Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP3743983B2 - Waste management system and waste management method - Google Patents
[go: Go Back, main page]

JP3743983B2 - Waste management system and waste management method - Google Patents

Waste management system and waste management method Download PDF

Info

Publication number
JP3743983B2
JP3743983B2 JP2004113523A JP2004113523A JP3743983B2 JP 3743983 B2 JP3743983 B2 JP 3743983B2 JP 2004113523 A JP2004113523 A JP 2004113523A JP 2004113523 A JP2004113523 A JP 2004113523A JP 3743983 B2 JP3743983 B2 JP 3743983B2
Authority
JP
Japan
Prior art keywords
waste
information
terminal
site
management device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2004113523A
Other languages
Japanese (ja)
Other versions
JP2005301451A (en
Inventor
裕幸 中村
寿美夫 高橋
孝一 大野
Original Assignee
裕幸 中村
株式会社ベンシステム
インシェント株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 裕幸 中村, 株式会社ベンシステム, インシェント株式会社 filed Critical 裕幸 中村
Priority to JP2004113523A priority Critical patent/JP3743983B2/en
Publication of JP2005301451A publication Critical patent/JP2005301451A/en
Application granted granted Critical
Publication of JP3743983B2 publication Critical patent/JP3743983B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Processing Of Solid Wastes (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本発明は、建築現場から排出される建築廃棄物を管理する廃棄物管理システム及び廃棄物管理方法に関する。 The present invention relates to a waste management system and a waste management method for managing building waste discharged from a building site.

住宅等の建物を建築する場合、建物を完成させる過程において非常に多くの建築工程が存在する。具体的には、住宅等の建築工程については、仮設工事、土工事・地業工事、型枠工事、鉄筋コンクリート工事、木工事、サッシ・ガラス工事、内装工事等の各工程に分かれている。また、通常は、前記各工程をそれぞれ異なる専門工事業者が施工する場合が多く、これらの各工程は、互いに異なる時期に行われることが多い。   When building a building such as a house, there are a great number of building processes in the process of completing the building. Specifically, the construction process of a house, etc. is divided into each process such as temporary work, earth work / geo work, formwork, reinforced concrete work, wood work, sash / glass work, and interior work. Also, usually, each of the above steps is often performed by different specialized contractors, and these steps are often performed at different times.

このため、住宅等の建物を建築する場合、工務店と専門工事業者との間で工事の工程計画を予め取り決め、この工程計画に沿って、建築工事に必要な資材をその都度搬入し各工程の工事が進められる。また、各工程で排出された廃棄物は、排出事業者(土木建築工事(解体工事含む)においては、発注者から工事を直接請け負った者(元請業者)が排出事業者となる)の責任で各工程の作業終了後に、建築現場から排出される。   For this reason, when building a building such as a house, a construction process plan is agreed in advance between the construction company and the specialized contractor, and materials necessary for the building work are brought in each time according to this process plan. Work is underway. In addition, the waste discharged in each process is the responsibility of the discharge company (in civil engineering and construction work (including dismantling work), the person who directly contracted the work from the orderer (primary contractor) becomes the discharge company) After the work of each process is completed, it is discharged from the construction site.

なお、現在は、国内において排出される産業廃棄物を処理する場合、マニフェストの使用・交付が義務付けられている。マニフェストとは、排出事業者(廃棄物を出す会社)が産業廃棄物の処理を委託する際に、産業廃棄物の名称(品目)や数量、現場名、運搬業者名、処理業者名等を記入する産業廃棄物管理票であり、産業廃棄物の流れを排出事業者が把握・管理することができるものである。   Currently, when processing industrial waste discharged in the country, the use and delivery of a manifest is obligatory. The manifest is the name (item) and quantity of industrial waste, the name of the site, the name of the carrier, the name of the processing company, etc. when the discharge company (company that produces waste) entrusts the processing of industrial waste. This is an industrial waste management form that allows the discharge company to grasp and manage the flow of industrial waste.

このため、住宅等の小規模な建築現場において、建築現場から排出される建築廃棄物を処理する場合についても、個々の現場毎にマニフェストの交付が必要である。マニフェストを使用して建築廃棄物を処理する場合、排出事業者(現場管理者)が産業廃棄物の種類及び数量を記入することが法律で義務づけられている。このため、現場管理者が、建築廃棄物の排出時に立ち会うことが管理上望ましく、立ち会う旨を条例等で指定している自治体も存在する。   For this reason, also in the case of processing the building waste discharged from a building site in a small building site such as a house, it is necessary to issue a manifest for each individual site. When building waste is treated using a manifest, it is legally required that the discharge company (site manager) fill in the type and quantity of industrial waste. For this reason, it is desirable for the site manager to be present when building waste is discharged, and there are local governments that specify that they are present in the regulations.

しかし、住宅等の小規模な建築現場においては、建築廃棄物の排出管理責任を負う現場管理者は、一人で複数の現場を管理する場合が多く、複数の現場を巡回管理していることが多い。このため、1つの現場に常駐していない場合が多く、自己が担当する全ての現場を1日に何回も見に行くことはできない。つまり、現場管理者が建築廃棄物の排出時に立ち会うことができないことが多く、現場管理者が排出物自体の内容確認を行うことができる場合が少ない。したがって、排出管理責任の所在が不明確となり、排出物の種類、排出時刻、排出手法等を把握することができず、建築廃棄物について適切な管理をすることができないという問題がある。   However, in small construction sites such as houses, site managers who are responsible for managing building waste emissions often manage multiple sites on their own, and often manage multiple sites. Many. For this reason, it is often not resident at one site, and it is not possible to go to see all the sites for which it is in charge many times a day. That is, the site manager often cannot be present at the time of discharging the building waste, and the site manager can rarely confirm the content of the discharged material itself. Therefore, there is a problem that the location of the responsibility for emission management is unclear, the type of emission, the time of emission, the emission method, etc. cannot be grasped, and the construction waste cannot be appropriately managed.

なお、本発明に関連する発明として、特許文献1には、建設現場から排出された廃棄物を収集運搬業者が収集運搬し、処理場で処理業者が処理する廃棄物処理工程において、接続中継センタを介して、排出する廃棄物の廃棄物処理情報を、移動接続式端末機器から情報処理センタへ登録する廃棄物処理情報管理システムが開示されている。
特開2002−80103号公報
As an invention related to the present invention, Patent Document 1 discloses a connection relay center in a waste processing step in which a collection and transportation company collects and transports waste discharged from a construction site and processes it at a treatment site. A waste processing information management system for registering waste processing information of waste to be discharged from a mobile terminal device to an information processing center is disclosed.
JP 2002-80103 A

最近は、地球環境の保全に関する関心が高まり、資源の枯渇を防止するための循環型省資源住宅の開発が求められている。このため、住宅建築における各工程で排出される廃棄物について、リサイクル率を高め再資源化を円滑に進めることは社会的に意義のあることである。   Recently, interest in conservation of the global environment has increased, and the development of recycling-type resource-saving houses to prevent resource depletion has been demanded. For this reason, it is socially meaningful to increase the recycling rate and smoothly promote the recycling of waste discharged in each process in residential construction.

また、住宅建築における各工程で排出される廃棄物について、正確に管理することができない場合、再資源化が可能な廃棄物についても廃棄処理をすることになる場合がある。この場合には、廃棄処理のための費用が発生し、結果として住宅価格のコストが増加し、住宅建築に係る全体価格が必要以上に高くなるという問題がある。   In addition, if the waste discharged in each process in the residential building cannot be managed accurately, the waste that can be recycled may be disposed of. In this case, there is a problem that costs for disposal are generated, resulting in an increase in the cost of the house price, and the overall price related to the home building becomes higher than necessary.

なお、特許文献1に記載の技術は、廃棄物の排出・収集運搬・処理についての電子情報のやりとりを簡便・迅速に行うことができるが、当該廃棄物自体の管理を正確に行えない場合があり、また、リサイクル率の向上に結び付けることができないという問題がある。   The technique described in Patent Document 1 can easily and quickly exchange electronic information about waste discharge, collection, transportation, and processing. However, there are cases where the waste itself cannot be managed accurately. There is also a problem that it cannot be linked to an improvement in the recycling rate.

本発明は、住宅等の建物を建築する場合に、各建築工程において専門工事業者が排出した廃棄物を正確に管理することができると共に、当該廃棄物のリサイクル率を飛躍的に高め、さらに当該廃棄物に係る物流全体のコストと建物建築に係るコストとを低減させることができる廃棄物管理システム及び廃棄物管理方法を提供することを目的とする。 When building a building such as a house, the present invention can accurately manage the waste discharged by a professional contractor in each building process, and dramatically increase the recycling rate of the waste. An object of the present invention is to provide a waste management system and a waste management method capable of reducing the cost of the entire physical distribution related to waste and the cost related to building construction.

本発明は、建築現場の管理者が使用する現場管理者端末と、廃棄物処理業者が使用する処理業者端末と、廃棄物容器に装着された電子タグと、建築現場において使用される資材に係る廃棄物に関する情報を記憶する記憶手段を備えた廃棄物管理装置とを有する廃棄物管理システムであって、前記現場管理者端末は、前記廃棄物容器に収容された、所定の建築現場で排出された資材に係る廃棄物に関する情報であって当該廃棄物の種類及び品質と当該建築現場を特定する情報である建築現場識別情報とを含む情報である廃棄物実績情報を入力する手段と、前記入力した廃棄物実績情報を、前記入力した廃棄物実績情報に係る廃棄物が収容された廃棄物容器に装着された電子タグに書き込むと共に、前記廃棄物管理装置に送信する手段とを有し、前記廃棄物管理装置は、前記廃棄物実績情報を前記現場管理者端末から受信すると、当該廃棄物実績情報に含まれる建築現場識別情報に係る建築現場に関連付けて当該廃棄物実績情報を前記記憶手段に記憶する手段と、前記受信した廃棄物実績情報に係る廃棄物の種類及び品質に基づいて廃棄物処理業者を決定し、当該廃棄物実績情報に係る廃棄物の受入指示情報を、前記決定した廃棄物処理業者に係る処理業者端末に送信する手段とを有し、前記処理業者端末は、前記受入指示情報を前記廃棄物管理装置から受信すると、当該受入指示情報を出力する手段と、廃棄物が収容された廃棄物容器に装着された電子タグに書き込まれた情報を読み出す手段と、前記読み出した情報と前記受信した受入指示情報とを比較し、前記読み出した情報に係る廃棄物と前記受信した受入指示情報に係る廃棄物とが同一であれば、この同一に係る情報を読み出した電子タグが装着された廃棄物容器の受入指示を出力する手段と、前記受入指示がされた廃棄物容器に収容された廃棄物に関する情報であって当該廃棄物の種類及び品質と当該廃棄物に係る建築現場識別情報とを含む情報である廃棄物処理情報を入力すると共に、当該廃棄物のリサイクル代の値を入力する手段と、前記入力された廃棄物処理情報及びリサイクル代の値を前記廃棄物管理装置に送信する手段とを有し、前記廃棄物管理装置は、前記廃棄物処理情報またはリサイクル代の値を前記処理業者端末から受信すると、当該廃棄物処理情報またはリサイクル代に係る廃棄物に係る建築現場に関連付けて、当該廃棄物処理情報またはリサイクル代の値を前記記憶手段に記憶する手段と、前記現場管理者端末が送信した廃棄物実績情報に含まれる廃棄物の品質と、前記処理業者端末が送信した廃棄物処理情報に含まれる廃棄物の品質とが一致するか否かを判断し、一致した場合には、一致した廃棄物に係る建築現場に関連付けて、当該建築現場に係るリサイクル代に係るフィードバック代を増加させるポイントを前記記憶手段に付与する手段とを有することを特徴とする廃棄物管理システムである。 The present invention, the administrator of the building site and the site manager terminal to be used, are for the processing agent terminal to waste disposer is used, an electronic tag attached to waste containers, using Te building site odor A waste management system having a waste management device having storage means for storing information on waste related to materials, wherein the site manager terminal is stored in the waste container, and is a predetermined building site Means for inputting waste performance information, which is information relating to the waste discharged from the material and includes information on the type and quality of the waste and the construction site identification information that is information for identifying the construction site ; Means for writing the input waste result information to an electronic tag attached to a waste container in which the waste related to the input waste result information is stored, and transmitting the information to the waste management device. And Serial waste management device receives the waste record information from said site administrator terminal, in association with the building site according to the construction site identification information contained in the waste record information such waste results information to the storage Determining a waste disposal contractor based on the type and quality of the waste related to the received waste performance information, and determining the acceptance instruction information of the waste related to the waste performance information And a means for transmitting to the processor terminal associated with the waste processor, the processor terminal, when receiving the acceptance instruction information from the waste management device, a means for outputting the acceptance instruction information, and a disposal Means for reading information written in an electronic tag attached to a waste container in which an object is stored, and comparing the read information with the received acceptance instruction information, and If the waste and the waste related to the received acceptance instruction information are the same, the means for outputting the acceptance instruction of the waste container equipped with the electronic tag that reads out the information related to the same, and the acceptance instruction Information on the waste contained in the discarded waste container, and information on the type and quality of the waste and the construction site identification information related to the waste are input and the disposal Means for inputting a recycling value of the waste, and means for transmitting the inputted waste processing information and the value of the recycling fee to the waste management device, wherein the waste management device has the waste When the processing information or the value of the recycling fee is received from the processor terminal, the waste processing information or the recycling fee is associated with the construction site related to the waste processing information or the waste related to the recycling fee. Means for storing the cost value in the storage means, the quality of the waste included in the waste performance information transmitted by the site manager terminal, and the disposal included in the waste processing information transmitted by the processor terminal It is determined whether or not the quality of the product matches, and if they match, the memory points that increase the feedback fee related to the recycling fee related to the building site are associated with the building site related to the matched waste. A waste management system comprising: a means for assigning to the means .

本発明は、前記廃棄物管理システムは、輸送業者が使用する輸送業者端末を有し、前記記憶手段は、施工業者が過去に施行した際に発生した資材についてのロス率の平均値を当該施工業者に関連付けて記憶する手段であり、前記廃棄物管理装置は、建築現場において所定の施工業者の施行の際に使用される資材に係る廃棄物に関する情報であって排出予定日時と位置と廃棄物の種類と廃棄物の予測排出量とを含む情報である廃棄物予測情報を、当該建築現場に係る設計情報と前記記憶手段に記憶されている当該施工業者に係るロス率の平均値とに基づいて作成する手段と、前記作成した廃棄物予測情報を、前記現場管理者端末と前記輸送業者端末とに送信する手段とを有し、前記現場管理者端末は、前記廃棄物予測情報を前記廃棄物管理装置から受信すると、当該廃棄物予測情報を出力する手段を有し、前記輸送業者端末は、前記廃棄物予測情報を前記廃棄物管理装置から受信すると、当該廃棄物予測情報を出力する手段を有することを特徴とする廃棄物管理システムである。 The present invention, the waste management system has a transport agent terminal the courier will be used, the storage unit, the construction of the average of the loss rate for the materials generated during the contractor is enforced in the past The waste management device is information relating to the waste related to the material used at the time of the execution of a predetermined construction contractor at a construction site , and is scheduled to be discharged, the position and waste. based waste prediction information is information including a predicted emissions type and waste, to the average value of the loss rate according to the contractor which is stored in the design information and the storage means according to the construction site And means for transmitting the created waste prediction information to the site manager terminal and the transporter terminal, wherein the site manager terminal discards the waste forecast information. Material management device Upon al receiving comprises means for outputting said waste prediction information, the transporters terminal receives the waste prediction information from the waste management system has a means for outputting the waste prediction information This is a waste management system.

本発明は、前記廃棄物管理装置は、前記廃棄物実績情報を前記現場管理者端末から受信すると、当該廃棄物実績情報に係る廃棄物の回収指示情報を前記輸送業者端末に送信する手段を有し、前記輸送業者端末は、前記回収指示情報を前記廃棄物管理装置から受信すると、当該回収指示情報を出力する手段と、廃棄物が収容された廃棄物容器に装着された電子タグに書き込まれている廃棄物に関する情報を読み出す手段と、前記読み出した情報と前記受信した廃棄物実績情報とを比較し、前記読み出した情報に係る廃棄物と前記受信した廃棄物実績情報に係る廃棄物とが同一であれば、この同一に係る情報を読み出した電子タグが装着された廃棄物容器の回収指示を出力する手段とを有することを特徴とする廃棄物管理システムである。 In the present invention, the waste management apparatus has means for transmitting, to the transporter terminal, waste collection instruction information related to the waste performance information when the waste performance information is received from the site manager terminal. When the transporter terminal receives the collection instruction information from the waste management device, the carrier terminal writes the collection instruction information in an electronic tag attached to a waste container in which the waste is stored. Means for reading out information relating to the waste, and comparing the read information with the received waste result information, and the waste according to the read information and the waste according to the received waste result information; And a means for outputting a recovery instruction for a waste container equipped with an electronic tag that has read out the information related to the same, is a waste management system.

本発明は、建築現場の管理者が使用する現場管理者端末と、廃棄物処理業者が使用する処理業者端末と、廃棄物容器に装着された電子タグと、建築現場において使用される資材に係る廃棄物に関する情報を記憶する記憶手段を備えた廃棄物管理装置とを有する廃棄物管理システムにおける廃棄物管理方法であって、前記現場管理者端末が、前記廃棄物容器に収容された、所定の建築現場で排出された資材に係る廃棄物に関する情報であって当該廃棄物の種類及び品質と当該建築現場を特定する情報である建築現場識別情報とを含む情報である廃棄物実績情報を入力するステップと、前記現場管理者端末が、前記入力した廃棄物実績情報を、前記入力した廃棄物実績情報に係る廃棄物が収容された廃棄物容器に装着された電子タグに書き込むと共に、前記廃棄物管理装置に送信するステップと、前記廃棄物管理装置が、前記廃棄物実績情報を前記現場管理者端末から受信すると、当該廃棄物実績情報に含まれる建築現場識別情報に係る建築現場に関連付けて当該廃棄物実績情報を前記記憶手段に記憶するステップと、前記廃棄物管理装置が、前記受信した廃棄物実績情報に係る廃棄物の種類及び品質に基づいて廃棄物処理業者を決定し、当該廃棄物実績情報に係る廃棄物の受入指示情報を、前記決定した廃棄物処理業者に係る処理業者端末に送信するステップと、前記処理業者端末が、前記受入指示情報を前記廃棄物管理装置から受信すると、当該受入指示情報を出力するステップと、前記処理業者端末が、廃棄物が収容された廃棄物容器に装着された電子タグに書き込まれた情報を読み出すステップと、前記処理業者端末が、前記読み出した情報と前記受信した受入指示情報とを比較し、前記読み出した情報に係る廃棄物と前記受信した受入指示情報に係る廃棄物とが同一であれば、この同一に係る情報を読み出した電子タグが装着された廃棄物容器の受入指示を出力するステップと、前記処理業者端末が、前記受入指示がされた廃棄物容器に収容された廃棄物に関する情報であって当該廃棄物の種類及び品質と当該廃棄物に係る建築現場識別情報とを含む情報である廃棄物処理情報を入力すると共に、当該廃棄物のリサイクル代の値を入力するステップと、前記処理業者端末が、前記入力された廃棄物処理情報及びリサイクル代の値を前記廃棄物管理装置に送信するステップと、前記廃棄物管理装置が、前記廃棄物処理情報またはリサイクル代の値を前記処理業者端末から受信すると、当該廃棄物処理情報またはリサイクル代に係る廃棄物に係る建築現場に関連付けて、当該廃棄物処理情報またはリサイクル代の値を前記記憶手段に記憶するステップと、前記廃棄物管理装置が、前記現場管理者端末が送信した廃棄物実績情報に含まれる廃棄物の品質と、前記処理業者端末が送信した廃棄物処理情報に含まれる廃棄物の品質とが一致するか否かを判断し、一致した場合には、一致した廃棄物に係る建築現場に関連付けて、当該建築現場に係るリサイクル代に係るフィードバック代を増加させるポイントを前記記憶手段に付与するステップとを有することを特徴とする廃棄物管理方法である。 The present invention, the administrator of the building site and the site manager terminal to be used, are for the processing agent terminal to waste disposer is used, an electronic tag attached to waste containers, using Te building site odor A waste management method in a waste management system having a waste management device having a storage means for storing information on waste related to materials, wherein the site manager terminal is accommodated in the waste container , Waste performance information, which is information related to waste discharged from a given construction site and includes the type and quality of the waste and the building site identification information that identifies the construction site And the site manager terminal writes the input waste result information to an electronic tag attached to a waste container containing the waste related to the input waste result information. To, and sending to said waste management device, the waste management device, when receiving the waste record information from said site administrator terminal, according to the construction site identification information contained in the waste record information A step of storing the waste result information in the storage means in association with a construction site, and the waste management device selects a waste disposal contractor based on the type and quality of the waste related to the received waste result information. Determining and transmitting the waste acceptance instruction information related to the waste result information to the processor terminal associated with the determined waste disposal contractor; and the processor terminal sends the acceptance instruction information to the waste When receiving from the management device, the step of outputting the acceptance instruction information, and the processor terminal receives the information written in the electronic tag attached to the waste container containing the waste. And the processor terminal compares the read information with the received acceptance instruction information, and the waste according to the read information and the waste according to the received acceptance instruction information are the same. If there is, a step of outputting an instruction for receiving a waste container equipped with an electronic tag from which the same information is read, and a waste housed in the waste container for which the processor terminal has received the instruction for reception. Inputting waste disposal information, which is information relating to the type and quality of the waste and the construction site identification information relating to the waste, and inputting a value for the recycling cost of the waste; The processor terminal transmits the input waste processing information and the recycling value to the waste management device; and the waste management device includes the waste processing information. When the information or recycling fee value is received from the processor terminal, the waste processing information or the recycling fee value is stored in the storage means in association with the construction site related to the waste disposal information or the recycling fee. Storing, the quality of the waste included in the waste performance information transmitted by the site manager terminal, and the waste included in the waste processing information transmitted by the processor terminal It is determined whether or not the quality matches, and if they match, a point for increasing the feedback fee related to the recycling fee related to the building site in association with the building site related to the matched waste is stored in the storage means. And a step of assigning the waste.

