Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP3746748B2 - Method for producing gas permeation preventive membrane coated plastic container - Google Patents
[go: Go Back, main page]

JP3746748B2 - Method for producing gas permeation preventive membrane coated plastic container - Google Patents

Method for producing gas permeation preventive membrane coated plastic container Download PDF

Info

Publication number
JP3746748B2
JP3746748B2 JP2002279451A JP2002279451A JP3746748B2 JP 3746748 B2 JP3746748 B2 JP 3746748B2 JP 2002279451 A JP2002279451 A JP 2002279451A JP 2002279451 A JP2002279451 A JP 2002279451A JP 3746748 B2 JP3746748 B2 JP 3746748B2
Authority
JP
Japan
Prior art keywords
gas
film
pressure
plastic container
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2002279451A
Other languages
Japanese (ja)
Other versions
JP2004115853A (en
Inventor
英男 山越
阿部  隆夫
光雄 加藤
敦士 上田
良治 田中
小林  巧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Heavy Industries Ltd
Original Assignee
Mitsubishi Heavy Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Heavy Industries Ltd filed Critical Mitsubishi Heavy Industries Ltd
Priority to JP2002279451A priority Critical patent/JP3746748B2/en
Publication of JP2004115853A publication Critical patent/JP2004115853A/en
Application granted granted Critical
Publication of JP3746748B2 publication Critical patent/JP3746748B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Containers Having Bodies Formed In One Piece (AREA)
  • Details Of Rigid Or Semi-Rigid Containers (AREA)
  • Chemical Vapour Deposition (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、気体透過防止膜被覆プラスチック容器の製造方法に関する。
【0002】
【従来の技術】
プラスチック容器、例えばペットボトルは、外部からの酸素の透過、内部(例えば炭酸飲料水)からの二酸化炭素の透過を防止するためにその内面にDLC(Diamond Like Carbon)のような炭素膜をコーティングして気体透過防止膜被覆プラスチック容器を製造することが試みられている。
【0003】
このようなプラスチック容器内面に炭素膜をコーティングする方法としては、特許文献1および特許文献2に高周波プラズマを用いる方法が開示されている。特許文献3には、その応用的な方法として高周波プラズマを用いて炭素膜をフィルムにコーティングする方法が開示されている。特許文献4には、特殊形状容器に対応する炭素膜のコーティング方法が、特許文献5などには量産化技術として複数個の容器に同時にコーティングする方法が開示されている。また、非特許文献1には、プラスチック容器に炭素膜をコーティングする技術が開示されている。
【0004】
ところで、高周波プラズマCVDによるプラスチック容器への炭素膜コーティングは次のような構造の炭素膜コーティング装置が用いられている。すなわち、この装置は筒状の本体およびこの本体の上端に取り付けられるキャップ部から構成され、プラスチック容器、例えばペットボトルの外形にほぼ沿った形の内形状を有すると共に真空容器を兼ねる外部電極と、この外部電極に連通されるガス排気管と、この排気管を通して前記外部電極の内部に挿入されるガス供給を兼ねる内部電極と、前記排気管に連通された粗引き排気ポンプと、前記排気管と前記粗引き排気ポンプの間に介装された粗引き排気バルブと、前記排気管に連通された成膜ガス排気ポンプと、前記排気管と前記成膜ガス排気ポンプの間に介装された成膜ガス排気バルブと、内部電極に成膜ガス、例えばアセチレンガスを供給するための成膜ガス供給源と、前記内部電極とこの原料ガス供給源との間に前記ガス供給源から順次介装されたマスフローコントローラおよび成膜ガス供給バルブと、前記外部電極に接続された高周波電源とを備えている。
【0005】
このような炭素膜コーティング装置による炭素膜の成膜工程を図6に示す粗引き排気バルブ、成膜ガス排気バルブ、成膜ガス供給バルブの開閉、マスフロー流量および高周波電源のオン・オフのタイミング図を参照して説明する。
【0006】
まず、外部電極内にプラスチック容器、例えばペットボトルを収納する。粗引き排気ポンプを作動し、粗引き排気バルブを開とすることにより前記外部電極に収納したペットボトル内のガスを排気管を通して排気する。この粗引き排気ポンプの作動により前記ペットボトル内が成膜圧力に比べて低い到達真空度に至った後、粗引き排気ポンプを停止し、粗引き排気バルブを閉とする。ここで、『到達真空度』とは前記粗引き排気ポンプを備えた炭素膜コーティング装置で十分に真空引きをしたときに一定の真空度となったときの圧力であり、装置の排気量とコンダクタンスとリークレートから決まるものである。
【0007】
次いで、成膜ガス供給バルブを開とし、マスフローコントローラの流量制御を行なった後、成膜ガス供給源から成膜ガス(例えばアセチレン)をマスフローコントローラおよび成膜ガス供給バルブを通して内部電極に供給し、前記ペットボトル内に位置する前記内部電極部分から成膜ガスを前記ペットボトル内に導入する。このとき、前記ペットボトル内の圧力が上昇するため、成膜ガス排気ポンプを作動し、成膜排気バルブを開とすることによりペットボトル内のガスを排気管を通して排気してそのペットボトル内を成膜圧力に維持する。さらに、高周波電源をオンして高周波電力を前記外部電極に供給することにより、前記外部電極と接地された前記内部電極との間、つまり前記ペットボトル内にプラズマを発生させる。前記成膜ガス(例えばアセチレン)は、前記プラズマによって解離、又は更にイオン化して、炭素膜を形成するための製膜種が生成され、この製膜種が前記ペットボトル内面に堆積し、炭素膜を形成する。炭素膜を所定の膜厚まで形成した後、高周波電力の供給を停止し、成膜ガス供給バルブを閉とし、成膜ガス排気ポンプを停止し、成膜ガス排気バルブを閉とするとともに、窒素、希ガス、又は空気等を外部電極(ペットボトル)内に供給し、この空間内を大気圧に戻す。この後、前記ペットボトルを外部電極から取り外す。
【0008】
【特許文献1】
特開平8−53116号公報
【0009】
【特許文献2】
特許第2788412号公報
【0010】
【特許文献3】
特開平9−272567号公報
【0011】
【特許文献4】
特許第3072269号公報
【0012】
【特許文献5】
特許第3115252号公報
【0013】
【非特許文献1】
K.Takemoto, et al, Proceedings of ADC/FCT '99,p285」、「E.Shimamura
et al, 10th years IAPRI World Conference 1997,p251
【0014】
【発明が解決しようとする課題】
前述した方法によれば、到達真空度(0.01Torr以下)まで充分に粗引きするため、成膜中に空気中の窒素量を検出限界(0.1%程度)以下まで低減して不純物が炭素膜に混在するのを回避で生きると共に、高いバリヤ性(例えばペットボトルの10倍以上)を有する炭素膜(気体透過防止膜)が被覆されたペットボトルを製造することが可能になる。
【0015】
しかしながら、到達真空度まで充分に粗引きすることにより排気開始から成膜開始までの時間が数十秒と非常に長くかかるため、結果としてプロセス時間が長くなり、量産機での生産性の低下を招く。特に、このプロセスを、ペットボトルの生産ライン(たとえば、300本/分の生産量)に高速で連続的に生産を行うロータリー型装置で組み込む場合、全体のプロセス時間を10秒以内に抑えなければならず、実現不可能である。
【0016】
本発明は、プラスチック容器内面に不純物の混入がなく、高いバリヤ性を有する炭素膜のような気体透過防止膜を被覆した気体透過防止膜被覆プラスチック容器を量産的に製造しえる方法を提供することを目的とする。
【0017】
【課題を解決するための手段】
本発明に係る気体透過防止膜被覆プラスチック容器の製造方法は、被処理物であるプラスチック容器内のガスを排気する工程と、このガス排気を続行しながら、前記プラスチック容器内に上流側からマスフローコントローラおよびバルブをこの順序で介装した配管を通して原料ガスを供給する工程と、前記ガス排気を続行しながら、前記プラスチック容器内にプラズマを発生させて前記原料ガスを解離して前記プラスチック容器内面に気体透過防止被膜を形成する工程を含む気体透過防止膜被覆プラスチック容器の製造方法であって、
前記バルブを閉じた状態で前記マスフローコントローラを予め一定の流量に設定して前記原料ガスを前記マスフローコントローラと前記バルブ間の前記配管部分に高圧で滞留させた後に前記バルブを開けて前記配管部分に滞留する高圧原料ガスを前記プラスチック容器内に前記マスフローコントローラで設定した一定の流量を超える流量で供給すると共に、その供給時点を前記ガス排気により前記プラスチック容器内のガス圧力が成膜圧力より高真空(成膜圧力を含まず)から到達真空度より(到達真空度を含まず)低真空の範囲に設定することを特徴とするものである。
【0018】
本発明に係る気体透過防止膜被覆プラスチック容器の製造方法において、前記原料ガスを前記プラスチック容器内にその容器容積の10倍以上の量を供給した後、前記プラスチック容器内にプラズマを発生させることことが好ましい。
【0019】
本発明に係る気体透過防止膜被覆プラスチック容器の製造方法において、前記マスフローコントローラと前記バルブの距離および前記原料ガスの圧力を制御することにより、マスフローコントローラとバルブ間の前記配管部分で発生する高圧原料ガス量を調節することを許容する。
【0020】
本発明に係る別の気体透過防止膜被覆プラスチック容器の製造方法は、プラスチック容器の口部を除く外周面を囲む外部電極と、前記プラスチック容器内に挿入され、原料ガスの供給を兼ねる内部電極と、この内部電極に接続された配管と、この配管に前記内部電極側から順次介装されたバルブおよびマスフローコントローラとを有し、ロータリー系に配置された複数の成膜ユニット;前記各成膜ユニットの配管に接続された主配管と、この主配管に第1分岐配管を介して接続された原料ガス供給源と、この主配管に第2分岐配管を介して接続された不活性ガスからなるキャリアガス供給源と、前記第1、第2の分岐配管にそれぞれ前記供給源側から順次介装されたマスフローコントローラおよびバルブとを有するキャリアガス含有原料ガスの供給系;を具備し、前記内部電極および外部電極のいずれか一方が接地され、他方が高周波電源に接続された気体透過防止膜被覆装置を用いて気体透過防止膜被覆プラスチック容器の製造するにあたり、
前記キャリアガス含有原料ガスの供給系からキャリアガス含有原料ガスを前記プラスチック容器内のガス圧力が成膜圧力より高真空(成膜圧力を含まず)から到達真空度より(到達真空度を含まず)低真空の範囲に到達した時に、前記主配管、配管、マスフローコントローラ、バルブおよび内部電極を通して前記プラスチック容器内に供給する際、前記主配管のガス圧力が前記成膜ユニットのマスフローコントローラの流量制御範囲を超える値になったときに主配管内のキャリアガス含有原料ガスを外部に排出してそのガス圧力を前記マスフローコントローラが正常に作動する値に低減させることを特徴とするものである。
【0021】
本発明に係る別の気体透過防止膜被覆プラスチック容器の製造方法において、前記原料ガスを前記プラスチック容器内にその容器容積の10倍以上の量を供給した後、前記プラスチック容器内にプラズマを発生させることことが好ましい。
【0022】
【発明の実施の形態】
以下、本発明を図面を参照して詳細に説明する。
【0023】
(第1実施形態)
図1は、第1実施形態に係る気体透過防止膜被覆プラスチック容器の製造に用いられる気体透過防止膜被覆装置を示す概略断面図である。
【0024】
この気体透過防止膜被覆装置は、プラスチック容器、例えばペットボトルの外形にほぼ沿った形の内形状を有すると共に真空容器を兼ねる外部電極1を備える。この外部電極1は、上部外部電極1aと下部外部電極1bとからなり、上下に分割可能な構造になっている。ガス排気管2は、前記外部電極1の上部外部電極1b上にその開口部と連通するように取り付けられている。ガス供給を兼ねる棒状の内部電極3は、前記ガス排気管2を通して前記外部電極1の内部に挿入されている。なお、内部電極3は前記外部電極1およびガス排気管2に対して電気的に絶縁され、かつ接地されている。
【0025】
粗引き排気ポンプ4は、前記ガス排気管2に配管5および分岐配管6aを通して連結されている。粗引き排気バルブ7は、前記分岐配管6aに介装されている。成膜ガス排気ポンプ8は、前記ガス排気管2に前記配管5および分岐配管6bを通して連結されている。成膜ガス排気バルブ9は、前記分岐配管6bに介装されている。容量式圧力計10は、前記ガス排気管2に取り付けられている。
【0026】
成膜ガス供給源、例えばアセチレンボンベ11は、前記内部電極3の上端に配管12を通して連結されている。レギュレータ13、マスフローコントローラ14および成膜ガス供給バルブ15は、前記配管1に前記アセチレンボンベ11側(上流側)から順次介装されている。図示しない高周波電源は、前記外部電極1の上部外部電極1aに接続されている。
【0027】
次に、前述した図1の気体透過防止膜被覆装置を用いて図2に示す粗引き排気バルブ、成膜ガス排気バルブ、成膜ガス供給バルブの開閉、マスフロー流量および高周波電源のオン・オフのタイミング図に従って炭素膜の成膜による気体透過防止膜被覆プラスチック容器(気体透過防止膜被覆ペットボトル)の製造を説明する。
【0028】
まず、下部外部電極1bを下降させて上部外部電極1aの底部を開放し、この上部外部電極1aの底部からプラスチック容器(例えばペットボトルB)を挿入し、下部外部電極1bを前記上部外部電極1aの底部に取り付けることにより外部電極1内にペットボトルBを収納する。
【0029】
次いで、粗引き排気ポンプ4を作動し、粗引き排気バルブ7を開とすることにより前記外部電極1に収納したペットボトルB内のガスをガス排気管2、配管5および分岐配管6aを通して排気する。この粗引き排気ポンプ4の作動により前記ペットボトルB内のガス圧力が成膜圧力より高真空(成膜圧力を含まず)から到達真空度より(到達真空度を含まず)低真空の範囲(設定到達圧力)に到達した時点で、図2に示すように前記粗引き排気ポンプ4を停止し、粗引き排気バルブ7を閉とする。この粗引き排気バルブ7の閉動作と同時に配管12に介装された成膜ガス供給バルブ15を開とし、アセチレンボンベ11からアセチレンを前記配管12を通して内部電極3に供給し、その下端から前記ペットボトルB内に供給する。このとき、前記配管12に介装されたマスフローコントローラ14を予め一定の流量に設定した後に前記成膜ガス供給バルブ15を開くことによって、前記マスフローコントローラ14と前記バルブ15間の前記配管12部分に滞留するアセチレンが瞬時に排出されるため、高圧で多量のアセチレンが前記ペットボトルB内に供給される。この後直ぐに、成膜ガス排気ポンプ8を作動し、成膜排気バルブ9を開とすることにより前記ペットボトルB内のガスをガス排気管2、配管5および分岐配管6bを通して排気してそのペットボトルB内のガス圧力を成膜圧力に維持する。
【0030】
前記成膜ガス排気ポンプ8の作動および前記アセチレンの供給において、ペットボトル内のガス置換がなされ、例えばアセチレンの供給量が前記ペットボトルBの容積の10倍以上になった時点で、高周波電源をONして高周波電力を前記外部電極1に印加することにより、前記外部電極1と接地された前記内部電極3との間、つまり前記ペットボトルB内にプラズマを発生させる。前記アセチレンは、前記プラズマによって解離、又は更にイオン化して、炭素膜を形成するための製膜種が生成され、この製膜種が前記ペットボトルB内面に堆積し、炭素膜を形成する。炭素膜を所定の膜厚まで形成した後、高周波電力の供給を停止し、成膜ガス供給バルブ15を閉とし、成膜ガス排気ポンプ8を停止し、成膜ガス排気バルブ9を閉とするとともに、窒素、希ガス、又は空気等をペットボトルB内に供給し、この空間内を大気圧に戻す。この後、前記ペットボトルBを外部電極1から取り外す。
【0031】
なお、成膜ガスとしてはアセチレンのほかに、例えばメタン、エタン、プロパン、ブタン、ペンタン、ヘキサン等のアルカン類;エチレン、プロピレン、ブテン、ペンテン、ブタジエン等のアルケン類;ベンゼン、トルエン、キシレン、インデン、ナフタリン、フェナントレン等の芳香族炭化水素類;シクロプロパン、シクロヘキサン等のシクロパラフィン類;シクロペンテン、シクロヘキセン等のシクロオレフィン類;メチルアルコール、エチルアルコール等の含酸素炭化水素類等を用いることができる。
【0032】
以上、第1実施形態によればプラスチック容器(例えばペットボトルB)内のガス圧力が成膜圧力より高真空(成膜圧力を含まず)から到達真空度より(到達真空度を含まず)低真空の範囲(設定到達圧力)に到達した時点で、成膜ガス(例えばアセチレンガス)を供給することによって、前述した図6に示す到達真空度に達した時点でアセチレンを供給する従来法に比べて排気開始から成膜開始までの時間を短縮することができる。また、成膜ガス(例えばアセチレンガス)を供給する際、配管12に介装されたマスフローコントローラ14で予め一定の流量に設定した後に成膜ガス供給バルブ15を開いて、前記マスフローコントローラ14と前記バルブ15間の前記配管12部分に滞留するアセチレンを瞬時に排出し、高圧で多量のアセチレンを前記ペットボトルB内に供給することによって、ペットボトル内のガスを置換できる。
【0033】
したがって、排気開始から成膜開始までの時間を短縮することができるため、量産機、特にロータリー機に適用した場合、気体透過防止膜被覆プラスチック容器(例えば気体透過防止膜被覆ペットボトル)の製造効率を向上できる。また、ペットボトル内のガスを置換できるために、成膜中に空気中の窒素量を検出限界(0.1%程度)以下まで低減して窒素に起因する不純物が炭素膜に混在するのを回避できると共に、高いバリヤ性(例えばペットボトルの10倍以上)を有する炭素膜(気体透過防止膜)が被覆されたペットボトルを製造することが可能になる。
【0034】
さらに、成膜開始前に、所定の置換時間を置いて成膜ガス(例えばアセチレンガス)をプラスチック容器(例えばペットボトルB)内にその容積の10倍以上の量を供給すれば、ペットボトルBの空気をアセチレンガスで十分に置換できる。その結果、不純物の炭素膜への混在を回避できると共に、より高いバリヤ性(例えばペットボトルの10倍以上)を有する炭素膜(気体透過防止膜)が被覆されたペットボトルを製造することが可能になる。なお、このような所定の置換時間を置いても前述した図6に示す従来法に比べて排気開始から成膜開始までの時間を短縮することが可能になる。
【0035】
(実施例1)
前述した図1の気体透過防止膜被覆装置を用いて図2に示す粗引き排気バルブ、成膜ガス排気バルブ、成膜ガス供給バルブの開閉、マスフロー流量および高周波電源のオン・オフのタイミング図に従って炭素膜を成膜して気体透過防止膜被覆ペットボトルを製造する第1実施形態において、成膜圧力より高真空の設定到達圧力に達したときに、アセチレンをペットボトルB内にその容積の2倍、4倍、6倍および10倍の量供給した後、高周波電源をオンして高周波電力を外部電極1に印加することにより、前記外部電極1と接地された内部電極3との間、つまり前記ペットボトルB内にプラズマを発生させ、前記ペットボトルB内面に堆積して炭素膜を形成することにより気体透過防止膜被覆ペットボトルを製造した。
【0036】
得られた各気体透過防止膜被覆ペットボトルのバリヤ性を調べた。このバリヤ性は、炭素膜をコーティングしないペットボトルの酸素バリヤ性を1とした時の相対値で評価した。この結果を図3に示す。なお、図3には前述した図6に示す粗引き排気バルブ、成膜ガス排気バルブ、成膜ガス供給バルブの開閉、マスフロー流量および高周波電源のオン・オフのタイミング図に従って炭素膜の成膜して製造した従来の気体透過防止膜被覆ペットボトルの酸素バリヤ性を破線で示した。
【0037】
図3から明らかなように成膜ガス排気ポンプの作動を続行しながら、アセチレンをペットボトルBの容積の10倍の量供給した後、高周波電源をオンして高周波電力を外部電極に印加する本発明の方法で製造された気体透過防止膜被覆ペットボトルは従来法で製造された気体透過防止膜被覆ペットボトルと同等ないしそれ以上の酸素バリヤ性を有することがわかる。なお、本発明方法は従来法の排気開始から成膜開始までの時間が30秒程度かかっていたのに対し、約2.5秒程度に大幅に短縮することができた。
【0038】
また、成膜ガス排気ポンプの作動を続行しながら、アセチレンをペットボトルBの容積の10倍の量供給した後、高周波電源をオンして高周波電力を外部電極に印加する本発明の方法で製造された気体透過防止膜被覆ペットボトルについて、炭素膜中の窒素原子ESCA(X線光電子分析装置)により計測した。その結果、窒素に起因する不純物が生成されない計測限界以下であることが確認された。
【0039】
(第2実施形態)
前述した図1の気体透過防止膜被覆装置を用いて図4に示す粗引き排気バルブ、成膜ガス排気バルブ、成膜ガス供給バルブの開閉、マスフロー流量および高周波電源のオン・オフのタイミング図に従って炭素膜の成膜による気体透過防止膜被覆プラスチック容器(気体透過防止膜被覆ペットボトル)の製造を説明する。ただし、マスフローコントローラ14とバルブ15間に位置する配管12部分の距離を長く設定した。
【0040】
まず、下部外部電極1bを下降させて上部外部電極1aの底部を開放し、この上部外部電極1aの底部からプラスチック容器(例えばペットボトルB)を挿入し、下部外部電極1bを前記上部外部電極1aの底部に取り付けることにより外部電極1内にペットボトルBを収納する。
【0041】
次いで、粗引き排気ポンプ4を作動し、粗引き排気バルブ7を開とすることにより前記外部電極1に収納したペットボトルB内のガスをガス排気管2、配管5および分岐配管6aを通して排気する。この粗引き排気ポンプ4の作動により前記ペットボトルB内のガス圧力が成膜圧力より高真空(成膜圧力を含まず)から到達真空度より(到達真空度を含まず)低真空の範囲(設定到達圧力)に到達した時点で、図4に示すように前記粗引き排気ポンプ4を停止し、粗引き排気バルブ7を閉とする。この粗引き排気バルブ7の閉動作と同時に配管12に介装された成膜ガス供給バルブ15を開とし、アセチレンボンベ11からアセチレンを前記配管12を通して内部電極3に供給し、その下端から前記ペットボトルB内に供給する。このとき、前記配管12に介装されたマスフローコントローラ14を予め前述した第1実施形態より多い一定の流量に設定した後に前記成膜ガス供給バルブ15を開くことによって、前記マスフローコントローラ14と前記バルブ15間の前記配管12部分に滞留するアセチレンが瞬時に排出されるため、高圧でより多量のアセチレンが前記ペットボトルB内に供給される。この後直ぐに、成膜ガス排気ポンプ8を作動し、成膜排気バルブ9を開とすることにより前記ペットボトルB内のガスをガス排気管2、配管5および分岐配管6bを通して排気してそのペットボトルB内のガス圧力を成膜圧力に維持する。
【0042】
前記成膜ガス排気ポンプ8の作動および前記アセチレンの供給において、ペットボトル内のガス置換がなされ、例えばアセチレンの供給量が前記ペットボトルBの容積の10倍以上になった時点で、高周波電源をONして高周波電力を前記外部電極1に印加することにより、前記外部電極1と接地された前記内部電極3との間、つまり前記ペットボトルB内にプラズマを発生させる。前記アセチレンは、前記プラズマによって解離、又は更にイオン化して、炭素膜を形成するための製膜種が生成され、この製膜種が前記ペットボトルB内面に堆積し、炭素膜を形成する。炭素膜を所定の膜厚まで形成した後、高周波電力の供給を停止し、成膜ガス供給バルブ15を閉とし、成膜ガス排気ポンプ8を停止し、成膜ガス排気バルブ9を閉とするとともに、窒素、希ガス、又は空気等をペットボトルB内に供給し、この空間内を大気圧に戻す。この後、前記ペットボトルBを外部電極1から取り外す。
【0043】
