Caisson installation method at sea Download PDF

Info

Publication number
JP3754985B2
JP3754985B2 JP02294096A JP2294096A JP3754985B2 JP 3754985 B2 JP3754985 B2 JP 3754985B2 JP 02294096 A JP02294096 A JP 02294096A JP 2294096 A JP2294096 A JP 2294096A JP 3754985 B2 JP3754985 B2 JP 3754985B2
Authority
JP
Japan
Prior art keywords
caisson
installation
air bag
sea
moving means
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP02294096A
Other languages
Japanese (ja)
Other versions
JPH09195281A (en
Inventor
正治 巻渕
哲 手塚
正夫 志賀
時男 長沼
Original Assignee
国土交通省関東地方整備局長
若築建設株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 国土交通省関東地方整備局長, 若築建設株式会社 filed Critical 国土交通省関東地方整備局長
Priority to JP02294096A priority Critical patent/JP3754985B2/en
Publication of JPH09195281A publication Critical patent/JPH09195281A/en
Application granted granted Critical
Publication of JP3754985B2 publication Critical patent/JP3754985B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Revetment (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、防波堤,岸壁,護岸,係船施設,突堤,離岸堤等に使用され底部が閉塞されているコンクリート製や鋼製のケーソンを海底に敷き詰められた基礎捨石上に順次据え付ける際に、予め基礎捨石上に着底せしめられている既設のケーソン(以下、着底ケーソンと言うことがある)との衝突を防止しながら、安全且つ迅速に着底ケーソンに隣接する所定の位置に次に据え付けるべきケーソン(以下、単に据付ケーソンと言うことがある)を据え付けることのできる海上におけるケーソンの据付方法に関するものである。
【0002】
【従来の技術】
底部が閉塞されているコンクリート製や鋼製のケーソンを使用して防波堤,岸壁,護岸,係船施設,突堤,離岸堤等を構築するには、海底の所定の位置に捨石を敷き詰めて基礎捨石を構成し、製造されたケーソンの底部をこの基礎捨石上の所定の位置に載置するように着底せしめ、次いでこの着底せしめられた着底ケーソンに隣接して適当な間隔を隔てた位置に次に据え付けられる据付ケーソンを基礎捨石上に着底させて据え付ける作業を、順次繰り返し行うのである。
【0003】
着底ケーソンに隣接して据付ケーソンを据え付けるための一般的な作業は、図6にフローシートで示す如く、
▲1▼ 先ず、据付ケーソンを海上に浮遊させた状態で据え付けるべき位置近傍である所定の海域まで曳船により曳航する。
▲2▼ そして、曳航してきた据付ケーソンを着底ケーソンに或る程度まで近付けて後、ケーソン移動手段を稼動可能状態とする。このケーソン移動手段としては、例えば据付ケーソン又は着底ケーソンに設置されているウインチと、このウインチが設置されているケーソンと反対側の着底ケーソン又は据付ケーソンに端部を連結されていて滑車を介して前記ウインチに巻取・巻出される引寄用ワイヤーロープと、一端を海底に係止されており前記据付ケーソン又は着底ケーソンに設置されているウインチに巻取・巻出されるアンカーワイヤーロープとを備えている態様や、据付ケーソン又は着底ケーソンに設置されているウインチと、このウインチが設置されているケーソンと反対側の着底ケーソン又は据付ケーソンに設けられている滑車と、一端を海底に係止されており前記滑車を介して前記ウインチに巻取・巻出される引寄用ワイヤーロープ兼アンカーワイヤーロープとを備えている態様を挙げることができる。
▲3▼ 次いでケーソン移動手段のウインチを操作して、着底ケーソンに対して据付ケーソンが適当な間隔を隔てた位置に位置するように移動させる。
▲4▼ この据付ケーソンを着底ケーソン側に移動させるときに、据付ケーソンの側壁と閉塞されている底部とにより囲まれている内部に注水(一次注水)することによってその底部が基礎捨石の上面から適当な距離だけ離れた位置に位置するまで据付ケーソンを沈降させる。
▲5▼ しかる後、据付け位置の精密な位置決め及び確認を行うと共に、更に据付ケーソンの内部に注水(二次注水)して、未だ浮いた状態にある据付ケーソンを基礎捨石上に着底させる。
▲6▼ かくして据え付けられたケーソン及び着底ケーソンに設置したケーソン移動手段等の機材を取り外してケーソンの据付が完了する。
これら一連の作業は、気象条件の良い,すなわち風が弱く波が静かなときに一気に行われる。
【0004】
ケーソン移動手段としては、前記した如き態様の他に、図8に示す如くウインチ3aが設置されている起重機船7を利用し、着底ケーソン1に一端を連結されている引寄用ワイヤロープ3cが据付ケーソン2に設けられた滑車3bを介して起重機船7のウインチ3aに巻取・巻出自在に装着されている態様や、図示しないが同じくウインチが設置されている起重機船を利用し、据付ケーソンに一端を連結されている引寄用ワイヤロープが着底ケーソンに設けられた滑車を介して起重機船のウインチに巻取・巻出自在に装着されている態様等種々挙げることができ、これらの態様の場合、通常据付ケーソン2に対して着底ケーソン1の反対側及び法線10と直交する方向等据付ケーソン2の周辺に引船9が配されていてこの引船9と据付ケーソン2とがロープで繋がれている。そして、この引船9によって引っ張りながら据付ケーソン2を移動する作業が行われる。
ここで、例えば据付ケーソン2の浮力が小さい場合等に、クレーン8を設置されている起重機船7を利用し、図9に示す如く据付ケーソン2の上端に端部を連結されている吊下用ワイヤロープ8aを前記クレーン8のフックに引っ掛けて据付ケーソン2を吊り下げた状態にし、据付ケーソン2を据え付けるべき所定の海域に位置させたり、クレーン操作によって沈降させて基礎捨石6上に着底させたりする作業が行われることもある。
【0005】
このようなケーソンの据付作業は、気象条件の良いときに行うと言っても海上の作業であるから浮いている据付ケーソン2は常にあらゆる方向に揺動しているのであり、据付ケーソン2が着底ケーソン1に近接せしめられた状態では据付ケーソン2が着底ケーソン1に衝突して互いに破損する恐れがあるので、着底ケーソン1の据付ケーソン2と対向する側壁1bに図7,8に示す如く緩衝材5を配して衝撃を緩めてケーソン1,2の破損を防止することが極めて重要であった。
【0006】
従来、ケーソンの衝突による破損を防止するための前記緩衝材5としては、角材(木材),ゴム防舷材,ゴムタイヤ等が使用されており、ロープ等の吊り下げ手段により作業者が着底ケーソン1上の所定の位置で把持することによりこの緩衝材5を着底ケーソン1の上端より吊り下げていた。
すなわち、据付ケーソン2は着底ケーソン1に対して所定の間隔を隔てて据え付けられるので、この所定の間隔と略同幅の緩衝材5をロープ等の吊り下げ手段により所定の位置に着底ケーソン1の上端より吊り下げた状態で据付け位置の精密な位置決め及び確認・修正を行って据付ケーソン2を基礎捨石6上に着底させて後、作業者により緩衝材5を引き上げて取り除いていた。
【0007】
しかしながら、前述した如く据付ケーソン2は常にあらゆる方向に揺動しており且つ据付ケーソン2の位置調整はウインチの巻取・巻出によって行われるので、寸分の狂いが生じること無く据え付けることは困難である。従ってウインチによって据付ケーソン2を着底ケーソン1側に引き寄せすぎると、据付ケーソン2と着底ケーソン1との間に緩衝材5が強く挾持されて緩衝材5を引き上げることができなくなるという欠点があった。このような場合には、精度良く据え付けられた据付ケーソン2を内部の水を排水したりクレーン8で吊り下げている場合にはクレーン操作によって僅かに浮かせてからケーソン移動手段によって緩衝材5を取り除くことができる程度に着底ケーソン1と反対側に移動させ、緩衝材5を取り除いてから再び注水又はクレーン操作を行って着底させるのであるが、据付ケーソン2を着底ケーソン1と反対側に移動させたときに位置がズレることがあり据付ケーソン2を再び精度良く所定に位置に着底させて据え付けるのに時間を要するという欠点があった。
【0008】
更に、着底ケーソン1上にはワイヤーロープ,アンカーワイヤーロープ,ウインチ,滑車等のケーソン移動手段を構成する部材や据付ケーソン2内部へ海水を注水又は排水するためのポンプその他の機械器具が設けられていて煩雑な状態にあり且つ緩衝材5は前記した如く作業者が着底ケーソン1上で吊り下げ手段により把持しているので、据付ケーソン2と着底ケーソン1との間に緩衝材5が挾持されていて作業者が吊り下げ手段をしっかり把持している状態のときにうねりの影響等を受けて緩衝材5が挾持されている力が急激に弱くなると、その反動により作業者がバランスを失って煩雑な機械器具につまずいて転んだり浮いている据付ケーソン2と着底ケーソン1との間の海に転落したりして非常に危険であるという欠点があった。
【0009】
【発明が解決しようとする課題】
本発明は、上記従来技術の欠点を解消し、海底の基礎捨石上に着底されている既設のケーソンに隣接する所定の間隔を隔てた位置に次に据え付けられるケーソンを着底させる作業を、安全に且つ短時間に行うことができる海上におけるケーソンの据付方法を提供することを課題とする。
【0010】
【課題を解決するための手段】
本発明者等は、かかる課題を解決すべく鋭意検討を重ねた結果、海底に敷き詰められた基礎捨石上に底部を予め着底されている着底ケーソンの近傍の海上に据付ケーソンを底部が該基礎捨石から離れた状態に位置させた後、前記着底ケーソンから所定の間隔を隔てた位置に移動させて該基礎捨石上に着底させるに際し、据付ケーソンを移動させるため着底ケーソンと据付ケーソンとに設置されているケーソン移動手段を稼動可能な状態にすると共に、圧力調整手段と該圧力調整手段により内部圧力を調整されて着底ケーソンから据付ケーソンが据え付けられる所定の間隔より広幅なケーソン当接部分を形成される空気袋とを備えた緩衝装置の該空気袋を、着底ケーソンの上面より据付ケーソンと対向する側壁に間隔を隔てて2個以上吊り下げてその内部を高圧にして、据付ケーソンをその底部が基礎捨石の近傍に位置するまで沈降させると共にケーソン移動手段によって据付ケーソンを着底ケーソン側に引き寄せて緩衝装置の空気袋に当接させた状態から、空気袋内の圧力を調整しながら据付ケーソンの位置をケーソン移動手段によって移動修正して後、据付ケーソンの底部が基礎捨石上に載置されて着底されるまで据付ケーソンを沈降させ、しかる後に空気袋内圧力を圧力調整手段によって低下させて空気袋を収縮させてから引き上げれば、着底ケーソンから所定の間隔を隔てた位置に次に据え付けるべき据付ケーソンを着底させて据え付ける作業を安全且つ迅速に行えることを究明して本発明を完成したのである。
【0011】
【発明の実施の形態】
以下、図面により本発明に係る海上におけるケーソンの据付方法について詳細に説明する。
図1は本発明方法に好ましく使用される緩衝装置を示す正面説明図、図2は本発明方法に使用されるコンクリート製のケーソンの1例を示す斜視図、図3はケーソンが基礎捨石上に据え付けられた状態を示しており(イ)は側面説明図で(ロ)は平面説明図、図4は本発明方法を実施している過程を示しており着底ケーソンの近傍に浮いている据付ケーソンと着底ケーソンとにケーソン移動手段を稼働可能状態とすると共に緩衝装置の空気袋を着底ケーソンの上部より吊り下げている状態を示す(イ)は側面説明図で(ロ)は平面説明図、図5は本発明方法を実施している過程を示しておりケーソン移動手段によって据付ケーソンを着底ケーソン側に移動させると共に位置決めを行っている状態を示す(イ)は側面説明図で(ロ)は平面説明図である。
【0012】
図面中、1は海底に敷き詰められた基礎捨石6上に底部1aを予め着底されている着底ケーソン、2はこの着底ケーソン1に隣接して所定の間隔を隔てた位置に前記着底ケーソン1と同様に基礎捨石6上に底部2aを載置されて着底される据付ケーソンである。これらの着底ケーソン1及び据付ケーソン2は、コンクリートや鋼板より構成されており、図2に示す如く少なくとも対向する側壁1b,2bがフラットに形成されており側壁1b,2bに囲まれた空間に全高さに亘って隔壁1c,2cが形成されていて底部1a,2aが閉塞されている。
【0013】
3は底部2aが基礎捨石6から離れた状態で位置せしめられている据付ケーソン2を着底ケーソン1側に移動させたり着底ケーソン1の側面とその側面とが一直線を成すようにすなわち法線10の方向の位置を修正したりするためのケーソン移動手段であり、従来技術として説明したケーソン移動手段を使用することができるのでその説明は省略する。
【0014】
