JP3752345B2 - Casing construction method - Google Patents
Casing construction method Download PDFInfo
- Publication number
- JP3752345B2 JP3752345B2 JP04512397A JP4512397A JP3752345B2 JP 3752345 B2 JP3752345 B2 JP 3752345B2 JP 04512397 A JP04512397 A JP 04512397A JP 4512397 A JP4512397 A JP 4512397A JP 3752345 B2 JP3752345 B2 JP 3752345B2
- Authority
- JP
- Japan
- Prior art keywords
- casing
- mud
- pipe
- construction method
- built
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
- Earth Drilling (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、地中に鋼管杭やPC杭等のケーシングを建て込んで、強固な側壁により立杭を構築し、あるいは強固な基礎杭を構築するためのケーシングの建込工法に関する。
【0002】
【従来の技術】
この種のケーシングの建込工法としては、従来より例えば図5に示す工法(以下「従来例1」という)、あるいは図6に示す工法(以下「従来例2」という)が知られている。ここで、図4は従来例1で用いられるチュービング装置の概要図、図5(A)〜(D)は従来例1によるケーシングの建込工法の工程図、図6(A)(B)は従来例2によるケーシングの建込工法の概要図である。
【0003】
まず、上記従来例1を図4及び図5に基づいて概説する。
上記チュービング装置50は、チャック51を構成するクサビ52及びコーンリング53と、上記クサビ52を着脱操作するチャックシリンダ54と、上記チャック51を搭載する昇降フレーム55と、上記昇降フレーム55に搭載され、コーンリング53を介してケーシング1を旋回駆動する油圧モータ56と、上記昇降フレーム55を昇降駆動する4つの昇降シリンダ57と、上記昇降シリンダ57を搭載する基台58と、上記基台58を水平に支持する水平ジャッキ59とから構成されている。以下、この従来例1によるケーシングの建込工法について説明する。
【0004】
据付工程〔図5(a)〕では、チュービング装置50を立込位置に据え付けて第1番目のケーシング1を旋回させて挿入テストをする。なお、第1番目のケーシング1の下端には掘削用ビットが付設されている。挿入工程〔図5(b)〕では、地中の目標深さまでケーシング1を旋回しながら挿入する。排土工程〔図5(c)〕では、ハンマグラプ60をケーシング1内に挿入して内部の掘削土を地上に排出する。コンクリート打設工程〔図5(c)〕では、ケーシング1内に鉄筋カゴ61を挿入した後、コンクリート62を打設し、その後ケーシング1を旋回しつつ引き抜く。このようにして地中に基礎杭を造成する。
【0005】
次に、従来例2によるケーシングの建込工法を図6に基づいて説明する。
この従来例2は、図6(A)に示すように、ケーシング1の上端にバイブロハンマ101を取り付け、ケーシング1内に複数のジェットパイプ102を設け、各ジェットパイプ102にウォータジェットポンプ103を接続し、ジェットパイプ102の下端部の噴射ノズルよりウォータジェットを下向きに噴射させながらバイブロハンマ101を稼働させて上記ケーシング1を目標深さまで建て込む工法である。なお、目標深度が深い場合にはケーシング1は溶接により、また、ケーシング1内のジェットパイプ102はねじ込みにより、それぞれ複数個継ぎ足して行く。そして、目標深さまでケーシング1の建て込みが終了したなら、バイブロハンマ101を取り外し、ケーシング1内のジェットパイプ102を引き抜く。このようにして順次ケーシングの建て込みを行い、地中に基礎杭あるいは立杭を構築する。
【0006】
【発明が解決しようとする課題】
上記従来例1では、大型のチュービング装置50を用いてケーシングを建て込むため、消費エネルギーも多くなるとともに、ハンマグラプ60をケーシング1内に挿入して内部の掘削土を地上に排出するため、ケーシングの挿入及び排土に手間取り、施工費用も高くつく。
【0007】
一方、上記従来例2においては、バイブロハンマを用いることから振動や騒音が問題になり、市街地周辺ではこの工法は採用し難い面がある。しかも、下向きに噴射するウォータジェットで地盤を掘削するので、ケーシングが大きくなればそれだけ多くのジェットパイプ及び噴射ノズルが必要となるため、これに伴って消費エネルギーも増大する。