以上、第2実施形態によればプラスチック容器(例えばペットボトルB)内のガス圧力が成膜圧力より高真空(成膜圧力を含まず)から到達真空度より(到達真空度を含まず)低真空の範囲(設定到達圧力)に到達した時点で、成膜ガス(例えばアセチレンガス)を供給することによって、前述した図6に示す到達真空度に達した時点でアセチレンを供給する従来法に比べて排気開始から成膜開始までの時間を短縮することができる。また、前記成膜ガス(例えばアセチレンガス)を供給する際、配管12に介装されたマスフローコントローラ14を予め一定の流量に設定した後に成膜ガス供給バルブ15を開いて、前記マスフローコントローラ14と前記バルブ15間の前記配管12部分に滞留するアセチレンを瞬時に排出し、高圧で多量のアセチレンを前記ペットボトルB内に供給することによって、ペットボトル内のガスを置換できる。
【0044】
したがって、排気開始から成膜開始までの時間を短縮することができるため、量産機、特にロータリー機に適用した場合、気体透過防止膜被覆プラスチック容器(例えば気体透過防止膜被覆ペットボトル)の製造効率を向上できる。また、ペットボトル内のガスを置換できるために、成膜中に空気中の窒素量を検出限界(0.1%程度)以下まで低減して窒素に起因する不純物が炭素膜に混在するのを回避できると共に、高いバリヤ性(例えばペットボトルの10倍以上)を有する炭素膜(気体透過防止膜)が被覆されたペットボトルを製造することが可能になる。
【0045】
さらに、マスフローコントローラ14とバルブ15間に位置する配管12部分の距離およびアセチレンのガス圧力を適正化することによって、成膜開始前に成膜ガス(例えばアセチレンガス)をプラスチック容器(例えばペットボトルB)内にその容積の10倍以上の量を供給する際の置換時間を前述した第1実施形態に比べて短縮することができる。その結果、成膜時間をより一層短くでき、量産機、特にロータリー機に適用した場合に製造効率を一層の向上を図ることができ、さらに成膜中に空気中の窒素量を検出限界(0.1%程度)以下まで低減して窒素に起因する不純物の炭素膜への混在を回避できると共に、高いバリヤ性(例えばペットボトルの10倍以上)を有する炭素膜(気体透過防止膜)が被覆されたペットボトルを製造することが可能になる。
【0046】
事実、第2実施形態で製造された気体透過防止膜被覆ペットボトルについて、炭素膜中の窒素原子ESCA(X線光電子分析装置)により計測した。その結果、不純物が生成されない計測限界以下であることが確認された。
【0047】
(第3実施形態)
図5は、第3実施形態に係る気体透過防止膜被覆プラスチック容器の製造に用いられるキャリアガス含有成膜ガスの供給系を有する気体透過防止膜被覆装置を示す概略図である。
【0048】
この気体透過防止膜被覆装置は、プラスチック容器、例えばペットボトルの外形にほぼ沿った形の内形状を有すると共に真空容器を兼ねる外部電極21を備えている。この外部電極21は、上部外部電極21aと下部外部電極21bとからなり、上下に分割可能な構造になっている。ガス排気管22は、前記外部電極21の上部外部電極21b上にその開口部と連通するように取り付けられている。ガス供給を兼ねる棒状の内部電極23は、前記ガス排気管22を通して前記外部電極21の内部に挿入されている。なお、前記内部電極23は前記外部電極21およびガス排気管22に対して電気的に絶縁され、かつ接地されている。図示しない高周波電源は、前記外部電極21の上部外部電極21aに接続されている。
【0049】
粗引き排気ポンプ24は、前記ガス排気管22に配管25および分岐配管26aを通して連結されている。粗引き排気バルブ27は、前記分岐配管26aに介装されている。成膜ガス排気ポンプ28は、前記ガス排気管22に前記配管25および分岐配管26bを通して連結されている。成膜ガス排気バルブ29は、前記分岐配管26bに介装されている。ロータリー側配管30は、前記内部電極23の上端に連結されている。成膜ガス供給バルブ31、成膜ガス用マスフローコントローラ32およびレギュレータ33は、前記ロータリー側配管30に前記内部電極23の上端側から順次介装されている。プラズマ発光検知センサ34は、前記外部電極21に挿入されている。圧力センサ35は、前記ガス排気管22に取り付けられている。前記プラズマ発光検知センサ34および圧力センサ35は、成膜制御用コントローラ36に接続されている。この成膜制御用コントローラ36は、前記成膜ガス用マスフローコントローラ32に接続され、そのマスフローコントローラ32の流量を制御する信号が出力される。
【0050】
なお、前記構成の成膜ユニットはロータリー系に複数、例えば32台配置されている。
【0051】
原料ガス供給源、例えばアセチレンボンベ(図示せず)は、第1分岐配管37aに連結され、この第1分岐配管37aは主配管38に連結されている。この主配管38は、前記各成膜ユニットの前記ロータリー側配管30にロータリージョイント39を介して連結されている。アセチレン用マスフローコントローラ40およびアセチレン供給バルブ41は、前記第1分岐配管37aに前記アセチレンボンベ側から順次介装されている。キャリアガスとしての不活性ガス(例えばアルゴン)の供給源、例えばアルゴンボンベ(図示せず)は、第2分岐配管37bを通して前記主配管38に連結されている。アルゴン用マスフローコントローラ42およびアルゴン供給バルブ43は、前記第2分岐配管37bに前記アルゴンボンベ側から順次介装されている。排気分岐配管44は、一端が前記第1、第2の分岐配管37a、37bの結合箇所と後述する圧力検出器の取り付け位置との中間の前記主配管38部分に連結され、他端がガス排気系、例えば真空ポンプに連結されている。なお、前記排気分岐配管44の取り付け位置は排気分岐配管44から排気するアセチレンとアルゴンのキャリアガス含有アセチレンの量が少ない場合は前記主配管38のいずれの箇所でもよい。排気用マスフローコントローラ45および排気バルブ46は、前記排気分岐配管44にガス排気系側から順次介装されている。
【0052】
圧力検出器47は、前記主配管38に取り付けられている。この圧力検出器47は、圧力コントローラ48に接続され、その検出信号が前記圧力コントローラ48に出力される。前記圧力コントローラ48は、前記アセチレン用マスフローコントローラ40およびアルゴン用マスフローコントローラ42に比率演算回路49を介して接続され、それらマスフローコントローラ40,42の流量を制御する信号が出力される。また、前記圧力コントローラ48は前記排気用マスフローコントローラ45に接続され、前記圧力検出器47からの検出信号に基づいて前記排気用マスフローコントローラ45の開度を制御する信号が出力される。
【0053】
次に、前述した図5の気体透過防止膜被覆装置を用いて前述した図2に示す粗引き排気バルブ、成膜ガス排気バルブ、成膜ガス供給バルブの開閉、マスフロー流量および高周波電源のオン・オフのタイミング図に従って炭素膜の成膜による気体透過防止膜被覆プラスチック容器(気体透過防止膜被覆ペットボトル)の製造を説明する。
【0054】
まず、各成膜ユニットの下部外部電極21bを下降させて上部外部電極21aの底部を開放し、この上部外部電極21aの底部からプラスチック容器(例えばペットボトルB)をそれぞれ挿入し、下部外部電極21bを前記上部外部電極21aの底部に取り付けることにより外部電極21内にペットボトルBを収納する。
【0055】
次いで、各成膜ユニットの粗引き排気ポンプ24を作動し、粗引き排気バルブ27を開とすることにより前記外部電極21に収納したペットボトルB内のガスをガス排気管22、配管25および分岐配管26aを通して排気する。この粗引き排気ポンプ24の作動により前記ペットボトルB内のガス圧力が成膜圧力より高真空(成膜圧力を含まず)から到達真空度より(到達真空度を含まず)低真空の範囲(設定到達圧力)に到達した時点で、図2に示すように前記粗引き排気ポンプ24を停止し、粗引き排気バルブ27を閉とする。この粗引き排気バルブ27の閉動作と同時にアセチレンとアルゴンのキャリアガス含有アセチレン(成膜ガス)を内部電極3に供給し、その下端から前記ペットボトルB内に供給する。
【0056】
すなわち、アセチレンボンベ(図示せず)からアセチレン、アルゴンボンベ(図示せず)からアルゴンをそれぞれ第1、第2の分岐配管37a、37bを通して主配管38に供給する際、アセチレン供給バルブ41およびアルゴン供給バルブ43をそれぞれ開き、圧力コントローラ48から制御信号を比率演算回路49を通してアセチレン用マスフローコントローラ40およびアルゴン用マスフローコントローラ42に出力してそれらマスフローコントローラ40,42の開度を制御することにより所望の比率でアセチレンとアルゴンとを混合したキャリアガス含有アセチレン(成膜ガス)を主配管38からロータリージョイント39を介して連結された各成膜ユニットのロータリー側配管30に供給する。同時に、前記ロータリー側配管30に介装された成膜ガス供給バルブ31を開とすることにより、前記キャリアガス含有アセチレン(成膜ガス)を前記ロータリー側配管30を通して内部電極23に供給し、その下端から前記ペットボトルB内に供給する。このとき、前記ロータリー側配管30に介装されたマスフローコントローラ32を予め一定の流量に設定し後に前記成膜ガス供給バルブ31を開くことによって、前記マスフローコントローラ32と前記バルブ31間の前記配管30部分に滞留する成膜ガスが瞬時に排出されるため、高圧で多量の成膜ガスが前記ペットボトルB内に供給される。このような操作と共に、成膜ガス排気ポンプ28を作動し、成膜排気バルブ29を開とすることにより前記ペットボトルB内のガスをガス排気管22、配管25および分岐配管26bを通して排気してそのペットボトルB内のガス圧力を成膜圧力に維持する。
【0057】
前記成膜ガス排気ポンプ28の作動および前記キャリアガス含有アセチレンの供給において、所定の置換時間を取ってキャリアガス含有アセチレンの供給量が前記ペットボトルBの容積の10倍以上になった時点で、高周波電源をオンして高周波電力を前記外部電極21に印加することにより、前記外部電極21と接地された前記内部電極23との間、つまり前記ペットボトルB内にプラズマを発生させる。前記キャリアガス含有アセチレン中のアセチレンは、前記プラズマによって解離、又は更にイオン化して、炭素膜を形成するための製膜種が生成され、この製膜種が前記ペットボトルB内面に堆積し、炭素膜を形成する。炭素膜を所定の膜厚まで形成した後、高周波電力の供給を停止し、キャリアガス含有アセチレン(成膜ガス)の供給を停止し、成膜ガス排気ポンプ28による排気を停止するとともに、窒素、希ガス、又は空気等をペットボトルB内に供給し、この空間内を大気圧に戻す。この後、前記各成膜ユニットのペットボトルBを外部電極21から取り外す。
【0058】
前述した炭素膜の成膜において、アセチレンとアルゴンを混合したキャリアガス含有アセチレンを成膜ガスとして供給する系では配管系に対してマスフローコントローラを2段配置する形態を採用するため、それらのマスフローコントローラ40(または42)、32間に位置する配管(主配管38、ロータリー側配管30)部分のガス圧力が増大する。
【0059】
また、前記キャリアガス含有アセチレン(成膜ガス)が流通される前記主配管38を前記各成膜ユニットの前記ロータリー側配管30にロータリージョイント39を介して連結した場合、前記各成膜ユニットのうちのいくつかのペットボトルBへのキャリアガス含有アセチレンの供給を停止すると、前記マスフローコントローラ40(または42)、32間に位置する配管(主配管38、ロータリー側配管30)部分のガス圧力が増大する。
【0060】
前記配管(主配管38、ロータリー側配管30)部分でのガス圧力増大は、後段の成膜ガス用マスフローコントローラ32とレギュレータ33間に位置するロータリー側配管30部分でのガス圧力(一次圧力)の著しく増大を招くため、その一次圧力を受ける後段の成膜ガス用マスフローコントローラ32による流量制御が困難になる。その結果、成膜ガス供給バルブ31を開くとロータリー側配管30を流通するキャリアガス含有アセチレンが前記成膜ガス用マスフローコントローラ32で流量制御されずに、つまり成膜ガス用マスフローコントローラ32による流量制御範囲を超えて内部電極23を通してペットボトルB内に供給される。したがって、ペットボトルB内のガス圧力が図2に示す成膜圧力を超えて高くなるため、目的とする高いバリヤ性を有する炭素膜の成膜が困難になる。
【0061】
このようなことから、前記成膜中に前記主配管38に取り付けた圧力検出器47でその主配管38を流通するキャリアガス含有アセチレンの圧力を検出し、この検出信号を圧力コントローラ48にフィードバックさせる。このとき、前記圧力検出器47で検出したガス圧力が後段の成膜ガス用マスフローコントローラ32の制御範囲を超える値になったとき、前記圧力コントローラ48から排気分岐配管44に介装された排気用マスフローコントローラ45にその開度を制御する信号が出力され、前記主配管38内のキャリアガス含有アセチレンを真空ポンプのような排気系を持つ前記排気分岐配管44を通して排気する。このため、前記主配管38およびロータリー側配管30を流通するキャリアガス含有アセチレンのガス圧力を前記後段の成膜ガス用マスフローコントローラ32が正常に作動する値に低減できる。その結果、成膜ガス供給バルブ31を開いた時、ロータリー側配管30を流通するキャリアガス含有アセチレンを前記成膜ガス用マスフローコントローラ32で適正な流量範囲に制御して内部電極23を通してペットボトルB内に供給できる。したがって、ペットボトルB内のガス圧力を図2に示す成膜圧力に設定できるため、目的とする高いバリヤ性を有する炭素膜の成膜が可能になる。
【0062】
以上、第3実施形態によれば前述した第1実施形態と同様、従来法に比べても排気開始から成膜開始までの時間を短縮して気体透過防止膜被覆プラスチック容器(例えば気体透過防止膜被覆ペットボトル)の製造効率を向上できる。また、成膜中に空気中の窒素量を検出限界(0.1%程度)以下まで低減して窒素に起因する不純物が炭素膜に混在するのを回避できると共に、高いバリヤ性(例えばペットボトルの10倍以上)を有する炭素膜(気体透過防止膜)が被覆されたペットボトルを製造することが可能になる。
【0063】
さらに、アセチレンとアルゴンを混合したキャリアガス含有アセチレンを成膜ガスとして供給する系では配管系に対してマスフローコントローラを2段配置する形態を採用するため、それらのマスフローコントローラ40(または42)、32間に位置する配管(主配管38、ロータリー側配管30)部分のガス圧力が増大する。また、前記キャリアガス含有アセチレン(成膜ガス)が流通される前記主配管38を前記各成膜ユニットの前記ロータリー側配管30にロータリージョイント39を介して連結した場合、前記各成膜ユニットのうちのいくつかのペットボトルBへのキャリアガス含有アセチレンの供給を停止すると、前記マスフローコントローラ40(または42)、32間に位置する配管(主配管38、ロータリー側配管30)部分のガス圧力が増大する。これらのガス圧力の増大により後段のマスフローコントローラ(成膜ガス用マスフローコントローラ32)の上流側の一次圧力が増大し、成膜ガス用マスフローコントローラ32による流量制御が困難になる。
【0064】
この第3実施形態によれば、前記成膜中に前記主配管38に取り付けた圧力検出器47でその主配管38を流通するキャリアガス含有アセチレンの圧力を検出し、この検出信号を圧力コントローラ48にフィードバックさせ、前記圧力コントローラ48から排気分岐配管44に介装された排気用マスフローコントローラ45にその開度を制御する信号が出力して前記主配管38内のキャリアガス含有アセチレンを真空ポンプのような排気系を持つ前記排気分岐配管44を通して排気することによって、前記主配管38およびロータリー側配管30を流通するキャリアガス含有アセチレンのガス圧力を後段の成膜ガス用マスフローコントローラ32が正常に作動する値に低減できる。その結果、複数の成膜ユニットをロータリー系に配置し、これら成膜ユニットにキャリアガス含有アセチレンの供給系を接続した形態において、キャリアガス含有アセチレンをマスフローコントローラ32で適正な流量範囲に制御して内部電極23を通してペットボトルB内に供給でき、ペットボトルB内のガス圧力を図2に示す成膜圧力に設定できるため、目的とする高いバリヤ性を有する炭素膜の成膜が可能になる。
【0065】
【発明の効果】
以上詳述したように本発明によれば、プラスチック容器内面に不純物の混入がなく、高いバリヤ性を有する炭素膜のような気体透過防止膜を被覆した気体透過防止膜被覆プラスチック容器を量産的に製造しえる方法を提供することができる。
【図面の簡単な説明】
【図1】本発明の第1実施形態に係る気体透過防止膜被覆プラスチック容器の製造に用いられる気体透過防止膜被覆装置を示す概略断面図。
【図2】本発明の第1実施形態に係る気体透過防止膜被覆プラスチック容器の製造における粗引き排気バルブ、成膜ガス排気バルブ、成膜ガス供給バルブの開閉、マスフロー流量および高周波電源のオン・オフのタイミング図。
【図3】本発明の実施例1における原料供給量とコーティングペットボトルのバリヤ性との関係を示す特性図。
【図4】本発明の第2実施形態に係る気体透過防止膜被覆プラスチック容器の製造における粗引き排気バルブ、成膜ガス排気バルブ、成膜ガス供給バルブの開閉、マスフロー流量および高周波電源のオン・オフのタイミング図。
【図5】本発明の第3実施形態に係る気体透過防止膜被覆プラスチック容器の製造に用いられる気体透過防止膜被覆装置を示す概略断面図。
【図6】従来の気体透過防止膜被覆プラスチック容器の製造における粗引き排気バルブ、成膜ガス排気バルブ、成膜ガス供給バルブの開閉、マスフロー流量および高周波電源のオン・オフのタイミング図。
【符号の説明】
1、21…外部電極、
2、22…ガス排気管、
3、23…内部電極、
4,24…粗引き排気ポンプ、
8,28…成膜ガス排気ポンプ、
11…アセチレンボンベ、
13,33…レギュレータ、
14,32,40,42,45…マスフローコントローラ、
15,31…成膜ガス供給バルブ、
44…排気分岐配管、
47…圧力検出器、
48…圧力コントローラ、
B…ペットボトル。
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a method for producing a gas-permeable prevention film-coated plastic container.
[0002]
[Prior art]
Plastic containers, such as PET bottles, are coated with a carbon film such as DLC (Diamond Like Carbon) on the inner surface to prevent the permeation of oxygen from the outside and the penetration of carbon dioxide from the inside (for example, carbonated drinking water). Attempts have been made to produce a plastic container coated with a gas permeation prevention film.
[0003]
As a method of coating a carbon film on the inner surface of such a plastic container, Patent Document 1 and Patent Document 2 disclose a method using high-frequency plasma. Patent Document 3 discloses a method of coating a film with a carbon film using high-frequency plasma as an applied method. Patent Document 4 discloses a carbon film coating method corresponding to a specially shaped container, and Patent Document 5 discloses a method of simultaneously coating a plurality of containers as a mass production technique. Non-Patent Document 1 discloses a technique for coating a plastic container with a carbon film.
[0004]
Incidentally, a carbon film coating apparatus having the following structure is used for coating a carbon film on a plastic container by high-frequency plasma CVD. That is, this apparatus is composed of a cylindrical main body and a cap portion attached to the upper end of the main body, and has an inner shape substantially in line with the outer shape of a plastic container, for example, a plastic bottle, and also serves as a vacuum container, A gas exhaust pipe communicated with the external electrode, an internal electrode serving also as a gas supply inserted into the external electrode through the exhaust pipe, a roughing exhaust pump communicated with the exhaust pipe, the exhaust pipe, A roughing exhaust valve interposed between the roughing exhaust pump, a film forming gas exhaust pump communicated with the exhaust pipe, and a component interposed between the exhaust pipe and the film forming gas exhaust pump. A film gas exhaust valve, a film forming gas supply source for supplying a film forming gas, for example, acetylene gas, to the internal electrode, and the gas supply source between the internal electrode and the source gas supply source. It includes a mass flow controller and the deposition gas supply valve which are sequentially interposed, and a high frequency power source connected to said external electrodes.
[0005]
The carbon film forming process by such a carbon film coating apparatus is shown in FIG. 6 as a roughing exhaust valve, film forming gas exhaust valve, film forming gas supply valve opening / closing, mass flow rate, and on / off timing of a high-frequency power source. Will be described with reference to FIG.
[0006]
First, a plastic container, for example, a PET bottle is accommodated in the external electrode. By operating the roughing exhaust pump and opening the roughing exhaust valve, the gas in the PET bottle stored in the external electrode is exhausted through the exhaust pipe. After the roughing exhaust pump is operated, the inside of the PET bottle reaches a vacuum level lower than the film forming pressure, and then the roughing exhaust pump is stopped and the roughing exhaust valve is closed. Here, “degree of ultimate vacuum” is the pressure at which a certain degree of vacuum is obtained when a sufficient vacuum is applied in the carbon film coating apparatus equipped with the roughing exhaust pump, and the exhaust amount and conductance of the apparatus. And the leak rate.