4は圧力調整手段4aとこの圧力調整手段4aによって空気を供給・排出されて容積が増減せしめられ膨張・収縮される軟質な材料より形成されている空気袋4bとを備えている緩衝装置である。空気袋4bは、空気が供給されてその内部が高圧となって膨張した状態で着底ケーソン1から据付ケーソン2が据え付けられる所定の間隔より広幅なケーソン当接部分4bcを有している。更にこの空気袋4bには、着底ケーソン1上からの吊下げ及び着底ケーソン1の着底後にこの空気袋4bを引き上げるためにロープ4bdが装着されている。
【0015】
また空気袋4bを形成している材料としては、この空気袋4bは後述する如く着底ケーソン1と据付ケーソン2との間で押圧されるものであってケーソンは小さいものでも1,000トン程度の重量を有しているので着底ケーソン1と据付ケーソン2とで押圧されたときに耐え得る強度を有し且つ容積が増減せしめられるものであれば使用することができる。更に海面近傍位置に吊り下げられて使用され且つ据付ケーソン2を所定の位置に着底させた後に作業者により引き上げられるので、水を吸収する材質であると空気袋4bの重量が増大して引き上げるときに作業者にかかる負担が大きくなるので水を吸収しないものであることが好ましい。これらを考慮して、種々のゴム等より形成されていることが好ましく、図1に示す如く空気袋4bはゴム製の本体4ba内にナイロンコードの如き補強材を埋設されているゴム製の補強帯4bbが縦方向及び横方向にそれぞれ間隔を隔てて周設されているものを挙げることができる。
【0016】
また、このような空気袋4bのケーソン当接部分4bcには、その表面とケーソンとが当接したときに生じる摩擦抵抗を小さくする部材,例えばふっ素樹脂製の板体が固定されていたり二硫化モリブデンの粉末が混入された塗料が塗布されていたりすることが空気袋4bの損傷を防止することができるので好ましい。
【0017】
圧力調整手段4aとしては、コンプレッサ4aaと、一端がこのコンプレッサ4aaにまた他端が空気袋4bに連結されている空気供給可撓管4abと、空気袋4b内の圧力を検出する圧力計4acと、空気袋4b内の空気を排気するためのバルブ4adとを備えて構成されているものを挙げることができる。
【0018】
本発明方法を実施して着底ケーソン2に隣接して基礎捨石6上の所定の間隔を隔てた位置に据付ケーソン2を着底させて据え付けるには、先ず据付ケーソン2を所定の位置に,すなわち既に着底されていて次に据付ケーソン2を隣接して据え付けられる着底ケーソン1の近傍位置に据付ケーソン2を底部2aが基礎捨石6から離れた状態で位置せしめるのであり、ケーソンが置かれているケーソン仮置場より据え付けるべき据付ケーソン2を、浮遊させた状態で引船によって前記所定の位置まで曳航したり、クレーン8が設置されている起重機船7を利用しこのクレーン8に吊下用ワイヤロープ8aを介して吊り下げた状態で起重機船7を航行させて前記所定の位置まで運んだりする。
【0019】
そして、着底ケーソン1上に圧力調整手段4aを設置すると共に空気袋4bを圧力調整手段4aによりその内部を高圧にしてケーソン当接部分4bcが形成された状態で着底ケーソン1上から据付ケーソン2に対向せしめられる側壁1bに間隔を隔てて2個以上吊り下げて、緩衝装置4を着底ケーソン1に設置する。空気袋4bの吊下げは、着底ケーソン1に吊下げ金具を固定しておき、この吊下げ金具に空気袋4bに装着されているロープ4bdを固定すれば良い。
また、着底ケーソン1の近傍位置に位置せしめられ底部2aが基礎捨石6から離れた状態の据付ケーソン2を移動せしめるケーソン移動手段3を設置する。
【0020】
次いで、据付ケーソン2を移動させるため着底ケーソン1と据付ケーソン2とに設置されているケーソン移動手段3を稼動可能な状態にして、このケーソン移動手段3によって据付ケーソン2を着底ケーソン1側に移動させるのであるが、このとき前記した如く据付ケーソン2を曳航するときには据付ケーソン2に働く水の抵抗を低減させるために据付ケーソン2は比較的浅く浮いている状態であるから据付ケーソン2の側壁2bで囲まれた空間内に一次注水して、またクレーン8で吊り下げている場合にはクレーン8を操作して基礎捨石6上の近傍に底部2aが位置するが未だ着底しない浮いている状態に沈降させる。このように据付ケーソン2を沈降させたり浮上させたりする操作は、据付ケーソン内に注水・排水したりクレーン8を操作したりすることによって行われるのであり、以下単に沈降又は浮上と言うことがある。
【0021】
そして、据付ケーソン2を着底ケーソン1側に引き寄せて緩衝装置4の空気袋4bに当接させた状態にして据付ケーソン2と着底ケーソン1とを前記所定の間隔より広い間隔で保持する。この状態から据付ケーソン2の法線10の方向の位置をケーソン移動手段3によって移動修正すると共に据付ケーソン2の着底ケーソン1からの間隔が所定の間隔となるように空気袋内4bの圧力を圧力調整手段4aによって調整しながらケーソン移動手段3によって据付ケーソン2を移動修正する。このとき、据付ケーソン2はケーソン移動手段3により着底ケーソン1側に或る程度の力で引き寄せられている。
【0022】
しかる後、据付ケーソン2の底部2aが基礎捨石6上に載置されて着底されるまで沈降させて据付ケーソン2の据付を完了したら、空気袋4b内の圧力を圧力調整手段4aによって低下させて空気袋4bを収縮させてから引き上げれば全作業が完了する。
【0023】
【発明の効果】
このような本発明方法を実施して、既に基礎捨石6上に着底されている着底ケーソン1に隣接して所定の間隔を隔てた位置に据付ケーソン2を着底させて据え付けると、着底ケーソン1の近傍に位置せしめられ浮いている状態の据付ケーソン2を着底ケーソン1側に移動させるときに据付ケーソン2は波の影響を受けてあらゆる方向に揺動していて着底ケーソン1側にも揺動するのであるが、着底ケーソン1の据付ケーソン2と対向する側壁1bに緩衝装置4の空気袋4bが吊り下げられているので据付ケーソン2が着底ケーソン1に衝突することが防止され、非常に高価なケーソンを破損させることなく据え付けることができる。
【0024】
また、緩衝装置4の空気袋4bは空気が供給されて膨張した状態では着底ケーソン1から据付ケーソン2の据え付けられる所定の間隔より広幅なケーソン当接部分4bcを有しているので、据付ケーソン2と着底ケーソン1との間隔を緩衝装置4の空気袋4b内の圧力を調整することによって据付ケーソン2が着底されるまでの間或る程度調整保持することができ、且つ緩衝装置4の圧力調整手段4aのバルブ4adを開いて空気袋4b内の空気を排出し圧力を低くすることによって空気袋4b内の容積を減少せしめて据付ケーソン2と着底ケーソン1との間隔を狭くするように修正することができる。すなわち、緩衝装置4の空気袋4bが間隔を隔てて2個以上吊り下げられているので、据付ケーソン2が法線10に対してズレた角度で空気袋4bに当接しているときに、一方の側(着底ケーソン1と据付ケーソン2との間隔が広い側)の空気袋4b内の圧力を前記した如く低くすることによって据付ケーソン2と着底ケーソン1との間隔を調整し、前記角度を修正することができる。
【0025】
更に、緩衝装置4の空気袋4bは軟質な材料より形成されているので、空気袋4b内の空気を排出して圧力を低下させることによって、着底ケーソン1を基礎捨石6上に着底させて後、着底ケーソン1と据付ケーソン2との間の間隙から空気袋4bを容易に引き上げることができる。従って緩衝装置4の空気袋4bを繰り返し使用することができるので経済的である。そして、緩衝装置4の空気袋4bのケーソン当接部分4bcに摩擦抵抗を小さくする部材が設けられていると、空気袋4bの損傷を防止することができて空気袋4bの寿命を長くすることができてより経済的である。
【0026】
緩衝装置4の空気袋4bは着底ケーソン1上の吊下げ金具からロープで吊り下げておけばよく作業者により支持する必要がなく、且つ空気袋4b内の圧力を調整するための圧力調整手段4aの操作は側壁から離れた位置に圧力調整手段4aを設置しておくことによってこの位置から行えば良いので、着底ケーソン1と据付ケーソン2との間の海上に作業者が転落することがなく安全性に非常に優れている。
【0027】
このように種々の効果を奏する本発明に係る海上におけるケーソンの据付方法は、その工業的価値の非常に大きなものである。
【図面の簡単な説明】
【図1】本発明方法に好ましく使用される緩衝装置を示す正面説明図である。
【図2】本発明方法に使用されるコンクリート製のケーソンの1例を示す斜視図である。
【図3】ケーソンが基礎捨石上に据え付けられた状態を示しており(イ)は側面説明図、(ロ)は平面説明図である。
【図4】本発明方法を実施している過程を示しており着底ケーソンの近傍に浮いている据付ケーソンと着底ケーソンとにケーソン移動手段を稼働可能状態とすると共に緩衝装置の空気袋を着底ケーソンの上部より吊り下げている状態を示す(イ)は側面説明図で(ロ)は平面説明図である。
【図5】本発明方法を実施している過程を示しており、ケーソン移動手段によって据付ケーソンを着底ケーソン側に移動させると共に位置決めを行っている状態を示す(イ)は側面説明図、(ロ)は平面説明図である。
【図6】着底ケーソンに所定の間隔を隔てて次に据え付けられる据付ケーソンを据え付ける一連の作業を説明するフローシートである。
【図7】従来の緩衝材を使用して据付ケーソンと着底ケーソンとの直接接触を防止して据付作業を行っている状態を示す側面説明図である。
【図8】ケーソン移動手段を示す平面説明図である。
【図9】起重機船に設置されているクレーンによって据付ケーソンを吊り下げている状態を示す正面説明図である。
【符号の説明】
1 着底ケーソン
1a 底部
1b 側壁
1c 隔壁
2 据付ケーソン
2a 底部
2b 側壁
2c 隔壁
3 ケーソン移動手段
3a ウインチ
3b 滑車
3c 引寄用ワイヤロープ
3d アンカワイヤロープ
4 緩衝装置
4a 圧力調整手段
4aa コンプレッサ
4ab 空気供給可撓管
4ac 圧力計
4ad バルブ
4b 空気袋
4ba 本体
4bb 補強帯
4bc ケーソン当接部分
4bd ロープ
5 緩衝材
6 基礎捨石
7 起重機船
8 クレーン
8a 吊下用ワイヤロープ
9 引船
10 法線
[0001]
BACKGROUND OF THE INVENTION
The present invention is used for a breakwater, a quay, a revetment, a mooring facility, a jetty, a breakwater, etc., when a concrete or steel caisson with a closed bottom is sequentially installed on a foundation rubble laid on the seabed, Next to a predetermined position adjacent to the bottom caisson safely and quickly, while preventing collision with an existing caisson (hereinafter sometimes referred to as a bottom caisson) that has been grounded on the rubble in advance. The present invention relates to a method for installing a caisson on the sea where a caisson to be installed (hereinafter sometimes simply referred to as an installation caisson) can be installed.
[0002]
[Prior art]
To construct a breakwater, quay, revetment, mooring facility, jetty, breakwater, etc. using a concrete or steel caisson with a closed bottom, rubble at a predetermined position on the bottom of the sea. The bottom of the manufactured caisson is grounded so as to be placed at a predetermined position on the foundation rubble, and then is positioned adjacent to the bottomed bottom caisson at an appropriate interval. Next, the work of installing the installation caisson, which is to be installed next, on the foundation rubble, is repeated sequentially.
[0003]
The general operation for installing the installation caisson adjacent to the bottom caisson is as shown in the flow sheet in FIG.
(1) First, the towed vessel is towed to a predetermined sea area near the position where the installation caisson is suspended in the sea.