【0008】
さらに、従来例2におけるウォータジェットポンプは、泥水中の粒子によりプランジャーやプランジャーパッキンが直ちに消耗して使用不能に陥ることから、ベントナイト泥水等の安定液を使用することはもとより当該安定液を循環使用することもできないため、多量の水を使用することとなり、ひいては多量の泥醤が生ずるため、その排泥処理が高くつくという問題がある。
【0009】
しかも、従来例2による工法では、掘削に水を使用するためケーシングの建て込みが終了した状態では、図6(B)に示すように、ケーシング内に多量の水と沈下した土砂とが分離した状態で残留する。このケーシング内を例えば立杭として利用する場合には、上記水と土砂を取り除いて根固めをする必要があるが、ケーシングの根固め位置が地下水位よりも深い場合には水と土砂を取り除くとボイリングが発生する。そこで別途打設管を建て込んで硬化材を注入することになるが、沈下した土砂が邪魔になるため、根固めをするのが容易でない。
【0010】
本発明はこのような事情を考慮してなされたもので、
[1] 消費エネルギーを少なくし、併せて施工費用の低減をはかること、
[2] 市街地周辺でも採用できるように振動や騒音の問題を解消すること、
[3] 排出される泥醤から安定液を分離して循環使用できるようにして、排泥処理費用を低減すること、
[4] 地下水位よりも深い場合においても容易にケーシングの根固めをできるようにすること、
を技術課題とする。
【0011】
【課題を解決するための手段】
上記課題を解決するために、本発明は以下のように構成される。
即ち、請求項1に記載の発明は、ケーシング1の底面を底板1bで封止し、上記ケーシング(1)の中央部に噴射管2を設けるとともに上記ケーシング(1)内に排泥管(8)を設け、上記噴射管5の上部に組み付けたスイベル3から安定液WとエアーAを高圧で注入し、上記底板1bを貫通する上記噴射管2の下部に組み付けた噴射機構4から安定液WとエアーAを連続的に噴射させ、上記噴射管2を旋回駆動しながらケーシング1の自重で一体に下降させることにより、上記噴射機構4から連続的に噴射する安定液WとエアーAの旋回噴流でその周囲の地盤を切削するとともに、切削泥醤Hを上記底板(1b)の下側に下端開口(8b)を臨ませた上記排泥管(8)を介してケーシング1内を通して地上へ排出し、かつ、上記ケーシング(1)内に水を入れて該ケーシング(1)に作用する浮力と該ケーシング(1)内へ入れた水の重量とをバランスさせながらその切削域(S)にケーシング(1)を建て込む、ことを特徴とするケーシングの建込工法である。ここで安定液とは、たとえばベントナイト泥水、ポリマー安定液、泥水(清水の中に掘削粘土・シルト分を含む)等を包括する概念である。
【0012】
請求項2に記載の発明は、請求項1に記載したケーシングの建込工法において、ケーシング(1)の建て込み後、硬化材(G)を注入することにより、前記切削域(S)に建て込んだケーシング(1)の低部(1d)を根固めする、ことを特徴とするケーシングの建込工法である。
【0013】
【0014】
【発明の作用・効果】
(イ)請求項1に記載の発明では、噴射管2を旋回駆動しながらケーシング1の自重で一体に下降させることにより、噴射機構4から連続的に噴射する安定液WとエアーAの旋回噴流でその周囲の地盤を切削し、その切削域Sにケーシング1を建て込むことから、大型のチュービング装置を用いる必要がないので、消費エネルギーも少なく、ケーシングの挿入が容易で、施工費用の低減を図ることができる。
【0015】
(ロ)しかも、請求項1に記載の発明では、噴射機構4から連続的に噴射する安定液WとエアーAの旋回噴流でその周囲の地盤を切削し、その切削域Sにケーシング1を自重で下降させて建て込むことから、従来例2のようにバイブロハンマを用いる必要がなく、振動や騒音が問題になることもないので、市街地周辺でも本発明によるケーシングの建込み工法を採用し得る。
【0016】
(ハ)請求項2に記載の発明では、請求項1に記載したケーシングの建込工法において、上記ケーシング(1)の建て込み後、硬化材(G)を注入することにより、前記切削域(S)に建て込んだケーシング(1)の低部(1d)を根固めすることから、地下水位よりも深い場合においてもボイリングの影響もなく、容易にケーシングの根固めをすることができる。
【0017】
【0018】
【発明の実施の形態】
以下本発明の実施の形態を図面に基づいてさらに詳しく説明する。
図1(A)は図2中の掘削・建込工程(b)の取り出し図、図1(B)は図1(A)中のケーシングの上部の平面図、図1(C)は図1(A)中の軸支部Cの拡大図、図2は本発明の第1の実施形態に係るケーシングの建込手順を例示する工程図である。本発明に係るケーシングの建込装置は、噴射管2と、この噴射管2を保持する油圧チャック5と、油圧チャック5を解して噴射管2を旋回させる油圧モータ6と、安定液Wの供給装置7と、図示しない高圧エアー供給装置及び硬化材供給装置と、切削泥醤Hを地上へ排出する排泥管8と、排泥用ポンプ9と、マッドスクリーン10と、安定液W用の泥水タンク11とを備える。なお、この実施形態では、安定液Wとしてベントナイト泥水が用いられる。
