動ねじボックス42とされ、固定ナット支持板部33と主桁4の上面との間が固定ねじボックス43とされている。
そして、駆動ねじボックス42内に、駆動ロッド26にねじ込まれた駆動ロッド支持ナット44が設けられ、固定ねじボックス43内に、固定ロッド34にねじ込まれた固定ロッド支持ナット45が設けられている。そして、上記固定ロッド34と固定ロッド支持ナット45とによって昇降床2を柱1に保持させる保持手段が構成されている。
【0010】
また、この昇降床2を構成する主桁4の両端部には、前記ねじボックス部31の下方側に、昇降床2を柱1に支持するロック機構51が設けられている。
図4及び図5に示すように、このロック機構51は、主桁4の上面板4aに固定されためねじ部52と、このめねじ部52に上方からねじ込まれたボルト部53と、このボルト部53の先端部に長ねじ54によって取り付けられた支持ブロック55とを有するものである。支持ブロック55は、その両端部がそれぞれねじブロック部31を構成する側板41に形成された長孔56の両側部に沿って設けられた一対のレール57に嵌め込まれて上下方向へ摺動可能とされている。また、このロック機構51の支持ブロック55の下端には、長手方向へわたって円弧状の溝55aが形成されている。なお、側板41に形成された長孔56は、柱1のウエブ1aに長手方向へ沿って間隔をあけて形成された複数の孔部60のいずれかと連通するようになっている。
【0011】
そして、上記ロック機構51によって昇降床2を柱1へ支持する場合は、側板41に形成された長孔56と連通した、柱1のウエブ1aの孔部60へピン58を挿通させることによりこのピン58を柱1のウエブ1a間に掛け渡らせて係止ピン59によって係止させ、この状態にて、このピン58にその上方から支持ブロック55を載置させることにより、昇降床2がロック機構51を介して柱1に支持される。
そして、このとき、ボルト部53のねめじ部52へのねじ込み量を調整することにより、支持ブロック55が上下に摺動され、昇降床2の支持高さが調整される。
なお、このロック機構51によって調整可能な高さ寸法は、柱1のウエブ1aに形成された孔部60同士の間隔よりも大きくされている。
【0012】
次に、上記構成の昇降架台の昇降床2を昇降させる場合について説明する。
(1)昇降床2を上昇させる場合は、まず、油圧ジャッキ23を作動させてピストン24を伸長させる。このようにすると、図6に示すように、吊りフレーム25が上方へ押し上げられ、これにともない、吊りフレーム25に固着されている駆動ロッド26が引き上げられ、この駆動ロッド26によって昇降床2が吊り上げられる。
これにより、固定ねじボックス43における固定ナット支持板部33と固定ロッド支持ナット45とが油圧ジャッキ23のストローク分だけ間隔があいた状態となる。
(2)次に、図7に示すように、この固定ロッド支持ナット45の固定位置を固定ナット支持板部33の下部位置に移動させる。
(3)次いで、油圧ジャッキ23を収縮させる。このようにすると、図8に示すように、吊りフレーム25が下方へ下げられ、これにともない、昇降床2が固定ロッド34によって支持され、吊りフレーム25に固着されている駆動ロッド26が下げられる。
これにより、駆動ねじボックス42における駆動ナット支持板部32と駆動ロッド支持ナット44とが油圧ジャッキ23のストローク分だけ間隔があいた状態となる。
【0013】
(4)次に、この駆動ロッド支持ナット44の固定位置を駆動ナット支持板部32の下部位置に移動させる(図3参照)。
そして、上記(1)〜(4)の作業を繰り返し行うことにより、昇降床2が油圧ジャッキ23のストローク分ずつ上昇される。
そして、昇降床2の高さ位置が所定位置に到達したら、この昇降床2をロック機構51によって柱1に確実にロックして支持させ、後の作業、つまり推進装置によるエレメントの推進作業を行う。
また、昇降床2を下降させる場合は、上記作業と逆の作業を行うことにより、昇降床2が油圧ジャッキ23のストローク分ずつ下降される。
【0014】
このように、上記の昇降架台によれば、昇降床2を昇降させる際に、駆動ロッド26を上下に移動させることにより行うもの、つまり、昇降床2を上昇させる際に、柱1の上端からロッドを出っ張らせることなく、昇降床2を上昇させることができるので、例えば、上方に構造物やケーブル等が存在するような場所であっても、極めて好適に用いることができる。
また、ロック機構51によって昇降床2の高さを調整することができるので、昇降床2の高さ位置を、要求高さに極めて正確に位置決めすることができる。
しかも、このロック機構51による昇降床2の高さの調整可能な寸法が、柱1のウエブ1aに形成されて、昇降床2を支持するピン58が差し込まれる孔部60の間隔よりも大きくされているので、昇降床2の高さを無段階にて調整することができる。
【0015】
【発明の効果】
以上、説明したように、本発明の昇降架台によれば、下記の効果を得ることができる。
請求項1記載の昇降架台によれば、移動機構部によって支持ブロックを上下方向へ移動させることにより、昇降床の柱への支持高さを容易に調整することができる。
また、移動機構部による支持ブロックの移動距離が昇降床を柱へ支持させるピンが挿通される孔部の間隔よりも大きくされているので、昇降床の柱への支持高さを無段階に調整することができる。
これにより、この昇降架台を、エレメントを打ち込んでトンネルを構築するURT工法にて用いた場合、エレメントの打ち込み高さに合わせてその掘進装置を正確な高さ位置に位置決めして良好な推進作業を行うことができる。
請求項2記載の昇降架台によれば、めねじ部へのボルト部のねじ込み量を調整することにより、極めて容易に昇降床の柱への支持高さを調整することができる。
請求項3記載の昇降架台によれば、支持ブロックに形成された溝にピンが嵌合することにより、支持ブロックのピンへの確実な支持状態を確保することができる。
【図面の簡単な説明】
【図1】 本発明の実施の形態の昇降架台の構成及び構造を説明する昇降架台の側面図である。
【図2】 本発明の実施の形態の昇降架台を構成する昇降機構の構成及び構造を説明する昇降機構部分の斜視図である。
【図3】 本発明の実施の形態の昇降架台を構成する昇降機構の構成及び構造を説明する昇降機構部分の断面図である。