{Circle around (2)} After the towing installation caisson is brought close to the bottom caisson to a certain extent, the caisson moving means is brought into an operable state. As the caisson moving means, for example, a winch installed in an installed caisson or a bottomed caisson, and an end connected to the bottomed caisson or installed caisson on the opposite side of the caisson where the winch is installed and a pulley is used. Wire rope for winding and unwinding to the winch through, and an anchor wire rope wound on and unwound to the winch installed at the installation caisson or the landing caisson, one end of which is locked to the seabed A winch installed in the installation caisson or the bottom caisson, a pulley provided in the bottom caisson or the installation caisson opposite to the caisson in which the winch is installed, and one end of the winch An attracting wire rope / anchor wire rope that is locked to the seabed and wound and unwound on the winch via the pulley It can be exemplified embodiment comprises and.
(3) Next, the winch of the caisson moving means is operated to move the installation caisson so as to be positioned at an appropriate distance from the bottom caisson.
(4) When this installation caisson is moved to the bottom caisson side, water is poured into the interior surrounded by the side wall of the installation caisson and the closed bottom (primary water injection), so that the bottom is the top surface of the foundation rubble. The settling caisson is allowed to settle until it is located at a suitable distance from.
{Circle around (5)} After that, the installation position is precisely positioned and confirmed, and further, water is injected into the installation caisson (secondary water injection), and the installation caisson that is still floating is settled on the foundation rubble.
(6) The installation of the caisson is completed by removing the equipment such as the caisson moving means installed in the caisson thus installed and the bottom caisson.
A series of these operations is performed at a time when the weather conditions are good, that is, when the wind is weak and the waves are quiet.
[0004]
As the caisson moving means, in addition to the above-described embodiment, a hoisting ship 7 in which a winch 3a is installed as shown in FIG. 8 is used, and a drawing wire rope 3c connected at one end to the bottom caisson 1 is used. Is installed in a winch 3a of a hoist ship 7 via a pulley 3b provided in the installation caisson 2, and a hoist ship in which a winch is also installed (not shown), There can be mentioned various aspects such as a drawing wire rope, one end of which is connected to the installation caisson, can be wound and unwound freely mounted on the winch of the hoist ship through a pulley provided in the bottom caisson, In the case of these modes, the tug 9 is arranged around the installed caisson 2 such as the direction opposite to the bottom caisson 1 and the direction perpendicular to the normal 10 with respect to the installed caisson 2, and the tug 9 and the installed caisson 2 The rope It is connected with. And the operation | work which moves the installation caisson 2 is performed, pulling with this tugboat 9. FIG.
Here, for example, when the buoyancy of the installation caisson 2 is small, the hoist ship 7 in which the crane 8 is installed is used, and the suspension is connected to the upper end of the installation caisson 2 as shown in FIG. Hook the wire rope 8a on the hook of the crane 8 so that the installation caisson 2 is suspended, and place the installation caisson 2 in a predetermined sea area where the installation caisson 2 is to be installed. Work may be performed.
[0005]
Such caisson installation work is performed at sea even if the weather conditions are good, so the floating installation caisson 2 always swings in all directions. Since the installation caissons 2 may collide with the bottom caissons 1 and break each other when they are close to the bottom caissons 1, the side walls 1b of the bottom caissons 1 facing the installation caissons 2 are shown in FIGS. Thus, it was extremely important to dispose the shock absorbing material 5 to loosen the impact and prevent the caissons 1 and 2 from being damaged.
[0006]
Conventionally, as the cushioning material 5 for preventing breakage due to the collision of caisson, square wood (wood), rubber fenders, rubber tires, etc. are used, and the operator uses a hanging means such as a rope to reach the bottom caisson. The cushioning material 5 was suspended from the upper end of the bottomed caisson 1 by gripping it at a predetermined position on the bottom 1.
That is, since the installation caisson 2 is installed at a predetermined interval with respect to the bottoming caisson 1, the cushioning material 5 having a width substantially equal to the predetermined interval is placed at a predetermined position by a hanging means such as a rope. In the state suspended from the upper end of 1, the installation position was precisely positioned, confirmed and corrected, the installation caisson 2 was settled on the foundation rubble 6, and then the cushioning material 5 was pulled up and removed by the operator.
[0007]
However, as described above, the installation caisson 2 is always oscillating in all directions, and the position adjustment of the installation caisson 2 is performed by winding and unwinding the winch. is there. Therefore, if the installation caisson 2 is pulled too close to the bottom caisson 1 by the winch, the buffer material 5 is strongly held between the installation caisson 2 and the bottom caisson 1, and the buffer material 5 cannot be pulled up. It was. In such a case, when the installed caisson 2 installed with high accuracy is drained from the internal water or is suspended by the crane 8, the cushioning material 5 is removed by the caisson moving means after floating slightly by crane operation. It is moved to the side opposite to the bottomed caisson 1 to the extent that it can be removed, and after the buffer material 5 is removed, the water is poured again or the crane operation is performed to make the bottoming. There is a drawback in that the position may be shifted when it is moved, and it takes time to install the installation caisson 2 at a predetermined position again with high accuracy.