本発明は、前記廃棄物管理システムは、輸送業者が使用する輸送業者端末を有し、前記記憶手段は、施工業者が過去に施行した際に発生した資材についてのロス率の平均値を当該施工業者に関連付けて記憶する手段であり、前記廃棄物管理装置が、建築現場において所定の施工業者の施行の際に使用される資材に係る廃棄物に関する情報であって排出予定日時と位置と廃棄物の種類と廃棄物の予測排出量とを含む情報である廃棄物予測情報を、当該建築現場に係る設計情報と前記記憶手段に記憶されている当該施工業者に係るロス率の平均値とに基づいて作成するステップと、前記廃棄物管理装置が、前記作成した廃棄物予測情報を、前記現場管理者端末と前記輸送業者端末とに送信するステップと、前記現場管理者端末が、前記廃棄物予測情報を前記廃棄物管理装置から受信すると、当該廃棄物予測情報を出力するステップと、前記輸送業者端末が、前記廃棄物予測情報を前記廃棄物管理装置から受信すると、当該廃棄物予測情報を出力するステップとを有することを特徴とする廃棄物管理方法である。 The present invention, the waste management system has a transport agent terminal the courier will be used, the storage unit, the construction of the average value of the loss rate of the material that occurs when the contractor has enforced in the past Means for storing in association with a contractor, wherein the waste management device is information relating to the waste related to the material used at the time of enforcement by a predetermined contractor at a construction site , and is scheduled to be discharged, the position and waste based waste prediction information is information including a predicted emissions type and waste, to the average value of the loss rate according to the contractor which is stored in the design information and the storage means according to the construction site Creating, the waste management device transmitting the created waste prediction information to the site manager terminal and the transporter terminal, and the site manager terminal including the waste forecast Upon receiving the broadcast from the waste management system, and outputting the waste prediction information, the shippers terminal receives the waste prediction information from the waste management system, the waste prediction information And a step of outputting the waste.

本発明は、前記廃棄物管理装置が、前記廃棄物実績情報を前記現場管理者端末から受信すると、当該廃棄物実績情報に係る廃棄物の回収指示情報を前記輸送業者端末に送信するステップと、前記輸送業者端末が、前記回収指示情報を前記廃棄物管理装置から受信すると、当該回収指示情報を出力するステップと、前記輸送業者端末が、廃棄物が収容された廃棄物容器に装着された電子タグに書き込まれている廃棄物に関する情報を読み出すステップと、前記輸送業者端末が、前記読み出した情報と前記受信した廃棄物実績情報とを比較し、前記読み出した情報に係る廃棄物と前記受信した廃棄物実績情報に係る廃棄物とが同一であれば、この同一に係る情報を読み出した電子タグが装着された廃棄物容器の回収指示を出力するステップとを有することを特徴とする廃棄物管理方法である。
The present invention, when the waste management device receives the waste performance information from the site manager terminal, transmitting waste collection instruction information related to the waste performance information to the transporter terminal, When the transporter terminal receives the collection instruction information from the waste management device, a step of outputting the collection instruction information; and an electronic device mounted on a waste container in which the transporter terminal stores waste The step of reading information on the waste written in the tag, and the carrier terminal compares the read information with the received waste record information, and the received waste and the received information related to the information. If the waste related to the waste record information is the same, there is a step of outputting a collection instruction for the waste container attached with the electronic tag from which the information related to the same is read. A waste management method comprising Rukoto.

本発明によれば、住宅等の建物を建築する場合に、各建築工程において専門工事業者が排出した廃棄物を正確に管理することができると共に、当該廃棄物のリサイクル率を飛躍的に高め、さらに当該廃棄物に係る物流全体のコストと建物建築に係るコストとを低減させることができるという効果を奏する。   According to the present invention, when building a building such as a house, it is possible to accurately manage the waste discharged by a professional contractor in each building process, and dramatically increase the recycling rate of the waste, Furthermore, there is an effect that it is possible to reduce the cost of the entire physical distribution related to the waste and the cost related to the building construction.

以下、本発明の実施の形態である廃棄物管理システム及び廃棄物管理方法について、図面を参照して詳細に説明する。   Hereinafter, a waste management system and a waste management method according to embodiments of the present invention will be described in detail with reference to the drawings.

[第1の実施の形態]
図1は、本発明の第1の実施の形態である廃棄物管理システム1の構成を示すブロック図であって、廃棄物管理システム1において、建築現場101で排出された廃棄物についての建築現場101から中間処理工場102までの流れを概略的に示す図である。なお、各実施の形態で示す建築現場は、土木建築工事(解体工事含む)全般の現場を含むものとする。また、中間処理工場は、中間処理工場と再資源化工場とを意味するものとする。さらに、専門工事業者は、施工業者全般を意味するものとする。
[First Embodiment]
FIG. 1 is a block diagram showing a configuration of a waste management system 1 according to a first embodiment of the present invention. In the waste management system 1, a construction site for waste discharged from a construction site 101 It is a figure which shows roughly the flow from 101 to the intermediate processing factory 102. In addition, the construction site shown in each embodiment shall include the general site of civil engineering construction work (including dismantling work). The intermediate processing factory means an intermediate processing factory and a recycling factory. Furthermore, a professional contractor shall mean the general contractor.

図2は、廃棄物管理システム1において使用されるハードウェア構成を概略的に示す概略構成図である。   FIG. 2 is a schematic configuration diagram schematically showing a hardware configuration used in the waste management system 1.

廃棄物管理システム1は、システム管理サーバ(建築生産システム管理サーバ)10と、廃棄物管理サーバ(廃棄物管理システムサーバ)20と、建築現場常設PDA30と、ドライバ常備PDA40と、中間処理工場常設PDA50と、電子タグ60と、廃棄物容器70と、ルータ80と、インターネット90と、CAD積算装置(図示せず)とを有する。   The waste management system 1 includes a system management server (building production system management server) 10, a waste management server (waste management system server) 20, a construction site permanent PDA 30, a driver permanent PDA 40, and an intermediate processing factory permanent PDA 50. And an electronic tag 60, a waste container 70, a router 80, the Internet 90, and a CAD integrating device (not shown).

システム管理サーバ10は、廃棄物管理システム1全体を管理するサーバであって、住宅建築における工事の工程計画に関する各種情報が格納されたデータベースを有する。また、システム管理サーバ10は、廃棄物管理サーバ20とCAD積算装置とに接続され、廃棄物管理サーバ20との間で廃棄物の排出に関する各種情報の通信を実行し、CAD積算装置との間で住宅建築における各種情報の通信を実行する。この各種情報は、各工程における建築工事に使用される資材とその数量、体積、ロス率と、金融コードとを含むものである。   The system management server 10 is a server that manages the entire waste management system 1 and includes a database that stores various types of information related to construction process plans in residential buildings. In addition, the system management server 10 is connected to the waste management server 20 and the CAD integration device, and communicates various information related to the discharge of waste with the waste management server 20 to communicate with the CAD integration device. Executes communication of various information in residential construction. The various information includes materials used for building work in each process, their quantity, volume, loss rate, and financial code.

なお、第1の実施の形態において、現場コードは、建築現場を特定するために建築現場毎に付与される識別番号を示すものであり、金融コードは、建築現場における複数の建築工程について各建築工程を特定するために建築工程毎に付与される識別番号を示すものであり、ドライバコードは、廃棄物収集運搬業者のドライバを特定するためにドライバ毎に付与される識別番号を示すものであり、中間処理工場コードは、中間処理工場を特定するために中間処理工場毎に付与される識別番号を示すものであり、資材コードは、建築現場の各建築工程に係る工事において使用される各資材を特定するために資材毎に付与される識別番号を示すものであり、業者コードは、建築現場における複数の建築工程について実際に建築工事を行う専門工事業者毎に付与される識別番号を示すものである。   In the first embodiment, the site code indicates an identification number assigned to each building site in order to identify the building site, and the financial code indicates each building for a plurality of building processes at the building site. Indicates the identification number assigned to each building process to specify the process, and the driver code indicates the identification number assigned to each driver to identify the driver of the waste collection and transportation company The intermediate processing factory code indicates an identification number assigned to each intermediate processing factory in order to identify the intermediate processing factory, and the material code indicates each material used in the construction related to each construction process at the construction site. The identification number given to each material in order to specify the contractor code is a professional construction business that actually performs construction work for multiple building processes at the construction site Shows the identification number assigned to each.

図14は、システム管理サーバ10が有する建築工程データベース10aと専門工事業者データベース10bとを概念的に示す図である。   FIG. 14 is a diagram conceptually showing the building process database 10a and the specialized contractor database 10b that the system management server 10 has.

つまり、各建築現場に付与されている現場コードには1つ又は複数の金融コードが対応付けられ、各金融コードには1つ又は複数の資材コードが対応付けられて、システム管理サーバ10が有する建築工程データベース10aに格納されている。また、建築工程については、建築工程毎に施工する専門工事業者が決定するので、この決定後に金融コードと業者コードとが対応付けられて、建築工程データベース10aに格納される。また、システム管理サーバ10が有する専門工事業者データベース10bには、専門工事業者毎に集計された過去の実績情報(業者別平均ロス率、金融コード、評価情報等)が業者コードに関連付けて格納されている。なお、金融コードは、各建築工程の作業の終了後、専門工事業者に対する支払いの際に利用される。   That is, the system management server 10 has one or more financial codes associated with the site codes assigned to each building site, and one or more material codes associated with each financial code. It is stored in the building process database 10a. Moreover, since the construction contractor determines the construction process for each construction process, after this determination, the financial code and the contractor code are associated with each other and stored in the construction process database 10a. Further, in the specialized contractor database 10b possessed by the system management server 10, past performance information (average loss rate by vendor, financial code, evaluation information, etc.) collected for each specialized contractor is stored in association with the contractor code. ing. The financial code is used at the time of payment to the professional contractor after the completion of each construction process.

廃棄物管理サーバ20は、廃棄物の排出に関する各種情報を管理するサーバであって、ルータ80を介してインターネット90と接続され、インターネット90を介して、各PDA30〜50との間で廃棄物の排出に関する各種情報の通信を実行する。   The waste management server 20 is a server that manages various types of information related to the discharge of waste. The waste management server 20 is connected to the Internet 90 via the router 80, and receives wastes between the PDAs 30 to 50 via the Internet 90. Communication of various information related to discharge is executed.

CAD積算装置は、住宅建築における建築の設計に関する設計情報(建築物の設計図等)を作成し、作成した設計情報をCADファイルとして登録し、登録したCADファイルをシステム管理サーバ10に出力するものである。   The CAD accumulating device creates design information (design drawings of buildings, etc.) related to architectural design in residential buildings, registers the created design information as a CAD file, and outputs the registered CAD file to the system management server 10 It is.

図3は、システム管理サーバ10の内部構成を示すブロック図である。
なお、廃棄物管理サーバ20の内部構成は、システム管理サーバ10の内部構成とほぼ同様である。
FIG. 3 is a block diagram showing the internal configuration of the system management server 10.
The internal configuration of the waste management server 20 is substantially the same as the internal configuration of the system management server 10.

システム管理サーバ10は、CPU11と、ROM12と、RAM13と、入力部14と、記憶部15と、表示部16と、通信部17とを有する。   The system management server 10 includes a CPU 11, a ROM 12, a RAM 13, an input unit 14, a storage unit 15, a display unit 16, and a communication unit 17.

CPU11は、ROM12に格納された各種制御プログラムに基づいて各種制御を実行するものである。また、CPU11は、入力部14によって生成された操作情報を入力すると、入力された操作情報に基づいて、制御情報を生成し、生成した制御情報を各部に出力するものである。   The CPU 11 executes various controls based on various control programs stored in the ROM 12. Further, when the operation information generated by the input unit 14 is input, the CPU 11 generates control information based on the input operation information and outputs the generated control information to each unit.

ROM12は、CPU11に実行させる各種制御プログラムが格納されているメモリである。   The ROM 12 is a memory that stores various control programs to be executed by the CPU 11.

RAM13は、CPU11のワーク領域等に使用されるメモリである。   The RAM 13 is a memory used as a work area for the CPU 11.

入力部14は、各種入力キーを備え、操作されたキーに応じて、操作情報を生成し、生成した操作情報をCPU11に出力するものである。   The input unit 14 includes various input keys, generates operation information according to the operated key, and outputs the generated operation information to the CPU 11.

記憶部15は、各種アプリケーションプログラムや廃棄物の排出に関する各種情報等が格納されるハードディスクである。また、記憶部15には、各種データベースが格納されている。   The storage unit 15 is a hard disk that stores various application programs, various types of information related to waste discharge, and the like. The storage unit 15 stores various databases.

表示部16は、CPU11の制御に基づいて各種情報を表示する表示部である。   The display unit 16 is a display unit that displays various information based on the control of the CPU 11.

通信部17は、廃棄物管理サーバ20とCAD積算装置とに接続し、廃棄物管理サーバ20とCAD積算装置との間で各種情報の送受信を実行する通信部である。なお、廃棄物管理サーバ20が有する通信部は、システム管理サーバ10と接続すると共に、ルータ80と接続し、システム管理サーバ10との間で各種情報の送受信を実行すると共に、インターネット90を介して、各PDA30〜50との間で各種情報の送受信を実行する。   The communication unit 17 is a communication unit that is connected to the waste management server 20 and the CAD integration device and executes transmission / reception of various types of information between the waste management server 20 and the CAD integration device. The communication unit included in the waste management server 20 is connected to the system management server 10 and is connected to the router 80 to transmit / receive various information to / from the system management server 10 and via the Internet 90. Various types of information are transmitted and received between the PDAs 30 to 50.

建築現場常設PDA30は、PDA本体30aと、電子タグリードライタ(CFカード型RFIDリードライタ)30bと、データ通信カード30cとで構成される携帯型個人情報端末である。なお、ドライバ常備PDA40と中間処理工場常設PDA50との構成は、建築現場常設PDA30の構成と同様である。   The construction site permanent PDA 30 is a portable personal information terminal including a PDA main body 30a, an electronic tag reader / writer (CF card type RFID reader / writer) 30b, and a data communication card 30c. The configuration of the driver permanent PDA 40 and the intermediate processing factory permanent PDA 50 is the same as that of the construction site permanent PDA 30.

図4は、PDA本体30aの内部構成を示すブロック図である。
PDA本体30aは、CPU31と、ROM32と、RAM33と、入力部34と、表示部35と、電子タグリードライタI/F部36と、データ通信カードI/F部37とを有する。
FIG. 4 is a block diagram showing an internal configuration of the PDA main body 30a.
The PDA main body 30 a includes a CPU 31, a ROM 32, a RAM 33, an input unit 34, a display unit 35, an electronic tag reader / I / F unit 36, and a data communication card I / F unit 37.

CPU31は、ROM32に格納された各種制御プログラムに基づいて各種制御を実行するものである。また、CPU31は、入力部34によって生成された操作情報を入力すると、入力された操作情報に基づいて、制御情報を生成し、生成した制御情報を各部に出力するものである。なお、CPU31は、時刻を計測するカウンタ(図示せず)を内蔵する。   The CPU 31 executes various controls based on various control programs stored in the ROM 32. In addition, when the operation information generated by the input unit 34 is input, the CPU 31 generates control information based on the input operation information and outputs the generated control information to each unit. The CPU 31 includes a counter (not shown) that measures time.

ROM32は、CPU31に実行させる各種制御プログラムが格納されているメモリである。   The ROM 32 is a memory in which various control programs to be executed by the CPU 31 are stored.

RAM33は、各種アプリケーションプログラムや廃棄物の排出に関する各種情報等が格納されるメモリであって、CPU31のワーク領域等に使用されるものである。   The RAM 33 is a memory for storing various application programs, various information related to waste discharge, and the like, and is used for a work area of the CPU 31.

入力部34は、各種情報を入力するタッチパネルであって、ユーザの入力操作に応じて、操作情報を生成し、生成した操作情報をCPU31に出力するものである。なお、入力部34を、タッチパネル以外の各種入力キー(テンキー、上下左右キー、各種機能キー等)で構成するようにしてもよい。   The input unit 34 is a touch panel for inputting various types of information. The input unit 34 generates operation information according to a user input operation, and outputs the generated operation information to the CPU 31. The input unit 34 may be configured by various input keys (such as numeric keys, up / down / left / right keys, and various function keys) other than the touch panel.

表示部35は、CPU31の制御に基づいて、廃棄物管理サーバ20から受信した廃棄物の排出に関する各種情報やCPU31が生成した画像情報等の各種画像情報を表示するタッチパネルである。なお、表示部36を、タッチパネル以外の液晶ディスプレイ等の各種ディスプレイで構成するようにしてもよい。   The display unit 35 is a touch panel that displays various types of image information such as various types of information regarding discharge of waste received from the waste management server 20 and image information generated by the CPU 31 based on the control of the CPU 31. In addition, you may make it comprise the display part 36 with various displays, such as liquid crystal displays other than a touch panel.

電子タグリードライタI/F部36は、電子タグリードライタ30bと接続し、電子タグリードライタ30bのI/F部303との間で実行される各種情報の送受信を制御するインタフェースである。   The electronic tag reader / writer I / F unit 36 is an interface that is connected to the electronic tag reader / writer 30b and controls transmission / reception of various information executed with the I / F unit 303 of the electronic tag reader / writer 30b.

データ通信カードI/F部37は、データ通信カード30cと接続し、廃棄物管理サーバ20との間で実行される各種情報の送受信を制御するインタフェースである。   The data communication card I / F unit 37 is an interface that is connected to the data communication card 30 c and controls transmission / reception of various information executed with the waste management server 20.

データ通信カード30cは、インターネット90を介して廃棄物管理サーバ20と接続し、廃棄物管理サーバ20との間で各種情報の送受信を実行するデータ通信カードである。   The data communication card 30 c is a data communication card that is connected to the waste management server 20 via the Internet 90 and executes transmission / reception of various information to and from the waste management server 20.

また、PDA本体30aは、人工衛星から電波を受信して位置を検出するGPS装置(図示せず)を有し、このGPS装置によって現在の位置を測定し、測定した現在位置を、位置情報としてRAM33に格納する。なお、GPS装置をPDA本体30aに設ける代わりに、PDA30を所持する現場管理者P1が入力部34から位置情報を随時入力し、入力された位置情報をRAM33に格納するようにしてもよい。   Further, the PDA main body 30a has a GPS device (not shown) that receives radio waves from an artificial satellite and detects a position, measures the current position by the GPS device, and uses the measured current position as position information. Store in the RAM 33. Instead of providing the GPS device in the PDA main body 30a, the site manager P1 possessing the PDA 30 may input the position information from the input unit 34 as needed, and store the input position information in the RAM 33.

また、ネットワーク上において各PDAを特定するユーザIDがPDAのそれぞれに付与され、たとえば、IPアドレスと関連付けられてRAM33に格納されている。なお、PDA30については現場コードとユーザIDとを対応付け、PDA40についてはドライバコードとユーザIDとを対応付け、PDA50については中間処理工場コードとユーザIDとを対応付けるようにする。   A user ID for identifying each PDA on the network is assigned to each PDA and stored in the RAM 33 in association with, for example, an IP address. The PDA 30 is associated with the site code and the user ID, the PDA 40 is associated with the driver code and the user ID, and the PDA 50 is associated with the intermediate processing factory code and the user ID.

