JP3752082B2 - Fabric foundation construction method - Google Patents
Fabric foundation construction method Download PDFInfo
- Publication number
- JP3752082B2 JP3752082B2 JP23840198A JP23840198A JP3752082B2 JP 3752082 B2 JP3752082 B2 JP 3752082B2 JP 23840198 A JP23840198 A JP 23840198A JP 23840198 A JP23840198 A JP 23840198A JP 3752082 B2 JP3752082 B2 JP 3752082B2
- Authority
- JP
- Japan
- Prior art keywords
- footing
- concrete
- groove
- foundation
- spacer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000004744 fabric Substances 0.000 title claims description 22
- 238000010276 construction Methods 0.000 title claims description 18
- 239000002689 soil Substances 0.000 claims description 35
- 239000002699 waste material Substances 0.000 claims description 23
- 125000006850 spacer group Chemical group 0.000 claims description 14
- 238000009415 formwork Methods 0.000 claims description 9
- 238000000034 method Methods 0.000 description 15
- 238000000465 moulding Methods 0.000 description 8
- 238000010586 diagram Methods 0.000 description 5
- 241001070941 Castanea Species 0.000 description 3
- 235000014036 Castanea Nutrition 0.000 description 3
- 239000011230 binding agent Substances 0.000 description 2
- 229920006248 expandable polystyrene Polymers 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 238000002360 preparation method Methods 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 230000007547 defect Effects 0.000 description 1
- 230000000994 depressogenic effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000001771 impaired effect Effects 0.000 description 1
Images
Landscapes
- Foundations (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、建物の布基礎の施工方法に関し、特に掘削土の処理及び土間コンクリートの施工手順に改良を加えたものである。
【0002】
【従来の技術】
従来より、建物の布基礎の施工方法として、次のようなものが公知である。
(1)ショベルカーや手掘りによってフーチング幅よりも幅広の溝1を掘削し、割栗2、捨てコンクリート3を施工する。このとき、後で埋戻しに使用するため、掘削土4の大部分は溝1の両脇に盛り上げておく(図4(a)参照)。
(2)鉄筋5を配するとともに、治具6(特開平8−105060号公報参照)を用いて捨て型枠7を建込む(同(b)参照)。
(3)捨て型枠7の内側にコンクリートを打設し、フーチング8と基礎梁9を一体に形成する(同(c)参照)。
(4)一定期間の養生後、フーチング8の上に掘削土4を埋戻し、その上面を平坦に均す(同(d)参照)。
(5)土間コンクリート10を施工する(同(e)参照)。
【0003】
【発明が解決しようとする課題】
しかしながら、かかる布基礎の施工方法には、次のような問題がある。
(1)掘削土4が盛り上げられた溝1の両脇は作業通路となるため、配筋や捨て型枠7の建込み、コンクリート打設等を行う作業者の足場が悪く、危険であるともに工事進行の妨げとなる。
(2)作業者が作業通路を歩行したり、捨て型枠7の建込みやコンクリート打設等の作業を行うことにより溝1の両脇に盛り上げられた掘削土4が崩れ、捨て型枠7の内側や養生中のコンクリート中に掘削土4が混入するため、これを排除するために工事の後戻りが必要となったり、フーチング8の断面欠損が生じて所定の品質を確保できなくなったりすることがある。