[0007]
Next, after opening the film formation gas supply valve and controlling the flow rate of the mass flow controller, a film formation gas (for example, acetylene) is supplied from the film formation gas supply source to the internal electrode through the mass flow controller and the film formation gas supply valve, A film forming gas is introduced into the PET bottle from the internal electrode portion located in the PET bottle. At this time, since the pressure in the PET bottle rises, the film forming gas exhaust pump is operated, and the film forming exhaust valve is opened, thereby exhausting the gas in the PET bottle through the exhaust pipe to evacuate the inside of the PET bottle. Maintain film deposition pressure. Further, by turning on the high frequency power source and supplying high frequency power to the external electrode, plasma is generated between the external electrode and the grounded internal electrode, that is, in the PET bottle. The film forming gas (for example, acetylene) is dissociated or further ionized by the plasma to generate a film forming species for forming a carbon film, and this film forming species is deposited on the inner surface of the PET bottle. Form. After the carbon film is formed to a predetermined thickness, the supply of high-frequency power is stopped, the deposition gas supply valve is closed, the deposition gas exhaust pump is stopped, the deposition gas exhaust valve is closed, Then, rare gas, air, or the like is supplied into the external electrode (pet bottle), and the space is returned to atmospheric pressure. Thereafter, the PET bottle is removed from the external electrode.
[0008]
[Patent Document 1]
JP-A-8-53116
[0009]
[Patent Document 2]
Japanese Patent No. 2788412
[0010]
[Patent Document 3]
JP 9-272567 A
[0011]
[Patent Document 4]
Japanese Patent No. 3072269
[0012]
[Patent Document 5]
Japanese Patent No. 3115252
[0013]
[Non-Patent Document 1]
K. Takemoto, et al, Proceedings of ADC / FCT '99, p285 '', `` E. Shimamura
et al, 10th years IAPRI World Conference 1997, p251
[0014]
[Problems to be solved by the invention]
According to the above-described method, the amount of nitrogen in the air is reduced to the detection limit (about 0.1%) or less during film formation in order to sufficiently rough the vacuum to an ultimate vacuum (0.01 Torr or less). It is possible to manufacture a PET bottle that is covered with a carbon film (gas permeation preventive film) having a high barrier property (for example, 10 times or more that of a PET bottle) while living by avoiding mixing with the carbon film.
[0015]
However, since the time from the start of exhaust to the start of film formation takes a very long time of several tens of seconds by sufficiently roughing to the ultimate vacuum, the process time becomes long as a result, resulting in a decrease in productivity in mass production machines. Invite. In particular, if this process is incorporated into a PET bottle production line (for example, 300 bottles / minute) with a rotary type device that produces continuously at high speed, the overall process time must be kept within 10 seconds. It is not feasible.
[0016]
The present invention provides a method for mass production of a gas permeation-preventing film-coated plastic container that is coated with a gas permeation-preventing film such as a carbon film that has no barrier on the inner surface of the plastic container and has a high barrier property. With the goal.
[0017]
[Means for Solving the Problems]
According to the present invention, there is provided a method of manufacturing a plastic container coated with a gas permeation preventive film, a process of exhausting a gas in a plastic container as an object to be processed, and a mass flow controller from the upstream side into the plastic container while continuing the gas exhaust. And supplying a raw material gas through a pipe having valves arranged in this order, and continuing the gas exhaust, generating plasma in the plastic container and dissociating the raw material gas to gas on the inner surface of the plastic container A method of manufacturing a gas permeation prevention film-coated plastic container including a step of forming a permeation prevention film,
With the valve closed The mass flow controller Was previously set at a constant flow rate, and the raw material gas was retained at a high pressure in the piping portion between the mass flow controller and the valve. After opening the valve, the piping part Stay in High pressure source gas in the plastic container With a flow rate that exceeds the fixed flow rate set by the mass flow controller In addition to supplying the gas, the gas pressure in the plastic container is higher than the film formation pressure (not including the film formation pressure) and lower than the ultimate vacuum (not including the ultimate vacuum) by the gas exhaust. The range is set.
[0018]
In the method for manufacturing a plastic container coated with a gas permeation prevention film according to the present invention, after supplying the source gas into the plastic container in an amount of 10 times or more of the container volume, plasma is generated in the plastic container. Is preferred.
[0019]
In the method of manufacturing a plastic container coated with a gas permeation prevention film according to the present invention, a high-pressure raw material generated in the pipe portion between the mass flow controller and the valve by controlling a distance between the mass flow controller and the valve and a pressure of the raw material gas. Allow to adjust the gas amount.
[0020]
Another gas permeation prevention film-coated plastic container manufacturing method according to the present invention includes an external electrode surrounding an outer peripheral surface excluding a mouth portion of the plastic container, an internal electrode inserted into the plastic container and also serving as a source gas A plurality of film forming units arranged in a rotary system, each having a pipe connected to the internal electrode, a valve and a mass flow controller sequentially inserted in the pipe from the internal electrode side; A main pipe connected to the main pipe, a source gas supply source connected to the main pipe via the first branch pipe, and a main pipe connected to the main pipe via the second branch pipe Inactive A carrier gas supply source comprising gas, and a carrier gas-containing source gas supply system having a mass flow controller and a valve sequentially inserted from the supply source side into the first and second branch pipes, respectively, In manufacturing a gas permeation prevention film-coated plastic container using a gas permeation prevention film coating apparatus in which one of the internal electrode and the external electrode is grounded and the other is connected to a high frequency power source.
The carrier gas-containing source gas from the carrier gas-containing source gas supply system has a gas pressure in the plastic container that is higher than the deposition pressure (not including the deposition pressure) than the ultimate vacuum (not including the ultimate vacuum) ) When a low vacuum range is reached, the gas pressure in the main pipe controls the flow rate of the mass flow controller of the film forming unit when supplying the plastic container through the main pipe, pipe, mass flow controller, valve and internal electrode. When the value exceeds the range, the carrier gas-containing raw material gas in the main pipe is discharged to the outside, and the gas pressure is reduced to a value at which the mass flow controller operates normally.
[0021]
In another gas permeation prevention film-coated plastic container manufacturing method according to the present invention, plasma is generated in the plastic container after supplying the source gas into the plastic container in an amount of 10 times or more the container volume. It is preferable.
[0022]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, the present invention will be described in detail with reference to the drawings.
[0023]
(First embodiment)
FIG. 1 is a schematic cross-sectional view showing a gas permeation prevention film coating apparatus used for manufacturing a gas permeation prevention film coated plastic container according to the first embodiment.
[0024]
This gas permeation preventive membrane coating apparatus includes an external electrode 1 having an inner shape substantially in line with the outer shape of a plastic container, for example, a PET bottle, and also serving as a vacuum container. The external electrode 1 includes an upper external electrode 1a and a lower external electrode 1b, and has a structure that can be divided vertically. The gas exhaust pipe 2 is mounted on the upper external electrode 1b of the external electrode 1 so as to communicate with the opening. A rod-shaped internal electrode 3 also serving as a gas supply is inserted into the external electrode 1 through the gas exhaust pipe 2. The internal electrode 3 is electrically insulated from the external electrode 1 and the gas exhaust pipe 2 and is grounded.
[0025]
The roughing exhaust pump 4 is connected to the gas exhaust pipe 2 through a pipe 5 and a branch pipe 6a. The roughing exhaust valve 7 is interposed in the branch pipe 6a. The film forming gas exhaust pump 8 is connected to the gas exhaust pipe 2 through the pipe 5 and the branch pipe 6b. The film forming gas exhaust valve 9 is interposed in the branch pipe 6b. The capacity type pressure gauge 10 is attached to the gas exhaust pipe 2.
[0026]
A film forming gas supply source, for example, an acetylene cylinder 11 is connected to the upper end of the internal electrode 3 through a pipe 12. The regulator 13, the mass flow controller 14, and the film forming gas supply valve 15 are sequentially interposed in the pipe 1 from the acetylene cylinder 11 side (upstream side). A high frequency power source (not shown) is connected to the upper external electrode 1 a of the external electrode 1.
[0027]
Next, using the gas permeation prevention film coating apparatus shown in FIG. 1, the roughing exhaust valve, the film forming gas exhaust valve, the film forming gas supply valve shown in FIG. Production of a gas permeation prevention film-coated plastic container (gas permeation prevention film-coated PET bottle) by forming a carbon film according to the timing diagram will be described.
[0028]
First, the lower external electrode 1b is lowered to open the bottom of the upper external electrode 1a, a plastic container (for example, plastic bottle B) is inserted from the bottom of the upper external electrode 1a, and the lower external electrode 1b is connected to the upper external electrode 1a. The plastic bottle B is accommodated in the external electrode 1 by being attached to the bottom portion.
[0029]
