JP3750222B2 - Dismantling method of spherical tank - Google Patents
Dismantling method of spherical tank Download PDFInfo
- Publication number
- JP3750222B2 JP3750222B2 JP26757396A JP26757396A JP3750222B2 JP 3750222 B2 JP3750222 B2 JP 3750222B2 JP 26757396 A JP26757396 A JP 26757396A JP 26757396 A JP26757396 A JP 26757396A JP 3750222 B2 JP3750222 B2 JP 3750222B2
- Authority
- JP
- Japan
- Prior art keywords
- dismantling
- spherical tank
- cutting
- scaffold
- hemisphere
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000000034 method Methods 0.000 title claims description 25
- 238000005520 cutting process Methods 0.000 claims description 54
- 230000001936 parietal effect Effects 0.000 claims description 7
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical group C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
Images
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、球形タンクを解体する際に適用して好適な方法に関する。
【0002】
【従来の技術】
球形タンクを解体するに当っては、球形タンクの周囲に頭頂部へ達する仮設の足場を組み、作業員がその足場に立って球形タンクの殻となっている壁面をその頭頂部から細かく切断する作業を行い、切断した部分をクレーンを用いて順次地上に吊り降ろすという方法が一般的に行われている。
【0003】
【発明が解決しようとする課題】
上記のような従来の解体方法では、高所作業が大半を占めるので作業性に乏しいばかりでなく、解体に先立つ足場の組み立てや解体後の足場の撤去に多大な手間と費用を要するといった問題があった。
【0004】
本発明は上記の事情に鑑みてなされたものであり、高所作業を極力少なくし、かつ足場を必要としない有効な解体方法を提供することを目的としている。
【0005】
【課題を解決するための手段】
上記の課題を解決するための手段として、請求項1に記載された球形タンクの解体方法は、球形タンクの解体に際し、赤道から上に位置する上半球部と下に位置する下半球部とに分けて解体を実施するものとし、上半球部について、頭頂付近に既設の頭頂部足場と赤道付近に既設の赤道部足場との間に、タンクの側面に沿ってガイドレールを架設し、該ガイドレールに沿って自動切断機を作動させることにより当該上半球部を切断する工程を備えることを特徴としている。
【0006】
さらに、請求項2に記載された球形タンクの解体方法は、請求項1に記載された球形タンクの解体方法において、頭頂部足場とこれが設置された天壁部をそのまま残しつつ、上半球部を天壁部側から放射状に切断する工程と、複数に切り分けられた側壁部のうち、天壁部を支持させるものだけを残してその他の側壁部を天壁部および下半球部から切断分離しながらひとつずつ撤去していく工程と、残された側壁部で支持されている天壁部を撤去する工程と、天壁部を支持していた側壁部を撤去する工程とを備えることを特徴としている。
【0007】
また、請求項3に記載された球形タンクの解体方法は、球形タンクの解体に際し、赤道から上に位置する上半球部と下に位置する下半球部とに分けて解体を実施するものとし、上半球部解体後の下半球部について、赤道付近に既設の赤道部足場と底壁部との間に、タンクの側面に沿ってガイドレールを架設し、該ガイドレールに沿って自動切断機を作動させることにより当該下半球部を切断する工程を備えることを特徴としている。
【0008】
さらに、請求項4に記載された球形タンクの解体方法としては、請求項3に記載された球形タンクの解体方法において、下半球部を底壁部側から放射状に切断する工程と、複数に切り分けられた各側壁部を赤道部足場から切断分離しながらひとつずつ撤去していく工程とを備えることを特徴としている。
【0009】
【発明の実施の形態】
本発明の球形タンクの解体方法の実施の形態を図1ないし図6に示して説明する。
図1は、解体すべき球形タンクTと、この球形タンクTのうち赤道から上に位置する上半球部Tuに設置されてその側壁部Wuを切断する自動切断機Cとを側方視したものである。