(3)フーチング8のコンクリート打設終了後は一定期間の養生を行わなければならないため、フーチング8の上にすぐに掘削土4を被せることはできず、その間は工事の手待ち状態となる。
【0004】
そこで、本発明は、上記問題点に鑑み、掘削した溝の脇の足場がよくて崩れない、しかも布基礎のコンクリート打設終了後すぐの土間コンクリートの施工が可能な布基礎の施工方法を提供することにより、工期短縮及び品質確保を図ることを目的とする。
【0005】
すなわち、請求項1記載の発明は、布基礎用の溝を掘削した後、フーチングと基礎梁を形成するための捨て型枠を建込み、この捨て型枠の内側にコンクリートを打設して断面凸形の布基礎を構築する工法において、前記捨て型枠のうちフーチング側面に係るものがその天端を埋戻しレベルとした土留め壁を兼ね、この土留め壁の天端をゲージとして、前記溝の脇に盛り上げた掘削土を埋戻しレベルにて平坦化するとともに、フーチングのコンクリート打設後その硬化前に、埋め殺し可能なスペーサーであってその上面を埋戻しレベルとしたものを当該フーチング上に敷設し、このスペーサーの上面及び前記溝の脇の平坦化された地盤の上面にわたり土間コンクリートを打設することを特徴とする布基礎施工方法である。
【0006】
このようにフーチング側面に係る捨て型枠の天端が埋戻しレベルまで達して土留め壁の役割をも果たすことにより、溝の脇に盛り上げた掘削土が崩れることがなくなって安全性が向上するとともに、捨て型枠の内側に掘削土が混入することもなくなって工事の円滑化及び品質の確保を図ることができる。また、捨て型枠の天端をゲージとして利用して溝の脇に盛り上げた掘削土を埋戻しレベルにて平坦化することにより、作業者がその上を作業用通路として歩行しやすくなり安全性が向上するとともに、後で土間コンクリートを打設するための準備が整って省施工化を図ることができる。
また、このようにフーチングのコンクリートが硬化する前であっても、その上面にスペーサーを敷設してその上面を埋戻しレベルとすれば、前記溝の脇の平坦化された地盤の上面も既に埋戻しレベルとなっているから、手待ちとなることなく布基礎コンクリート打設後すぐに土間コンクリートを施工することができ、工期短縮を図ることができる。
【0009】
さらに、請求項2記載の発明は、請求項1記載の発明において、前記スペーサーが廃材を再利用した複数の成形ブロックからなることを特徴とする。
【0010】
このようにスペーサーを廃材再利用品とすることにより資源の有効利用を図ることができ、また、複数の成形ブロックでスペーサーを構成することにより運搬が容易となって施工性がよくなる。
【0011】
【発明の実施の形態】
以下、添付図面に基づき、本発明の実施の形態を詳細に説明する。なお、説明において、同一要素には同一符号を用い、重複する説明は省略する。
【0012】
図1は、本発明に係る布基礎施工方法の一実施形態を説明するための工程図であり、従来の布基礎施工方法を説明するための工程図である図4と比較しやすいように各工程を対応させて表したものである。以下、同図を参照しつつ工程順に説明を行う。
【0013】
(1)まず、従来と同様にして、ショベルカーや手掘りによってフーチング幅よりも幅広の溝1を掘削し、割栗2、捨てコンクリート3を施工する。このとき、後で埋戻しに使用するため、掘削土4の大部分は溝1の脇に盛り上げておく(図1(a)参照)。
【0014】
(2)次に、鉄筋5を配するとともに、治具6を用いて捨て型枠7を建込み、溝1の両脇の掘削土4を均して当該地盤上を平坦化する(同(b)参照)。ここで捨て型枠7は、粉砕した発泡スチロール等の廃材をつなぎ材を挟んで再成形したものであって、充分な強度を維持しつつも安価なものであり、基礎梁9の両側面を挟持する捨て型枠7a,7bと、フーチング8の両側面を挟持する捨て型枠7c,7dとから構成されている。そして、捨て型枠7a〜7cは従来と同様の寸法を有するものであるが、捨て型枠7dは従来のものと異なり、建込んだときにその天端が埋戻しレベルまで達するような高さを有している。このように捨て型枠7dの高さをフーチング8のコンクリート打設の際のせき板として要求される高さ以上に大きくしたのは、この捨て型枠7dが溝1の脇に盛り上げた掘削土4の土留め壁としての役割をも担っているからである。したがって、土留め壁としての役割を果たす限りにおいては、捨て型枠7dの天端は埋戻しレベルより高くなっていればよいのであるが、ここでは捨て型枠7dの天端を埋戻しレベルと等しい高さとしている。これは、捨て型枠7dの天端をゲージとして溝1の脇に盛り上げた掘削土4を埋戻しレベルにて平坦化し、後でその上に土間コンクリート10を打設するためである。なお、ここでは捨て型枠7cについては従来同様のものを用いたが、これについても捨て型枠7dと同様のものにしてもよい。すなわち、捨て型枠7c,7dはいずれも、フーチング8の側面高さ以上であり、かつ、各埋戻しレベルと等しい高さのものであればよい。
【0015】
また、治具6は布基礎のフーチング8と基礎梁9とにコンクリートを一体に打設するためのものであり、従来より公知である(図2参照)。ただし、本発明においては必ずしもフーチング8と基礎梁9とにコンクリートを一体に打設するためのものでなくとも、捨て型枠7を所定位置に設置できるものであればよい。