【0019】
この実施形態は、目標深度が比較的深い場合に適用され、上記ケーシング1は直径が略1500〜3000mmで、その底面が底板1bで封止されている。これは地中に当該ケーシング1を建て込んだ後には主に立杭として用いられるため、ケーシング1内に切削泥醤Hが侵入するのを防止するためである。また、上記噴射管2は上記底板1bを貫通する状態でケーシング1の中央部に旋回可能に設けられ、図1(C)に示すように、底板1bの軸支部Cはゴムパッキン1cで封止されている。そしてこの噴射管2は上部に組み付けたスイベル3から安定液WとエアーAを高圧で注入し、噴射管2の下部に組み付けた噴射機構4から安定液WとエアーAを水平に連続的に噴射させるとともに、安定液Wを垂直に噴射させるように構成されている。
【0020】
上記油圧チャック5と油圧モータ6は、ケーシング1の上端面に固設されたベース1a上に設けられ、油圧チャック5で保持した噴射管2を旋回させるように構成されている。また、上記排泥用ポンプ9を接続した排泥管8はケーシング1内に挿通されており、この排泥管8の下端開口8bは上記底板1bの下側に臨ませ、切削泥醤Hを排泥管8を介して地上へ排出するように構成されている。そして地上へ排出された切削泥醤Hはマッドスクリーン10を介して濾過され、上記安定液Wを循環使用するように構成されている。以下、この第1の実施形態に係るケーシングの建込手順を図2(a)〜(d)に基づいて説明する。
【0021】
A.据付工程〔図2(a)参照〕
本工程では、ケーシング1の上端部にベース1aを固設し、このベース1aを介して噴射管2と排泥管8を組み付けるとともに、上記噴射管2に油圧チャック5と油圧モータ6とを組み付け、ケーシング1をクレーンのフック15で吊持して建込位置に据え付ける。そして据え付け後、前記スイベル3から安定液WとエアーAを高圧で注入し、噴射管2の下部に組み付けた噴射機構4から水平方向に安定液WとエアーAを連続的に噴射させるとともに、安定液Wを垂直に噴射させて噴射テストをする。
【0022】
ちなみに、噴射テスト時の安定液Wの噴射圧力は200kg/cm2〜400kg/cm2で吐出量は60l/min〜300l/min、エアーAの噴射圧力は6kg/cm2〜11kg/cm2で吐出量は1m3/min〜5m3/minに設定され、噴射管2よりスムースに安定液Wが噴射されているか否かをチェックする。これにより、噴射テストが順調なら本格的に掘削・建込工程へ移行する。
【0023】
B.掘削・建込工程〔図2(b)参照〕
本工程では、噴射管2を旋回駆動しながら噴射機構4から連続的に噴射する安定液WとエアーAの旋回噴流でその周囲の地盤を切削するとともに、切削泥醤Hを排泥管8を介して地上へ排出しながら、ケーシング1を自重で下降させることにより噴射管2と一体に下降させ、その切削域Sにケーシング1を建て込んで行く。このとき地上へ排出した前記切削泥醤Hをマッドスクリーン10を介して濾過し、安定液Wを循環使用する。
【0024】
これにより、従来例1のような大型のチュービング装置を用いる必要がないので、消費エネルギーも少なく、ケーシングの建て込みが容易で、施工費用の低減を図ることができる。また、従来例2のようにバイブロハンマを用いる必要がなく、振動や騒音が問題にならないので、市街地周辺でも本発明によるケーシングの建込工法を採用することができる。しかも、全体として安定液Wの使用量が少なく、発生する泥醤の量も少なくなり、ひいては、その排泥処理費用を低減することができる。
【0025】
なお、ケーシング1の単位長さが目標深度に満たないときは、ケーシング1及び噴射管2をそれぞれ継ぎ足して行く。このとき地下水位hよりも建込み深度が深くなると、底面が底板1bで封止されているケーシング1に浮力が作用して建込みが困難になることから、図1(A)に示すように、ホース12でケーシング1内に水を入れてケーシング1に作用する浮力とケーシング1内へ入れた水の重量とをバランスさせながらケーシング1を建て込んで行く。
【0026】
C.根固め工程〔図2(c)参照〕
ケーシング1を目標深度まで建込んだら、循環泥水を水に切り替えて噴射管2内を洗い、排泥管8より水が地上へ排出されることを確認してから、水をセメントミルク等の硬化材Gに切り替え、上記噴射管2を介して硬化材Gを注入し、切削域Sに建て込んだケーシング1の低部1dを根固めする。これにより、硬化材Gの注入に際して土砂が邪魔になることもなく、地下水位よりも深い場合においてもボイリングの影響を受けることなく、容易にケーシングの根固めをすることができる。なお、上記硬化材Gとして、セメントミルクの他に、セメントミルクと硅酸ソーダとの混合物や、モルタル、あるいはその他の急結材を使用することもできる。