球形タンクTは、地上Gに等間隔を空けて立設された複数の支持脚Lに支持されており、これら支持脚Lはタンク本体の赤道付近に接合されている。支持脚Lが接合された赤道付近には、この赤道に沿ってタンク本体の周囲を取り囲むように赤道部足場Seが設置されている。さらに、タンク本体の頭頂付近には、円を描くように頭頂部足場Stが設置されている。
【0010】
自動切断機Cは、側壁部Wuの切断箇所に沿って設置されたガイドレールRuに沿って走行しながら切断を行うものであるが、上半球部Tuには、頭頂部足場Stと赤道部足場Seとの間にガイドレールRuが架設されており、このガイドレールRu上に自動切断機Cが装備されている。ガイドレールRuは頭頂部足場St側、赤道部足場Se側ともに固定、離脱が簡単に行える構造を有しており、ある箇所の切断を終えたらこれを取り外して次に切断すべき箇所に移動させて設置することが可能である。また、自動切断機Cには、切断手段としてガスバーナーを備えるガス切断機が採用されている。
【0011】
図2は、球形タンクTのうち赤道から下に位置する下半球部Tdと、この下半球部Tdに設置されてその側壁部Wdを切断する自動切断機Cとを、上半球部Tu解体後に上方から平面視したものである。
下半球部Tdは、赤道部足場Seから下に残されて支持脚Lに支持されており、上半球部Tuが解体されたことでその内側が開放されている。
【0012】
自動切断機Cは、上半球部Tuの解体に使用したものであり、下半球部Tdの内側に、赤道部足場Seと下半球部Tdの底壁部Bとの間にわたって架設されたガイドレールRd上に装備されている。ガイドレールRdは、赤道足場Se側、底壁部B側ともに固定、離脱が簡単に行える構造を有しており、ある箇所の切断を終えたらこれを取り外して次に切断すべき箇所に移動させて設置することが可能である。
【0013】
上記のようにして上半球部Tuおよび下半球部Tdにそれぞれ設置される自動切断機Cを使用し、球形タンクTを解体する工程を説明する。なお、解体は上半球部Tuと下半球部Tdとに分けて実施するものとし、その順序としては、まず上半球部Tuを解体し続いて下半球部Tdを解体する。
【0014】
[1.上半球部Tuの解体]
[1−1.側壁部Wuの切断]
図1に示した自動切断機Cを使用し、頭頂部足場Stとこれが設置された天壁部Pをそのまま残しつつ上半球部Tuを図3のように放射状に切断する。この段階では、上半球部Tuの切れ目は頭頂部足場Stと赤道部足場Seとの間だけに形成され、複数に切り分けられた各側壁部Wuは依然として天壁部Pおよび下半球部Tdに繋がったままの状態となっている。
【0015】
[1−2.側壁部Wuの撤去]
分割された側壁部Wuをひとつずつ撤去していく。このとき、撤去する側壁部Wuを予めクレーンで吊り下げ支持しておき、その側壁部Wuを天壁部Pおよび下半球部Tdから切断分離してタンク本体から完全に切り離し、クレーンで吊り降ろす。この切断分離作業を、タンク本体の重量バランスを崩さないように規則的な順序を検討したうえで、この順序に従って実施し各側壁部Wuを撤去していく。
なお、側壁部Wuと繋がった天壁部P側および下半球部Td側の各部は、作業員が頭頂部足場Stおよび赤道部足場Seに載って手動切断機を操作して切断する。
【0016】
図4(a)に示した数字は、各側壁部Wuおよび天壁部Pの撤去を行う順番を示している。まず、1番から3枚の側壁部Wuを間に挟んで2、3番まで撤去し、次に2枚の側壁部Wuを挟んで4番、3枚分(内1枚は既に撤去済)の側壁部Wuを挟んで5、6番まで撤去し、さらに2枚分(内1枚は既に撤去済)の側壁部Wuを挟んで7番、3枚分(内2枚は既に撤去済)の側壁部Wuを挟んで8、9番まで撤去し、図4(b)の状態まで撤去を終える。
【0017】
[1−3.天壁部Pの撤去]
図4(b)の状態から10番の天壁部Pを撤去する。このとき、側壁部Wuのときと同様に天壁部Pをクレーンで予め吊り下げ支持しておき、その天壁部Pを支持している11、12、13番の側壁部Wuから切断分離してタンク本体から完全に切り離し、クレーンで吊り降ろして図4(c)の状態まで撤去を終える。なお、側壁部Wuと繋がった天壁部P側および下半球部Td側の各部は、作業員が頭頂部足場Stおよび赤道部足場Seに載って手動切断機を操作して切断するが、天壁部P側の切断には危険が伴うので、クレーンとは別に高所作業車を用意してこれに乗って作業を行うのがよい。
【0018】
[1−4.残された側壁部Wuの撤去]
図4(c)の状態から残された11、12、13番の側壁部Wuを撤去する。このとき、撤去する各側壁部Wuを予めクレーンで吊り下げ支持しておき、その側壁部Wuを下半球部Tdから切断分離してタンク本体から完全に切り離し、クレーンで吊り降ろして上半球部Tuの解体を完了する。
【0019】
[2.下半球部Tdの解体]
[2−1.側壁部Wdの切断]
図2に示した自動切断機Cを使用し、タンク本体の底壁部Bをそのまま残しつつ下半球部Tdを図5のように放射状に切断する。この段階では、下半球部Tdの切れ目は赤道部足場Seと底壁部Bとの間だけに形成され、複数に切り分けられた各側壁部Wdは依然として赤道部足場Seおよび底壁部Bに繋がったままの状態となっている。
【0020】
[2−2.側壁部Wdの撤去]