【0016】
(3)そして、捨て型枠7の内側にコンクリートを打設し、フーチング8と基礎梁9を一体に形成する(同(c)参照)。この工程も従来と同様に行うものであるが、本発明においては必ずしもフーチング8と基礎梁9を一体に形成する必要はない。なお、コンクリートを打設する作業員は、溝1の両脇に盛り上げた掘削土4の上面を作業用通路として歩行することになるが、前工程においてこれが平坦化されているため、安全性が高く、作業性がよい。
【0017】
(4)次に、フーチング8の打設コンクリートがまだ硬化しない状態で、フーチング8の上に廃材再成形ブロック11を敷き並べる(同(d)参照)。打設コンクリートがまだ硬化しない状態で行うのは、養生の期間を省いて工期短縮を図るためである。また、ここでは前工程においてフーチング8と基礎梁9に一体にコンクリートを打設した後、フーチング8の上に廃材再成形ブロック11を敷き並べているが、フーチング8のみについてコンクリートを打設し、フーチング8の上に廃材再成形ブロック11を敷き並べた後、基礎梁9にコンクリートを打設する手順をとってもよい。そして、この廃材再成形ブロック11は、その上面が埋戻しレベルと同じ高さになっており、本工程完了後に埋戻しレベルで平坦な土間コンクリート10を施工すべく地盤面を嵩上げする、いわゆるスペーサーの役割を果たす。したがって、ここでは埋戻しレベルの低い(フーチング8の天端と同レベル)紙面左側のフーチング8上には廃材再成形ブロック11を敷き並べない。
【0018】
また、廃材再成形ブロック11は、粉砕した発泡スチロール等の廃材をつなぎ材を挟んで再成形したブロックであり、充分な強度を維持しつつも安価なものであり、省資源化の要請に沿うものである。また、廃材再成形ブロック11は作業者が楽に持ち運びできる大きさと重さとしてあるため、作業性は良好である。ここで、廃材再成形ブロック11をフーチング8の上に敷き並べる様子を図3(a)に表す。同図に表したように作業者は、一の廃材再成形ブロック11をフーチング8上に載置すると、次はその上に乗って次の一の廃材再成形ブロック11を載置する。このようにして埋戻しレベルで平坦な土間コンクリート10を打設することができるようになるまで、複数個の廃材再成形ブロック11,11,…を次々にフーチング8上に敷き並べていく。この作業が完了した状態を表したものが図3(b)である。同図に示したように、敷き並べられた複数個の廃材再成形ブロック11,11,…の間隙には、次工程で打設する土間コンクリート10が入り込んで、フーチング8、廃材再成形ブロック11、土間コンクリート10が強固に一体化することになる。
【0019】
なお本発明においては、廃材再成形ブロック11を別のものに変更してもよく、例えばコンクリートブロック等で代替することも考えられる。しかし、あまり重量の大きなものであると布基礎の重量バランスが崩れ、構造上好ましくない。当該部分をコンクリートの増し打ちとした場合も同様である。また、本発明における廃材再成形ブロック11は、上記要件の他に埋め殺し可能なものであることも必要である。埋め殺して腐敗するような材質のスペーサーでは、後で土間コンクリート10が陥没してしまうからである。
【0020】
(5)最後に、埋戻しレベルで土間コンクリート10を施工する(同(e)参照)。埋戻しレベルの平坦面は前記(2)及び(4)の工程で完成しているため、本工程は従来同様に行えばよい。
【0021】
以上、本発明の一実施形態について説明を行ったが、本発明はこれに限られず、各工程においてその機能を損なうものでないことを条件として、各部について適宜変更可能である。例えば、布基礎の左右脇の埋戻しレベルの設定や配筋の態様、廃材再成形ブロックの材質、大きさ等については、本実施形態において説明したものに拘泥されず、適宜設計条件等に適合させて実施すればよい。
【0022】
【発明の効果】
以上説明したように、請求項1記載の発明によれば、フーチング側面に係る捨て型枠の天端が埋戻しレベルまで達して土留め壁の役割をも果たすことにより、溝の脇に盛り上げた掘削土が崩れることがなくなって安全性が向上するとともに、捨て型枠の内側に掘削土が混入することもなくなって工事の円滑化及び品質の確保を図ることができる。また、捨て型枠の天端をゲージとして利用して溝の脇に盛り上げた掘削土を埋戻しレベルにて平坦化することにより、作業者がその上を作業用通路として歩行しやすくなり安全性が向上するとともに、後で土間コンクリートを打設するための準備が整って省施工化を図ることができる。
また、フーチングのコンクリートが硬化する前であっても、その上面にスペーサーを敷設してその上面を埋戻しレベルとすることによって、前記溝の脇の平坦化された地盤の上面も既に埋戻しレベルとなっているから、手待ちとなることなく布基礎コンクリート打設後すぐに土間コンクリートを施工することができ、工期短縮を図ることができる。
【0024】
さらに、請求項2記載の発明によれば、スペーサーを廃材再利用品とするので資源の有効利用を図ることができ、また、複数の成形ブロックでスペーサーを構成するので運搬が容易となって施工性がよくなる。
【図面の簡単な説明】
【図1】本発明に係る布基礎施工方法の一実施形態を説明するための工程図である。
【図2】図1(b)に示した治具の詳細を表した斜視図である。