[0008]
Further, on the bottom caisson 1, members constituting caisson moving means such as wire ropes, anchor wire ropes, winches, pulleys, pumps and other mechanical devices for pouring or draining seawater into the installation caisson 2 are provided. Since the cushioning material 5 is held by the suspension means on the bottoming caisson 1 as described above, the cushioning material 5 is interposed between the installation caisson 2 and the bottoming caisson 1. When the force of holding the cushioning material 5 is suddenly weakened due to the influence of the swell or the like when the operator is gripping and holding the suspension means firmly, the reaction force balances the operator. There is a drawback that it is very dangerous to fall and fall into the sea between the installed caisson 2 and the bottomed caisson 1 stumbling on a troublesome mechanical device.
[0009]
[Problems to be solved by the invention]
The present invention eliminates the drawbacks of the prior art described above, and performs the work of bottoming a caisson that is next installed at a predetermined interval adjacent to an existing caisson that is grounded on a foundation rubble on the seabed. It is an object of the present invention to provide a caisson installation method at sea that can be performed safely and in a short time.
[0010]
[Means for Solving the Problems]
As a result of intensive studies to solve such problems, the present inventors have installed a caisson on the sea in the vicinity of the bottoming caisson that has been bottomed on a foundation rubble spread on the bottom of the sea. A bottoming caisson and an installation caisson are used to move the installation caisson when moving to a position spaced apart from the bottoming caisson after being positioned away from the foundation rubbing stone and landing on the foundation rubbing stone. The caisson moving means installed at the bottom is operable, and the internal pressure is adjusted by the pressure adjusting means and the pressure adjusting means so that the caisson is wider than a predetermined interval at which the installation caisson is installed from the bottom caisson. Two or more of the air bags of the shock absorber provided with the air bag formed with the contact portion are suspended from the upper surface of the bottomed caisson to the side wall facing the installation caisson at an interval. From the state in which the inside is made high pressure, the installation caisson is allowed to settle until the bottom part is located in the vicinity of the foundation rubble, and the caisson moving means draws the installation caisson to the bottom caisson side to contact the air bag of the shock absorber. After adjusting the position of the installation caisson by the caisson moving means while adjusting the pressure in the air bag, the installation caisson is allowed to settle until the bottom of the installation caisson is placed on the foundation rubble and settled down. Later, if the pressure inside the air bag is reduced by the pressure adjusting means and then the air bag is contracted and then pulled up, the installation caisson to be installed next is installed at a position spaced a predetermined distance from the bottom caisson. The present invention was completed by investigating that it can be performed safely and quickly.
[0011]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, a method for installing a caisson on the sea according to the present invention will be described in detail with reference to the drawings.
FIG. 1 is a front explanatory view showing a shock absorber preferably used in the method of the present invention, FIG. 2 is a perspective view showing an example of a concrete caisson used in the method of the present invention, and FIG. (A) is a side view, (b) is a plan view, and FIG. 4 shows a process in which the method of the present invention is being carried out. The caisson and the bottom caisson are in a state where the caisson moving means can be operated and the air bag of the shock absorber is suspended from the top of the bottom caisson. FIG. 5 and FIG. 5 show the process of carrying out the method of the present invention. The caisson moving means moves the installation caisson to the bottom caisson side and shows the position (a) is an explanatory side view. (B) is an explanatory plan view.
[0012]
In the drawings, 1 is a bottoming caisson in which a bottom portion 1a is previously grounded on a foundation rubble 6 spread on the seabed, and 2 is a bottoming caisson adjacent to the bottoming caisson 1 at a predetermined interval. Like the caisson 1, the caisson is a stationary caisson that is placed on the foundation rubble 6 with the bottom 2a placed on the bottom. These bottoming caisson 1 and installation caisson 2 are made of concrete or steel plate, and as shown in FIG. 2, at least opposing side walls 1b and 2b are formed flat and are surrounded by side walls 1b and 2b. Bulkheads 1c and 2c are formed over the entire height, and the bottoms 1a and 2a are closed.
[0013]
3 indicates that the base 2a is moved away from the foundation rubble 6 and the installation caisson 2 is moved to the bottom caisson 1 side so that the side surface of the bottom caisson 1 and the side surface thereof are aligned. The caisson moving means for correcting the position in the direction of 10 and the caisson moving means described as the prior art can be used, and the description thereof is omitted.
[0014]