分割された側壁部Wdをひとつずつ撤去していく。このとき、撤去する側壁部Wdを予めクレーンで吊り下げ支持しておき、その側壁部Wdを赤道部足場Seおよび底壁部Bから切断分離してタンク本体から完全に切り離し、クレーンで吊り降ろす。この作業を、タンク本体の重量バランスを崩さないように規則的な順序を検討しこれに従って各側壁部Wdを撤去していく。
なお、側壁部Wdと繋がった赤道部足場Se側および底壁部B側の各部は、作業員が赤道部足場Seおよび地上Gから手動切断機を操作して切断する。
【0021】
図5に示した数字は、各側壁部Wdおよび天壁部Pの撤去を行う順番を示しており、この順番に従って側壁部Wdを撤去し、下半球部Tdの解体を完了する。
【0022】
[3.支持脚Lおよび赤道部足場Seの撤去]
タンク本体の解体を完了した後、図6のように支持脚Lを予めクレーンで吊り下げ支持しておき、その支持脚Lを赤道部足場Seおよび基礎から切断分離してタンクから完全に切り離し、クレーンで吊り降ろす。この作業をすべての支持脚Lについて行って球形タンクTの解体を完了する。
【0023】
上記のようにして球形タンクTの解体を進めれば、自動切断機Cの採用によって上半球部Tuおよび下半球部Tdの切断作業が自動的に行えるようになる。これによって、高所における切断作業の作業性を格段に向上させることができるだけでなく、高所作業そのものを減らしめて解体作業の安全性を高めることができる。
【0024】
また、上半球部Tuの解体に際して、既設の頭頂部足場Stおよび赤道部足場Seを、解体の際の足場として自動切断機Cと併わせて有効に利用するとともに、複数に切り分けられた側壁部Wuおよびその上の天壁部Pの撤去の順番を工夫することで、上半球部Tuの周囲に足場を組み立てなくても解体が進められるようになる。
さらに、下半球部Tdの解体に際しても、既設の赤道部足場Seを解体の際の足場として自動切断機Cと併わせて有効に利用するとともに、複数に切り分けられた側壁部Wdおよびその下の底壁部Bの撤去の順番を工夫することで、下半球部Tdの周囲に足場を組み立てなくても解体が進められるようになる。
これによって、足場の組み立てや球形タンク解体後の足場の撤去に要していた手間と費用を削減することができ、球形タンクTの解体にかかる総費用を大幅に圧縮することができる。
【0025】
なお、上半球部Tuの解体に際して、複数に切り分けられた側壁部Wuおよび天壁部Pの撤去作業は、本実施の形態において説明した順番に厳密に従わなくてもよい。例えば、天壁部Pを支持する側壁部Wuを残すことは必要であるが、それ以外の側壁部Wuの撤去の順は解体を実施する球形タンクTの状態や設置場所等の条件により適宜検討して決定してよい。これは、下半球部Tdの解体に際して複数に切り分けられた側壁部Wdおよび底壁部Bの撤去作業を実施するときも同様である。
【0026】
本実施の形態においては、切断手段としてガスバーナーを備えるガス切断機を採用したが、これに限らず他の切断手段を備える自動切断機Cを採用してもよい。
【0027】
【発明の効果】
以上説明したように、請求項1に記載された球形タンクの解体方法によれば、タンクに既設の頭頂部足場と同じく既設の赤道部足場との間にガイドレールを架設し、このガイドレールに沿って自動切断機を作動させることで、上半球部の側壁部の切断作業が自動的に行えるようになる。これによって、上半球部の解体に際して高所における切断作業の作業性を格段に向上させることができるだけでなく、高所作業そのものを減らしめて解体作業の安全性を高めることができる。
【0028】
請求項2に記載された球形タンクの解体方法によれば、既設の頭頂部足場および赤道部足場を、上半球部解体の際の足場として自動切断機と併わせて有効に利用するとともに、複数に切り分けられた側壁部およびその上の天壁部の撤去の順番を工夫することで、上半球部の周囲に足場を組み立てなくても解体が進められるようになる。これによって、上半球部の解体に際して足場の組み立てや球形タンク解体後の足場の撤去に要していた手間と費用を削減することができ、球形タンクの解体にかかる総費用を大幅に圧縮することができる。
【0029】
請求項3に記載された球形タンクの解体方法によれば、タンクに既設の赤道部足場とタンクの底壁部との間にガイドレールを架設し、このガイドレールに沿って自動切断機を作動させることで、下半球部の側壁部の切断作業が自動的に行えるようになる。これによって、下半球部の解体に際して高所における切断作業の作業性を格段に向上させることができるだけでなく、高所作業そのものを減らしめて解体作業の安全性を高めることができる。
【0030】
請求項4に記載された球形タンクの解体方法によれば、既設の赤道部足場を、下半球部解体の際の足場として自動切断機と併わせて有効に利用するとともに、複数に切り分けられた側壁部およびその下の底壁部の撤去の順番を工夫することで、下半球部の周囲に足場を組み立てなくても解体が進められるようになる。これによって、下半球部の解体に際して足場の組み立てや球形タンク解体後の足場の撤去に要していた手間と費用を削減することができ、球形タンクの解体にかかる総費用を大幅に圧縮することができる。
【図面の簡単な説明】
【図1】 上半球部に自動切断装置を設置した状態を示す側方図である。