【図3】図1(d)の工程を説明するための図であって、(a)は廃材再成形ブロックを敷設する作業の様子を表す斜視図、(b)はその作業が完了した状態を表す斜視図である。
【図4】従来の布基礎施工方法を説明するための工程図である。
【符号の説明】
1 … 溝
2 … 割栗
3 … 捨てコンクリート
4 … 掘削土
5 … 鉄筋
6 … 治具
7 … 捨て型枠
8 … フーチング
9 … 基礎梁
10 … 土間コンクリート
11 … 廃材再成形ブロック[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a method for constructing a fabric foundation of a building, and more particularly to an improvement in the excavated soil treatment and the soil concrete construction procedure.
[0002]
[Prior art]
Conventionally, the following methods are known as construction methods for building fabric foundations.
(1) Excavate a
(2) The
(3) Concrete is cast inside the discard mold 7 to integrally form the
(4) After curing for a certain period, the excavated
(5) The
[0003]
[Problems to be solved by the invention]
However, the construction method of such a fabric foundation has the following problems.
(1) Since both sides of the
(2) The excavated
(3) Since it is necessary to perform curing for a certain period after the concrete placement of the
[0004]
Accordingly, in view of the above problems, the present invention provides a method for constructing a fabric foundation that can be applied to soil concrete immediately after finishing the concrete placement of the fabric foundation, because the scaffolding beside the excavated groove is good and does not collapse. The purpose is to shorten the work period and ensure the quality.
[0005]
That is, according to the first aspect of the present invention, after excavating a groove for a fabric foundation, a discarded mold for forming a footing and a foundation beam is built, and concrete is placed inside the discarded mold to obtain a cross section. In the construction method of constructing a convex fabric foundation, the thing related to the footing side of the abandoned formwork also serves as a retaining wall with the top end as a backfill level, and the top end of the retaining wall as a gauge, The excavated soil that has been raised beside the groove is flattened at the backfill level , and after the concrete is placed on the footing and before it is hardened, it is a spacer that can be buried and its top surface is backfilled. It is a cloth foundation construction method characterized in that it is laid on the top surface and soil concrete is placed over the upper surface of the spacer and the flattened ground surface beside the groove .