【図4】 本発明の実施の形態の昇降架台を構成するロック機構の構成及び構造を説明するロック機構部分の断面図である。
【図5】 本発明の実施の形態の昇降架台を構成するロック機構の構成及び構造を説明するロック機構部分の分解斜視図である。
【図6】 本発明の実施の形態の昇降架台を構成する昇降機構の動きを説明する昇降機構の断面図である。
【図7】 本発明の実施の形態の昇降架台を構成する昇降機構の動きを説明する昇降機構の断面図である。
【図8】 本発明の実施の形態の昇降架台を構成する昇降機構の動きを説明する昇降機構の断面図である。
【図9】 エレメント推進装置が設置される昇降架台の構成を説明する昇降架台の概略側面図である。
【図10】 従来の昇降架台を構成する昇降機構の構成及び構造を説明する昇降機構の斜視図である。
【符号の説明】
1 柱
2 昇降床
21 昇降機構
51 ロック機構
52 めねじ部(移動機構部)
53 ボルト部(移動機構部)
55 支持ブロック
55a 溝
60 孔部[0001]
BACKGROUND OF THE INVENTION
TECHNICAL FIELD The present invention relates to a lifting platform used when a tunnel such as an underground cave such as a water supply / sewerage system, electric power, gas, etc. is newly installed at a three-dimensional intersection of a track and a road or below the track.
[0002]
[Prior art]
A URT (Under Railway Tunnel) method of construction using a long tubular element is known as a method of constructing a tunnel that intersects three-dimensionally under a railway or road.
In this construction method, first, an element is set at the starting shaft toward the natural ground, and this element is placed at the tip of the element while being propelled horizontally to the natural ground by the thrust of the excavating device placed behind the element. By excavating the earth and sand of the natural ground with the cut cutter, the element is excavated and penetrated and buried in the natural ground along the tunnel lining section, and the concrete is filled and cured in the element and between the elements to cover the tunnel After constructing the construction body, the tunnel is constructed by excavating and removing the earth and sand inside the tunnel lining body.
By the way, in this URT method, an elevating platform for elevating and lowering the excavating device according to the driving height of the element is used.
As shown in FIG. 9, the lifting platform includes a plurality of pillars 1 erected on the start shaft and a
Further, each column 1 is provided with an
[0003]
Next, the
A pair of rods 5 are fixed to a part of the
Further, the column 1 is provided with a hydraulic jack 7 and a suspension frame 8 pushed up by the hydraulic jack 7 in the vicinity of the upper end thereof, and the rod 5 is fixed to the suspension frame 8 by a
And when raising the raising / lowering
Next, the
And the raising / lowering floor |
Further, the pillar 1 is formed with a plurality of
In FIG. 10,
[0004]
[Problems to be solved by the invention]
However, the locking mechanism composed of the
[0005]
The present invention has been made in view of the above circumstances, and an object of the present invention is to provide a lifting platform that can finely adjust the height of the lifting floor.