【図2】 上半球部解体後の下半球部に自動切断装置を設置した状態を示す平面図である。
【図3】 切断分離後の側壁部を撤去する工程を示す側方図である。
【図4】 複数に切り分けられた側壁部および天壁部の撤去の順番と、その順番に従って解体されていく上半球部の状態を示す説明図である。
【図5】 複数に切り分けられた側壁部および底壁部の撤去の順番を示す説明図である。
【図6】 最後に残った支持脚および赤道部足場を撤去する工程を示す側方図である。
【符号の説明】
T 球形タンク
Tu 上半球部
Td 下半球部
Wu、Wd 側壁部
P 天壁部
B 底壁部
C 自動切断機
Ru、Rd ガイドレール
St 頭頂部足場
Se 赤道部足場[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a method suitable for application when dismantling a spherical tank.
[0002]
[Prior art]
When disassembling the spherical tank, a temporary scaffold that reaches the top of the head is assembled around the spherical tank, and an operator stands on the foothold and cuts the wall that forms the shell of the spherical tank from the top of the head. A method is generally performed in which work is performed and the cut portions are sequentially suspended on the ground using a crane.
[0003]
[Problems to be solved by the invention]
In the conventional dismantling methods as described above, work at high places occupies the majority, so not only the workability is poor, but also the problem that assembly of the scaffold prior to dismantling and removal of the scaffold after dismantling requires a lot of labor and cost. there were.
[0004]
The present invention has been made in view of the above circumstances, and an object of the present invention is to provide an effective dismantling method that minimizes work at height and does not require a scaffold.
[0005]
[Means for Solving the Problems]
As a means for solving the above-described problems, the method for disassembling a spherical tank according to
[0006]
Furthermore, the dismantling method of the spherical tank described in
[0007]
Further, the dismantling method of the spherical tank described in
[0008]
Further, as a method for dismantling the spherical tank described in claim 4, in the method for dismantling the spherical tank described in
[0009]
DETAILED DESCRIPTION OF THE INVENTION
An embodiment of a method for disassembling a spherical tank according to the present invention will be described with reference to FIGS.
Figure 1 is a spherical tank T to be dismantled, side view and an automatic cutter C which is installed in a semi-spherical portion T u on located on the equator to cut the side wall portion W u of the spherical tank T It is a thing.