Reference numeral 4 denotes a shock absorber provided with a pressure adjusting means 4a and an air bag 4b formed of a soft material that is supplied and discharged by the pressure adjusting means 4a to increase / decrease the volume and expand / contract. . The air bag 4b has a caisson abutting portion 4bc wider than a predetermined interval at which the installation caisson 2 is installed from the bottomed caisson 1 in a state where air is supplied and the inside thereof is expanded to a high pressure. Further, a rope 4bd is attached to the air bag 4b in order to hang the air bag 4b from the bottomed caisson 1 and lift the air bag 4b after the bottomed caisson 1 is bottomed.
[0015]
As a material for forming the air bag 4b, the air bag 4b is pressed between the bottom caisson 1 and the installation caisson 2 as will be described later, and even if the caisson is small, it is about 1,000 tons. Therefore, it can be used if it has a strength that can be withstood when pressed by the bottoming caisson 1 and the installation caisson 2 and the volume can be increased or decreased. Further, the air bag 4b is used by being suspended near the sea surface and lifted up by the operator after the installation caisson 2 is settled at a predetermined position, so that the weight of the air bag 4b increases when the material absorbs water. Since the burden on the worker is sometimes increased, it is preferable that water is not absorbed. In consideration of these, it is preferable that the air bag 4b is formed of various rubbers and the like. As shown in FIG. 1, the air bag 4b is a rubber reinforcement in which a reinforcing material such as a nylon cord is embedded in a rubber body 4ba. An example is one in which the band 4bb is provided around the vertical direction and the horizontal direction at intervals.
[0016]
Further, the caisson contact portion 4bc of the air bag 4b is fixed with a member for reducing the frictional resistance generated when the surface and the caisson come into contact with each other, for example, a plate made of fluororesin. It is preferable that a coating mixed with molybdenum powder is applied because the air bag 4b can be prevented from being damaged.
[0017]
The pressure adjusting means 4a includes a compressor 4aa, an air supply flexible tube 4ab having one end connected to the compressor 4aa and the other end connected to the air bag 4b, and a pressure gauge 4ac for detecting the pressure in the air bag 4b. In addition, a configuration including a valve 4ad for exhausting air in the air bag 4b can be given.
[0018]
In order to carry out the method of the present invention and place the installation caisson 2 in a predetermined position on the foundation rubble 6 adjacent to the bottom caisson 2, the installation caisson 2 is first placed in a predetermined position. In other words, the installation caisson 2 is positioned in the vicinity of the bottom caisson 1 where the installation caisson 2 has been already installed and next to the installation caisson 2 with the bottom 2a away from the foundation rubble 6, and the caisson is placed. The installed caisson 2 to be installed from the temporary caisson storage site is towed to the predetermined position by a tug in a suspended state, or the hoisting ship 7 in which the crane 8 is installed is used to suspend the wire. The hoist ship 7 is sailed while being suspended via the rope 8a and carried to the predetermined position.
[0019]
Then, the pressure adjusting means 4a is installed on the bottoming caisson 1, and the air bag 4b is set to a high pressure inside the air bag 4b by the pressure adjusting means 4a so that the caisson contact part 4bc is formed from above the bottoming caisson 1. Two or more shock absorbers 4 are installed on the bottom caisson 1 with two or more suspended from the side wall 1b opposed to the two. The air bag 4b may be suspended by fixing a hanging metal fitting to the bottom caisson 1 and fixing the rope 4bd attached to the air bag 4b to the hanging metal fitting.
In addition, caisson moving means 3 for moving the installation caisson 2 positioned near the bottom caisson 1 and having the bottom 2a separated from the rubble 6 is installed.
[0020]
Subsequently, in order to move the installation caisson 2, the caisson moving means 3 installed in the bottom caisson 1 and the installation caisson 2 is made operable, and the caisson moving means 3 is used to move the installation caisson 2 to the bottom caisson 1 side. At this time, when towing the installation caisson 2 as described above, since the installation caisson 2 is in a relatively shallow floating state in order to reduce the resistance of water acting on the installation caisson 2, the installation caisson 2 When the primary water is poured into the space surrounded by the side wall 2b and is suspended by the crane 8, the crane 8 is operated and the bottom portion 2a is located near the foundation rubble 6 but has not yet settled. Settling to the state of being. The operation of sinking or floating the installation caisson 2 in this way is performed by pouring / draining water into the installation caisson or operating the crane 8 and may be simply referred to as sedimentation or floating below. .
[0021]
Then, the installation caisson 2 and the bottom caisson 1 are held at an interval wider than the predetermined interval in a state where the installation caisson 2 is drawn toward the bottom caisson 1 and brought into contact with the air bag 4b of the shock absorber 4. From this state, the position of the installation caisson 2 in the direction of the normal 10 is corrected by the caisson moving means 3, and the pressure in the air bag 4b is adjusted so that the distance from the bottom caisson 1 of the installation caisson 2 is a predetermined interval. The installation caisson 2 is moved and corrected by the caisson moving means 3 while being adjusted by the pressure adjusting means 4a. At this time, the installation caisson 2 is attracted by the caisson moving means 3 to the bottom caisson 1 side with a certain force.