[0006]
[Means for Solving the Problems]
In order to achieve the above object, the lifting platform according to claim 1 includes a plurality of standing columns, a lifting floor supported slidably on the columns, a lifting mechanism for lifting and lowering the lifting floor, A lifting mechanism having a locking mechanism for supporting the lifting floor to a pillar, the locking mechanism being supported by the lifting floor so as to be slidable in the vertical direction, and spaced apart from the pillar in the longitudinal direction. A support block that is inserted from a plurality of formed holes and is placed from above on a pin that is horizontally supported by the pillar, and a movement that moves the support block in a vertical direction larger than the interval between the holes. And a mechanism portion.
[0007]
The lifting platform according to
The lifting platform according to
[0008]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the lifting platform of the present invention will be described with reference to the drawings.
1 to 3,
Next, the
In the vicinity of the upper end of the column 1, a
In addition, one end of a pair of
[0009]
Further, one end of a pair of fixed
The
A drive
[0010]
Further, at both ends of the
As shown in FIGS. 4 and 5, the
[0011]
And when supporting the raising / lowering
At this time, the
The height dimension that can be adjusted by the
[0012]
Next, the case where the raising / lowering
(1) When raising the raising / lowering
As a result, the fixed nut
(2) Next, as shown in FIG. 7, the fixed position of the fixed
(3) Next, the
As a result, the drive nut
[0013]
(4) Next, the fixed position of the drive
And the raising / lowering floor |
When the height of the
Further, when the
[0014]
Thus, according to the above-described lifting platform, when the lifting
Moreover, since the height of the raising / lowering
In addition, the height of the lifting / lowering
[0015]
【The invention's effect】
As described above, according to the lifting platform of the present invention, the following effects can be obtained.
According to the lifting platform according to the first aspect, the supporting height of the lifting floor to the pillar can be easily adjusted by moving the supporting block in the vertical direction by the moving mechanism.
In addition, since the moving distance of the support block by the moving mechanism is larger than the interval between the holes through which the pins that support the lift floor to the pillar are inserted, the support height of the lift floor to the pillar is adjusted steplessly can do.
As a result, when this lifting platform is used in the URT method of constructing a tunnel by driving in the element, the excavating device is positioned at an accurate height position according to the driving height of the element, and good propulsion work is performed. It can be carried out.
According to the lifting platform according to the second aspect, the height of support of the lifting floor to the pillar can be very easily adjusted by adjusting the screwing amount of the bolt portion into the female thread portion.
According to the lifting frame of the third aspect, the pin is fitted into the groove formed in the support block, so that a reliable support state to the pin of the support block can be ensured.
[Brief description of the drawings]
BRIEF DESCRIPTION OF DRAWINGS FIG. 1 is a side view of a lifting platform for explaining the configuration and structure of a lifting platform according to an embodiment of the present invention.
FIG. 2 is a perspective view of an elevating mechanism part for explaining the configuration and structure of the elevating mechanism that constitutes the elevating frame according to the embodiment of the present invention.
FIG. 3 is a cross-sectional view of a lifting mechanism portion for explaining the configuration and structure of a lifting mechanism that constitutes a lifting platform according to an embodiment of the present invention.
FIG. 4 is a cross-sectional view of the lock mechanism portion for explaining the configuration and structure of the lock mechanism that constitutes the lifting platform of the embodiment of the present invention.
FIG. 5 is an exploded perspective view of a lock mechanism portion for explaining the configuration and structure of a lock mechanism that constitutes the lifting platform according to the embodiment of the present invention.
FIG. 6 is a cross-sectional view of the lifting mechanism for explaining the movement of the lifting mechanism constituting the lifting platform according to the embodiment of the present invention.
FIG. 7 is a cross-sectional view of the elevating mechanism for explaining the movement of the elevating mechanism that constitutes the elevating platform according to the embodiment of the present invention.
FIG. 8 is a cross-sectional view of the lifting mechanism for explaining the movement of the lifting mechanism constituting the lifting platform according to the embodiment of the present invention.