The spherical tank T is supported by a plurality of support legs L that are erected on the ground G at equal intervals, and these support legs L are joined near the equator of the tank body. In the vicinity of the equator where the support legs L are joined, an equator scaffold Se is installed along the equator so as to surround the periphery of the tank body. Furthermore, a top scaffold Sc is installed in the vicinity of the top of the tank body so as to draw a circle.
[0010]
Automatic cutting machine C is performs a cutting while traveling along a side wall portion W u guide rails R u placed along the cut portion of the upper hemisphere T u, parietal scaffolding S t equator guide rail R u are installed between the scaffolding S e, the automatic cutting machine C on the guide rail R u is equipped with. The guide rail R u parietal scaffolding S t side, the equatorial portion scaffolding S e side both in stationary, withdrawal has easily performed structure, portions to be then cut and remove this After completing the cutting of a portion It is possible to move and install. Further, the automatic cutter C employs a gas cutter equipped with a gas burner as a cutting means.
[0011]
Figure 2 is a lower hemispherical portion T d which is located below the equator of the spherical tank T, and an automatic cutter C for cutting the side wall portion W d is installed in the lower hemisphere T d, the upper hemispherical portion This is a plan view from above after Tu dismantling.
Lower hemisphere portion T d is the equator scaffolding S e is supported by the supporting leg L is left down the inside by the upper hemispherical portion T u is dismantled is open.
[0012]
Automatic cutting machine C is obtained by using the dismantling of the upper hemispherical portion T u, to the inside of the lower hemisphere portion T d, erection over between the bottom wall B of the equator scaffolding S e and a lower hemispherical portion T d Is mounted on the guide rail Rd . The guide rail R d has a structure that can be easily fixed and detached on both the equatorial scaffold Se side and the bottom wall B side. It can be moved and installed.
[0013]
A process of disassembling the spherical tank T using the automatic cutter C installed in the upper hemisphere part Tu and the lower hemisphere part Td as described above will be described. Incidentally, dismantling it shall be carried out divided into the upper hemisphere portion T u and a lower hemispherical portion T d, as is the order, first and subsequently dismantled upper hemisphere portion T u dismantling the lower hemisphere T d.
[0014]
[1. Dismantling of the upper hemisphere part T u]
[1-1. Cutting of the side wall portion W u]
Using an automated cutting machine C shown in FIG. 1, to cut the top portion scaffolding S t and a top wall portion P which this is placed over the hemispherical portion T u radially as shown in Fig. 3 while leaving intact. At this stage, breaks the upper hemisphere T u is formed only between the parietal scaffolding S t and the equatorial portion scaffolding S e, each side wall portion W u diced into a plurality still ceiling wall portion P and the lower hemisphere It remains connected to the part Td .
[0015]
[1-2. Removal of the side wall portion W u]
The divided side wall portions W u are removed one by one. At this time, previously suspended and supported in advance crane sidewall portion W u of removal, completely separated from the tank body was cut separating the side wall portion W u from the top wall portion P and the lower hemisphere T d, a crane Hanging down. This cutting / separating operation is performed in accordance with this order after considering a regular order so as not to break the weight balance of the tank body, and each side wall part W u is removed.
Incidentally, each part of the side wall portion W u and connected with the top wall portion P side and the lower hemispherical portion T d side, cutting operator operates the manual cutting machine rests on top portion scaffolding S t and the equatorial portion scaffolding S e To do.
[0016]
The numbers shown in FIG. 4A indicate the order in which the side wall portions W u and the top wall portion P are removed. First, remove the first to third side walls W u to the second and third, and then remove the second and third side walls W u to the fourth and third sheets (one of which has already been removed) across the side wall portion W u of the closed) was removed to fifth and sixth, further two sheets (one inner already 7th across the side wall portion Wu dismantled already), 3 sheets (two sheets inner already It was removed until 8,9 number across the side wall portion W u of the removed already), completing the removal to the state in Figure 4 (b).
[0017]
[1-3. Removal of top wall P]
The 10th ceiling wall part P is removed from the state of FIG.4 (b). At this time, similarly to the side wall portion W u , the ceiling wall portion P is suspended and supported by a crane in advance, and cut from the 11th, 12th, and 13th sidewall portions W u that support the ceiling wall portion P. Separate and completely separate from the tank body, suspend with a crane and finish removal to the state of FIG. Incidentally, each part of the side wall portion W u and connected with the top wall portion P side and the lower hemispherical portion T d side, cutting operator operates the manual cutting machine rests on top portion scaffolding S t and the equatorial portion scaffolding S e However, since there is a danger in cutting the top wall P, it is preferable to prepare an aerial work vehicle separately from the crane and work on it.