Next, the roughing exhaust pump 4 is operated and the roughing exhaust valve 7 is opened to exhaust the gas in the PET bottle B stored in the external electrode 1 through the gas exhaust pipe 2, the pipe 5 and the branch pipe 6a. . By operating the roughing exhaust pump 4, the gas pressure in the PET bottle B is in a range from a vacuum higher than the film forming pressure (not including the film forming pressure) to a lower vacuum than the ultimate vacuum (not including the ultimate vacuum) ( When the pressure reaches the set pressure, the roughing exhaust pump 4 is stopped and the roughing exhaust valve 7 is closed as shown in FIG. Simultaneously with the closing operation of the roughing exhaust valve 7, the film forming gas supply valve 15 interposed in the pipe 12 is opened, acetylene is supplied from the acetylene cylinder 11 to the internal electrode 3 through the pipe 12, and the pet Supply into bottle B. At this time, the mass flow controller 14 interposed in the pipe 12 is set to a predetermined flow rate in advance, and then the film forming gas supply valve 15 is opened, so that the pipe 12 portion between the mass flow controller 14 and the valve 15 is placed. Since the staying acetylene is instantaneously discharged, a large amount of acetylene is supplied into the plastic bottle B at a high pressure. Immediately after this, the film-forming gas exhaust pump 8 is operated and the film-forming exhaust valve 9 is opened, whereby the gas in the PET bottle B is exhausted through the gas exhaust pipe 2, the pipe 5 and the branch pipe 6b. The gas pressure in the bottle B is maintained at the film forming pressure.
[0030]
In the operation of the film forming gas exhaust pump 8 and the supply of the acetylene, the gas in the PET bottle is replaced. For example, when the supply amount of acetylene becomes 10 times or more the volume of the PET bottle B, the high frequency power supply is turned on. By turning on and applying high frequency power to the external electrode 1, plasma is generated between the external electrode 1 and the grounded internal electrode 3, that is, in the plastic bottle B. The acetylene is dissociated or further ionized by the plasma to generate a film forming species for forming a carbon film, and this film forming species is deposited on the inner surface of the PET bottle B to form a carbon film. After the carbon film is formed to a predetermined thickness, the supply of high-frequency power is stopped, the film formation gas supply valve 15 is closed, the film formation gas exhaust pump 8 is stopped, and the film formation gas exhaust valve 9 is closed. At the same time, nitrogen, rare gas, air, or the like is supplied into the PET bottle B, and the space is returned to atmospheric pressure. Thereafter, the plastic bottle B is removed from the external electrode 1.
[0031]
In addition to acetylene, for example, alkanes such as methane, ethane, propane, butane, pentane and hexane; alkenes such as ethylene, propylene, butene, pentene and butadiene; benzene, toluene, xylene and indene Aromatic hydrocarbons such as naphthalene and phenanthrene; cycloparaffins such as cyclopropane and cyclohexane; cycloolefins such as cyclopentene and cyclohexene; and oxygen-containing hydrocarbons such as methyl alcohol and ethyl alcohol.
[0032]
As described above, according to the first embodiment, the gas pressure in the plastic container (for example, PET bottle B) is lower than the ultimate vacuum (not including the ultimate vacuum) from the vacuum higher than the deposition pressure (excluding the deposition pressure). Compared with the conventional method in which acetylene is supplied when the ultimate vacuum shown in FIG. 6 is reached by supplying a film forming gas (for example, acetylene gas) when the vacuum range (set ultimate pressure) is reached. Thus, the time from the start of exhaust to the start of film formation can be shortened. In addition, when supplying a film forming gas (for example, acetylene gas), the mass flow controller 14 interposed in the pipe 12 sets a predetermined flow rate in advance, and then opens the film forming gas supply valve 15 so that the mass flow controller 14 and the mass flow controller 14 The gas in the PET bottle can be replaced by instantaneously discharging the acetylene staying in the pipe 12 between the valves 15 and supplying a large amount of acetylene into the PET bottle B at a high pressure.
[0033]
Therefore, since the time from the start of evacuation to the start of film formation can be shortened, the production efficiency of a gas permeation prevention film-coated plastic container (for example, a gas permeation prevention film-coated PET bottle) when applied to a mass production machine, particularly a rotary machine. Can be improved. Moreover, since the gas in the PET bottle can be replaced, the amount of nitrogen in the air is reduced to the detection limit (about 0.1%) or less during film formation, and impurities caused by nitrogen are mixed in the carbon film. This makes it possible to manufacture a PET bottle coated with a carbon film (gas permeation preventive film) having a high barrier property (for example, 10 times or more that of a PET bottle).
[0034]
Furthermore, if a film-forming gas (for example, acetylene gas) is supplied in a plastic container (for example, PET bottle B) in an amount of 10 times or more of its volume before the start of film formation, a PET bottle B can be obtained. Can be sufficiently replaced with acetylene gas. As a result, it is possible to manufacture a PET bottle coated with a carbon film (gas permeation preventive film) having a higher barrier property (for example, 10 times or more than that of a PET bottle) while preventing impurities from being mixed into the carbon film. become. Even when such a predetermined replacement time is set, the time from the start of exhaust to the start of film formation can be shortened as compared with the conventional method shown in FIG.
[0035]
Example 1
Using the gas permeation preventive membrane coating apparatus of FIG. 1 described above, according to the timing chart of opening / closing of the roughing exhaust valve, film forming gas exhaust valve, film forming gas supply valve, mass flow rate, and on / off of the high frequency power source shown in FIG. In the first embodiment in which a carbon membrane is formed to produce a gas permeation preventive membrane-coated PET bottle, when the set ultimate pressure higher than the deposition pressure is reached, acetylene is put into the PET bottle B at a volume of 2 After supplying double, four times, six times, and ten times the amount, the high frequency power supply is turned on and high frequency power is applied to the external electrode 1, so that between the external electrode 1 and the grounded internal electrode 3, that is, Plasma was generated in the PET bottle B, and deposited on the inner surface of the PET bottle B to form a carbon film, thereby manufacturing a gas permeation prevention film-coated PET bottle.
[0036]
The barrier properties of the obtained PET bottles coated with gas permeation preventive membranes were examined. This barrier property was evaluated by a relative value when the oxygen barrier property of a PET bottle not coated with a carbon film was 1. The result is shown in FIG. In FIG. 3, the carbon film is formed according to the timing chart of opening / closing of the roughing exhaust valve, film forming gas exhaust valve, film forming gas supply valve, mass flow flow rate, and high-frequency power source on / off shown in FIG. The oxygen barrier property of a conventional PET bottle coated with a gas permeation prevention film is shown by a broken line.
[0037]
As apparent from FIG. 3, the acetylene is supplied 10 times the volume of the PET bottle B while continuing the operation of the film forming gas exhaust pump, and then the high frequency power is turned on to apply the high frequency power to the external electrode. It can be seen that the gas permeation-preventing membrane-coated PET bottle produced by the method of the invention has an oxygen barrier property equivalent to or higher than that of the gas permeation-preventing membrane-coated PET bottle produced by the conventional method. In the method of the present invention, it took about 30 seconds from the start of evacuation to the start of film formation in the conventional method, but it was able to be significantly reduced to about 2.5 seconds.
[0038]
Further, while the film forming gas exhaust pump is continuously operated, acetylene is supplied in an amount 10 times the volume of the PET bottle B, and then the high frequency power is turned on to apply the high frequency power to the external electrode. The gas permeation-preventing film-coated PET bottle was measured with a nitrogen atom ESCA (X-ray photoelectron analyzer) in the carbon film. As a result, it was confirmed that it was below the measurement limit where impurities caused by nitrogen were not generated.
[0039]
(Second Embodiment)
Using the above-described gas permeation prevention film coating apparatus of FIG. 1, according to the timing chart of roughing exhaust valve, film forming gas exhaust valve, film forming gas supply valve opening and closing, mass flow rate and high-frequency power on / off shown in FIG. Production of a gas permeation prevention film-coated plastic container (gas permeation prevention film-coated PET bottle) by carbon film formation will be described. However, the distance of the piping 12 part located between the mass flow controller 14 and the valve 15 was set long.
[0040]
First, the lower external electrode 1b is lowered to open the bottom of the upper external electrode 1a, a plastic container (for example, plastic bottle B) is inserted from the bottom of the upper external electrode 1a, and the lower external electrode 1b is connected to the upper external electrode 1a. The plastic bottle B is accommodated in the external electrode 1 by being attached to the bottom portion.
[0041]
Next, the roughing exhaust pump 4 is operated and the roughing exhaust valve 7 is opened to exhaust the gas in the PET bottle B stored in the external electrode 1 through the gas exhaust pipe 2, the pipe 5 and the branch pipe 6a. . By operating the roughing exhaust pump 4, the gas pressure in the PET bottle B is in a range from a vacuum higher than the film forming pressure (not including the film forming pressure) to a lower vacuum than the ultimate vacuum (not including the ultimate vacuum) ( When the pressure reaches the set pressure, the roughing exhaust pump 4 is stopped and the roughing exhaust valve 7 is closed as shown in FIG. Simultaneously with the closing operation of the roughing exhaust valve 7, the film forming gas supply valve 15 interposed in the pipe 12 is opened, acetylene is supplied from the acetylene cylinder 11 to the internal electrode 3 through the pipe 12, and the pet Supply into bottle B. At this time, the mass flow controller 14 and the valve are opened by opening the film forming gas supply valve 15 after setting the mass flow controller 14 interposed in the pipe 12 to a constant flow rate higher than that of the first embodiment described above. Since the acetylene staying in the portion of the pipe 12 between 15 is instantaneously discharged, a larger amount of acetylene is supplied into the plastic bottle B at a high pressure. Immediately after this, the film-forming gas exhaust pump 8 is operated and the film-forming exhaust valve 9 is opened, whereby the gas in the PET bottle B is exhausted through the gas exhaust pipe 2, the pipe 5 and the branch pipe 6b. The gas pressure in the bottle B is maintained at the film forming pressure.
[0042]