電子タグ60は、ICチップとアンテナとを内蔵したICタグ、無線タグ、無線ICタグ、RFID(RadioFrequency Identification)タグ等の電子タグである。電子タグ60には各種情報(タグ情報)が格納され、電子タグ60に格納されているタグ情報を電波を利用してPDA30が読み書きすることができる。つまり、PDA30が電子タグ60に接触しなくてもタグ情報を読み書きすることができ、さらに複数の電子タグから同時にタグ情報を読み取ることができる。   The electronic tag 60 is an electronic tag such as an IC tag incorporating an IC chip and an antenna, a wireless tag, a wireless IC tag, or an RFID (Radio Frequency Identification) tag. Various information (tag information) is stored in the electronic tag 60, and the PDA 30 can read and write the tag information stored in the electronic tag 60 using radio waves. That is, the tag information can be read and written without the PDA 30 contacting the electronic tag 60, and the tag information can be read simultaneously from a plurality of electronic tags.

図5は、電子タグリードライタ30bと電子タグ60との内部構成を示すブロック図である。
電子タグリードライタ30bは、主制御部301と、RAM302と、I/F部303と、信号変換部304と、変調部305と、復調部306と、送信アンテナ307と、受信アンテナ308とを有する。
FIG. 5 is a block diagram showing an internal configuration of the electronic tag reader / writer 30b and the electronic tag 60. As shown in FIG.
The electronic tag reader / writer 30b includes a main control unit 301, a RAM 302, an I / F unit 303, a signal conversion unit 304, a modulation unit 305, a demodulation unit 306, a transmission antenna 307, and a reception antenna 308. .

主制御部301は、電子タグリードライタ30b全体を制御する主制御部である。RAM302は、電子タグ60から受信した各種タグ情報を蓄積する記憶部であって、読み出し/書き込み可能なRAMである。I/F部303は、PDA本体30aとの間で実行される各種情報の送受信を制御するインタフェースである。   The main control unit 301 is a main control unit that controls the entire electronic tag reader / driver 30b. The RAM 302 is a storage unit that accumulates various tag information received from the electronic tag 60, and is a readable / writable RAM. The I / F unit 303 is an interface that controls transmission and reception of various types of information executed with the PDA main body 30a.

信号変換部304は、電子タグ60への送信情報をパラレル信号からシリアル信号に変換し、電子タグ60からの受信信号をシリアル信号からパラレル信号に変換する信号変換部である。変調部305は、電子タグ60への送信信号を伝送用の信号に変調する変調部である。復調部306は、電子タグ60からの受信信号を復調する復調部である。   The signal conversion unit 304 is a signal conversion unit that converts transmission information to the electronic tag 60 from a parallel signal to a serial signal, and converts a reception signal from the electronic tag 60 from a serial signal to a parallel signal. The modulation unit 305 is a modulation unit that modulates a transmission signal to the electronic tag 60 into a transmission signal. The demodulator 306 is a demodulator that demodulates the received signal from the electronic tag 60.

電子タグ60は、主制御部61と、EEPROM62と、信号変換部63と、変調部64と、復調部65と、送信アンテナ66と、受信アンテナ67とを有する。   The electronic tag 60 includes a main control unit 61, an EEPROM 62, a signal conversion unit 63, a modulation unit 64, a demodulation unit 65, a transmission antenna 66, and a reception antenna 67.

主制御部61は、電子タグ60全体を制御する主制御部である。
EEPROM62は、各種タグ情報を蓄積するEEPROM等の電源バックアップ不要な記憶部である。信号変換部63は、電子タグリードライタ30bへの送信情報をパラレル信号からシリアル信号に変換し、電子タグリードライタ30bからの受信信号をシリアル信号からパラレル信号に変換する信号変換部である。
The main control unit 61 is a main control unit that controls the entire electronic tag 60.
The EEPROM 62 is a storage unit that does not require power backup, such as an EEPROM that stores various tag information. The signal converter 63 is a signal converter that converts transmission information to the electronic tag reader / driver 30b from a parallel signal to a serial signal, and converts a reception signal from the electronic tag reader / driver 30b from a serial signal to a parallel signal.

変調部64は、電子タグリードライタ30bへの送信信号を伝送用の信号に変調する変調部である。復調部65は、電子タグリードライタ30bからの受信信号を復調する復調部である。   The modulation unit 64 is a modulation unit that modulates a transmission signal to the electronic tag reader / driver 30b into a transmission signal. The demodulator 65 is a demodulator that demodulates the received signal from the electronic tag reader / writer 30b.

図6、7は、廃棄物容器70の例を示す外観斜視図である。
廃棄物容器70は、建築現場101から排出される各種建築廃棄物(図6、7に示す廃材等)を収容する容器であり、この容器に電子タグ60が装着されている。なお、図6、7に示すように、廃棄物容器としては、公知の容器を使用することができる。
6 and 7 are external perspective views showing examples of the waste container 70.
The waste container 70 is a container for storing various building wastes (such as waste materials shown in FIGS. 6 and 7) discharged from the building site 101, and an electronic tag 60 is attached to the container. In addition, as shown to FIG. 6, 7, a well-known container can be used as a waste container.

また、廃棄物容器70は、図7(2)に示すように、蓋70aを閉めることができ、廃棄物容器70内に収容されている廃棄物を外部の者が取り出せない構造を有する容器にすることが好ましい。   Further, as shown in FIG. 7B, the waste container 70 can be a container having a structure that can close the lid 70a and cannot allow the outside person to take out the waste contained in the waste container 70. It is preferable to do.

具体的には、廃棄物容器70に廃棄物(例えば、廃材)を収容し、廃棄物容器70の蓋70aを閉め、蓋70aを封印した後に、廃棄物容器70に装着されている電子タグ60に、収容された廃棄物に関する各種情報を、現場管理者P1がPDA30を使用して書き込む。この書き込み操作が終了した後に、廃棄物容器70から電子タグ60が剥がされた場合と、廃棄物容器70の蓋70aが開けらた場合に、電子タグ60へ書き込まれた各種情報を消去するようにすることが好ましい。例えば、廃棄物容器70の蓋70aが開けられると電子タグ60が壊れるように構成し(廃棄物容器70本体と蓋70aとを跨ぐように電子タグ60をシールで張り付ける等)、廃棄物容器70の蓋70aが開けられると電子タグ60の記録内容を読み出せないようにする。または、廃棄物容器70の蓋70aが開けられると電子タグ60のリセット機能が働くように構成し、廃棄物容器70の蓋70aが開けられると電子タグ60の記録内容を消去するようにする。これらによって、現場管理者P1が廃棄物容器70に収容されている廃棄物を一度確認し電子タグ60に書き込みをした後に、電子タグ60に書き込まれた情報を他の人が書き換えたり、廃棄物容器70に収容された廃棄物を変えられないようにすることができる。   Specifically, the electronic tag 60 mounted on the waste container 70 is stored after the waste (for example, waste material) is stored in the waste container 70, the lid 70a of the waste container 70 is closed, and the lid 70a is sealed. On the other hand, the site manager P1 writes various information about the stored waste using the PDA 30. After the writing operation is finished, when the electronic tag 60 is peeled off from the waste container 70 and when the lid 70a of the waste container 70 is opened, various information written on the electronic tag 60 is erased. It is preferable to make it. For example, the electronic tag 60 is configured to be broken when the lid 70a of the waste container 70 is opened (such as attaching the electronic tag 60 with a seal so as to straddle the waste container 70 main body and the lid 70a). When the lid 70a of the 70 is opened, the recorded content of the electronic tag 60 cannot be read out. Alternatively, the electronic tag 60 is reset when the lid 70a of the waste container 70 is opened, and the recorded content of the electronic tag 60 is erased when the lid 70a of the waste container 70 is opened. As a result, after the site manager P1 once confirms the waste contained in the waste container 70 and writes it on the electronic tag 60, other people can rewrite the information written on the electronic tag 60, The waste stored in the container 70 can be prevented from being changed.

次に、廃棄物管理システム1における動作について説明する。
最初に、CAD積算装置の動作について説明する。
図8(1)は、建築現場101から排出される廃棄物の数量について期間内予測を実行する動作を示すフローチャートである。
Next, the operation in the waste management system 1 will be described.
First, the operation of the CAD integrating device will be described.
FIG. 8 (1) is a flowchart showing an operation of performing intra-period prediction on the quantity of waste discharged from the construction site 101.

図8(2)は、金融コードに検査日を対応させている金融コードテーブルを示す図である。金融コードテーブルは、現場コード毎に存在し、システム管理サーバ10の記憶部15に格納されている。   FIG. 8B is a diagram showing a financial code table in which an inspection date is associated with a financial code. A financial code table exists for each site code and is stored in the storage unit 15 of the system management server 10.

CAD積算装置に建築物の設計に関する各種情報が入力される(S10)と、入力された情報に基づいてCAD積算装置が建築物の設計に関する設計情報(建築物の設計図等)を作成し、作成した設計情報をCADファイルとして現場コードに対応付けて登録する(S11)。続いて、登録したCADファイルに基づいて、このCADファイルに係る建築に使用される各資材についての積算データ(資材別発注ロス率、体積、資材コードを含む情報)をCAD積算装置が作成する(S12)。資材別発注ロス率は、下記の(式1)を使用して求められる。   When various information related to the design of the building is input to the CAD integration device (S10), the CAD integration device creates design information (such as a blueprint of the building) based on the input information. The created design information is registered as a CAD file in association with the site code (S11). Subsequently, based on the registered CAD file, the CAD integrating device creates integrated data (information including order loss rate by material, volume, and material code) for each material used in the construction related to the CAD file ( S12). The order loss rate by material is obtained using the following (Formula 1).

(式1)資材別発注ロス率={メーカ発注量−必要施工面積(容積、重さ)}÷メーカ発注量×100 (Formula 1) Order loss rate by material = {Manufacturer order quantity-Required construction area (volume, weight)} ÷ Manufacturer order quantity × 100

なお、各資材については資材製造会社に応じて寸法等が規格化(メーカ規格品)されている場合が多い。このため、各資材を発注する場合には、規格化された寸法単位で発注する。つまり、「メーカ発注量」は、規格化された寸法単位で資材メーカに発注する資材の合計量を示し、「資材の数量×単位数量あたりの面積(容積、重さ)」で表すことができる。「必要施工面積(容積、重さ)」は、CAD積算装置によって設計された各資材が使用される部分の必要施工面積(容積、重さ)を示す数値である。なお、「面積(容積、重さ)」は、面積、容積、重さのいずれかを示す表示とする。面積(容積)は、CAD積算装置が設計した設計上の各資材の面積(容積)である。上記「メーカ発注量」は、必要施工面積、容積、重さ等を基準にして算出する。なお、資材別発注ロス率は、工法的な違いや、その工法自体の成熟度によるロスの差と、これに加え職人の技量によるロス、その他廃棄物の現場外からの持込や持ち出しによって発生するロスに基づくものである。また、上記「メーカ発注量」は、資材供給量を代表する概念である。   In many cases, the dimensions of each material are standardized (manufacturer standard products) according to the material manufacturing company. For this reason, when ordering each material, it orders by the standardized dimension unit. In other words, the “manufacturer order quantity” indicates the total quantity of materials ordered from the material maker in standardized dimensional units, and can be expressed as “quantity of material × area per unit quantity (volume, weight)”. . “Necessary construction area (volume, weight)” is a numerical value indicating the necessary construction area (volume, weight) of a portion where each material designed by the CAD integrating device is used. “Area (volume, weight)” is a display indicating one of area, volume, and weight. The area (volume) is the area (volume) of each designed material designed by the CAD integrating device. The “manufacturer order quantity” is calculated based on the required construction area, volume, weight, and the like. In addition, the order loss rate by material is caused by differences in construction methods, differences in losses due to the maturity of the construction methods themselves, losses due to craftsmanship, and other waste brought in and out of the field. This is based on loss. The “manufacturer order quantity” is a concept representing the material supply quantity.

具体的に、「内装ボード貼り」工程において使用される資材「内装ボード」についての資材別発注ロス率を説明する。資材「内装ボード」の1枚あたりのメーカ発注量を「縦:1.82m×横:0.91m(×厚さ:0.012m)」とする。実際の施工では、メーカ規格品をそのまま貼れることが望ましいが、内装ボードの貼り方、窓の位置、柱や梁の位置等によってメーカ規格品を切って貼る必要がある。例えば、1棟の家の内装壁の面積を153.6mとCAD設計から見積もると、内装ボードを93枚(縦:1.82m×横:0.91m×93枚=154.0m>153.6m)発注すれば、理論的には足りるはずである。しかし、上記の理由で、ロス率を見込んで、実際は100枚(縦:1.82m×横:0.91m×100枚=165.6m)を発注する。したがって、資材別発注ロス率は、(165.6−153.6)÷165.6×100=7.2(%)となる。 Specifically, the order loss rate by material for the material “interior board” used in the “interior board pasting” step will be described. The manufacturer order quantity per piece of the material “interior board” is “vertical: 1.82 m × horizontal: 0.91 m (× thickness: 0.012 m)”. In actual construction, it is desirable to attach the manufacturer standard product as it is, but it is necessary to cut and apply the manufacturer standard product depending on the method of attaching the interior board, the position of the window, the position of the pillar or beam, and the like. For example, if the area of the interior wall of one house is estimated to be 153.6 m 2 from CAD design, 93 interior boards (length: 1.82 m x width: 0.91 m x 93 sheets = 154.0 m 2 > 153) .6m 2 ) If you place an order, it should be sufficient theoretically. However, for the above reasons, in consideration of the loss rate, 100 sheets (length: 1.82 m × width: 0.91 m × 100 sheets = 165.6 m 2 ) are actually ordered. Therefore, the order loss rate by material is (165.6-153.6) ÷ 165.6 × 100 = 7.2 (%).

CAD積算装置が積算データを作成すると、作成した積算データをシステム管理サーバ10に出力する(S13)。作成した積算データをシステム管理サーバ10が受信すると、受信した積算データを現場コードに対応付けて記憶部15の建築工程データベース10aに格納する。   When the CAD integration device creates integration data, the created integration data is output to the system management server 10 (S13). When the system management server 10 receives the created integrated data, the received integrated data is stored in the building process database 10a of the storage unit 15 in association with the site code.

次に、建築現場から排出される廃棄物の数量を予測する動作について説明する。
廃棄物の数量予測については、使用目的に応じて、配送回別予測と、期間内予測とを実行する。
Next, the operation for predicting the quantity of waste discharged from the construction site will be described.
As for the quantity forecast of waste, the forecast for each delivery time and the forecast within the period are executed according to the purpose of use.

期間内予測は、積算期間を設定し、この積算期間内に回収する配送回分の廃棄物量を廃棄回別・処理方法別に算定して行う予測である。期間内予測は、実際の回収の計画をする際に使用される。   The intra-period prediction is an estimation performed by setting an accumulation period and calculating the amount of waste for the delivery batch collected within the accumulation period for each disposal time and processing method. Intra-period forecasts are used when planning actual collections.

また、配送回別予測は、配送回別・処理方法別の廃棄物量を全配送回分一括して算定して行う予測である。配送回別予測は、設計・積算に対するフィードバックで用いられる。   Further, the forecast for each delivery time is a prediction made by calculating the amount of waste for each delivery time and processing method collectively for all delivery times. Delivery-specific prediction is used as feedback for design and integration.

最初に、廃棄物管理システム1において、システム管理サーバ10が期間内予測を実行する動作について説明する。   First, an operation in which the system management server 10 executes intra-period prediction in the waste management system 1 will be described.

この動作は、システム管理サーバ10においてROM12に格納されている各種制御プログラムに基づいて、CPU11が実行する動作である。また、システム管理サーバ10が予測する数量等は、CAD積算装置から出力された積算情報に基づいて、算出されるものである。   This operation is an operation executed by the CPU 11 based on various control programs stored in the ROM 12 in the system management server 10. The quantity and the like predicted by the system management server 10 are calculated based on integration information output from the CAD integration device.

各建築工程には、図8(2)に示すように、各建築工程に係る工事についての検査日が設けられ、各検査日と金融コードとが関連付けて金融コードテーブルに格納されている。   As shown in FIG. 8 (2), each building process is provided with an inspection date for the construction related to each building process, and each inspection date and a financial code are associated with each other and stored in the financial code table.

図9は、期間内予測を求める場合に、システム管理サーバ10の表示部16に表示される画面の一例を示す図である。   FIG. 9 is a diagram illustrating an example of a screen displayed on the display unit 16 of the system management server 10 when the intra-period prediction is obtained.

期間内予測を求める場合には、オペレータが入力部14で所定の操作を行い、所望の建築現場(例えば、(株)△△ホーム ○○邸)を選択し、選択した建築現場に関する「廃棄物量予測システム期間内予測」画面を、図9(1)に示すように、システム管理サーバ10の表示部16に表示させる。続いて、「積算開始基準日」16aと「積算算出日」16bとの積算期間を入力部14からオペレータが入力し(例えば、3/20〜3/30)、入力部14からの操作によって積算実行ボタン16cを押下する。積算実行ボタン16cが押下されると、入力された積算期間の各値をRAM13に格納する(S21)。続いて、入力された積算期間内に存在する検査日を金融コードテーブル(選択された建築現場に係る現場コードに対応するもの)から取り出し、取り出した検査日に対応する金融コードを金融コードテーブルから取り出す(S22)。   When obtaining the prediction within the period, the operator performs a predetermined operation with the input unit 14, selects a desired construction site (for example, △△ Home XX House), and “waste amount” regarding the selected construction site. The “predicted system period prediction” screen is displayed on the display unit 16 of the system management server 10 as shown in FIG. Subsequently, an operator inputs an integration period between the “integration start reference date” 16 a and the “integration calculation date” 16 b from the input unit 14 (for example, 3/20 to 3/30), and integration is performed by an operation from the input unit 14. The execution button 16c is pressed. When the integration execution button 16c is pressed, each value of the input integration period is stored in the RAM 13 (S21). Subsequently, the inspection date existing within the inputted accumulation period is taken out from the financial code table (corresponding to the site code related to the selected construction site), and the financial code corresponding to the taken out inspection date is taken out from the financial code table. Remove (S22).

続いて、取り出した金融コードに対応付けて格納されている各資材コードを建築工程データベース10aから抽出し、抽出した各資材コードのそれぞれについて、下記の(式2)を使用して廃棄物予測量を算出する(S23)。   Subsequently, each material code stored in association with the extracted financial code is extracted from the building process database 10a, and the estimated amount of waste using the following (Equation 2) for each extracted material code. Is calculated (S23).

(式2)廃棄物予測量=メーカ発注量−{(メーカ発注量×業者別平均ロス率)+必要施工面積(容積、重さ)}
なお、(式2)を、『廃棄物予測量=メーカ発注量−[{メーカ発注量×(業者別平均ロス率+工法に起因するロス率+持込又は持出し等によるロス率)}+必要施工面積(容積、重さ)]』としてもよい。工法に起因するロス率は、たとえば、ボードを縦に貼るか、横に貼るか等による施工方法の違い等に基づくロス率を意味する。また、持込又は持出し等によるロス率は、実際にはあってはならないことであるが、建築現場での実情も考慮にいれておくという意思表示である。
(Equation 2) Predicted amount of waste = Manufacturer order amount-{(Manufacturer order amount × Average loss rate by contractor) + Required construction area (volume, weight)}
In addition, (Equation 2) is calculated as follows: “Waste prediction amount = Manufacturer order amount − [{Manufacturer order amount × (Average loss rate by supplier + Loss rate due to construction method + Loss rate due to bringing in or taking out)}} required Construction area (volume, weight)] ”. The loss rate resulting from the construction method means, for example, the loss rate based on the difference in construction method depending on whether the board is attached vertically or horizontally. Moreover, although the loss rate by carrying-in or taking-out etc. should not actually exist, it is a will indication that the actual situation in a construction site is also taken into consideration.

専門工事業者の作業者によって作業品質が異なり、使用する資材が同じであっても専門工事業者に応じて発生する資材の廃棄物の量が異なるので、(式2)で示すように、業者別平均ロス率を使用する。   The work quality varies depending on the workers of the specialized contractor, and even if the materials used are the same, the amount of material waste generated varies depending on the specialized contractor. Use the average loss rate.

業者別平均ロス率は、過去に施工された各建築工程において、発生した各資材についての業者別ロス率の平均値を各専門工事業者毎に算出した値である。なお、業者別ロス率は、下記の(式3)を使用して求められる。   The average loss rate by trader is a value obtained by calculating the average value of the loss rate by trader for each material generated in each construction process executed in the past for each specialized construction contractor. The loss rate by trader is obtained using the following (Formula 3).

(式3)業者別ロス率={メーカ発注量−(廃棄物量+必要施工面積(容積、重さ))}÷メーカ発注量×100
なお、(式3)を、『業者別ロス率={メーカ発注量−(廃棄物量+必要施工面積(容積、重さ))}÷必要施工面積(容積、重さ)×100』とするようにしてもよい。
(Formula 3) Loss rate by supplier = {manufacturer order quantity− (waste amount + required construction area (volume, weight))} ÷ manufacturer order quantity × 100
Note that (Equation 3) is “loss rate by supplier = {manufacturer order quantity− (waste amount + required construction area (volume, weight))} ÷ required construction area (volume, weight) × 100”. It may be.