[0018]
[1-4. Removal of the remaining side wall portion W u]
The 11th, 12th, and 13th side wall portions W u remaining from the state of FIG. 4C are removed. Over this time, leave suspended in advance crane the side walls W u to remove the support, completely separated from the tank body was cut separating the side wall portion W u of the lower semi-spherical portion T d, and down hanging by crane complete dismantling of hemispherical unit T u.
[0019]
[2. Demolition of lower hemisphere Td ]
[2-1. Cutting of the side wall portion W d]
Using the automatic cutting machine C shown in FIG. 2, the lower hemisphere Td is cut radially as shown in FIG. 5 while leaving the bottom wall B of the tank body as it is. At this stage, breaks lower hemisphere portion T d is formed only between the equatorial portion scaffolding S e and the bottom wall portion B, each side wall portion W d diced into a plurality still equator scaffolding S e and bottom wall It is in a state of being connected to the part B.
[0020]
[2-2. Removal of the side wall portion W d]
The divided side wall portions W d are removed one by one. At this time, previously suspended and supported in advance crane sidewall portion W d to remove, completely separated from the tank body was cut separating the side wall portion W d of the equator portion scaffolding S e and the bottom wall portion B, and a crane Hanging down. A regular order is examined for this work so as not to break the weight balance of the tank body, and the side wall portions Wd are removed in accordance with this.
Incidentally, each part of the equatorial portion led sidewall portion W d scaffolding S e side and bottom wall portion B side, the worker cuts by operating the manual cutter from the equatorial portion scaffolding S e and ground G.
[0021]
The numbers shown in FIG. 5 indicate the order in which the side wall portions W d and the top wall portion P are removed. In accordance with this order, the side wall portions W d are removed, and the dismantling of the lower hemisphere portion T d is completed.
[0022]
[3. Removal of the support leg L and the equatorial portion scaffolding S e]
After the dismantling of the tank body is completed, the supporting leg L is suspended and supported in advance by a crane as shown in FIG. 6, and the supporting leg L is cut and separated from the equatorial scaffold Se and the foundation and completely separated from the tank. , Suspended with a crane. This operation is performed for all the support legs L to complete the dismantling of the spherical tank T.
[0023]
If the spherical tank T is disassembled as described above, the cutting operation of the upper hemisphere portion Tu and the lower hemisphere portion Td can be automatically performed by employing the automatic cutting machine C. Thereby, not only can the workability of the cutting work at a high place be remarkably improved, but also the safety of the dismantling work can be increased by reducing the work at the high place.
[0024]
Further, when dismantling of the upper hemispherical portion T u, the top portion scaffolding S t and the equatorial portion scaffold Se of the existing, together effectively use this in an automatic cutting machine C and併Align as a scaffold during demolition, was cut into a plurality By devising the order of removal of the side wall portion W u and the top wall portion P above it, the dismantling can proceed without assembling a scaffold around the upper hemispherical portion Tu .
Furthermore, even when dismantling the lower hemisphere portion T d, together effectively use this in an automatic cutting machine C and併Align the equator scaffolding S e of the existing as a scaffold upon disassembly, the side wall portion W d and was cut into multiple By devising the order of removal of the bottom wall portion B below, disassembly can proceed without assembling a scaffold around the lower hemispherical portion Td .
As a result, it is possible to reduce the labor and cost required to assemble the scaffold and remove the scaffold after dismantling the spherical tank, and to greatly reduce the total cost for dismantling the spherical tank T.
[0025]
Note that when dismantling of the upper hemispherical portion T u, dismantling of the side wall portion W u and top wall P which is cut into a plurality may not strictly follow the order described in the present embodiment. For example, it is necessary to leave the side wall portion W u that supports the top wall portion P, but the order of removal of the other side wall portions W u depends on conditions such as the state of the spherical tank T to be disassembled and the installation location. It may be determined by appropriate examination. The same applies to the removal of the side wall portion W d and the bottom wall portion B cut into a plurality of parts when the lower hemisphere portion T d is disassembled.