In the operation of the film forming gas exhaust pump 8 and the supply of the acetylene, the gas in the PET bottle is replaced. For example, when the supply amount of acetylene becomes 10 times or more the volume of the PET bottle B, the high frequency power supply is turned on. By turning on and applying high frequency power to the external electrode 1, plasma is generated between the external electrode 1 and the grounded internal electrode 3, that is, in the plastic bottle B. The acetylene is dissociated or further ionized by the plasma to generate a film forming species for forming a carbon film, and this film forming species is deposited on the inner surface of the PET bottle B to form a carbon film. After the carbon film is formed to a predetermined thickness, the supply of high-frequency power is stopped, the film formation gas supply valve 15 is closed, the film formation gas exhaust pump 8 is stopped, and the film formation gas exhaust valve 9 is closed. At the same time, nitrogen, rare gas, air, or the like is supplied into the PET bottle B, and the space is returned to atmospheric pressure. Thereafter, the plastic bottle B is removed from the external electrode 1.
[0043]
As described above, according to the second embodiment, the gas pressure in the plastic container (for example, the plastic bottle B) is lower than the ultimate vacuum (not including the ultimate vacuum) from the vacuum higher than the deposition pressure (excluding the deposition pressure). Compared with the conventional method in which acetylene is supplied when the ultimate vacuum shown in FIG. 6 is reached by supplying a film forming gas (for example, acetylene gas) when the vacuum range (set ultimate pressure) is reached. Thus, the time from the start of exhaust to the start of film formation can be shortened. Further, when supplying the film forming gas (for example, acetylene gas), the mass flow controller 14 interposed in the pipe 12 is set to a constant flow rate in advance, and then the film forming gas supply valve 15 is opened, The gas in the PET bottle can be replaced by instantaneously discharging the acetylene retained in the pipe 12 between the valves 15 and supplying a large amount of acetylene into the PET bottle B at a high pressure.
[0044]
Therefore, since the time from the start of evacuation to the start of film formation can be shortened, the production efficiency of a gas permeation prevention film-coated plastic container (for example, a gas permeation prevention film-coated PET bottle) when applied to a mass production machine, particularly a rotary machine. Can be improved. Moreover, since the gas in the PET bottle can be replaced, the amount of nitrogen in the air is reduced to the detection limit (about 0.1%) or less during film formation, and impurities caused by nitrogen are mixed in the carbon film. This makes it possible to manufacture a PET bottle coated with a carbon film (gas permeation preventive film) having a high barrier property (for example, 10 times or more that of a PET bottle).
[0045]
Further, by optimizing the distance of the pipe 12 located between the mass flow controller 14 and the valve 15 and the gas pressure of acetylene, the film-forming gas (for example, acetylene gas) is made into a plastic container (for example, PET bottle B) before the film formation is started. ), The replacement time for supplying an amount of 10 times or more of the volume can be shortened as compared with the first embodiment described above. As a result, the film formation time can be further shortened, the production efficiency can be further improved when applied to a mass production machine, particularly a rotary machine, and the amount of nitrogen in the air during film formation can be detected (0). .1%) or less to avoid mixing impurities caused by nitrogen into the carbon film, and covering it with a carbon film (gas permeation prevention film) having a high barrier property (for example, 10 times or more that of a PET bottle) It becomes possible to manufacture a manufactured plastic bottle.
[0046]
In fact, the gas permeation prevention film-coated PET bottle manufactured in the second embodiment was measured by a nitrogen atom ESCA (X-ray photoelectron analyzer) in the carbon film. As a result, it was confirmed that it was below the measurement limit where impurities were not generated.
[0047]
(Third embodiment)
FIG. 5 is a schematic view showing a gas permeation preventive film coating apparatus having a carrier gas-containing film forming gas supply system used for manufacturing the gas permeation preventive film coated plastic container according to the third embodiment.
[0048]
This gas permeation preventive film coating apparatus includes an external electrode 21 having an inner shape substantially in line with the outer shape of a plastic container, for example, a PET bottle, and also serving as a vacuum container. The external electrode 21 includes an upper external electrode 21a and a lower external electrode 21b, and has a structure that can be divided vertically. The gas exhaust pipe 22 is mounted on the upper external electrode 21b of the external electrode 21 so as to communicate with the opening. A rod-shaped internal electrode 23 also serving as a gas supply is inserted into the external electrode 21 through the gas exhaust pipe 22. The internal electrode 23 is electrically insulated from the external electrode 21 and the gas exhaust pipe 22 and is grounded. A high frequency power source (not shown) is connected to the upper external electrode 21 a of the external electrode 21.
[0049]
The roughing exhaust pump 24 is connected to the gas exhaust pipe 22 through a pipe 25 and a branch pipe 26a. The roughing exhaust valve 27 is interposed in the branch pipe 26a. The film forming gas exhaust pump 28 is connected to the gas exhaust pipe 22 through the pipe 25 and the branch pipe 26b. The film forming gas exhaust valve 29 is interposed in the branch pipe 26b. The rotary side pipe 30 is connected to the upper end of the internal electrode 23. The film-forming gas supply valve 31, the film-forming gas mass flow controller 32, and the regulator 33 are sequentially inserted in the rotary side pipe 30 from the upper end side of the internal electrode 23. The plasma light emission detection sensor 34 is inserted into the external electrode 21. The pressure sensor 35 is attached to the gas exhaust pipe 22. The plasma emission detection sensor 34 and the pressure sensor 35 are connected to a film formation control controller 36. The film formation control controller 36 is connected to the film formation gas mass flow controller 32 and outputs a signal for controlling the flow rate of the mass flow controller 32.
[0050]
A plurality of, for example, 32 film forming units having the above-described configuration are arranged in the rotary system.
[0051]
A source gas supply source, for example, an acetylene cylinder (not shown) is connected to a first branch pipe 37 a, and the first branch pipe 37 a is connected to a main pipe 38. The main pipe 38 is connected to the rotary side pipe 30 of each film forming unit via a rotary joint 39. The acetylene mass flow controller 40 and the acetylene supply valve 41 are sequentially inserted into the first branch pipe 37a from the acetylene cylinder side. A supply source of an inert gas (for example, argon) as a carrier gas, for example, an argon cylinder (not shown) is connected to the main pipe 38 through a second branch pipe 37b. The argon mass flow controller 42 and the argon supply valve 43 are sequentially inserted in the second branch pipe 37b from the argon cylinder side. One end of the exhaust branch pipe 44 is connected to the main pipe 38 in the middle between the connecting portion of the first and second branch pipes 37a and 37b and a position where a pressure detector to be described later is attached, and the other end is gas exhausted. It is connected to a system, for example a vacuum pump. The attachment position of the exhaust branch pipe 44 may be any location of the main pipe 38 when the amount of acetylene exhausted from the exhaust branch pipe 44 and the amount of acetylene containing the carrier gas of argon is small. The exhaust mass flow controller 45 and the exhaust valve 46 are sequentially disposed in the exhaust branch pipe 44 from the gas exhaust system side.
[0052]
The pressure detector 47 is attached to the main pipe 38. The pressure detector 47 is connected to a pressure controller 48, and the detection signal is output to the pressure controller 48. The pressure controller 48 is connected to the acetylene mass flow controller 40 and the argon mass flow controller 42 via a ratio calculation circuit 49, and a signal for controlling the flow rate of the mass flow controllers 40, 42 is output. The pressure controller 48 is connected to the exhaust mass flow controller 45, and a signal for controlling the opening degree of the exhaust mass flow controller 45 is output based on a detection signal from the pressure detector 47.
[0053]
Next, using the gas permeation preventive film coating apparatus shown in FIG. 5, the roughing exhaust valve, the film forming gas exhaust valve, the film forming gas supply valve shown in FIG. Production of a gas permeation prevention film-coated plastic container (gas permeation prevention film-coated PET bottle) by forming a carbon film according to the timing chart of OFF will be described.
[0054]
First, the lower external electrode 21b of each film forming unit is lowered to open the bottom of the upper external electrode 21a, and a plastic container (for example, a plastic bottle B) is inserted from the bottom of the upper external electrode 21a. Is attached to the bottom of the upper external electrode 21 a to accommodate the plastic bottle B in the external electrode 21.
[0055]
Next, by operating the roughing exhaust pump 24 of each film forming unit and opening the roughing exhaust valve 27, the gas in the PET bottle B stored in the external electrode 21 is supplied to the gas exhaust pipe 22, the pipe 25 and the branch. It exhausts through the piping 26a. By operating the roughing exhaust pump 24, the gas pressure in the PET bottle B is in a range from a vacuum higher than the film forming pressure (not including the film forming pressure) to a lower vacuum than the ultimate vacuum (not including the ultimate vacuum) ( When the pressure reaches the set pressure, the roughing exhaust pump 24 is stopped and the roughing exhaust valve 27 is closed as shown in FIG. Simultaneously with the closing operation of the roughing exhaust valve 27, acetylene and an acetylene containing argon carrier gas (film forming gas) are supplied to the internal electrode 3 and supplied into the PET bottle B from the lower end thereof.
[0056]