なお、「廃棄物量」は、専門工事業者が施工した後に実際に発生した各資材の廃棄物の数量(重さ、体積等)を示す数値である。つまり、業者別平均ロス率は、上記業者別ロス率を各作業工程における資材毎に算出し、さらに、算出した値を専門工事業者毎に集計し、集計した値の平均値を示すものである。なお、業者別平均ロス率を、上記業者別ロス率を各作業工程における資材毎に算出し、さらに、算出した値を専門工事業者毎の資材毎に集計し、集計した値の平均値としてもよい。   The “waste amount” is a numerical value indicating the quantity (weight, volume, etc.) of waste of each material actually generated after construction by a professional contractor. That is, the trader average loss rate is calculated by calculating the trader loss rate for each material in each work process, and further summing up the calculated values for each professional construction contractor and indicating the average value of the summed values. . The average loss rate for each supplier is calculated for each material in each work process, and the calculated value is totaled for each material for each professional contractor. Good.

具体的に、図14に示す専門工事業者「AA工業」についての業者別ロス率について上記(式1)を使用して資材別発注ロス率を求めた例に基づいて説明すると、資材「内装ボード」のメーカ発注量を「(縦:1.82m×横:0.91m×厚さ:0.012m)×100枚」とし、必要施工面積を「153.6m(1棟の家の内装壁の面積)」とし、AA工業が実際に施工した後に発生した資材「内装ボード」の廃棄物の数量を「0.13m(体積)」とすると、業者別ロス率は、{165.6×0.012−(0.13+153.6×0.012)}÷(165.6×0.012)×100=0.7(%)である。ここで示した例は、廃棄物の体積に基づいて、業者別ロス率を求める例であるが、廃棄物の体積を測ることが困難である場合等には、廃棄物の重さに基づいて、業者別ロス率を求めるようにしてもよい。つまり、上記業者別ロス率は、{(165.6×0.012)×「内装ボードの単位体積当たりの重さ」−(廃棄物の重さ+153.6×0.012×「内装ボードの単位体積当たりの重さ」}÷(153.6×0.012)×「内装ボードの単位体積当たりの重さ」×100で求めることができる。 Specifically, the loss rate by trader for the professional construction contractor “AA Industry” shown in FIG. 14 will be described based on the example of obtaining the order loss rate by material using the above (Formula 1). "(Vertical: 1.82m x Width: 0.91m x Thickness: 0.012m) x 100" and the required construction area is "153.6m 2 (interior wall of one house) ) ”, And the amount of waste of the material“ interior board ”generated after the actual construction by AA Industry is“ 0.13 m 2 (volume) ”, the loss rate by trader is {165.6 × 0.012- (0.13 + 153.6 × 0.012)} ÷ (165.6 × 0.012) × 100 = 0.7 (%). The example shown here is an example of obtaining the loss rate by trader based on the volume of waste, but when it is difficult to measure the volume of waste, it is based on the weight of waste. The loss rate for each trader may be obtained. In other words, the loss rate by trader is {(165.6 × 0.012) × “weight per unit volume of the interior board” − (weight of waste + 153.6 × 0.012 × “interior board Weight per unit volume "} / (153.6 × 0.012) ד weight per unit volume of interior board ”× 100.

続いて、各資材コードについて廃棄物予測量の算出が終了すると(S23)、各資材コードに基づいて、例えば、木材系廃材と、木材系以外で再資源可能なものと、木材系以外で再資源不可能なものとの3種類に分けて、算出した各廃棄物予測量の合計値を集計する。木材系以外で再資源可能なものとしては、はいプラ、金属くず等がある(S24)。   Subsequently, when the calculation of the predicted amount of waste for each material code is completed (S23), based on each material code, for example, wood-based waste material, recyclable materials other than wood-based materials, and non-wood-based materials are recycled. The total value of the calculated predicted amounts of waste is divided into three types: those that cannot be resourced. Examples of recyclable materials other than wood-based materials include yes plastic and metal scraps (S24).

続いて、3種類に分けて集計された各廃棄物予測量の合計と、現場コードと、金融コードと、積算期間とを関連付けてシステム管理サーバ10の記憶部15の廃棄物予測テーブルに格納する(S25)。   Subsequently, the total of the predicted amounts of waste collected in three types, the site code, the financial code, and the integration period are associated and stored in the waste prediction table of the storage unit 15 of the system management server 10. (S25).

図9(2)は、システム管理サーバ10の表示部16に表示される廃棄物予測テーブルに格納された内容を示す画面の一例を示す図である。   FIG. 9B is a diagram illustrating an example of a screen showing the contents stored in the waste prediction table displayed on the display unit 16 of the system management server 10.

続いて、図9(1)に示す画面において、明細ボタン16dが入力部14からの操作によって押下されると、図9(2)に示すように、廃棄物予測テーブルに格納された内容を表示部16に表示する(S26)。   Subsequently, on the screen shown in FIG. 9A, when the detail button 16d is pressed by an operation from the input unit 14, the contents stored in the waste prediction table are displayed as shown in FIG. 9B. It is displayed on the part 16 (S26).

次に、廃棄物管理システム1において、システム管理サーバ10が配送回別予測を実行する動作について説明する。   Next, an operation of the waste management system 1 in which the system management server 10 performs the delivery-specific prediction will be described.

この動作では、住宅建築における建築工程を3工程に分け、各工程において使用される資材の配送と、各工程で発生する廃棄物の回収との双方を各工程毎に1回づつ行う場合について説明する。   In this operation, the building process in residential construction is divided into three processes, and both the delivery of materials used in each process and the collection of waste generated in each process are performed once for each process. To do.

なお、各工程における建築工事に必要な資材は、CAD積算装置によって作成された建築資材の積算情報に基づいて、建築資材の発注と、建築現場への各工程における配送(期日指定共同配送)との計画情報をシステム管理サーバ10が作成するが、オペレータの操作によって作成するようにしてもよい。各工程における配送は、それぞれ金融コードに対応付けられている。   In addition, materials necessary for construction work in each process are based on the building material accumulation information created by the CAD accumulator, and orders for building materials and delivery to each construction site (date-designated joint delivery) The plan management information is created by the system management server 10, but may be created by an operator's operation. Delivery in each process is associated with a financial code.

図10は、配送回別予測を求める場合に、システム管理サーバ10の表示部16に表示される画面の一例を示す図である。   FIG. 10 is a diagram illustrating an example of a screen displayed on the display unit 16 of the system management server 10 when obtaining a delivery-specific prediction.

配送回別予測を求める場合には、オペレータが入力部14で所定の操作を行い、所望の建築現場(例えば、(株)△△ホーム ○○邸)を選択し、選択した建築現場に関する「廃棄物量予測システム配送回別予測」画面を、図10(1)に示すように、システム管理サーバ10の表示部16に表示させる。続いて、入力部14からの操作によってオペレータが積算実行ボタン16eを押下する。積算実行ボタン16eが押下されると、金融コードテーブル(選択された建築現場に係る現場コードに対応するもの)から全ての金融コードを取り出す。   When obtaining the forecast for each delivery time, the operator performs a predetermined operation with the input unit 14, selects a desired construction site (for example, △△ Home XX House), and “discards” for the selected construction site. As shown in FIG. 10A, the “quantity prediction system delivery prediction” screen is displayed on the display unit 16 of the system management server 10. Subsequently, the operator depresses the integration execution button 16 e by an operation from the input unit 14. When the integration execution button 16e is pressed, all financial codes are extracted from the financial code table (corresponding to the site code related to the selected construction site).

続いて、取り出した各金融コードに対応付けて格納されている各資材コードをデータベースから抽出し、抽出した各資材コードのそれぞれについて、上記(式2)を使用して廃棄物予測量を算出する。   Subsequently, each material code stored in association with each extracted financial code is extracted from the database, and the estimated amount of waste is calculated for each of the extracted material codes using the above (Equation 2). .

続いて、各資材コードについて廃棄物予測量の算出が終了すると、各資材コードに対応付けられている金融コードに基づいて、算出した各廃棄物予測量の合計値を金融コード毎(配送回毎)に集計する。続いて、各金融コード毎の集計が終了すると、各資材コードに基づいて、木材系廃材と、木材系以外で再資源可能なものと、木材系以外で再資源不可能なものとの3種類に分けて、算出した各廃棄物予測量の合計値を金融コード毎に集計する。   Subsequently, when the calculation of the predicted amount of waste for each material code is completed, the total value of the calculated predicted amounts of waste is calculated for each financial code (for each delivery time) based on the financial code associated with each material code. ). Subsequently, when the calculation for each financial code is completed, based on each material code, there are three types: wood-based waste materials, those that can be recycled other than wood-based materials, and those that cannot be recycled other than wood-based materials The total value of the calculated predicted amounts of each waste is tabulated for each financial code.

続いて、金融コード毎に3種類に分けて集計された各廃棄物予測量の合計と、現場コードとを関連付けて廃棄物予測テーブルに格納する。   Subsequently, the total of the predicted amounts of waste collected in three types for each financial code and the site code are associated with each other and stored in the waste prediction table.

図10(2)は、システム管理サーバ10の表示部16に表示される廃棄物予測テーブルに格納された内容を示す画面の一例を示す図である。   FIG. 10B is a diagram illustrating an example of a screen showing the contents stored in the waste prediction table displayed on the display unit 16 of the system management server 10.

続いて、図10(1)に示す画面において、明細ボタン16fが入力部14からの操作によって押下されると、図10(2)に示すように、廃棄物予測テーブルに格納された内容を表示部16に表示する。   Subsequently, on the screen shown in FIG. 10 (1), when the detail button 16f is pressed by an operation from the input unit 14, the contents stored in the waste prediction table are displayed as shown in FIG. 10 (2). This is displayed on the part 16.

図11、12は、廃棄物管理システム1において建築現場から排出される廃棄物を処理する動作を示す動作フロー図である。   FIGS. 11 and 12 are operation flowcharts showing the operation of processing the waste discharged from the construction site in the waste management system 1.

図11、12に示す動作フロー図のうちで、上段は、廃棄物管理システム1における情報の流れを示すシステムフロー図であり、下段は、排出事業者と、収集運搬業者と、中間処分業者とに関する実際の作業動作を示す運用フロー図である。   11 and 12, the upper part is a system flow chart showing the information flow in the waste management system 1, and the lower part is a discharge company, a collection transporter, an intermediate disposal company, It is an operation | movement flowchart which shows the actual work operation | movement regarding.

この動作のうちの各装置に係る制御動作は、各装置においてROMに格納されている制御プログラムに基づいてCPUが実行する動作である。   Of these operations, the control operation related to each device is an operation executed by the CPU based on a control program stored in the ROM in each device.

システム管理サーバ10は、廃棄物予測テーブルに格納された廃棄物情報に基づいて作成された廃棄物排出予定情報(廃棄物予定情報)を廃棄物管理サーバ20に送信する(S50)。廃棄物管理サーバ20がシステム管理サーバ10から廃棄物排出予定情報を受信すると、受信した廃棄物排出予定情報を廃棄物管理サーバ20の記憶部25のデータベースに格納する(S51)。廃棄物排出予定情報は、建築現場名(現場コード)と、排出予定日時(金融コード)と、廃棄物品目(資材コード)と、排出量と、廃棄物容器70に関する情報(重さ、荷姿等)とを含む情報である。   The system management server 10 transmits waste discharge schedule information (waste schedule information) created based on the waste information stored in the waste prediction table to the waste management server 20 (S50). When the waste management server 20 receives the waste discharge schedule information from the system management server 10, the received waste discharge schedule information is stored in the database of the storage unit 25 of the waste management server 20 (S51). The waste discharge schedule information includes the construction site name (site code), scheduled release date and time (financial code), waste item (material code), discharge amount, and information about the waste container 70 (weight, packing) Etc.).

続いて、記録部25に格納されている廃棄物排出予定情報に含まれる現場コードに対応する建築現場常設PDA30のユーザIDに基づいて、廃棄物排出予定情報を廃棄物管理サーバ20が建築現場常設PDA30に送信する(S52)。廃棄物排出予定情報を建築現場常設PDA30が受信すると、受信した廃棄物排出予定情報をRAM33に格納し、表示部35に表示する(S53)。この場合には、例えば、建築現場名と、排出予定日時と、廃棄物品目と、排出量と、廃棄物容器70の荷姿と、廃棄物が排出される日時が近いので表示された建築現場に行き廃棄物を確認するように促す通知とを表示する。   Subsequently, based on the user ID of the construction site permanent PDA 30 corresponding to the site code included in the waste discharge schedule information stored in the recording unit 25, the waste management server 20 stores the waste discharge schedule information in the construction site permanent configuration. The data is transmitted to the PDA 30 (S52). When the construction site permanent PDA 30 receives the waste discharge schedule information, the received waste discharge schedule information is stored in the RAM 33 and displayed on the display unit 35 (S53). In this case, for example, the construction site displayed because the name of the construction site, the scheduled date and time of discharge, the waste item, the amount of discharge, the packaging of the waste container 70, and the date and time when the waste is discharged are close. And a notice prompting you to confirm the waste.

このように、建築現場常設PDA30の表示部35において、現場管理者P1が廃棄物排出予定情報(建築現場名、排出予定日時等)を視覚的に容易に確認することができるので、一人で複数の現場を管理する現場管理者P1が、複数の現場を巡回する巡回計画を立てやすい。なお、RAM33に複数の廃棄物排出予定情報が格納されている場合には、当該廃棄物排出予定情報の排出予定日時の順番に表示部35に表示させるようにしてもよい。また、廃棄物排出予定情報を建築現場常設PDA30に送信すると共に、廃棄物管理サーバ20が建築現場101の情報処理装置(パソコン等)に廃棄物排出予定情報を送信し、「現場管理者P1が廃棄物の確認に行くので廃棄物を廃棄物容器70に収容する」旨の通知を当該情報処理装置に表示させるようにしてもよい。これらにより、現場管理者P1が建築現場101に到着する前に、作業者が廃棄物を廃棄物容器70に収容しておくことができ、現場管理者P1が確認作業を迅速に行うことができる。   In this way, on the display unit 35 of the construction site permanent PDA 30, the site manager P1 can easily visually confirm the waste discharge schedule information (building site name, scheduled release date, etc.). It is easy for the site manager P1 who manages the sites to make a patrol plan for patroling a plurality of sites. When a plurality of waste discharge schedule information is stored in the RAM 33, the information may be displayed on the display unit 35 in the order of the scheduled discharge date and time of the waste discharge schedule information. In addition, the waste discharge schedule information is transmitted to the construction site permanent PDA 30, and the waste management server 20 transmits the waste discharge schedule information to the information processing apparatus (such as a personal computer) of the building site 101. You may make it display the notification that the waste is accommodated in the waste container 70 because it goes to the confirmation of the waste on the information processing apparatus. Thus, before the site manager P1 arrives at the construction site 101, the worker can store the waste in the waste container 70, and the site manager P1 can quickly perform the confirmation work. .

続いて、建築現場常設PDA30の表示部35に表示された廃棄物排出予定情報を見た現場管理者P1が、表示された指示に基づいて、表示された建築現場101に行き、廃棄物容器70に収容されている廃棄物を確認する。この場合に、現場管理者P1は、廃棄物容器70に収容の廃棄物についての廃棄物品目と、排出量と、廃棄物の品質と、廃棄物容器70の荷姿(例えば、図7(2)に示す形状の容器であり外観の色は赤である等のように、廃棄物収集運搬業者のドライバP2等が視覚的に容易に廃棄物容器70の荷姿を認識できる情報)と、運搬経路とを確認し、確認が終了した後に、確認した廃棄物容器70に収容の廃棄物についての廃棄物品目と、排出量と、廃棄物の品質(例えば、再資源化が可能な場合には3段階(A:優、B:良、C:可)で評価し、再資源化が不可能な場合にはDとする)と、廃棄物容器70の荷姿と、運搬経路と、確認者と、確認日時と、収集依頼と、位置情報とを含む廃棄物実績情報を建築現場常設PDA30の入力部34から入力する(S54)。なお、確認日時と位置情報とについては、現場管理者P1が入力部34から入力する代わりに、CPU31が計測する時刻とGPS装置によって取得した位置情報とを使用するようにしてもよい。また、廃棄物が収容されている廃棄物容器70の重さを計り、この値を現場管理者P1が入力部34から入力すると、入力された値から廃棄物容器70自体の重さを引き、廃棄物の排出量とすることができる。なお、廃棄物容器70を廃棄物回収車C1に積み込む際に、廃棄物容器70の重さを計り、この値をドライバP2がPDA40から入力するようにしてもよい。   Subsequently, the site manager P1 who has seen the waste discharge schedule information displayed on the display unit 35 of the construction site permanent PDA 30 goes to the displayed construction site 101 based on the displayed instructions, and the waste container 70 Check the waste contained in In this case, the site manager P1 determines the waste item, the discharge amount, the quality of the waste, and the packing state of the waste container 70 (for example, FIG. ) And the information such that the driver P2 of the waste collection and transporter can easily visually recognize the packing state of the waste container 70) such as the container having the shape shown in FIG. After confirming the route, after confirming the waste item, the amount of waste contained in the confirmed waste container 70, the amount of discharge, and the quality of the waste (for example, if recycling is possible) 3 stages (A: excellent, B: good, C: acceptable), and D if it is impossible to recycle), the packaging of the waste container 70, the transportation route, and the confirmer The waste actual result information including the confirmation date and time, the collection request, and the position information is input to the input unit 34 of the construction site permanent PDA 30. To et al input (S54). In addition, about the confirmation date and time and position information, you may make it use the time which CPU31 measures, and the positional information acquired with the GPS apparatus instead of the site manager P1 inputting from the input part 34. FIG. Further, when the weight of the waste container 70 containing the waste is measured and the site manager P1 inputs this value from the input unit 34, the weight of the waste container 70 itself is subtracted from the input value, This can be the amount of waste discharged. Note that when the waste container 70 is loaded on the waste collection vehicle C1, the weight of the waste container 70 may be measured, and this value may be input from the PDA 40 by the driver P2.

建築現場常設PDA30において廃棄物実績情報が入力部34から入力されると、入力された廃棄物実績情報を、資材コードと金融コードとに対応付けてRAM33に格納する。続いて、廃棄物実績情報の入力が終了すると、図7(2)に示すように、現場管理者P1が廃棄物容器70の蓋70aを閉め、廃棄物容器70に収容されている廃棄物を外部の者が取り出せないようにする。つまり、廃棄物容器70に収容されている廃棄物の内容が変化しないようにする。   When the waste performance information is input from the input unit 34 in the construction site permanent PDA 30, the input waste performance information is stored in the RAM 33 in association with the material code and the financial code. Subsequently, when the input of the waste record information is finished, the site manager P1 closes the lid 70a of the waste container 70 as shown in FIG. 7 (2), and the waste contained in the waste container 70 is removed. Prevent outsiders from taking it out. That is, the contents of the waste stored in the waste container 70 are not changed.

続いて、廃棄物容器70の蓋70aを閉めた後に、建築現場常設PDA30と電子タグ60との間で情報の送受信が可能な範囲内に入るように、現場管理者P1が建築現場常設PDA30を廃棄物容器70に貼付されている電子タグ60に近づけ、入力した廃棄物実績情報を電子タグ60へ書き込む操作を現場管理者P1が入力部35で実行する(S55)。なお、この書き込み操作が終了した後に、廃棄物容器70の蓋70aが開けられると、電子タグ60へ書き込まれた廃棄物実績情報を消去する。   Subsequently, after closing the lid 70a of the waste container 70, the site manager P1 sets the construction site permanent PDA 30 so that the information can be transmitted and received between the construction site permanent PDA 30 and the electronic tag 60. The site manager P1 performs an operation of approaching the electronic tag 60 attached to the waste container 70 and writing the input waste result information to the electronic tag 60 by the input unit 35 (S55). When the lid 70a of the waste container 70 is opened after this writing operation is completed, the waste record information written on the electronic tag 60 is erased.

入力部35で書き込み操作が実行されると、RAM33に格納されている廃棄物実績情報を、電子タグリードライタI/F部36を介して、電子タグリードライタ30bが電子タグ60に送信し、廃棄物実績情報をEEPROM62に格納する(S56)。また、電子タグ60への書き込み動作と同時に、データ通信カードI/F部37を介して、データ通信カード30cが廃棄物実績情報を廃棄物管理サーバ20に送信する。廃棄物実績情報を廃棄物管理サーバ20が受信すると、受信した廃棄物実績情報に含まれる資材コード及び金融コードに基づいて、受信した廃棄物実績情報と当該資材コード及び金融コードとを対応させ、記憶部25のデータベースに格納する(S57)。これらの動作を実行することによって、同一の廃棄物実績情報を廃棄物管理サーバ20と電子タグ60とに登録することができる。   When a writing operation is executed by the input unit 35, the electronic tag reader / writer 30b transmits the waste record information stored in the RAM 33 to the electronic tag 60 through the electronic tag reader / writer I / F unit 36. The waste record information is stored in the EEPROM 62 (S56). Simultaneously with the writing operation to the electronic tag 60, the data communication card 30 c transmits the waste record information to the waste management server 20 via the data communication card I / F unit 37. When the waste management server 20 receives the waste performance information, the received waste performance information is associated with the material code and the financial code based on the material code and the financial code included in the received waste performance information, The data is stored in the database of the storage unit 25 (S57). By executing these operations, the same waste performance information can be registered in the waste management server 20 and the electronic tag 60.