[0026]
In the present embodiment, the gas cutting machine including the gas burner is employed as the cutting means. However, the present invention is not limited thereto, and an automatic cutting machine C including other cutting means may be employed.
[0027]
【The invention's effect】
As described above, according to the dismantling method of the spherical tank described in
[0028]
According to the method for disassembling a spherical tank according to
[0029]
According to the method for disassembling a spherical tank according to
[0030]
According to the method for disassembling the spherical tank described in claim 4, the existing equatorial scaffold is effectively used in conjunction with an automatic cutting machine as a scaffold for dismantling the lower hemisphere, and is divided into a plurality of parts. By devising the order of removal of the side wall portion and the bottom wall portion below the side wall portion, disassembly can proceed without assembling a scaffold around the lower hemisphere portion. As a result, the labor and cost required to assemble the scaffold and dismantle the scaffold after dismantling the lower hemisphere can be reduced, and the total cost of dismantling the spherical tank can be greatly reduced. Can do.
[Brief description of the drawings]
FIG. 1 is a side view showing a state where an automatic cutting device is installed in an upper hemisphere portion.
FIG. 2 is a plan view showing a state in which an automatic cutting device is installed in the lower hemisphere part after dismantling the upper hemisphere part.
FIG. 3 is a side view showing a step of removing a side wall portion after cutting and separation.
FIG. 4 is an explanatory view showing the order of removing the plurality of side walls and the top wall, and the state of the upper hemisphere that is dismantled according to the order.
FIG. 5 is an explanatory diagram showing an order of removing a side wall portion and a bottom wall portion cut into a plurality of portions.
FIG. 6 is a side view showing a process of removing the last remaining supporting leg and equatorial scaffold.
[Explanation of symbols]
T spherical tank T u hemispherical portion T d under hemispherical portion W u, W d sidewall portion P top wall B bottom wall C automatic cutting machine R u, R d guide rail S t parietal scaffolding S e equator scaffold
Claims (4)
上半球部について、頭頂付近に既設の頭頂部足場と赤道付近に既設の赤道部足場との間に、タンクの側面に沿ってガイドレールを架設し、該ガイドレールに沿って自動切断機を作動させることにより当該上半球部を切断する工程を備える
ことを特徴とする球形タンクの解体方法。When dismantling the spherical tank, the dismantling shall be carried out separately in the upper hemisphere part located above the equator and the lower hemisphere part located below,
For the upper hemisphere, a guide rail is installed along the side of the tank between the existing parietal scaffold near the top of the head and the existing equatorial scaffold near the equator, and an automatic cutter is operated along the guide rail. A method for disassembling a spherical tank, comprising the step of cutting the upper hemisphere by causing the upper hemisphere to cut.
前記頭頂部足場とこれが設置された天壁部をそのまま残しつつ、上半球部を天壁部側から放射状に切断する工程と、
複数に切り分けられた側壁部のうち、天壁部を支持させるものだけを残してその他の側壁部を天壁部および下半球部から切断分離しながらひとつずつ撤去していく工程と、
残された側壁部で支持されている天壁部を撤去する工程と、
天壁部を支持していた側壁部を撤去する工程とを備える
ことを特徴とする球形タンクの解体方法。The method for disassembling a spherical tank according to claim 1,
Cutting the upper hemisphere part radially from the top wall part side, leaving the top part scaffold and the top wall part where it is installed as it is,
The step of removing one by one while cutting and separating the other side wall part from the top wall part and the lower hemisphere part, leaving only the one that supports the top wall part among the plurality of side wall parts cut,
Removing the top wall supported by the remaining side wall;
And a step of removing the side wall portion supporting the top wall portion.
上半球部を解体後の下半球部について、赤道付近に既設の赤道部足場と底壁部との間に、タンクの側面に沿ってガイドレールを架設し、該ガイドレールに沿って自動切断機を作動させることにより当該下半球部を切断する工程を備える
ことを特徴とする球形タンクの解体方法。When dismantling the spherical tank, the dismantling shall be carried out separately in the upper hemisphere part located above the equator and the lower hemisphere part located below,
For the lower hemisphere after dismantling the upper hemisphere, a guide rail is installed along the side of the tank between the existing equator scaffolding near the equator and the bottom wall, and an automatic cutting machine is installed along the guide rail. A method for disassembling the spherical tank, comprising the step of cutting the lower hemisphere portion by actuating.