[0022]
After that, when the bottom 2a of the installation caisson 2 is placed on the foundation rubble 6 and settled until it is settled, the installation of the installation caisson 2 is completed, and the pressure in the air bag 4b is lowered by the pressure adjusting means 4a. If the air bag 4b is contracted and then lifted, the entire operation is completed.
[0023]
【The invention's effect】
When such a method of the present invention is carried out and the installation caisson 2 is installed at a position spaced by a predetermined interval adjacent to the bottoming caisson 1 already bottomed on the foundation rubble 6, When the installation caisson 2 positioned in the vicinity of the bottom caisson 1 and floating is moved to the bottom caisson 1 side, the installation caisson 2 is swung in all directions under the influence of waves, and the bottom caisson 1 The air bag 4b of the shock absorber 4 is suspended from the side wall 1b facing the installation caisson 2 of the bottomed caisson 1, so that the installation caisson 2 collides with the bottomed caisson 1. Can be installed without damaging the very expensive caisson.
[0024]
In addition, the air bag 4b of the shock absorber 4 has a caisson contact portion 4bc wider than a predetermined interval at which the installation caisson 2 is installed from the bottom caisson 1 when air is supplied and inflated. 2 and the bottom caisson 1 can be adjusted and held to some extent until the installation caisson 2 is bottomed by adjusting the pressure in the air bag 4 b of the shock absorber 4. By opening the valve 4ad of the pressure adjusting means 4a and discharging the air in the air bag 4b to lower the pressure, the volume in the air bag 4b is reduced and the distance between the installation caisson 2 and the bottomed caisson 1 is reduced. Can be modified as follows. That is, since two or more air bags 4b of the shock absorber 4 are hung at intervals, when the installation caisson 2 is in contact with the air bag 4b at an angle shifted from the normal line 10, The distance between the installation caisson 2 and the bottom caisson 1 is adjusted by reducing the pressure in the air bag 4b on the side (the side where the distance between the bottom caisson 1 and the installation caisson 2 is wide) as described above, and the angle Can be corrected.
[0025]
Further, since the air bag 4b of the shock absorber 4 is formed of a soft material, the bottom caisson 1 is grounded on the basic rubble 6 by discharging the air in the air bag 4b and reducing the pressure. After that, the air bag 4b can be easily pulled up from the gap between the bottoming caisson 1 and the installation caisson 2. Therefore, the air bag 4b of the shock absorber 4 can be used repeatedly, which is economical. If the caisson contact portion 4bc of the air bag 4b of the shock absorber 4 is provided with a member that reduces the frictional resistance, the air bag 4b can be prevented from being damaged and the life of the air bag 4b can be extended. Can be more economical.
[0026]
The air bag 4b of the shock absorber 4 need only be hung from the hanging metal fitting on the bottom caisson 1 with a rope, and need not be supported by the operator, and pressure adjusting means for adjusting the pressure in the air bag 4b Since the operation of 4a can be performed from this position by installing pressure adjusting means 4a at a position away from the side wall, an operator may fall on the sea between the bottom caisson 1 and the installation caisson 2. There is no safety.
[0027]
Thus, the caisson installation method on the sea according to the present invention that exhibits various effects as described above has a very large industrial value.
[Brief description of the drawings]
FIG. 1 is a front view showing a shock absorber preferably used in the method of the present invention.
FIG. 2 is a perspective view showing an example of a concrete caisson used in the method of the present invention.
FIG. 3 shows a state in which a caisson is installed on a basic rubble, (A) is a side explanatory view, and (B) is a plane explanatory view.
FIG. 4 shows a process in which the method of the present invention is carried out, and the caisson moving means is made operable in the installed caisson and the bottomed caisson floating in the vicinity of the bottomed caisson and the air bag of the shock absorber is installed. FIG. 2A is a side explanatory view and FIG. 2B is a plane explanatory view showing a state of being hung from the upper part of the bottom caisson.
FIG. 5 shows a process in which the method of the present invention is carried out, and shows a state in which the installation caisson is moved to the bottom caisson side by the caisson moving means and positioning is performed (a) is an explanatory side view; (B) is an explanatory plan view.
FIG. 6 is a flow sheet for explaining a series of operations for installing the installation caisson to be installed next to the bottoming caisson at a predetermined interval.
FIG. 7 is an explanatory side view showing a state in which installation work is performed using a conventional cushioning material while preventing direct contact between the installation caisson and the bottom caisson.
FIG. 8 is an explanatory plan view showing caisson moving means.
FIG. 9 is an explanatory front view showing a state in which an installation caisson is suspended by a crane installed in a hoist ship.
[Explanation of symbols]
1 Bottoming caisson
1a Bottom
1b Side wall
1c Bulkhead 2 Installation caisson
2a Bottom
2b Side wall
2c Bulkhead 3 Caisson moving means
3a winch
3b pulley
3c Lead wire rope
3d anchor wire rope 4 shock absorber
4a Pressure adjusting means
4aa compressor
4ab air supply flexible tube
4ac pressure gauge
4ad valve
4b air bag
4ba body
4bb reinforcement band
4bc Caisson contact part
4bd rope 5 cushioning material 6 foundation rubble 7 hoist ship 8 crane
8a Hanging wire rope 9
10 Normal