廃棄物管理サーバ20が廃棄物排出予定情報を受信すると(S51)、受信した廃棄物排出予定情報についての廃棄物の収集運搬に関する情報(収集依頼情報)を廃棄物収集業者に通知し、配車確定登録をする(S58)。例えば、廃棄物収集業者の情報処理装置に前記収集依頼情報を送信する。なお、前記収集依頼情報は、廃棄物容器70に収容の廃棄物についての廃棄物品目(資材コード)と、排出量と、廃棄物容器70の荷姿と、運搬経路と、収集依頼と、位置情報(現場コード)とを含む情報である。   When the waste management server 20 receives the waste discharge schedule information (S51), it notifies the waste collection company of information (collection request information) related to the collection and transportation of waste for the received waste discharge schedule information, and confirms the dispatch. Registration is performed (S58). For example, the collection request information is transmitted to an information processing apparatus of a waste collector. The collection request information includes the waste item (material code) for the waste contained in the waste container 70, the discharge amount, the packing state of the waste container 70, the transport route, the collection request, the position Information (field code).

廃棄物収集業者は、前記収集依頼情報を通知されると、前記収集依頼情報に基づいて、車両及びドライバに関する配車確定情報(ドライバ常備PDA40のユーザID、資材コード及び金融コードを含む)を作成し、作成した配車確定情報を廃棄物管理サーバ20に送信する。受信した配車確定情報を廃棄物管理サーバ20が、資材コード及び金融コードに対応させ、記憶部25のデータベースに格納する。このように、廃棄物に関する詳細な情報(廃棄物品目、排出量、運搬経路、位置情報等)を廃棄物の回収前に廃棄物収集業者が知ることができるので、通知された収集依頼情報に基づいて、廃棄物収集業者は配車と回収ルートとに関する回収計画を効率的に設定することができる。なお、廃棄物管理サーバ20が廃棄物排出予定情報を受信すると(S51)、受信した廃棄物排出予定情報を、ドライバ常備PDA40のユーザIDに基づいて、廃棄物管理サーバ20がドライバ常備PDA40に直接送信するようにしてもよい。   When notified of the collection request information, the waste collection company creates vehicle allocation information (including the user ID, material code, and financial code of the driver permanent PDA 40) based on the collection request information. The created dispatch information is transmitted to the waste management server 20. The waste management server 20 stores the received vehicle allocation confirmation information in the database of the storage unit 25 in correspondence with the material code and the financial code. In this way, detailed information on waste (waste items, emissions, transport routes, location information, etc.) can be known by the waste collector before the collection of waste. Based on this, the waste collector can efficiently set up a recovery plan for dispatch and recovery routes. When the waste management server 20 receives the waste discharge schedule information (S51), the waste management server 20 directly sends the received waste discharge schedule information to the driver permanent PDA 40 based on the user ID of the driver permanent PDA 40. You may make it transmit.

建築現場常設PDA30から廃棄物実績情報を廃棄物管理サーバ20が受信すると(S57)、廃棄物収集業者から受信した配車確定情報に含まれるドライバ常備PDA40のユーザIDに基づいて、ドライバ常備PDA40に廃棄物回収指示情報を送信する(S59)。廃棄物回収指示情報は、廃棄物容器70に収容の廃棄物についての廃棄物品目(資材コード)と、排出予定日時(金融コード)と、排出量と、廃棄物の品質と、廃棄物容器70の荷姿と、運搬経路と、収集依頼と、位置情報(建築現場名(現場コード))とを含む情報(対応する廃棄物実績情報を含ませてもよい)である。   When the waste management server 20 receives the waste performance information from the construction site permanent PDA 30 (S57), it is discarded by the driver permanent PDA 40 based on the user ID of the driver permanent PDA 40 included in the vehicle allocation confirmation information received from the waste collector. The material collection instruction information is transmitted (S59). The waste collection instruction information includes a waste item (material code), a scheduled release date (financial code), a discharge amount, a quality of waste, a waste container 70, and a waste container 70. The information (which may include the corresponding waste performance information) including the package form, the transport route, the collection request, and the position information (building site name (site code)).

廃棄物回収指示情報をドライバ常備PDA40が受信すると、受信した廃棄物回収指示情報をRAM43に格納すると共に、表示部45に表示する(S60)。この場合に、例えば、建築現場名と、排出予定日時と、廃棄物品目と、排出量と、廃棄物容器70の荷姿と、建築現場101に行き廃棄物容器70を回収する指示とを表示する。   When the driver permanent PDA 40 receives the waste collection instruction information, the received waste collection instruction information is stored in the RAM 43 and displayed on the display unit 45 (S60). In this case, for example, the name of the construction site, the scheduled date and time of discharge, the waste item, the discharge amount, the packing state of the waste container 70, and the instruction to go to the construction site 101 and collect the waste container 70 are displayed. To do.

このように、ドライバ常備PDA40の表示部45において、廃棄物回収運搬業者のドライバP2が廃棄物回収指示情報を視覚的に容易に確認することができるので、ドライバP2が建築現場101に行くことが容易であり、廃棄物の回収作業が容易である。つまり、ドライバP2が廃棄物の回収を効率的に行うことができる。   In this way, the driver P2 of the waste collection and transportation company can visually confirm the waste collection instruction information visually on the display unit 45 of the driver permanent PDA 40, so the driver P2 may go to the construction site 101. It is easy and the collection work of waste is easy. That is, the driver P2 can efficiently collect the waste.

続いて、ドライバ常備PDA40の表示部45に表示された廃棄物回収指示情報を見たドライバP2が、表示された指示に基づいて、表示された建築現場101に行き、表示された荷姿の廃棄物容器70を見つける。続いて、見つけた廃棄物容器70が回収を指示された廃棄物容器であるか否かを確認するために、ドライバ常備PDA40と電子タグ60との間で情報の送受信が可能な範囲内になるように、ドライバ常備PDA40を廃棄物容器70に貼付されている電子タグ60にドライバP2が近づけ、回収を指示された廃棄物容器であるか否かを確認するための操作をドライバP2が入力部44で実行する(S61)。この確認操作が実行されると、電子タグリードライタI/F部46を介して、EEPROM62に格納されている廃棄物実績情報を読み出す旨の情報を電子タグリードライタ40bが電子タグ60に送信し、この情報を電子タグ60が受信すると、EEPROM62に格納されている廃棄物実績情報を、ドライバ常備PDA40に送信する(S62)。   Subsequently, the driver P2 who has seen the waste collection instruction information displayed on the display unit 45 of the driver permanent PDA 40 goes to the displayed construction site 101 based on the displayed instruction and discards the displayed packing state. Find the container 70. Subsequently, in order to confirm whether or not the found waste container 70 is a waste container instructed to be collected, the information can be transmitted and received between the driver permanent PDA 40 and the electronic tag 60. As described above, the driver P2 brings the driver P2 close to the electronic tag 60 attached to the waste container 70, and the driver P2 performs an operation for confirming whether the driver P2 is a waste container instructed to be collected. This is executed at 44 (S61). When this confirmation operation is executed, the electronic tag reader / writer 40b transmits information to the electronic tag 60 via the electronic tag reader / I / F unit 46 to read the waste record information stored in the EEPROM 62. When this information is received by the electronic tag 60, the waste record information stored in the EEPROM 62 is transmitted to the driver permanent PDA 40 (S62).

続いて、電子タグ60から廃棄物実績情報をドライバ常備PDA40が受信すると(S61)、受信した廃棄物実績情報に含まれる資材コード及び金融コードと、廃棄物回収指示情報に含まれる資材コード及び金融コードとを比較する。比較した結果、比較した双方の資材コード及び金融コードが同一であれば、受信した廃棄物実績情報に係る廃棄物と、廃棄物回収指示情報に係る廃棄物とが同一であると判断できるので、この電子タグ60が貼付されている廃棄物容器70を回収する指示と、回収日時・回収業者名を入力する旨とを表示部45に表示する。   Subsequently, when the driver permanent PDA 40 receives the waste performance information from the electronic tag 60 (S61), the material code and the financial code included in the received waste performance information, and the material code and the financial included in the waste collection instruction information Compare with code. As a result of comparison, if both the material code and the financial code compared are the same, it can be determined that the waste related to the received waste performance information and the waste related to the waste collection instruction information are the same. The display unit 45 displays an instruction to collect the waste container 70 to which the electronic tag 60 is affixed, and the input of the collection date / time and the collection trader name.

この表示を見たドライバP2が、指示された廃棄物容器70を廃棄物回収車C1に積み込み、ドライバ常備PDA40の入力部44から回収した日時である回収日時と回収業者名とを入力する。入力部44に回収日時・回収業者名が入力されると、入力された回収日時・回収業者名を資材コード及び金融コードに関連付けてRAM43に格納する。なお、ドライバP2がドライバ常備PDA40に入力した回収日時をRAM43に格納する代わりに、前記比較した結果、比較した双方の資材コード及び金融コードが同一であった場合に、この時の時刻をRAM43に格納し、この時刻を回収日時とするようにしてもよい。また、この場合に、回収した実際の位置を確認することができるように、GPS装置で測定した現在位置を位置情報として、回収日時と関連付けてRAM43に格納するようにしてもよい。   The driver P2 who sees this display loads the designated waste container 70 into the waste collection vehicle C1, and inputs the collection date and time and the name of the collection company, which is the date and time of collection from the input unit 44 of the driver permanent PDA 40. When the collection date / time and the name of the collection trader are input to the input unit 44, the input collection date / time / collection trader name is stored in the RAM 43 in association with the material code and the financial code. Note that instead of storing the collection date and time input by the driver P2 into the driver permanent PDA 40 in the RAM 43, if the compared material code and financial code are the same as a result of the comparison, the time at this time is stored in the RAM 43. It may be stored and this time may be set as the collection date. In this case, the current position measured by the GPS device may be stored as position information in the RAM 43 in association with the collection date so that the collected actual position can be confirmed.

続いて、入力部44に回収日時・回収業者名が入力されると(S63)、入力された回収日時・回収業者名と資材コード及び金融コードとを含む廃棄物排出実績情報を、データ通信カードI/F部47を介して、データ通信カード40cが廃棄物管理サーバ20に送信し、廃棄物排出実績情報を資材コード及び金融コードに関連付けて廃棄物管理サーバ20の記憶部25のデータベースに格納する(S64)。   Subsequently, when the collection date / time and the name of the collection company are input to the input unit 44 (S63), the waste discharge record information including the input collection date / time / collection company name, material code and financial code is stored in the data communication card. The data communication card 40c transmits to the waste management server 20 via the I / F unit 47, and the waste discharge result information is stored in the database of the storage unit 25 of the waste management server 20 in association with the material code and the financial code. (S64).

これらによって、ドライバP2が廃棄物容器70を誤って回収することを防止することができ、実際の回収日時と回収場所とを正確に特定し、廃棄物管理サーバ20に登録することができる。また、正しい容器を照合した際に、回収業者名・日時を追加記入することで、当該廃棄物の管理責任が回収業者に移転したことを保証することができる。   Thus, the driver P2 can prevent the waste container 70 from being mistakenly collected, and the actual collection date and time and the collection place can be accurately identified and registered in the waste management server 20. In addition, when the correct container is verified, it is possible to guarantee that the responsibility for managing the waste has been transferred to the collection company by additionally entering the name and date of the collection company.

以下、回収業者から受け入れた再資源化施設、または中間処理場でも、同様の処理を行うことによって、順次管理責任が移転することを保証すると共に、その処理の適切性を担保することができる。   Hereinafter, by performing the same processing also at the recycling facility or the intermediate processing plant received from the collection company, it is possible to guarantee that the management responsibility is transferred sequentially and to ensure the appropriateness of the processing.

ドライバ常備PDA40から、廃棄物排出実績情報を廃棄物管理サーバ20が受信すると(S64)、受信した廃棄物排出実績情報(対応する廃棄物実績情報を含ませてもよい)を記憶部25のデータベースに格納すると共に、廃棄物管理サーバ20がシステム管理サーバ10に送信する。廃棄物管理サーバ20から廃棄物排出実績情報をシステム管理サーバ10が受信すると、受信した廃棄物排出実績情報を、資材コード及び金融コードに基づいて、建築工程データベース10aに格納する(S65)。これによって、システム管理サーバ10が作成した廃棄物排出予定情報と、受信した廃棄物排出実績情報とを比較することができるので、システム管理サーバ10が作成した廃棄物の排出に関する情報と、実際の廃棄物の排出に関する情報とを比較し、比較結果を解析することができる。したがって、解析した結果を次回の予測に参考情報として使用することができる。   When the waste management server 20 receives the waste discharge record information from the driver permanent PDA 40 (S64), the received waste discharge record information (which may include the corresponding waste record information) is stored in the database of the storage unit 25. And the waste management server 20 transmits it to the system management server 10. When the system management server 10 receives the waste discharge record information from the waste management server 20, the received waste discharge record information is stored in the building process database 10a based on the material code and the financial code (S65). As a result, it is possible to compare the waste discharge schedule information created by the system management server 10 with the received waste discharge record information, so that the information regarding the waste discharge created by the system management server 10 and the actual It is possible to compare the information on the discharge of waste and analyze the comparison result. Therefore, the analyzed result can be used as reference information for the next prediction.

廃棄物容器70を積み込んだ廃棄物回収車C1は、廃棄物容器70を中間処理工場102まで運搬する。   The waste collection vehicle C <b> 1 loaded with the waste container 70 transports the waste container 70 to the intermediate processing factory 102.

また、ドライバ常備PDA40から、廃棄物排出実績情報を廃棄物管理サーバ20が受信すると(S64)、受信した廃棄物排出実績情報に対応する廃棄物荷下指示情報(対応する廃棄物実績情報を含ませてもよい)を、資材コード及び廃棄物の品質に基づいて決定される中間処理工場(中間処理工場コード)と、ドライバコードとに基づいて、廃棄物管理サーバ20がドライバ常備PDA40と中間処理工場常設PDA50とに送信する(S66)。廃棄物荷下指示情報は、回収した廃棄物容器70を運搬する中間処理工場102(中間処理工場コード)と、中間処理工場102で荷下すべき廃棄物容器70の荷姿と、資材コード及び金融コードを含む情報である。なお、ドライバP2が運搬先と荷下すべき廃棄物容器の荷姿とを視覚的に容易に認識することができるように、廃棄物容器70と中間処理工場102とに関する画像情報を廃棄物荷下指示情報に含め、この画像情報をドライバ常備PDA40が表示するようにしてもよい。   Further, when the waste management server 20 receives the waste discharge result information from the driver permanent PDA 40 (S64), the waste unloading instruction information (including the corresponding waste result information) corresponding to the received waste discharge result information. The waste management server 20 and the driver processing PDA 40 and the intermediate processing are based on the intermediate processing factory (intermediate processing factory code) determined based on the material code and the quality of the waste and the driver code. The data is transmitted to the factory permanent PDA 50 (S66). The waste unloading instruction information includes the intermediate processing factory 102 (intermediate processing factory code) that transports the collected waste container 70, the packing state of the waste container 70 to be unloaded at the intermediate processing factory 102, the material code, and the finance. Information including code. It should be noted that image information relating to the waste container 70 and the intermediate processing factory 102 is unloaded so that the driver P2 can easily visually recognize the transport destination and the package of the waste container to be unloaded. This image information may be included in the instruction information and displayed on the driver permanent PDA 40.

続いて、廃棄物管理サーバ20から廃棄物荷下指示情報をドライバ常備PDA40が受信すると、受信した廃棄物荷下指示情報をRAM43に格納すると共に、表示部45に表示する(S67)。この場合には、例えば、中間処理工場102に関する情報(場所、周辺地図)と、廃棄物容器70の荷姿と、中間処理工場102において廃棄物容器70を荷下する指示とを表示する。   Subsequently, when the driver permanent PDA 40 receives the waste unloading instruction information from the waste management server 20, the received waste unloading instruction information is stored in the RAM 43 and displayed on the display unit 45 (S67). In this case, for example, information (location, surrounding map) regarding the intermediate processing factory 102, the packing state of the waste container 70, and an instruction to unload the waste container 70 in the intermediate processing factory 102 are displayed.

これにより、ドライバ常備PDA40の表示部45に表示された廃棄物荷下指示情報をドライバP2が、視覚的に容易に認識することができるので、中間処理工場102において、ドライバP2が誤った廃棄物容器を荷下ろしすることを防止することができる。   Thereby, the driver P2 can easily visually recognize the waste unloading instruction information displayed on the display unit 45 of the driver permanent PDA 40. Therefore, in the intermediate processing factory 102, the driver P2 makes an erroneous waste. It is possible to prevent the container from being unloaded.

続いて、ドライバ常備PDA40の表示部45に表示された廃棄物荷下指示情報を見たドライバP2が、表示された指示に基づいて、表示された中間処理工場102に廃棄物回収車C1で行き、表示された荷姿の廃棄物容器70を廃棄物回収車C1から見つけだす。そして、見つけた廃棄物容器70が荷下を指示された廃棄物容器であるか否かを確認するために、ドライバ常備PDA40と電子タグ60との間で情報の送受信が可能な範囲内になるように、ドライバ常備PDA40を廃棄物容器70に貼付されている電子タグ60にドライバP2が近づけ、回収を指示された廃棄物容器であるか否かを確認するための操作をドライバP2が入力部44で実行する(S68)。   Subsequently, the driver P2 who has seen the waste unloading instruction information displayed on the display unit 45 of the driver permanent PDA 40 goes to the displayed intermediate processing factory 102 by the waste collection vehicle C1 based on the displayed instruction. Then, the displayed waste container 70 is found from the waste collection vehicle C1. Then, in order to confirm whether or not the found waste container 70 is a waste container instructed to be unloaded, the information can be transmitted and received between the driver permanent PDA 40 and the electronic tag 60. As described above, the driver P2 brings the driver P2 close to the electronic tag 60 attached to the waste container 70, and the driver P2 performs an operation for confirming whether the driver P2 is a waste container instructed to be collected. This is executed at 44 (S68).

この確認操作が実行されると、電子タグリードライタI/F部46を介して、EEPROM62に格納されている廃棄物実績情報を読み出す旨の情報を電子タグリードライタ40bが電子タグ60に送信し、この情報を電子タグ60が受信すると、EEPROM62に格納されている廃棄物実績情報を、ドライバ常備PDA40に送信する(S69)。   When this confirmation operation is executed, the electronic tag reader / writer 40b transmits information to the electronic tag 60 via the electronic tag reader / I / F unit 46 to read the waste record information stored in the EEPROM 62. When this information is received by the electronic tag 60, the waste record information stored in the EEPROM 62 is transmitted to the driver permanent PDA 40 (S69).

続いて、電子タグ60から廃棄物実績情報をドライバ常備PDA40が受信すると(S68)、受信した廃棄物実績情報に含まれる資材コード及び金融コードと、廃棄物荷下指示情報に含まれる資材コード及び金融コードとを比較する。比較した結果、資材コード及び金融コードが同じであれば、この電子タグ60が貼付されている廃棄物容器70を荷下する旨と、荷下日時・荷下場所とを入力する旨とを表示部45に表示する。この表示を見たドライバP2が、指示された廃棄物容器70を廃棄物回収車C1から荷下し、ドライバ常備PDA40の入力部44に荷下しした日時・荷下場所を入力する。入力された荷下日時・荷下場所をドライバ常備PDA40がRAM43に格納する。なお、ドライバP2がドライバ常備PDA40に入力した荷下日時をRAM43に格納する代わりに、前記比較した結果、比較した双方の資材コード及び金融コードが同一であった場合に、この時の時刻をRAM43に格納し、この時刻を荷下日時とするようにしてもよい。また、この場合に、荷下した実際の位置を確認することができるように、GPS装置で測定した現在位置を位置情報として、荷下日時と関連付けてRAM43に格納するようにしてもよい。   Subsequently, when the driver permanent PDA 40 receives the waste performance information from the electronic tag 60 (S68), the material code and the financial code included in the received waste performance information, the material code included in the waste unloading instruction information, and Compare with financial code. As a result of the comparison, if the material code and the financial code are the same, it is displayed that the waste container 70 to which the electronic tag 60 is attached is unloaded and that the unloading date / time and the unloading location are input. Displayed on the unit 45. The driver P2 who sees this display unloads the designated waste container 70 from the waste collection vehicle C1 and inputs the date / time and unloading location at the input unit 44 of the driver's permanent PDA 40. The driver permanent PDA 40 stores the input unloading date / time and unloading location in the RAM 43. Instead of storing the unloading date and time input by the driver P2 into the driver permanent PDA 40 in the RAM 43, if both the compared material codes and financial codes are the same as a result of the comparison, the time at this time is stored in the RAM 43. And this time may be set as the unloading date. In this case, the current position measured by the GPS device may be stored in the RAM 43 in association with the unloading date and time as position information so that the actual unloaded position can be confirmed.