前記下半球部を底壁部側から放射状に切断する工程と、
複数に切り分けられた各側壁部を赤道部足場から切断分離しながらひとつずつ撤去していく工程とを備える
ことを特徴とする球形タンクの解体方法。The method for disassembling a spherical tank according to claim 3,
Cutting the lower hemisphere part radially from the bottom wall part side;
A method of disassembling the spherical tank, comprising: removing each of the side walls divided into a plurality of pieces while cutting and separating from the equatorial scaffold.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP26757396A JP3750222B2 (en) | 1996-10-08 | 1996-10-08 | Dismantling method of spherical tank |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP26757396A JP3750222B2 (en) | 1996-10-08 | 1996-10-08 | Dismantling method of spherical tank |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH10110543A JPH10110543A (en) | 1998-04-28 |
| JP3750222B2 true JP3750222B2 (en) | 2006-03-01 |
Family
ID=17446671
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP26757396A Expired - Fee Related JP3750222B2 (en) | 1996-10-08 | 1996-10-08 | Dismantling method of spherical tank |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3750222B2 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR101357784B1 (en) | 2013-09-13 | 2014-02-04 | (주)신원이앤씨 | Tank cutting apparatus |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP4978837B2 (en) * | 2007-03-27 | 2012-07-18 | 株式会社石井鐵工所 | How to dismantle the tank |
| JP5291993B2 (en) * | 2008-06-11 | 2013-09-18 | ベステラ株式会社 | Cutting and dismantling of large storage tank |
| CN112144913A (en) * | 2020-08-05 | 2020-12-29 | 中石化宁波工程有限公司 | Large storage tank wall dismantling process |
-
1996
- 1996-10-08 JP JP26757396A patent/JP3750222B2/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR101357784B1 (en) | 2013-09-13 | 2014-02-04 | (주)신원이앤씨 | Tank cutting apparatus |
Also Published As
| Publication number | Publication date |
|---|---|
| JPH10110543A (en) | 1998-04-28 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP3750222B2 (en) | Dismantling method of spherical tank | |
| US20090255104A1 (en) | Simplified generator removal operation for rotor removal of center generator in a single shaft combined cycle machine | |
| JP2012127103A (en) | Demolition method of cylindrical structure | |
| JP4789876B2 (en) | Method and apparatus for disassembling double structure chimney | |
| JPH08270232A (en) | Demolishing method for steel structural building | |
| JP2012052306A (en) | Stack dismantlement method | |
| JP5654419B2 (en) | Tank dismantling method | |
| JP2927321B2 (en) | Dismantling method of large hanging boiler | |
| JPH09268778A (en) | Dismantling method of water-containing gas holder and members used for the method | |
| JPH10299290A (en) | Top removal method and scaffold for removal work of ultra-high tubular structure | |
| JP3806329B2 (en) | Method and apparatus for disassembling cylindrical structure | |
| JP6438931B2 (en) | Temporary column, temporary column installation structure, and roof frame construction method | |
| JP3688655B2 (en) | Method of dismantling tower structure | |
| JP2019206817A (en) | Demolition method for steel tower- supported chimney and demolishing device for steel tower-supported chimney | |
| JPH10159357A (en) | Dismantling method of the tank installed on the ground | |
| JP2948433B2 (en) | Dismantling method of steel freestanding chimney | |
| JP2014047587A (en) | Simultaneous boiler demolition method of boiler and boiler building | |
| JP5291993B2 (en) | Cutting and dismantling of large storage tank | |
| CN113279606A (en) | Brick-concrete wall packaging and dismantling mechanism and method | |
| JPH11159155A (en) | Temporary column support device, boiler and method of dismantling boiler building | |
| JP3971859B2 (en) | Tank side plate dismantling method | |
| JPH11201404A (en) | Dismantling method of boiler and boiler building | |
| KR101733933B1 (en) | Temporary working plate for chimney demolishing and construction method of this temporary working plate and chimney demolishing method | |
| JP5654398B2 (en) | Chimney dismantling method | |
| JP5255912B2 (en) | Dismantling method of boiler and boiler building |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20051107 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20051115 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20051128 |
|
| S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
| S533 | Written request for registration of change of name |
Free format text: JAPANESE INTERMEDIATE CODE: R313533 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20081216 Year of fee payment: 3 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| LAPS | Cancellation because of no payment of annual fees |