[0006]
In this way, the top end of the abandoned formwork on the side of the footing reaches the backfill level and also serves as a retaining wall, so that the excavated soil raised on the side of the groove will not collapse and safety is improved. At the same time, the excavated soil is not mixed inside the abandoned formwork, thereby facilitating the construction and ensuring the quality. In addition, the excavated soil raised beside the groove is flattened at the backfill level using the top edge of the abandoned formwork as a gauge, making it easier for workers to walk on it as a work passage. In addition, the preparation for placing concrete in the soil later is complete and the construction can be saved.
Even before the footing concrete is hardened in this way, if the spacer is laid on the upper surface and the upper surface is set to the backfill level, the upper surface of the flattened ground beside the groove is already buried. Since it is at the return level, it is possible to construct the soil concrete immediately after placing the foundation of the fabric without waiting, and to shorten the work period.
[0009]
Further, the invention described in
[0010]
Thus, by making the spacer a waste material reuse product, it is possible to effectively use resources, and by constructing the spacer with a plurality of molding blocks, transportation becomes easy and workability is improved.
[0011]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings. In the description, the same reference numerals are used for the same elements, and redundant descriptions are omitted.
[0012]
FIG. 1 is a process diagram for explaining an embodiment of a fabric foundation construction method according to the present invention, and is easy to compare with FIG. 4 which is a process diagram for explaining a conventional fabric foundation construction method. The process is shown correspondingly. Hereinafter, it demonstrates in order of a process, referring the same figure.
[0013]
(1) First, in the same manner as in the prior art, a
[0014]
(2) Next, the
[0015]
The
[0016]
(3) Then, concrete is cast inside the discarded mold 7 to form the
[0017]
(4) Next, the waste material re-forming blocks 11 are laid on the
[0018]
In addition, the waste
[0019]
In the present invention, the waste
[0020]
(5) Finally, the
[0021]
As mentioned above, although one Embodiment of this invention was described, this invention is not restricted to this, It can change suitably about each part on the condition that the function is not impaired in each process. For example, the setting of the backfill level on the left and right sides of the fabric foundation, the arrangement of reinforcement, the material and size of the waste material re-molding block are not limited to those described in this embodiment, and appropriately meet the design conditions etc. It can be done.
[0022]
【The invention's effect】
As described above, according to the first aspect of the present invention, the top end of the discarded form frame on the footing side surface reaches the backfill level and also functions as a retaining wall, so that it is raised to the side of the groove. The excavated soil will not collapse and safety will be improved, and excavated soil will not be mixed inside the discarded formwork, thereby facilitating the construction and ensuring the quality. In addition, the excavated soil raised beside the groove is flattened at the backfill level using the top edge of the abandoned formwork as a gauge, making it easier for workers to walk on it as a work passage. In addition, the preparation for placing concrete in the soil later is complete and the construction can be saved.
Even before the concrete of the footing is hardened, the upper surface of the flattened ground beside the groove is already at the backfill level by laying a spacer on the top surface and setting the top surface to the backfill level. Therefore, it is possible to construct the soil concrete immediately after placing the fabric foundation concrete without waiting, and the construction period can be shortened.
[0024]
Furthermore, according to the invention described in
[Brief description of the drawings]
FIG. 1 is a process diagram for explaining one embodiment of a fabric foundation construction method according to the present invention.
FIG. 2 is a perspective view showing details of the jig shown in FIG.
3A and 3B are diagrams for explaining the process of FIG. 1D, wherein FIG. 3A is a perspective view showing a state of work for laying a waste material re-forming block, and FIG. 3B is a state in which the work is completed; FIG.
FIG. 4 is a process diagram for explaining a conventional cloth foundation construction method.
[Explanation of symbols]
DESCRIPTION OF
Claims (2)
前記捨て型枠のうちフーチング側面に係るものがその天端を埋戻しレベルとした土留め壁を兼ね、この土留め壁の天端をゲージとして、前記溝の脇に盛り上げた掘削土を埋戻しレベルにて平坦化するとともに、
フーチングのコンクリート打設後その硬化前に、埋め殺し可能なスペーサーであってその上面を埋戻しレベルとしたものを当該フーチング上に敷設し、このスペーサーの上面及び前記溝の脇の平坦化された地盤の上面にわたり土間コンクリートを打設することを特徴とする布基礎施工方法。After excavating the groove for the fabric foundation, constructing a fabric foundation with a convex section by laying concrete inside the discarded mold frame to build a footing and a foundation beam. ,
Of the abandoned formwork, the one related to the footing side also serves as a retaining wall with the top edge as the backfill level, and the top edge of the retaining wall is used as a gauge to refill the excavated soil raised beside the groove with flattening at the level,
After the concrete placement of the footing and before its hardening, a spacer that can be buried and whose upper surface is the backfill level was laid on the footing, and the upper surface of this spacer and the side of the groove were flattened. A cloth foundation construction method characterized by placing soil concrete over the upper surface of the ground .