続いて、入力部44に荷下日時・荷下場所が入力されると(S70)、入力された荷下日時・荷下場所と資材コード及び金融コードとを含む廃棄物荷下実績情報(対応する廃棄物実績情報を含ませてもよい)を、データ通信カードI/F部47を介して、データ通信カード40cが廃棄物管理サーバ20に送信する。続いて、廃棄物荷下実績情報を廃棄物管理サーバ20が受信すると、受信した廃棄物荷下実績情報を資材コード及び金融コードに関連付けて記憶部25のデータベースに格納する(S71)。これらによって、廃棄物容器70を誤って荷下することを防止することができ、実際の荷下日時と荷下場所とを特定することができる。   Subsequently, when the unloading date / time / unloading location is input to the input unit 44 (S70), the waste unloading record information (corresponding to the input unloading date / time / unloading location, material code and financial code) Data communication card 40c transmits to the waste management server 20 via the data communication card I / F unit 47. Subsequently, when the waste management server 20 receives the waste unloading record information, the received waste unloading record information is stored in the database of the storage unit 25 in association with the material code and the financial code (S71). By these, it is possible to prevent the waste container 70 from being unloaded accidentally, and the actual unloading date and time and the unloading location can be specified.

ドライバ常備PDA40から廃棄物荷下実績情報を廃棄物管理サーバ20が受信すると(S71)、受信した廃棄物荷下実績情報に対応する廃棄物受入指示情報を、中間処理工場コードに基づいて廃棄物管理サーバ20が中間処理工場常設PDA50に送信する(S72)。廃棄物受入指示情報(対応する廃棄物実績情報を含ませてもよい)は、中間処理工場102で受け入れるべき廃棄物容器70の荷姿と資材コード及び金融コードとを含む情報である。   When the waste management server 20 receives the waste unloading record information from the driver permanent PDA 40 (S71), the waste acceptance instruction information corresponding to the received waste unloading record information is generated based on the intermediate processing factory code. The management server 20 transmits to the intermediate processing factory permanent PDA 50 (S72). The waste acceptance instruction information (which may include the corresponding waste result information) is information including the packing state of the waste container 70 to be received by the intermediate processing factory 102, the material code, and the financial code.

続いて、廃棄物管理サーバ20から廃棄物受入指示情報を中間処理工場常設PDA50が受信すると、受信した廃棄物受入指示情報をRAM53に格納すると共に、表示部55に表示する(S73)。この場合には、例えば、廃棄物容器70の荷姿と、廃棄物回収車C1に積み込まれた廃棄物容器70を受け入れる指示とを表示する。これにより、中間処理工場常設PDA50の表示部55に表示された廃棄物受入指示情報を作業者P3が、視覚的に容易に認識することができるので、中間処理工場102において、誤って廃棄物容器70を受け入れることを防止することができる。   Subsequently, when the intermediate processing factory permanent PDA 50 receives the waste acceptance instruction information from the waste management server 20, the received waste acceptance instruction information is stored in the RAM 53 and displayed on the display unit 55 (S73). In this case, for example, the packing state of the waste container 70 and an instruction to accept the waste container 70 loaded in the waste collection vehicle C1 are displayed. As a result, the worker P3 can easily visually recognize the waste reception instruction information displayed on the display unit 55 of the intermediate processing factory permanent PDA 50. 70 can be prevented.

続いて、中間処理工場常設PDA50の表示部55に表示された廃棄物受入指示情報を見た作業者P3が表示された指示に基づいて、表示された荷姿の廃棄物容器70が廃棄物回収車C1から荷下されると、荷下された廃棄物容器70が受入を指示された廃棄物容器であるか否かを確認するために、S61、S68で示した操作と同様の操作を作業者P3が入力部54で実行する(S74)。この確認操作が実行されると、電子タグリードライタI/F部56を介して、EEPROM62に格納されている廃棄物実績情報を読み出す旨の情報を電子タグリードライタ50bが電子タグ60に送信し、この情報を電子タグ60が受信すると、EEPROM62に格納されている廃棄物実績情報を、中間処理工場常設PDA50に送信する(S75)。   Subsequently, based on the instruction displayed by the worker P3 who has seen the waste reception instruction information displayed on the display unit 55 of the intermediate processing factory permanent PDA 50, the displayed waste container 70 is recovered as waste. When unloaded from the vehicle C1, the same operation as that shown in S61 and S68 is performed to confirm whether or not the unloaded waste container 70 is a waste container instructed to be received. The person P3 executes with the input unit 54 (S74). When this confirmation operation is executed, the electronic tag reader / writer 50b transmits information to the electronic tag 60 via the electronic tag reader / writer I / F unit 56 to the effect that the waste record information stored in the EEPROM 62 is read out. When this information is received by the electronic tag 60, the waste record information stored in the EEPROM 62 is transmitted to the intermediate processing factory permanent PDA 50 (S75).

続いて、電子タグ60から廃棄物実績情報を中間処理工場常設PDA50が受信すると(S74)、受信した廃棄物実績情報に含まれる資材コード及び金融コードと、廃棄物受入指示情報に含まれる資材コード及び金融コードとを比較する。比較した結果、双方の資材コード及び金融コードが同じであれば、この電子タグ60が貼付されている廃棄物容器70を受け入れる旨と、受入日時・受入中間処理業者とを入力する旨とを表示部54に表示する。   Subsequently, when the intermediate processing factory permanent PDA 50 receives the waste performance information from the electronic tag 60 (S74), the material code and the financial code included in the received waste performance information, and the material code included in the waste acceptance instruction information And financial codes. As a result of the comparison, if both the material code and the financial code are the same, a message is displayed indicating that the waste container 70 to which the electronic tag 60 is attached is accepted and that the reception date / time and the receiving intermediate processing company are input. Displayed on the unit 54.

この表示を見た作業者P3が、廃棄物回収車C1から荷下された廃棄物容器70を受け入れ、受け入れた日時・中間処理業者名を中間処理工場常設PDA50の入力部54に入力する。入力部54に受入日時・中間処理業者名が入力されると、入力された受入日時・中間処理業者名を資材コード及び金融コードと対応してRAM53に格納する。なお、作業者P3が中間処理工場常設PDA50に入力した受入日時・中間処理業者名をRAM53に格納する代わりに、前記比較した結果、比較した双方の資材コード及び金融コードが同一であった場合に、この時の時刻をRAM53に格納し、この時刻を受入日時とするようにしてもよい。また、この場合に、受入した実際の位置を確認することができるように、GPS装置で測定した現在位置を位置情報として、受入日時と資材コード及び金融コードとを関連付けてRAM33に格納するようにしてもよい。   The worker P3 who sees this display receives the waste container 70 unloaded from the waste collection vehicle C1, and inputs the received date / time and the name of the intermediate processing trader to the input unit 54 of the intermediate processing factory permanent PDA 50. When the reception date / time / intermediate processing trader name is input to the input unit 54, the input reception date / time / intermediate processing trader name is stored in the RAM 53 in association with the material code and the financial code. In addition, instead of storing the reception date / time and the name of the intermediate processing trader input to the intermediate processing factory permanent PDA 50 by the operator P3 in the RAM 53, when the comparison results in that both the material code and the financial code are the same, The time at this time may be stored in the RAM 53, and this time may be set as the reception date and time. In this case, the current position measured by the GPS device is stored as position information in the RAM 33 in association with the reception date and time, the material code, and the financial code so that the received actual position can be confirmed. May be.

続いて、入力部54に受入日時・中間処理業者名が入力されると(S76)、入力された受入日時・中間処理業者名を含む廃棄物受入実績情報(対応する廃棄物実績情報を含ませてもよい)を、データ通信カードI/F部57を介して、データ通信カード50cが廃棄物管理サーバ20に送信する。廃棄物受入実績情報を廃棄物管理サーバ20が受信すると、受信した廃棄物受入実績情報を資材コード及び金融コードと関連付けて記憶部25のデータベースに格納する(S77)。これらによって、廃棄物容器70を誤って受け入れることを防止することができ、実際の受入日時を特定することができる。   Subsequently, when the acceptance date / time / intermediate processing trader name is input to the input unit 54 (S76), the waste acceptance result information including the inputted acceptance date / time / intermediate treatment trader name (including the corresponding waste performance information). May be transmitted to the waste management server 20 via the data communication card I / F unit 57. When the waste management result information is received by the waste management server 20, the received waste acceptance result information is stored in the database of the storage unit 25 in association with the material code and the financial code (S77). By these, it can prevent receiving the waste container 70 accidentally, and can specify the actual date and time of acceptance.

中間処理工場102において、廃棄物回収車C1から荷下された廃棄物容器70を受け入れると、作業者P3が受け入れた廃棄物容器70の蓋70aを開け、収容されている廃棄物を廃棄物容器70から取り出し、取り出した廃棄物について、仕分け、分別等の処理をし、廃棄物の種類毎に最終処分工場へ排出する準備をする。そして、排出準備が整えば、廃棄物の種類毎に所定の最終処分工場へ廃棄物を運搬する。なお、この廃棄物容器70から取り出した廃棄物について、最終的な品質・量を作業者P3が確認し、確認した品質・量と共に廃棄物品目(資材コード)と建築現場名(現場コード)とを中間処理工場常設PDA50に入力するようにしてもよい。入力された品質・量と、廃棄物品目と、建築現場名とを含む情報は、廃棄物管理サーバ20に送信され、この情報を受信した廃棄物管理サーバ20は、受信した時刻と建築現場名(現場コード)とに基づいて金融コードを特定し、特定した金融コード及び資材コードに関連付けて、この情報を記憶部25のデータベースに格納する。   In the intermediate processing factory 102, when the waste container 70 unloaded from the waste collection vehicle C1 is received, the lid 70a of the waste container 70 received by the worker P3 is opened, and the stored waste is discarded as a waste container. The waste taken out from 70 is subjected to processing such as sorting and sorting, and preparations are made for discharge to the final disposal factory for each type of waste. And if discharge preparation is ready, a waste will be conveyed to a predetermined final disposal factory for every kind of waste. In addition, about the waste taken out from the waste container 70, the operator P3 confirms the final quality and quantity, together with the confirmed quality and quantity, the waste item (material code), the construction site name (site code), and May be input to the intermediate processing factory permanent PDA 50. Information including the input quality / quantity, waste item, and construction site name is transmitted to the waste management server 20, and the waste management server 20 that has received this information receives the received time and the construction site name. A financial code is specified based on (site code), and this information is stored in the database of the storage unit 25 in association with the specified financial code and material code.

中間処理工場常設PDA50から、廃棄物受入実績情報を廃棄物管理サーバ20が受信すると、受信した廃棄物受入実績情報を金融コード及び資材コードと関連付けて記憶部25のデータベースに格納する。   When the waste management result information is received by the waste management server 20 from the intermediate processing factory permanent PDA 50, the received waste acceptance result information is stored in the database of the storage unit 25 in association with the financial code and the material code.

続いて、中間処理工場102において、所定の最終処分工場へ廃棄物を運搬することによって廃棄物容器70から取り出した廃棄物についての中間処理が終了すれば、廃棄物中間処理終了情報(処理終了日等)を中間処理工場常設PDA50に入力し、入力した廃棄物中間処理終了情報(対応する廃棄物実績情報を含ませてもよい)を中間処理工場常設PDA50が廃棄物管理サーバ20に送信する。中間処理工場常設PDA50から、廃棄物中間処理終了情報を廃棄物管理サーバ20が受信すると、受信した廃棄物中間処理終了情報を金融コード及び資材コードと関連付けて記憶部25のデータベースに格納する(S78)。   Subsequently, in the intermediate processing factory 102, when the intermediate processing on the waste taken out from the waste container 70 is completed by transporting the waste to a predetermined final disposal factory, the intermediate processing end information (processing end date) Etc.) is input to the intermediate processing factory permanent PDA 50, and the intermediate processing factory permanent PDA 50 transmits the input waste intermediate processing end information (which may include corresponding waste result information) to the waste management server 20. When the waste management server 20 receives the waste intermediate processing end information from the intermediate processing factory permanent PDA 50, the received waste intermediate processing end information is stored in the database of the storage unit 25 in association with the financial code and the material code (S78). ).

なお、各PDA30〜50から廃棄物管理サーバ20が廃棄物に関する情報を受信すると、受信する毎に受信した情報をシステム管理サーバ10に送信し、建築工程データベース10aに金融コード及び資材コードと関連付けて格納するようにしてもよい。また、各PDA30〜50の表示部で上記各情報を表示して通知する代わりに、音声等を出力する出力手段を設け、この出力手段によって上記各情報を通知するようにしてもよい。   When the waste management server 20 receives information on waste from each PDA 30 to 50, the received information is transmitted to the system management server 10 every time it is received, and is associated with the financial code and the material code in the building process database 10a. You may make it store. Further, instead of displaying and notifying each of the above information on the display units of the PDAs 30 to 50, output means for outputting sound or the like may be provided, and the above information may be notified by this output means.

第1の実施の形態によれば、小規模な建築現場において、適正な排出管理ができると共に、回収時の分別内容(電子タグに書き込まれた情報)に応じて、物流業者が配車計画を行うことができる。また、混合廃棄物以外は再資源化施設へ直送できるので、効率的な物流を行うことができる。これらにより、物流コストを低減することができると共に、リサイクル率を向上させ、中間処理場における精度の高い分別を行うことができる。また、住宅等の建物を建築する場合に、各建築工程において専門工事業者が排出した廃棄物を正確に管理することができると共に、当該廃棄物のリサイクル率を飛躍的に高め、さらに当該廃棄物に係る物流全体のコストと建物建築に係るコストとを低減させることができる。   According to the first embodiment, appropriate discharge management can be performed at a small-scale construction site, and a logistics company makes a vehicle allocation plan according to the classification content (information written on the electronic tag) at the time of collection. be able to. In addition, since mixed waste can be sent directly to a recycling facility, efficient logistics can be performed. As a result, the distribution cost can be reduced, the recycling rate can be improved, and the separation can be performed with high accuracy in the intermediate treatment plant. In addition, when building a building such as a house, it is possible to accurately manage the waste discharged by a professional contractor in each building process, and dramatically increase the recycling rate of the waste. It is possible to reduce the cost of the entire physical distribution related to and the cost related to building construction.

なお、中間処理工場102において実際の品質を確認した後に、リサイクル可能な廃棄物についてリサイクル代を得た場合には、リサイクルをすることができた廃棄物の数量とその得た代金とを資材名(資材コード)と現場名(現場コード、金融コード)と共に、中間処理工場常設PDA50に入力し、入力したこれらの情報をシステム管理サーバ10に送信し、建築工程データベース10aに格納するようにしてもよい。これによって、建築工程データベース10aの金融コードに基づいて、この代金の一部を専門工事業者にフィードバックすることができる。同様に、再資源化施設へ直送した廃棄物によってリサイクル代を得た場合にも、排出事業者又は専門工事業者にフィードバックすることもできる。これらの場合に、どの排出事業者又は専門工事業者の排出であるかを、電子タグ60に書き込まれた情報を逆にたどり、知ることができる。また、現場管理者P1の管理を向上させるために、現場管理者P1が確認した品質と、中間処理工場の作業員P3が確認した品質とが一致した場合には、現場コードに対応させて所定のポイントを付与し、前記フィードバックする代金を増加させるようにしてもよい。   In addition, after the actual quality is confirmed at the intermediate processing factory 102, when the recycling fee is obtained for the recyclable waste, the quantity of the waste that can be recycled and the price obtained are the material names. (Material code) and site name (site code, financial code) are input to the intermediate processing factory permanent PDA 50, and the input information is transmitted to the system management server 10 and stored in the building process database 10a. Good. Thereby, based on the financial code of the construction process database 10a, a part of the price can be fed back to the specialized construction contractor. Similarly, when a recycling fee is obtained from waste directly sent to a recycling facility, it is also possible to provide feedback to the discharge company or specialized contractor. In these cases, the information written on the electronic tag 60 can be known by reversing the information written on the electronic tag 60 to determine which discharge company or special construction contractor is the discharge. Further, in order to improve the management of the site manager P1, when the quality confirmed by the site manager P1 matches the quality confirmed by the worker P3 of the intermediate processing factory, it is determined according to the site code. You may make it increase the price to give the said feedback.

次に、建築物の生産性や有効性を評価する廃棄物管理システム及び廃棄物管理方法の動作について説明する。   Next, operations of the waste management system and the waste management method for evaluating the productivity and effectiveness of the building will be described.

住宅等の建物を建築する場合、「メーカ発注量」に「資材別発注ロス率」をかけた値と、専門工事業者が実際に施工した後に発生した各資材の廃棄物の数量を示す値との間には、資材の加工等によってロス率が必ず発生する。   When building a building such as a house, a value obtained by multiplying the “order quantity by material” by “manufacturer's order quantity” and a value indicating the amount of waste of each material generated after actual construction by a professional contractor During this period, a loss rate is inevitably generated due to processing of materials.

一般的に、ロス率が少ない場合は、専門工事業者の生産性・作業品質が高いと評価することができ、逆に、ロス率が高い場合は、専門工事業者の生産性・作業品質が低いと評価することができる。つまり、ロス率は、専門工事業者の生産性・作業品質を示す尺度である。   In general, when the loss rate is low, it can be evaluated that the productivity and work quality of the specialized contractor are high. Conversely, when the loss rate is high, the productivity and work quality of the specialized contractor is low. Can be evaluated. In other words, the loss rate is a scale indicating the productivity and work quality of a professional contractor.

また、各工程において、CAD積算装置によって設計された積算情報に基づいて予測した各資材についての廃棄物予測数量が、実際の施工で排出された廃棄物の数量とほぼ同じであれば、採用した構工法は適切なものであると判断することができる。   In each process, if the estimated amount of waste for each material predicted based on the integration information designed by the CAD integration device is almost the same as the amount of waste discharged in actual construction, it was adopted. It can be judged that the construction method is appropriate.

つまり、システム管理サーバ10が有する専門工事業者データベース10bに格納された各種情報(業者コード、業者別平均ロス率等)と、建築工程データベース10aに格納された各種情報(現場コード、金融コード、業者コード、資材コード、専門工事業者が実際に施工した後に発生した各資材の廃棄物の数量を示す数値等)とに基づいて、建築物の生産性や有効性を評価することができる。なお、これらの動作は、システム管理サーバ10においてROM12に格納されている各種制御プログラムに基づいて、CPU11が実行する動作である。   That is, various information (a contractor code, an average loss rate for each contractor, etc.) stored in the specialized construction contractor database 10b of the system management server 10 and various information (a site code, a financial code, a contractor, etc.) stored in the construction process database 10a. The productivity and effectiveness of the building can be evaluated based on the code, the material code, the numerical value indicating the quantity of waste of each material generated after the actual construction by the specialized contractor. These operations are operations performed by the CPU 11 based on various control programs stored in the ROM 12 in the system management server 10.

図13は、システム管理サーバ10が各工程毎に作成するロス率管理グラフを示す図である。ロス率管理グラフは、横軸を各資材を示す軸とし、縦軸を各ロス率の値を示す軸としたグラフである。なお、横軸については、各資材以外に、時間、専門工事業者、各建築工程等を示す軸とするようにしてもよい。   FIG. 13 is a diagram illustrating a loss rate management graph created by the system management server 10 for each process. The loss rate management graph is a graph in which the horizontal axis is an axis indicating each material and the vertical axis is an axis indicating the value of each loss rate. In addition, about a horizontal axis | shaft, you may make it be an axis | shaft which shows time, a special construction contractor, each construction process, etc. besides each material.

図14は、システム管理サーバ10が有する建築工程データベース10aと専門工事業者データベース10bとを概念的に示す図である。   FIG. 14 is a diagram conceptually showing the building process database 10a and the specialized contractor database 10b that the system management server 10 has.