Claims (3)

海底に敷き詰められた基礎捨石(6)上に底部(1a)を予め着底されている着底ケーソン(1)の近傍の海上に据付ケーソン(2)を底部(2a)が該基礎捨石(6)から離れた状態に位置させた後、前記着底ケーソン(1)から所定の間隔を隔てた位置に移動させて該基礎捨石(6)上に着底させるに際し、据付ケーソン(2)を移動させるため着底ケーソン(1)と据付ケーソン(2)とに設置されているケーソン移動手段(3)を稼動可能な状態にすると共に、圧力調整手段(4a)と該圧力調整手段(4a)により内部圧力を調整されて着底ケーソン(1)から据付ケーソン(2)が据え付けられる所定の間隔より広幅なケーソン当接部分(4bc)を形成される空気袋(4b)とを備えた緩衝装置(4)の該空気袋(4b)を、着底ケーソン(1)の上面より据付ケーソン(2)と対向する側壁(1b)に間隔を隔てて2個以上吊り下げてその内部を高圧にして、据付ケーソン(2)をその底部(2a)が基礎捨石(6)の近傍に位置するまで沈降させると共にケーソン移動手段(3)によって据付ケーソン(2)を着底ケーソン(1)側に引き寄せて緩衝装置(4)の空気袋(4b)に当接させた状態から、空気袋内(4b)の圧力を調整しながら据付ケーソン(2)の位置をケーソン移動手段(3)によって移動修正して後、据付ケーソン(2)の底部(2a)が基礎捨石(6)上に載置されて着底されるまで据付ケーソン(2)を沈降させ、しかる後に空気袋(4b)内圧力を圧力調整手段(4a)によって低下させてから空気袋(4b)を収縮させてから引き上げることを特徴とする海上におけるケーソンの据付方法。On the foundation rubble (6) spread on the sea floor, the bottom (1a) is placed in advance near the bottom caisson (1). ) Is moved away from the bottom caisson (1) and moved to a position spaced a predetermined distance from the bottom caisson (1) to move the installation caisson (2) on the foundation rubble (6). To make the caisson moving means (3) installed in the bottom caisson (1) and the installation caisson (2) operable, the pressure adjusting means (4a) and the pressure adjusting means (4a) A shock absorber provided with an air bag (4b) having a caisson contact portion (4bc) wider than a predetermined interval at which the internal pressure is adjusted and the installation caisson (2) is installed from the bottom caisson (1). 4) The air bag (4b) of 2) is spaced from the upper surface of the bottomed caisson (1) to the side wall (1b) facing the installation caisson (2). The installation caisson (2) is submerged until the bottom (2a) is located in the vicinity of the foundation rubble (6) and the installation caisson (2) is moved by the caisson moving means (3). The position of the installation caisson (2) is adjusted while adjusting the pressure in the air bag (4b) from the state where it is drawn to the bottom caisson (1) and brought into contact with the air bag (4b) of the shock absorber (4). After the movement is corrected by the moving means (3), the installation caisson (2) is allowed to settle until the bottom (2a) of the installation caisson (2) is placed on the foundation rubble (6) and then settled. A caisson installation method at sea, wherein the pressure inside the air bag (4b) is lowered by the pressure adjusting means (4a) and then the air bag (4b) is contracted and then pulled up. 空気袋(4b)として、ゴム製の本体(4ba)の周面に補強帯(4bb)が周設されているものを使用する請求項1に記載の海上におけるケーソンの据付方法。The method for installing a caisson on the sea according to claim 1, wherein the air bag (4b) is a rubber body (4ba) having a reinforcing band (4bb) around the peripheral surface thereof. 空気袋(4b)として、ケーソン当接部分(4bc)にケーソンとの間に生じる摩擦抵抗を小さくする部材が設けられているものを使用する請求項1又は2に記載の海上におけるケーソンの据付方法。The method for installing caisson at sea according to claim 1 or 2, wherein the air bag (4b) is provided with a member for reducing frictional resistance generated between the caisson abutting portion (4bc) and the caisson. .
JP02294096A 1996-01-17 1996-01-17 Caisson installation method at sea Expired - Lifetime JP3754985B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP02294096A JP3754985B2 (en) 1996-01-17 1996-01-17 Caisson installation method at sea