FIG. 9 is a schematic side view of the lifting platform for explaining the configuration of the lifting platform on which the element propulsion device is installed.
FIG. 10 is a perspective view of a lifting mechanism for explaining the configuration and structure of a lifting mechanism that constitutes a conventional lifting platform.
[Explanation of symbols]
1
53 Bolt part (movement mechanism part)
55 Support
Claims (3)
前記ロック機構は、前記昇降床に上下方向へ摺動可能に支持されて、前記柱にその長手方向へ間隔をあけて形成された複数の孔部から差し込まれて前記柱に水平に支持されるピンにその上方から載置される支持ブロックと、該支持ブロックを前記孔部の間隔よりも大きく上下方向へ移動させる移動機構部とを有することを特徴とする昇降架台。A lifting platform having a plurality of standing columns, a lifting floor supported slidably on the columns, a lifting mechanism for lifting the lifting floor, and a lock mechanism for supporting the lifting floor to the columns. And
The lock mechanism is supported by the elevating floor so as to be slidable in the vertical direction, and is inserted into a plurality of holes formed at intervals in the longitudinal direction of the pillar and horizontally supported by the pillar. A lifting platform comprising: a support block placed on the pin from above; and a moving mechanism that moves the support block in a vertical direction that is larger than the interval between the holes.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP19239896A JP3741785B2 (en) | 1996-07-22 | 1996-07-22 | Lifting platform |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP19239896A JP3741785B2 (en) | 1996-07-22 | 1996-07-22 | Lifting platform |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH1037664A JPH1037664A (en) | 1998-02-10 |
| JP3741785B2 true JP3741785B2 (en) | 2006-02-01 |
Family
ID=16290653
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP19239896A Expired - Lifetime JP3741785B2 (en) | 1996-07-22 | 1996-07-22 | Lifting platform |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3741785B2 (en) |
-
1996
- 1996-07-22 JP JP19239896A patent/JP3741785B2/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| JPH1037664A (en) | 1998-02-10 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US5660504A (en) | Metal foundation push-it and installation apparatus and method | |
| CN109252533B (en) | Open caisson sinking control system and construction method thereof | |
| WO1985002435A1 (en) | Method and apparatus for installing an in-ground support footing around an upstanding elongate object | |
| JP4317322B2 (en) | Arch support structure | |
| CN110578476B (en) | Slope drilling construction platform | |
| JP2684155B2 (en) | Excavation method used for construction of underground structures | |
| CN113356077B (en) | Construction method of reinforced concrete frame bridge with lift beam overhead line jacking in and down | |
| CN106284333B (en) | A kind of fast positioning pile extension platform and pile extension method | |
| JP3741784B2 (en) | Lifting platform | |
| JP3741785B2 (en) | Lifting platform | |
| US6354769B1 (en) | Apparatus and method for replacing in-ground elevator cylinder casings | |
| CN119041459B (en) | A construction device and method for assembling cast-in-place lattice beams for slope rescue | |
| CN216950416U (en) | Construction device for jacking box culvert | |
| JP2004270304A (en) | Earth auger excavator and drilling method | |
| CN113309145B (en) | Method for dismantling through-floor tower crane for large building construction | |
| JP5865760B2 (en) | Steel pipe press-fitting device moving device and steel pipe press-fitting device installation method | |
| CN116380512A (en) | A wall fixing device and method for indoor shield cutting ground connection wall experiment | |
| CN220704323U (en) | Integrated bridging equipment | |
| JP5365852B2 (en) | Element launch stand | |
| RU2783828C1 (en) | Device for strengthening earth structures | |
| JPH0957661A (en) | Scaffold device for wall surface work | |
| EP1792019B1 (en) | Method of raising a building structure, in particular a building structure subject to flooding | |
| CN112922644B (en) | A guide hole arch frame erection device for initial support of tunnel and construction method thereof | |
| CN119411616B (en) | Anti-seepage curtain construction trench section isolation system and waterproof curtain construction method | |
| JP2009203750A (en) | Excavating machine and excavation method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20051021 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20051101 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20051109 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20091118 Year of fee payment: 4 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20091118 Year of fee payment: 4 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20101118 Year of fee payment: 5 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111118 Year of fee payment: 6 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20121118 Year of fee payment: 7 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20131118 Year of fee payment: 8 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
| S533 | Written request for registration of change of name |
Free format text: JAPANESE INTERMEDIATE CODE: R313533 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| EXPY | Cancellation because of completion of term |