具体的には、例えば、システム管理サーバ10が、現場コード「111」の各建築工程(金融コードaa〜ca)に対応して建築工程データベース10aに格納されている業者コード(101〜103)を建築工程データベース10aから取り出し、取り出した各業者コードについて専門工事業者データベース10bに格納されている業者別平均ロス率を専門工事業者データベース10bから取り出す。続いて、図13に示すロス率管理グラフにおいて、取り出した業者別平均ロス率(例えば、AA工業:0.7%)に基づいて中心線CLを作成し、取り出した業者別平均ロス率に対する所定の範囲(例えば、業者別平均ロス率に対して−0.1%〜+0.1%の値)を算出し、算出した値に基づいて、下部管理限界LCL(0.6%)と上部管理限界UCL(0.8%)とを作成する。なお、横軸は、建築工程(金融コードaa)で使用される各資材(資材コードa〜o)を示す軸とする。上部管理限界UCLと下部管理限界LCLとの間の範囲は、工事が安定していると判断することができる範囲を示すものである。なお、上記(式3)業者別ロス率を、資材毎に算出し、資材毎に算出した業者別ロス率の平均値を専門工事業者データベース10bに資材毎に格納し、資材毎の業者別平均ロス率を用いてロス率管理グラフを作成するようにしてもよい。   Specifically, for example, the system management server 10 stores the contractor codes (101 to 103) stored in the building process database 10a corresponding to each building process (financial codes aa to ca) of the site code “111”. From the construction process database 10a, the trader average loss rate stored in the specialized contractor database 10b for each of the retrieved contractor codes is retrieved from the specialized contractor database 10b. Subsequently, in the loss rate management graph shown in FIG. 13, a center line CL is created based on the extracted average loss rate for each supplier (for example, AA industry: 0.7%), and predetermined with respect to the extracted average loss rate for each supplier. Range (for example, a value of -0.1% to + 0.1% with respect to the average loss rate by supplier), and based on the calculated value, the lower control limit LCL (0.6%) and the upper management Create a limit UCL (0.8%). The horizontal axis is an axis indicating each material (material codes a to o) used in the building process (financial code aa). A range between the upper control limit UCL and the lower control limit LCL indicates a range in which it can be determined that the construction is stable. The above (Equation 3) loss rate for each supplier is calculated for each material, and the average value of the loss rate for each supplier calculated for each material is stored for each material in the specialized contractor database 10b. A loss rate management graph may be created using the loss rate.

このように、1つの現場についての各建築工程で使用される資材毎に、業者別平均ロス率に基づいたロス率管理グラフを作成する。   In this manner, a loss rate management graph based on the average loss rate for each supplier is created for each material used in each building process for one site.

続いて、PDA10から受信し建築工程データベース10aに格納されている廃棄物の数量に基づいて、下記の(式4)を使用して、実際に発生した資材別ロス率を算出する。   Subsequently, based on the quantity of waste received from the PDA 10 and stored in the building process database 10a, the loss rate by material actually generated is calculated using the following (Formula 4).

(式4)実際に発生した資材別ロス率={メーカ発注量−(廃棄物量+必要施工面積(容積、重さ))}÷必要施工面積(容積、重さ)×100
なお、(式4)を、『実際に発生した資材別ロス率={メーカ発注量−(廃棄物量+必要施工面積(容積、重さ))}÷メーカ発注量×100』とするようにしてもよい。
(Formula 4) Loss rate by material actually generated = {Manufacturer's order quantity− (waste amount + required construction area (volume, weight))} ÷ required construction area (volume, weight) × 100
In addition, (Equation 4) is set so that “loss rate by material actually generated = {manufacturer order amount− (waste amount + required construction area (volume, weight))} ÷ manufacturer order amount × 100”. Also good.

続いて、算出した資材別ロス率をロス率管理グラフ上に取り入れる。図13に示す折線OLは、専門工事業者毎の資材別ロス率の数値を結んだ折線である。   Subsequently, the calculated loss rate by material is taken in the loss rate management graph. The broken line OL shown in FIG. 13 is a broken line that connects the numerical values of the loss rates by material for each professional contractor.

ロス率管理グラフ上の折線OLが管理状態(上部管理限界UCLと下部管理限界LCLの間)に存在すれば、このロス率管理グラフに係る建築工程の工事が安定していると判断することができる。一方、図13に示すように、少なくとも1の資材別ロス率が管理状態に存在しなければ(m、n)、異常原因によるばらつきが発生したことを示すので、工事に変化が起きたと判断することができる。このため、対策を講じる必要がある。   If the broken line OL on the loss rate management graph exists in the management state (between the upper management limit UCL and the lower management limit LCL), it may be determined that the construction process related to the loss rate management graph is stable. it can. On the other hand, as shown in FIG. 13, if at least one material-specific loss rate does not exist in the management state (m, n), it indicates that variation due to the cause of the abnormality has occurred, so it is determined that the construction has changed. be able to. Therefore, it is necessary to take measures.

このように、廃棄物管理システム1において図13に示すロス率管理グラフをシステム管理サーバ10が各建築工程毎に作成することによって、作成したロス率管理グラフに基づいて建設現場の客観的な評価を容易に行うことができる。つまり、ロス率管理グラフ上の折線OLが管理状態に存在すれば、このロス率管理グラフに係る建築工程の作業品質が正常と評価(例えば、中心線CLと折線OLとの距離を資材毎(a〜o)に算出し、算出した数値の合計に応じて品質の度合いをA、B、Cで評価)し、この評価に基づいた評価情報を作成し、作成した評価情報を表示部16に表示する。また、ロス率管理グラフ上の折線OLのうち少なくとも1つが管理状態に存在しなければ、このロス率管理グラフに係る建築工程の作業品質を不良と評価(例えば、範囲外に存在する点(m、n)の数(2つ)に応じて不良の度合いを評価「D:点が1、E:点が2、F:点が3以上」)し、この評価に基づいた評価情報を作成し、作成した評価情報(E)を表示部16に表示する。なお、図13に示すロス率管理グラフを所定の操作で表示部16に表示するようにしてもよい。このように、ロス率管理グラフを表示部16に表示すれば、建築現場101の各建築工程における専門工事業者の作業品質を視覚的に容易に認識することができる。   As described above, in the waste management system 1, the system management server 10 creates the loss rate management graph shown in FIG. 13 for each building process, so that the construction site can be objectively evaluated based on the created loss rate management graph. Can be easily performed. That is, if the broken line OL on the loss rate management graph exists in the management state, the work quality of the building process related to the loss rate management graph is evaluated as normal (for example, the distance between the center line CL and the broken line OL is determined for each material ( a to o), the degree of quality is evaluated by A, B, and C according to the total of the calculated numerical values), evaluation information based on this evaluation is created, and the created evaluation information is displayed on the display unit 16. indicate. Moreover, if at least one of the broken lines OL on the loss rate management graph does not exist in the management state, the work quality of the building process according to the loss rate management graph is evaluated as bad (for example, a point (m , N) is evaluated according to the number (two) of “D: point is 1, E: point is 2, F: point is 3 or more”), and evaluation information based on this evaluation is created. The created evaluation information (E) is displayed on the display unit 16. In addition, you may make it display the loss rate management graph shown in FIG. 13 on the display part 16 by predetermined | prescribed operation. As described above, when the loss rate management graph is displayed on the display unit 16, the work quality of the specialized contractor in each construction process of the construction site 101 can be easily recognized visually.

なお、ロス率管理グラフは、図11に示すS65で、システム管理サーバ10がPDA30からの廃棄物排出実績情報を受信した後に廃棄物排出実績情報に基づいて作成するが、システム管理サーバ10がPDA50からの廃棄物中間処理終了報告情報を受信した後に廃棄物中間処理終了報告情報に基づいて作成するようにしてもよい。   The loss rate management graph is created based on the waste discharge record information after the system management server 10 receives the waste discharge record information from the PDA 30 in S65 shown in FIG. It may be created based on the waste intermediate processing end report information after receiving the waste intermediate processing end report information.

建設工事においては、避けられない偶発的な原因による変動(1)と、原因を取り除けば避けられることができる変動(2)との2つ変動が考えられる。このため、この2つの変動を利用して建設現場の管理を行うことができる。   In construction work, there are two types of fluctuations: fluctuations due to accidental causes that cannot be avoided (1) and fluctuations that can be avoided if the causes are removed (2). For this reason, the construction site can be managed using these two variations.

このように、ロス率管理グラフを、工事を安定状態に維持するための管理と、工事が安定状態にあるか否かについて現在の工事状態を知るための解析との両方に使用することができる。   In this way, the loss rate management graph can be used for both management for maintaining the construction in a stable state and analysis for knowing the current construction state as to whether or not the construction is in a stable state. .

なお、ロス率が管理限界を越えた場合、実際の現場を調査し、調査した結果、(1)の場合は、避けられない偶発的な原因であるので、再発防止策としては、保険の契約等での対策を講じることができる。(2)の場合は、原因を取り除くことによって、さらに生産性の高い生産システムを構築することができる。   In addition, when the loss rate exceeds the control limit, the actual site was investigated, and as a result of investigation, (1) is an unavoidable accidental cause. Measures can be taken. In the case of (2), it is possible to construct a production system with higher productivity by removing the cause.

また、建築現場の建築工程毎にロス率管理グラフを作成するが、建築現場毎に作成するようにしてもよく、専門工事業者毎に作成するようにしてもよい。このように、専門工事業者毎にロス率管理グラフを作成した場合には、専門工事業者毎に作業品質の精度を時系列的に評価することができる。つまり、管理限界の範囲内に存在する場合であっても、継続的に下降傾向となる場合には、ロス率が減少したことを示し、この専門工事業者の作業品質の精度が向上されたと判断することができる。このため、この専門工事業者の生産システムの生産性が向上されたとして、次回の見積での設定ロス率へフィードバックすることにより、さらに的確な管理へとブラッシュアップすることが可能となる。   Moreover, although the loss rate management graph is created for each construction process of the construction site, it may be created for each construction site or for each specialized construction contractor. Thus, when a loss rate management graph is created for each specialized contractor, the accuracy of work quality can be evaluated in time series for each specialized contractor. In other words, even if it is within the limits of control, if it continues to decline, it indicates that the loss rate has decreased, and it has been judged that the accuracy of work quality of this specialized contractor has been improved. can do. For this reason, assuming that the productivity of the production system of this specialized contractor has been improved, it is possible to brush up to a more accurate management by feeding back to the set loss rate in the next estimate.

また、S54において、確認した廃棄物容器70に収容の廃棄物についての廃棄物品目等の廃棄物実績情報を建築現場常設PDA30の入力部34から現場管理者P1が入力すると同時に、この工程の作業品質を現場管理者P1が主観的に評価し、評価した評価情報(例えば、優、良、可、要再工事の4パターンのうち、良と評価)を入力し、入力した評価情報をシステム管理サーバ10が受信し、受信した評価情報を金融コード及び資材コードと関連付けて建築工程データベース10aに格納するようにしてもよい。そして、ロス率管理グラフに基づいた評価情報(A〜F)と、現場管理者P1の主観的な評価(優、良、可、要再工事)とをそれぞれ数値化する。例えば、Aを8、Bを7、Cを6、Dを5、Eを4、Fを3とし、優を8、良を6、可を3、要再工事を0とする。続いて、数値化したロス率管理グラフに基づいた評価情報(E:4)と、現場管理者P1の主観的な評価(良:6)とを集計し、集計した数値(4+6=10、4×6=24等)に基づいて、ロス率管理グラフに係る建築工程の作業品質を評価する評価情報(例えば、足した合計が16、15であれば優良、14〜12であれば良、11〜9であれば可、8以下の場合は要注意と評価。また、かけた合計が64〜56であれば優良、56〜36であれば良、35〜9であれば可、0の場合は要注意と評価。)を作成するようにしてもよい。また、作成した評価情報を表示部16に表示することができる。また、前記集計した数値に基づいて、各専門工事業者を評価するようにしてもよく、集計した数値の平均を算出し、算出した平均値を専門工事業者データベース10bに業者コードに対応して格納するようにしてもよい。なお、上記で示した数値、計算方法等は、一例であり、他の数値、計算方法等を使用するようにしてもよい。また、廃棄物排出実績情報に基づく予測廃棄物の排出量と、PDAから入力された廃棄物の排出量との差を算出し、算出した差に基づいて、各専門工事業者の作業品質に関する評価情報を作成するようにしてもよい。   In S54, the site manager P1 inputs the actual waste information such as the waste item of the waste contained in the confirmed waste container 70 from the input unit 34 of the construction site permanent PDA 30. The site manager P1 subjectively evaluates the quality, inputs the evaluated evaluation information (e.g., evaluated as good out of the four patterns of excellent, good, acceptable, and rework required), and system management of the input evaluation information The server 10 may receive the evaluation information and store it in the construction process database 10a in association with the financial code and the material code. Then, the evaluation information (A to F) based on the loss rate management graph and the subjective evaluation (excellent, good, acceptable, rework required) of the site manager P1 are each digitized. For example, A is 8, B is 7, C is 6, D is 5, E is 4, F is 3, excellent is 8, good is 6, good is 3, and rework is required. Subsequently, the evaluation information (E: 4) based on the digitized loss rate management graph and the subjective evaluation (good: 6) of the site manager P1 are totaled, and the total numerical values (4 + 6 = 10, 4 Evaluation information that evaluates the work quality of the building process according to the loss rate management graph based on × 6 = 24, etc. (for example, if the sum total is 16, 15 is excellent, 14-12 is good, 11 It is acceptable if it is ~ 9, and it is necessary to be careful when it is 8 or less, and it is excellent if the total applied is 64-56, good if it is 56-36, acceptable if it is 35-9, if 0 May need to be watched and evaluated.) The created evaluation information can be displayed on the display unit 16. Further, each specialized contractor may be evaluated based on the aggregated numerical value, and an average of the aggregated numerical values is calculated, and the calculated average value is stored in the specialized contractor database 10b corresponding to the contractor code. You may make it do. Note that the numerical values and calculation methods described above are examples, and other numerical values and calculation methods may be used. Also, calculate the difference between the predicted waste emission amount based on the waste emission performance information and the waste emission amount input from the PDA, and evaluate the work quality of each specialized contractor based on the calculated difference Information may be created.

建築物の生産性や有効性を評価する上記実施の形態によれば、各建築工程において、専門工事業者によって管理範囲内で運営されているか否かを容易に確認することができ、逸脱が予想される場合には、それを警告して予防的措置をとらせることができる。   According to the above embodiment for evaluating the productivity and effectiveness of a building, it is possible to easily check whether or not it is operated within the management range by a specialized construction contractor in each building process, and a deviation is expected. If so, you can warn them and take precautionary measures.

また、住宅等の建物を建築する場合に、各建築工程における専門工事業者の作業品質を定量的かつ正確に評価することができ、完成した建物全体について一定以上の住宅品質を提供することができる。   In addition, when building a building such as a house, the work quality of a professional contractor in each building process can be quantitatively and accurately evaluated, and a certain level of housing quality can be provided for the entire completed building. .

なお、上記各実施の形態においては通信端末としてPDAを使用したが、所定のネットワークとの通信機能と、電子タグの読み書き機能とを有するPDA以外の通信端末を使用するようにしてもよい。   In each of the above embodiments, a PDA is used as a communication terminal. However, a communication terminal other than a PDA having a communication function with a predetermined network and a read / write function of an electronic tag may be used.

また、上記各実施の形態で示したステム管理サーバ10と廃棄物管理サーバ20とが有する機能を1つのサーバに備え、この1つのサーバがステム管理サーバ10と廃棄物管理サーバ20との動作を実行するようにしてもよい。また、回収業者の配車及びドライバに関する情報の作成をこの1つのサーバが行い、作成した情報をPDA40に送信するようにしてもよい。また、この1つのサーバにCAD積算装置が有する機能を設けるようにしてもよい。   Further, the functions of the stem management server 10 and the waste management server 20 described in the above embodiments are provided in one server, and this one server performs the operations of the stem management server 10 and the waste management server 20. You may make it perform. Alternatively, this one server may create information related to the dispatch of the collection company and the driver, and the created information may be transmitted to the PDA 40. Moreover, you may make it provide the function which a CAD integrating device has in this one server.

なお、上記各実施の形態をプログラムの発明として把握することができる。
つまり、上記制御動作に係るプログラムをパソコン等の情報処理装置の記憶媒体に記憶させ、この記憶媒体から上記プログラムを読み出し、読み出したプログラムを当該情報処理装置に実行させることで、本発明を実現することができる。
Each of the above embodiments can be understood as a program invention.
That is, the present invention is realized by storing a program related to the control operation in a storage medium of an information processing apparatus such as a personal computer, reading the program from the storage medium, and causing the information processing apparatus to execute the read program. be able to.

なお、建設現場における各建築工程を評価する場合に、上記実施の形態を適用することができる。また、建設現場における1つの建築工程を複数の施工業者が施工する場合に、当該建築工程の評価をする場合に、上記実施の形態を適用することができる。この場合には、それぞれの施工業者の業者別平均ロス率を使用して、複数の施工業者全体の業者別平均ロス率を算出し、算出した複数の施工業者全体の業者別平均ロス率を使用する。   In addition, when evaluating each building process in a construction site, the said embodiment is applicable. Further, when a plurality of contractors construct one building process at a construction site, the above embodiment can be applied when evaluating the building process. In this case, use the average loss rate by contractor for each contractor to calculate the average loss rate by contractor for the entire number of contractors, and use the calculated average loss rate by contractor for all contractors. To do.

本発明の活用例として、パソコン等の情報処理装置を用い、本発明に係る制御動作を当該情報処理装置に実行させることが考えられる。   As an application example of the present invention, an information processing apparatus such as a personal computer may be used to cause the information processing apparatus to execute a control operation according to the present invention.

本発明の第1の実施の形態である廃棄物管理システム1の構成を示すブロック図である。It is a block diagram which shows the structure of the waste management system 1 which is the 1st Embodiment of this invention. 廃棄物管理システム1において使用されるハードウェア構成を概略的に示す概略構成図である。It is a schematic block diagram which shows schematically the hardware constitutions used in the waste management system. システム管理サーバ10の内部構成を示すブロック図である。2 is a block diagram showing an internal configuration of a system management server 10. FIG. PDA本体30aの内部構成を示すブロック図である。It is a block diagram which shows the internal structure of the PDA main body 30a. 電子タグリードライタ30bと電子タグ60との内部構成を示すブロック図である。3 is a block diagram showing an internal configuration of an electronic tag reader / writer 30b and an electronic tag 60. FIG. 廃棄物容器70の例を示す外観斜視図である。3 is an external perspective view showing an example of a waste container 70. FIG. 廃棄物容器70の例を示す外観斜視図である。3 is an external perspective view showing an example of a waste container 70. FIG. 建築現場101から排出される廃棄物の数量について期間内予測を実行する動作を示すフローチャートと、金融コードに検査日を対応させている金融コードテーブルとを示す図である。It is a figure which shows the flowchart which shows the operation | movement which performs the prediction within a period about the quantity of the waste discharged | emitted from the construction site 101, and the financial code table which matched the inspection date with the financial code. 期間内予測を求める場合に、システム管理サーバ10の表示部16に表示される画面の一例を示す図である。It is a figure which shows an example of the screen displayed on the display part 16 of the system management server 10, when calculating | requiring intra-period prediction. 配送回別予測を求める場合に、システム管理サーバ10の表示部16に表示される画面の一例を示す図である。It is a figure which shows an example of the screen displayed on the display part 16 of the system management server 10, when calculating | requiring the delivery classification | category prediction. 廃棄物管理システム1において建築現場から排出される廃棄物を処理する動作を示す動作フロー図である。It is an operation | movement flowchart which shows the operation | movement which processes the waste discharged | emitted from a construction site in the waste management system. 廃棄物管理システム1において建築現場から排出される廃棄物を処理する動作を示す動作フロー図である。It is an operation | movement flowchart which shows the operation | movement which processes the waste discharged | emitted from a construction site in the waste management system. システム管理サーバ10が各工程毎に作成するロス率管理グラフを示す図である。It is a figure which shows the loss rate management graph which the system management server 10 produces for every process. システム管理サーバ10が有する建築工程データベース10aと専門工事業者データベース10bとを概念的に示す図である。It is a figure which shows notionally the building process database 10a and the professional contractor database 10b which the system management server 10 has.

符号の説明Explanation of symbols

1…廃棄物管理システム、
10…システム管理サーバ(建築生産システム管理サーバ)、
20…廃棄物管理サーバ(廃棄物管理システムサーバ)、
30…建築現場常設PDA、
40…ドライバ常備PDA、
50…中間処理工場常設PDA、
60…電子タグ、
70…廃棄物容器、
80…ルータ、
90…インターネット。
1 ... Waste management system,
10 ... System management server (building production system management server),
20 ... Waste management server (waste management system server),
30 ... Construction site permanent PDA,
40 ... Driver permanent PDA,
50 ... Intermediate processing factory permanent PDA,
60 ... Electronic tag,
70 ... Waste container,
80 ... Router,
90 ... Internet.