【0027】
D.建込完結工程〔図2(d)参照〕
ケーシング1の根固めが完了したら、ケーシング1内より噴射管2と排泥管8を引き上げる。そしてケーシング1内を集水杭や立杭として利用する場合には、根固め部16が硬化してからケーシング1内に図示しない水中ポンプを建込んで排水する。基礎杭として利用する場合にはケーシング1内に水を溜めた状態で終了することもある。
【0028】
図3(A)は、本発明の参考例1に係るケーシングの建込工法の概要図である。この参考例1は、以下の点を除き上記第1の実施形態(図1)と同様に構成されている。
即ち、この参考例1は目標深度が比較的浅い場合に適用され、ケーシング1の底面が解放状態で掘削・建込みが行われる。従って、切削泥醤Hを排泥管8を介して地上へ排出しながら、ケーシング1の自重でその切削域Sに当該ケーシング1を建て込んで行くが、ケーシング1内には地下水位hまで切削泥醤Hが残留することとなる。なお、噴射管2の下部は軸支部Cによって回転自在に枢支されている。
【0029】
ケーシング1を目標深度まで建込んだら噴射管2を引き上げ、代わりにケーシング1内に図示しない打設管を建て込んで硬化材G(例えば生コン)を注入し、ケーシング1の低部1dを根固めする。ケーシング1内を集水杭や立杭として利用する場合には、根固め部が硬化してからケーシング1内に残留している切削泥醤Hを排泥管8を介して地上へ排出する。根固め部が硬化しないうちに切削泥醤Hを取り除くとボイリングが生じるからである。
【0030】
図3(B)は、本発明の参考例2に係るケーシングの建込工法の概要図である。この参考例2は、以下の点を除き上記参考例1〔図3(A)〕と同様に構成されている。
即ち、この参考例2は基礎杭の構築に適用され、ケーシング1として管径の小さいPC管が用いられる。そして、PC管1の底面が解放状態で掘削・建込みが行われ、切削泥醤HをPC管1を介して地上へ排出しながら、PC管1の自重でその切削域Sに当該PC管を建て込んで行く。そしてこの実施形態では、噴射管2を介して硬化材Gを注入し、ケーシング1の低部1dを根固めする。その他の点は上記参考例1と同様である。
【図面の簡単な説明】
【図1】 図1(A)は本発明の第1の実施形態に係る図2中の掘削・建込工程(b)の取り出し図、図1(B)は図1(A)中のケーシングの上部平面図、図1(C)は図1(A)中の軸支部C部の拡大図である。
【図2】 本発明の第1の実施形態に係るケーシング建込手順を例示する工程図である。
【図3】 図3(A)及び(B)は、それぞれ本発明の参考例1及び参考例2に係るケーシングの建込工法の概要図である。
【図4】 従来例1に係るケーシングの建込装置の概要図である。
【図5】 従来例1に係るケーシングの建込手順を示す工程図である。
【図6】 図6(A)は従来例2に係るケーシング建込工法の概要図、図6(B)は従来例2に係るケーシングの建込み完了状態を示す縦断面図である。
【符号の説明】
1…ケーシング、1b…ケーシングの底板、2…噴射管、3…スイベル、4…噴射機構、8…排泥管、8b…排泥管の下端開口、10…マッドスクリーン、A…エアー、G…硬化材、H…切削泥醤、S…切削域、W…安定液。[0001]
BACKGROUND OF THE INVENTION
TECHNICAL FIELD The present invention relates to a casing erection method for constructing a standing pile by building a casing such as a steel pipe pile or a PC pile in the ground and building a strong foundation pile.
[0002]
[Prior art]
Conventionally, for example, a construction method shown in FIG. 5 (hereinafter referred to as “conventional example 1”) or a construction method shown in FIG. 6 (hereinafter referred to as “conventional example 2”) is known as a construction method for this type of casing. Here, FIG. 4 is a schematic diagram of the tubing device used in Conventional Example 1, FIGS. 5A to 5D are process diagrams of the casing construction method according to Conventional Example 1, and FIGS. 6A and 6B are FIG. It is a schematic diagram of the casing construction method by the prior art example 2. FIG.