That is, when supplying acetylene from an acetylene cylinder (not shown) and argon from an argon cylinder (not shown) to the main pipe 38 through the first and second branch pipes 37a and 37b, respectively, the acetylene supply valve 41 and the argon supply Each of the valves 43 is opened, and a control signal is output from the pressure controller 48 to the acetylene mass flow controller 40 and the argon mass flow controller 42 through the ratio calculation circuit 49 to control the opening degree of the mass flow controllers 40, 42, thereby controlling a desired ratio. The carrier gas-containing acetylene (film forming gas) obtained by mixing acetylene and argon is supplied from the main pipe 38 to the rotary side pipe 30 of each film forming unit connected through the rotary joint 39. At the same time, by opening the film forming gas supply valve 31 interposed in the rotary side pipe 30, the carrier gas-containing acetylene (film forming gas) is supplied to the internal electrode 23 through the rotary side pipe 30, It supplies in the said PET bottle B from a lower end. At this time, the mass flow controller 32 interposed in the rotary side pipe 30 is set in advance to a constant flow rate and then the film forming gas supply valve 31 is opened, whereby the pipe 30 between the mass flow controller 32 and the valve 31 is opened. Since the film-forming gas staying in the portion is instantaneously discharged, a large amount of film-forming gas is supplied into the PET bottle B at a high pressure. Along with this operation, the film forming gas exhaust pump 28 is operated and the film forming exhaust valve 29 is opened, whereby the gas in the PET bottle B is exhausted through the gas exhaust pipe 22, the pipe 25 and the branch pipe 26b. The gas pressure in the PET bottle B is maintained at the film forming pressure.
[0057]
In the operation of the film forming gas exhaust pump 28 and the supply of the carrier gas-containing acetylene, when the supply amount of the carrier gas-containing acetylene becomes 10 times or more the volume of the PET bottle B by taking a predetermined replacement time, By turning on a high frequency power source and applying high frequency power to the external electrode 21, plasma is generated between the external electrode 21 and the grounded internal electrode 23, that is, in the plastic bottle B. The acetylene in the carrier gas-containing acetylene is dissociated or further ionized by the plasma to generate a film-forming species for forming a carbon film, and this film-forming species is deposited on the inner surface of the PET bottle B, and carbon A film is formed. After the carbon film is formed to a predetermined thickness, the supply of high-frequency power is stopped, the supply of carrier gas-containing acetylene (film formation gas) is stopped, the exhaust by the film formation gas exhaust pump 28 is stopped, nitrogen, A rare gas or air is supplied into the PET bottle B, and the space is returned to atmospheric pressure. Thereafter, the plastic bottle B of each film forming unit is removed from the external electrode 21.
[0058]
In the film formation of the carbon film described above, the system for supplying a carrier gas-containing acetylene mixed with acetylene and argon as a film formation gas adopts a form in which two stages of mass flow controllers are arranged for the piping system. The gas pressure of the pipe (main pipe 38, rotary side pipe 30) located between 40 (or 42) and 32 increases.
[0059]
Further, when the main pipe 38 through which the carrier gas-containing acetylene (film-forming gas) is circulated is connected to the rotary-side pipe 30 of each film-forming unit via a rotary joint 39, When the supply of carrier gas-containing acetylene to some of the plastic bottles B is stopped, the gas pressure in the piping (main piping 38, rotary side piping 30) located between the mass flow controller 40 (or 42) and 32 increases. To do.
[0060]
The increase in gas pressure in the pipe (main pipe 38, rotary side pipe 30) is the same as the gas pressure (primary pressure) in the rotary side pipe 30 located between the film-forming gas mass flow controller 32 and the regulator 33 in the subsequent stage. Since the increase is remarkably increased, it becomes difficult to control the flow rate by the film-forming gas mass flow controller 32 that receives the primary pressure. As a result, when the film forming gas supply valve 31 is opened, the flow rate of the carrier gas-containing acetylene flowing through the rotary side pipe 30 is not controlled by the film forming gas mass flow controller 32, that is, the flow control by the film forming gas mass flow controller 32. It is supplied into the PET bottle B through the internal electrode 23 beyond the range. Therefore, since the gas pressure in the PET bottle B becomes higher than the film formation pressure shown in FIG. 2, it is difficult to form a carbon film having a desired high barrier property.
[0061]
For this reason, the pressure detector 47 attached to the main pipe 38 detects the pressure of the carrier gas-containing acetylene flowing through the main pipe 38 during the film formation, and feeds back this detection signal to the pressure controller 48. . At this time, when the gas pressure detected by the pressure detector 47 exceeds the control range of the film-forming gas mass flow controller 32 in the subsequent stage, the exhaust controller interposed in the exhaust branch pipe 44 from the pressure controller 48. A signal for controlling the opening degree is output to the mass flow controller 45, and the carrier gas-containing acetylene in the main pipe 38 is exhausted through the exhaust branch pipe 44 having an exhaust system such as a vacuum pump. Therefore, the gas pressure of the carrier gas-containing acetylene flowing through the main pipe 38 and the rotary side pipe 30 can be reduced to a value at which the film-forming gas mass flow controller 32 in the subsequent stage operates normally. As a result, when the film-forming gas supply valve 31 is opened, the carrier gas-containing acetylene flowing through the rotary side pipe 30 is controlled to an appropriate flow rate range by the film-forming gas mass flow controller 32, and the PET bottle B is passed through the internal electrode 23. Can be supplied within. Therefore, since the gas pressure in the PET bottle B can be set to the film formation pressure shown in FIG. 2, it is possible to form a carbon film having a desired high barrier property.
[0062]
As described above, according to the third embodiment, the gas permeation prevention film-coated plastic container (for example, the gas permeation prevention film) is shortened by shortening the time from the start of exhaust to the start of film formation as compared with the conventional method as in the first embodiment. The production efficiency of coated PET bottles can be improved. Further, during film formation, the amount of nitrogen in the air can be reduced to a detection limit (about 0.1%) or less to prevent impurities caused by nitrogen from being mixed in the carbon film, and high barrier properties (for example, PET bottles) It is possible to manufacture a PET bottle coated with a carbon film (gas permeation preventive film) having 10 times or more).
[0063]
Furthermore, since a system in which acetylene and argon mixed carrier gas-containing acetylene is supplied as a film forming gas adopts a configuration in which two stages of mass flow controllers are arranged in the piping system, the mass flow controllers 40 (or 42), 32 The gas pressure in the piping (main piping 38, rotary side piping 30) located between them increases. Further, when the main pipe 38 through which the carrier gas-containing acetylene (film-forming gas) is circulated is connected to the rotary-side pipe 30 of each film-forming unit via a rotary joint 39, When the supply of carrier gas-containing acetylene to some of the plastic bottles B is stopped, the gas pressure in the piping (main piping 38, rotary side piping 30) located between the mass flow controller 40 (or 42) and 32 increases. To do. The increase in the gas pressure increases the primary pressure upstream of the subsequent mass flow controller (deposition gas mass flow controller 32), making it difficult to control the flow rate by the deposition gas mass flow controller 32.
[0064]
According to the third embodiment, the pressure of the carrier gas-containing acetylene flowing through the main pipe 38 is detected by the pressure detector 47 attached to the main pipe 38 during the film formation, and this detection signal is used as the pressure controller 48. And a signal for controlling the opening degree is output from the pressure controller 48 to the exhaust mass flow controller 45 interposed in the exhaust branch pipe 44 so that the carrier gas-containing acetylene in the main pipe 38 is like a vacuum pump. When the exhaust gas is exhausted through the exhaust branch pipe 44 having a simple exhaust system, the gas flow of the carrier gas-containing acetylene flowing through the main pipe 38 and the rotary side pipe 30 is operated normally. The value can be reduced. As a result, in a form in which a plurality of film forming units are arranged in a rotary system, and a carrier gas-containing acetylene supply system is connected to these film forming units, the carrier gas-containing acetylene is controlled to an appropriate flow rate range by the mass flow controller 32. Since the gas can be supplied into the plastic bottle B through the internal electrode 23 and the gas pressure in the plastic bottle B can be set to the film-forming pressure shown in FIG. 2, a carbon film having a desired high barrier property can be formed.
[0065]
【The invention's effect】
As described above in detail, according to the present invention, a plastic container coated with a gas permeation preventive film in which a gas permeation preventive film such as a carbon film having a high barrier property is not mixed with impurities on the inner surface of the plastic container is mass-produced. A method that can be manufactured can be provided.
[Brief description of the drawings]
FIG. 1 is a schematic sectional view showing a gas permeation prevention film coating apparatus used for manufacturing a gas permeation prevention film coated plastic container according to a first embodiment of the present invention.
FIG. 2 shows the roughing exhaust valve, the film forming gas exhaust valve, the film forming gas supply valve opening and closing, the mass flow flow rate, and the on / off of the high frequency power source in the manufacture of the gas permeation prevention film-coated plastic container according to the first embodiment of the present invention. OFF timing diagram.
FIG. 3 is a characteristic diagram showing the relationship between the amount of raw material supplied and the barrier property of a coated PET bottle in Example 1 of the present invention.
FIG. 4 shows opening / closing of a roughing exhaust valve, a film forming gas exhaust valve, a film forming gas supply valve, a mass flow flow rate, and a high-frequency power on / off in the manufacture of the gas permeation prevention film-coated plastic container according to the second embodiment of the present invention. OFF timing diagram.
FIG. 5 is a schematic sectional view showing a gas permeation preventive film coating apparatus used for manufacturing a gas permeation preventive film coated plastic container according to a third embodiment of the present invention.
FIG. 6 is a timing diagram of opening / closing of a roughing exhaust valve, a film forming gas exhaust valve, a film forming gas supply valve, a mass flow rate, and on / off of a high-frequency power source in manufacturing a conventional plastic container coated with a gas permeation prevention film.
[Explanation of symbols]
1, 21 ... External electrodes,
2, 22 ... Gas exhaust pipe,
3, 23 ... internal electrodes,
4, 24 ... Roughing exhaust pump,
8, 28 ... Deposition gas exhaust pump,
11 ... Acetylene cylinder,
13, 33 ... regulator,
14, 32, 40, 42, 45 ... mass flow controller,
15, 31 ... Film-forming gas supply valve,
44 ... Exhaust branch piping,
47 ... Pressure detector,
48 ... pressure controller,
B: PET bottle.