Claims (6)

建築現場の管理者が使用する現場管理者端末と、廃棄物処理業者が使用する処理業者端末と、廃棄物容器に装着された電子タグと、建築現場において使用される資材に係る廃棄物に関する情報を記憶する記憶手段を備えた廃棄物管理装置とを有する廃棄物管理システムであって、
前記現場管理者端末は、
前記廃棄物容器に収容された、所定の建築現場で排出された資材に係る廃棄物に関する情報であって当該廃棄物の種類及び品質と当該建築現場を特定する情報である建築現場識別情報とを含む情報である廃棄物実績情報を入力する手段と、
前記入力した廃棄物実績情報を、前記入力した廃棄物実績情報に係る廃棄物が収容された廃棄物容器に装着された電子タグに書き込むと共に、前記廃棄物管理装置に送信する手段と、
を有し、前記廃棄物管理装置は、
前記廃棄物実績情報を前記現場管理者端末から受信すると、当該廃棄物実績情報に含まれる建築現場識別情報に係る建築現場に関連付けて当該廃棄物実績情報を前記記憶手段に記憶する手段と、
前記受信した廃棄物実績情報に係る廃棄物の種類及び品質に基づいて廃棄物処理業者を決定し、当該廃棄物実績情報に係る廃棄物の受入指示情報を、前記決定した廃棄物処理業者に係る処理業者端末に送信する手段と、
を有し、前記処理業者端末は、
前記受入指示情報を前記廃棄物管理装置から受信すると、当該受入指示情報を出力する手段と、
廃棄物が収容された廃棄物容器に装着された電子タグに書き込まれた情報を読み出す手段と、
前記読み出した情報と前記受信した受入指示情報とを比較し、前記読み出した情報に係る廃棄物と前記受信した受入指示情報に係る廃棄物とが同一であれば、この同一に係る情報を読み出した電子タグが装着された廃棄物容器の受入指示を出力する手段と、
前記受入指示がされた廃棄物容器に収容された廃棄物に関する情報であって当該廃棄物の種類及び品質と当該廃棄物に係る建築現場識別情報とを含む情報である廃棄物処理情報を入力すると共に、当該廃棄物のリサイクル代の値を入力する手段と、
前記入力された廃棄物処理情報及びリサイクル代の値を前記廃棄物管理装置に送信する手段と、
を有し、前記廃棄物管理装置は、
前記廃棄物処理情報またはリサイクル代の値を前記処理業者端末から受信すると、当該廃棄物処理情報またはリサイクル代に係る廃棄物に係る建築現場に関連付けて、当該廃棄物処理情報またはリサイクル代の値を前記記憶手段に記憶する手段と、
前記現場管理者端末が送信した廃棄物実績情報に含まれる廃棄物の品質と、前記処理業者端末が送信した廃棄物処理情報に含まれる廃棄物の品質とが一致するか否かを判断し、一致した場合には、一致した廃棄物に係る建築現場に関連付けて、当該建築現場に係るリサイクル代に係るフィードバック代を増加させるポイントを前記記憶手段に付与する手段と、
を有することを特徴とする廃棄物管理システム。
Information on site manager terminals used by construction site managers, processor terminals used by waste disposal contractors, electronic tags attached to waste containers, and waste related to materials used at construction sites A waste management system comprising a waste management device comprising storage means for storing
The site manager terminal is
Information on the waste stored in the waste container and related to the material discharged at a predetermined construction site, the type and quality of the waste and the construction site identification information which is information for identifying the construction site Means for inputting waste performance information which is information to include,
A means for writing the input waste result information to an electronic tag attached to a waste container in which the waste related to the input waste result information is stored, and transmitting to the waste management device;
And the waste management device comprises:
When receiving the waste performance information from the site manager terminal, means for storing the waste performance information in the storage means in association with the construction site related to the construction site identification information included in the waste performance information;
A waste disposal contractor is determined based on the type and quality of the waste related to the received waste performance information, and the waste acceptance instruction information related to the waste performance information is related to the determined waste disposal contractor. Means for sending to the processor terminal;
And the processor terminal
Means for outputting the acceptance instruction information upon receiving the acceptance instruction information from the waste management device;
Means for reading out information written on an electronic tag attached to a waste container containing waste;
The read information and the received acceptance instruction information are compared, and if the waste related to the read information and the waste related to the received acceptance instruction information are the same, the information related to the same is read Means for outputting an instruction to accept a waste container equipped with an electronic tag;
Input waste processing information, which is information related to the waste stored in the waste container for which the acceptance instruction has been issued, and includes information on the type and quality of the waste and the building site identification information related to the waste. And a means for inputting the value of the recycling cost of the waste,
Means for transmitting the input waste treatment information and the value of the recycling fee to the waste management device;
And the waste management device comprises:
When the waste processing information or the value of the recycling fee is received from the processor terminal, the waste processing information or the value of the recycling fee is associated with the construction site related to the waste related to the waste processing information or the recycling fee. Means for storing in the storage means;
Determining whether the quality of the waste included in the waste performance information transmitted by the site manager terminal and the quality of the waste included in the waste processing information transmitted by the processor terminal match, In the case of a match, a means for associating with the construction site related to the matched waste, a means for giving the storage means a point for increasing the feedback cost related to the recycling fee related to the building site;
A waste management system comprising:
前記廃棄物管理システムは、輸送業者が使用する輸送業者端末を有し、
前記記憶手段は、施工業者が過去に施行した際に発生した資材についてのロス率の平均値を当該施工業者に関連付けて記憶する手段であり、
前記廃棄物管理装置は、
建築現場において所定の施工業者の施行の際に使用される資材に係る廃棄物に関する情報であって排出予定日時と位置と廃棄物の種類と廃棄物の予測排出量とを含む情報である廃棄物予測情報を、当該建築現場に係る設計情報と前記記憶手段に記憶されている当該施工業者に係るロス率の平均値とに基づいて作成する手段と、
前記作成した廃棄物予測情報を、前記現場管理者端末と前記輸送業者端末とに送信する手段と、
を有し、
前記現場管理者端末は、前記廃棄物予測情報を前記廃棄物管理装置から受信すると、当該廃棄物予測情報を出力する手段を有し、
前記輸送業者端末は、前記廃棄物予測情報を前記廃棄物管理装置から受信すると、当該廃棄物予測情報を出力する手段を有することを特徴とする請求項1に記載の廃棄物管理システム。
The waste management system has a carrier terminal used by a carrier,
The storage means is means for storing an average value of loss rates for materials generated when a contractor has been implemented in the past in association with the contractor,
The waste management device includes:
Waste related to the material used at the time of enforcement by a prescribed contractor at a construction site, including information on the scheduled date and position of discharge, position, type of waste, and expected amount of waste discharged Means for creating prediction information based on design information relating to the construction site and an average value of loss rates relating to the contractor stored in the storage means;
Means for transmitting the created waste prediction information to the site manager terminal and the carrier terminal;
Have
The site manager terminal, when receiving the waste prediction information from the waste management device, has means for outputting the waste prediction information,
The waste management system according to claim 1, wherein the transporter terminal has means for outputting the waste prediction information when the waste prediction information is received from the waste management device.
前記廃棄物管理装置は、前記廃棄物実績情報を前記現場管理者端末から受信すると、当該廃棄物実績情報に係る廃棄物の回収指示情報を前記輸送業者端末に送信する手段を有し、
前記輸送業者端末は、
前記回収指示情報を前記廃棄物管理装置から受信すると、当該回収指示情報を出力する手段と、
廃棄物が収容された廃棄物容器に装着された電子タグに書き込まれている廃棄物に関する情報を読み出す手段と、
前記読み出した情報と前記受信した廃棄物実績情報とを比較し、前記読み出した情報に係る廃棄物と前記受信した廃棄物実績情報に係る廃棄物とが同一であれば、この同一に係る情報を読み出した電子タグが装着された廃棄物容器の回収指示を出力する手段と、
を有することを特徴とする請求項2に記載の廃棄物管理システム。
When the waste management apparatus receives the waste performance information from the site manager terminal, the waste management device has means for transmitting waste collection instruction information related to the waste performance information to the transporter terminal,
The carrier terminal is
Means for outputting the collection instruction information upon receiving the collection instruction information from the waste management device;
Means for reading out information about the waste written in the electronic tag attached to the waste container containing the waste;
The read information and the received waste performance information are compared. If the waste related to the read information and the waste related to the received waste performance information are the same, the information related to the same is Means for outputting a collection instruction for the waste container to which the read electronic tag is attached;
The waste management system according to claim 2, further comprising:
建築現場の管理者が使用する現場管理者端末と、廃棄物処理業者が使用する処理業者端末と、廃棄物容器に装着された電子タグと、建築現場において使用される資材に係る廃棄物に関する情報を記憶する記憶手段を備えた廃棄物管理装置とを有する廃棄物管理システムにおける廃棄物管理方法であって、
前記現場管理者端末が、前記廃棄物容器に収容された、所定の建築現場で排出された資材に係る廃棄物に関する情報であって当該廃棄物の種類及び品質と当該建築現場を特定する情報である建築現場識別情報とを含む情報である廃棄物実績情報を入力するステップと、
前記現場管理者端末が、前記入力した廃棄物実績情報を、前記入力した廃棄物実績情報に係る廃棄物が収容された廃棄物容器に装着された電子タグに書き込むと共に、前記廃棄物管理装置に送信するステップと、
前記廃棄物管理装置が、前記廃棄物実績情報を前記現場管理者端末から受信すると、当該廃棄物実績情報に含まれる建築現場識別情報に係る建築現場に関連付けて当該廃棄物実績情報を前記記憶手段に記憶するステップと、
前記廃棄物管理装置が、前記受信した廃棄物実績情報に係る廃棄物の種類及び品質に基づいて廃棄物処理業者を決定し、当該廃棄物実績情報に係る廃棄物の受入指示情報を、前記決定した廃棄物処理業者に係る処理業者端末に送信するステップと、
前記処理業者端末が、前記受入指示情報を前記廃棄物管理装置から受信すると、当該受入指示情報を出力するステップと、
前記処理業者端末が、廃棄物が収容された廃棄物容器に装着された電子タグに書き込まれた情報を読み出すステップと、
前記処理業者端末が、前記読み出した情報と前記受信した受入指示情報とを比較し、前記読み出した情報に係る廃棄物と前記受信した受入指示情報に係る廃棄物とが同一であれば、この同一に係る情報を読み出した電子タグが装着された廃棄物容器の受入指示を出力するステップと、
前記処理業者端末が、前記受入指示がされた廃棄物容器に収容された廃棄物に関する情報であって当該廃棄物の種類及び品質と当該廃棄物に係る建築現場識別情報とを含む情報である廃棄物処理情報を入力すると共に、当該廃棄物のリサイクル代の値を入力するステップと、
前記処理業者端末が、前記入力された廃棄物処理情報及びリサイクル代の値を前記廃棄物管理装置に送信するステップと、
前記廃棄物管理装置が、前記廃棄物処理情報またはリサイクル代の値を前記処理業者端末から受信すると、当該廃棄物処理情報またはリサイクル代に係る廃棄物に係る建築現場に関連付けて、当該廃棄物処理情報またはリサイクル代の値を前記記憶手段に記憶するステップと、
前記廃棄物管理装置が、前記現場管理者端末が送信した廃棄物実績情報に含まれる廃棄物の品質と、前記処理業者端末が送信した廃棄物処理情報に含まれる廃棄物の品質とが一致するか否かを判断し、一致した場合には、一致した廃棄物に係る建築現場に関連付けて、当該建築現場に係るリサイクル代に係るフィードバック代を増加させるポイントを前記記憶手段に付与するステップと、
を有することを特徴とする廃棄物管理方法。
Information on site manager terminals used by construction site managers, processor terminals used by waste disposal contractors, electronic tags attached to waste containers, and waste related to materials used at construction sites A waste management method in a waste management system having a waste management device comprising a storage means for storing
The site manager terminal is information relating to the waste contained in the waste container and discharged from a predetermined construction site, and is information identifying the type and quality of the waste and the construction site. Inputting waste performance information that is information including certain building site identification information;
The site manager terminal writes the input waste result information to an electronic tag attached to a waste container in which the waste related to the input waste result information is stored, and the waste management device Sending, and
When the waste management device receives the waste performance information from the site manager terminal, the storage means stores the waste performance information in association with the construction site related to the construction site identification information included in the waste performance information. The step of storing in
The waste management device determines a waste disposal contractor based on the type and quality of the waste related to the received waste performance information, and determines the waste acceptance instruction information related to the waste performance information. Sending to the waste disposal contractor terminal associated with the waste disposal contractor,
When the processor terminal receives the acceptance instruction information from the waste management device, outputting the acceptance instruction information;
The processor terminal reads information written on an electronic tag attached to a waste container containing waste; and
The processor terminal compares the read information with the received reception instruction information. If the waste related to the read information and the waste related to the received reception instruction information are the same, the same Outputting an instruction to accept a waste container equipped with an electronic tag that has read information related to
Disposal in which the processor terminal is information on the waste stored in the waste container for which the acceptance instruction has been given, and includes the type and quality of the waste and the building site identification information related to the waste Entering waste disposal information and entering a recycling value for the waste;
The processor terminal transmits the input waste processing information and a recycling value to the waste management device;
When the waste management device receives the waste processing information or the value of the recycling fee from the processing company terminal, the waste management information is associated with the construction site related to the waste related to the waste processing information or the recycling fee, and the waste processing Storing the information or the value of the recycling fee in the storage means;
The waste management device matches the quality of the waste included in the waste performance information transmitted from the site manager terminal with the quality of the waste included in the waste processing information transmitted from the processor terminal. Determining whether or not, in the case of coincidence, in association with the construction site related to the matched waste, giving the storage means a point for increasing the feedback fee related to the recycling fee related to the building site; and
A waste management method comprising:
前記廃棄物管理システムは、輸送業者が使用する輸送業者端末を有し、
前記記憶手段は、施工業者が過去に施行した際に発生した資材についてのロス率の平均値を当該施工業者に関連付けて記憶する手段であり、
前記廃棄物管理装置が、建築現場において所定の施工業者の施行の際に使用される資材に係る廃棄物に関する情報であって排出予定日時と位置と廃棄物の種類と廃棄物の予測排出量とを含む情報である廃棄物予測情報を、当該建築現場に係る設計情報と前記記憶手段に記憶されている当該施工業者に係るロス率の平均値とに基づいて作成するステップと、
前記廃棄物管理装置が、前記作成した廃棄物予測情報を、前記現場管理者端末と前記輸送業者端末とに送信するステップと、
前記現場管理者端末が、前記廃棄物予測情報を前記廃棄物管理装置から受信すると、当該廃棄物予測情報を出力するステップと、
前記輸送業者端末が、前記廃棄物予測情報を前記廃棄物管理装置から受信すると、当該廃棄物予測情報を出力するステップと、
を有することを特徴とする請求項4に記載の廃棄物管理方法。
The waste management system has a carrier terminal used by a carrier,
The storage means is means for storing an average value of loss rates for materials generated when a contractor has been implemented in the past in association with the contractor,
The waste management device is information on the waste related to the material used at the time of enforcement by a predetermined contractor at a construction site, and the scheduled release date and position, the type of waste, and the predicted discharge amount of waste Creating waste prediction information that includes information based on design information related to the construction site and an average value of loss rates related to the contractor stored in the storage means;
The waste management device transmitting the created waste prediction information to the site manager terminal and the transporter terminal;
When the site manager terminal receives the waste prediction information from the waste management device, outputting the waste prediction information;
When the transporter terminal receives the waste prediction information from the waste management device, outputting the waste prediction information;
The waste management method according to claim 4, further comprising:
前記廃棄物管理装置が、前記廃棄物実績情報を前記現場管理者端末から受信すると、当該廃棄物実績情報に係る廃棄物の回収指示情報を前記輸送業者端末に送信するステップと、
前記輸送業者端末が、前記回収指示情報を前記廃棄物管理装置から受信すると、当該回収指示情報を出力するステップと、
前記輸送業者端末が、廃棄物が収容された廃棄物容器に装着された電子タグに書き込まれている廃棄物に関する情報を読み出すステップと、
前記輸送業者端末が、前記読み出した情報と前記受信した廃棄物実績情報とを比較し、前記読み出した情報に係る廃棄物と前記受信した廃棄物実績情報に係る廃棄物とが同一であれば、この同一に係る情報を読み出した電子タグが装着された廃棄物容器の回収指示を出力するステップと、
を有することを特徴とする請求項5に記載の廃棄物管理方法。
When the waste management device receives the waste performance information from the site manager terminal, the step of transmitting waste collection instruction information related to the waste performance information to the transporter terminal;
When the transporter terminal receives the collection instruction information from the waste management device, outputting the collection instruction information;
The carrier terminal reads out information about waste written on an electronic tag attached to a waste container containing waste; and
The transporter terminal compares the read information with the received waste performance information, and if the waste according to the read information and the waste according to the received waste performance information are the same, Outputting a collection instruction of a waste container equipped with an electronic tag that has read the information related to the same;
The waste management method according to claim 5, further comprising:
JP2004113523A 2004-04-07 2004-04-07 Waste management system and waste management method Expired - Fee Related JP3743983B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2004113523A JP3743983B2 (en) 2004-04-07 2004-04-07 Waste management system and waste management method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2004113523A JP3743983B2 (en) 2004-04-07 2004-04-07 Waste management system and waste management method

Publications (2)

Publication Number Publication Date
JP2005301451A JP2005301451A (en) 2005-10-27
JP3743983B2 true JP3743983B2 (en) 2006-02-08

Family

ID=35332941

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2004113523A Expired - Fee Related JP3743983B2 (en) 2004-04-07 2004-04-07 Waste management system and waste management method

Country Status (1)

Country Link
JP (1) JP3743983B2 (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB0717085D0 (en) * 2007-09-03 2007-10-10 Rftraq Ltd A method of obtaining information on balable waste material
JP5282454B2 (en) * 2008-06-16 2013-09-04 株式会社大林組 Waste container management method and waste container management system
JP6688599B2 (en) * 2015-11-24 2020-04-28 大成建設株式会社 By-product recovery system from construction works
IT202100016781A1 (en) 2021-06-25 2021-09-25 Esper S R L Computer for the evaluation of costs and quantification of resources related to the collection of urban waste
WO2024203039A1 (en) * 2023-03-30 2024-10-03 株式会社Lixil Composition for sash, sash, and method for producing sash
JP7553994B1 (en) 2023-05-25 2024-09-19 株式会社ゼロボード Information processing system, information processing method, and program
JP2025129951A (en) * 2024-02-26 2025-09-05 Nttドコモビジネス株式会社 Information providing device, information providing method, and information providing program
JP7766896B1 (en) * 2025-07-02 2025-11-11 株式会社カー・ルバインス Resource Recycling System

Also Published As

Publication number Publication date
JP2005301451A (en) 2005-10-27

Similar Documents

Publication Publication Date Title
Lee et al. Information lifecycle management with RFID for material control on construction sites
Navon Research in automated measurement of project performance indicators
Ahmadian FF et al. BIM-enabled sustainability assessment of material supply decisions
US10013666B2 (en) Product lifecycle sustainability score tracking and indicia
Patel et al. Construction materials management on project sites
US7877285B2 (en) System and method for forecasting demanufacturing requirements
US20100250461A1 (en) System and methods for transportation utilization and control
Wang et al. An empirical study on waste generation rates at different stages of construction projects in China
JP2017502441A (en) Asset information system and method of using the same
JP2010244247A (en) Delivery record collection system and dispatch plan creation method
JP3743983B2 (en) Waste management system and waste management method
Uzairuddin et al. Digital monitoring and modeling of construction supply chain management scheme with BIM and GIS: An overview
Kolaventi et al. Construction waste in India: a structural equation model for identification of causes
US20070106528A1 (en) Method and system of restricted substance management and recycling
Ahmadzadeh Amid et al. Identifying factors affecting waste production throughout the construction project life cycle and proposing BIM-based solutions
JP2000126749A (en) Recycling processing management system and recycling processing management method
JP6798870B2 (en) High pressure gas container management system
JP2005301452A (en) Building quality evaluation apparatus, building quality evaluation method and program
CN116823235A (en) Garbage collection business model
Chima Improving approaches to material inventory management in construction industry in the UK
Ajweh A framework for design of panelized wood framing prefabrication utilizing multi-panels and crew balancing
Ghanem Real-time construction project progress tracking: A hybrid model for wireless technologies selection, assessment, and implementation
Navon et al. Automated materials management and control model
JP4129414B2 (en) Temporary materials rental system
JP2008084224A (en) Waste management system, method and program

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050913

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050916

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20051018

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20051111

R150 Certificate of patent or registration of utility model

Ref document number: 3743983

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081202

Year of fee payment: 3

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081202

Year of fee payment: 3

R360 Written notification for declining of transfer of rights

Free format text: JAPANESE INTERMEDIATE CODE: R360

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081202

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081202

Year of fee payment: 3

R370 Written measure of declining of transfer procedure

Free format text: JAPANESE INTERMEDIATE CODE: R370

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111202

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111202

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111202

Year of fee payment: 6

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111202

Year of fee payment: 6

R360 Written notification for declining of transfer of rights

Free format text: JAPANESE INTERMEDIATE CODE: R360

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111202

Year of fee payment: 6

R370 Written measure of declining of transfer procedure

Free format text: JAPANESE INTERMEDIATE CODE: R370

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111202

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20141202

Year of fee payment: 9

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

LAPS Cancellation because of no payment of annual fees