[0003]
First, the conventional example 1 will be outlined with reference to FIGS.
The
[0004]
In the installation process (FIG. 5A), the
[0005]
Next, a casing construction method according to Conventional Example 2 will be described with reference to FIG.
In this conventional example 2, as shown in FIG. 6A, a
[0006]
[Problems to be solved by the invention]
In the above conventional example 1, since the casing is built using the
[0007]
On the other hand, in the above-mentioned conventional example 2, vibration and noise become a problem because of using a vibro hammer, and this construction method is difficult to adopt around urban areas. Moreover, since the ground is excavated with a water jet jetting downward, the larger the casing is, the more jet pipes and jet nozzles are required, and the energy consumption increases accordingly.
[0008]
Furthermore, since the water jet pump in the conventional example 2 is not usable because the plunger and the plunger packing are immediately consumed by the particles in the muddy water, the stabilizing liquid is used as well as the bentonite muddy water. Since it cannot be circulated, a large amount of water is used, and a large amount of mud soy is produced.
[0009]
Moreover, in the construction method according to the conventional example 2, since water is used for excavation, in the state in which the casing has been built, a large amount of water and the settled sediment are separated in the casing as shown in FIG. 6 (B). Remains in a state. When using the inside of this casing as a vertical pile, for example, it is necessary to remove the water and earth and sand, and when it is deeper than the groundwater level, remove the water and earth and sand. Boiling occurs. Therefore, it will be necessary to install a casting tube separately and inject the hardener, but the settled earth and sand will be in the way, so it is not easy to solidify.