Claims (3)

被処理物であるプラスチック容器内のガスを排気する工程と、このガス排気を続行しながら、前記プラスチック容器内に上流側からマスフローコントローラおよびバルブをこの順序で介装した配管を通して原料ガスを供給する工程と、前記ガス排気を続行しながら、前記プラスチック容器内にプラズマを発生させて前記原料ガスを解離して前記プラスチック容器内面に気体透過防止被膜を形成する工程を含む気体透過防止膜被覆プラスチック容器の製造方法であって、
前記バルブを閉じた状態で前記マスフローコントローラを予め一定の流量に設定して前記原料ガスを前記マスフローコントローラと前記バルブ間の前記配管部分に高圧で滞留させた後に前記バルブを開けて前記配管部分に滞留する高圧原料ガスを前記プラスチック容器内に前記マスフローコントローラで設定した一定の流量を超える流量で供給すると共に、その供給時点を前記ガス排気により前記プラスチック容器内のガス圧力が成膜圧力より高真空(成膜圧力を含まず)から到達真空度より(到達真空度を含まず)低真空の範囲に設定することを特徴とする気体透過防止膜被覆プラスチック容器の製造方法。
The process of exhausting the gas in the plastic container, which is the object to be processed, and supplying the raw material gas through the piping in which the mass flow controller and the valve are interposed in this order from the upstream side into the plastic container while continuing the gas exhaust. A gas permeation preventive film-coated plastic container comprising: a step of generating a plasma in the plastic container while dissociating the raw material gas while continuing the gas exhaustion to form a gas permeation preventive film on the inner surface of the plastic container A manufacturing method of
With the valve closed, the mass flow controller is set in advance to a constant flow rate, and the source gas is retained in the piping portion between the mass flow controller and the valve at a high pressure, and then the valve is opened to the piping portion . The stagnant high-pressure source gas is supplied into the plastic container at a flow rate that exceeds a predetermined flow rate set by the mass flow controller, and the gas pressure in the plastic container is higher than the film formation pressure by the gas exhaust at the time of supply. A method for producing a gas permeation-preventing film-coated plastic container, characterized in that it is set in a range of low vacuum (excluding ultimate vacuum) from ultimate vacuum (excluding deposition pressure).
前記マスフローコントローラと前記バルブの距離および前記原料ガスの圧力を制御することにより、マスフローコントローラとバルブ間の前記配管部分に滞留する高圧原料ガス量を調節することを特徴とする請求項1記載の気体透過防止膜被覆プラスチック容器の製造方法。2. The gas according to claim 1, wherein the amount of the high-pressure raw material gas staying in the pipe portion between the mass flow controller and the valve is adjusted by controlling the distance between the mass flow controller and the valve and the pressure of the raw material gas. A method of manufacturing a plastic container coated with a permeation-preventing film. プラスチック容器の口部を除く外周面を囲む外部電極と、前記プラスチック容器内に挿入され、原料ガスの供給を兼ねる内部電極と、この内部電極に接続された配管と、この配管に前記内部電極側から順次介装されたバルブおよびマスフローコントローラとを有し、ロータリー系に配置された複数の成膜ユニット;前記各成膜ユニットの配管に接続された主配管と、この主配管に第1分岐配管を介して接続された原料ガス供給源と、この主配管に第2分岐配管を介して接続された不活性ガスからなるキャリアガス供給源と、前記第1、第2の分岐配管にそれぞれ前記供給源側から順次介装されたマスフローコントローラおよびバルブとを有するキャリアガス含有原料ガスの供給系;を具備し、前記内部電極および外部電極のいずれか一方が接地され、他方が高周波電源に接続された気体透過防止膜被覆装置を用いて気体透過防止膜被覆プラスチック容器の製造するにあたり、An external electrode surrounding the outer peripheral surface excluding the mouth of the plastic container, an internal electrode inserted into the plastic container and also serving as a source gas supply, a pipe connected to the internal electrode, and the internal electrode side of the pipe A plurality of film forming units disposed in a rotary system; a main pipe connected to a pipe of each film forming unit; and a first branch pipe connected to the main pipe The source gas supply source connected via the main pipe, the carrier gas supply source made of an inert gas connected to the main pipe via the second branch pipe, and the supply to the first and second branch pipes, respectively. A carrier gas-containing source gas supply system having a mass flow controller and a valve sequentially provided from the source side, wherein either one of the internal electrode and the external electrode is connected. It is, when the other is the production of a gas permeable barrier layer coated plastic containers with connected gas permeation barrier layer coating device to a high frequency power supply,
前記キャリアガス含有原料ガスの供給系からキャリアガス含有原料ガスを前記プラスチック容器内のガス圧力が成膜圧力より高真空(成膜圧力を含まず)から到達真空度より(到達真空度を含まず)低真空の範囲に到達した時に、前記主配管、配管、マスフローコントローラ、バルブおよび内部電極を通して前記プラスチック容器内に供給する際、前記主配管のガス圧力が前記成膜ユニットのマスフローコントローラの流量制御範囲を超える値になったときに主配管内のキャリアガス含有原料ガスを外部に排出してそのガス圧力を前記マスフローコントローラが正常に作動する値に低減させることを特徴とする気体透過防止膜被覆プラスチック容器の製造方法。Carrier gas-containing source gas from the carrier gas-containing source gas supply system gas pressure in the plastic container is higher than the deposition pressure (not including the deposition pressure) than the ultimate vacuum (not including the ultimate vacuum) ) When a low vacuum range is reached, the gas pressure in the main pipe controls the flow rate of the mass flow controller of the film forming unit when supplying the plastic container through the main pipe, pipe, mass flow controller, valve and internal electrode. A gas permeation preventive membrane coating characterized by exhausting the carrier gas-containing source gas in the main pipe to the outside when the value exceeds the range and reducing the gas pressure to a value at which the mass flow controller operates normally A method for manufacturing plastic containers.
JP2002279451A 2002-09-25 2002-09-25 Method for producing gas permeation preventive membrane coated plastic container Expired - Lifetime JP3746748B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002279451A JP3746748B2 (en) 2002-09-25 2002-09-25 Method for producing gas permeation preventive membrane coated plastic container