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP23840198A JP3752082B2 (en) | 1998-08-25 | 1998-08-25 | Fabric foundation construction method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP23840198A JP3752082B2 (en) | 1998-08-25 | 1998-08-25 | Fabric foundation construction method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2000064300A JP2000064300A (en) | 2000-02-29 |
| JP3752082B2 true JP3752082B2 (en) | 2006-03-08 |
Family
ID=17029663
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP23840198A Expired - Fee Related JP3752082B2 (en) | 1998-08-25 | 1998-08-25 | Fabric foundation construction method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3752082B2 (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP6442725B2 (en) * | 2014-10-17 | 2018-12-26 | 大和ハウス工業株式会社 | Embankment structure for embankment and integrated foundation between soil and foundation |
| JP2016125220A (en) * | 2014-12-26 | 2016-07-11 | フクビ化学工業株式会社 | Building foundation |
| JP7412249B2 (en) * | 2020-03-30 | 2024-01-12 | 大和ハウス工業株式会社 | Construction method of building entrance structure |
-
1998
- 1998-08-25 JP JP23840198A patent/JP3752082B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JP2000064300A (en) | 2000-02-29 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP3752082B2 (en) | Fabric foundation construction method | |
| JP2769936B2 (en) | Construction method of beams and slabs in underground skeleton construction | |
| JP7112635B1 (en) | U-shaped throwaway formwork for rising foundations of buildings | |
| JP2020197015A (en) | Construction method of foundation | |
| CN114108671A (en) | Construction method of shallow foundation | |
| CN114991015B (en) | Viaduct bearing platform construction method and bearing platform template used by same | |
| JP3230448B2 (en) | Construction method of building foundation on cohesive ground | |
| JPH0665973A (en) | Construction method of reinforced concrete structures such as foundations and walls and the structures | |
| JPH08177059A (en) | Foundation block and cloth foundation integration method using this foundation block | |
| CN223482362U (en) | First layer reinforced concrete stand plate structure | |
| JP3343598B2 (en) | Hanging wall type retaining wall method for lightweight embankment method | |
| JP4170955B2 (en) | Construction method of concrete structure using residual formwork and soil concrete | |
| JP3059058U (en) | Solid foundation structure with stabilizer | |
| JP7722743B1 (en) | Structure including ground improvement body and precast concrete plate, and construction method thereof | |
| JPH10299003A (en) | Foundation method using precast concrete members | |
| JP7721956B2 (en) | Construction method and earthen floor structure | |
| JP7149924B2 (en) | Level plate and foundation construction method | |
| JP2002356858A (en) | Foundation | |
| JPH03228921A (en) | Execution method for concrete foundation work | |
| WO2023175836A1 (en) | Method for constructing foundation of structure | |
| JP3281347B2 (en) | Underground structure construction method | |
| JP2824374B2 (en) | Concrete block for foundation, manufacturing method thereof, and foundation construction method using the same | |
| JPH1088567A (en) | Building ground improvement method and building foundation construction method | |
| JP4119315B2 (en) | Construction method of independent foundation | |
| JP2000170178A (en) | Construction method for building foundation |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20050217 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20050511 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20050711 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20051130 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20051209 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20081216 Year of fee payment: 3 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20091216 Year of fee payment: 4 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20101216 Year of fee payment: 5 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20101216 Year of fee payment: 5 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111216 Year of fee payment: 6 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111216 Year of fee payment: 6 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20121216 Year of fee payment: 7 |
|
| LAPS | Cancellation because of no payment of annual fees |