[0010]
The present invention has been made in consideration of such circumstances,
[1] Reduce energy consumption and reduce construction costs.
[2] Eliminate vibration and noise problems so that they can be adopted around urban areas.
[3] To reduce the waste disposal cost by separating the stable liquid from the discharged mud soy so that it can be recycled.
[4] Make it possible to easily solidify the casing even when deeper than the groundwater level.
Is a technical issue.
[0011]
[Means for Solving the Problems]
In order to solve the above problems, the present invention is configured as follows.
That is, a first aspect of the present invention, seals the bottom of the
[0012]
Invention of
[0013]
[0014]
[Operation and effect of the invention]
(A) In the invention described in
[0015]
(B) Moreover, in the invention described in
[0016]
(C) In the invention according to
[0017]
[0018]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described in more detail with reference to the drawings.
FIG. 1A is a drawing of the excavation / building step (b) in FIG. 2, FIG. 1B is a plan view of the upper part of the casing in FIG. 1A, and FIG. FIG. 2A is a process diagram illustrating a procedure for erection of a casing according to the first embodiment of the present invention. The casing erection device according to the present invention includes an
[0019]
This embodiment is applied when the target depth is relatively deep, and the
[0020]
The
[0021]
A. Installation process (see Fig. 2 (a))
In this step, a
[0022]
Incidentally, the injection pressure of the stabilizing solution W is discharged amount 200kg / cm 2 ~400kg / cm 2 at the time of injection tests 60l / min~300l / min, the injection pressure of the air A is 6kg / cm 2 ~11kg / cm 2 the discharge amount is set to 1m 3 / min~5m 3 / min, a smooth stable liquid W from the
[0023]
B. Excavation and erection process (see Fig. 2 (b))
In this step, the ground around the cutting is made by the swirling jet of the stabilizing liquid W and the air A continuously sprayed from the
[0024]
Thereby, since it is not necessary to use a large-sized tubing device as in Conventional Example 1, less energy is consumed, the casing can be easily built, and the construction cost can be reduced. In addition, it is not necessary to use a vibratory hammer as in Conventional Example 2, and vibration and noise do not become a problem. Therefore, the casing erection method according to the present invention can be adopted even in the vicinity of urban areas. In addition, the amount of the stabilizing liquid W used is small as a whole, and the amount of generated mud soy is also reduced, so that the waste mud treatment cost can be reduced.
[0025]
In addition, when the unit length of the
[0026]
C. Rooting process [see Fig. 2 (c)]
After the
[0027]
D. Construction completion process [See Fig. 2 (d)]
When the root hardening of the
[0028]
FIG. 3 (A) is a schematic diagram of a casing erection method according to Reference Example 1 of the present invention. The reference example 1 is configured in the same manner as the first embodiment (FIG. 1) except for the following points.
That is, this reference example 1 is applied when the target depth is relatively shallow, and excavation and erection are performed with the bottom surface of the
[0029]
After the
[0030]
FIG. 3 (B) is a schematic diagram of the casing construction method according to Reference Example 2 of the present invention. Reference Example 2 is configured in the same manner as Reference Example 1 (FIG. 3A) except for the following points.
That is, this reference example 2 is applied to construction of a foundation pile, and a PC pipe having a small pipe diameter is used as the
[Brief description of the drawings]
FIG. 1 (A) is a drawing of the excavation / construction process (b) in FIG. 2 according to the first embodiment of the present invention, and FIG. 1 (B) is a casing in FIG. 1 (A). FIG. 1 (C) is an enlarged view of the shaft support portion C in FIG. 1 (A).
FIG. 2 is a process diagram illustrating a casing erection procedure according to the first embodiment of the invention.
3 (A) and 3 (B) are schematic views of the casing construction method according to Reference Example 1 and Reference Example 2 of the present invention, respectively.
FIG. 4 is a schematic diagram of a casing erection device according to Conventional Example 1;
FIG. 5 is a process diagram showing a procedure for installing a casing according to Conventional Example 1;
6A is a schematic diagram of a casing erection method according to Conventional Example 2, and FIG. 6B is a longitudinal cross-sectional view showing a completed state of casing installation according to Conventional Example 2.