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002279451A JP3746748B2 (en) 2002-09-25 2002-09-25 Method for producing gas permeation preventive membrane coated plastic container

Publications (2)

Publication Number Publication Date
JP2004115853A JP2004115853A (en) 2004-04-15
JP3746748B2 true JP3746748B2 (en) 2006-02-15

Family

ID=32274451

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002279451A Expired - Lifetime JP3746748B2 (en) 2002-09-25 2002-09-25 Method for producing gas permeation preventive membrane coated plastic container

Country Status (1)

Country Link
JP (1) JP3746748B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4606947B2 (en) * 2005-03-16 2011-01-05 東京エレクトロン株式会社 Leak rate measurement method, program used for leak rate measurement, and storage medium
FR2889204B1 (en) * 2005-07-26 2007-11-30 Sidel Sas APPARATUS FOR THE PECVD DEPOSITION OF AN INTERNAL BARRIER LAYER ON A CONTAINER, COMPRISING A GAS LINE ISOLATED BY ELECTROVANNE

Also Published As

Publication number Publication date
JP2004115853A (en) 2004-04-15

Similar Documents

Publication Publication Date Title
JP5260050B2 (en) Gas barrier plastic container manufacturing apparatus and method for manufacturing the container
JP3698887B2 (en) Diamond-like carbon film production equipment
TWI557269B (en) Film formation method
TWI591201B (en) Film forming device, film forming method and memory medium
US20060121211A1 (en) Chemical vapor deposition apparatus and chemical vapor deposition method using the same
JP2006111967A (en) Gas barrier membrane and container
WO1997044503A1 (en) Method and apparatus for treating inside surfaces of containers
JP3993971B2 (en) Plastic container having gas barrier coating layer and method for producing the same
JP3746748B2 (en) Method for producing gas permeation preventive membrane coated plastic container
JP3665052B2 (en) Method for producing gas permeation preventive membrane coated plastic container
WO2003000559A1 (en) Manufacturing device for dlc film coated plastic container, dlc film coated plastic container, and method of manufacturing the dlc film coated plastic container
KR101029657B1 (en) Coating film forming apparatus to inner surface of container and manufacturing method of inner coating film container
JP2001335946A (en) System and method for cvd film deposition
WO2021090794A1 (en) Film formation method and film formation device
WO2002085717A1 (en) Gas-barrier synthetic resin vessel, device for producing the same, and article-received gas-barrier synthetic resin vessel
JP2005194606A (en) Apparatus for forming barrier film on inner surface of plastic vessel, and method for manufacturing plastic vessel with barrier film-coated inner surface
JP4519808B2 (en) Thin film deposition method and thin film deposition apparatus
KR102715297B1 (en) Film forming apparatus and film forming method
JP3970246B2 (en) Apparatus for forming barrier film on inner surface of plastic container and manufacturing method of inner surface barrier film-coated plastic container
JP4078326B2 (en) Film forming apparatus and method
JP2004107689A (en) Diamond like carbon film deposition method and deposition system
JP2004189322A (en) Apparatus for forming barrier layer on inner surface of plastic container and manufacturing method for plastic container having inner surface coated with barrier layer
JP2020007612A (en) Film formation method for synthetic resin-made multiple bottle, and film formation apparatus therefor
JP3123979U (en) Deposition equipment
JP4945398B2 (en) Manufacturing method of ultra-thin carbon film coated plastic container

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20050628

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050712

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050909

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20051108

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20051124

R151 Written notification of patent or utility model registration

Ref document number: 3746748

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091202

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091202

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101202

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101202

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111202

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111202

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121202

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131202

Year of fee payment: 8

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R371 Transfer withdrawn

Free format text: JAPANESE INTERMEDIATE CODE: R371

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

EXPY Cancellation because of completion of term