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP02294096A JP3754985B2 (en) 1996-01-17 1996-01-17 Caisson installation method at sea

Publications (2)

Publication Number Publication Date
JPH09195281A JPH09195281A (en) 1997-07-29
JP3754985B2 true JP3754985B2 (en) 2006-03-15

Family

ID=12096633

Family Applications (1)

Application Number Title Priority Date Filing Date
JP02294096A Expired - Lifetime JP3754985B2 (en) 1996-01-17 1996-01-17 Caisson installation method at sea

Country Status (1)

Country Link
JP (1) JP3754985B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103243729A (en) * 2013-05-10 2013-08-14 王炳贞 Lifting method of large-scale caisson

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4740887B2 (en) * 2007-02-06 2011-08-03 東亜建設工業株式会社 Reinforcing existing breakwater
CN102108710B (en) * 2010-12-30 2012-07-04 中铁大桥局集团第二工程有限公司 Method for stopping horizontal oscillation in large-scale steel open caisson construction
JP5689738B2 (en) * 2011-05-06 2015-03-25 五洋建設株式会社 Underwater structure contact protective material and underwater structure installation method
CN108824469B (en) * 2018-07-05 2020-09-18 浙江科技学院 A device for reinforcing caisson bottom sealing and its application method
CN114277827B (en) * 2021-12-31 2022-10-25 中铁广州工程局集团有限公司 double-GPS positioning round caisson transportation, installation and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103243729A (en) * 2013-05-10 2013-08-14 王炳贞 Lifting method of large-scale caisson

Also Published As

Publication number Publication date
JPH09195281A (en) 1997-07-29

Similar Documents

Publication Publication Date Title
CN107140156B (en) Method for integrally salvaging sunken ship by bottom-supporting steel girder
CN110185057B (en) Tool and construction method for lifting and erecting steel pipe piles of offshore wind power single pile foundation
JP2022076730A (en) Construction method of pile
JP3754985B2 (en) Caisson installation method at sea
JP6735050B1 (en) Stand lifting device for ships
CN107176273B (en) Using method of rubber buoy for sunken ship salvage
US5577874A (en) Method and apparatus for the transfer of loads from a floating vessel to another or to a fixed installation
JP2019534401A (en) Port plant and method for mooring a floating body in a port plant
KR20170055631A (en) Method for salvaging a sunken ship
US12460367B2 (en) Method for anchoring a hollow tubular element in a water bottom, and assembly of the tubular element and a closing body
US3500785A (en) System for salvaging submerged objects
KR101793231B1 (en) Transferable embodiment on water reduced resistance to wave force
GB2222190A (en) Installing large, heavy structures on the sea bottom
JP2023132438A (en) Method for preventing scouring of pile foundations
CN210151774U (en) Tool for hoisting vertical pile of steel pipe pile of offshore wind power single-pile foundation
JPH09195282A (en) How to join floating structures at sea
JP5542012B2 (en) 浚 渫 Pollution diffusion prevention device
CN223304955U (en) Dock protection device for ultra-close underwater operation
JP2541897B2 (en) Installation method of shallow water bowling turret and its turret device
JP4094392B2 (en) Floating pier and evacuation device and evacuation method of floating pier
JP6244163B2 (en) Underwater work support apparatus and method
JP4258792B2 (en) Catamaran cruise support device
JPH1025738A (en) Burying method of sinker
US20240125070A1 (en) Transport cap of a sea foundation pile, installation cradle of the transport cap of a sea foundation pile, method of installing a transport cap inside a foundation pile, towing set of sea foundation piles, method of sea towage foundation piles and preparation of a foundation pile for installation in the seabed
JPS5911021B2 (en) Cell transport method and device

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20051021

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20051101

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20051102

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090106

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120106

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120106

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150106

Year of fee payment: 9

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term