[Explanation of symbols]
DESCRIPTION OF
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP04512397A JP3752345B2 (en) | 1997-02-28 | 1997-02-28 | Casing construction method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP04512397A JP3752345B2 (en) | 1997-02-28 | 1997-02-28 | Casing construction method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH10237865A JPH10237865A (en) | 1998-09-08 |
| JP3752345B2 true JP3752345B2 (en) | 2006-03-08 |
Family
ID=12710500
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP04512397A Expired - Lifetime JP3752345B2 (en) | 1997-02-28 | 1997-02-28 | Casing construction method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3752345B2 (en) |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2006046324A1 (en) * | 2004-10-26 | 2006-05-04 | Shinnihon-Kogyo, Inc. | Method for laying buried matter |
| JP4783120B2 (en) * | 2005-10-27 | 2011-09-28 | 東日本旅客鉄道株式会社 | Drilling method |
| JP6390834B2 (en) * | 2014-07-15 | 2018-09-19 | 株式会社本間組 | Drilling device for no discharge drilling |
| WO2016009888A1 (en) * | 2014-07-15 | 2016-01-21 | 株式会社本間組 | Drilling device for non-discharge drilled hole |
-
1997
- 1997-02-28 JP JP04512397A patent/JP3752345B2/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| JPH10237865A (en) | 1998-09-08 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN113322990B (en) | Construction method of lock catch steel pipe pile cofferdam suitable for thin-covering-layer hard riverbed | |
| CN109882097A (en) | A kind of hole-drilling system of cast-in-situ bored pile | |
| CN115478543B (en) | Artificial hole digging pile foundation pit supporting structure and construction method | |
| JP5378066B2 (en) | Mountain fastening method | |
| JP3752345B2 (en) | Casing construction method | |
| CN1206417C (en) | Forming method for water-proof pile fender and screw drill therefor | |
| CN215669558U (en) | Front-mounted inclined pile of foundation pit supporting system | |
| CN110258600A (en) | A kind of vertical cofferdam construction engineering method suitable for deep water waters | |
| JP3108916B2 (en) | Ground improvement method | |
| CN221501989U (en) | Bored pile dredging device | |
| CN120119640A (en) | A method for cleaning and construction of pile foundation of pile group cast-in-place piles | |
| CN115748792B (en) | A barrel foundation with drag reduction system and a hinged plunger installation method | |
| GB2132667A (en) | Method of installing precast concrete piles | |
| JP3224008B2 (en) | Underwater ground improvement method | |
| JP3673171B2 (en) | Concrete pile setting method | |
| JP2000192481A (en) | Ground digging-down device and method for forming cylindrical underground structure | |
| JPS6192213A (en) | Pile head processing device | |
| JP2006322190A (en) | Pile head processing method of cast-in-place concrete pile and concrete processing agent mixing device | |
| JPH0470422A (en) | Open caisson method | |
| JP2002097639A (en) | Pile burying method and jig | |
| JPS61158517A (en) | Method of processing extra-banking concrete for cast-in-place pile | |
| JPH10131172A (en) | Soil improvement method | |
| KR200426640Y1 (en) | Tofu Organizer for Cast-In-Place Piles | |
| JPS6250517A (en) | Method and apparatus for construction of ready-made hollow pile | |
| JP2001336147A (en) | Rotary cap with pile top treatment function, pile top treatment method, and embedding method of pile |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20040115 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20050719 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20050726 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20050922 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20051115 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20051212 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20081216 Year of fee payment: 3 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20091216 Year of fee payment: 4 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20091216 Year of fee payment: 4 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20101216 Year of fee payment: 5 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20101216 Year of fee payment: 5 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111216 Year of fee payment: 6 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111216 Year of fee payment: 6 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20131216 Year of fee payment: 8 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20141216 Year of fee payment: 9 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| EXPY | Cancellation because of completion of term |